{"id":null,"ids":[],"kind":"named in documents","name":"Balboa Reservoir","tied_by":"name","block":"3180","release":"v0.7.1","rows_columns":["t","id","year","y","date","kind","topic","outcome","summary","tier","source","leaf","scan","addr","quote","note","title","how","g","rec","sc"],"rows":[["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:23/2",1990,1930,"1930's","building","study or report",null,"Balboa Reservoir · built: WPA project initiated; completed to present condition late 1950s","unverified","C124904960",23,"https://archive.org/details/C124904960/page/n22",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:13/2",1990,1930,"1930’s to late 1950’s","building","study or report",null,"Balboa Reservoir · built: Construction initiated as WPA project in 1930’s, completed late 1950’s","unverified","C124904960",13,"https://archive.org/details/C124904960/page/n12",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["d","qipu:sf/decision/journalofproceed29sanfrich:541/3",1934,1934,"1934-04-09","communication","water-sewers","referred","West of Twin Peaks Boosters' Club protested the proposed Balboa Reservoir; the communication was referred to the Public Utilities Committee.","quoted","journalofproceed29sanfrich",541,"https://archive.org/details/journalofproceed29sanfrich/page/n541",null,"Protest Against Proposed Balboa Reservoir,",null,null,"n","a",0,7.0],["d","qipu:sf/decision/journalofproceed29sanfrich:542/2",1934,1934,"1934-04-09","communication","water-sewers","referred","Twin Peaks Boosters, Inc. urged homes instead of the proposed Balboa Reservoir; communication referred to Public Utilities Committee.","quoted","journalofproceed29sanfrich",542,"https://archive.org/details/journalofproceed29sanfrich/page/n542",null,"Balboa Reservoir Construction Opposed. Supervisor Shannon presented communication from Twin Peaks Boosters, Inc., opposing",null,null,"n","a",0,4.0],["d","qipu:sf/decision/journalofproceed29sanfrich:542/3",1934,1934,"1934-04-09","resolution","water-sewers","referred","Supervisor Uhl proposed a resolution to halt Balboa Reservoir construction until property owners can be heard.","quoted","journalofproceed29sanfrich",542,"https://archive.org/details/journalofproceed29sanfrich/page/n542",null,"Supervisor Uhl presented the following resolution opposing the construction of proposed Balboa Reservoir until hearing",null,null,"n","a",0,4.0],["d","qipu:sf/decision/journalofproceed29sanfrich|149",1934,1934,"1934-04-09","resolution","running-the-city",null,"Balboa Reservoir work asked postponed so 17 acres become home sites","unverified","journalofproceed29sanfrich",543,"https://archive.org/details/journalofproceed29sanfrich/page/n543",null,"Resolution No. 1370, as follows: Resolved, That, inasmuch as 1760 persons in the Ingleside District adjacent to Balboa Reservoir desire the 17 acres in the Balboa Reservoir be used for home sites, the Public utilities Commission is requested to postpone further work on said reservoir until the perso",null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed29sanfrich:645/1",1934,1934,"1934-04-30","other","water-sewers",null,"A letter argues a Supervisor's lobbying of the Public Utilities Commission on the Balboa reservoir site breaks Charter section 22.","quoted","journalofproceed29sanfrich",645,"https://archive.org/details/journalofproceed29sanfrich/page/n645",null,"the matured and unanimous judgment of the Freeholders, that is, that the administration",null,null,"n","a",0,4.0],["d","qipu:sf/decision/journalofproceed42sanfrich:1007/2",1947,1947,"1947-05-05","resolution",null,"passed","Balboa Reservoir lease with the United States cut to $101.09 (≈ $1,527 in 2026 dollars) monthly after removing 2.35 acres.","quoted","journalofproceed42sanfrich",1007,"https://archive.org/details/journalofproceed42sanfrich/page/n1007",null,"Authorizing Execution of Supplemental Agreement Deleting a Certain Area From the Balboa Reservoir Lease to the United States of America.",null,null,"n","a",0,0.12],["d","qipu:sf/decision/journalofproceed42sanfrich|286",1947,1947,"1947-05-05","ordinance","land-and-building","passed","Federal lease at the Balboa Reservoir shrinks and rent drops","unverified","journalofproceed42sanfrich",1007,"https://archive.org/details/journalofproceed42sanfrich/page/n1007",null,"Ordinance No. 1756 (Series of 1939), the Director of Property, on behalf of the City and County of San Francisco, a municipal corporation, as Lessor, entered into a certain written lease dated January 1, 1945, with the United States of America, as Lessee, of approximately 29 acres of City-owned land",null,null,"n","a",0,0.4],["d","qipu:sf/decision/journalofproceed47sanfrich:18/3",1952,1952,"1952-01-07","ordinance","water-sewers","passed first reading","The Water Department would receive $300,000 (≈ $3.8 million in 2026 dollars) to excavate Balboa Reservoir, and the appropriation passed first reading.","quoted","journalofproceed47sanfrich",18,"https://archive.org/details/journalofproceed47sanfrich/page/n17",null,null,null,null,"n","a",0,7.5],["d","qipu:sf/decision/journalofproceed47sanfrich:19/1",1952,1952,"1952-01-07","ordinance","water-sewers","passed first reading","Water Department's $300,000 (≈ $3.8 million in 2026 dollars) Balboa Reservoir excavation funding passed first reading.","quoted","journalofproceed47sanfrich",19,"https://archive.org/details/journalofproceed47sanfrich/page/n18",null,null,null,null,"n","a",0,7.5],["d","qipu:sf/decision/journalofproceed47sanfrich:54/5",1952,1952,"1952-01-21","ordinance","water-sewers","passed","Water Department gets $300,000 (≈ $3.8 million in 2026 dollars) to excavate Balboa Reservoir; passed in final reading.","quoted","journalofproceed47sanfrich",54,"https://archive.org/details/journalofproceed47sanfrich/page/n53",null,null,null,null,"n","a",0,7.63],["d","qipu:sf/decision/journalofproceed51sanfrich:334/3",1956,1956,"1956-05-16","other","water-sewers","passed","Water Department budget adopted after Finance Committee cuts, with added surplus and salary supplements for Balboa Reservoir work.","quoted","journalofproceed51sanfrich",334,"https://archive.org/details/journalofproceed51sanfrich/page/n333",null,null,null,null,"n","a",0,6.36],["d","qipu:sf/decision/journalofproceed52sanfrich:928/6",1957,1957,"1957-12-09","ordinance","water-sewers",null,"A $140,000 (≈ $1.7 million in 2026 dollars) Water Department appropriation to replace small water mains near Balboa Reservoir was introduced; outcome not shown.","quoted","journalofproceed52sanfrich",928,"https://archive.org/details/journalofproceed52sanfrich/page/n925",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed52sanfrich:944/1",1957,1957,"1957-12-16","ordinance","water-sewers","passed","Appropriation of $140,000 (≈ $1.7 million in 2026 dollars) passed to replace small water mains with 6- and 8-inch mains, funded from the Balboa Reservoir balance.","quoted","journalofproceed52sanfrich",944,"https://archive.org/details/journalofproceed52sanfrich/page/n941",null,null,null,null,"n","a",0,7.34],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101694397:29/6",1978,1972,"1972","project","audit",null,"San Francisco Water Department 1972 bond projects (including Balboa Reservoir completion) · cost usd: approximately $20.5 million total estimated cost in 1972","unverified","C101694397",29,"https://archive.org/details/C101694397/page/n28",null,null,null,"Report to the finance committee of the Board of Supervisors : review of the operations of the Public Utilities Commission (PUC), PUC General Office, Water Department, Hetch Hetchy Project, PUC Data Processing Center","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101694397:54/10001",1978,1972,"1972","project","audit",null,"Balboa Reservoir · cost usd: $8,000,000 estimated 1972 cost, including pump station and feeder mains","unverified","C101694397",54,"https://archive.org/details/C101694397/page/n53",null,null,null,"Report to the finance committee of the Board of Supervisors : review of the operations of the Public Utilities Commission (PUC), PUC General Office, Water Department, Hetch Hetchy Project, PUC Data Processing Center","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101694397:54/4",1978,1972,"1972","project","audit",null,"Balboa Reservoir · cost usd: estimated cost $8,000,000 (including pump station and feeder mains)","unverified","C101694397",54,"https://archive.org/details/C101694397/page/n53",null,null,null,"Report to the finance committee of the Board of Supervisors : review of the operations of the Public Utilities Commission (PUC), PUC General Office, Water Department, Hetch Hetchy Project, PUC Data Processing Center","n","a",0,3.0],["d","qipu:sf/decision/journalofproceed67sanfrich:264/2",1972,1972,"1972-03-20","motion",null,null,"Request granted asking that drag racing and hill-climbing be prevented on the Balboa Reservoir cover.","quoted","journalofproceed67sanfrich",264,"https://archive.org/details/journalofproceed67sanfrich/page/n263",null,null,null,null,"n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101694397:5/5",1978,1972,"1972-11","event","audit",null,"San Andreas Pipeline, [name withheld], and Balboa Reservoir projects · event: bond issue approved by electorate for construction projects","unverified","C101694397",5,"https://archive.org/details/C101694397/page/n4",null,null,null,"Report to the finance committee of the Board of Supervisors : review of the operations of the Public Utilities Commission (PUC), PUC General Office, Water Department, Hetch Hetchy Project, PUC Data Processing Center","n","a",0,2.0],["d","qipu:sf/decision/journalofjanjuneproceed72sanfrich|g408",1977,1977,"1977-02-07","ordinance","works","pending","$5.8 million (≈ $32.2 million in 2026 dollars) to build Balboa Reservoir pumping plant still pending.","quoted","journalofjanjuneproceed72sanfrich",132,"https://archive.org/details/journalofjanjuneproceed72sanfrich/page/n131",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofjanjuneproceed72sanfrich|g489",1977,1977,"1977-02-14","ordinance","works","passed","$5.8 million (≈ $32.2 million in 2026 dollars) to build Balboa Reservoir pumping plant approved","quoted","journalofjanjuneproceed72sanfrich",154,"https://archive.org/details/journalofjanjuneproceed72sanfrich/page/n153",null,null,null,null,"n","a",0,9.37],["d","qipu:sf/decision/journalofjanjuneproceed72sanfrich|g490",1977,1977,"1977-02-14",null,"works","passed","$5.8 million (≈ $32.2 million in 2026 dollars) for new Balboa Reservoir and pumping plant approved","unverified","journalofjanjuneproceed72sanfrich",154,"https://archive.org/details/journalofjanjuneproceed72sanfrich/page/n153",null,null,null,null,"n","a",0,5.99],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101694397:10/1",1978,1978,"","recommendation","audit",null,"Balboa Reservoir Project · recommendation: Complete the environmental impact reports, including hiring an outside consultant, to expedite the project","unverified","C101694397",10,"https://archive.org/details/C101694397/page/n9",null,null,null,"Report to the finance committee of the Board of Supervisors : review of the operations of the Public Utilities Commission (PUC), PUC General Office, Water Department, Hetch Hetchy Project, PUC Data Processing Center","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101694397:130/3",1978,1978,"","measure","audit",null,"Balboa Reservoir Pump Station · cost usd: Originally scheduled at $1,200,000; should be reduced by approximately $600,000","unverified","C101694397",130,"https://archive.org/details/C101694397/page/n129",null,null,null,"Report to the finance committee of the Board of Supervisors : review of the operations of the Public Utilities Commission (PUC), PUC General Office, Water Department, Hetch Hetchy Project, PUC Data Processing Center","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101694397:130/4",1978,1978,"","alternative","audit",null,"Alemany station rehabilitation (Balboa Reservoir pumping function) · cost usd: Present Alemany station can be rehabilitated at a cost of about $600,000, avoiding EIR delays","unverified","C101694397",130,"https://archive.org/details/C101694397/page/n129",null,null,null,"Report to the finance committee of the Board of Supervisors : review of the operations of the Public Utilities Commission (PUC), PUC General Office, Water Department, Hetch Hetchy Project, PUC Data Processing Center","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101694397:5/6",1978,1978,"","finding","audit",null,"San Andreas Pipeline, [name withheld], and Balboa Reservoir projects · finding: projects delayed 3 to 4 years; construction contracts not yet awarded","unverified","C101694397",5,"https://archive.org/details/C101694397/page/n4",null,null,null,"Report to the finance committee of the Board of Supervisors : review of the operations of the Public Utilities Commission (PUC), PUC General Office, Water Department, Hetch Hetchy Project, PUC Data Processing Center","n","a",0,2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101694397:5/7",1978,1978,"","finding","audit",null,"San Andreas Pipeline, [name withheld], and Balboa Reservoir projects · cost usd: increased project costs of at least $6.6 million","unverified","C101694397",5,"https://archive.org/details/C101694397/page/n4",null,null,null,"Report to the finance committee of the Board of Supervisors : review of the operations of the Public Utilities Commission (PUC), PUC General Office, Water Department, Hetch Hetchy Project, PUC Data Processing Center","n","a",0,2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101694397:54/10002",1978,1978,"","project","audit",null,"Balboa Reservoir · other: 850 parking spaces on the roof of the reservoir","unverified","C101694397",54,"https://archive.org/details/C101694397/page/n53",null,null,null,"Report to the finance committee of the Board of Supervisors : review of the operations of the Public Utilities Commission (PUC), PUC General Office, Water Department, Hetch Hetchy Project, PUC Data Processing Center","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101694397:54/6",1978,1978,"","project","audit",null,"Balboa Reservoir · other: 850 parking spaces on the roof of the reservoir",null,"C101694397",54,"https://archive.org/details/C101694397/page/n53",null,null,null,"Report to the finance committee of the Board of Supervisors : review of the operations of the Public Utilities Commission (PUC), PUC General Office, Water Department, Hetch Hetchy Project, PUC Data Processing Center","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101694397:55/3",1978,1978,"","finding","audit",null,"Balboa Reservoir · finding: Environmental review has still not been initiated by the Water Department","unverified","C101694397",55,"https://archive.org/details/C101694397/page/n54",null,null,null,"Report to the finance committee of the Board of Supervisors : review of the operations of the Public Utilities Commission (PUC), PUC General Office, Water Department, Hetch Hetchy Project, PUC Data Processing Center","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101694397:55/4",1978,1978,"","finding","audit",null,"Balboa Reservoir · finding: Project delayed 4 years beyond expected starting date; costs up an estimated 40%","unverified","C101694397",55,"https://archive.org/details/C101694397/page/n54",null,null,null,"Report to the finance committee of the Board of Supervisors : review of the operations of the Public Utilities Commission (PUC), PUC General Office, Water Department, Hetch Hetchy Project, PUC Data Processing Center","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101694397:56/1",1978,1978,"","finding","audit",null,"Balboa Reservoir project · finding: Delayed; relatively low priority given by the Water Department appears to account for delays","unverified","C101694397",56,"https://archive.org/details/C101694397/page/n55",null,null,null,"Report to the finance committee of the Board of Supervisors : review of the operations of the Public Utilities Commission (PUC), PUC General Office, Water Department, Hetch Hetchy Project, PUC Data Processing Center","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101694397:56/2",1978,1978,"","finding","audit",null,"Balboa Reservoir project · finding: Water Department allowed Planning Department and City College negotiations to proceed without stressing the project's importance, so Planning gave it low priority","unverified","C101694397",56,"https://archive.org/details/C101694397/page/n55",null,null,null,"Report to the finance committee of the Board of Supervisors : review of the operations of the Public Utilities Commission (PUC), PUC General Office, Water Department, Hetch Hetchy Project, PUC Data Processing Center","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101694397:56/4",1978,1978,"","finding","audit",null,"Water Department projects including Balboa Reservoir · finding: Failure to hire environmental review consultants and low priority for Balboa Reservoir Project caused delays to three Water Department projects","unverified","C101694397",56,"https://archive.org/details/C101694397/page/n55",null,null,null,"Report to the finance committee of the Board of Supervisors : review of the operations of the Public Utilities Commission (PUC), PUC General Office, Water Department, Hetch Hetchy Project, PUC Data Processing Center","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101694397:57/5",1978,1978,"","recommendation","audit",null,"Balboa Reservoir project · recommendation: Take steps to proceed with the environmental impact review of the Balboa Reservoir, with or without City College of San Francisco participation","unverified","C101694397",57,"https://archive.org/details/C101694397/page/n56",null,null,null,"Report to the finance committee of the Board of Supervisors : review of the operations of the Public Utilities Commission (PUC), PUC General Office, Water Department, Hetch Hetchy Project, PUC Data Processing Center","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:129/7",1990,1978,"1978","building","study or report",null,"Balboa Reservoir South Basin roof structure · other: roof structure designed in 1978 but not constructed; structural design evaluated from original San Francisco Water Department drawings","unverified","C124904960",129,"https://archive.org/details/C124904960/page/n128",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["d","qipu:sf/decision/journaljulydecofproceed73sanfrich|g1847",1978,1978,"1978-11-13","ordinance","works","pending","Bill moving $500,000 (≈ $2.6 million in 2026 dollars) from Balboa Reservoir to suburban water sites advances.","quoted","journaljulydecofproceed73sanfrich",623,"https://archive.org/details/journaljulydecofproceed73sanfrich/page/n623",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journaljulydecofproceed73sanfrich|g1848",1978,1978,"1978-11-13",null,"works","pending","Bill moving $500,000 (≈ $2.6 million in 2026 dollars) from Balboa Reservoir to suburban water sites advances.","unverified","journaljulydecofproceed73sanfrich",623,"https://archive.org/details/journaljulydecofproceed73sanfrich/page/n623",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journaljulydecofproceed73sanfrich|g1916",1978,1978,"1978-11-20","ordinance","works","passed","$500,000 (≈ $2.6 million in 2026 dollars) moved from Balboa Reservoir work to new suburban water facilities","quoted","journaljulydecofproceed73sanfrich",644,"https://archive.org/details/journaljulydecofproceed73sanfrich/page/n644",null,null,null,null,"n","a",0,8.12],["d","qipu:sf/decision/journaljulydecofproceed73sanfrich|g1917",1978,1978,"1978-11-20",null,"works","passed","$500,000 (≈ $2.6 million in 2026 dollars) moved from Balboa Reservoir work to new suburban water facilities.","unverified","journaljulydecofproceed73sanfrich",644,"https://archive.org/details/journaljulydecofproceed73sanfrich/page/n644",null,null,null,null,"n","a",0,5.99],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101694397:132/2",1978,1978,"August 3, 1973","finding","audit",null,"Balboa Reservoir · finding: Water Department processed Balboa Reservoir project on basis of negative declaration issued by Department of City Planning; need for Environmental Impact Report unclear","unverified","C101694397",132,"https://archive.org/details/C101694397/page/n131",null,null,null,"Report to the finance committee of the Board of Supervisors : review of the operations of the Public Utilities Commission (PUC), PUC General Office, Water Department, Hetch Hetchy Project, PUC Data Processing Center","n","a",0,3.0],["d","qipu:sf/decision/journaljanjuneofproceed76sanfrich:537/4",1981,1981,"1981-05-11","ordinance","water-sewers","passed first reading","Board passed on second reading a $3,010,000 (≈ $11.2 million in 2026 dollars) Water Department transfer, rescinding funds for Balboa Reservoir construction.","quoted","journaljanjuneofproceed76sanfrich",537,"https://archive.org/details/journaljanjuneofproceed76sanfrich/page/n536",null,null,null,null,"n","a",0,7.87],["d","qipu:sf/decision/journaljanjuneofproceed76sanfrich:560/4",1981,1981,"1981-05-18","ordinance","water-sewers","passed","Ordinance moving $3,010,000 (≈ $11.2 million in 2026 dollars) in Water Department capital funds away from Balboa Reservoir construction was finally passed.","quoted","journaljanjuneofproceed76sanfrich",560,"https://archive.org/details/journaljanjuneofproceed76sanfrich/page/n559",null,null,null,null,"n","a",0,7.87],["d","qipu:sf/decision/journaljulydecofproceed79sanfrich:276/3",1984,1984,"1984-09-11","hearing","schools","referred","Nelder requested a hearing on student parking at the Balboa Reservoir site; referred to transportation committee.","quoted","journaljulydecofproceed79sanfrich",276,"https://archive.org/details/journaljulydecofproceed79sanfrich/page/n275",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journaljanjuneofproceed80sanfrich:521/2",1985,1985,"1985-04-22","resolution","whats-being-built","passed","Board moved to offer surplus city sites for development; Balboa Reservoir and [name withheld] adopted, University Mound vote not shown.","quoted","journaljanjuneofproceed80sanfrich",521,"https://archive.org/details/journaljanjuneofproceed80sanfrich/page/n508",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journaljanjuneofproceed80sanfrich:540/3",1985,1985,"1985-04-22","hearing","schools","referred","Silver asked for a hearing on an easement to the Community College District at North Balboa Reservoir; referred to Finance Committee.","quoted","journaljanjuneofproceed80sanfrich",540,"https://archive.org/details/journaljanjuneofproceed80sanfrich/page/n527",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journaljanjuneofproceed80sanfrich:540/4",1985,1985,"1985-04-22","hearing","schools","referred","Walker and Nelder asked for a hearing on disposing of the north basin of Balboa Reservoir; referred to Finance Committee.","quoted","journaljanjuneofproceed80sanfrich",540,"https://archive.org/details/journaljanjuneofproceed80sanfrich/page/n527",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journaljanjuneofproceed80sanfrich|243",1985,1985,"1985-04-22","resolution","running-the-city",null,"Balboa Reservoir site near Ocean Avenue moved back to committee","unverified","journaljanjuneofproceed80sanfrich",521,"https://archive.org/details/journaljanjuneofproceed80sanfrich/page/n508",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journaljanjuneofproceed80sanfrich|244",1985,1985,"1985-04-22","motion","running-the-city","passed","Balboa Reservoir, Geneva Car Barn and University Mound sites adopted","unverified","journaljanjuneofproceed80sanfrich",521,"https://archive.org/details/journaljanjuneofproceed80sanfrich/page/n508",null,null,null,null,"n","a",0,8.47],["d","qipu:sf/decision/journalofjulydecproceed80sanfrich:222/3",1985,1985,"1985-08-12","resolution","schools","referred","Resolution urges sale of a North Balboa Reservoir easement to the Community College District for $1 (≈ $3.13 in 2026 dollars) for parking; referred to committee.","quoted","journalofjulydecproceed80sanfrich",222,"https://archive.org/details/journalofjulydecproceed80sanfrich/page/n221",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/journalofjulydecproceed80sanfrich:297/4",1985,1985,"1985-08-26","resolution","schools","referred","Silver, Molinari and Hongisto urged the Mayor to ask the PUC to lease North Balboa Reservoir to City College for parking; sent to Finance Committee.","quoted","journalofjulydecproceed80sanfrich",297,"https://archive.org/details/journalofjulydecproceed80sanfrich/page/n296",null,null,null,null,"n","a",0,-3.0],["d","qipu:sf/decision/journalofjulydecproceed80sanfrich:657/4",1985,1985,"1985-11-25","motion","water-sewers",null,"A letter to the City Attorney is proposed asking whether the North Balboa Reservoir could be declared surplus and transferred to City College.","quoted","journalofjulydecproceed80sanfrich",657,"https://archive.org/details/journalofjulydecproceed80sanfrich/page/n656",null,null,null,null,"n","a",0,4.0],["d","qipu:sf/decision/journalofjulydecproceed80sanfrich:657/5",1985,1985,"1985-11-25","motion","water-sewers",null,"A resolution is proposed urging the Public Utilities Commission to lease the North Balboa Reservoir to City College for $1 (≈ $3.13 in 2026 dollars) a year.","quoted","journalofjulydecproceed80sanfrich",657,"https://archive.org/details/journalofjulydecproceed80sanfrich/page/n656",null,null,null,null,"n","a",0,-3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124881943:57/18",1986,1986,"","site","study or report",null,"Balboa Reservoir · other: Park without supervision","unverified","C124881943",57,"https://archive.org/details/C124881943/page/n56",null,null,null,"Where the children play : a report on after-school recreational resources in San Francisco","n","a",0,3.0],["d","qipu:sf/decision/journalofproceedjanapr81sanfrich|45",1986,1986,"1986-01-27","resolution","land-and-building","referred","City College parking at North Balboa Reservoir sent to committee","quoted","journalofproceedjanapr81sanfrich",110,"https://archive.org/details/journalofproceedjanapr81sanfrich/page/n109",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceedjanapr81sanfrich:158/9",1986,1986,"1986-02-10","ballot_measure","whats-being-built","referred","Walker proposed a ballot argument opposing a three-year moratorium on development of the South Balboa Reservoir; referred to Rules Committee.","quoted","journalofproceedjanapr81sanfrich",158,"https://archive.org/details/journalofproceedjanapr81sanfrich/page/n157",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceedjanapr81sanfrich:305/3",1986,1986,"1986-03-17","motion","whats-being-built","amended","Ballot argument opposing Proposition E, the Balboa Reservoir development ban, was amended to add a Vote No on Proposition F line.","unverified","journalofproceedjanapr81sanfrich",305,"https://archive.org/details/journalofproceedjanapr81sanfrich/page/n304",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceedjanapr81sanfrich:306/1",1986,1986,"1986-03-17","motion",null,"tabled","Ballot argument opposing Proposition E on the Balboa Reservoir development ban was refused and then tabled.","unverified","journalofproceedjanapr81sanfrich",306,"https://archive.org/details/journalofproceedjanapr81sanfrich/page/n305",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalseptdecofproceed81sanfrich|104",1986,1986,"1986-08-04","motion","land-and-building","passed","Findings adopted for the Balboa Reservoir special permission","unverified","journalseptdecofproceed81sanfrich",170,"https://archive.org/details/journalseptdecofproceed81sanfrich/page/n169",null,null,null,null,"n","a",0,5.34],["d","qipu:sf/decision/journalseptdecofproceed81sanfrich:108/1",1986,1986,"1986-09-22","hearing","housing","continued","Appeal against approval of up to 203 homes at Balboa Reservoir, near Ocean and Phelan Avenues, was continued to September 29, 1986.","unverified","journalseptdecofproceed81sanfrich",108,"https://archive.org/details/journalseptdecofproceed81sanfrich/page/n107",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/journalseptdecofproceed81sanfrich:109/1",1986,1986,"1986-09-22","motion","whats-being-built","continued","Board continued consideration of approval of conditional use at Balboa Reservoir to September 29, 1986.","unverified","journalseptdecofproceed81sanfrich",109,"https://archive.org/details/journalseptdecofproceed81sanfrich/page/n108",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalseptdecofproceed81sanfrich:109/2",1986,1986,"1986-09-22","motion","whats-being-built","continued","Board continued consideration of a motion to disapprove the Balboa Reservoir conditional use to September 29, 1986.","unverified","journalseptdecofproceed81sanfrich",109,"https://archive.org/details/journalseptdecofproceed81sanfrich/page/n108",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalseptdecofproceed81sanfrich|55",1986,1986,"1986-09-22","motion","land-and-building","continued","Appeal heard over 203 houses at the Balboa Reservoir","unverified","journalseptdecofproceed81sanfrich",108,"https://archive.org/details/journalseptdecofproceed81sanfrich/page/n107",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalseptdecofproceed81sanfrich|56",1986,1986,"1986-09-22","motion","running-the-city",null,"Balboa Reservoir environmental review put off to late September","unverified","journalseptdecofproceed81sanfrich",108,"https://archive.org/details/journalseptdecofproceed81sanfrich/page/n107",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalseptdecofproceed81sanfrich|57",1986,1986,"1986-09-22","motion","land-and-building",null,"Special permission for Balboa Reservoir put off to late September","unverified","journalseptdecofproceed81sanfrich",109,"https://archive.org/details/journalseptdecofproceed81sanfrich/page/n108",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalseptdecofproceed81sanfrich|58",1986,1986,"1986-09-22","motion","land-and-building",null,"Special permission for Balboa Reservoir put off to late September","unverified","journalseptdecofproceed81sanfrich",109,"https://archive.org/details/journalseptdecofproceed81sanfrich/page/n108",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalseptdecofproceed81sanfrich|59",1986,1986,"1986-09-22","motion","running-the-city","continued","Findings on Balboa Reservoir put off to late September","unverified","journalseptdecofproceed81sanfrich",109,"https://archive.org/details/journalseptdecofproceed81sanfrich/page/n108",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/map:journalseptdecofproceed81sanfrich/107/ba427f06",1986,1986,"1986-09-22","motion",null,"continued","Appeal heard over 203 houses at the Balboa Reservoir","unverified","journalseptdecofproceed81sanfrich",108,"https://archive.org/details/journalseptdecofproceed81sanfrich/page/n107",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalseptdecofproceed81sanfrich:133/2",1986,1986,"1986-09-29","motion","whats-being-built","passed","Board approved the City Planning Commission's conditional use approval for Balboa Reservoir at Ocean and Phelan Avenues.","unverified","journalseptdecofproceed81sanfrich",133,"https://archive.org/details/journalseptdecofproceed81sanfrich/page/n132",null,null,null,null,"n","a",0,9.82],["d","qipu:sf/decision/journalseptdecofproceed81sanfrich:134/1",1986,1986,"1986-09-29","motion","whats-being-built","tabled","Walker's motion to overturn the Planning Commission's approval of conditional use at Balboa Reservoir was tabled.","unverified","journalseptdecofproceed81sanfrich",134,"https://archive.org/details/journalseptdecofproceed81sanfrich/page/n133",null,null,null,null,"n","a",0,4.0],["d","qipu:sf/decision/journalseptdecofproceed81sanfrich|73",1986,1986,"1986-09-29","motion","running-the-city","passed","Environmental check for Balboa Reservoir site accepted","unverified","journalseptdecofproceed81sanfrich",133,"https://archive.org/details/journalseptdecofproceed81sanfrich/page/n132",null,null,null,null,"n","a",0,7.59],["d","qipu:sf/decision/journalseptdecofproceed81sanfrich|74",1986,1986,"1986-09-29","motion","land-and-building","passed","Permit for Balboa Reservoir's southern basin approved","unverified","journalseptdecofproceed81sanfrich",133,"https://archive.org/details/journalseptdecofproceed81sanfrich/page/n132",null,null,null,null,"n","a",0,7.59],["d","qipu:sf/decision/journalseptdecofproceed81sanfrich|75",1986,1986,"1986-09-29","motion","land-and-building","tabled","A duplicate Balboa Reservoir permission motion tabled","unverified","journalseptdecofproceed81sanfrich",134,"https://archive.org/details/journalseptdecofproceed81sanfrich/page/n133",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalseptdecofproceed81sanfrich|76",1986,1986,"1986-09-29","motion","running-the-city","passed","City staff told to write up reasons for Balboa Reservoir permit","unverified","journalseptdecofproceed81sanfrich",134,"https://archive.org/details/journalseptdecofproceed81sanfrich/page/n133",null,null,null,null,"n","a",0,7.34],["d","qipu:sf/decision/journalseptdecofproceed81sanfrich:248/2",1986,1986,"1986-10-27","resolution","housing","passed","The city adopted a negative declaration finding no significant environmental impact from up to 203 homes at Balboa Reservoir.","unverified","journalseptdecofproceed81sanfrich",248,"https://archive.org/details/journalseptdecofproceed81sanfrich/page/n245",null,null,null,null,"n","a",0,8.88],["d","qipu:sf/decision/journalseptdecofproceed81sanfrich:249/1",1986,1986,"1986-10-27","ordinance","whats-being-built","passed first reading","Balboa Reservoir southern basin land near Ocean and Phelan Avenues rezoned from public use to one-family homes, passed on first reading.","unverified","journalseptdecofproceed81sanfrich",249,"https://archive.org/details/journalseptdecofproceed81sanfrich/page/n246",null,null,null,null,"n","a",0,8.94],["d","qipu:sf/decision/journalseptdecofproceed81sanfrich|139",1986,1986,"1986-10-27","ordinance","land-and-building","passed first reading","Balboa Reservoir land proposed for houses instead of public use","unverified","journalseptdecofproceed81sanfrich",248,"https://archive.org/details/journalseptdecofproceed81sanfrich/page/n245",null,null,null,null,"n","a",0,5.97],["d","qipu:sf/decision/journalseptdecofproceed81sanfrich|151",1986,1986,"1986-11-03","ordinance","land-and-building","passed","Balboa Reservoir land proposed for houses instead of public use","unverified","journalseptdecofproceed81sanfrich",278,"https://archive.org/details/journalseptdecofproceed81sanfrich/page/n275",null,null,null,null,"n","a",0,7.74],["d","qipu:sf/decision/journaljanaprofproceed82sanfrich:13/2",1987,1987,"1987-01-05","ballot_measure","whats-being-built","continued","Proposed November 1987 referendum on the Balboa Reservoir rezoning was continued to January 20, 1987.","quoted","journaljanaprofproceed82sanfrich",13,"https://archive.org/details/journaljanaprofproceed82sanfrich/page/n12",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/journaljanaprofproceed82sanfrich|8",1987,1987,"1987-01-05","ordinance","land-and-building","continued","Balboa Reservoir housing rezoning put off after a referendum petition","quoted","journaljanaprofproceed82sanfrich",13,"https://archive.org/details/journaljanaprofproceed82sanfrich/page/n12",null,null,null,null,"n","a",0,9.47],["d","qipu:sf/decision/journaljanaprofproceed82sanfrich|9",1987,1987,"1987-01-05","ordinance","land-and-building",null,"Balboa Reservoir rezoning vote in November put off to January","unverified","journaljanaprofproceed82sanfrich",13,"https://archive.org/details/journaljanaprofproceed82sanfrich/page/n12",null,null,null,null,"n","a",0,9.47],["d","qipu:sf/decision/journaljanaprofproceed82sanfrich|g20",1987,1987,"1987-01-05",null,"zoning","pending","Balboa Reservoir homes change put off.","unverified","journaljanaprofproceed82sanfrich",13,"https://archive.org/details/journaljanaprofproceed82sanfrich/page/n12",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journaljanaprofproceed82sanfrich|g21",1987,1987,"1987-01-05",null,"zoning","pending","Ballot vote on Balboa Reservoir homes put off.","unverified","journaljanaprofproceed82sanfrich",13,"https://archive.org/details/journaljanaprofproceed82sanfrich/page/n12",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journaljanaprofproceed82sanfrich:68/4",1987,1987,"1987-01-20","motion","housing","continued","Supervisor Gonzalez moved that the City Attorney sue over referendum petitions against zoning for Balboa Reservoir and Polytechnic High School.","quoted","journaljanaprofproceed82sanfrich",68,"https://archive.org/details/journaljanaprofproceed82sanfrich/page/n67",null,null,null,null,"n","a",0,4.0],["d","qipu:sf/decision/journaljanaprofproceed82sanfrich:70/2",1987,1987,"1987-01-20","ballot_measure","whats-being-built","continued","Proposal to put the Balboa Reservoir rezoning to RH-1 on the November 1987 ballot was continued to February 17, 1987.","quoted","journaljanaprofproceed82sanfrich",70,"https://archive.org/details/journaljanaprofproceed82sanfrich/page/n69",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/journaljanaprofproceed82sanfrich:85/7",1987,1987,"1987-01-20","motion","whats-being-built",null,"Supervisor Walker proposed asking the District Attorney to investigate irregularities in Balboa Reservoir and Polytechnic referendum petitions.","quoted","journaljanaprofproceed82sanfrich",85,"https://archive.org/details/journaljanaprofproceed82sanfrich/page/n84",null,null,null,null,"n","a",0,4.0],["d","qipu:sf/decision/journaljanaprofproceed82sanfrich|26",1987,1987,"1987-01-20","ordinance","land-and-building",null,"Balboa Reservoir rezoning vote put off again to February","unverified","journaljanaprofproceed82sanfrich",70,"https://archive.org/details/journaljanaprofproceed82sanfrich/page/n69",null,null,null,null,"n","a",0,9.47],["d","qipu:sf/decision/journaljanaprofproceed82sanfrich|g172",1987,1987,"1987-01-20","ordinance","zoning","pending","Balboa Reservoir zoning for houses postponed to February 17.","quoted","journaljanaprofproceed82sanfrich",69,"https://archive.org/details/journaljanaprofproceed82sanfrich/page/n68",null,null,null,null,"n","a",0,9.47],["d","qipu:sf/decision/journaljanaprofproceed82sanfrich|g173",1987,1987,"1987-01-20",null,"zoning","pending","Balboa Reservoir zoning for houses postponed to February 17.","unverified","journaljanaprofproceed82sanfrich",70,"https://archive.org/details/journaljanaprofproceed82sanfrich/page/n69",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journaljanaprofproceed82sanfrich|g174",1987,1987,"1987-01-20",null,"zoning","pending","Balboa Reservoir zoning public vote postponed to February 17.","unverified","journaljanaprofproceed82sanfrich",70,"https://archive.org/details/journaljanaprofproceed82sanfrich/page/n69",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journaljanaprofproceed82sanfrich:193/2",1987,1987,"1987-02-17","ballot_measure","housing","continued","Board moved to continue consideration of the South Balboa Reservoir rezoning ballot measure to March 2, 1987.","quoted","journaljanaprofproceed82sanfrich",193,"https://archive.org/details/journaljanaprofproceed82sanfrich/page/n192",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journaljanaprofproceed82sanfrich:194/1",1987,1987,"1987-02-17","ballot_measure","whats-being-built","continued","Motion to put the Balboa Reservoir zoning change to voters was continued to March 2, 1987.","quoted","journaljanaprofproceed82sanfrich",194,"https://archive.org/details/journaljanaprofproceed82sanfrich/page/n193",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/journaljanaprofproceed82sanfrich|91",1987,1987,"1987-02-17","ordinance","land-and-building","passed","Move to reaffirm the Balboa Reservoir housing rezoning","quoted","journaljanaprofproceed82sanfrich",193,"https://archive.org/details/journaljanaprofproceed82sanfrich/page/n192",null,null,null,null,"n","a",0,9.47],["d","qipu:sf/decision/journaljanaprofproceed82sanfrich|92",1987,1987,"1987-02-17","ordinance","land-and-building",null,"Balboa Reservoir rezoning vote put off to March","unverified","journaljanaprofproceed82sanfrich",193,"https://archive.org/details/journaljanaprofproceed82sanfrich/page/n192",null,null,null,null,"n","a",0,9.47],["d","qipu:sf/decision/journaljanaprofproceed82sanfrich|g475",1987,1987,"1987-02-17",null,"zoning","passed","Balboa Reservoir site change to one-family homes reaffirmed.","unverified","journaljanaprofproceed82sanfrich",193,"https://archive.org/details/journaljanaprofproceed82sanfrich/page/n192",null,null,null,null,"n","a",0,7.97],["d","qipu:sf/decision/journaljanaprofproceed82sanfrich:229/7",1987,1987,"1987-02-23","motion","housing",null,"Supervisor Kennedy asked departments to outline mortgage revenue financing requirements for the [name withheld] and Balboa Reservoir projects.","quoted","journaljanaprofproceed82sanfrich",229,"https://archive.org/details/journaljanaprofproceed82sanfrich/page/n228",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journaljanaprofproceed82sanfrich:249/2",1987,1987,"1987-03-02","motion","whats-being-built","tabled","Supervisor Maher's motion to table the South Balboa Reservoir rezoning referendum passed, so it will not go to voters.","quoted","journaljanaprofproceed82sanfrich",249,"https://archive.org/details/journaljanaprofproceed82sanfrich/page/n248",null,null,null,null,"n","a",0,4.0],["d","qipu:sf/decision/journaljanaprofproceed82sanfrich|110",1987,1987,"1987-03-02","ordinance","land-and-building",null,"Balboa Reservoir rezoning ballot measure tabled","unverified","journaljanaprofproceed82sanfrich",249,"https://archive.org/details/journaljanaprofproceed82sanfrich/page/n248",null,null,null,null,"n","a",0,9.47],["d","qipu:sf/decision/journaljanaprofproceed82sanfrich:298/2",1987,1987,"1987-03-09","ballot_measure",null,"referred","Skeletal ballot argument on the Balboa Reservoir referendum was referred to the Rules Committee.","quoted","journaljanaprofproceed82sanfrich",298,"https://archive.org/details/journaljanaprofproceed82sanfrich/page/n297",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journaljanaprofproceed82sanfrich|g872",1987,1987,"1987-03-16","motion","zoning","passed","City backs Proposition B to rezone Balboa Reservoir for low-density homes.","quoted","journaljanaprofproceed82sanfrich",329,"https://archive.org/details/journaljanaprofproceed82sanfrich/page/n328",null,null,null,null,"n","a",0,7.22],["d","qipu:sf/decision/journalmayaugofproceed82sanfrich:96/6",1987,1987,"1987-05-18","ordinance","housing","referred","Proposed sale of about 11.5 acres at Balboa Reservoir to 1st Nationwide Network Mortgage Company for housing was referred to committee.","quoted","journalmayaugofproceed82sanfrich",96,"https://archive.org/details/journalmayaugofproceed82sanfrich/page/n96",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/journalmayaugofproceed82sanfrich:153/4",1987,1987,"1987-06-01","ordinance","housing","passed first reading","Sale of 11.5 acres at Balboa Reservoir to 1st Nationwide Network Mortgage for housing passed on second reading.","quoted","journalmayaugofproceed82sanfrich",153,"https://archive.org/details/journalmayaugofproceed82sanfrich/page/n153",null,null,null,null,"n","a",0,6.88],["d","qipu:sf/decision/journalmayaugofproceed82sanfrich:154/1",1987,1987,"1987-06-01","ordinance","housing","passed first reading","Ordinance proposed to sell about 11.5 acres of city-owned Balboa Reservoir land to 1st Nationwide Network Mortgage Company for housing; passed first reading.","quoted","journalmayaugofproceed82sanfrich",154,"https://archive.org/details/journalmayaugofproceed82sanfrich/page/n154",null,null,null,null,"n","a",0,8.63],["d","qipu:sf/decision/journalmayaugofproceed82sanfrich:190/1",1987,1987,"1987-06-08","ordinance","housing","tabled","Proposed sale of 11.5 city acres at Balboa Reservoir to 1st Nationwide Network Mortgage Company for housing was tabled.","quoted","journalmayaugofproceed82sanfrich",190,"https://archive.org/details/journalmayaugofproceed82sanfrich/page/n190",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalmayaugofproceed82sanfrich:205/4",1987,1987,"1987-06-08","hearing","schools","referred","Supervisors Silver and Hongisto asked for a hearing on giving Balboa Reservoir to the Community College District; referred to Finance Committee.","quoted","journalmayaugofproceed82sanfrich",205,"https://archive.org/details/journalmayaugofproceed82sanfrich/page/n205",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalmayaugofproceed82sanfrich:206/1",1987,1987,"1987-06-08","other","schools","referred","Supervisors Silver and Hongisto asked the City Attorney to draft legislation giving Balboa Reservoir to the Community College District.","quoted","journalmayaugofproceed82sanfrich",206,"https://archive.org/details/journalmayaugofproceed82sanfrich/page/n206",null,null,null,null,"n","a",0,4.0],["d","qipu:sf/decision/journalmayaugofproceed82sanfrich:302/3",1987,1987,"1987-06-22","resolution","schools","referred","A resolution urging the Mayor to approve selling South Balboa Reservoir Basin to the Community College District was referred to Finance Committee.","quoted","journalmayaugofproceed82sanfrich",302,"https://archive.org/details/journalmayaugofproceed82sanfrich/page/n302",null,null,null,null,"n","a",0,4.0],["d","qipu:sf/decision/journalmayaugofproceed82sanfrich:407/3",1987,1987,"1987-07-13","other","schools",null,"Britt, for Nelder, directed the City Attorney to draft legislation transferring South Balboa Reservoir to the San Francisco Community College District.","quoted","journalmayaugofproceed82sanfrich",407,"https://archive.org/details/journalmayaugofproceed82sanfrich/page/n407",null,null,null,null,"n","a",0,4.0],["d","qipu:sf/decision/journalofproceed82septdecsanfrich:489/1",1987,1987,"1987-12-21","ordinance","housing","referred","Supervisors Maher and Walker proposed a policy for the Balboa Reservoir for City College, housing and open space; referred to Land Use Committee.","quoted","journalofproceed82septdecsanfrich",489,"https://archive.org/details/journalofproceed82septdecsanfrich/page/n488",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofjanaprproceed83sanfrich:346/12",1988,1988,"1988-03-07","other",null,null,"Walker requested a ballot argument on a proposition concerning the Balboa Reservoir; the outcome is not shown on this page.","quoted","journalofjanaprproceed83sanfrich",346,"https://archive.org/details/journalofjanaprproceed83sanfrich/page/n346",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofjanaprproceed83sanfrich:440/2",1988,1988,"1988-03-21","motion",null,"continued","Consideration of a ballot argument for Proposition I on Balboa Reservoir was continued to March 28, 1988.","quoted","journalofjanaprproceed83sanfrich",440,"https://archive.org/details/journalofjanaprproceed83sanfrich/page/n440",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/journalofjanaprproceed83sanfrich:496/1",1988,1988,"1988-03-28","motion",null,"tabled","Motion to fund a ballot argument favoring Proposition L on Balboa Reservoir was tabled by the Board.","quoted","journalofjanaprproceed83sanfrich",496,"https://archive.org/details/journalofjanaprproceed83sanfrich/page/n496",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofjanaprproceed83sanfrich:497/1",1988,1988,"1988-03-28","motion",null,"tabled","The Board tabled a motion to authorize a ballot argument favoring Proposition L on the Balboa Reservoir.","quoted","journalofjanaprproceed83sanfrich",497,"https://archive.org/details/journalofjanaprproceed83sanfrich/page/n497",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalmayaugofproceed83sanfrich:228/4",1988,1988,"1988-06-13","hearing","schools","referred","Silver, Nelder and Hongisto proposed selling Balboa Reservoir to City College for $1 (≈ $2.85 in 2026 dollars); sent to Finance Committee.","quoted","journalmayaugofproceed83sanfrich",228,"https://archive.org/details/journalmayaugofproceed83sanfrich/page/n228",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalmayaugofproceed83sanfrich:357/1",1988,1988,"1988-07-11","resolution","schools","passed","Resolution urges the Mayor to press the PUC to allow sale of Balboa Reservoir to the Community College District.","quoted","journalmayaugofproceed83sanfrich",357,"https://archive.org/details/journalmayaugofproceed83sanfrich/page/n357",null,null,null,null,"n","a",0,9.65],["d","qipu:sf/decision/journalofjanaprproceed84sanfrich:408/4",1989,1989,"1989-04-10","ordinance","schools","passed","Supervisor Nelder's request for legislation transferring Balboa Reservoir to City College for new library facilities was granted; drafting ordered.","quoted","journalofjanaprproceed84sanfrich",408,"https://archive.org/details/journalofjanaprproceed84sanfrich/page/n407",null,null,null,null,"n","a",0,7.03],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:101/1",1990,1990,"","site","study or report",null,"Balboa Reservoir · other: Adjacent to the Crosstown pipeline connecting Sunset and College Hill Reservoirs, at an intermediate elevation","unverified","C124904960",101,"https://archive.org/details/C124904960/page/n100",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:109/7",1990,1990,"","finding","study or report",null,"Balboa Reservoir · finding: low pressure areas in College Hill pressure zone could benefit from higher elevation of Balboa Reservoir","unverified","C124904960",109,"https://archive.org/details/C124904960/page/n108",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:109/8",1990,1990,"","recommendation","study or report",null,"Balboa Reservoir · recommendation: add one or both basins to provide significant additional storage","unverified","C124904960",109,"https://archive.org/details/C124904960/page/n108",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:113/2",1990,1990,"","finding","study or report",null,"Balboa Reservoir · finding: Franciscan Complex underlies Colma Formation beneath Balboa Reservoir","unverified","C124904960",113,"https://archive.org/details/C124904960/page/n112",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:113/3",1990,1990,"","finding","study or report",null,"Balboa Reservoir south basin · finding: Depth to Franciscan may be on the order of 200-250 feet beneath southwest corner","unverified","C124904960",113,"https://archive.org/details/C124904960/page/n112",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:113/4",1990,1990,"","finding","study or report",null,"Balboa Reservoir south basin · finding: Clayey and sandy clay layers encountered beneath southeast corner during early site investigation","unverified","C124904960",113,"https://archive.org/details/C124904960/page/n112",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:113/5",1990,1990,"","finding","study or report",null,"Colma Formation at Balboa Reservoir · finding: Medium to coarse sand with as much as 15 to 20 percent fines","unverified","C124904960",113,"https://archive.org/details/C124904960/page/n112",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:115/1",1990,1990,"","finding","study or report",null,"Balboa Reservoir · other: San Andreas fault, 4 miles from the site","unverified","C124904960",115,"https://archive.org/details/C124904960/page/n114",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:115/2",1990,1990,"","finding","study or report",null,"Balboa Reservoir · other: Hayward fault, 14 miles from the site","unverified","C124904960",115,"https://archive.org/details/C124904960/page/n114",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:115/3",1990,1990,"","finding","study or report",null,"Balboa Reservoir · other: Calaveras fault, 25 miles from the site","unverified","C124904960",115,"https://archive.org/details/C124904960/page/n114",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:115/4",1990,1990,"","finding","study or report",null,"Balboa Reservoir · other: San Gregorio fault, 7 miles from the site","unverified","C124904960",115,"https://archive.org/details/C124904960/page/n114",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:115/5",1990,1990,"","finding","study or report",null,"Balboa Reservoir · other: Concord fault, 27 miles from the site","unverified","C124904960",115,"https://archive.org/details/C124904960/page/n114",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:115/6",1990,1990,"","finding","study or report",null,"Balboa Reservoir · other: Rodgers Creek fault, 30 miles from the site","unverified","C124904960",115,"https://archive.org/details/C124904960/page/n114",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:115/7",1990,1990,"","finding","study or report",null,"Balboa Reservoir · other: San Andreas fault maximum Richter magnitude 8.3","unverified","C124904960",115,"https://archive.org/details/C124904960/page/n114",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:115/8",1990,1990,"","finding","study or report",null,"Balboa Reservoir project area · finding: Smaller regional faults are not considered capable of causing significant earthquake shaking within the project area","unverified","C124904960",115,"https://archive.org/details/C124904960/page/n114",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:117/1",1990,1990,"","finding","study or report",null,"Balboa Reservoir · finding: no known active faults at the site","unverified","C124904960",117,"https://archive.org/details/C124904960/page/n116",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:117/2",1990,1990,"","finding","study or report",null,"City College Fault · finding: City College Fault considered inactive","unverified","C124904960",117,"https://archive.org/details/C124904960/page/n116",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:117/5",1990,1990,"","measure","study or report",null,"Balboa Reservoir geotechnical investigation · other: 14 borings and 7 test pits in ESA study","unverified","C124904960",117,"https://archive.org/details/C124904960/page/n116",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:117/6",1990,1990,"","measure","study or report",null,"Balboa Reservoir geotechnical investigation · other: 10 borings and 10 test pits in MKE study","unverified","C124904960",117,"https://archive.org/details/C124904960/page/n116",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:13/1",1990,1990,"","site","study or report",null,"Balboa Reservoir · other: 150-million-gallon capacity, two basins","unverified","C124904960",13,"https://archive.org/details/C124904960/page/n12",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:13/3",1990,1990,"","site","study or report",null,"Balboa Reservoir · other: Never connected to City system and never filled","unverified","C124904960",13,"https://archive.org/details/C124904960/page/n12",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:13/4",1990,1990,"","site","study or report",null,"Balboa Reservoir north basin · use: Parking facility for City College","unverified","C124904960",13,"https://archive.org/details/C124904960/page/n12",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:145/1",1990,1990,"","project","study or report",null,"Balboa Reservoir South Basin · cost usd: Total cost estimate 24,086,246","unverified","C124904960",145,"https://archive.org/details/C124904960/page/n144",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:145/2",1990,1990,"","project","study or report",null,"Balboa Reservoir South Basin · cost usd: Subtotal 20,944,562","unverified","C124904960",145,"https://archive.org/details/C124904960/page/n144",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:145/3",1990,1990,"","project","study or report",null,"Balboa Reservoir South Basin · cost usd: Contingencies 15%, 3,141,684","unverified","C124904960",145,"https://archive.org/details/C124904960/page/n144",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:147/1",1990,1990,"","site","study or report",null,"Balboa Reservoir · other: overflow elevation 312 feet","unverified","C124904960",147,"https://archive.org/details/C124904960/page/n146",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:147/2",1990,1990,"","site","study or report",null,"Balboa Reservoir · other: depth about 30 feet","unverified","C124904960",147,"https://archive.org/details/C124904960/page/n146",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:147/3",1990,1990,"","finding","study or report",null,"Balboa Reservoir potential service area · other: static service between 100-foot and 220-foot contours at 40 to 90 psi","unverified","C124904960",147,"https://archive.org/details/C124904960/page/n146",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:147/4",1990,1990,"","finding","study or report",null,"Balboa Reservoir potential service area · other: could serve portions in the Western Addition and portions south of the freeway within College Hill pressure zone","unverified","C124904960",147,"https://archive.org/details/C124904960/page/n146",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:147/5",1990,1990,"","finding","study or report",null,"Balboa Reservoir potential service area · other: could serve a narrow band east of Twin Peaks","unverified","C124904960",147,"https://archive.org/details/C124904960/page/n146",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:151/1",1990,1990,"","alternative","study or report",null,"Balboa Reservoir · alternative: could serve the lower elevations of the Sunset pressure zone and virtually the entire Richmond District","unverified","C124904960",151,"https://archive.org/details/C124904960/page/n150",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:165/3",1990,1990,"","alternative","study or report",null,"Balboa Reservoir · rejected: use to solve Sunset and Richmond pressure problems eliminated as not practicable","unverified","C124904960",165,"https://archive.org/details/C124904960/page/n164",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:205/7",1990,1990,"","alternative","study or report",null,"Balboa Reservoir · alternative: supply College Hill zone, eliminating need to pump at Alemany","unverified","C124904960",205,"https://archive.org/details/C124904960/page/n204",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:211/1",1990,1990,"","finding","study or report",null,"Balboa Reservoir · alternative: Balboa could supply College Hill and University Mound Reservoirs","unverified","C124904960",211,"https://archive.org/details/C124904960/page/n210",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:215/1",1990,1990,"","alternative","study or report",null,"Balboa Reservoir supply from [name withheld] · cost usd: $3.0 million","unverified","C124904960",215,"https://archive.org/details/C124904960/page/n214",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:215/2",1990,1990,"","alternative","study or report",null,"Balboa Reservoir supply options · alternative: Alemany Pump Station or Sunset Reservoir","unverified","C124904960",215,"https://archive.org/details/C124904960/page/n214",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:215/3",1990,1990,"","measure","study or report",null,"Balboa Reservoir supply pipe, Circular Ave. · cost usd: $426,000","unverified","C124904960",215,"https://archive.org/details/C124904960/page/n214","Circular Ave.",null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:215/4",1990,1990,"","measure","study or report",null,"Balboa Reservoir supply pipe, Circular Ave. · cost usd: $1,708,000","unverified","C124904960",215,"https://archive.org/details/C124904960/page/n214","Circular Ave.",null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:215/5",1990,1990,"","measure","study or report",null,"Balboa Reservoir supply pipe, Natick St. · cost usd: $73,200","unverified","C124904960",215,"https://archive.org/details/C124904960/page/n214","Natick St.",null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:215/6",1990,1990,"","measure","study or report",null,"Balboa Reservoir supply pipe, Chenery St. · cost usd: $597,800","unverified","C124904960",215,"https://archive.org/details/C124904960/page/n214","Chenery St.",null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:215/7",1990,1990,"","measure","study or report",null,"Balboa Reservoir supply pipe, Fairmont St. · cost usd: $109,800","unverified","C124904960",215,"https://archive.org/details/C124904960/page/n214","Fairmont St.",null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:215/8",1990,1990,"","measure","study or report",null,"Balboa Reservoir supply pipe, Roanoke vault · cost usd: $122,000","unverified","C124904960",215,"https://archive.org/details/C124904960/page/n214",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:215/9",1990,1990,"","measure","study or report",null,"Balboa Reservoir supply pipe total · cost usd: $3,036,800","unverified","C124904960",215,"https://archive.org/details/C124904960/page/n214",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:217/1",1990,1990,"","site","study or report",null,"Balboa Reservoir · other: two basins located near San Francisco City College on Ocean and Phelan Avenues","unverified","C124904960",217,"https://archive.org/details/C124904960/page/n216","Ocean Avenue",null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:217/2",1990,1990,"","site","study or report",null,"Balboa Reservoir · other: total capacity 150 million gallons at overflow elevation 312 feet","unverified","C124904960",217,"https://archive.org/details/C124904960/page/n216","Ocean Avenue",null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:217/3",1990,1990,"","site","study or report",null,"Balboa Reservoir · other: never used for water storage","unverified","C124904960",217,"https://archive.org/details/C124904960/page/n216","Ocean Avenue",null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:217/4",1990,1990,"","site","study or report",null,"Balboa Reservoir north basin · use: parking lot for the College","unverified","C124904960",217,"https://archive.org/details/C124904960/page/n216","Ocean Avenue",null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:217/5",1990,1990,"","recommendation","study or report",null,"Balboa Reservoir · recommendation: renovation and roofing of a single basin with a piping connection to the City system","unverified","C124904960",217,"https://archive.org/details/C124904960/page/n216","Ocean Avenue",null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:217/6",1990,1990,"","site","study or report",null,"Balboa Reservoir · other: service to portions of the Sunset and College Hill pressure zones","unverified","C124904960",217,"https://archive.org/details/C124904960/page/n216","Ocean Avenue",null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:221/3",1990,1990,"","project","study or report",null,"Balboa Reservoir · alternative: Could mitigate low pressures in Western Addition and other low pressure regions","unverified","C124904960",221,"https://archive.org/details/C124904960/page/n220",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:221/8",1990,1990,"","project","study or report",null,"Balboa Reservoir · finding: Would ensure adequate fire fighting, emergency, and operational storage for College Hill zone","unverified","C124904960",221,"https://archive.org/details/C124904960/page/n220",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:225/1",1990,1990,"","finding","study or report",null,"Balboa Reservoir north basin · finding: southwest corner embankment soils liquefiable under maximum credible earthquake","unverified","C124904960",225,"https://archive.org/details/C124904960/page/n224",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:225/2",1990,1990,"","project","study or report",null,"Balboa Reservoir south basin roof · cost usd: approximately $24.1 million","unverified","C124904960",225,"https://archive.org/details/C124904960/page/n224",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:225/3",1990,1990,"","project","study or report",null,"Balboa Reservoir single basin renovation, roofing and piping · cost usd: estimated at $27.1 million, exclusive of Alemany Pump Station upgrades","unverified","C124904960",225,"https://archive.org/details/C124904960/page/n224",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:23/1",1990,1990,"","site","study or report",null,"Balboa Reservoir · other: unutilized facility in SFWD distribution system","unverified","C124904960",23,"https://archive.org/details/C124904960/page/n22",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:23/3",1990,1990,"","building","study or report",null,"Balboa Reservoir · other: two basins totaling 150 million gallons, never filled","unverified","C124904960",23,"https://archive.org/details/C124904960/page/n22",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:23/7",1990,1990,"","site","study or report",null,"Balboa Reservoir · other: Crosstown Pipeline runs by Balboa site; logical supply source","unverified","C124904960",23,"https://archive.org/details/C124904960/page/n22",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:233/1",1990,1990,"","finding","study or report",null,"Balboa Reservoir · finding: geotechnical evaluations based on limited subsurface data from previous studies","unverified","C124904960",233,"https://archive.org/details/C124904960/page/n232",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:233/2",1990,1990,"","recommendation","study or report",null,"Balboa Reservoir · recommendation: additional subsurface exploration and laboratory testing if grouting selected for liquefaction mitigation; evaluate medium dense soils in northern basin embankments","unverified","C124904960",233,"https://archive.org/details/C124904960/page/n232",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:25/1",1990,1990,"","site","study or report",null,"Balboa Reservoir (future) · other: capacity 150 MG, elevation 312.5 ft","unverified","C124904960",25,"https://archive.org/details/C124904960/page/n24",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:27/1",1990,1990,"","site","study or report",null,"Balboa Reservoir · other: assessed for integration into the City water distribution system","unverified","C124904960",27,"https://archive.org/details/C124904960/page/n26",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:35/1",1990,1990,"","site","study or report",null,"Balboa Reservoir · other: Total capacity 150 million gallons at overflow elevation 312 feet when both basins filled","unverified","C124904960",35,"https://archive.org/details/C124904960/page/n34",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:35/2",1990,1990,"","site","study or report",null,"Balboa Reservoir · other: Two basins located near San Francisco City College on Ocean and Phelan Avenues","unverified","C124904960",35,"https://archive.org/details/C124904960/page/n34","Ocean Avenue",null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:35/3",1990,1990,"","site","study or report",null,"Balboa Reservoir north basin · use: Parking lot for the College","unverified","C124904960",35,"https://archive.org/details/C124904960/page/n34",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:35/4",1990,1990,"","site","study or report",null,"Balboa Reservoir · other: Asphalt-concrete lined basins never used for water storage","unverified","C124904960",35,"https://archive.org/details/C124904960/page/n34",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:35/5",1990,1990,"","site","study or report",null,"Balboa Reservoir · other: Pipe connects the two basins; no supply or service lines connected to either basin","unverified","C124904960",35,"https://archive.org/details/C124904960/page/n34",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:45/3",1990,1990,"","site","study or report",null,"Balboa Reservoir · other: Crosstown Pipeline runs past the Balboa Reservoir site","unverified","C124904960",45,"https://archive.org/details/C124904960/page/n44",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:51/1",1990,1990,"","finding","study or report",null,"Balboa Reservoir · finding: North basin used for parking for years","unverified","C124904960",51,"https://archive.org/details/C124904960/page/n50",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:51/2",1990,1990,"","recommendation","study or report",null,"Balboa Reservoir · recommendation: Clean and/or line north basin before use to prevent oil contamination","unverified","C124904960",51,"https://archive.org/details/C124904960/page/n50",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:95/1",1990,1990,"","finding","study or report",null,"Balboa Reservoir basin addition · other: average 3.6 days of storage to Sunset-group pressure zones","unverified","C124904960",95,"https://archive.org/details/C124904960/page/n94",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:95/2",1990,1990,"","finding","study or report",null,"Balboa Reservoir basin addition · other: average 3.8 days of storage to Balboa-group pressure zones","unverified","C124904960",95,"https://archive.org/details/C124904960/page/n94",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:95/3",1990,1990,"","finding","study or report",null,"Balboa Reservoir basins · other: storage of Balboa group increased to 5.0 days with both basins","unverified","C124904960",95,"https://archive.org/details/C124904960/page/n94",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:95/4",1990,1990,"","finding","study or report",null,"Balboa Reservoir basins · other: City-wide storage average 4.1 days with both Balboa basins","unverified","C124904960",95,"https://archive.org/details/C124904960/page/n94",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:149/1",1990,1990,"12/65","site","study or report",null,"Potential Balboa Reservoir · other: Service area of potential Balboa Reservoir, shown with 40 PSI and 90 PSI static pressure contours (Figure 4-1, City Drawing E-3728-3)","unverified","C124904960",149,"https://archive.org/details/C124904960/page/n148",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:270/1",1990,1990,"12/89","site","study or report",null,"Balboa Reservoir · other: Plan layout drawing, Plate 11, prepared by AGS, Inc. civil engineers (Job No. SF90506)","unverified","C124904960",270,"https://archive.org/details/C124904960/page/n269",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:272/1",1990,1990,"12/89","building","study or report",null,"Balboa Reservoir · other: Typical north-south reservoir section at shear wall 5 (plate 12)","unverified","C124904960",272,"https://archive.org/details/C124904960/page/n271",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:272/2",1990,1990,"12/89","building","study or report",null,"Balboa Reservoir · other: North-south span, typical, 44 ft 3 in","unverified","C124904960",272,"https://archive.org/details/C124904960/page/n271",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:272/3",1990,1990,"12/89","agency","study or report",null,"Balboa Reservoir general sections drawing · other: AGS, inc., Civil Engineers, job no. SF90506","unverified","C124904960",272,"https://archive.org/details/C124904960/page/n271",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:111/1",1990,1990,"1990","site","study or report",null,"Balboa Reservoir · other: two existing cut and fill basins","unverified","C124904960",111,"https://archive.org/details/C124904960/page/n110",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:111/2",1990,1990,"1990","site","study or report",null,"Balboa Reservoir · other: lowest elevation about 205 feet, below the toe of the south basin","unverified","C124904960",111,"https://archive.org/details/C124904960/page/n110",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:111/3",1990,1990,"1990","site","study or report",null,"Balboa Reservoir · other: highest elevation about 320 feet, above the rim of the north basin","unverified","C124904960",111,"https://archive.org/details/C124904960/page/n110",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:111/4",1990,1990,"1990","site","study or report",null,"Balboa Reservoir · other: basins lined with asphalt concrete; exterior slopes covered with vegetation","unverified","C124904960",111,"https://archive.org/details/C124904960/page/n110",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:111/5",1990,1990,"1990","finding","study or report",null,"Balboa Reservoir · finding: no outcrops of geologic units underlying the facility were observed during the site reconnaissance","unverified","C124904960",111,"https://archive.org/details/C124904960/page/n110",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:111/6",1990,1990,"1990","site","study or report",null,"Balboa Reservoir · other: located in the south central portion of the City of San Francisco","unverified","C124904960",111,"https://archive.org/details/C124904960/page/n110",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:123/1",1990,1990,"1990","finding","study or report",null,"Balboa Reservoir northern basin embankments · finding: liquefaction potential and seismic stability reevaluated for eastern and western embankments","unverified","C124904960",123,"https://archive.org/details/C124904960/page/n122",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:123/2",1990,1990,"1990","finding","study or report",null,"Balboa Reservoir northern basin embankments · finding: northern and southern embankments not evaluated due to inadequate geotechnical data","unverified","C124904960",123,"https://archive.org/details/C124904960/page/n122",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:123/3",1990,1990,"1990","measure","study or report",null,"Balboa Reservoir western embankment · other: finite element seismic response analysis using computer program FLUSH","unverified","C124904960",123,"https://archive.org/details/C124904960/page/n122",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:123/4",1990,1990,"1990","recommendation","study or report",null,"Balboa Reservoir embankment · recommendation: seismic stability evaluation should include dynamic response analysis, static stress analysis, liquefaction evaluation, and stability assessment","unverified","C124904960",123,"https://archive.org/details/C124904960/page/n122",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:127/1",1990,1990,"1990","finding","study or report",null,"Balboa and Francisco Reservoirs embankment-foundation system · other: FLUSH response analyses performed for generalized soil profile; maximum credible earthquake bedrock acceleration 0.60g","unverified","C124904960",127,"https://archive.org/details/C124904960/page/n126",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:129/1",1990,1990,"1990","finding","study or report",null,"Balboa Reservoir south basin · finding: foundation materials in southeastern portion of the south basin are not liquefiable","unverified","C124904960",129,"https://archive.org/details/C124904960/page/n128",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:129/2",1990,1990,"1990","finding","study or report",null,"Balboa Reservoir north basin · finding: a portion of the western and eastern embankment of the north basin is liquefiable under the maximum credible earthquake","unverified","C124904960",129,"https://archive.org/details/C124904960/page/n128",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:129/3",1990,1990,"1990","recommendation","study or report",null,"Balboa Reservoir embankment · recommendation: line reservoir with subdrains or grout the liquefiable soils to mitigate liquefaction potential","unverified","C124904960",129,"https://archive.org/details/C124904960/page/n128",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:129/4",1990,1990,"1990","finding","study or report",null,"Balboa Reservoir embankment · finding: consequences of liquefaction could be settlement and cracking of the embankment and failure of some portions of the embankment slopes","unverified","C124904960",129,"https://archive.org/details/C124904960/page/n128",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:129/5",1990,1990,"1990","recommendation","study or report",null,"Balboa Reservoir south basin · recommendation: additional subsurface exploration and laboratory testing required in the south basin","unverified","C124904960",129,"https://archive.org/details/C124904960/page/n128",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:129/6",1990,1990,"1990","building","study or report",null,"Balboa Reservoir · built: proposed two-basin reservoir, each basin approximately 870 feet long by 540 feet wide by 31 feet deep","unverified","C124904960",129,"https://archive.org/details/C124904960/page/n128",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:131/2",1990,1990,"1990","finding","study or report",null,"Balboa Reservoir roof structure · finding: conceptual evaluation of structural design of roof structure found satisfactory; construction details not checked","unverified","C124904960",131,"https://archive.org/details/C124904960/page/n130",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:131/3",1990,1990,"1990","building","study or report",null,"Balboa Reservoir · other: roof structure with two north-south expansion joints and one east-west expansion joint, dividing structure into six sections","unverified","C124904960",131,"https://archive.org/details/C124904960/page/n130",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:131/4",1990,1990,"1990","building","study or report",null,"Balboa Reservoir North and South Basins · other: North Basin and South Basin have approximately the same dimensions and operating conditions; North Basin design should match South Basin","unverified","C124904960",131,"https://archive.org/details/C124904960/page/n130",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:139/6",1990,1990,"1990","project","study or report",null,"Balboa Reservoir South Basin roof · cost usd: approximately $24.0 million (1990 dollars)","unverified","C124904960",139,"https://archive.org/details/C124904960/page/n138",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:139/7",1990,1990,"1990","measure","study or report",null,"grouting of soil under reservoir · cost usd: approximately $10 per cubic yard of soil to be grouted","unverified","C124904960",139,"https://archive.org/details/C124904960/page/n138",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:167/12",1990,1990,"1990","finding","study or report",null,"Balboa Reservoir · other: Hydraulic grade line near Balboa Reservoir under maximum day demand is 365 feet","unverified","C124904960",167,"https://archive.org/details/C124904960/page/n166",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:167/13",1990,1990,"1990","finding","study or report",null,"Balboa pressure zone · finding: Balboa pressure zone grade line of only 312 feet; extension will not solve low pressure problems","unverified","C124904960",167,"https://archive.org/details/C124904960/page/n166",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:17/1",1990,1990,"1990","finding","study or report",null,"Balboa Reservoir · finding: southernmost portion of the College Hill zone would experience low pressures under maximum day, peak hour, and fire fighting demands","unverified","C124904960",17,"https://archive.org/details/C124904960/page/n16",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:17/2",1990,1990,"1990","finding","study or report",null,"Balboa Reservoir · finding: costs of the piping required to connect the Western Addition area are not justified by the benefit","unverified","C124904960",17,"https://archive.org/details/C124904960/page/n16",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:19/1",1990,1990,"1990","finding","study or report",null,"Balboa Reservoir · finding: soils in the southwest corner of the north basin are liquefiable","unverified","C124904960",19,"https://archive.org/details/C124904960/page/n18",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:19/2",1990,1990,"1990","recommendation","study or report",null,"Balboa Reservoir · recommendation: renovation and roofing of a single basin and piping connection to the City system","unverified","C124904960",19,"https://archive.org/details/C124904960/page/n18",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:19/3",1990,1990,"1990","measure","study or report",null,"Balboa Reservoir · cost usd: $27.1 million","unverified","C124904960",19,"https://archive.org/details/C124904960/page/n18",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:19/4",1990,1990,"1990","finding","study or report",null,"Balboa Reservoir · finding: does not meet the 3.5- to 7.0- day reserve supply criterion","unverified","C124904960",19,"https://archive.org/details/C124904960/page/n18",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:19/5",1990,1990,"1990","recommendation","study or report",null,"Balboa Reservoir · recommendation: supply from [name withheld] and use to supply College Hill pressure zone","unverified","C124904960",19,"https://archive.org/details/C124904960/page/n18",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:201/4",1990,1990,"1990","building","study or report",null,"Balboa Reservoir · height ft: 312-foot Balboa Reservoir","unverified","C124904960",201,"https://archive.org/details/C124904960/page/n200",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:209/1",1990,1990,"1990","finding","study or report",null,"Balboa Reservoir · finding: Could provide a direct, gravity-fed supply in the event of a failure of the College Hill supply system","unverified","C124904960",209,"https://archive.org/details/C124904960/page/n208",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:213/1",1990,1990,"1990","finding","study or report",null,"Balboa Reservoir water supply · finding: Supplied least expensively by the Alemany Pump Station","unverified","C124904960",213,"https://archive.org/details/C124904960/page/n212",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:213/3",1990,1990,"1990","alternative","study or report",null,"Supply to Balboa via C.S. pipeline/Alemany P/S · cost usd: $40 per MG total cost","unverified","C124904960",213,"https://archive.org/details/C124904960/page/n212",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:219/10",1990,1990,"1990","recommendation","study or report",null,"Balboa Reservoir · recommendation: direct service from Balboa Reservoir would mitigate low-pressure problems south of College Hill Reservoir","unverified","C124904960",219,"https://archive.org/details/C124904960/page/n218",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:219/2",1990,1990,"1990","alternative","study or report",null,"Balboa Reservoir · rejected: [name withheld] to resolve low pressures in the northeast portion of the Sunset pressure zone is not an alternative solution","unverified","C124904960",219,"https://archive.org/details/C124904960/page/n218",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:219/3",1990,1990,"1990","finding","study or report",null,"Sunset hydraulic grade line near Balboa Reservoir · other: hydraulic grade line 365 feet under maximum day demand","unverified","C124904960",219,"https://archive.org/details/C124904960/page/n218",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:223/1",1990,1990,"1990","alternative","study or report",null,"Balboa Reservoir · recommendation: [name withheld] to serve the entire College Hill pressure zone","unverified","C124904960",223,"https://archive.org/details/C124904960/page/n222",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:223/2",1990,1990,"1990","alternative","study or report",null,"Balboa Reservoir · recommendation: Use one Balboa basin, served via the [name withheld] pipelines and the Alemany Pump Station","unverified","C124904960",223,"https://archive.org/details/C124904960/page/n222",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:223/3",1990,1990,"1990","measure","study or report",null,"Balboa Reservoir connection to Alemany Pump Station · cost usd: about $3.0 million for 12,200 feet of 36-inch water main","unverified","C124904960",223,"https://archive.org/details/C124904960/page/n222","Circular Avenue",null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:223/6",1990,1990,"1990","finding","study or report",null,"Balboa Reservoir · other: Reserves for College Hill and University Mound zones increase to 3.8 days with one Balboa basin or 5.0 days with both","unverified","C124904960",223,"https://archive.org/details/C124904960/page/n222",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:223/9",1990,1990,"1990","finding","study or report",null,"Balboa Reservoir · finding: Water in storage should be circulated about once a week; one basin circulated every 5.6 days, both every 11.3 days","unverified","C124904960",223,"https://archive.org/details/C124904960/page/n222",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:117/4",1990,1990,"June 1987","event","study or report",null,"Seismic and Geotechnical Re-evaluation of the North Basin, Balboa Reservoir · other: Morrison-Knudsen Engineers report for Utilities Engineering Bureau","unverified","C124904960",117,"https://archive.org/details/C124904960/page/n116",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:117/3",1990,1990,"May 1974","event","study or report",null,"Geotechnical Investigation of Balboa Reservoir · other: Earth Sciences Associates report for San Francisco Water Department","unverified","C124904960",117,"https://archive.org/details/C124904960/page/n116",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:113/1",1990,1990,"Pleistocene","finding","study or report",null,"Balboa Reservoir · finding: Reservoir situated on Colma Formation, Pleistocene unconsolidated sandy estuarine and coastal deposit","unverified","C124904960",113,"https://archive.org/details/C124904960/page/n112",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/igsl_san-francisco-real-prop-report_1995:41/12",1995,1995,"1995","property_record","city-owned property report",null,"Balboa Reservoir, South Basin · owned by city: Community College","unverified","igsl_san-francisco-real-prop-report_1995",41,"https://archive.org/details/igsl_san-francisco-real-prop-report_1995/page/n40","Phelan Ave.",null,null,"Real property owned by the city and county of San Francisco / 1995","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/igsl_san-francisco-real-prop-report_1998:43/6",1998,1998,"","property_record","city-owned property report",null,"Balboa Reservoir, South Basin · assessed value usd: $629,727","unverified","igsl_san-francisco-real-prop-report_1998",43,"https://archive.org/details/igsl_san-francisco-real-prop-report_1998/page/n42","Phelan Avenue",null,null,"Real property owned by the city and county of San Francisco / 1998","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/igsl_san-francisco-real-prop-report_2000:58/7",2000,2000,"","property_record","city-owned property report",null,"Balboa Reservoir, South Basin Rechannelization · owned by city: Community College","unverified","igsl_san-francisco-real-prop-report_2000",58,"https://archive.org/details/igsl_san-francisco-real-prop-report_2000/page/n57","Phelan Avenue",null,null,"Real property owned by the city and county of San Francisco / 2000","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124925153:71/2",2001,2001,"","site","study or report",null,"Balboa reservoir site · other: Water Department and Community College District have interests in the site","unverified","C124925153",71,"https://archive.org/details/C124925153/page/n70",null,null,null,"Data and needs analysis : part one of the Housing element revision : an element of the San Francisco general plan","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101694856:77/4",2002,2002,"","site","plan",null,"Balboa reservoir site · other: Community College District and Water Department have interests; within Better Neighborhoods study area","unverified","C101694856",77,"https://archive.org/details/C101694856/page/n76",null,null,null,"Housing element : an element of the San Francisco general plan : draft for public review","n","a",0,3.0],["d","qipu:sf/decision/meetingjuneaugminutes97sanfrich:48/3",2002,2002,"2002-06-03","hearing","schools","referred","Supervisor Sandoval requested a hearing on land use issues in the Balboa Reservoir transfer between City College and the utilities commission.","quoted","meetingjuneaugminutes97sanfrich",48,"https://archive.org/details/meetingjuneaugminutes97sanfrich/page/n47",null,null,null,null,"n","a",0,4.0],["d","qipu:sf/decision/meetingminutesb2002sanf_0:48/3",2002,2002,"2002-06-03","hearing","schools","referred","A hearing on transferring Balboa Reservoir land between City College and the Public Utilities Commission was referred to committee.","quoted","meetingminutesb2002sanf_0",48,"https://archive.org/details/meetingminutesb2002sanf_0/page/n47",null,null,null,null,"n","a",0,1.5],["f","dl-sf-facts-v1.1-haiku55-2026-10/igsl_san-francisco-real-prop-report_2003:153/1",2003,2002,"2002-2003","property_record","annual report",null,"Balboa Reservoir, South Basin · owned by city","unverified","igsl_san-francisco-real-prop-report_2003",153,"https://archive.org/details/igsl_san-francisco-real-prop-report_2003/page/n152","15 PHELAN AVE",null,null,"Real property owned by the city and county of San Francisco / 2003","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/igsl_san-francisco-real-prop-report_2002:157/8",2002,2002,"FISCAL YEAR 2001-2002","property_record","annual report",null,"BALBOA RESERVOIR, SOUTH BASIN · owned by city: CITY COUNTY OF SAN FRANCISCO","unverified","igsl_san-francisco-real-prop-report_2002",157,"https://archive.org/details/igsl_san-francisco-real-prop-report_2002/page/n156","15 PHELAN AVE",null,null,"Real property owned by the city and county of San Francisco / 2002","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124925579:94/4",2003,2003,"","site","plan",null,"Balboa reservoir site · other: Community College District and Water Department both have interests in the site","unverified","C124925579",94,"https://archive.org/details/C124925579/page/n93",null,null,null,"Housing element : an element of the San Francisco general plan : final draft for public review","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/igsl_san-francisco-real-prop-report_2003:58/5",2003,2003,"2003","property_record","annual report",null,"BALBOA RESERVOIR, SOUTH BASIN · owned by city: SF Community College District","unverified","igsl_san-francisco-real-prop-report_2003",58,"https://archive.org/details/igsl_san-francisco-real-prop-report_2003/page/n57","15 PHELAN AVENUE",null,null,"Real property owned by the city and county of San Francisco / 2003","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/igsl_san-francisco-real-prop-report_2004:58/5",2004,2003,"2003-2004","property_record","annual report",null,"BALBOA RESERVOIR, SOUTH BASIN · owned by city: SF Community College District","unverified","igsl_san-francisco-real-prop-report_2004",58,"https://archive.org/details/igsl_san-francisco-real-prop-report_2004/page/n57","15 PHELAN AVENUE",null,null,"Real property owned by the city and county of San Francisco / 2004","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101746510:114/1",2004,2004,"","site","plan",null,"Balboa Reservoir site · units: 575 to 1,000 new housing units","unverified","C101746510",114,"https://archive.org/details/C101746510/page/n113",null,null,null,"Housing element : an element of the San Francisco general plan","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101746510:114/2",2004,2004,"","site","plan",null,"Balboa Reservoir site · acreage: 25-acre site","unverified","C101746510",114,"https://archive.org/details/C101746510/page/n113",null,null,null,"Housing element : an element of the San Francisco general plan","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/igsl_san-francisco-real-prop-report_2004:154/14",2004,2004,"Fiscal Year 2003-2004","property_record","annual report",null,"Balboa Reservoir, South Basin · owned by city: City and County of San Francisco","unverified","igsl_san-francisco-real-prop-report_2004",154,"https://archive.org/details/igsl_san-francisco-real-prop-report_2004/page/n153","15 PHELAN AVE",null,null,"Real property owned by the city and county of San Francisco / 2004","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/igsl_san-francisco-real-prop-report_2005:160/4",2005,2005,"FY 2004-2005","property_record","annual report",null,"Balboa Reservoir, South Basin · owned by city: not printed on page","unverified","igsl_san-francisco-real-prop-report_2005",160,"https://archive.org/details/igsl_san-francisco-real-prop-report_2005/page/n159","50 Phelan Ave",null,null,"Real property owned by the city and county of San Francisco / 2005","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/igsl_san-francisco-real-prop-report_2005:60/9",2005,2005,"FY 2004-2005","property_record","annual report",null,"BALBOA RESERVOIR, SOUTH BASIN · owned by city: SF Community College District","unverified","igsl_san-francisco-real-prop-report_2005",60,"https://archive.org/details/igsl_san-francisco-real-prop-report_2005/page/n59","15 PHELAN AVENUE",null,null,"Real property owned by the city and county of San Francisco / 2005","n","a",0,3.0],["d","qipu:sf/decision/meetingminutesb2006sanf_3:21/4",2006,2006,null,"resolution",null,"referred","Parking limits and meters on Ocean Avenue near Balboa Reservoir were sent to committee for review.","quoted","meetingminutesb2006sanf_3",21,"https://archive.org/details/meetingminutesb2006sanf_3/page/n20",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meetingseptdec2006minutes101sanfrich:163/4",2006,2006,null,"resolution",null,null,"Proposed parking rule changes near Balboa Reservoir, including Ocean Avenue; outcome not shown on this page.","quoted","meetingseptdec2006minutes101sanfrich",163,"https://archive.org/details/meetingseptdec2006minutes101sanfrich/page/n162",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meetingseptdec2006minutes101sanfrich:21/4",2006,2006,null,"resolution",null,"referred","Supervisor Elsbernd proposed parking time limit and meter changes on Ocean Avenue near Balboa Reservoir; referred to committee.","quoted","meetingseptdec2006minutes101sanfrich",21,"https://archive.org/details/meetingseptdec2006minutes101sanfrich/page/n20",null,null,null,null,"n","a",0,1.5],["d","qipu:sf/decision/meetingminutesb2006sanf_3:165/4",2006,2006,"2006-10-24","resolution",null,"passed","Parking rules near Balboa Reservoir would be enacted and rescinded at several locations, including Ocean Avenue; outcome pending.","quoted","meetingminutesb2006sanf_3",165,"https://archive.org/details/meetingminutesb2006sanf_3/page/n164",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meetingminutesd2006sanf_0:241/3",2006,2006,"2006-10-24","resolution",null,"passed","Ocean Avenue parking rules changed near Balboa Reservoir, adding two-hour metered parking on both sides; adopted.","quoted","meetingminutesd2006sanf_0",241,"https://archive.org/details/meetingminutesd2006sanf_0/page/n240",null,null,null,null,"n","a",0,5.75],["f","dl-sf-facts-v1.1-haiku55-2026-10/igsl_san-francisco-real-prop-report_2006:53/1",2006,2006,"FY 2005-2006","property_record","city-owned property report",null,"Balboa Reservoir, South Basin · owned by city: SF Community College District","unverified","igsl_san-francisco-real-prop-report_2006",53,"https://archive.org/details/igsl_san-francisco-real-prop-report_2006/page/n52",null,null,null,"Real property owned by the city and county of San Francisco / 2006","n","a",0,3.0],["d","qipu:sf/decision/meetingminutesbo2015sanf:163/3",2015,2015,"2015-03-10","ordinance","housing","referred","Proposed ordinance would create an advisory committee on housing development at the Balboa Reservoir; sent to the Government Audit and Oversight Committee.","quoted","meetingminutesbo2015sanf",163,"https://archive.org/details/meetingminutesbo2015sanf/page/n162",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meetingminutesbo2015sanf|g458",2015,2015,"2015-03-10",null,"housing","pending","Proposed advisory group on Balboa Reservoir housing plans.","unverified","meetingminutesbo2015sanf",163,"https://archive.org/details/meetingminutesbo2015sanf/page/n162",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meetingminutesbo2015sanf:197/2",2015,2015,"2015-03-17","ordinance","housing","passed first reading","Supervisor Yee's ordinance creating a Balboa Reservoir community advisory committee passed first reading.","quoted","meetingminutesbo2015sanf",197,"https://archive.org/details/meetingminutesbo2015sanf/page/n196",null,null,null,null,"n","a",0,7.63],["d","qipu:sf/decision/meetingminutesbo2015sanf|g566",2015,2015,"2015-03-17",null,"housing","pending","Proposal for advisory group for Balboa Reservoir housing to get first approval; no final vote on record.","unverified","meetingminutesbo2015sanf",197,"https://archive.org/details/meetingminutesbo2015sanf/page/n196",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meetingminutesdr2015sanf|g334",2015,2015,"2015-03-24",null,"housing","pending","Advisory group for Balboa Reservoir housing gets first vote.","unverified","meetingminutesdr2015sanf",151,"https://archive.org/details/meetingminutesdr2015sanf/page/n150",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meetingminutesbo2015sanf:215/1",2015,2015,"2015-03-31","ordinance","housing","passed","Board of Supervisors finally passed an ordinance creating the Balboa Reservoir Community Advisory Committee on proposed housing development there.","quoted","meetingminutesbo2015sanf",215,"https://archive.org/details/meetingminutesbo2015sanf/page/n214",null,null,null,null,"n","a",0,7.26],["d","qipu:sf/decision/meetingminutesbo2015sanf|g596",2015,2015,"2015-03-31",null,"housing","passed","Advisory group set up for Balboa Reservoir housing plans","unverified","meetingminutesbo2015sanf",215,"https://archive.org/details/meetingminutesbo2015sanf/page/n214",null,null,null,null,"n","a",0,5.88],["d","qipu:sf/decision/meetingminutesbo2015sanf|g597",2015,2015,"2015-03-31",null,"housing","passed","Advisory group set up for Balboa Reservoir housing plans.","unverified","meetingminutesbo2015sanf",215,"https://archive.org/details/meetingminutesbo2015sanf/page/n214",null,null,null,null,"n","a",0,5.88],["d","qipu:sf/decision/meetingminutesdr2015sanf:159/1",2015,2015,"2015-03-31","ordinance","housing","passed","Balboa Reservoir Community Advisory Committee established to advise on future housing development at the Balboa Reservoir, finally passed.","quoted","meetingminutesdr2015sanf",159,"https://archive.org/details/meetingminutesdr2015sanf/page/n158",null,null,null,null,"n","a",0,6.51],["d","qipu:sf/decision/meetingminutesdr2015sanf|g345",2015,2015,"2015-03-31",null,"housing","passed","Advisory group for Balboa Reservoir housing made final","unverified","meetingminutesdr2015sanf",159,"https://archive.org/details/meetingminutesdr2015sanf/page/n158",null,null,null,null,"n","a",0,5.88],["d","qipu:sf/decision/sfbos:bag021318|86",2018,2018,"2018-02-13","resolution","land-and-building",null,"Balboa Reservoir housing feasibility finding sent to committee","unverified",null,null,"https://sfbos.org/sites/default/files/bag021318_minutes.pdf#page=24",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag040318|44",2018,2018,"2018-04-03","resolution","land-and-building",null,"Balboa Reservoir development put forward as fiscally feasible","unverified",null,null,"https://sfbos.org/sites/default/files/bag040318_minutes.pdf#page=9",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag040318|45",2018,2018,"2018-04-03","resolution","running-the-city","passed","Balboa Reservoir housing plan found financially workable","unverified",null,null,"https://sfbos.org/sites/default/files/bag040318_minutes.pdf#page=9",null,null,null,null,"n","a",0,5.64],["d","qipu:sf/decision/sfbos:bag051220|13",2020,2020,"2020-05-12","ordinance",null,null,"Balboa Reservoir advisory committee extended on first reading","unverified",null,null,"https://sfbos.org/sites/default/files/bag051220_minutes.pdf#page=8",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag051220|14",2020,2020,"2020-05-12","resolution",null,null,"Comment on COVID-19 data reporting and library access","unverified",null,null,"https://sfbos.org/sites/default/files/bag051220_minutes.pdf#page=8",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag051220|15",2020,2020,"2020-05-12","resolution",null,null,"Comment on the facial recognition bill and hotel housing","unverified",null,null,"https://sfbos.org/sites/default/files/bag051220_minutes.pdf#page=8",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag051920|6",2020,2020,"2020-05-19","ordinance","running-the-city","passed","Balboa Reservoir community committee extended to July 2021","unverified",null,null,"https://sfbos.org/sites/default/files/bag051920_minutes.pdf#page=4",null,null,null,null,"n","a",0,5.43],["d","qipu:sf/decision/sfbos:bag062320|139",2020,2020,"2020-06-23","ordinance","land-and-building",null,"Balboa Reservoir plan changes sent to the land use committee","unverified",null,null,"https://sfbos.org/sites/default/files/bag062320_minutes.pdf#page=29",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag071420|71",2020,2020,"2020-07-14","ordinance","land-and-building",null,"Balboa Reservoir deal with Reservoir Community Partners sent to committee","unverified",null,null,"https://sfbos.org/sites/default/files/bag071420_minutes.pdf#page=24",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag072120|87",2020,2020,"2020-07-21","resolution",null,null,"Public comment on Cuba collaboration and the Balboa Reservoir project","unverified",null,null,"https://sfbos.org/sites/default/files/bag072120_minutes.pdf#page=23",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/sfbos:bag081120|46",2020,2020,"2020-08-11","motion","running-the-city",null,"Balboa Reservoir environmental report appeal heard and filed","unverified",null,null,"https://sfbos.org/sites/default/files/bag081120_minutes.pdf#page=14",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag081120|47",2020,2020,"2020-08-11","motion","running-the-city",null,"Affirming the Balboa Reservoir environmental report put forward","unverified",null,null,"https://sfbos.org/sites/default/files/bag081120_minutes.pdf#page=14",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag081120|48",2020,2020,"2020-08-11","motion","running-the-city",null,"Affirmation of the Balboa Reservoir report put to a vote","unverified",null,null,"https://sfbos.org/sites/default/files/bag081120_minutes.pdf#page=14",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag081120|49",2020,2020,"2020-08-11","motion","running-the-city","passed","Balboa Reservoir environmental review approved, 11-0","unverified",null,null,"https://sfbos.org/sites/default/files/bag081120_minutes.pdf#page=14",null,null,null,null,"n","a",0,4.82],["d","qipu:sf/decision/sfbos:bag081120|50",2020,2020,"2020-08-11","motion","running-the-city","refused","Conditional reversal of the Balboa Reservoir report put forward","unverified",null,null,"https://sfbos.org/sites/default/files/bag081120_minutes.pdf#page=15",null,null,null,null,"n","a",0,6.04],["d","qipu:sf/decision/sfbos:bag081120|51",2020,2020,"2020-08-11","motion","running-the-city",null,"Conditional reversal of the Balboa Reservoir report tabled","unverified",null,null,"https://sfbos.org/sites/default/files/bag081120_minutes.pdf#page=15",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag081120|52",2020,2020,"2020-08-11","motion","running-the-city",null,"Findings to reverse the Balboa Reservoir report put forward","unverified",null,null,"https://sfbos.org/sites/default/files/bag081120_minutes.pdf#page=15",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag081120|53",2020,2020,"2020-08-11","motion","running-the-city",null,"Findings to reverse the Balboa Reservoir report tabled","unverified",null,null,"https://sfbos.org/sites/default/files/bag081120_minutes.pdf#page=15",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag081120|54",2020,2020,"2020-08-11","ordinance","land-and-building",null,"Balboa Reservoir plan changes pass on first reading","unverified",null,null,"https://sfbos.org/sites/default/files/bag081120_minutes.pdf#page=15",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag081120|55",2020,2020,"2020-08-11","ordinance","land-and-building",null,"Balboa Reservoir zoning district put to the Board","unverified",null,null,"https://sfbos.org/sites/default/files/bag081120_minutes.pdf#page=16",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag081120|56",2020,2020,"2020-08-11","ordinance","land-and-building",null,"Balboa Reservoir zoning passes first reading with Block G lowered","unverified",null,null,"https://sfbos.org/sites/default/files/bag081120_minutes.pdf#page=16",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag081120|57",2020,2020,"2020-08-11","resolution","land-and-building",null,"City to sell Reservoir Community Partners 16.4 acres for $11.4M (≈ $14.8 million in 2026 dollars)","unverified",null,null,"https://sfbos.org/sites/default/files/bag081120_minutes.pdf#page=18",null,null,null,null,"n","m",0,3.0],["d","qipu:sf/decision/sfbos:bag081120|58",2020,2020,"2020-08-11","resolution","running-the-city","passed","City sells Balboa Reservoir land for $11.4 million (≈ $14.8 million in 2026 dollars)","unverified",null,null,"https://sfbos.org/sites/default/files/bag081120_minutes.pdf#page=18",null,null,null,null,"n","a",0,5.82],["d","qipu:sf/decision/hand:balboa-reservoir-development-2020",2020,2020,"2020-08-18","other",null,null,"Balboa Reservoir: half affordable homes and four acres of parks","unverified",null,null,"https://sfbos.archive.sf.gov/sites/default/files/bag081820_minutes.pdf","11 Frida Kahlo Way",null,"hand",null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag081820|34",2020,2020,"2020-08-18","ordinance","land-and-building",null,"General plan changes proposed for the Balboa Reservoir project","unverified",null,null,"https://sfbos.org/sites/default/files/bag081820_minutes.pdf#page=9",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag081820|35",2020,2020,"2020-08-18","ordinance","running-the-city","passed","Balboa Reservoir land plan amended for its development project","unverified",null,null,"https://sfbos.org/sites/default/files/bag081820_minutes.pdf#page=9",null,null,null,null,"n","a",0,5.97],["d","qipu:sf/decision/sfbos:bag081820|36",2020,2020,"2020-08-18","ordinance","land-and-building",null,"Balboa Reservoir zoning district proposed near City College","unverified",null,null,"https://sfbos.org/sites/default/files/bag081820_minutes.pdf#page=9",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag081820|37",2020,2020,"2020-08-18","ordinance","running-the-city","passed","Special zoning rules for Balboa Reservoir site approved","unverified",null,null,"https://sfbos.org/sites/default/files/bag081820_minutes.pdf#page=9",null,null,null,null,"n","a",0,5.97],["d","qipu:sf/decision/sfbos:bag081820|38",2020,2020,"2020-08-18","ordinance","land-and-building",null,"Development deal proposed with Reservoir Community Partners at Balboa Reservoir","unverified",null,null,"https://sfbos.org/sites/default/files/bag081820_minutes.pdf#page=10",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag081820|39",2020,2020,"2020-08-18","ordinance","running-the-city","passed","Development deal with Reservoir Community Partners approved","unverified",null,null,"https://sfbos.org/sites/default/files/bag081820_minutes.pdf#page=10",null,null,null,null,"n","m",0,6.22],["d","qipu:sf/decision/sfbos:bag072021|173",2021,2021,"2021-07-20","resolution","city-services",null,"State grant bid for the Balboa Reservoir site sent to committee","unverified",null,null,"https://sfbos.org/sites/default/files/bag072021_minutes.pdf#page=39",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag091421|34",2021,2021,"2021-09-14","resolution","city-services",null,"State grant sought for the Balboa Reservoir project","unverified",null,null,"https://sfbos.org/sites/default/files/bag091421_minutes.pdf#page=9",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag091421|35",2021,2021,"2021-09-14","resolution","running-the-city","passed","Balboa Reservoir infrastructure grant application approved","unverified",null,null,"https://sfbos.org/sites/default/files/bag091421_minutes.pdf#page=9",null,null,null,null,"n","a",0,5.64],["d","qipu:sf/decision/sfbos:bag052422|127",2022,2022,"2022-05-24","resolution","public-money",null,"$102M (≈ $117.4 million in 2026 dollars) in housing bonds planned for 11 Frida Kahlo Way","unverified",null,null,"https://sfbos.org/sites/default/files/bag052422_minutes.pdf#page=31",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag052422|128",2022,2022,"2022-05-24","resolution","city-services",null,"An unnamed project resolution sent to the Budget and Finance Committee","unverified",null,null,"https://sfbos.org/sites/default/files/bag052422_minutes.pdf#page=31",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag062822|59",2022,2022,"2022-06-28","resolution","public-money",null,"$102M (≈ $117.4 million in 2026 dollars) in housing bonds planned for 11 Frida Kahlo Way","unverified",null,null,"https://sfbos.org/sites/default/files/bag062822_minutes.pdf#page=14",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag062822|60",2022,2022,"2022-06-28","resolution","city-services",null,"Earlier steps on an unnamed project and application to be ratified; proposed, no final vote found.","unverified",null,null,"https://sfbos.org/sites/default/files/bag062822_minutes.pdf#page=14",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag062822|61",2022,2022,"2022-06-28","resolution","running-the-city",null,"A resolution adopted with no subject on this page","unverified",null,null,"https://sfbos.org/sites/default/files/bag062822_minutes.pdf#page=14",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag020723|83",2023,2023,"2023-02-07","resolution","the-street",null,"Four new street names proposed for the Balboa Reservoir project","unverified",null,null,"https://sfbos.org/sites/default/files/bag020723_minutes.pdf#page=19",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag022823|143",2023,2023,"2023-02-28","resolution","city-services",null,"Grant application for 159 affordable flats at Balboa Reservoir referred","unverified",null,null,"https://sfbos.org/sites/default/files/bag022823_minutes.pdf#page=24",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag040423|36",2023,2023,"2023-04-04","resolution","city-services",null,"Grant sought with BRIDGE Housing for Balboa Reservoir Building A","unverified",null,null,"https://sfbos.org/sites/default/files/bag040423_minutes.pdf#page=10",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag040423|37",2023,2023,"2023-04-04","resolution","running-the-city","passed","State grant application for Balboa Reservoir homes approved","unverified",null,null,"https://sfbos.org/sites/default/files/bag040423_minutes.pdf#page=10",null,null,null,null,"n","a",0,5.72],["d","qipu:sf/decision/map:bag050923/13/861527dd",2023,2023,"2023-05-09","resolution",null,null,"Four new street names approved for the Balboa Reservoir project","unverified","web:sfbos.org/sites/default/files/bag050923_minutes.pdf",null,"https://sfbos.org/sites/default/files/bag050923_minutes.pdf#page=13",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag050923|58",2023,2023,"2023-05-09","resolution","the-street",null,"Four new street names approved for the Balboa Reservoir project","unverified","web:sfbos.org/sites/default/files/bag050923_minutes.pdf",null,"https://sfbos.org/sites/default/files/bag050923_minutes.pdf#page=13",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag050923|59",2023,2023,"2023-05-09","resolution","running-the-city",null,"A resolution adopted with no subject on this page","unverified","web:sfbos.org/sites/default/files/bag050923_minutes.pdf",null,"https://sfbos.org/sites/default/files/bag050923_minutes.pdf#page=13",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag051623|99",2023,2023,"2023-05-16","resolution","land-and-building",null,"$11,400,000 (≈ $12.6 million in 2026 dollars) Balboa Reservoir loan changes sent to committee","unverified",null,null,"https://sfbos.org/sites/default/files/bag051623_minutes.pdf#page=27",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag062723|50",2023,2023,"2023-06-27","resolution","land-and-building",null,"Changes proposed to the $11,400,000 (≈ $12.6 million in 2026 dollars) Balboa Reservoir sale loan","unverified",null,null,"https://sfbos.org/sites/default/files/bag062723_minutes.pdf#page=11",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag062723|51",2023,2023,"2023-06-27","resolution","running-the-city","passed","Loan changes for Balboa Reservoir land sale approved","unverified",null,null,"https://sfbos.org/sites/default/files/bag062723_minutes.pdf#page=11",null,null,null,null,"n","a",0,5.39],["d","qipu:sf/decision/sfbos:bag041525|100",2025,2025,"2025-04-15","resolution","city-services",null,"$45.7M (≈ $47.8 million in 2026 dollars) for housing at 11 Frida Kahlo Way sent to committee","unverified",null,null,"https://sfbos.org/sites/default/files/bag041525_minutes.pdf#page=25",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag041525|101",2025,2025,"2025-04-15","resolution","city-services",null,"$20.1M (≈ $21.0 million in 2026 dollars) grant for Balboa Reservoir infrastructure sent to committee","unverified",null,null,"https://sfbos.org/sites/default/files/bag041525_minutes.pdf#page=25",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag041525|99",2025,2025,"2025-04-15","resolution","city-services",null,"$29.6M (≈ $31.0 million in 2026 dollars) state grant for housing at Balboa Reservoir sent to committee","unverified",null,null,"https://sfbos.org/sites/default/files/bag041525_minutes.pdf#page=24",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag050625|41",2025,2025,"2025-05-06","resolution","city-services",null,"$29.6M (≈ $31.0 million in 2026 dollars) state grant for housing at Balboa Reservoir put forward","unverified",null,null,"https://sfbos.org/sites/default/files/bag050625_minutes.pdf#page=11",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag050625|42",2025,2025,"2025-05-06","resolution","running-the-city","passed","$29.6M (≈ $31.0 million in 2026 dollars) state grant for affordable homes at Balboa Reservoir accepted","unverified",null,null,"https://sfbos.org/sites/default/files/bag050625_minutes.pdf#page=11",null,null,null,null,"n","a",0,5.89],["d","qipu:sf/decision/sfbos:bag050625|43",2025,2025,"2025-05-06","resolution","city-services",null,"$45.7M (≈ $47.8 million in 2026 dollars) for affordable housing at 11 Frida Kahlo Way","unverified",null,null,"https://sfbos.org/sites/default/files/bag050625_minutes.pdf#page=11",null,null,null,null,"n","m",0,3.0],["d","qipu:sf/decision/sfbos:bag050625|44",2025,2025,"2025-05-06","resolution","running-the-city","passed","$45.7M (≈ $47.8 million in 2026 dollars) state grant for affordable homes at Balboa Reservoir accepted","unverified",null,null,"https://sfbos.org/sites/default/files/bag050625_minutes.pdf#page=11",null,null,null,null,"n","a",0,5.89],["d","qipu:sf/decision/sfbos:bag050625|45",2025,2025,"2025-05-06","resolution","city-services",null,"$20.1M (≈ $21.0 million in 2026 dollars) grant for Balboa Reservoir infrastructure put forward","unverified",null,null,"https://sfbos.org/sites/default/files/bag050625_minutes.pdf#page=12",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag050625|46",2025,2025,"2025-05-06","resolution","running-the-city","passed","State grant accepted","unverified",null,null,"https://sfbos.org/sites/default/files/bag050625_minutes.pdf#page=12",null,null,null,null,"n","m",0,1.47],["d","qipu:sf/decision/sfbos:bag052025|73",2025,2025,"2025-05-20","motion","land-and-building",null,"Subdivision map for the Balboa Reservoir project with 624 homes proposed","unverified",null,null,"https://sfbos.org/sites/default/files/bag052025_minutes.pdf#page=21",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag052025|74",2025,2025,"2025-05-20","motion","running-the-city","passed","Land split for Balboa Reservoir homes approved","unverified",null,null,"https://sfbos.org/sites/default/files/bag052025_minutes.pdf#page=21",null,null,null,null,"n","a",0,5.64],["d","qipu:sf/decision/map:bag072925/40/267c1308",2025,2025,"2025-07-29","resolution",null,null,"$84.1M (≈ $88.0 million in 2026 dollars) borrowing for 127 flats at Balboa Reservoir","unverified","web:sfbos.org/sites/default/files/bag072925_minutes.pdf",null,"https://sfbos.org/sites/default/files/bag072925_minutes.pdf#page=40",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag072925|205",2025,2025,"2025-07-29","resolution","city-services",null,"$84.1M (≈ $88.0 million in 2026 dollars) borrowing for 127 flats at Balboa Reservoir","unverified","web:sfbos.org/sites/default/files/bag072925_minutes.pdf",null,"https://sfbos.org/sites/default/files/bag072925_minutes.pdf#page=40",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag072925|206",2025,2025,"2025-07-29","resolution","city-services",null,"Sent to the Budget and Finance Committee, its subject not named","unverified","web:sfbos.org/sites/default/files/bag072925_minutes.pdf",null,"https://sfbos.org/sites/default/files/bag072925_minutes.pdf#page=40",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag072925|207",2025,2025,"2025-07-29","resolution","city-services",null,"$56.4M (≈ $59.0 million in 2026 dollars) loan for Balboa Reservoir infrastructure sent to committee","unverified",null,null,"https://sfbos.org/sites/default/files/bag072925_minutes.pdf#page=41",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag072925|208",2025,2025,"2025-07-29","resolution","city-services",null,"$56.4M (≈ $59.0 million in 2026 dollars) loan for Balboa Reservoir infrastructure sent to committee","unverified",null,null,"https://sfbos.org/sites/default/files/bag072925_minutes.pdf#page=41",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag072925|209",2025,2025,"2025-07-29","resolution","land-and-building",null,"$36M (≈ $37.7 million in 2026 dollars) loan for 127 affordable flats on Frida Kahlo Way","unverified",null,null,"https://sfbos.org/sites/default/files/bag072925_minutes.pdf#page=41",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag072925|210",2025,2025,"2025-07-29","resolution","land-and-building",null,"$28.0M (≈ $29.3 million in 2026 dollars) loan for affordable housing at Balboa Reservoir sent to committee","unverified",null,null,"https://sfbos.org/sites/default/files/bag072925_minutes.pdf#page=41",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag090925|21",2025,2025,"2025-09-09","resolution","city-services",null,"$84.1M (≈ $88.0 million in 2026 dollars) borrowing for 127 flats at Balboa Reservoir","unverified",null,null,"https://sfbos.org/sites/default/files/bag090925_minutes.pdf#page=8",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag090925|22",2025,2025,"2025-09-09","resolution",null,null,"A supervisor to be added as co-sponsor, the subject not named here; proposed, no final vote yet","unverified",null,null,"https://sfbos.org/sites/default/files/bag090925_minutes.pdf#page=8",null,null,null,null,"n","m",0,0.0],["d","qipu:sf/decision/sfbos:bag090925|23",2025,2025,"2025-09-09","resolution","running-the-city",null,"An adoption vote with no subject on this page","unverified",null,null,"https://sfbos.org/sites/default/files/bag090925_minutes.pdf#page=8",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag090925|24",2025,2025,"2025-09-09","resolution","city-services","passed","$56M (≈ $58.6 million in 2026 dollars) loan approved for first phase of Balboa Reservoir work","unverified",null,null,"https://sfbos.org/sites/default/files/bag090925_minutes.pdf#page=9",null,null,null,null,"n","a",0,6.25],["d","qipu:sf/decision/sfbos:bag090925|25",2025,2025,"2025-09-09","resolution","city-services",null,"$56.4M (≈ $59.0 million in 2026 dollars) loan approved for Balboa Reservoir infrastructure","unverified",null,null,"https://sfbos.org/sites/default/files/bag090925_minutes.pdf#page=9",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag090925|26",2025,2025,"2025-09-09","resolution","land-and-building",null,"Balboa Reservoir loan amended to require progress reports","unverified",null,null,"https://sfbos.org/sites/default/files/bag090925_minutes.pdf#page=9",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag090925|27",2025,2025,"2025-09-09","resolution","running-the-city",null,"$56.4M (≈ $59.0 million in 2026 dollars) loan approved for Balboa Reservoir infrastructure","unverified",null,null,"https://sfbos.org/sites/default/files/bag090925_minutes.pdf#page=9",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag090925|28",2025,2025,"2025-09-09","resolution","land-and-building",null,"$28M (≈ $29.3 million in 2026 dollars) loan for 127 affordable flats on Frida Kahlo Way","unverified",null,null,"https://sfbos.org/sites/default/files/bag090925_minutes.pdf#page=10",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag090925|29",2025,2025,"2025-09-09","resolution",null,null,"$28.0M (≈ $29.3 million in 2026 dollars) loan approved for Balboa Reservoir affordable housing","unverified",null,null,"https://sfbos.org/sites/default/files/bag090925_minutes.pdf#page=10",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag090925|30",2025,2025,"2025-09-09","resolution","running-the-city","passed","Up to $28M (≈ $29.3 million in 2026 dollars) loan approved for affordable homes at Balboa Reservoir","unverified",null,null,"https://sfbos.org/sites/default/files/bag090925_minutes.pdf#page=10",null,null,null,null,"n","a",0,5.97],["d","qipu:sf/decision/sfbos:bag100725|75",2025,2025,"2025-10-07","resolution","city-services",null,"$45.7M (≈ $47.8 million in 2026 dollars) for housing at 11 Frida Kahlo Way sent to committee","unverified",null,null,"https://sfbos.org/sites/default/files/bag100725_minutes.pdf#page=20",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag102825|38",2025,2025,"2025-10-28","resolution","city-services",null,"$45.7M (≈ $47.8 million in 2026 dollars) state award proposed for housing at 11 Frida Kahlo Way","unverified",null,null,"https://sfbos.org/sites/default/files/bag102825_minutes.pdf#page=9",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag102825|39",2025,2025,"2025-10-28","resolution","running-the-city",null,"An adoption vote with no subject on this page","unverified",null,null,"https://sfbos.org/sites/default/files/bag102825_minutes.pdf#page=9",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag031026|72",2026,2026,"2026-03-10","resolution","land-and-building",null,"158 affordable flats and $29.3M proposed at Balboa Reservoir","unverified",null,null,"https://sfbos.org/sites/default/files/bag031026_minutes.pdf#page=17",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag031026|73",2026,2026,"2026-03-10","resolution","land-and-building",null,"A resolution with fiscal impact sent to the budget committee","unverified",null,null,"https://sfbos.org/sites/default/files/bag031026_minutes.pdf#page=17",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag031026|74",2026,2026,"2026-03-10","resolution","city-services",null,"$112.7M in bonds proposed for 159 flats at Balboa Reservoir","unverified",null,null,"https://sfbos.org/sites/default/files/bag031026_minutes.pdf#page=18",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag031026|75",2026,2026,"2026-03-10","resolution","city-services",null,"A resolution and related matters sent to the budget committee","unverified",null,null,"https://sfbos.org/sites/default/files/bag031026_minutes.pdf#page=18",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag040726|24",2026,2026,"2026-04-07","resolution","land-and-building",null,"$29.3M loan sought for 158 affordable flats at Balboa Reservoir","unverified",null,null,"https://sfbos.org/sites/default/files/bag040726_minutes.pdf#page=9",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag040726|25",2026,2026,"2026-04-07","resolution",null,null,"An adoption vote with no subject on this page","unverified",null,null,"https://sfbos.org/sites/default/files/bag040726_minutes.pdf#page=9",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag040726|26",2026,2026,"2026-04-07","resolution","city-services",null,"$112.7M borrowing proposed to build 159 flats at Balboa Reservoir","unverified",null,null,"https://sfbos.org/sites/default/files/bag040726_minutes.pdf#page=10",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag040726|27",2026,2026,"2026-04-07","resolution","running-the-city",null,"An adoption vote with no subject on this page","unverified",null,null,"https://sfbos.org/sites/default/files/bag040726_minutes.pdf#page=10",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:leg060926|54",2026,2026,"2026-06-09","ordinance","land-and-building",null,"Balboa Reservoir rule linking two buildings passes first reading","unverified",null,null,"https://sfgov.legistar.com/View.ashx?M=M&ID=1422326&GUID=D87CCFCB-B5D6-4D76-88A5-7C40684E2142",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:leg061626|11",2026,2026,"2026-06-16","ordinance","land-and-building",null,"Balboa Reservoir rules changed to link two buildings by South Street","unverified",null,null,"https://sfgov.legistar.com/View.ashx?M=M&ID=1423292&GUID=50EAB13C-AD2E-413A-871C-FEEACB21BE93",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/sfbos:leg061626|12",2026,2026,"2026-06-16","ordinance","running-the-city",null,"Balboa Reservoir rules changed to link two buildings by South Street","unverified",null,null,"https://sfgov.legistar.com/View.ashx?M=M&ID=1423292&GUID=50EAB13C-AD2E-413A-871C-FEEACB21BE93",null,null,null,null,"n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:87/1",1990,2035,"2035","project","study or report",null,"Balboa Reservoir · proposes: Use one Balboa Reservoir basin to increase emergency storage","unverified","C124904960",87,"https://archive.org/details/C124904960/page/n86",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:89/1",1990,2035,"2035","finding","study or report",null,"Balboa Reservoir · other: Use of both basins to increase emergency storage (2035 pressure emergency supply, Balboa Group, both basins)","unverified","C124904960",89,"https://archive.org/details/C124904960/page/n88",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:91/2",1990,2035,"2035","site","study or report",null,"Balboa Reservoir (both basins) · other: Balboa (both basins) storage 150.00 MG","unverified","C124904960",91,"https://archive.org/details/C124904960/page/n90",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0]],"pinned":["qipu:sf/decision/journalseptdecofproceed81sanfrich:249/1","qipu:sf/decision/sfbos:bag081120|49","qipu:sf/decision/sfbos:bag081120|58","qipu:sf/decision/sfbos:bag081820|37","qipu:sf/decision/sfbos:bag090925|24","qipu:sf/decision/journalofproceed47sanfrich:54/5","qipu:sf/decision/journaljanaprofproceed82sanfrich|g872","qipu:sf/decision/meetingminutesbo2015sanf:197/2","qipu:sf/decision/journalofjanaprproceed84sanfrich:408/4","qipu:sf/decision/journalmayaugofproceed82sanfrich:154/1","qipu:sf/decision/journalseptdecofproceed81sanfrich:248/2","qipu:sf/decision/journalofjanjuneproceed72sanfrich|g489","qipu:sf/decision/sfbos:bag081120|50"]}