{"id":null,"ids":[],"kind":"named in documents","name":"existing Terminal","tied_by":"name","block":null,"release":"v0.7.1","rows_columns":["t","id","year","y","date","kind","topic","outcome","summary","tier","source","leaf","scan","addr","quote","note","title","how","g","rec","sc"],"rows":[["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:29/5",1993,1993,"","alternative","study or report",null,"Second bus deck over existing Terminal · finding: second deck could be built but ramp splits and surface street connection would be difficult; option not developed","unverified","C124914494",29,"https://archive.org/details/C124914494/page/n28",null,null,null,"Transit terminal study","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:29/6",1993,1993,"","project","study or report",null,"Caltrain extension station at Transbay Terminal · proposes: use existing ramps and Terminal platform for a Caltrain station","unverified","C124914494",29,"https://archive.org/details/C124914494/page/n28",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:37/1",1993,1993,"","measure","study or report",null,"Alternative A - Existing Terminal Site · other: Transit Terminal Street Level Plan, Figure 10","unverified","C124914494",37,"https://archive.org/details/C124914494/page/n36",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:37/2",1993,1993,"","measure","study or report",null,"Transit terminal street level · other: Total street level bus count 38","unverified","C124914494",37,"https://archive.org/details/C124914494/page/n36",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:37/3",1993,1993,"","building","study or report",null,"AC Transit terminal · other: 39,000 sq ft","unverified","C124914494",37,"https://archive.org/details/C124914494/page/n36",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:57/4",1993,1993,"","project","study or report",null,"Existing Transbay Terminal seismic and safety compliance · cost usd: approximately $30 million in regional bridge tolls","unverified","C124914494",57,"https://archive.org/details/C124914494/page/n56",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:59/3",1993,1993,"","alternative","study or report",null,"Alternative X (modifications to existing Terminal) · other: twenty-six months for construction","unverified","C124914494",59,"https://archive.org/details/C124914494/page/n58",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:70/3",1993,1993,"","project","study or report",null,"Transit terminal reconstruction · other: expansion of existing terminal building envelope","unverified","C124914494",70,"https://archive.org/details/C124914494/page/n69",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:94/1",1993,1993,"","alternative","study or report",null,"Alternative A transit terminal, existing terminal site · alternative: Alternative A-Existing Terminal Site, Transit Terminal Below Ground Level Plan","unverified","C124914494",94,"https://archive.org/details/C124914494/page/n93","Howard Street",null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:12/5",1993,1993,"1993","alternative","study or report",null,"Alternative X · cost usd: $93 million","unverified","C124914494",12,"https://archive.org/details/C124914494/page/n11",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:12/6",1993,1993,"1993","alternative","study or report",null,"Alternative X · proposes: modifies the existing Terminal","unverified","C124914494",12,"https://archive.org/details/C124914494/page/n11",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:35/2",1993,1993,"1993","alternative","study or report",null,"Alternative A - New terminal at existing terminal site · alternative: New regional transit terminal primarily underneath potential land uses in blocks bounded by Mission, Beale, Natoma, First Streets","unverified","C124914494",35,"https://archive.org/details/C124914494/page/n34","Mission",null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:35/3",1993,1993,"1993","alternative","study or report",null,"Alternative A - New terminal at existing terminal site · other: Six bus platforms and twenty-two bus berths","unverified","C124914494",35,"https://archive.org/details/C124914494/page/n34",null,null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:36/1",1993,1993,"1993","alternative","study or report",null,"Alternative A - New terminal at existing terminal site · alternative: On Grade and Underground","unverified","C124914494",36,"https://archive.org/details/C124914494/page/n35",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:5/1",1993,1993,"1993","project","study or report",null,"Transbay Transit Terminal · alternative: Alternative A - New Terminal at Existing Terminal Site","unverified","C124914494",5,"https://archive.org/details/C124914494/page/n4",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:69/1",1993,1993,"1993","alternative","study or report",null,"Alternative 1 - Expand the Existing Terminal Building To Mission Street · alternative: Expand the existing Transbay Terminal Building to Mission Street for long-haul bus services","unverified","C124914494",69,"https://archive.org/details/C124914494/page/n68","Mission Street",null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:69/6",1993,1993,"1993","finding","study or report",null,"Alternative 1 - Expand the Existing Terminal Building To Mission Street · finding: Total clearance need is at least 28 feet; elevation difference between bus deck and street level is only 20 feet","unverified","C124914494",69,"https://archive.org/details/C124914494/page/n68",null,null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:69/7",1993,1993,"1993","finding","study or report",null,"Alternative 1 - Expand the Existing Terminal Building To Mission Street · finding: A total of 78 spaces can be accommodated off-street, including 9 MUNI/SamTrans spaces; 82 platforms needed; four spaces on street","unverified","C124914494",69,"https://archive.org/details/C124914494/page/n68",null,null,null,"Transit terminal study","n","m",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:93/1",1993,1993,"1993","alternative","study or report",null,"Alternative A - Existing Terminal Site · alternative: Existing terminal site, transit terminal street level plan","unverified","C124914494",93,"https://archive.org/details/C124914494/page/n92","Howard Street",null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:93/2",1993,1993,"1993","measure","study or report",null,"Alternative A - Existing Terminal Site · other: Total street level bus count: 38","unverified","C124914494",93,"https://archive.org/details/C124914494/page/n92","Howard Street",null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:93/3",1993,1993,"1993","measure","study or report",null,"Alternative A - Existing Terminal Site · other: Golden Gate Transit bus count: 13","unverified","C124914494",93,"https://archive.org/details/C124914494/page/n92","Howard Street",null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:93/4",1993,1993,"1993","measure","study or report",null,"Alternative A - Existing Terminal Site · floor area sqft: 39,000 S.F.","unverified","C124914494",93,"https://archive.org/details/C124914494/page/n92","Howard Street",null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:59/4",1993,1993,"second half of 1997","alternative","study or report",null,"Alternative X (modified existing Terminal) · other: earliest completion in second half of 1997","unverified","C124914494",59,"https://archive.org/details/C124914494/page/n58",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:17/5",1995,1995,"","finding","study or report",null,"Transbay Transit Terminal · finding: Findings for the existing Terminal site are less relevant to the Transbay Area Plan","unverified","C124914193",17,"https://archive.org/details/C124914193/page/n17",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:61/8",1995,1995,"October 1984","site","study or report",null,"CalTrain existing terminal · other: existing terminal at Fourth and Townsend","unverified","C124914193",61,"https://archive.org/details/C124914193/page/n61",null,null,null,"Transbay area plan : background data report","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124908577:220/1",1992,2010,"2010","finding","study or report",null,"Port of San Francisco existing container terminals · finding: Port can accommodate the 2010 growth forecast at existing terminal sites, including reserved areas","unverified","C124908577",220,"https://archive.org/details/C124908577/page/n219",null,null,null,"[Public information documents relating to Port of San Francisco waterfront plan project]","n","a",0,-1.0]]}