{"id":null,"ids":[],"kind":"named in documents","name":"new transit terminal","tied_by":"name","block":null,"release":"v0.7.1","rows_columns":["t","id","year","y","date","kind","topic","outcome","summary","tier","source","leaf","scan","addr","quote","note","title","how","g","rec","sc"],"rows":[["d","qipu:sf/decision/journalofproceed67sanfrich|g1791",1972,1972,"1972-06-26","resolution","transport","passed","City backs new transit terminal at Transbay site","quoted","journalofproceed67sanfrich",613,"https://archive.org/details/journalofproceed67sanfrich/page/n612",null,null,null,null,"n","a",0,3.28],["d","qipu:sf/decision/journalofproceed67sanfrich|g1792",1972,1972,"1972-06-26",null,"transport","passed","City backs new transit terminal at Transbay site.","unverified","journalofproceed67sanfrich",613,"https://archive.org/details/journalofproceed67sanfrich/page/n612",null,null,null,null,"n","a",0,2.03],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:10/7",1993,1993,"","alternative","study or report",null,"New transit terminal alternatives · other: easy access to existing transit services on Market and Mission Streets","unverified","C124914494",10,"https://archive.org/details/C124914494/page/n9","Market Street; Mission Street",null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:100/1",1993,1993,"","alternative","study or report",null,"New Transit Terminal · alternative: Alternative B","unverified","C124914494",100,"https://archive.org/details/C124914494/page/n99","Main Street",null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:101/1",1993,1993,"","alternative","study or report",null,"New Transit Terminal, Alternative B, Main/Beale Site · alternative: Alternative B, New Transit Terminal, Main/Beale Site, mezzanine level plan","unverified","C124914494",101,"https://archive.org/details/C124914494/page/n100","Main Street",null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:101/2",1993,1993,"","site","study or report",null,"New Transit Terminal, Main/Beale Site, mezzanine level · other: Ramp to Bay Bridge and to Folsom St. from the mezzanine level","unverified","C124914494",101,"https://archive.org/details/C124914494/page/n100","Howard Street",null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:108/1",1993,1993,"","measure","study or report",null,"New Transit Terminal, Alternative A · cost usd: Total direct construction cost 61,068,710","unverified","C124914494",108,"https://archive.org/details/C124914494/page/n107",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:108/2",1993,1993,"","measure","study or report",null,"New Transit Terminal, Alternative A · cost usd: Ramp demolition, construction contingency and related costs (+50%) 4,455,500","unverified","C124914494",108,"https://archive.org/details/C124914494/page/n107",null,null,null,"Transit terminal study","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:109/1",1993,1993,"","finding","study or report",null,"New Transit Terminal, Alternative A · other: No costs included for basement ventilation system for bus exhaust","unverified","C124914494",109,"https://archive.org/details/C124914494/page/n108",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:109/2",1993,1993,"","finding","study or report",null,"New Transit Terminal, Alternative A · other: No costs included for historic preservation impacts","unverified","C124914494",109,"https://archive.org/details/C124914494/page/n108",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:109/3",1993,1993,"","finding","study or report",null,"New Transit Terminal, Alternative A · other: Potential rail station not assumed to be developed as part of project","unverified","C124914494",109,"https://archive.org/details/C124914494/page/n108",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:109/4",1993,1993,"","finding","study or report",null,"New Transit Terminal, Alternative A · other: Scheme does not include a podium or any development above","unverified","C124914494",109,"https://archive.org/details/C124914494/page/n108",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:109/5",1993,1993,"","finding","study or report",null,"New Transit Terminal, Alternative A · other: Retail spaces are core and shell; tenant improvements paid by tenant","unverified","C124914494",109,"https://archive.org/details/C124914494/page/n108",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:109/6",1993,1993,"","finding","study or report",null,"New Transit Terminal, Alternative A · other: Major utility relocation not included since scope is not known","unverified","C124914494",109,"https://archive.org/details/C124914494/page/n108",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:109/7",1993,1993,"","finding","study or report",null,"New Transit Terminal, Alternative A · cost usd: Estimate based on today's construction cost with no escalation","unverified","C124914494",109,"https://archive.org/details/C124914494/page/n108",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:39/1",1993,1993,"","measure","study or report",null,"Alternative A New Transit Terminal · alternative: Existing site, below ground level plan (Figure 11)","unverified","C124914494",39,"https://archive.org/details/C124914494/page/n38",null,null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:43/1",1993,1993,"","alternative","study or report",null,"Alternative A - New Transit Terminal · alternative: Private Land Acquisition","unverified","C124914494",43,"https://archive.org/details/C124914494/page/n42","Market Street",null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:44/1",1993,1993,"","alternative","study or report",null,"Alternative A - New Transit Terminal · alternative: two-way, shorter ramp for bus access would eliminate existing ramp structure north of Folsom Street between Essex and Beale Streets","unverified","C124914494",44,"https://archive.org/details/C124914494/page/n43","Folsom Street",null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:45/1",1993,1993,"","alternative","study or report",null,"Alternative B - New Transit Terminal · alternative: New transit terminal at Main/Beale site, on grade and second level (Figure 16)","unverified","C124914494",45,"https://archive.org/details/C124914494/page/n44","Main and Beale Streets",null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:48/1",1993,1993,"","alternative","study or report",null,"New Transit Terminal Alternative B · alternative: Main/Beale Site, upper level plan","unverified","C124914494",48,"https://archive.org/details/C124914494/page/n47","Main St / Beale St",null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:48/2",1993,1993,"","measure","study or report",null,"New Transit Terminal Alternative B · other: Bus count ACT & Gray Line tours, total top level 40","unverified","C124914494",48,"https://archive.org/details/C124914494/page/n47","Main St / Beale St",null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:49/1",1993,1993,"","alternative","study or report",null,"Alternative B new transit terminal · cost usd: an estimated $101 million for a new transit terminal","unverified","C124914494",49,"https://archive.org/details/C124914494/page/n48","Main and Beale Streets",null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:49/2",1993,1993,"","alternative","study or report",null,"Alternative B new transit terminal · acquired: Two small parcels of privately owned property north of Howard Street and one triangular-shaped private parcel mid-block on Main between Howard and Folsom Streets would be required","unverified","C124914494",49,"https://archive.org/details/C124914494/page/n48","Main Street",null,null,"Transit terminal study","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:49/4",1993,1993,"","alternative","study or report",null,"Alternative B new transit terminal · other: single level stub-end terminal with eight tracks, six reserved for Caltrain extension and two for high speed rail","unverified","C124914494",49,"https://archive.org/details/C124914494/page/n48","Natoma and Howard Streets",null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:49/5",1993,1993,"","alternative","study or report",null,"Alternative B new transit terminal · other: 1000-1400 feet train platform to accommodate 10-car train operation","unverified","C124914494",49,"https://archive.org/details/C124914494/page/n48","Natoma and Howard Streets",null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:49/6",1993,1993,"","alternative","study or report",null,"Alternative B new transit terminal · other: eliminates the portion of the existing ramp structure located north of Folsom Street between Essex and First Streets","unverified","C124914494",49,"https://archive.org/details/C124914494/page/n48","Folsom Street",null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:49/7",1993,1993,"","alternative","study or report",null,"Alternative B new transit terminal · other: excellent pedestrian access provided by transit plaza at Mission and Beale Streets","unverified","C124914494",49,"https://archive.org/details/C124914494/page/n48","Mission and Beale Streets",null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:49/8",1993,1993,"","alternative","study or report",null,"Alternative B new transit terminal · other: forecloses reconstruction of the Main and Beale Street freeway ramps but preserves options for an elevated freeway ramp to the waterfront","unverified","C124914494",49,"https://archive.org/details/C124914494/page/n48","Main and Beale Streets",null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:49/9",1993,1993,"","alternative","study or report",null,"Alternative B new transit terminal · other: Alternative B would maximize land use development opportunities on the existing Transbay Transit Terminal site","unverified","C124914494",49,"https://archive.org/details/C124914494/page/n48",null,null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:51/1",1993,1993,"","alternative","study or report",null,"Alternative B New Transit Terminal, Main/Beale Site · alternative: Alternative B, New Transit Terminal, Main/Beale Site, Underground","unverified","C124914494",51,"https://archive.org/details/C124914494/page/n50","Main St / Beale St",null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:53/1",1993,1993,"","alternative","study or report",null,"Alternative B - New Transit Terminal · alternative: Alternative B new transit terminal at Main/Beale site","unverified","C124914494",53,"https://archive.org/details/C124914494/page/n52",null,null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:55/2",1993,1993,"","finding","study or report",null,"Combined EIR/EIS schedule for new transit terminal (Alternatives A and B) · other: 37-40 months total elapsed time","unverified","C124914494",55,"https://archive.org/details/C124914494/page/n54",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:56/1",1993,1993,"","project","study or report",null,"Separate EIR schedule for new transit terminal (Alternatives A or B) · other: TOTAL ELAPSED TIME 29-31 months","unverified","C124914494",56,"https://archive.org/details/C124914494/page/n55",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:57/2",1993,1993,"","alternative","study or report",null,"Alternative A new transit terminal · cost usd: $79 million","unverified","C124914494",57,"https://archive.org/details/C124914494/page/n56",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:57/3",1993,1993,"","alternative","study or report",null,"Alternative B new transit terminal at Main/Beale · cost usd: $101 million","unverified","C124914494",57,"https://archive.org/details/C124914494/page/n56","Main",null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:58/1",1993,1993,"","project","study or report",null,"new transit terminal · other: at least ten months for construction drawings","unverified","C124914494",58,"https://archive.org/details/C124914494/page/n57",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:58/2",1993,1993,"","project","study or report",null,"City approvals for new transit terminal · other: six months beyond completion of environmental process","unverified","C124914494",58,"https://archive.org/details/C124914494/page/n57",null,null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:59/1",1993,1993,"","alternative","study or report",null,"Alternative A (new transit terminal with land uses stacked above) · other: approximately thirty months for construction","unverified","C124914494",59,"https://archive.org/details/C124914494/page/n58",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:59/2",1993,1993,"","alternative","study or report",null,"Alternative B (new transit terminal) · other: twenty-six months to complete construction","unverified","C124914494",59,"https://archive.org/details/C124914494/page/n58",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:102/1",1993,1993,"1993","project","study or report",null,"Alternative B New Transit Terminal, Main/Beale Site · other: Bus count, top level: 40 total","unverified","C124914494",102,"https://archive.org/details/C124914494/page/n101",null,null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:104/1",1993,1993,"1993","building","study or report",null,"New Transit Terminal, Main/Beale Site, Alternative B · other: Bus Terminal Section, Section B-B","unverified","C124914494",104,"https://archive.org/details/C124914494/page/n103","Main Street",null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:110/1",1993,1993,"1993","alternative","study or report",null,"New Transit Terminal, Alternative B · alternative: No podium; no development above included in scheme","unverified","C124914494",110,"https://archive.org/details/C124914494/page/n109","Fremont",null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:110/2",1993,1993,"1993","project","study or report",null,"New Transit Terminal, Alternative B · other: Costs exclude potential rail station, not assumed to be developed as part of project","unverified","C124914494",110,"https://archive.org/details/C124914494/page/n109","Fremont",null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:110/3",1993,1993,"1993","project","study or report",null,"New Transit Terminal, Alternative B · floor area sqft: Terminal Space 134,000 sq ft, cost 16,080,000","unverified","C124914494",110,"https://archive.org/details/C124914494/page/n109","Fremont",null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:110/4",1993,1993,"1993","project","study or report",null,"New Transit Terminal, Alternative B · other: No costs included for interim bus operations which would have to be relocated during construction","unverified","C124914494",110,"https://archive.org/details/C124914494/page/n109","Fremont",null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:38/8",1993,1993,"1993","alternative","study or report",null,"new transit terminal (Alternative A) · cost usd: $79 million estimated construction cost","unverified","C124914494",38,"https://archive.org/details/C124914494/page/n37",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:47/1",1993,1993,"1993","alternative","study or report",null,"New Transit Terminal Main/Beale Site · alternative: Alternative B, New Transit Terminal Main/Beale Site, mezzanine level plan","unverified","C124914494",47,"https://archive.org/details/C124914494/page/n46","Beale Street",null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:47/2",1993,1993,"1993","project","study or report",null,"New Transit Terminal Main/Beale Site · other: Greyhound: 13 buses at mezzanine level","unverified","C124914494",47,"https://archive.org/details/C124914494/page/n46","Beale Street",null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:47/3",1993,1993,"1993","project","study or report",null,"New Transit Terminal Main/Beale Site · other: Gray Line Commute: 1 bus at mezzanine level","unverified","C124914494",47,"https://archive.org/details/C124914494/page/n46","Beale Street",null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:47/4",1993,1993,"1993","project","study or report",null,"New Transit Terminal Main/Beale Site · other: Amtrak: 3 buses at mezzanine level","unverified","C124914494",47,"https://archive.org/details/C124914494/page/n46","Beale Street",null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:47/5",1993,1993,"1993","project","study or report",null,"New Transit Terminal Main/Beale Site · other: SF Misc. Carriers: 3 buses at mezzanine level","unverified","C124914494",47,"https://archive.org/details/C124914494/page/n46","Beale Street",null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:47/6",1993,1993,"1993","project","study or report",null,"New Transit Terminal Main/Beale Site · other: Total mezzanine level bus count: 20","unverified","C124914494",47,"https://archive.org/details/C124914494/page/n46","Beale Street",null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:50/1",1993,1993,"1993","alternative","study or report",null,"Alternative B New Transit Terminal · alternative: New transit terminal, Main/Beale site, underground","unverified","C124914494",50,"https://archive.org/details/C124914494/page/n49","Main Street",null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:61/1",1993,1993,"1993","alternative","study or report",null,"Alternative B - New Transit Terminal at Main/Beale Site · alternative: New transit terminal at Main/Beale site; central location near financial and retail districts","unverified","C124914494",61,"https://archive.org/details/C124914494/page/n60","Main St / Beale St",null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:61/2",1993,1993,"1993","alternative","study or report",null,"Alternative B - New Transit Terminal at Main/Beale Site · finding: improves accessibility and connectivity to BART and MUNI Metro at Embarcadero Station","unverified","C124914494",61,"https://archive.org/details/C124914494/page/n60",null,null,null,"Transit terminal study","n","m",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:61/3",1993,1993,"1993","alternative","study or report",null,"Alternative B - New Transit Terminal at Main/Beale Site · finding: reduces traffic conflicts by moving transit circulation away from First and Fremont Streets","unverified","C124914494",61,"https://archive.org/details/C124914494/page/n60","First St / Fremont St",null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:61/4",1993,1993,"1993","alternative","study or report",null,"Alternative B - New Transit Terminal at Main/Beale Site · other: minor private land acquisition and assembly required","unverified","C124914494",61,"https://archive.org/details/C124914494/page/n60","Main St / Beale St",null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:61/5",1993,1993,"1993","alternative","study or report",null,"Alternative B - New Transit Terminal at Main/Beale Site · other: use of Main/Beale site would foreclose some Terminal Separator Structure options","unverified","C124914494",61,"https://archive.org/details/C124914494/page/n60","Main St / Beale St",null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:7/1",1993,1993,"1993","alternative","study or report",null,"Alternative B - New Transit Terminal · alternative: New transit terminal at Main/Beale site, on grade and underground","unverified","C124914494",7,"https://archive.org/details/C124914494/page/n6","Main",null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:7/2",1993,1993,"1993","alternative","study or report",null,"Alternative A - New Transit Terminal · alternative: New transit terminal at existing Transbay site, on grade and underground","unverified","C124914494",7,"https://archive.org/details/C124914494/page/n6",null,null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:57/6",1993,1993,"December 1993","project","study or report",null,"Separate EIR for new transit terminal and new land uses, Alternatives A or B · event: began December 1993; could be completed by Summer 1996","unverified","C124914494",57,"https://archive.org/details/C124914494/page/n56",null,null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:57/5",1993,1993,"early 1997","project","study or report",null,"Combined EIR/EIS for new transit terminal and new land uses, Alternatives A or B · event: could be completed by early 1997","unverified","C124914494",57,"https://archive.org/details/C124914494/page/n56",null,null,null,"Transit terminal study","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:12/8",1993,1993,"early 1999 to early 2000","event","study or report",null,"New transit terminal · event: could be completed between early 1999 and early 2000 if an EIR and/or EIS were required","unverified","C124914494",12,"https://archive.org/details/C124914494/page/n11",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:59/5",1993,1993,"early 1999 to early 2000","alternative","study or report",null,"Alternatives A and B (new transit terminal) · other: could be delivered between early 1999 and early 2000","unverified","C124914494",59,"https://archive.org/details/C124914494/page/n58",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914874:3/5",1996,1996,"","site","study or report",null,"Transit terminal area · other: high-rise office towers interspersed with landscaped walkways and open spaces","unverified","C124914874",3,"https://archive.org/details/C124914874/page/n2",null,null,null,"Transbay area plan : Transbay 2020, preliminary land use and urban design alternative","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914874:4/2",1996,1996,"","project","study or report",null,"New transit terminal · proposes: new transit terminal with joint development potential","unverified","C124914874",4,"https://archive.org/details/C124914874/page/n3","Howard Street",null,null,"Transbay area plan : Transbay 2020, preliminary land use and urban design alternative","n","a",0,-1.0]]}