{"id":"qipu:sf/place/landmark/pier-96","ids":["qipu:sf/place/landmark/pier-96"],"kind":"landmark","name":"Pier 96","tied_by":"name","block":null,"release":"v0.7.1","rows_columns":["t","id","year","y","date","kind","topic","outcome","summary","tier","source","leaf","scan","addr","quote","note","title","how","g","rec","sc"],"rows":[["f","dl-sf-facts-v1.1-haiku55-2026-10/C101737381:15/1",1994,1969,"1969","measure","ordinance or legislation",null,"Pier 96 LASH terminal · cost usd: $20 million in bonds for first LASH terminal","unverified","C101737381",15,"https://archive.org/details/C101737381/page/n14","96 Pier",null,null,"Draft waterfront land use plan","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124908106:20/1",1994,1969,"1969","project","ordinance or legislation",null,"LASH terminal at Pier 96 · cost usd: $20 million in bonds","unverified","C124908106",20,"https://archive.org/details/C124908106/page/n19",null,null,null,"Port of San Francisco : draft waterfront land use plan","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919184:33/1",1996,1969,"1969","measure","plan",null,"LASH terminal · cost usd: $20 million in bonds","unverified","C124919184",33,"https://archive.org/details/C124919184/page/n31","96",null,null,"Port of San Francisco waterfront land use plan : draft for public review and comment","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123317767:144/1",1973,1973,"","property_record","study or report",null,"Pier 96 Lash Terminal · owned by city: San Francisco Port Commission","unverified","C123317767",144,"https://archive.org/details/C123317767/page/n143","Jennings Street",null,null,"San Francisco Bay area in-depth study : vessels and port facilities analysis channels, ports and related facilities inventory","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123317767:144/2",1973,1973,"","property_record","study or report",null,"Pier 96 Lash Terminal · use: Lash and container cargo operations","unverified","C123317767",144,"https://archive.org/details/C123317767/page/n143","Jennings Street",null,null,"San Francisco Bay area in-depth study : vessels and port facilities analysis channels, ports and related facilities inventory","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123317767:144/3",1973,1973,"","building","study or report",null,"Pier 96 Lash Terminal transit shed · other: Transit shed, 650 by 205 feet, steel frame with metal cladding","unverified","C123317767",144,"https://archive.org/details/C123317767/page/n143","Jennings Street",null,null,"San Francisco Bay area in-depth study : vessels and port facilities analysis channels, ports and related facilities inventory","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123317767:144/4",1973,1973,"","measure","study or report",null,"Pier 96 Lash Terminal · other: 2 cranes, 30 T capacity, 115 ft reach, rail mounted","unverified","C123317767",144,"https://archive.org/details/C123317767/page/n143","Jennings Street",null,null,"San Francisco Bay area in-depth study : vessels and port facilities analysis channels, ports and related facilities inventory","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123317767:144/5",1973,1973,"","measure","study or report",null,"Pier 96 Lash Terminal · other: Load capacity 800 lbs per sq ft on front apron","unverified","C123317767",144,"https://archive.org/details/C123317767/page/n143","Jennings Street",null,null,"San Francisco Bay area in-depth study : vessels and port facilities analysis channels, ports and related facilities inventory","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123317767:144/6",1973,1973,"","measure","study or report",null,"Pier 96 Lash Terminal rail connection · other: Southern Pacific track from Quint Street to CargoWay, 800 feet on apron along lighted basin","unverified","C123317767",144,"https://archive.org/details/C123317767/page/n143","Quint Street",null,null,"San Francisco Bay area in-depth study : vessels and port facilities analysis channels, ports and related facilities inventory","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123317767:144/7",1973,1973,"","measure","study or report",null,"Pier 96 Lash Terminal electric service · other: A.C., 440 v., 3-phase, 60-cycle electric current available to vessels","unverified","C123317767",144,"https://archive.org/details/C123317767/page/n143","Jennings Street",null,null,"San Francisco Bay area in-depth study : vessels and port facilities analysis channels, ports and related facilities inventory","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123317767:45/7",1973,1973,"","project","study or report",null,"Pier 96 LASH Terminal · other: newest terminal facility operated by [name withheld], with 10-acre container storage and 11-acre water basin","unverified","C123317767",45,"https://archive.org/details/C123317767/page/n44","96",null,null,"San Francisco Bay area in-depth study : vessels and port facilities analysis channels, ports and related facilities inventory","c,n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123317767:45/8",1973,1973,"","building","study or report",null,"Pier 96 LASH Terminal · other: 200,000-square-foot transit shed and two large berths with prestressed concrete wharves","unverified","C123317767",45,"https://archive.org/details/C123317767/page/n44","96",null,null,"San Francisco Bay area in-depth study : vessels and port facilities analysis channels, ports and related facilities inventory","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101746486:75/3",1975,1975,"","action","study or report",null,"Container facilities · proposes: container facilities planned between Lash Terminal at Pier 96 and Islais Creek Channel at Pier 94, and at proposed Pier 72","unverified","C101746486",75,"https://archive.org/details/C101746486/page/n74",null,null,null,"Industrial trends : report containing background information for the Commerce and industry element of the Comprehensive plan of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123319604:23/4",1975,1975,"","building","environmental impact report",null,"Pier 96 · built: completed within the last five years","unverified","C123319604",23,"https://archive.org/details/C123319604/page/n22","96",null,null,"Final environmental impact report on special area plan for the San Francisco waterfront","c,n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123319604:24/3",1975,1975,"","measure","environmental impact report",null,"Pier 96 · acreage: sixty-one acres","unverified","C123319604",24,"https://archive.org/details/C123319604/page/n23",null,null,null,"Final environmental impact report on special area plan for the San Francisco waterfront","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123319604:29/4",1975,1975,"","site","environmental impact report",null,"Pier 96 · other: Served by Southern Pacific Railroad","unverified","C123319604",29,"https://archive.org/details/C123319604/page/n28",null,null,null,"Final environmental impact report on special area plan for the San Francisco waterfront","c,n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123317776:10/1",1976,1976,"","site","study or report",null,"Pier 96, Port of San Francisco · use: world's first and largest LASH terminal, capable of handling all types of cargoes","unverified","C123317776",10,"https://archive.org/details/C123317776/page/n9","96",null,null,"San Francisco Bay area in-depth study : vessels and port facilities analysis port facilities capability study","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123317776:10/10001",1976,1976,"","site","study or report",null,"Pier 96 · use: world's first and largest LASH (Lighter Aboard Ship) terminal, capable of handling all types of cargoes","unverified","C123317776",10,"https://archive.org/details/C123317776/page/n9","96",null,null,"San Francisco Bay area in-depth study : vessels and port facilities analysis port facilities capability study","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123317776:10/10002",1976,1976,"","site","study or report",null,"Pier 96 · use: containerized cargo, grain and automobiles","unverified","C123317776",10,"https://archive.org/details/C123317776/page/n9","96",null,null,"San Francisco Bay area in-depth study : vessels and port facilities analysis port facilities capability study","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123317776:51/9",1976,1976,"","site","study or report",null,"Pier 96 LASH Terminal · use: LASH (Lighter Aboard Ship) container terminal","unverified","C123317776",51,"https://archive.org/details/C123317776/page/n50","96",null,null,"San Francisco Bay area in-depth study : vessels and port facilities analysis port facilities capability study","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123317776:52/4",1976,1976,"","building","study or report",null,"Pier 96 LASH Terminal · acreage: 11-acre water basin for handling and loading lighters","unverified","C123317776",52,"https://archive.org/details/C123317776/page/n51","96",null,null,"San Francisco Bay area in-depth study : vessels and port facilities analysis port facilities capability study","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123317776:52/5",1976,1976,"","finding","study or report",null,"Pier 96 LASH Terminal · other: handles most of the internal cargo movement at the Port of San Francisco","unverified","C123317776",52,"https://archive.org/details/C123317776/page/n51","96",null,null,"San Francisco Bay area in-depth study : vessels and port facilities analysis port facilities capability study","c,n","a",0,-1.0],["d","qipu:sf/decision/journaljanjuneofproceed73sanfrich|g2858",1978,1978,"1978-06-26","ordinance","works","passed","$2.38 million (≈ $12.3 million in 2026 dollars) for Pier 96 equipment approved","quoted","journaljanjuneofproceed73sanfrich",855,"https://archive.org/details/journaljanjuneofproceed73sanfrich/page/n855",null,null,null,null,"n","a",0,6.29],["d","qipu:sf/decision/journaljanjuneofproceed73sanfrich|g2859",1978,1978,"1978-06-26",null,"works","passed","$2.38 million (≈ $12.3 million in 2026 dollars) for Pier 96 equipment approved.","unverified","journaljanjuneofproceed73sanfrich",855,"https://archive.org/details/journaljanjuneofproceed73sanfrich/page/n855",null,null,null,null,"n","a",0,1.99],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124884334:44/12",1982,1982,"","site","plan",null,"Pier 96 · other: Active","unverified","C124884334",44,"https://archive.org/details/C124884334/page/n43","47C",null,null,"The San Francisco Bay Area seaport plan","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124908577:214/2",1992,1992,"","site","study or report",null,"South Container Terminal · acreage: 70 acres","unverified","C124908577",214,"https://archive.org/details/C124908577/page/n213","96 Pier",null,null,"[Public information documents relating to Port of San Francisco waterfront plan project]","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124908577:214/4",1992,1992,"","site","study or report",null,"South Container Terminal · other: 3 deepwater (40'MLLW) berths","unverified","C124908577",214,"https://archive.org/details/C124908577/page/n213","96 Pier",null,null,"[Public information documents relating to Port of San Francisco waterfront plan project]","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124908577:214/5",1992,1992,"","site","study or report",null,"South Container Terminal · other: 12,500 TEU static capacity container yard","unverified","C124908577",214,"https://archive.org/details/C124908577/page/n213","96 Pier",null,null,"[Public information documents relating to Port of San Francisco waterfront plan project]","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124908577:214/6",1992,1992,"","building","study or report",null,"South Container Terminal freight station · other: 185,000 square feet","unverified","C124908577",214,"https://archive.org/details/C124908577/page/n213","96 Pier",null,null,"[Public information documents relating to Port of San Francisco waterfront plan project]","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124908577:214/7",1992,1992,"","building","study or report",null,"South Container Terminal maintenance and repair buildings · other: 24,000 square feet","unverified","C124908577",214,"https://archive.org/details/C124908577/page/n213","96 Pier",null,null,"[Public information documents relating to Port of San Francisco waterfront plan project]","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124908577:214/8",1992,1992,"","site","study or report",null,"South Container Terminal gate house · other: 14 truck lanes","unverified","C124908577",214,"https://archive.org/details/C124908577/page/n213","96 Pier",null,null,"[Public information documents relating to Port of San Francisco waterfront plan project]","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101737381:283/3",1994,1994,"","event","ordinance or legislation",null,"Maruba Line · event: agreed to transfer operations to Pier 96","unverified","C101737381",283,"https://archive.org/details/C101737381/page/n282","96",null,null,"Draft waterfront land use plan","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101737381:57/1",1994,1994,"","finding","ordinance or legislation",null,"Industrial cargo and ship repair operations · finding: concentrated in the City's industrial district south of [name withheld] from Pier 48 to Pier 96","unverified","C101737381",57,"https://archive.org/details/C101737381/page/n56",null,null,null,"Draft waterfront land use plan","c,n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124908106:171/3",1994,1994,"","finding","ordinance or legislation",null,"Pier 96 container terminal · other: Maruba Line agreed to transfer operations to Pier 96","unverified","C124908106",171,"https://archive.org/details/C124908106/page/n170","96",null,null,"Port of San Francisco : draft waterfront land use plan","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124908106:21/1",1994,1994,"","action","ordinance or legislation",null,"Port cargo operations consolidation · proposes: consolidate cargo shipping operations at Pier 96","unverified","C124908106",21,"https://archive.org/details/C124908106/page/n20","96",null,null,"Port of San Francisco : draft waterfront land use plan","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101737381:17/1",1994,1994,"1994","site","ordinance or legislation",null,"Pier 96 · use: Port consolidated its cargo shipping operations at Pier 96","unverified","C101737381",17,"https://archive.org/details/C101737381/page/n16","96 Pier 96",null,null,"Draft waterfront land use plan","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124908106:43/2",1994,1994,"1994","site","ordinance or legislation",null,"City's industrial district south of [name withheld] · use: Port industrial cargo and ship repair operations concentrated","unverified","C124908106",43,"https://archive.org/details/C124908106/page/n42",null,null,null,"Port of San Francisco : draft waterfront land use plan","c,n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919175:83/4",1996,1996,"","site","plan",null,"Port industrial cargo shipping and ship repair operations · other: Concentrated south of [name withheld] from Pier 48 to Pier 96","unverified","C124919175",83,"https://archive.org/details/C124919175/page/n82",null,null,null,"Port of San Francisco waterfront land use plan : draft for public review and comment","c,n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919184:62/2",1996,1996,"","site","plan",null,"Port southern waterfront cargo and ship repair · use: industrial cargo shipping and ship repair operations concentrated south of [name withheld]","unverified","C124919184",62,"https://archive.org/details/C124919184/page/n60",null,null,null,"Port of San Francisco waterfront land use plan : draft for public review and comment","c,n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919111:35/1",1997,1997,"","site","plan",null,"Pier 98 Wetlands · proposes: Future wetlands and open water surrounding swimming and rowing club docks","unverified","C124919111",35,"https://archive.org/details/C124919111/page/n33",null,null,null,"The Port of San Francisco waterfront design & access : an element of the Waterfront land use plan","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922522:230/6",2000,2000,"","action","environmental impact report",null,"Coach USA · proposes: tour bus maintenance and repair facility","unverified","C124922522",230,"https://archive.org/details/C124922522/page/n229","96",null,null,"Final environmental impact statement for the disposal and reuse of Hunters Point Shipyard","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922522:230/7",2000,2000,"","action","environmental impact report",null,"Coach USA · floor area sqft: approximately 28,030 square feet of shed space","unverified","C124922522",230,"https://archive.org/details/C124922522/page/n229","96",null,null,"Final environmental impact statement for the disposal and reuse of Hunters Point Shipyard","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922522:230/8",2000,2000,"","action","environmental impact report",null,"Coach USA · other: 300,000 square feet of paved land","unverified","C124922522",230,"https://archive.org/details/C124922522/page/n229","96",null,null,"Final environmental impact statement for the disposal and reuse of Hunters Point Shipyard","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922522:230/9",2000,2000,"","action","environmental impact report",null,"Coach USA · floor area sqft: 13,870 square feet of office space","unverified","C124922522",230,"https://archive.org/details/C124922522/page/n229","96",null,null,"Final environmental impact statement for the disposal and reuse of Hunters Point Shipyard","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922522:229/5",2000,2000,"December 31, 1999","property_record","environmental impact report",null,"GES Exposition Services · leased: staging and storage of truck trailers","unverified","C124922522",229,"https://archive.org/details/C124922522/page/n228",null,null,null,"Final environmental impact statement for the disposal and reuse of Hunters Point Shipyard","c,n","a",0,-4.0],["d","qipu:sf/decision/meetingminutes20042005san:71/2",2004,2004,"2004-06-09","other",null,"passed","Release of $4,392,000 (≈ $7.8 million in 2026 dollars) in reserved funds for solar systems at Pier 96 and Moscone West was approved.","quoted","meetingminutes20042005san",71,"https://archive.org/details/meetingminutes20042005san/page/n70",null,null,null,null,"n","a",0,3.52],["d","qipu:sf/decision/meetingminutesbo2006sanf|186",2006,2006,"2006-02-28","resolution","city-services","referred","Solar panels proposed for the recycling plant at Pier 96","quoted","meetingminutesbo2006sanf",341,"https://archive.org/details/meetingminutesbo2006sanf/page/n340",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/meetingjanmar2006minutes101sanfrich:366/1",2006,2006,"2006-03-07","resolution",null,"referred","Proposed agreement lets SFPUC install a solar power system at San Francisco Recycling and Disposal's Pier 96 facility; referred to committee.","quoted","meetingjanmar2006minutes101sanfrich",366,"https://archive.org/details/meetingjanmar2006minutes101sanfrich/page/n366",null,null,null,null,"n","a",0,-3.5],["d","qipu:sf/decision/meetingjanmar2006minutes101sanfrich:370/3",2006,2006,"2006-03-07","resolution",null,"referred","Proposed agreement between SFPUC and San Francisco Recycling and Disposal for a solar power system at Pier 96 was sent to committee.","quoted","meetingjanmar2006minutes101sanfrich",370,"https://archive.org/details/meetingjanmar2006minutes101sanfrich/page/n370",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/meetingjanmar2006minutes101sanfrich|g620",2006,2006,"2006-03-07",null,"utilities","pending","Solar power deal for Pier 96 recycling plant sent to committee.","unverified","meetingjanmar2006minutes101sanfrich",370,"https://archive.org/details/meetingjanmar2006minutes101sanfrich/page/n370",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/meetingminutesbo2006sanf:369/1",2006,2006,"2006-03-07","resolution",null,"referred","Proposed agreement between SFPUC and San Francisco Recycling and Disposal for a solar system at Pier 96 was referred to committee.","quoted","meetingminutesbo2006sanf",369,"https://archive.org/details/meetingminutesbo2006sanf/page/n368",null,null,null,null,"n","a",0,-3.5],["d","qipu:sf/decision/meetingminutesbo2006sanf:373/3",2006,2006,"2006-03-07","resolution",null,"referred","Proposed SFPUC agreement lets San Francisco Recycling and Disposal install a solar system at Pier 96; sent to committee.","quoted","meetingminutesbo2006sanf",373,"https://archive.org/details/meetingminutesbo2006sanf/page/n372",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/meetingminutesbo2006sanf|201",2006,2006,"2006-03-07","resolution","city-services",null,"Pier 96 solar project referred to committee","quoted","meetingminutesbo2006sanf",369,"https://archive.org/details/meetingminutesbo2006sanf/page/n368",null,null,null,null,"n","a",0,-3.5],["d","qipu:sf/decision/meetingminutesdr2006sanf:160/1",2006,2006,"2006-03-07","resolution",null,"referred","SFPUC proposed an agreement with SF Recycling and Disposal for a solar power system at Pier 96; referred to committee.","quoted","meetingminutesdr2006sanf",160,"https://archive.org/details/meetingminutesdr2006sanf/page/n159",null,null,null,null,"n","a",0,-3.5],["d","qipu:sf/decision/meeting2006aprmayminutes101sanfrich|g2",2006,2006,"2006-04-04","resolution","utilities","passed","Solar power system at Pier 96 recycling plant approved.","quoted","meeting2006aprmayminutes101sanfrich",10,"https://archive.org/details/meeting2006aprmayminutes101sanfrich/page/n9",null,null,null,null,"n","a",0,2.85],["d","qipu:sf/decision/meetingminutesdr2006sanf:220/2",2006,2006,"2006-04-04","resolution",null,"passed","SFPUC authorized an agreement with San Francisco Recycling and Disposal to install a solar power system at its Pier 96 facility.","quoted","meetingminutesdr2006sanf",220,"https://archive.org/details/meetingminutesdr2006sanf/page/n219",null,null,null,null,"n","a",0,1.62],["f","dl-sf-facts-v1.1-haiku55-2026-10/p16255coll1_H1371674965007_file2:109/1",2009,2009,"","site","plan",null,"Pier 96 commercial recycling lines · other: commercial recycling lines to be monitored for full capacity use","unverified","p16255coll1_H1371674965007_file2",109,"https://archive.org/details/p16255coll1_H1371674965007_file2/page/n109",null,null,null,"Climate action plan for San Francisco local actions to reduce greenhouse emissions","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/p16255coll1_H1371674965007_file2:88/4",2009,2009,"","measure","plan",null,"Pier 96 Materials Recovery Facility · other: New advanced sorting facility at Pier 96 processes commercial accounts with wood, light metals, film plastic","unverified","p16255coll1_H1371674965007_file2",88,"https://archive.org/details/p16255coll1_H1371674965007_file2/page/n88","Pier 96",null,null,"Climate action plan for San Francisco local actions to reduce greenhouse emissions","c,n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/p16255coll1_H1371674965007_file2:92/1",2009,2009,"January 2003","building","plan",null,"Pier 96 recyclables processing facility · other: new commingled recyclables processing facility, daily capacity 2,100 tons, full-time operation","unverified","p16255coll1_H1371674965007_file2",92,"https://archive.org/details/p16255coll1_H1371674965007_file2/page/n92","Pier 96",null,null,"Climate action plan for San Francisco local actions to reduce greenhouse emissions","c,n","a",0,-1.0],["d","qipu:sf/decision/sfbos:bag103123|59",2023,2023,"2023-10-31","resolution","land-and-building",null,"Recology seeks a Pier 96 lease at $369,500 (≈ $408,594 in 2026 dollars) a month","unverified",null,null,"https://sfbos.org/sites/default/files/bag103123_minutes.pdf#page=19",null,null,null,null,"n","a",0,-4.0],["d","qipu:sf/decision/sfbos:bag103123|60",2023,2023,"2023-10-31","resolution","land-and-building",null,"Recology seeks a Pier 96 lease at $369,500 (≈ $408,594 in 2026 dollars) a month","unverified",null,null,"https://sfbos.org/sites/default/files/bag103123_minutes.pdf#page=19",null,null,null,null,"n","a",0,-4.0],["d","qipu:sf/decision/sfbos:bag103123|61",2023,2023,"2023-10-31","resolution","land-and-building",null,"Recology's Pier 96 lease sent to committee","unverified",null,null,"https://sfbos.org/sites/default/files/bag103123_minutes.pdf#page=19",null,null,null,null,"n","a",0,-4.0],["d","qipu:sf/decision/sfbos:bag112823|34",2023,2023,"2023-11-28","resolution","land-and-building",null,"Recology to lease Pier 96 for about $369,500 (≈ $408,594 in 2026 dollars) monthly","unverified",null,null,"https://sfbos.org/sites/default/files/bag112823_minutes.pdf#page=9",null,null,null,null,"n","a",0,-4.0],["d","qipu:sf/decision/sfbos:bag112823|35",2023,2023,"2023-11-28","resolution","land-and-building",null,"Recology's Pier 96 lease may be amended by the Port","unverified",null,null,"https://sfbos.org/sites/default/files/bag112823_minutes.pdf#page=9",null,null,null,null,"n","a",0,-4.0],["d","qipu:sf/decision/sfbos:bag112823|36",2023,2023,"2023-11-28","resolution","running-the-city","passed","Recology's Pier 96 lease approved at $369,500 (≈ $408,594 in 2026 dollars) a month","unverified",null,null,"https://sfbos.org/sites/default/files/bag112823_minutes.pdf#page=9",null,null,null,null,"n","a",0,-1.53],["d","qipu:sf/decision/sfbos:leg092226|75",2026,2026,"2026-09-22","resolution","land-and-building",null,"Port lease with NorCal Rental Group for Pier 96 land proposed","unverified",null,null,"https://sfgov.legistar.com/View.ashx?M=M&ID=1445104&GUID=00773924-4B88-46B1-B8C5-1E41FD5C86F3",null,null,null,null,"n","a",0,-4.0],["d","qipu:sf/decision/sfbos:leg092226|76",2026,2026,"2026-09-22","resolution","land-and-building",null,"NorCal Pier 96 lease sent to Budget and Finance Committee","unverified",null,null,"https://sfgov.legistar.com/View.ashx?M=M&ID=1445104&GUID=00773924-4B88-46B1-B8C5-1E41FD5C86F3",null,null,null,null,"n","a",0,-4.0]]}