{"id":"qipu:sf/place/block/0069","kind":"block","name":"Assessor block 0069","block":"0069","neighbourhood":"Russian Hill","tied_by":"block","named":[],"release":"v0.7.1","rows_columns":["t","id","year","y","date","kind","topic","outcome","summary","tier","source","leaf","scan","addr","quote","note","title","how","g","rec","sc"],"rows":[["d","qipu:sf/decision/journalofproceed1909sanfrich|415",1909,1909,"1909-03-08","ordinance","the-street","passed first reading","Grading and paving proposed on K Street and A Street","quoted","journalofproceed1909sanfrich",267,"https://archive.org/details/journalofproceed1909sanfrich/page/n267",null,"Ordinance No. (New Series), entitled, \"Ordering the performance of certain street work to be done in the City and County of San Francisco, approving and adopting specifications therefor, and authorizing the Board of Public. Works to enter into contract for doing the same,\" the provisions of which or",null,null,"b,p","m",0,1.96],["d","qipu:sf/decision/map:journalofproceed1909sanfrich/267/03eb1e5a",1909,1909,"1909-03-08","ordinance",null,"passed first reading","Grading and paving proposed on K Street and A Street","unverified","journalofproceed1909sanfrich",267,"https://archive.org/details/journalofproceed1909sanfrich/page/n267",null,"Artificial stone sidewalks of the full official width be constructed on Lombard street, between Polk and Larkin streets, where artificial stone sidewalks at least 6 feet in width are not already constructed.",null,null,"p","m",0,-1.0],["d","qipu:sf/decision/journalofproceed1909sanfrich|441",1909,1909,"1909-03-11","ordinance","the-street",null,"Grading and paving ordered on K Street and A Street","unverified","journalofproceed1909sanfrich",280,"https://archive.org/details/journalofproceed1909sanfrich/page/n280",null,"Ordinance No. T02 (New Series), entitled, \"Ordering the performance of certain street work to be done in the City and County of San Francisco, approving and adopting specifications therefor, and authorizing the Board of Public Works to enter into contract for doing the same,\" the provisions of which",null,null,"b,p","m",0,-1.0],["d","qipu:sf/decision/map:journalofproceed1909sanfrich/280/1b6347cf",1909,1909,"1909-03-11","ordinance",null,null,"Grading and paving ordered on K Street and A Street","unverified","journalofproceed1909sanfrich",280,"https://archive.org/details/journalofproceed1909sanfrich/page/n280",null,"Ordering Street Work — Artificial stone sidewalks of the full official width be constructed on Lombard street, between Polk and Larkin streets, where artificial stone sidewalks at least 6 feet in width are not already constructed.",null,null,"p","m",0,-1.0],["d","qipu:sf/decision/map:journalofproceed1909sanfrich/639/ee35d8f2",1909,1909,"1909-06-07","resolution",null,"passed",null,"unverified","journalofproceed1909sanfrich",639,"https://archive.org/details/journalofproceed1909sanfrich/page/n639",null,"Install Street Lights — 1 gas lamp. Baker and Lombard streets.",null,null,"p","m",0,-1.0],["d","qipu:sf/decision/journalofproceed1912sanfrich|480",1912,1912,"1912-04-15","resolution","the-street",null,"New street levels proposed on Polk and Chestnut streets","unverified","journalofproceed1912sanfrich",326,"https://archive.org/details/journalofproceed1912sanfrich/page/n326",null,"Resolution No. 9408 (New Series), Resolved, That it is the intention of the Board of Supervisors to change and establish grades on the following named streets, at the points hereinafter specified and at the elevations above City base, as hereinafter stated, in accordance with the written recommendat",null,null,"b,p","m",0,-1.0],["d","qipu:sf/decision/journalofproceed1912sanfrich|461",1912,1912,"1912-04-22","resolution","the-street",null,"Plan to change street levels on Noe and Castro dropped","unverified","journalofproceed1912sanfrich",299,"https://archive.org/details/journalofproceed1912sanfrich/page/n299",null,"Resolution No. 8052 (New Series), approved June 28, 1911, declaring intention to change grades on Noe, Castro, Day, Thirtieth and Laidley streets is hereby repealed. Ayes — Supervisors Bancroft, Caglieri, Andrew J. Gallagher, Giannini, Hayden. Hilmer, Hocks, Koshland, Mauzy, McCarthy, McLeran, Murdo",null,null,"p","m",0,-1.0],["d","qipu:sf/decision/journalofproceed1912sanfrich|462",1912,1912,"1912-04-22","resolution","the-street","passed","Polk and Chestnut streets proposed for regrading and new sewers","quoted","journalofproceed1912sanfrich",299,"https://archive.org/details/journalofproceed1912sanfrich/page/n299",null,"Resolution No. (New Series), Resolved, That it is the intention of the Board of Supervisors to change and establish grades on the following named streets, at the points hereinafter specified and at the elevations above City base, as hereinafter stated, in accordance with the written recommen-' datio",null,null,"b,p","m",0,-1.0],["d","qipu:sf/decision/journalofproceed1912sanfrich|736",1912,1912,"1912-06-24","ordinance","the-street",null,"Street work ordered on King, Quane, Hyde and Texas streets","unverified","journalofproceed1912sanfrich",611,"https://archive.org/details/journalofproceed1912sanfrich/page/n611",null,"Ordinance No. (New Series), Ordering the performance of certain street work to be done on King street, between Second and Third streets; Quane street, between Twenty-third and Twenty-fourth streets; crossing of Quane and Twentyfirst streets; Ninth avenue, between Geary and Clement streets; Hyde stre",null,null,"b,p","m",0,-1.0],["d","qipu:sf/decision/map:journalofproceed1912sanfrich/611/56117238",1912,1912,"1912-06-24","ordinance",null,null,"Street work ordered on King, Quane, Hyde and Texas streets","unverified","journalofproceed1912sanfrich",611,"https://archive.org/details/journalofproceed1912sanfrich/page/n611",null,"Ordering Street Work — Hyde street, between Greenwich and Filbert streets; east side of Hyde street, between Greenwich and Lombard streets; Filbert street, between Hyde and Larkin streets, and Texas street, between Mariposa and Eighteenth streets.",null,null,"p","m",0,-1.0],["d","qipu:sf/decision/journalofproceed1915sanfrich|1157",1915,1915,"1915-06-28","resolution","the-street","passed","New street levels adopted on Larkin and Francisco streets near Polk","unverified","journalofproceed1915sanfrich",955,"https://archive.org/details/journalofproceed1915sanfrich/page/n942",null,"Resolution 39221 of the Board of Public Works adopted June 23, 1915, and written recomendation of said Board filed June 24, 1915, to-wit: Larkin street between Chestnut street and a line at right angles to the westerly line of, 118 feet northerly from Francisco street, and on Francisco street betwee",null,null,"b,p","m",0,1.94],["d","qipu:sf/decision/sq:eae19d5321",1915,1915,"1915-06-28",null,null,"passed","New street levels set on Larkin Street from Chestnut Street and Francisco Street","unverified","journalofproceed1915sanfrich",955,"https://archive.org/details/journalofproceed1915sanfrich/page/n942",null,null,null,null,"p","m",0,0.0],["d","qipu:sf/decision/journalofproceed1915sanfrich|1678",1915,1915,"1915-09-27","ordinance","the-street",null,"Street levels to change on Washington Street between Mason and Jones","unverified","journalofproceed1915sanfrich",1301,"https://archive.org/details/journalofproceed1915sanfrich/page/n1286",null,"Ordinance No. 3451 (New Series), entitled, \"Changing and re-establishing the official grades on Washington street, between Mason and Jones streets, and on Taylor street, between Clay street and a line parallel with Hi' northerly lino of Washington sireit and 137 feet 6 inches northerly therefrom.\" A",null,null,"p","m",0,-1.0],["d","qipu:sf/decision/journalofproceed1915sanfrich|1683",1915,1915,"1915-09-27","ordinance","the-street","passed","Street levels to change on Larkin and Francisco streets","quoted","journalofproceed1915sanfrich",1301,"https://archive.org/details/journalofproceed1915sanfrich/page/n1286",null,"Ordinance No. :;457 (New Series), entitled. \"Changing and re-establishing the official grades on Larkin street. between Chestnut street and a line at right angles to the westerly line of, 118 feet northerly from Francisco street, and on Francisco street, between Larkin and Polk streets.\" Ayes — Supe",null,null,"b,p","m",0,1.98],["d","qipu:sf/decision/sq:18d63a7287",1915,1915,"1915-09-27",null,null,"passed","Official grades changed on Larkin Street from Chestnut Street northward","unverified","journalofproceed1915sanfrich",1301,"https://archive.org/details/journalofproceed1915sanfrich/page/n1286",null,null,null,null,"p","m",0,0.0],["d","qipu:sf/decision/journalofproceed1915sanfrich|2202",1915,1915,"1915-12-20","resolution","doing-business","passed","J. P. Holland allowed to blast on Francisco and Larkin streets","quoted","journalofproceed1915sanfrich",1796,"https://archive.org/details/journalofproceed1915sanfrich/page/n1775",null,"Resolution No. (New Series), as follows: Resolved, That J. P. Holland is hereby granted permission revocable at will of the Board of Supervisors for a period not exceeding ninety days from date of this resolution to explode blasts on Francisco street between Larkin and Polk streets and on Larkin str",null,null,"b,p","m",0,2.32],["d","qipu:sf/decision/map:journalofproceed1915sanfrich/1775/ec56778b",1915,1915,"1915-12-20","resolution",null,"passed","J. P. Holland allowed to blast on Francisco and Larkin streets","unverified","journalofproceed1915sanfrich",1796,"https://archive.org/details/journalofproceed1915sanfrich/page/n1775",null,"Blasting Permits — Holland is hereby granted permission revocable at will of the Board of Supervisors for a period not exceeding ninety days from date of this resolution to explode blasts on Francisco street between Larkin and Polk streets and on Larkin…",null,null,"p","m",0,-1.0],["d","qipu:sf/decision/journalofproceed1915sanfrich|2252",1915,1915,"1915-12-28","resolution","doing-business","passed","J. P. Holland allowed to blast on Francisco and Larkin streets","quoted","journalofproceed1915sanfrich",1832,"https://archive.org/details/journalofproceed1915sanfrich/page/n1809",null,"Resolution No. 12419 (New Series), as follows: Resolved, That J. P. Holland is hereby granted permission revocable at will of the Board of Supervisors for a period not exceeding ninety days from date of this resolution to explode blasts on Francisco street between Larkin and Polk streets and on Lark",null,null,"b,p","m",0,2.32],["d","qipu:sf/decision/sq:fd8c4adf7d",1915,1915,"1915-12-28",null,null,"passed","J. P. Holland allowed to blast on Francisco and Larkin streets for ninety days","unverified","journalofproceed1915sanfrich",1832,"https://archive.org/details/journalofproceed1915sanfrich/page/n1809",null,null,null,null,"p","m",0,0.0],["d","qipu:sf/decision/journalofproceed1917sanfrich|248",1917,1917,"1917-02-05","ordinance","the-street",null,"City to take over new roadways on Francisco and Larkin streets","quoted","journalofproceed1917sanfrich",208,"https://archive.org/details/journalofproceed1917sanfrich/page/n208",null,"Ordinance No. (New Series), providing for conditional acceptance of the roadway of Francisco street between Polk street and Larkin street, and Larkin street between Chestnut street and PYancisco street, and the intersection of Larkin street and Francisco street. Also, Bill No. 4408,",null,null,"b,p","m",0,-1.0],["d","qipu:sf/decision/map:journalofproceed1917sanfrich/208/f6c1f385",1917,1917,"1917-02-05","ordinance",null,null,"City to take over new roadways on Francisco and Larkin streets","unverified","journalofproceed1917sanfrich",208,"https://archive.org/details/journalofproceed1917sanfrich/page/n208",null,"Conditional Acceptance, Certain Streets — Providing for conditional acceptance of the roadway of Francisco street between Polk street and Larkin street, and Larkin street between Chestnut street and PYancisco street…",null,null,"p","m",0,-1.0],["d","qipu:sf/decision/journalofproceed1917sanfrich|281",1917,1917,"1917-02-13","ordinance","the-street","passed","City takes over the new roadways on Francisco and Larkin streets","quoted","journalofproceed1917sanfrich",231,"https://archive.org/details/journalofproceed1917sanfrich/page/n231",null,"Ordinance No. 4063 (New Series), providing for conditional acceptance of the roadway of Francisco street between Polk street and Larkin street, and Larkin street between Chestnut street and Francisco street, and the intersection of Larkin street and Francisco street. Ayes — Supervisors Deasy, Hayden",null,null,"b,p","m",0,2.14],["d","qipu:sf/decision/sq:5adcb412e2",1917,1917,"1917-02-13",null,null,"passed","City takes conditional acceptance of new roadways on Larkin and Francisco streets","unverified","journalofproceed1917sanfrich",231,"https://archive.org/details/journalofproceed1917sanfrich/page/n231",null,null,null,null,"p","m",0,0.0],["d","qipu:sf/decision/journalofproceed1917sanfrich|455",1917,1917,"1917-03-05","resolution","doing-business",null,"Blasting permit on Francisco Street revoked, the work being finished","unverified","journalofproceed1917sanfrich",343,"https://archive.org/details/journalofproceed1917sanfrich/page/n343",null,"Resolution No. 12419 (New Series), to explode blasts on Francisco street, between Larkin and Polk streets, and on Larkin street, between Francisco and Chestnut streets, be and the same is hereby revoked, the work for which said permit was issued having been completed. Adopted by the following vote: ",null,null,"b,p","m",0,2.32],["d","qipu:sf/decision/sp:9262ccb07c",1923,1923,"1923-02-26",null,null,"passed","T. E. Williams allowed an oil storage tank (1500 gallons) on the west side of Hyde Street, 64 feet south of Chestnut Street","unverified","journalofproceed1923sanfrich",197,"https://archive.org/details/journalofproceed1923sanfrich/page/n197",null,null,null,null,"p","m",0,-3.0],["d","qipu:sf/decision/sp:e30391a220",1923,1923,"1923-07-30",null,null,"passed","W. Tuggle allowed an oil storage tank (1500 gallons capacity) on the east side of Larkin Street, 150 feet north of Lombard Street","unverified","journalofproceed1923sanfrich",903,"https://archive.org/details/journalofproceed1923sanfrich/page/n903",null,null,null,null,"p","m",0,-3.0],["d","qipu:sf/decision/journalofproceed1924sanfrich|1158",1924,1924,"1924-07-21","resolution","doing-business",null,"John J. Kingwell allowed an oil tank at Ellis and Hyde","unverified","journalofproceed1924sanfrich",973,"https://archive.org/details/journalofproceed1924sanfrich/page/n972",null,"Resolution No. 22687 (New Series), as follows: Resolved, That the following revocable permits are hereby granted: Oil Tanks. John J. Kingwell. northwest corner of Ellis and Hyde streets, 1500 gallons capacity. W. S. Hoffman, southwest corner of Gough and Lombard streets, 1500 gallons capacity.",null,null,"p","m",0,-4.0],["d","qipu:sf/decision/journalofproceed21sanfrich|129",1926,1926,"1926-01-18","resolution","the-street","passed","Fay Improvement Company given 90 more days on Chestnut Street","quoted","journalofproceed21sanfrich",100,"https://archive.org/details/journalofproceed21sanfrich/page/n100",null,"Resolution No. 25081 (New Series), as follows: Resolved, That the Fay Improvement Company is hereby granted an extension of ninety days' time from and after January 18, 1926, within which to complete improvement of Chestnut street between Polk and Larkin streets. This extension of time is granted fo",null,null,"b,p","m",0,1.61],["d","qipu:sf/decision/map:journalofproceed21sanfrich/100/548419ef",1926,1926,"1926-01-18","resolution",null,"passed","Fay Improvement Company given 90 more days on Chestnut Street","unverified","journalofproceed21sanfrich",100,"https://archive.org/details/journalofproceed21sanfrich/page/n100",null,"Extensions of Time — The Fay Improvement Company is hereby granted an extension of ninety days' time from and after January 18, 1926, within which to complete improvement of Chestnut street between Polk and Larkin streets.",null,null,"p","m",0,-1.0],["d","qipu:sf/decision/journalofproceed21sanfrich|563",1926,1926,"1926-03-08","resolution","the-street",null,"Gas lamps on Vallejo Street replaced with electric street lights","unverified","journalofproceed21sanfrich",375,"https://archive.org/details/journalofproceed21sanfrich/page/n375",null,"Resolution No. 25309 (New Series), as follows: Resolved, That the Pacific Gas and Electric Company be and it is hereby instructed to install and remove street lights as follows: Remove Gas Lamps. North and south sides Vallejo street between Gough and Octavia streets. Northeast and southwest corners ",null,null,"b,p","m",0,-4.0],["d","qipu:sf/decision/map:journalofproceed21sanfrich/375/01293fa6",1926,1926,"1926-03-08","resolution",null,"passed","Gas lamps on Vallejo Street replaced with electric street lights","unverified","journalofproceed21sanfrich",375,"https://archive.org/details/journalofproceed21sanfrich/page/n375",null,"Street Lights — South side Greenwich street, first, second and third east of Larkin street.",null,null,"p","m",0,-4.0],["d","qipu:sf/decision/journalofproceed21sanfrich|1506",1926,1926,"1926-06-21","resolution","the-street","passed","Fay Improvement Company given sixty more days on Chestnut Street","unverified","journalofproceed21sanfrich",1131,"https://archive.org/details/journalofproceed21sanfrich/page/n1131",null,"Resolution No. 25825 (New Series), as follows: Resolved, That the Fay Improvement Company is hereby granted an extension of sixty days' time from and after June 17, 1926, within which to complete the improvement of Chestnut street between Polk and Larkin streets. The work is completed with the excep",null,null,"b,p","m",0,1.56],["d","qipu:sf/decision/map:journalofproceed21sanfrich/1131/bca30ea4",1926,1926,"1926-06-21","resolution",null,"passed","Fay Improvement Company given sixty more days on Chestnut Street","unverified","journalofproceed21sanfrich",1131,"https://archive.org/details/journalofproceed21sanfrich/page/n1131",null,"Extensions of Time — The Fay Improvement Company is hereby granted an extension of sixty days' time from and after June 17, 1926, within which to complete the improvement of Chestnut street between Polk and Larkin streets.",null,null,"p","m",0,-1.0],["d","qipu:sf/decision/journalofproceed23sanfrich|643",1928,1928,"1928-03-05","resolution","public-money","passed","$4,500 (≈ $88,668 in 2026 dollars) to widen Parker Avenue south of California Street","unverified","journalofproceed23sanfrich",405,"https://archive.org/details/journalofproceed23sanfrich/page/n405",null,"Resolution No. (New Series), as follows: Resolved, That the following amounts be and the same are herebv set aside, appropriated and authorized to be expended out of County Road Fund for the following purposes, to-wit: (1) For the cost of widening Parker avenue southerly from California street $4,50",null,null,"p","m",0,-1.0],["d","qipu:sf/decision/journalofproceed23sanfrich|695",1928,1928,"1928-03-12","resolution","doing-business",null,"$4,500 (≈ $88,668 in 2026 dollars) to widen Parker Avenue south of California Street","unverified","journalofproceed23sanfrich",439,"https://archive.org/details/journalofproceed23sanfrich/page/n439",null,"Resolution No. 28635 (New Se^ ries), as follows: Resolved, That the following amounts be and the same are hereby set aside, appropriated and authorized to be expended out of County Road Fund for the following purposes, to-wit: (1) For the cost of widening Parker avenue southerly from California stre",null,null,"b,p","m",0,-1.0],["d","qipu:sf/decision/journalofproceed23sanfrich|1277",1928,1928,"1928-05-07","resolution","the-street","passed","Street lights changed at Broadway and Taylor and Clarion Alley","unverified","journalofproceed23sanfrich",827,"https://archive.org/details/journalofproceed23sanfrich/page/n827",null,"Resolution No. 28949 (New Series), as follows: Resolved, That the Pacific Gas and Electric Company be and it is hereby authorized and requested to remove and install street lights* as follows: Reinove Gas Lamps. Northeast and southwest corners Broadway and Taylor street. histaJl 250 M. R. Clarion al",null,null,"b,p","m",0,-0.85],["d","qipu:sf/decision/map:journalofproceed23sanfrich/827/89ed7964",1928,1928,"1928-05-07","resolution",null,"passed","Street lights changed at Broadway and Taylor and Clarion Alley","unverified","journalofproceed23sanfrich",827,"https://archive.org/details/journalofproceed23sanfrich/page/n827",null,"Street Lights — Install 400 M. R. Hyde and Chestnut streets.",null,null,"p","m",0,-4.0],["d","qipu:sf/decision/journalofproceed25part3sanfrich|850",1930,1930,"1930-12-08","resolution","the-street",null,"$498 (≈ $10,048 in 2026 dollars) to repair sidewalks on Stanyan Street beside Golden Gate Park","unverified","journalofproceed25part3sanfrich",853,"https://archive.org/details/journalofproceed25part3sanfrich/page/n852",null,"Resolution No. 33584 (New Series), as follows: Resolved, That the following amounts be and the same are hereby set aside, appropriated and authorized to be expended out of the County Road P'und for the following purposes, to-wit: (1) For repair of sidewalks on west side of Stanyan street between Fel",null,null,"b,p","m",0,-4.0],["d","qipu:sf/decision/journalofproceed27sanfrich|2",1932,1932,"1932-01-04","resolution","city-services",null,"Payment of $16,100 (≈ $395,966 in 2026 dollars) to Larsen & Larsen for Health Center terra cotta work; no vote on record; approved later.","unverified","journalofproceed27sanfrich",11,"https://archive.org/details/journalofproceed27sanfrich/page/n11",null,"Resolution No. (New Series), as follows: Resolved, That the sum of $16,100 be and the same is hereby set aside, appropriated and authorized to be expended out of the 1929 Health Bond Fund for the terra cotta work of the Health Center Building, Polk and Grove streets, per contract awarded to Larsen &",null,null,"b,p","m",0,-1.0],["d","qipu:sf/decision/journalofproceed27sanfrich|3",1932,1932,"1932-01-04","resolution","the-street",null,"$800 (≈ $19,675 in 2026 dollars) to replace basalt with concrete on Lombard Street","unverified","journalofproceed27sanfrich",11,"https://archive.org/details/journalofproceed27sanfrich/page/n11",null,"Resolution No. (New Series), as follows: Resolved, That the sum of $800 be and the same is hereby set aside, appropriated and authorized to be expended out of County Road Fund, for the cost of removing existing basalt and substituting concrete for same on Lombard street between Hyde and Larkin stree",null,null,"b,p","m",0,-1.0],["d","qipu:sf/decision/journalofproceed27sanfrich|54",1932,1932,"1932-01-11","resolution","the-street",null,"$800 (≈ $19,675 in 2026 dollars) to replace basalt with concrete on Lombard Street","unverified","journalofproceed27sanfrich",183,"https://archive.org/details/journalofproceed27sanfrich/page/n183",null,"Resolution No. 35625 (New Series), as follows: Resolved, That the sum of $800 be and the same is hereby set aside, appropriated and authorized to be expended out of County Road Fund, for the cost of removing existing basalt and substituting concrete for same on Lombard street between Hyde and Larkin",null,null,"b,p","m",0,-1.0],["d","qipu:sf/decision/sq:88f2eae193",1932,1932,"1932-01-11",null,null,"passed","$800 (≈ $19,675 in 2026 dollars) to replace basalt with concrete on Lombard Street between Hyde and Larkin","unverified","journalofproceed27sanfrich",183,"https://archive.org/details/journalofproceed27sanfrich/page/n183",null,null,null,null,"p","m",0,0.0],["d","qipu:sf/decision/journalofproceed30sanfrich|372",1935,1935,"1935-09-03","motion","running-the-city","referred","Maud Crowley and neighbors ask for a sidewalk on Lombard Street","quoted","journalofproceed30sanfrich",1463,"https://archive.org/details/journalofproceed30sanfrich/page/n1456",null,"Motion carried. Petition for Sidewalk and Bulkhead on Lombard Street. Supervisor Gallagher presented: Petition of Maud Crowley and others for the construction of a sidewalk and bulkhead on Lombard street between Hyde and Larkin streets, and a bulkhead on west line of same property in Larkin street b",null,null,"b,p","m",0,-4.0],["d","qipu:sf/decision/map:journalofproceed30sanfrich/1456/d17df2f1",1935,1935,"1935-09-03","motion",null,"passed","Maud Crowley and neighbors ask for a sidewalk on Lombard Street","unverified","journalofproceed30sanfrich",1463,"https://archive.org/details/journalofproceed30sanfrich/page/n1456",null,"Re Petition for Bus Service in Ingleside.",null,null,"p","m",0,-4.0],["d","qipu:sf/decision/journalofproceed33sanfrich|462",1938,1938,"1938-08-10","resolution","public-money","passed","Lombard Street tunnel bond issue taken up after being laid over","unverified","journalofproceed33sanfrich",1516,"https://archive.org/details/journalofproceed33sanfrich/page/n1516",null,"Resolution, Bond Issue for Lombard Street Tunnel. (Code No. ) The following matter heretofore presented by Supervisor Schmidt and laid over until this meeting was taken up:",null,null,"p","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/igsl_san-francisco-real-prop-report_1955:27/1",1955,1955,"January 1, 1955","property_record","annual report",null,"Funston Playground · owned by city: Park","unverified","igsl_san-francisco-real-prop-report_1955",27,"https://archive.org/details/igsl_san-francisco-real-prop-report_1955/page/n26",null,null,null,"Valuation of real property owned by city and county of San Francisco ... / 1955","G","a",0,-1.0],["d","qipu:sf/decision/map:journalofproceed51sanfrich/658/35c7e16b",1956,1956,"1956-09-17","resolution",null,"passed","Lombard Street named the most crooked street in the world","unverified","journalofproceed51sanfrich",659,"https://archive.org/details/journalofproceed51sanfrich/page/n658",null,null,null,null,"p","m",0,-1.0],["d","qipu:sf/decision/sd:029a98441b",1956,1956,"1956-09-17",null,"names","passed","Lombard Street, Leavenworth to Hyde, officially named world's most crooked street","unverified",null,null,"https://archive.org/details/journalofproceed51sanfrich/page/n658/mode/1up",null,null,null,null,"p","m",0,0.86],["d","qipu:sf/decision/map:journalofproceed52sanfrich/314/97dc6941",1957,1957,"1957-05-06","motion",null,"refused","Bus cut upheld after a Chestnut Street resident objects","unverified","journalofproceed52sanfrich",315,"https://archive.org/details/journalofproceed52sanfrich/page/n314",null,null,null,null,"P","a",0,-1.0],["d","qipu:sf/decision/journalofproceed59sanfrich|g1522",1964,1964,"1964-12-21",null,"permits","passed","Developer may use part of Chestnut Street for a walkway","unverified","journalofproceed59sanfrich",975,"https://archive.org/details/journalofproceed59sanfrich/page/n972",null,null,null,null,"p","m",0,-1.01],["d","qipu:sf/decision/map:journalofproceed68sanfrich/296/b2bb8e34",1973,1973,"1973-03-19","ordinance",null,null,"Chestnut and Francisco Streets between Polk and Hyde put forward","unverified","journalofproceed68sanfrich",296,"https://archive.org/details/journalofproceed68sanfrich/page/n296",null,null,null,null,"p","m",0,-1.0],["d","qipu:sf/decision/map:journalofproceed68sanfrich/315/a276add0",1973,1973,"1973-03-26","ordinance",null,"passed","Chestnut and Francisco Streets between Polk and Hyde finally passed","unverified","journalofproceed68sanfrich",315,"https://archive.org/details/journalofproceed68sanfrich/page/n315",null,null,null,null,"p","m",0,-1.0],["d","qipu:sf/decision/journalofproceed69sanfrich|438",1974,1974,"1974-10-15","resolution","getting-around","passed","Traffic controls adopted at seventeen corners, many on Eugenia Avenue","unverified","journalofproceed69sanfrich",1263,"https://archive.org/details/journalofproceed69sanfrich/page/n1254",null,null,null,null,"b,p","m",0,1.49],["d","qipu:sf/decision/journalseptdecofproceed71sanfrich|150",1976,1976,"1976-12-13","resolution","getting-around",null,"Stop signs created at two dozen corners citywide","unverified","journalseptdecofproceed71sanfrich",421,"https://archive.org/details/journalseptdecofproceed71sanfrich/page/n418",null,null,null,null,"p","m",0,-1.0],["d","qipu:sf/decision/journaljanaprofproceed82sanfrich|131",1987,1987,"1987-03-09","motion","land-and-building","passed","Subdivision map approved for the condominium at 1150 Lombard Street","quoted","journaljanaprofproceed82sanfrich",293,"https://archive.org/details/journaljanaprofproceed82sanfrich/page/n292",null,null,null,null,"B,P","a",0,1.51],["d","qipu:sf/decision/map:journaljanaprofproceed82sanfrich/292/8584361f",1987,1987,"1987-03-09","motion",null,"passed","Subdivision map approved for the condominium at 1150 Lombard Street","unverified","journaljanaprofproceed82sanfrich",293,"https://archive.org/details/journaljanaprofproceed82sanfrich/page/n292",null,null,null,null,"P","a",0,-1.0],["d","qipu:sf/decision/sq:64d98da431",1987,1987,"1987-03-09",null,null,"passed","Final map approved for condominium subdivision at 1150 Lombard Street","unverified","journaljanaprofproceed82sanfrich",293,"https://archive.org/details/journaljanaprofproceed82sanfrich/page/n292",null,null,null,null,"p","m",0,0.0],["d","qipu:sf/decision/journalofjanaprproceed83sanfrich|140",1988,1988,"1988-02-29","motion","land-and-building","passed","Changes approved to the subdivision map at 1150 Lombard Street","quoted","journalofjanaprproceed83sanfrich",292,"https://archive.org/details/journalofjanaprproceed83sanfrich/page/n292",null,null,null,null,"B,P","a",0,1.51],["d","qipu:sf/decision/map:journalofjanaprproceed83sanfrich/292/e105e62f",1988,1988,"1988-02-29","motion",null,null,"Changes approved to the subdivision map at 1150 Lombard Street","unverified","journalofjanaprproceed83sanfrich",292,"https://archive.org/details/journalofjanaprproceed83sanfrich/page/n292",null,null,null,null,"P","a",0,-1.0],["d","qipu:sf/decision/sd:583e6b6ad8",1988,1988,"1988-02-29",null,"housing","passed","Condo map changes approved at 1150 Lombard Street","unverified",null,null,"https://archive.org/details/journalofjanaprproceed83sanfrich/page/n292/mode/1up",null,null,null,null,"p","m",0,0.38],["d","qipu:sf/decision/map:journalofjanaprproceed90sanfrich/191/3e69a2ba",1995,1995,"1995-03-20","resolution",null,"passed","Permit parking changed temporarily on Lombard Street near Hyde Street","unverified","journalofjanaprproceed90sanfrich",192,"https://archive.org/details/journalofjanaprproceed90sanfrich/page/n191",null,null,null,null,"p","m",0,-4.0],["d","qipu:sf/decision/journalofproceed93sanfrich:18/4",1998,1998,"1998-01-05","hearing",null,"passed","The Board closed the hearing on [name withheld] appeal against a parcel map at 1001 Chestnut Street.","quoted","journalofproceed93sanfrich",18,"https://archive.org/details/journalofproceed93sanfrich/page/n17",null,null,null,null,"P","a",0,-2.0],["d","qipu:sf/decision/journalofproceed93sanfrich|10",1998,1998,"1998-01-05","motion","running-the-city","refused","Rejection of the 1001 Chestnut Street lot split proposed","quoted","journalofproceed93sanfrich",18,"https://archive.org/details/journalofproceed93sanfrich/page/n17",null,null,null,null,"P","a",0,2.09],["d","qipu:sf/decision/journalofproceed93sanfrich|11",1998,1998,"1998-01-05","motion","running-the-city","passed","Clerk asked to write findings on the 1001 Chestnut Street split","quoted","journalofproceed93sanfrich",18,"https://archive.org/details/journalofproceed93sanfrich/page/n17",null,null,null,null,"P","a",0,1.04],["d","qipu:sf/decision/journalofproceed93sanfrich|7",1998,1998,"1998-01-05","resolution","running-the-city","passed","Hearing held on the parcel map splitting 1001 Chestnut Street","quoted","journalofproceed93sanfrich",17,"https://archive.org/details/journalofproceed93sanfrich/page/n16",null,null,null,null,"P","a",0,0.77],["d","qipu:sf/decision/journalofproceed93sanfrich|8",1998,1998,"1998-01-05","motion","running-the-city","passed","Split of 1001 Chestnut Street into two lots upheld","quoted","journalofproceed93sanfrich",18,"https://archive.org/details/journalofproceed93sanfrich/page/n17",null,null,null,null,"P","a",0,1.49],["d","qipu:sf/decision/map:journalofproceed93sanfrich/17/19e13d63",1998,1998,"1998-01-05","motion",null,"passed","Clerk asked to write findings on the 1001 Chestnut Street split","unverified","journalofproceed93sanfrich",18,"https://archive.org/details/journalofproceed93sanfrich/page/n17",null,null,null,null,"P","a",0,-1.0],["d","qipu:sf/decision/map:journalofproceed93sanfrich/17/bd68cd52",1998,1998,"1998-01-05","motion",null,null,"Split of 1001 Chestnut Street into two lots upheld","unverified","journalofproceed93sanfrich",18,"https://archive.org/details/journalofproceed93sanfrich/page/n17",null,null,null,null,"P","a",0,-1.0],["d","qipu:sf/decision/map:journalofproceed93sanfrich/17/ddf704db",1998,1998,"1998-01-05","motion",null,"refused","Rejection of the 1001 Chestnut Street lot split proposed","unverified","journalofproceed93sanfrich",18,"https://archive.org/details/journalofproceed93sanfrich/page/n17",null,null,null,null,"P","a",0,-1.0],["d","qipu:sf/decision/journalofproceed93sanfrich|19",1998,1998,"1998-01-12","motion","running-the-city","passed","Findings written up for the 1001 Chestnut Street lot split","quoted","journalofproceed93sanfrich",29,"https://archive.org/details/journalofproceed93sanfrich/page/n28",null,null,null,null,"P","a",0,1.27],["d","qipu:sf/decision/map:journalofproceed93sanfrich/28/0b2fb6a8",1998,1998,"1998-01-12","motion",null,"passed","Findings written up for the 1001 Chestnut Street lot split","unverified","journalofproceed93sanfrich",29,"https://archive.org/details/journalofproceed93sanfrich/page/n28",null,null,null,null,"P","a",0,-1.0],["d","qipu:sf/decision/sd:5bf15089fd",1998,1998,"1998-01-12",null,"appeals","passed","Two-lot split of 1001 Chestnut Street approved","unverified",null,null,"https://archive.org/details/journalofproceed93sanfrich/page/n28/mode/1up",null,null,null,null,"p","m",0,0.66],["d","qipu:sf/decision/meetingminutesb2012sanf_0:172/1",2012,2012,null,"hearing",null,"continued","Appeal of a CEQA exemption for a firewall at 1100 Lombard Street was continued to July 17, 2012.","quoted","meetingminutesb2012sanf_0",172,"https://archive.org/details/meetingminutesb2012sanf_0/page/n171",null,null,null,null,"P","a",0,-3.5],["d","qipu:sf/decision/meetingminutesd2012sanf_0:43/2",2012,2012,null,"hearing",null,"continued","Appeal of the environmental exemption for a firewall at 1100 Lombard Street was continued to September 4, 2012.","quoted","meetingminutesd2012sanf_0",43,"https://archive.org/details/meetingminutesd2012sanf_0/page/n42",null,null,null,null,"P","a",0,-3.5],["d","qipu:sf/decision/meetingminutesb2012sanf_0:102/1",2012,2012,"2012-05-01","hearing","whats-being-built","continued","Appeal of the Planning Department's CEQA exemption for a firewall at 1100 Lombard Street was continued to May 22, 2012.","quoted","meetingminutesb2012sanf_0",102,"https://archive.org/details/meetingminutesb2012sanf_0/page/n101",null,null,null,null,"P","a",0,-3.5],["d","qipu:sf/decision/meetingminutesb2012sanf_0|100",2012,2012,"2012-05-01","motion","running-the-city","refused","Reversal sought of the 1100 Lombard Street environmental exemption","quoted","meetingminutesb2012sanf_0",102,"https://archive.org/details/meetingminutesb2012sanf_0/page/n101",null,null,null,null,"P","a",0,2.04],["d","qipu:sf/decision/meetingminutesb2012sanf_0|102",2012,2012,"2012-05-01","motion","running-the-city","continued","Findings asked for on the 1100 Lombard Street exemption appeal","quoted","meetingminutesb2012sanf_0",102,"https://archive.org/details/meetingminutesb2012sanf_0/page/n101",null,null,null,null,"P","a",0,-1.0],["d","qipu:sf/decision/meetingminutesb2012sanf_0|98",2012,2012,"2012-05-01","motion","running-the-city","continued","Vote asked on whether 1100 Lombard Street needs environmental review","quoted","meetingminutesb2012sanf_0",102,"https://archive.org/details/meetingminutesb2012sanf_0/page/n101",null,null,null,null,"B,P","a",0,-1.0],["d","qipu:sf/decision/meetingminutesb2012sanf_0:173/1",2012,2012,"2012-05-22","hearing","whats-being-built","continued","Appeal of the environmental exemption for a firewall at 1100 Lombard Street was continued to July 17, 2012.","quoted","meetingminutesb2012sanf_0",173,"https://archive.org/details/meetingminutesb2012sanf_0/page/n172",null,null,null,null,"P","a",0,-3.5],["d","qipu:sf/decision/meetingminutesb2012sanf_0|168",2012,2012,"2012-05-22","motion","running-the-city","continued","Vote asked on whether 1100 Lombard Street needs environmental review","quoted","meetingminutesb2012sanf_0",173,"https://archive.org/details/meetingminutesb2012sanf_0/page/n172",null,null,null,null,"P","a",0,-1.0],["d","qipu:sf/decision/meetingminutesb2012sanf_0|170",2012,2012,"2012-05-22","motion","running-the-city","refused","Reversal sought of the 1100 Lombard Street environmental exemption","quoted","meetingminutesb2012sanf_0",173,"https://archive.org/details/meetingminutesb2012sanf_0/page/n172",null,null,null,null,"P","a",0,2.34],["d","qipu:sf/decision/meetingminutesb2012sanf_0|172",2012,2012,"2012-05-22","motion","running-the-city","continued","Findings asked for on the 1100 Lombard Street exemption appeal","quoted","meetingminutesb2012sanf_0",173,"https://archive.org/details/meetingminutesb2012sanf_0/page/n172",null,null,null,null,"P","a",0,-1.0],["d","qipu:sf/decision/map:meetingminutesb2012sanf_2/11/c3a05c75",2012,2012,"2012-09-04","ordinance",null,null,"Appeal over the firewall at 1100 Lombard Street withdrawn","unverified","meetingminutesb2012sanf_2",12,"https://archive.org/details/meetingminutesb2012sanf_2/page/n11",null,null,null,null,"P","a",0,-1.0],["d","qipu:sf/decision/meetingminutesb2012sanf_2:12/2",2012,2012,"2012-09-04","hearing",null,"pending","Appeal against the environmental exemption for a firewall at 1100 Lombard Street was withdrawn; the hearing was held and the appeal filed.","quoted","meetingminutesb2012sanf_2",12,"https://archive.org/details/meetingminutesb2012sanf_2/page/n11",null,null,null,null,"P","a",0,-1.0],["d","qipu:sf/decision/meetingminutesb2012sanf_2:13/1",2012,2012,"2012-09-04","motion","whats-being-built","tabled","Motion to prepare findings on the appeal of the environmental exemption for 1100 Lombard Street was tabled.","quoted","meetingminutesb2012sanf_2",13,"https://archive.org/details/meetingminutesb2012sanf_2/page/n12",null,null,null,null,"P","a",0,-1.0],["d","qipu:sf/decision/meetingminutesb2012sanf_2|4",2012,2012,"2012-09-04","ordinance","city-services",null,"Appeal over the firewall at 1100 Lombard Street withdrawn","unverified","meetingminutesb2012sanf_2",12,"https://archive.org/details/meetingminutesb2012sanf_2/page/n11",null,null,null,null,"B,P","a",0,-1.0],["d","qipu:sf/decision/meetingminutesb2012sanf_2|5",2012,2012,"2012-09-04","motion","running-the-city","passed","Vote asked on whether 1100 Lombard Street needs environmental review","quoted","meetingminutesb2012sanf_2",12,"https://archive.org/details/meetingminutesb2012sanf_2/page/n11",null,null,null,null,"P","a",0,1.14],["d","qipu:sf/decision/meetingminutesb2012sanf_2|6",2012,2012,"2012-09-04","motion","running-the-city","pending","A motion approved, with no subject on this page","unverified","meetingminutesb2012sanf_2",12,"https://archive.org/details/meetingminutesb2012sanf_2/page/n11",null,null,null,null,"B,P","m",0,-1.0],["d","qipu:sf/decision/meetingminutesb2012sanf_2|7",2012,2012,"2012-09-04","motion","running-the-city","refused","Reversal sought of the environmental exemption at 1100 Lombard Street","quoted","meetingminutesb2012sanf_2",12,"https://archive.org/details/meetingminutesb2012sanf_2/page/n11",null,null,null,null,"P","a",0,2.04],["d","qipu:sf/decision/meetingminutesb2012sanf_2|8",2012,2012,"2012-09-04","motion","land-and-building","tabled","Findings asked for on the 1100 Lombard Street exemption appeal","unverified","meetingminutesb2012sanf_2",13,"https://archive.org/details/meetingminutesb2012sanf_2/page/n12",null,null,null,null,"B,P","a",0,-1.0],["d","qipu:sf/decision/meetingminutesd2012sanf_0:108/2",2012,2012,"2012-09-04","hearing",null,null,"Appeal of Planning's environmental exemption for a firewall at 1100 Lombard Street was withdrawn and the hearing filed.","quoted","meetingminutesd2012sanf_0",108,"https://archive.org/details/meetingminutesd2012sanf_0/page/n107",null,null,null,null,"P","a",0,-1.0],["d","qipu:sf/decision/meetingminutesd2012sanf_0:108/3",2012,2012,"2012-09-04","motion",null,"passed","Board approved a motion affirming Planning's finding that the 1100 Lombard Street project is exempt from environmental review.","quoted","meetingminutesd2012sanf_0",108,"https://archive.org/details/meetingminutesd2012sanf_0/page/n107",null,null,null,null,"P","a",0,1.75],["d","qipu:sf/decision/meetingminutesd2012sanf_0:108/4",2012,2012,"2012-09-04","motion",null,"tabled","Motion to reverse Planning's environmental exemption for 1100 Lombard Street was tabled by the Board.","quoted","meetingminutesd2012sanf_0",108,"https://archive.org/details/meetingminutesd2012sanf_0/page/n107",null,null,null,null,"P","a",0,-1.0],["d","qipu:sf/decision/meetingminutesd2012sanf_0:109/1",2012,2012,"2012-09-04","motion","whats-being-built","tabled","Motion to prepare findings on the 1100 Lombard Street environmental exemption appeal was tabled.","quoted","meetingminutesd2012sanf_0",109,"https://archive.org/details/meetingminutesd2012sanf_0/page/n108",null,null,null,null,"P","a",0,-1.0],["d","qipu:sf/decision/map:meetingminutesb2012sanf_1/174/e62c37cf",2012,2012,"2012-11-06","motion",null,null,"Findings asked for on the 1100 Lombard Street exemption appeal","unverified","meetingminutesb2012sanf_1",175,"https://archive.org/details/meetingminutesb2012sanf_1/page/n174",null,null,null,null,"P","a",0,-1.0],["d","qipu:sf/decision/meetingminutesb2012sanf_1:175/1",2012,2012,"2012-11-06","motion",null,"continued","Board continued the motion affirming the environmental exemption for 1100 Lombard Street until September 4, 2012.","quoted","meetingminutesb2012sanf_1",175,"https://archive.org/details/meetingminutesb2012sanf_1/page/n174",null,null,null,null,"P","a",0,-1.0],["d","qipu:sf/decision/meetingminutesb2012sanf_1|107",2012,2012,"2012-11-06","ordinance","running-the-city","continued","Appeal over the 1100 Lombard Street firewall put off to September","quoted","meetingminutesb2012sanf_1",174,"https://archive.org/details/meetingminutesb2012sanf_1/page/n173",null,null,null,null,"P","a",0,-1.0],["d","qipu:sf/decision/meetingminutesb2012sanf_1|109",2012,2012,"2012-11-06","motion","running-the-city","continued","A motion continued, with no subject on this page","quoted","meetingminutesb2012sanf_1",175,"https://archive.org/details/meetingminutesb2012sanf_1/page/n174",null,null,null,null,"P","m",0,-1.0],["d","qipu:sf/decision/meetingminutesb2012sanf_1|111",2012,2012,"2012-11-06","motion","running-the-city","continued","A motion continued, with no subject on this page","quoted","meetingminutesb2012sanf_1",175,"https://archive.org/details/meetingminutesb2012sanf_1/page/n174",null,null,null,null,"P","m",0,-1.0],["d","qipu:sf/decision/meetingminutesb2012sanf_1|112",2012,2012,"2012-11-06","motion","running-the-city",null,"Findings asked for on the 1100 Lombard Street exemption appeal","unverified","meetingminutesb2012sanf_1",175,"https://archive.org/details/meetingminutesb2012sanf_1/page/n174",null,null,null,null,"B,P","a",0,-1.0],["d","qipu:sf/decision/meetingminutesd2012sanf_0:44/1",2012,2012,"2012-11-06","motion","whats-being-built","continued","Motion to affirm the Planning Department's environmental exemption for the 1100 Lombard Street firewall project was continued to September 4, 2012.","quoted","meetingminutesd2012sanf_0",44,"https://archive.org/details/meetingminutesd2012sanf_0/page/n43",null,null,null,null,"P","a",0,-3.5],["d","qipu:sf/decision/meetingminutesd2012sanf_0:44/2",2012,2012,"2012-11-06","motion","whats-being-built","continued","Motion to reverse the Planning Department's environmental exemption for the 1100 Lombard Street firewall project was continued to September 4, 2012.","quoted","meetingminutesd2012sanf_0",44,"https://archive.org/details/meetingminutesd2012sanf_0/page/n43",null,null,null,null,"P","a",0,-3.5],["d","qipu:sf/decision/meetingminutesd2012sanf_0:44/3",2012,2012,"2012-11-06","motion","whats-being-built","continued","Motion directing the Clerk to prepare findings on the 1100 Lombard Street exemption appeal was continued to September 4, 2012.","quoted","meetingminutesd2012sanf_0",44,"https://archive.org/details/meetingminutesd2012sanf_0/page/n43",null,null,null,null,"P","a",0,-3.5],["d","qipu:sf/decision/map:bag091719/14/4e4e8e40",2019,2019,"2019-09-17","ordinance",null,null,"Bookings and a fee proposed for driving down Lombard Street","unverified",null,null,"https://sfbos.org/sites/default/files/bag091719_minutes.pdf#page=14",null,null,null,null,"p","m",0,-1.0]]}