{"id":null,"ids":[],"kind":"named in documents","name":"Francisco Reservoir site","tied_by":"name","block":null,"release":"v0.7.1","rows_columns":["t","id","year","y","date","kind","topic","outcome","summary","tier","source","leaf","scan","addr","quote","note","title","how","g","rec","sc"],"rows":[["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:133/2",1990,1990,"","site","study or report",null,"Francisco Reservoir · other: underlain by shale and sandstone of the Franciscan Complex; bedrock should be mostly shale with some sandstone at the southeast corner","unverified","C124904960",133,"https://archive.org/details/C124904960/page/n132",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:133/3",1990,1990,"","site","study or report",null,"Francisco Reservoir · other: Franciscan may be mantled with 5 to 10 feet of slope debris; elevation 125 bench cut into bedrock except along north berm toe","unverified","C124904960",133,"https://archive.org/details/C124904960/page/n132",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:151/7",1990,1990,"","alternative","study or report",null,"Francisco Reservoir · rejected: hydro-pneumatic tank on the site was not considered","unverified","C124904960",151,"https://archive.org/details/C124904960/page/n150",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:229/9",1990,1990,"","finding","study or report",null,"Francisco Reservoir · finding: insufficient geotechnical data for a definitive analysis","unverified","C124904960",229,"https://archive.org/details/C124904960/page/n228",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:131/1",1990,1990,"1990","building","study or report",null,"Francisco Reservoir · other: existing reservoir impounded by a berm on a bench cut into north slope of Russian Hill","unverified","C124904960",131,"https://archive.org/details/C124904960/page/n130",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:135/1",1990,1990,"1990","finding","study or report",null,"Francisco Reservoir · finding: no known active faults at the site","unverified","C124904960",135,"https://archive.org/details/C124904960/page/n134",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:135/2",1990,1990,"1990","finding","study or report",null,"Francisco Reservoir · finding: Franciscan Formation bedrock encountered at 0 to 13 feet depth in vicinity of site","unverified","C124904960",135,"https://archive.org/details/C124904960/page/n134",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124904960:135/3",1990,1990,"1990","finding","study or report",null,"Francisco Reservoir · finding: upper 10 to 20 feet of bedrock weathered and fractured","unverified","C124904960",135,"https://archive.org/details/C124904960/page/n134",null,null,null,"Final report Balboa and Francisco Reservoirs needs assessment","n","a",0,3.0],["d","qipu:sf/decision/sfbos:bag071216|101",2016,2016,"2016-07-12","ordinance","city-services",null,"$25M (≈ $35.1 million in 2026 dollars) park deal with the Francisco Park Conservancy passes first reading","unverified",null,null,"https://sfbos.org/sites/default/files/bag071216_minutes.pdf#page=16",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag071916|5",2016,2016,"2016-07-19","ordinance","city-services",null,"$25M (≈ $35.1 million in 2026 dollars) gift of park building work from the Francisco Park Conservancy","unverified",null,null,"https://sfbos.org/sites/default/files/bag071916_minutes.pdf#page=3",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag071916|6",2016,2016,"2016-07-19","ordinance","running-the-city","passed","$25 million (≈ $35.1 million in 2026 dollars) gift accepted for new Francisco Reservoir park","unverified",null,null,"https://sfbos.org/sites/default/files/bag071916_minutes.pdf#page=3",null,null,null,null,"n","m",0,6.22]]}