{"id":null,"ids":[],"kind":"named in documents","name":"Bay Area Rapid Transit System (BART)","tied_by":"name","block":null,"release":"v0.7.1","rows_columns":["t","id","year","y","date","kind","topic","outcome","summary","tier","source","leaf","scan","addr","quote","note","title","how","g","rec","sc"],"rows":[["f","dl-sf-facts-v1.1-haiku55-2026-10/C123301956:16/2",1975,1975,"","project","study or report",null,"Bay Area Rapid Transit system (BART) · other: first regional rapid transit system built in the nation in over half a century","unverified","C123301956",16,"https://archive.org/details/C123301956/page/n15",null,null,null,"Data needs for measuring the impacts of new transportation systems : the BART experience /","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124906108:16/1",1977,1977,"","project","study or report",null,"Bay Area Rapid Transit System (BART) · cost usd: $1.6 billion construction and equipment cost","unverified","C124906108",16,"https://archive.org/details/C124906108/page/n15",null,null,null,"Social impacts of BART on Bay Area families and life styles : technical memorandum","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124899682:14/1",1978,1978,"","project","study or report",null,"Bay Area Rapid Transit System (BART) · built: subway sections in San Francisco","unverified","C124899682",14,"https://archive.org/details/C124899682/page/n13",null,null,null,"Land use and urban development project : program-wide case studies","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124899682:14/3",1978,1978,"","project","study or report",null,"Bay Area Rapid Transit System (BART) · other: serves the counties of Alameda, [name withheld] and San Francisco","unverified","C124899682",14,"https://archive.org/details/C124899682/page/n13",null,null,null,"Land use and urban development project : program-wide case studies","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124906010:8/1",1978,1978,"March 1978","project","study or report",null,"Bay Area Rapid Transit System (BART) · cost usd: $1.6 billion construction and equipment cost","unverified","C124906010",8,"https://archive.org/details/C124906010/page/n7",null,null,null,"Implications of BART's mobility and accessibility impacts for the transportation disadvantaged","n","a",0,0.0]]}