{"id":null,"ids":[],"kind":"named in documents","name":"Laguna Honda Hospital campus","tied_by":"name","block":null,"release":"v0.7.1","rows_columns":["t","id","year","y","date","kind","topic","outcome","summary","tier","source","leaf","scan","addr","quote","note","title","how","g","rec","sc"],"rows":[["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:5/3",1994,1867,"1867","property_record","plan",null,"Municipal shelter for the homeless, [name withheld] site · built year: municipally financed shelter constructed on the site","unverified","C124914333",5,"https://archive.org/details/C124914333/page/n4",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902290:45/4",1992,1909,"1909","building","study or report",null,"Clarendon Hall · built year: built 1909, oldest structure on the campus","unverified","C124902290",45,"https://archive.org/details/C124902290/page/n44",null,null,null,"Into the 21st century : building a new facility to continue Laguna Honda Hospital's mission","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:111/4",1994,1909,"1909","building","plan",null,"Clarendon Hall · built year: 1909","unverified","C124914333",111,"https://archive.org/details/C124914333/page/n110",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:39/2",1994,1913,"1913","event","plan",null,"Laguna Honda Hospital · event: ward for terminally ill patients opened","unverified","C124914333",39,"https://archive.org/details/C124914333/page/n38",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:111/9",1994,1925,"1925","building","plan",null,"Bridge Structure · built year: 1925","unverified","C124914333",111,"https://archive.org/details/C124914333/page/n110",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:111/1",1994,1926,"1926","building","plan",null,"Laguna Honda Hospital Main Building · built year: 1926","unverified","C124914333",111,"https://archive.org/details/C124914333/page/n110",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:5/1",1994,1926,"1926","property_record","plan",null,"Main Building, Laguna Honda Hospital · built year: Main Building constructed 1926, designed as home for the elderly","unverified","C124914333",5,"https://archive.org/details/C124914333/page/n4",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:111/7",1994,1934,"1934","building","plan",null,"Boiler Plant · built year: 1934","unverified","C124914333",111,"https://archive.org/details/C124914333/page/n110",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:111/5",1994,1940,"1940 and 1957","building","plan",null,"Laundry Building · built year: 1940 and 1957","unverified","C124914333",111,"https://archive.org/details/C124914333/page/n110",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:111/10",1994,1957,"1957","building","plan",null,"Shop Building · built year: 1957","unverified","C124914333",111,"https://archive.org/details/C124914333/page/n110",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902290:115/1",1992,1992,"","finding","study or report",null,"Laguna Honda Hospital campus recommended Project · finding: Recommended Project selected as the recommended solution for the [name withheld] campus","unverified","C124902290",115,"https://archive.org/details/C124902290/page/n114",null,null,null,"Into the 21st century : building a new facility to continue Laguna Honda Hospital's mission","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902290:41/1",1992,1992,"","site","study or report",null,"Laguna Honda Hospital campus · other: well served by public transportation and has adequate utility capacity","unverified","C124902290",41,"https://archive.org/details/C124902290/page/n40",null,null,null,"Into the 21st century : building a new facility to continue Laguna Honda Hospital's mission","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902290:41/2",1992,1992,"","finding","study or report",null,"Laguna Honda Hospital campus · finding: traffic circulation within the steeply sloped site is currently difficult","unverified","C124902290",41,"https://archive.org/details/C124902290/page/n40",null,null,null,"Into the 21st century : building a new facility to continue Laguna Honda Hospital's mission","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902290:41/5",1992,1992,"","finding","study or report",null,"Laguna Honda Hospital campus buildings · finding: several existing buildings exceed current bulk restrictions and may remain; replacements or major additions require conditional use permit","unverified","C124902290",41,"https://archive.org/details/C124902290/page/n40",null,null,null,"Into the 21st century : building a new facility to continue Laguna Honda Hospital's mission","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902290:43/11",1992,1992,"","finding","study or report",null,"Laguna Honda Hospital campus roofs and asbestos · finding: roofs on every major building require replacement; asbestos removal needed on all buildings except garage and greenhouse","unverified","C124902290",43,"https://archive.org/details/C124902290/page/n42",null,null,null,"Into the 21st century : building a new facility to continue Laguna Honda Hospital's mission","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902290:43/12",1992,1992,"","measure","study or report",null,"Laguna Honda Hospital maintenance items · cost usd: approximately $10 million","unverified","C124902290",43,"https://archive.org/details/C124902290/page/n42",null,null,null,"Into the 21st century : building a new facility to continue Laguna Honda Hospital's mission","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902290:45/5",1992,1992,"","building","study or report",null,"Clarendon Hall · floor area sqft: 118,000 square feet, three stories","unverified","C124902290",45,"https://archive.org/details/C124902290/page/n44",null,null,null,"Into the 21st century : building a new facility to continue Laguna Honda Hospital's mission","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902290:45/6",1992,1992,"","building","study or report",null,"Clarendon Hall · other: houses 170 skilled nursing beds, Senior Nutrition Program, and Adult Day Health Center","unverified","C124902290",45,"https://archive.org/details/C124902290/page/n44",null,null,null,"Into the 21st century : building a new facility to continue Laguna Honda Hospital's mission","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902290:45/7",1992,1992,"","finding","study or report",null,"Clarendon Hall · finding: does not conform to current structural codes for seismic resistance","unverified","C124902290",45,"https://archive.org/details/C124902290/page/n44",null,null,null,"Into the 21st century : building a new facility to continue Laguna Honda Hospital's mission","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902290:45/8",1992,1992,"","finding","study or report",null,"Clarendon Hall · recommendation: may soon require major upgrading of lateral restraint systems (OSHPD review)","unverified","C124902290",45,"https://archive.org/details/C124902290/page/n44",null,null,null,"Into the 21st century : building a new facility to continue Laguna Honda Hospital's mission","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902290:79/2",1992,1992,"","building","study or report",null,"Clarendon Hall · demolished: Demolish Clarendon Hall, bridge between Clarendon and hospital, and Wing O; Remove asbestos; demolish Power Plant","unverified","C124902290",79,"https://archive.org/details/C124902290/page/n78",null,null,null,"Into the 21st century : building a new facility to continue Laguna Honda Hospital's mission","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902290:79/3",1992,1992,"","project","study or report",null,"Laguna Honda Hospital replacement project · proposes: Construct remainder of new hospital, 557 beds, ancillaries and support services, in Phase 2","unverified","C124902290",79,"https://archive.org/details/C124902290/page/n78",null,null,null,"Into the 21st century : building a new facility to continue Laguna Honda Hospital's mission","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902290:79/4",1992,1992,"","project","study or report",null,"Laguna Honda Hospital replacement project · proposes: Construct new Residential Care Facility","unverified","C124902290",79,"https://archive.org/details/C124902290/page/n78",null,null,null,"Into the 21st century : building a new facility to continue Laguna Honda Hospital's mission","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902290:79/6",1992,1992,"","project","study or report",null,"Laguna Honda Hospital replacement project · event: The entire Project is estimated to take 6 years to complete from beginning to end of construction","unverified","C124902290",79,"https://archive.org/details/C124902290/page/n78",null,null,null,"Into the 21st century : building a new facility to continue Laguna Honda Hospital's mission","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:111/11",1994,1992,"1992","project","plan",null,"Laguna Honda Hospital building repairs · cost usd: $8,051,000 - $8,200,000","unverified","C124914333",111,"https://archive.org/details/C124914333/page/n110",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:109/1",1994,1994,"","finding","plan",null,"Laguna Honda Hospital support buildings · finding: Laundry Building is the most questionable building","unverified","C124914333",109,"https://archive.org/details/C124914333/page/n108",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:109/2",1994,1994,"","finding","plan",null,"Laguna Honda Hospital ancillary buildings · finding: past their useful life, patched as funds become available","unverified","C124914333",109,"https://archive.org/details/C124914333/page/n108",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:109/4",1994,1994,"","finding","plan",null,"Laguna Honda Hospital asbestos assessment · finding: asbestos found in all buildings except the Greenhouse","unverified","C124914333",109,"https://archive.org/details/C124914333/page/n108",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:109/5",1994,1994,"","measure","plan",null,"Laguna Honda Hospital asbestos abatement · cost usd: up to $3 million for construction only","unverified","C124914333",109,"https://archive.org/details/C124914333/page/n108",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:109/6",1994,1994,"","measure","plan",null,"Laguna Honda Hospital asbestos removal and replacement · cost usd: up to $4 million for construction only","unverified","C124914333",109,"https://archive.org/details/C124914333/page/n108",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:111/2",1994,1994,"","building","plan",null,"Laguna Honda Hospital Main Building · floor area sqft: 533,000 gross sq ft; 401,400 net sq ft","unverified","C124914333",111,"https://archive.org/details/C124914333/page/n110",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:111/3",1994,1994,"","building","plan",null,"Clarendon Hall · floor area sqft: 112,800 gross sq ft; 82,150 net sq ft","unverified","C124914333",111,"https://archive.org/details/C124914333/page/n110",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:111/6",1994,1994,"","building","plan",null,"Laundry Building · floor area sqft: 9,500 gross sq ft; 8,400 net sq ft","unverified","C124914333",111,"https://archive.org/details/C124914333/page/n110",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:111/8",1994,1994,"","building","plan",null,"Boiler Plant · floor area sqft: 8,200 gross sq ft; 7,420 net sq ft","unverified","C124914333",111,"https://archive.org/details/C124914333/page/n110",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:5/6",1994,1994,"","property_record","plan",null,"Laguna Honda Hospital · units: 1172 beds, operating at capacity","unverified","C124914333",5,"https://archive.org/details/C124914333/page/n4",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:5/7",1994,1994,"","finding","plan",null,"Laguna Honda Hospital · other: constant waiting list of more than 200 people","unverified","C124914333",5,"https://archive.org/details/C124914333/page/n4",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:7/1",1994,1994,"","site","plan",null,"Laguna Honda Hospital Campus · acreage: 62 acres","unverified","C124914333",7,"https://archive.org/details/C124914333/page/n6",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:7/2",1994,1994,"","finding","plan",null,"Laguna Honda Hospital · finding: Hospital does not conform to codes or planning standards for the kind of care being provided","unverified","C124914333",7,"https://archive.org/details/C124914333/page/n6",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:7/3",1994,1994,"","finding","plan",null,"Laguna Honda Hospital · other: More than 150 patients require daily nasogastric or gastrostomic tube feeding","unverified","C124914333",7,"https://archive.org/details/C124914333/page/n6",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:7/4",1994,1994,"","agency","plan",null,"Laguna Honda Hospital tree management plan · lead agency: Recreation and Park Department","unverified","C124914333",7,"https://archive.org/details/C124914333/page/n6",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:73/1",1994,1994,"","property_record","plan",null,"Main Building, Laguna Honda Hospital · floor area sqft: 534,000 square foot Mediterranean style building","unverified","C124914333",73,"https://archive.org/details/C124914333/page/n72",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:73/2",1994,1994,"","property_record","plan",null,"Main Building, Laguna Honda Hospital · stories: 4 to 6","unverified","C124914333",73,"https://archive.org/details/C124914333/page/n72",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:73/3",1994,1994,"","property_record","plan",null,"Clarendon Hall, Laguna Honda Hospital · floor area sqft: approximately 118,000 square feet","unverified","C124914333",73,"https://archive.org/details/C124914333/page/n72",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:73/4",1994,1994,"","property_record","plan",null,"Clarendon Hall, Laguna Honda Hospital · stories: three story, oldest on campus","unverified","C124914333",73,"https://archive.org/details/C124914333/page/n72",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:73/5",1994,1994,"","site","plan",null,"Laguna Honda Hospital campus · acreage: 62 acre property","unverified","C124914333",73,"https://archive.org/details/C124914333/page/n72",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:87/1",1994,1994,"","site","plan",null,"Laguna Honda Hospital campus parking · other: approximately 580 parking stalls on campus","unverified","C124914333",87,"https://archive.org/details/C124914333/page/n86",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:93/2",1994,1994,"","site","plan",null,"Laguna Honda Hospital walkways · other: Existing walkways provide pedestrian access from [name withheld] to the Hospital main entrance and the Clarendon Hall area","unverified","C124914333",93,"https://archive.org/details/C124914333/page/n92",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:93/5",1994,1994,"11 pm - 7 am","site","plan",null,"Laguna Honda Hospital · jobs: Night shift staff FTEs 205 (11 pm - 7 am)","unverified","C124914333",93,"https://archive.org/details/C124914333/page/n92",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:145/1",1994,1994,"1994","finding","plan",null,"Clarendon Hall and Main Building · finding: Structural systems do not meet minimum requirements for seismic resistance","unverified","C124914333",145,"https://archive.org/details/C124914333/page/n144",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:145/2",1994,1994,"1994","finding","plan",null,"Laguna Honda Hospital campus · finding: Patient accessibility around the campus grounds and within the buildings is severely compromised","unverified","C124914333",145,"https://archive.org/details/C124914333/page/n144",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:145/3",1994,1994,"1994","finding","plan",null,"Laguna Honda Hospital open wards · finding: Principal patient care areas (open wards) are not mechanically ventilated","unverified","C124914333",145,"https://archive.org/details/C124914333/page/n144",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:71/1",1994,1994,"1994","site","plan",null,"Laguna Honda Hospital campus · other: Campus site plan showing Olympia Street and Main Building","unverified","C124914333",71,"https://archive.org/details/C124914333/page/n70","Olympia Street",null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:77/7",1994,1994,"1994","site","plan",null,"Laguna Honda Hospital campus · other: landscaped grounds and Mediterranean style buildings providing views for surrounding neighborhoods","unverified","C124914333",77,"https://archive.org/details/C124914333/page/n76",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:83/1",1994,1994,"1994","site","plan",null,"Laguna Honda Hospital campus · height ft: 80 foot height limit","unverified","C124914333",83,"https://archive.org/details/C124914333/page/n82",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:83/2",1994,1994,"1994","site","plan",null,"Laguna Honda Hospital campus · other: majority designated as Open Space by City Planning Code","unverified","C124914333",83,"https://archive.org/details/C124914333/page/n82",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:83/3",1994,1994,"1994","site","plan",null,"Neighborhood surrounding Laguna Honda Hospital campus · height ft: 40 foot height limit","unverified","C124914333",83,"https://archive.org/details/C124914333/page/n82",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:9/2",1994,1994,"1994","building","plan",null,"Laguna Honda Hospital · built year: principal buildings between fifty and eighty years old","unverified","C124914333",9,"https://archive.org/details/C124914333/page/n8",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:9/3",1994,1994,"1994","site","plan",null,"Laguna Honda Hospital campus · finding: building roofs beyond expected life; most in poor condition","unverified","C124914333",9,"https://archive.org/details/C124914333/page/n8",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:9/4",1994,1994,"1994","site","plan",null,"Laguna Honda Hospital campus · finding: asbestos in piping and some finish materials; removal program being developed, cost high, funds not designated","unverified","C124914333",9,"https://archive.org/details/C124914333/page/n8",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:95/3",1994,1994,"1994","building","plan",null,"Clarendon Hall · other: Service vehicles use the main drive to access Clarendon Hall","unverified","C124914333",95,"https://archive.org/details/C124914333/page/n94",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:93/4",1994,1994,"3 pm - 11 pm","site","plan",null,"Laguna Honda Hospital · jobs: Evening shift staff FTEs 316 (3 pm - 11 pm)","unverified","C124914333",93,"https://archive.org/details/C124914333/page/n92",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:93/3",1994,1994,"7 am - 3 pm","site","plan",null,"Laguna Honda Hospital · jobs: Day shift staff FTEs 1057 (7 am - 3 pm)","unverified","C124914333",93,"https://archive.org/details/C124914333/page/n92",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:5/2",1994,1994,"By 1867","property_record","plan",null,"Laguna Honda Hospital site · acquired: site acquired by San Francisco","unverified","C124914333",5,"https://archive.org/details/C124914333/page/n4",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:109/3",1994,1994,"January 1990","event","plan",null,"Laguna Honda Hospital asbestos assessment · event: City commissioned Clayton Environmental Consultants to investigate asbestos","unverified","C124914333",109,"https://archive.org/details/C124914333/page/n108",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:5/4",1994,1994,"after 1906","property_record","plan",null,"Relief Home · built: rebuilt after the 1906 Earthquake as the Relief Home","unverified","C124914333",5,"https://archive.org/details/C124914333/page/n4",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:5/5",1994,1994,"soon after 1906","property_record","plan",null,"Clarendon Hall · built: Clarendon Hall built soon after the Relief Home, to serve its residents' healthcare needs","unverified","C124914333",5,"https://archive.org/details/C124914333/page/n4",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914333:39/1",1994,1994,"year after the Relief Home was built","building","plan",null,"Clarendon Hall · built: infirmary added to the Relief Home campus; oldest building on the campus","unverified","C124914333",39,"https://archive.org/details/C124914333/page/n38",null,null,null,"Laguna Honda Hospital institutional master plan","n","a",0,3.0]]}