{"id":null,"ids":[],"kind":"named in documents","name":"Cargo Way","tied_by":"name","block":"4570","release":"v0.7.1","rows_columns":["t","id","year","y","date","kind","topic","outcome","summary","tier","source","leaf","scan","addr","quote","note","title","how","g","rec","sc"],"rows":[["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919175:187/5",1996,1925,"1925","recommendation","plan",null,"Cargo Way Mixed Use Opportunity Area · recommendation: new uses should be state-of-the-art design complementing existing waterfront uses including nearby 1925 brick fire station","unverified","C124919175",187,"https://archive.org/details/C124919175/page/n186","Cargo Way",null,null,"Port of San Francisco waterfront land use plan : draft for public review and comment","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:309/1",1998,1959,"1959 to 1975","site","environmental impact report",null,"Cargo Way Maintenance Facility Site · other: Site located on artificial fill placed from 1959 to 1975","unverified","C124915258",309,"https://archive.org/details/C124915258/page/n308","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:271/4",1998,1960,"1960s","site","environmental impact report",null,"Cargo Way site · other: waste lots filled in the 1960s and reclaimed as dry land","unverified","C124915258",271,"https://archive.org/details/C124915258/page/n270","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:365/3",1998,1960,"1960s","site","environmental impact report",null,"Cargo Way Maintenance Facility Site · other: Fill placed in the 1960s; deposits do not meet 500-year CEQA or 100-year NEPA age requirement","unverified","C124915258",365,"https://archive.org/details/C124915258/page/n364","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123317767:147/6",1973,1973,"","site","study or report",null,"Cargo Way (formerly Arthur Ave.) · other: Marginal to 3rd St. arterial","unverified","C123317767",147,"https://archive.org/details/C123317767/page/n146","Cargo Way",null,null,"San Francisco Bay area in-depth study : vessels and port facilities analysis channels, ports and related facilities inventory","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:380/3",1998,1975,"1975","finding","environmental impact report",null,"Cargo Way Maintenance Facility Site · finding: portions of the site still settling due to Bay Mud consolidation from fill placed as recently as 1975","unverified","C124915258",380,"https://archive.org/details/C124915258/page/n379","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["d","qipu:sf/decision/annualreportofd1977sanf_0|2",1977,1977,null,"other",null,null,"A concrete box sewer runs from Cargo Way to Selby Street",null,null,null,"https://archive.org/details/annualreportofd1977sanf_0/page/n69",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/journalofjanjuneproceed72sanfrich|146",1977,1977,"1977-04-18","ordinance","getting-around","passed first reading","Speed limits to be set on Evans Avenue, Cargo Way and Jennings Street; passed first reading, later finally passed","quoted","journalofjanjuneproceed72sanfrich",377,"https://archive.org/details/journalofjanjuneproceed72sanfrich/page/n376",null,null,null,null,"n","a",0,1.39],["d","qipu:sf/decision/journalofjanjuneproceed72sanfrich|g1215",1977,1977,"1977-04-18",null,"traffic","pending","Speed limits for Evans Avenue area moved toward final approval.","unverified","journalofjanjuneproceed72sanfrich",377,"https://archive.org/details/journalofjanjuneproceed72sanfrich/page/n376",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/map:journalofjanjuneproceed72sanfrich/376/a20307e1",1977,1977,"1977-04-18","ordinance",null,"passed first reading","Speed limits to be set on Evans Avenue, Cargo Way and Jennings Street; passed first reading only","unverified","journalofjanjuneproceed72sanfrich",377,"https://archive.org/details/journalofjanjuneproceed72sanfrich/page/n376",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/journalofjanjuneproceed72sanfrich|151",1977,1977,"1977-04-25","ordinance","getting-around","passed","Speed limits set on Evans Avenue, Cargo Way and Jennings Street","quoted","journalofjanjuneproceed72sanfrich",395,"https://archive.org/details/journalofjanjuneproceed72sanfrich/page/n394",null,null,null,null,"n","a",0,1.39],["d","qipu:sf/decision/journalofjanjuneproceed72sanfrich|g1267",1977,1977,"1977-04-25",null,"traffic","passed","Speed limits set on Evans Avenue, Cargo Way, Jennings Street","unverified","journalofjanjuneproceed72sanfrich",395,"https://archive.org/details/journalofjanjuneproceed72sanfrich/page/n394",null,null,null,null,"n","a",0,1.99],["d","qipu:sf/decision/journaljulydecofproceed73sanfrich|176",1978,1978,"1978-10-10","resolution","land-and-building",null,"Map approved for Cargo Way between Third and Jennings Streets","quoted","journaljulydecofproceed73sanfrich",483,"https://archive.org/details/journaljulydecofproceed73sanfrich/page/n483",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/map:journaljulydecofproceed73sanfrich/483/31dffc70",1978,1978,"1978-10-10","resolution",null,"passed","Map approved for Cargo Way between Third and Jennings Streets","unverified","journaljulydecofproceed73sanfrich",483,"https://archive.org/details/journaljulydecofproceed73sanfrich/page/n483",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/sd:6c00f8b96b",1978,1978,"1978-10-10",null,"housing","passed","Cargo Way street map approved, Third to Jennings Streets","unverified",null,null,"https://archive.org/details/journaljulydecofproceed73sanfrich/page/n483/mode/1up",null,null,null,null,"n","a",0,0.38],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902184:46/3",1987,1987,"1987","finding","study or report",null,"Cargo Way · other: Four lanes wide","unverified","C124902184",46,"https://archive.org/details/C124902184/page/n45","Cargo Way",null,null,"Issues report for the South Bayshore Study Area","n","a",0,-1.0],["d","qipu:sf/decision/journaloctdecofproceed84sanfrich:98/2",1989,1989,"1989-10-23","resolution",null,"passed","No-stopping zone on Parnassus Avenue and a right-turn-only rule on Cargo Way at 3rd Street adopted.","quoted","journaloctdecofproceed84sanfrich",98,"https://archive.org/details/journaloctdecofproceed84sanfrich/page/n97",null,null,null,null,"n","a",0,1.75],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124903568:59/23",1991,1991,"","site","other",null,"Pier 98 · use: under consideration as official public access location","unverified","C124903568",59,"https://archive.org/details/C124903568/page/n58","98 Cargo Way Street",null,null,"A guide to City Hall, city & county of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124908577:214/1",1992,1992,"","site","study or report",null,"South Container Terminal · other: Location: On Cargo Way off Third Street, southern waterfront","unverified","C124908577",214,"https://archive.org/details/C124908577/page/n213","Cargo Way",null,null,"[Public information documents relating to Port of San Francisco waterfront plan project]","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101737381:19/3",1994,1994,"","site","ordinance or legislation",null,"Port cargo facilities · use: primarily in the southern waterfront, relying on truck access via Illinois and Third Streets and Cargo Way","unverified","C101737381",19,"https://archive.org/details/C101737381/page/n18","Illinois Street",null,null,"Draft waterfront land use plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101737381:231/1",1994,1994,"1994","site","ordinance or legislation",null,"Cogeneration Power Plant Opportunity Area · acreage: approximately 10 acres","unverified","C101737381",231,"https://archive.org/details/C101737381/page/n230","Cargo Way",null,null,"Draft waterfront land use plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101737381:231/2",1994,1994,"1994","project","ordinance or legislation",null,"Cogeneration Power Plant Opportunity Area · proposes: proposed cogeneration power plant to provide supplemental power to PG&E","unverified","C101737381",231,"https://archive.org/details/C101737381/page/n230","Cargo Way",null,null,"Draft waterfront land use plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:290/8",1998,1994,"1994","site","environmental impact report",null,"Cargo Way site · other: Groundwater depth 5 to 20 ft below ground surface, subsurface investigation","unverified","C124915258",290,"https://archive.org/details/C124915258/page/n289","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:309/2",1998,1994,"1994","finding","environmental impact report",null,"Cargo Way Maintenance Facility Site · finding: Several metals reported above the acceptance threshold for a Class III facility","unverified","C124915258",309,"https://archive.org/details/C124915258/page/n308","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:309/3",1998,1994,"1994","finding","environmental impact report",null,"Cargo Way Maintenance Facility Site · finding: Total chromium, lead and nickel above ten times the California hazardous waste level","unverified","C124915258",309,"https://archive.org/details/C124915258/page/n308","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:309/4",1998,1994,"1994","finding","environmental impact report",null,"Cargo Way Maintenance Facility Site · finding: Hazardous levels of metals may be encountered during excavation","unverified","C124915258",309,"https://archive.org/details/C124915258/page/n308","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:309/5",1998,1994,"1994","finding","environmental impact report",null,"Cargo Way Maintenance Facility Site · other: Depth to groundwater 2.7 to 8.5 meters (9 to 28 feet) bgs","unverified","C124915258",309,"https://archive.org/details/C124915258/page/n308","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:494/1",1998,1994,"1994","measure","environmental impact report",null,"Cargo Way (possible Metro East site) · other: Chromium","unverified","C124915258",494,"https://archive.org/details/C124915258/page/n493","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124910717:106/7",1998,1994,"1994-1995","event","environmental impact report",null,"Third Street truck accidents · other: about 34 truck-involved traffic accidents south of Cargo Way","unverified","C124910717",106,"https://archive.org/details/C124910717/page/n105","Third Street",null,null,"Revised draft environmental impact statement/environmental impact report for the disposal and reuse of Hunters Point Shipyard","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124910717:106/8",1998,1994,"1994-1995","event","environmental impact report",null,"Third Street truck accidents · other: 8 accidents between Cesar Chavez Street and Cargo Way","unverified","C124910717",106,"https://archive.org/details/C124910717/page/n105","Third Street",null,null,"Revised draft environmental impact statement/environmental impact report for the disposal and reuse of Hunters Point Shipyard","n","a",0,-1.0],["d","qipu:sf/decision/journalofmayaugproceed90sanfrich:184/2",1995,1995,"1995-06-19","ordinance",null,"referred","Speed limits on Cargo Way, Hunters Point Boulevard and part of Innes Avenue proposed to change, sent to committee.","quoted","journalofmayaugproceed90sanfrich",184,"https://archive.org/details/journalofmayaugproceed90sanfrich/page/n183",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/journalofmayaugproceed90sanfrich|119",1995,1995,"1995-06-19","ordinance","getting-around","referred","Speed limit changes proposed for Cargo Way and Hunters Point Boulevard","unverified","journalofmayaugproceed90sanfrich",184,"https://archive.org/details/journalofmayaugproceed90sanfrich/page/n183",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/journalofmayaugproceed90sanfrich|169",1995,1995,"1995-07-17","ordinance","getting-around",null,"Speed limit changes proposed for Cargo Way and Hunters Point Boulevard","quoted","journalofmayaugproceed90sanfrich",248,"https://archive.org/details/journalofmayaugproceed90sanfrich/page/n247",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/journalofmayaugproceed90sanfrich|181",1995,1995,"1995-07-24","ordinance","getting-around","passed","Speed limit changes proposed for Cargo Way and Hunters Point Boulevard","quoted","journalofmayaugproceed90sanfrich",263,"https://archive.org/details/journalofmayaugproceed90sanfrich/page/n262",null,null,null,null,"n","a",0,1.12],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919175:178/3",1996,1996,"","site","plan",null,"Second surplus site near Cargo Way · acreage: approximately 10 acres","verified","C124919175",178,"https://archive.org/details/C124919175/page/n177","Cargo Way",null,null,"Port of San Francisco waterfront land use plan : draft for public review and comment","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919175:187/2",1996,1996,"","site","plan",null,"Cargo Way Mixed Use Opportunity Area · other: site located inland of the existing grain elevator between Amador and Cargo Way","unverified","C124919175",187,"https://archive.org/details/C124919175/page/n186","Cargo Way",null,null,"Port of San Francisco waterfront land use plan : draft for public review and comment","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919175:187/4",1996,1996,"","project","plan",null,"Cargo Way Mixed Use Opportunity Area · proposes: cogeneration power plant providing steam power to Port maritime tenants","unverified","C124919175",187,"https://archive.org/details/C124919175/page/n186","Cargo Way",null,null,"Port of San Francisco waterfront land use plan : draft for public review and comment","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919175:187/6",1996,1996,"","recommendation","plan",null,"Western Pacific and Cargo Way Mixed Use [name withheld] · recommendation: new uses must not interfere with rail service to the Port","unverified","C124919175",187,"https://archive.org/details/C124919175/page/n186",null,null,null,"Port of San Francisco waterfront land use plan : draft for public review and comment","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919175:68/4",1996,1996,"","finding","plan",null,"Port cargo facilities · other: rely heavily on truck access to and from Illinois and Third Streets, Cargo Way, I-280 and U.S. 101","unverified","C124919175",68,"https://archive.org/details/C124919175/page/n67","Illinois Street; Third Street; Cargo Way",null,null,"Port of San Francisco waterfront land use plan : draft for public review and comment","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919184:166/2",1996,1996,"","property_record","plan",null,"Port surplus site near Cargo Way · acreage: approximately 10 acres","verified","C124919184",166,"https://archive.org/details/C124919184/page/n164","Cargo Way",null,null,"Port of San Francisco waterfront land use plan : draft for public review and comment","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919184:178/3",1996,1996,"","site","plan",null,"Cargo Way Mixed Use Opportunity Area · acreage: approximately 10 acres","verified","C124919184",178,"https://archive.org/details/C124919184/page/n176","Cargo Way",null,null,"Port of San Francisco waterfront land use plan : draft for public review and comment","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919184:178/4",1996,1996,"","project","plan",null,"Cargo Way Mixed Use Opportunity Area cogeneration power plant · proposes: cogeneration power plant providing steam to Port maritime tenants and supplemental power to PG&E Hunters Point power plant","unverified","C124919184",178,"https://archive.org/details/C124919184/page/n176","Cargo Way",null,null,"Port of San Francisco waterfront land use plan : draft for public review and comment","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919184:178/5",1996,1996,"","recommendation","plan",null,"Cargo Way Mixed Use Opportunity Area cogeneration power plant · recommendation: state-of-the-art design, environmental protections and public benefits, including open space, public access, restrooms and parking","unverified","C124919184",178,"https://archive.org/details/C124919184/page/n176","Cargo Way",null,null,"Port of San Francisco waterfront land use plan : draft for public review and comment","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919184:178/6",1996,1996,"","recommendation","plan",null,"Cargo Way Mixed Use Opportunity Area · recommendation: new uses should support Islais Creek public access and open space improvements and avoid negative impacts on them","unverified","C124919184",178,"https://archive.org/details/C124919184/page/n176","Cargo Way",null,null,"Port of San Francisco waterfront land use plan : draft for public review and comment","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919184:178/7",1996,1996,"","recommendation","plan",null,"Western Pacific and Cargo Way Mixed Use [name withheld] · recommendation: uses must not preclude nearby maritime activities or rail service to the Port","unverified","C124919184",178,"https://archive.org/details/C124919184/page/n176",null,null,null,"Port of San Francisco waterfront land use plan : draft for public review and comment","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124910717:100/4",1998,1996,"1996","site","environmental impact report",null,"Cargo Way · other: Four-lane east-west secondary arterial providing a large percentage of truck access to the Intermodal Container Transfer Facility, India Basin Industrial Park, and Piers 90-96","unverified","C124910717",100,"https://archive.org/details/C124910717/page/n99","Cargo Way",null,null,"Revised draft environmental impact statement/environmental impact report for the disposal and reuse of Hunters Point Shipyard","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:539/1",1998,1996,"1996","alternative","environmental impact report",null,"Third Street Light Rail Project maintenance facility - Cargo Way site · alternative: Cargo Way site, south of Islais Creek and east of Third Street, vacant land","unverified","C124915258",539,"https://archive.org/details/C124915258/page/n538","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:539/2",1998,1996,"1996","property_record","environmental impact report",null,"Cargo Way site (Seawall Lot 344) · owned by city: Port of San Francisco","unverified","C124915258",539,"https://archive.org/details/C124915258/page/n538","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:539/3",1998,1996,"1996","alternative","environmental impact report",null,"Third Street Light Rail Project maintenance facility - Cargo Way site · other: new driveway connecting to Amador Street to the north of the site","unverified","C124915258",539,"https://archive.org/details/C124915258/page/n538","Amador Street",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:101/11",1998,1998,"","project","environmental impact report",null,"LRV maintenance facility · other: main lead track installed either on Cargo Way or 25th Street, depending on site selected","unverified","C124915258",101,"https://archive.org/details/C124915258/page/n100",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:118/2",1998,1998,"","alternative","environmental impact report",null,"New LRV yard and shop facilities · units: practical yard and shop capacity for approximately 100 LRVs","unverified","C124915258",118,"https://archive.org/details/C124915258/page/n117",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:118/3",1998,1998,"","alternative","environmental impact report",null,"New LRV yard and shop facilities · floor area sqft: approximately 154,000 sq. feet of shop floor space","unverified","C124915258",118,"https://archive.org/details/C124915258/page/n117",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:118/4",1998,1998,"","alternative","environmental impact report",null,"New LRV yard and shop facilities · other: approximately 200 spaces for employee and visitor parking","unverified","C124915258",118,"https://archive.org/details/C124915258/page/n117",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:119/5",1998,1998,"","building","environmental impact report",null,"LRV maintenance facility substations · proposes: two adjoining substations at new LRV maintenance facility site","unverified","C124915258",119,"https://archive.org/details/C124915258/page/n118",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:146/5",1998,1998,"","building","environmental impact report",null,"New bus operations and maintenance facility (No Build/TSM Alternative) · proposes: new 40-bus operations and maintenance facility at Western Pacific site or Cargo Way site","unverified","C124915258",146,"https://archive.org/details/C124915258/page/n145",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:146/7",1998,1998,"","site","environmental impact report",null,"Cargo Way site · acreage: 17.5-acre yard","unverified","C124915258",146,"https://archive.org/details/C124915258/page/n145",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:169/7",1998,1998,"","finding","environmental impact report",null,"San Francisco General Plan truck routes · other: routes with significant truck traffic","unverified","C124915258",169,"https://archive.org/details/C124915258/page/n168","Bayshore Boulevard",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:172/2",1998,1998,"","site","environmental impact report",null,"Intermodal container transfer facility · other: Intermodal container transfer facility located by Cargo Way and at Pier 80","unverified","C124915258",172,"https://archive.org/details/C124915258/page/n171","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:197/1",1998,1998,"","finding","environmental impact report",null,"Third Street Light Rail Project, maintenance facility traffic · finding: LOS B conditions during both peak periods","unverified","C124915258",197,"https://archive.org/details/C124915258/page/n196","Third Street",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:205/7",1998,1998,"","site","environmental impact report",null,"Cargo Way · other: Freight traffic would use the Cargo Way crossing of Third Street","unverified","C124915258",205,"https://archive.org/details/C124915258/page/n204","Third Street",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:211/8",1998,1998,"","finding","environmental impact report",null,"Third Street Light Rail Alternative, Galvez Avenue to Cesar Chavez Street · other: about six parking spaces added by elimination of a bus stop","unverified","C124915258",211,"https://archive.org/details/C124915258/page/n210","Third Street",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:220/3",1998,1998,"","alternative","environmental impact report",null,"No Project and No Build/TSM Alternatives bicycle lanes · alternative: bicycle lanes striped on both sides of Third Street","unverified","C124915258",220,"https://archive.org/details/C124915258/page/n219","Third Street",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:221/11",1998,1998,"","recommendation","environmental impact report",null,"Third Street bicycle lanes · recommendation: bicycle lanes striped on both sides of Third Street","unverified","C124915258",221,"https://archive.org/details/C124915258/page/n220","Third Street",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:236/9",1998,1998,"","site","environmental impact report",null,"Cargo Way and Western Pacific maintenance facility sites · other: maintenance facility sites located in the Waterfront Plan Area","unverified","C124915258",236,"https://archive.org/details/C124915258/page/n235",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:237/2",1998,1998,"","site","environmental impact report",null,"Western Pacific and Cargo Way maintenance facility sites · other: Within BCDC jurisdiction","unverified","C124915258",237,"https://archive.org/details/C124915258/page/n236",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:247/4",1998,1998,"","alternative","environmental impact report",null,"MUNI Metro maintenance facility · alternative: community recycling center site at Cargo Way and Amador","unverified","C124915258",247,"https://archive.org/details/C124915258/page/n246","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:276/2",1998,1998,"","site","environmental impact report",null,"Cargo Way Maintenance Facility Site · other: flat, largely undeveloped site; recycling center and piles of debris occupy a portion","unverified","C124915258",276,"https://archive.org/details/C124915258/page/n275","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:28/11",1998,1998,"","site","environmental impact report",null,"Port-owned site along Cargo Way · owned by city: Port","unverified","C124915258",28,"https://archive.org/details/C124915258/page/n27","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:281/5",1998,1998,"","finding","environmental impact report",null,"Cargo Way maintenance facility alternative site · other: about 3 to 13 meters (10 to 43 feet) of artificial fill over Bay Mud","unverified","C124915258",281,"https://archive.org/details/C124915258/page/n280","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:288/8",1998,1998,"","site","environmental impact report",null,"New LRV maintenance facility site at Cargo Way · other: entirely unpaved except approximately 20,000 square meters of the San Francisco DPW Bioremediation Site","unverified","C124915258",288,"https://archive.org/details/C124915258/page/n287","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:289/11",1998,1998,"","finding","environmental impact report",null,"Sea level rise at Cargo Way site · finding: Projected 0.38 meter (1.25 feet) sea level rise in next 100 years could cause additional flooding at Cargo Way site","unverified","C124915258",289,"https://archive.org/details/C124915258/page/n288","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:289/8",1998,1998,"","site","environmental impact report",null,"Cargo Way site · other: Elevation ranges from more than six to -2 meters SFCD (more than 20 to -7 feet)","unverified","C124915258",289,"https://archive.org/details/C124915258/page/n288","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:289/9",1998,1998,"","finding","environmental impact report",null,"Cargo Way site · finding: Could be partially inundated by a 100-year or less high tide if not graded","unverified","C124915258",289,"https://archive.org/details/C124915258/page/n288","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:290/1",1998,1998,"","site","environmental impact report",null,"Cargo Way site · other: Portions below -1.1 m SFCD (-3.6 ft) could experience partial inundation from a 100-year tsunami","unverified","C124915258",290,"https://archive.org/details/C124915258/page/n289","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:304/9",1998,1998,"","project","environmental impact report",null,"Segment 4 historical industrial land uses · other: battery manufacturing, sheet metal works, foundry, blacksmith, paint shop and other industrial uses","unverified","C124915258",304,"https://archive.org/details/C124915258/page/n303",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:337/4",1998,1998,"","finding","environmental impact report",null,"Cargo Way Maintenance Facility Site · finding: BCDC consistency determination required before project approval","unverified","C124915258",337,"https://archive.org/details/C124915258/page/n336","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:338/5",1998,1998,"","alternative","environmental impact report",null,"Bus maintenance facility · alternative: Western Pacific site or Cargo Way site","unverified","C124915258",338,"https://archive.org/details/C124915258/page/n337",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:34/6",1998,1998,"","building","environmental impact report",null,"New 40-bus operations and maintenance facility · proposes: new 40-bus operations and maintenance facility at Western Pacific site or Cargo Way site","unverified","C124915258",34,"https://archive.org/details/C124915258/page/n33","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:340/4",1998,1998,"","alternative","environmental impact report",null,"Cargo Way maintenance facility · alternative: light rail maintenance yard at Cargo Way site","unverified","C124915258",340,"https://archive.org/details/C124915258/page/n339","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:340/5",1998,1998,"","action","environmental impact report",null,"Cargo Way maintenance facility · acquired: portion of area west of maintenance facility, currently a recycling center","unverified","C124915258",340,"https://archive.org/details/C124915258/page/n339","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:341/1",1998,1998,"","alternative","environmental impact report",null,"No Build/TSM Alternative · proposes: purchase of a site for a new bus maintenance facility","unverified","C124915258",341,"https://archive.org/details/C124915258/page/n340",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:341/10004",1998,1998,"","alternative","environmental impact report",null,"No Build/TSM Alternative bus maintenance facility · acquired: purchase from the Port of San Francisco for new bus maintenance facility","unverified","C124915258",341,"https://archive.org/details/C124915258/page/n340","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:341/2",1998,1998,"","property_record","environmental impact report",null,"No Build/TSM bus maintenance facility site · acquired: purchased from the Port of San Francisco","unverified","C124915258",341,"https://archive.org/details/C124915258/page/n340",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:341/3",1998,1998,"","property_record","environmental impact report",null,"Western Pacific and Cargo Way maintenance facility sites · use: vacant properties zoned for industrial use","unverified","C124915258",341,"https://archive.org/details/C124915258/page/n340",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:341/4",1998,1998,"","property_record","environmental impact report",null,"Cargo Way site · other: relocation of an adjacent recycling business may be required","unverified","C124915258",341,"https://archive.org/details/C124915258/page/n340","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:344/4",1998,1998,"","alternative","environmental impact report",null,"Light Rail Alternative - Initial Operating Segment, Cargo Way site · jobs: up to 45 employees at seven businesses if the Cargo Way site were selected","unverified","C124915258",344,"https://archive.org/details/C124915258/page/n343","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:347/2",1998,1998,"","finding","environmental impact report",null,"Western Pacific and Cargo Way maintenance facility sites · other: Use would preclude other industrial uses of the selected site","unverified","C124915258",347,"https://archive.org/details/C124915258/page/n346",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:354/1",1998,1998,"","finding","environmental impact report",null,"Western Pacific and Cargo Way maintenance facility sites · finding: Would not affect existing community or public facilities; none located close to these sites","unverified","C124915258",354,"https://archive.org/details/C124915258/page/n353",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:356/1",1998,1998,"","finding","environmental impact report",null,"Western Pacific and Cargo Way Maintenance Facility Sites · finding: potential conflicts with fire trucks exiting the fire station at Third Street and Cargo Way","unverified","C124915258",356,"https://archive.org/details/C124915258/page/n355","Third Street",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:356/2",1998,1998,"","recommendation","environmental impact report",null,"Cargo Way maintenance facility site · recommendation: signal pre-emption or other controls at Third Street and Cargo Way, after Fire Department review","unverified","C124915258",356,"https://archive.org/details/C124915258/page/n355","Third Street",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:357/9",1998,1998,"","finding","environmental impact report",null,"Cargo Way Maintenance Facility Site · finding: No construction or operation impacts to existing parklands or recreational facilities","unverified","C124915258",357,"https://archive.org/details/C124915258/page/n356","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:361/5",1998,1998,"","finding","environmental impact report",null,"Cargo Way Maintenance Facility Site · finding: No historic properties located within the site; no construction impacts expected","unverified","C124915258",361,"https://archive.org/details/C124915258/page/n360",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:362/1",1998,1998,"","finding","environmental impact report",null,"Cargo Way site · finding: no historic properties located; no operation or cumulative impacts expected","unverified","C124915258",362,"https://archive.org/details/C124915258/page/n361","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:362/2",1998,1998,"","alternative","environmental impact report",null,"No Build/TSM Alternative bus storage and maintenance facility · acreage: approximate 1.6-hectare (4.0-acre) bus storage and maintenance facility","unverified","C124915258",362,"https://archive.org/details/C124915258/page/n361","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:362/3",1998,1998,"","finding","environmental impact report",null,"Western Pacific on Cargo Way site · finding: maritime resources could be deeply buried below the northern and western section of the site","unverified","C124915258",362,"https://archive.org/details/C124915258/page/n361","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:365/4",1998,1998,"","finding","environmental impact report",null,"Cargo Way Maintenance Facility Site · finding: No significant impacts to prehistoric or historic resources identified","unverified","C124915258",365,"https://archive.org/details/C124915258/page/n364","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:366/7",1998,1998,"","alternative","environmental impact report",null,"No Build/TSM Alternative bus maintenance facility · alternative: new bus maintenance facility at old Western Pacific site adjacent to Pier 80 or at Cargo Way","unverified","C124915258",366,"https://archive.org/details/C124915258/page/n365",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:375/1",1998,1998,"","finding","environmental impact report",null,"Western Pacific and Cargo Way Maintenance Facility Sites · finding: No existing, major utilities would be affected at the Western Pacific or Cargo Way sites","unverified","C124915258",375,"https://archive.org/details/C124915258/page/n374",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:380/1",1998,1998,"","site","environmental impact report",null,"Cargo Way Maintenance Facility Site · other: artificial fill to depths of ten feet to 43 feet","unverified","C124915258",380,"https://archive.org/details/C124915258/page/n379","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:380/2",1998,1998,"","site","environmental impact report",null,"Cargo Way Maintenance Facility Site · other: decomposing wood encountered in eight of the 22 boreholes","unverified","C124915258",380,"https://archive.org/details/C124915258/page/n379","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:380/4",1998,1998,"","measure","environmental impact report",null,"Cargo Way Maintenance Facility Site · other: additional Bay Mud mitigation if development requires more than three feet of new fill","unverified","C124915258",380,"https://archive.org/details/C124915258/page/n379","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:380/5",1998,1998,"","recommendation","environmental impact report",null,"Cargo Way Maintenance Facility Site · recommendation: design-level geotechnical analysis of settlement and foundation design","unverified","C124915258",380,"https://archive.org/details/C124915258/page/n379","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:381/3",1998,1998,"","alternative","environmental impact report",null,"No Build/TSM Alternative bus maintenance facility · alternative: New bus maintenance facility at Western Pacific and Cargo Way sites","unverified","C124915258",381,"https://archive.org/details/C124915258/page/n380",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:383/4",1998,1998,"","site","environmental impact report",null,"Western Pacific and Cargo Way maintenance facility sites · finding: extremely high levels of groundshaking possible at either site","unverified","C124915258",383,"https://archive.org/details/C124915258/page/n382",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:384/1",1998,1998,"","finding","environmental impact report",null,"Western Pacific and Cargo Way maintenance facility sites · finding: underlain by geologic materials potentially susceptible to earthquake-induced liquefaction","unverified","C124915258",384,"https://archive.org/details/C124915258/page/n383",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:384/2",1998,1998,"","finding","environmental impact report",null,"Western Pacific and Cargo Way maintenance facility sites · finding: fill below the water table at depths of 2 to 7 meters (6 to 23 feet) could fail during an earthquake","unverified","C124915258",384,"https://archive.org/details/C124915258/page/n383",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:384/3",1998,1998,"","finding","environmental impact report",null,"Western Pacific and Cargo Way maintenance facility sites · finding: liquefaction could cause severe damage to structures and other site improvements","unverified","C124915258",384,"https://archive.org/details/C124915258/page/n383",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:384/4",1998,1998,"","measure","environmental impact report",null,"Western Pacific and Cargo Way maintenance facility sites · other: deep dynamic compaction, or other suitable method, for susceptible areas","unverified","C124915258",384,"https://archive.org/details/C124915258/page/n383",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:384/5",1998,1998,"","agency","environmental impact report",null,"Port of San Francisco, Building Inspection and Construction Management Department · other: reviews and inspects geotechnical analysis and site work for maintenance facility sites","unverified","C124915258",384,"https://archive.org/details/C124915258/page/n383",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:388/1",1998,1998,"","site","environmental impact report",null,"Western Pacific and Cargo Way Maintenance Facility Sites · other: within 305 meters (1,000 feet) of the Bay","unverified","C124915258",388,"https://archive.org/details/C124915258/page/n387",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:388/4",1998,1998,"","site","environmental impact report",null,"Cargo Way site · other: about 3,721 cubic meters of runoff per day (983,000 gallons per day) for the five-year storm","unverified","C124915258",388,"https://archive.org/details/C124915258/page/n387",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:388/5",1998,1998,"","site","environmental impact report",null,"Cargo Way site, existing condition · other: about 697 cubic meters of runoff per day (184,000 gallons per day) for the five-year storm","unverified","C124915258",388,"https://archive.org/details/C124915258/page/n387",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:388/6",1998,1998,"","measure","environmental impact report",null,"Western Pacific and Cargo Way Maintenance Facility · other: Industrial Waste Discharge Permit required from Public Utilities Commission","unverified","C124915258",388,"https://archive.org/details/C124915258/page/n387",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:389/1",1998,1998,"","site","environmental impact report",null,"Cargo Way site · acreage: 17 acres","unverified","C124915258",389,"https://archive.org/details/C124915258/page/n388","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:389/2",1998,1998,"","finding","environmental impact report",null,"Cargo Way site · other: 697 cubic meters per day runoff under existing conditions (five-year storm)","unverified","C124915258",389,"https://archive.org/details/C124915258/page/n388","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:389/3",1998,1998,"","finding","environmental impact report",null,"Cargo Way site · other: 3,721 cubic meters per day runoff under developed conditions","unverified","C124915258",389,"https://archive.org/details/C124915258/page/n388","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:389/7",1998,1998,"","finding","environmental impact report",null,"maintenance yard sites (Western Pacific and Cargo Way) · finding: five-year storm runoff would be about 0.3 percent of the treatment plant's capacity","unverified","C124915258",389,"https://archive.org/details/C124915258/page/n388",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:390/1",1998,1998,"","finding","environmental impact report",null,"Cargo Way site · finding: Portions may flood during construction if flood conditions occur and finished ground elevations are not above -1.1 meters; not a significant impact","unverified","C124915258",390,"https://archive.org/details/C124915258/page/n389",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:390/2",1998,1998,"","finding","environmental impact report",null,"Cargo Way site · finding: Flooding would be less than 1 meter (less than 3 feet), not likely to injure people, only temporary damage to unfinished structures; not significant","unverified","C124915258",390,"https://archive.org/details/C124915258/page/n389",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:391/2",1998,1998,"","site","environmental impact report",null,"Cargo Way site · finding: Flooding during construction would be less than one meter; not a significant impact","unverified","C124915258",391,"https://archive.org/details/C124915258/page/n390",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:391/3",1998,1998,"","site","environmental impact report",null,"Western Pacific and Cargo Way sites · finding: Sites to be regraded; final elevations above 100-year tides or tsunami events; no flooding impacts","unverified","C124915258",391,"https://archive.org/details/C124915258/page/n390",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:403/1",1998,1998,"","alternative","environmental impact report",null,"No Build/TSM Alternative bus maintenance facility · alternative: Bus maintenance facility at either the east or west end Western Pacific site or Cargo Way site","unverified","C124915258",403,"https://archive.org/details/C124915258/page/n402",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:403/2",1998,1998,"","finding","environmental impact report",null,"No Build/TSM Alternative bus maintenance facility construction · finding: PM10 construction emissions on the order of 0.5 ton per day over a twelve-month grading period","unverified","C124915258",403,"https://archive.org/details/C124915258/page/n402",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:406/2",1998,1998,"","site","environmental impact report",null,"Cargo Way site · other: about 180,000 cubic yards of disturbed soil","unverified","C124915258",406,"https://archive.org/details/C124915258/page/n405","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:412/1",1998,1998,"","site","environmental impact report",null,"Western Pacific maintenance facility site · acreage: about 13 acres of surface area","unverified","C124915258",412,"https://archive.org/details/C124915258/page/n411",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:412/2",1998,1998,"","site","environmental impact report",null,"Cargo Way maintenance facility site · acreage: about 19 acres","unverified","C124915258",412,"https://archive.org/details/C124915258/page/n411","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:412/3",1998,1998,"","project","environmental impact report",null,"Maintenance facility site (Western Pacific or Cargo Way) · other: constructed within approximately 27 months","unverified","C124915258",412,"https://archive.org/details/C124915258/page/n411",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:412/5",1998,1998,"","finding","environmental impact report",null,"Cargo Way maintenance facility site · other: less than two tons per day PM10 construction emissions","unverified","C124915258",412,"https://archive.org/details/C124915258/page/n411",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:412/6",1998,1998,"","finding","environmental impact report",null,"Western Pacific and Cargo Way maintenance facility sites construction · finding: PM10 construction emissions would be a significant impact","unverified","C124915258",412,"https://archive.org/details/C124915258/page/n411",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:412/8",1998,1998,"","finding","environmental impact report",null,"Maintenance facility organic compound emissions · finding: BAAQMD regulation compliance reduces effects to less-than-significant level","unverified","C124915258",412,"https://archive.org/details/C124915258/page/n411",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:424/4",1998,1998,"","finding","environmental impact report",null,"Western Pacific and Cargo Way Maintenance and [name withheld] · finding: No vibration impacts projected during construction or operation affecting existing receptors","unverified","C124915258",424,"https://archive.org/details/C124915258/page/n423","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:424/5",1998,1998,"","finding","environmental impact report",null,"Western Pacific and Cargo Way Maintenance and [name withheld] · finding: Both sites in industrial areas with no existing vibration sensitive land uses nearby","unverified","C124915258",424,"https://archive.org/details/C124915258/page/n423","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:46/5",1998,1998,"","finding","environmental impact report",null,"Western Pacific and Cargo Way maintenance facility sites · finding: sites underlain by heterogeneous artificial fill potentially susceptible to earthquake-induced liquefaction","unverified","C124915258",46,"https://archive.org/details/C124915258/page/n45",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:46/6",1998,1998,"","finding","environmental impact report",null,"Cargo Way maintenance facility site · finding: majority of business displacements would occur if the Cargo Way maintenance facility site were selected","unverified","C124915258",46,"https://archive.org/details/C124915258/page/n45",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:464/3",1998,1998,"","alternative","environmental impact report",null,"No Build/TSM Alternative · alternative: would require property if a new bus maintenance facility were constructed at the Cargo Way site","unverified","C124915258",464,"https://archive.org/details/C124915258/page/n463","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:465/1",1998,1998,"","alternative","environmental impact report",null,"Light Rail Alternative-Initial Operating Segment · other: displacement of one business with three to five employees, plus more businesses if Cargo Way site selected","unverified","C124915258",465,"https://archive.org/details/C124915258/page/n464","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:540/1",1998,1998,"","measure","environmental impact report",null,"Third Street light rail maintenance facility · other: storage tracks for up to 100 light rail vehicles","unverified","C124915258",540,"https://archive.org/details/C124915258/page/n539",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:540/11",1998,1998,"","site","environmental impact report",null,"Cargo Way and Western Pacific maintenance facility sites · other: sovereign tidelands held under public trust by the Port Commission","unverified","C124915258",540,"https://archive.org/details/C124915258/page/n539",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:540/2",1998,1998,"","building","environmental impact report",null,"Third Street light rail maintenance facility central building · height ft: two-story, 25 foot to 40 foot high","unverified","C124915258",540,"https://archive.org/details/C124915258/page/n539",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:540/3",1998,1998,"","building","environmental impact report",null,"Third Street light rail maintenance facility central building · stories: two-story","unverified","C124915258",540,"https://archive.org/details/C124915258/page/n539",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:540/4",1998,1998,"","building","environmental impact report",null,"Third Street light rail maintenance facility central building · other: 260 feet by 520 feet","unverified","C124915258",540,"https://archive.org/details/C124915258/page/n539",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:540/5",1998,1998,"","building","environmental impact report",null,"Third Street light rail maintenance facility maintenance of way building · other: 50 feet by 80 feet","unverified","C124915258",540,"https://archive.org/details/C124915258/page/n539",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:540/6",1998,1998,"","building","environmental impact report",null,"Third Street light rail maintenance facility paint and body shop · other: 65 feet by 210 feet","unverified","C124915258",540,"https://archive.org/details/C124915258/page/n539",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:540/7",1998,1998,"","project","environmental impact report",null,"Third Street light rail maintenance facility · other: construction estimated to take two years","unverified","C124915258",540,"https://archive.org/details/C124915258/page/n539",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:540/8",1998,1998,"","project","environmental impact report",null,"Third Street light rail maintenance facility · jobs: about 50 persons during construction","unverified","C124915258",540,"https://archive.org/details/C124915258/page/n539",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:540/9",1998,1998,"","project","environmental impact report",null,"Third Street light rail maintenance facility · jobs: 300 persons during operation","unverified","C124915258",540,"https://archive.org/details/C124915258/page/n539",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:56/3",1998,1998,"","alternative","environmental impact report",null,"Third Street light rail maintenance facility · alternative: eastern or western portion of former Western Pacific railyard adjacent to Pier 80, or Port-owned site along Cargo Way","unverified","C124915258",56,"https://archive.org/details/C124915258/page/n55","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:75/4",1998,1998,"","finding","environmental impact report",null,"Metro East rail yard site · alternative: Port property on Cargo Way near Third Street recommended as a viable alternative site","unverified","C124915258",75,"https://archive.org/details/C124915258/page/n74","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:80/6",1998,1998,"","alternative","environmental impact report",null,"LRV maintenance and storage facility site decision · alternative: Mission Bay, Cargo Way, or the former Western Pacific Rail Yard","unverified","C124915258",80,"https://archive.org/details/C124915258/page/n79","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124910717:583/2",1998,1998,"1998","finding","environmental impact report",null,"Hunters Point Shipyard project traffic · finding: 33.5% of future cumulative weekday P.M. peak hour intersection traffic at Third Street/Cargo Way","unverified","C124910717",583,"https://archive.org/details/C124910717/page/n582","Third Street",null,null,"Revised draft environmental impact statement/environmental impact report for the disposal and reuse of Hunters Point Shipyard","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:114/4",1998,1998,"1998","alternative","environmental impact report",null,"Cargo Way LRV maintenance and storage site · alternative: 7-hectare (17.5-acre) Port-owned site along Cargo Way","unverified","C124915258",114,"https://archive.org/details/C124915258/page/n113","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:114/5",1998,1998,"1998","alternative","environmental impact report",null,"Cargo Way LRV maintenance and storage site · other: displacement of seven existing businesses in two separate locations","unverified","C124915258",114,"https://archive.org/details/C124915258/page/n113","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:343/12",1998,1998,"1998","finding","environmental impact report",null,"Cargo Way Maintenance Facility Site · finding: business displacement impacts would not be significant","unverified","C124915258",343,"https://archive.org/details/C124915258/page/n342","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:343/8",1998,1998,"1998","finding","environmental impact report",null,"Cargo Way Maintenance Facility Site · finding: site is currently vacant; acquisition would not cause displacements","unverified","C124915258",343,"https://archive.org/details/C124915258/page/n342","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:343/9",1998,1998,"1998","property_record","environmental impact report",null,"Recycling center, Cargo Way and Amador Street · jobs: recycling center estimated to employ three to five persons","unverified","C124915258",343,"https://archive.org/details/C124915258/page/n342","Cargo Way; Amador Street",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:346/4",1998,1998,"1998","finding","environmental impact report",null,"Western Pacific and Cargo Way maintenance facility sites · finding: impacts would be less than significant","unverified","C124915258",346,"https://archive.org/details/C124915258/page/n345",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:346/5",1998,1998,"1998","finding","environmental impact report",null,"Western Pacific and Cargo Way maintenance facility sites · finding: located away from residential neighborhoods and commercial centers, so no adverse effect on neighborhood character or business activities","unverified","C124915258",346,"https://archive.org/details/C124915258/page/n345",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:346/6",1998,1998,"1998","site","environmental impact report",null,"Cargo Way maintenance facility site · other: adjoins a rail spur to Pier 94-96","unverified","C124915258",346,"https://archive.org/details/C124915258/page/n345","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:346/7",1998,1998,"1998","site","environmental impact report",null,"Western Pacific and Cargo Way maintenance facility sites · finding: both in industrial areas subject to heavy volumes of truck traffic and noise","unverified","C124915258",346,"https://archive.org/details/C124915258/page/n345",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:351/1",1998,1998,"1998","finding","environmental impact report",null,"Cargo Way maintenance facility site · other: seven potentially displaced businesses","unverified","C124915258",351,"https://archive.org/details/C124915258/page/n350","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:351/3",1998,1998,"1998","alternative","environmental impact report",null,"Maintenance facility site selection · alternative: site other than Cargo Way may be preferable from an environmental justice perspective","unverified","C124915258",351,"https://archive.org/details/C124915258/page/n350","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:360/1",1998,1998,"1998","alternative","environmental impact report",null,"No Build/TSM Alternative bus storage and maintenance facility · proposes: bus storage and maintenance facility for 33 diesel buses and 7 trolley buses","unverified","C124915258",360,"https://archive.org/details/C124915258/page/n359",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:360/2",1998,1998,"1998","finding","environmental impact report",null,"Western Pacific and Cargo Way properties · finding: no historic properties surround either property; no construction impacts expected","unverified","C124915258",360,"https://archive.org/details/C124915258/page/n359",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:393/1",1998,1998,"1998","finding","environmental impact report",null,"Western Pacific and Cargo Way Maintenance Facility Sites · finding: No special-status species or critical habitat identified at either site; no construction impacts","unverified","C124915258",393,"https://archive.org/details/C124915258/page/n392",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:393/2",1998,1998,"1998","finding","environmental impact report",null,"Western Pacific and Cargo Way Maintenance Facility Sites · finding: Operation would not result in any significant impacts","unverified","C124915258",393,"https://archive.org/details/C124915258/page/n392",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:407/1",1998,1998,"1998","measure","environmental impact report",null,"Cargo Way Maintenance Facility Construction · other: 284.9 146.9 1,463.0 (construction emissions, columns as printed)","unverified","C124915258",407,"https://archive.org/details/C124915258/page/n406","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:407/3",1998,1998,"1998","measure","environmental impact report",null,"IOS Rail track installation and Cargo Way Maintenance Facility Construction · other: 24.2 136.5 5.9 9.1 2,672.6 (construction emissions, columns as printed)","unverified","C124915258",407,"https://archive.org/details/C124915258/page/n406","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:421/7",1998,1998,"1998","alternative","environmental impact report",null,"New LRV Maintenance and Storage Facility · alternative: site along Cargo Way immediately south of Islais Creek and Pier 90","unverified","C124915258",421,"https://archive.org/details/C124915258/page/n420","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:44/3",1998,1998,"1998","measure","environmental impact report",null,"Third Street Light Rail Project · recommendation: Restripe portions of Third Street for bike lanes where on-street parking is currently prohibited","unverified","C124915258",44,"https://archive.org/details/C124915258/page/n43","Third Street",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:117/1",1998,1998,"1998-01-02","project","environmental impact report",null,"New LRV Yard and Shop · proposes: New LRV yard and shop at Cargo Way site","unverified","C124915258",117,"https://archive.org/details/C124915258/page/n116","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922522:221/7",2000,1998,"1998-12-10","site","environmental impact report",null,"Intermodal Container Transfer Facility (I.C.T.F.) · other: Direct rail link between Pier 80 and the I.C.T.F. near Cargo Way","unverified","C124922522",221,"https://archive.org/details/C124922522/page/n220","Cargo Way",null,null,"Final environmental impact statement for the disposal and reuse of Hunters Point Shipyard","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:76/10",1998,1998,"June 27, 1997","alternative","environmental impact report",null,"LRV maintenance site alternative · alternative: Former Western Pacific yard adjacent to Pier 80, or a site along Cargo Way","unverified","C124915258",76,"https://archive.org/details/C124915258/page/n75","Cargo Way",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922531:96/3",2000,2000,"","finding","environmental impact report",null,"Third Street truck route designation · other: Identified in General Plan as route with significant truck traffic","unverified","C124922531",96,"https://archive.org/details/C124922531/page/n95","Third Street, Bayshore Boulevard, Evans Street, Cargo Way, Cesar Chavez Street",null,null,"Final environmental impact statement for the disposal and reuse of Hunters Point Shipyard","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922531:531/2",2000,2000,"future conditions, weekday P.M. peak hour","finding","environmental impact report",null,"Hunters Point Shipyard project · finding: 33.5% of critical volume at Third Street/Cargo Way contributed by Hunters Point traffic","unverified","C124922531",531,"https://archive.org/details/C124922531/page/n530","Third Street",null,null,"Final environmental impact statement for the disposal and reuse of Hunters Point Shipyard","n","a",0,-1.0],["d","qipu:sf/decision/meetingminutesb2004sanf_1:415/1",2004,2004,null,"resolution","transit","referred","Proposed 25-year lease of a Union Pacific spur track at Third Street and Cargo Way for the Third Street light rail project.","quoted","meetingminutesb2004sanf_1",415,"https://archive.org/details/meetingminutesb2004sanf_1/page/n414",null,null,null,null,"n","a",0,-4.0],["d","qipu:sf/decision/meetingjuneaug2004minutes9917sanfrich:415/1",2004,2004,"2004-07-27","resolution","transit","referred","Proposal to lease a 310-foot Union Pacific spur track at Third Street and Cargo Way for the Third Street light rail project, sent to committee.","unverified","meetingjuneaug2004minutes9917sanfrich",415,"https://archive.org/details/meetingjuneaug2004minutes9917sanfrich/page/n414",null,null,null,null,"n","a",0,-4.0],["d","qipu:sf/decision/meetingjuneaug2004minutes9917sanfrich|136",2004,2004,"2004-07-27","resolution","getting-around",null,"Union Pacific track lease at Cargo Way sent to committee","unverified","meetingjuneaug2004minutes9917sanfrich",415,"https://archive.org/details/meetingjuneaug2004minutes9917sanfrich/page/n414",null,null,null,null,"n","a",0,-4.0],["d","qipu:sf/decision/meetingminutesb2004sanf_1:478/3",2004,2004,"2004-08-10","resolution","transit","passed","Board adopted a resolution authorizing a 25-year track lease with Union Pacific and BNSF at Third Street and Cargo Way for $750 (≈ $1,338 in 2026 dollars).","quoted","meetingminutesb2004sanf_1",478,"https://archive.org/details/meetingminutesb2004sanf_1/page/n477",null,null,null,null,"n","a",0,-0.47],["d","qipu:sf/decision/meetingminutesb2004sanf_1|196",2004,2004,"2004-08-10","resolution","getting-around",null,"$750 (≈ $1,338 in 2026 dollars) leases Union Pacific track at Third Street and Cargo Way","unverified","meetingminutesb2004sanf_1",478,"https://archive.org/details/meetingminutesb2004sanf_1/page/n477",null,null,null,null,"n","a",0,-4.0],["d","qipu:sf/decision/meetingjuneaug2004minutes9917sanfrich:478/3",2004,2004,"2004-08-17","resolution","transit","passed","The city leases about 310 feet of Union Pacific spur track at Third Street and Cargo Way for the Third Street light rail project.","unverified","meetingjuneaug2004minutes9917sanfrich",478,"https://archive.org/details/meetingjuneaug2004minutes9917sanfrich/page/n477",null,null,null,null,"n","a",0,-0.6],["d","qipu:sf/decision/meetingjuneaug2004minutes9917sanfrich|198",2004,2004,"2004-08-17","resolution","getting-around",null,"Union Pacific track lease at Cargo Way approved for 25 years","unverified","meetingjuneaug2004minutes9917sanfrich",478,"https://archive.org/details/meetingjuneaug2004minutes9917sanfrich/page/n477",null,null,null,null,"n","a",0,-4.0],["d","qipu:sf/decision/meetingminutesb2006sanf_1:153/6",2006,2006,null,"resolution",null,"referred","Resolution proposes an 18-month bicycle lane trial on Illinois Street, Sixteenth Street and Cargo Way.","unverified","meetingminutesb2006sanf_1",153,"https://archive.org/details/meetingminutesb2006sanf_1/page/n152",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/meetingminutesb2006sanf_1:65/1",2006,2006,null,"resolution",null,"continued","Proposed 18-month bicycle lanes on Illinois Street, Sixteenth Street and Cargo Way were continued to June 27, 2006.","quoted","meetingminutesb2006sanf_1",65,"https://archive.org/details/meetingminutesb2006sanf_1/page/n64",null,null,null,null,"n","a",0,-3.5],["d","qipu:sf/decision/meeting2006aprmayminutes101sanfrich:164/2",2006,2006,"2006-05-08","ordinance",null,"referred","Maxwell proposed letting loading trucks block bike lanes on Illinois Street between 16th Street and Cargo Way during rush hour; referred to committee.","quoted","meeting2006aprmayminutes101sanfrich",164,"https://archive.org/details/meeting2006aprmayminutes101sanfrich/page/n163",null,null,null,null,"n","a",0,-3.5],["d","qipu:sf/decision/meeting2006aprmayminutes101sanfrich:164/4",2006,2006,"2006-05-08","resolution",null,"referred","Maxwell proposed an 18-month bicycle lane trial on Illinois Street, Sixteenth Street and Cargo Way; outcome not shown on this page.","quoted","meeting2006aprmayminutes101sanfrich",164,"https://archive.org/details/meeting2006aprmayminutes101sanfrich/page/n163",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/meeting2006aprmayminutes101sanfrich|85",2006,2006,"2006-05-08","resolution","getting-around","referred","Bike lanes on Illinois Street, 16th Street and Cargo Way to be established; sent to committee","unverified","meeting2006aprmayminutes101sanfrich",164,"https://archive.org/details/meeting2006aprmayminutes101sanfrich/page/n163",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/meetingjuneaug2006minutes101sanfrich:65/5",2006,2006,"2006-06-13","resolution",null,"continued","Proposed 18-month bicycle lanes on Illinois Street, Sixteenth Street and Cargo Way were continued to June 27, 2006.","quoted","meetingjuneaug2006minutes101sanfrich",65,"https://archive.org/details/meetingjuneaug2006minutes101sanfrich/page/n64",null,null,null,null,"n","a",0,-3.5],["d","qipu:sf/decision/meetingjuneaug2006minutes101sanfrich|g156",2006,2006,"2006-06-13",null,"traffic","pending","Bike lane trial on Illinois Street put off to June 27.","unverified","meetingjuneaug2006minutes101sanfrich",65,"https://archive.org/details/meetingjuneaug2006minutes101sanfrich/page/n64",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/meetingjuneaug2006minutes101sanfrich|g193",2006,2006,"2006-06-13",null,"traffic","pending","Trucks could block Illinois bike lanes at rush hour; put off.","unverified","meetingjuneaug2006minutes101sanfrich",76,"https://archive.org/details/meetingjuneaug2006minutes101sanfrich/page/n75",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/meetingminutesdr2006sanf:431/1",2006,2006,"2006-06-13","resolution",null,"continued","Bicycle lanes on parts of Illinois Street, Sixteenth Street and Cargo Way were continued to June 27, 2006.","quoted","meetingminutesdr2006sanf",431,"https://archive.org/details/meetingminutesdr2006sanf/page/n430",null,null,null,null,"n","a",0,-3.5],["d","qipu:sf/decision/meetingjuneaug2006minutes101sanfrich:153/3",2006,2006,"2006-06-27","resolution","transit","referred","A resolution would set an 18-month bike lane trial on Illinois, Sixteenth Street and Cargo Way; the vote continues on the next page.","unverified","meetingjuneaug2006minutes101sanfrich",153,"https://archive.org/details/meetingjuneaug2006minutes101sanfrich/page/n152",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/meetingjuneaug2006minutes101sanfrich|67",2006,2006,"2006-06-27","resolution","getting-around",null,"Trial bike lanes proposed on Illinois Street and Cargo Way","unverified","meetingjuneaug2006minutes101sanfrich",153,"https://archive.org/details/meetingjuneaug2006minutes101sanfrich/page/n152",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/meetingjuneaug2006minutes101sanfrich|g395",2006,2006,"2006-06-27",null,"traffic","pending","Plan to let trucks block Illinois bike lane sent back.","unverified","meetingjuneaug2006minutes101sanfrich",153,"https://archive.org/details/meetingjuneaug2006minutes101sanfrich/page/n152",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/meetingminutesdr2006sanf:484/1",2006,2006,"2006-06-27","resolution",null,"referred","Maxwell's resolution creating 18-month bike lanes on Illinois Street, Sixteenth Street and Cargo Way was re-referred to committee.","quoted","meetingminutesdr2006sanf",484,"https://archive.org/details/meetingminutesdr2006sanf/page/n483",null,null,null,null,"n","a",0,-3.5],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922531:105/2",2000,2010,"2010","finding","environmental impact report",null,"Third Street/Cargo Way and Cesar Chavez Street/Evans Avenue intersections · finding: Worsen from LOS C to LOS D in A.M. peak hour (future baseline)","unverified","C124922531",105,"https://archive.org/details/C124922531/page/n104","Third Street",null,null,"Final environmental impact statement for the disposal and reuse of Hunters Point Shipyard","n","a",0,-1.0],["d","qipu:sf/decision/map:meetingminutesb2011sanf_2/67/0e6db11a",2011,2011,"2011-09-13","resolution",null,null,"$70,000 (≈ $104,854 in 2026 dollars) grant for a bike lane on Cargo Way","unverified","meetingminutesb2011sanf_2",68,"https://archive.org/details/meetingminutesb2011sanf_2/page/n67",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/meetingminutesb2011sanf_2|43",2011,2011,"2011-09-13","resolution","city-services",null,"$70,000 (≈ $104,854 in 2026 dollars) grant for a bike lane on Cargo Way","unverified","meetingminutesb2011sanf_2",49,"https://archive.org/details/meetingminutesb2011sanf_2/page/n48",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/meetingminutesb2011sanf_2|59",2011,2011,"2011-09-13","resolution","public-money","passed","City accepted $70,000 (≈ $104,854 in 2026 dollars) grant for a Cargo Way bike lane","quoted","meetingminutesb2011sanf_2",68,"https://archive.org/details/meetingminutesb2011sanf_2/page/n67",null,null,null,null,"n","a",0,1.27],["d","qipu:sf/decision/meetingminutesb2011sanf_2|60",2011,2011,"2011-09-13","resolution","city-services",null,"$70,000 (≈ $104,854 in 2026 dollars) grant for a bike lane on Cargo Way","unverified","meetingminutesb2011sanf_2",68,"https://archive.org/details/meetingminutesb2011sanf_2/page/n67",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/meetingminutesb2011sanf_2|g207",2011,2011,"2011-09-13",null,"transport","passed","Port takes $70,000 (≈ $104,854 in 2026 dollars) state grant for a Cargo Way bike lane.","unverified","meetingminutesb2011sanf_2",68,"https://archive.org/details/meetingminutesb2011sanf_2/page/n67",null,null,null,null,"n","a",0,2.03],["d","qipu:sf/decision/sd:36663f9dab",2011,2011,"2011-09-13",null,"works","passed","$70K (≈ $104,854 in 2026 dollars) state grant pays for bike lane on Cargo Way","unverified",null,null,"https://archive.org/details/meetingminutesb2011sanf_2/page/n67/mode/1up",null,null,null,null,"n","a",0,0.49],["d","qipu:sf/decision/meetingminutesd2011sanf_0|143",2011,2011,"2011-09-20","resolution","city-services",null,"$70,000 (≈ $104,854 in 2026 dollars) accepted for a Cargo Way bike lane to Jennings Street","unverified","meetingminutesd2011sanf_0",138,"https://archive.org/details/meetingminutesd2011sanf_0/page/n137",null,null,null,null,"n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:118/1",1998,2015,"2015","alternative","environmental impact report",null,"New LRV yard and shop facilities, Western Pacific or Cargo Way site · proposes: Full build-out of new LRV yard and shop by 2015","unverified","C124915258",118,"https://archive.org/details/C124915258/page/n117",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:413/1",1998,2015,"2015","finding","environmental impact report",null,"Third Street Light Rail Project maintenance facility · finding: Expected increase in emissions from the maintenance facility sites would be below BAAQMD threshold of 80 lb/day for ROG, NOx and PM10","unverified","C124915258",413,"https://archive.org/details/C124915258/page/n412",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-4.0]],"pinned":["qipu:sf/decision/meetingminutesb2011sanf_2|59","qipu:sf/decision/journalofjanjuneproceed72sanfrich|146"]}