{"id":null,"ids":[],"kind":"named in documents","name":"Hunters Point and Potrero generating stations","tied_by":"name","block":null,"release":"v0.7.1","rows_columns":["t","id","year","y","date","kind","topic","outcome","summary","tier","source","leaf","scan","addr","quote","note","title","how","g","rec","sc"],"rows":[["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:117/2",1997,1996,"1996","finding","study or report",null,"SF reliability units (Hunters Point and Potrero generating stations) · cost usd: about $10-million per year in 1996 dollars","unverified","C124916234",117,"https://archive.org/details/C124916234/page/n116",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:116/1",1997,1997,"","finding","study or report",null,"Hunters Point and Potrero generating stations · other: assumed not acquired or operated by a SF municipal electric utility","unverified","C124916234",116,"https://archive.org/details/C124916234/page/n115",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:185/1",1997,1997,"","site","study or report",null,"Hunters Point and Potrero generating stations · other: Will continue to be dispatched to provide reliability to SF until an alternative source is constructed, whether or not the distribution system is municipalized","unverified","C124916234",185,"https://archive.org/details/C124916234/page/n184",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:78/1",1997,1997,"","site","study or report",null,"Hunters Point and Potrero generating stations · other: used to supply part of the local San Francisco load","unverified","C124916234",78,"https://archive.org/details/C124916234/page/n77",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:78/2",1997,1997,"","site","study or report",null,"Hunters Point and Potrero generating stations · other: two aged and two relatively efficient gas/oil fired steam units and four quick-start combustion turbines","unverified","C124916234",78,"https://archive.org/details/C124916234/page/n77",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:78/4",1997,1997,"","finding","study or report",null,"Hunters Point and Potrero generating stations · finding: San Francisco municipal electric utility will not be required to purchase the stations from PG&E; excluded from acquisition cost analysis","unverified","C124916234",78,"https://archive.org/details/C124916234/page/n77",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:83/4",1997,1997,"","finding","study or report",null,"Hunters Point and Potrero generating stations · other: municipal utility will not have to acquire these SF generating stations; no capital costs included","unverified","C124916234",83,"https://archive.org/details/C124916234/page/n82",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:117/1",1997,1997,"August 1996","finding","study or report",null,"SF reliability units (Hunters Point and Potrero generating stations) · other: SF reliability costs spread over all of PG&E's service territory in the CEC consultant's forecast","unverified","C124916234",117,"https://archive.org/details/C124916234/page/n116",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","m",0,-1.0]]}