{"id":null,"ids":[],"kind":"named in documents","name":"project site","tied_by":"name","block":null,"release":"v0.7.1","rows_columns":["t","id","year","y","date","kind","topic","outcome","summary","tier","source","leaf","scan","addr","quote","note","title","how","g","rec","sc"],"rows":[["f","dl-sf-facts-v1.1-haiku55-2026-10/C124921078:51/2",1992,1855,"1855","finding","environmental impact report",null,"Lobos Creek water supply structures · finding: Historically significant remains of water supply structures dating to 1855 located north of project site","unverified","C124921078",51,"https://archive.org/details/C124921078/page/n50",null,null,null,"Environmental assessment : activities proposed by the San Francisco Clean Water Program for the Richmond transport combined sewer overflow project on lands of the Golden Gate National Recreation Area and Presidio of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101695203:57/2",1969,1969,"","measure","plan",null,"Diamond Heights project site improvements · cost usd: $ 7,885,399","unverified","C101695203",57,"https://archive.org/details/C101695203/page/n56",null,null,null,"Butchertown redevelopment plan [official redevelopment plan for the Butchertown approved redevelopment project area","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101695203:57/3",1969,1969,"","measure","plan",null,"Embarcadero-Lower Market project site improvements · cost usd: 7,094,680","unverified","C101695203",57,"https://archive.org/details/C101695203/page/n56",null,null,null,"Butchertown redevelopment plan [official redevelopment plan for the Butchertown approved redevelopment project area","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124878408:26/5",1970,1970,"","property_record","study or report",null,"Redevelopment A-2 project site · other: Redevelopment A-2 project site (vacant razed lot with sign)","unverified","C124878408",26,"https://archive.org/details/C124878408/page/n25","Filmore street",null,null,"Housing and urban resource development for the city of San Francisco : an interdisciplinary study in systems design at Stanford University, winter and spring quarters 1970 : final report","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124883817:15/2",1974,1974,"","project","study or report",null,"Hunters Point Redevelopment Project site · cost usd: $29,3000,000 spent in U.S. funds","unverified","C124883817",15,"https://archive.org/details/C124883817/page/n14",null,null,null,"Establishment of Mayor's Office of Economic Development in San Francisco : first year final report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124883817:15/3",1974,1974,"","project","study or report",null,"Hunters Point Redevelopment Project site · cost usd: $18,600,000 needed to complete site development","unverified","C124883817",15,"https://archive.org/details/C124883817/page/n14",null,null,null,"Establishment of Mayor's Office of Economic Development in San Francisco : first year final report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:75/4",1998,1976,"1976","property_record","environmental impact report",null,"Buildings within one-block radius of project site · other: about 15 buildings rated on 1976 Architectural Inventory","unverified","C101697812",75,"https://archive.org/details/C101697812/page/n74",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:25/1",1998,1977,"1977","event","environmental impact report",null,"International Hotel · other: tenants evicted","unverified","C101697812",25,"https://archive.org/details/C101697812/page/n24",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:25/2",1998,1979,"1979","event","environmental impact report",null,"International Hotel · demolished: demolished","unverified","C101697812",25,"https://archive.org/details/C101697812/page/n24",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,3.0],["d","qipu:sf/decision/journaljanjuneofproceed76sanfrich:98/2",1981,1981,"1981-01-26","resolution","housing","referred","Proposal to sell or lease the former Wisconsin Housing Project site for low and middle income housing was referred to committee.","quoted","journaljanjuneofproceed76sanfrich",98,"https://archive.org/details/journaljanjuneofproceed76sanfrich/page/n97",null,null,null,null,"n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124878444:157/1",1984,1984,"","project","study or report",null,"Downtown Stadium Project Site 7 · cost usd: $17,460,000 land subtotal (Budget Analyst recomputed estimate)","unverified","C124878444",157,"https://archive.org/details/C124878444/page/n156",null,null,null,"Report to the Board of Supervisors of the City and County of San Francisco : review of the report of the Mayor's Stadium Task Force","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124878444:91/6",1984,1984,"","project","study or report",null,"Southern Pacific Mission Bay Project · other: up to 16,410 future parking spaces","unverified","C124878444",91,"https://archive.org/details/C124878444/page/n90",null,null,null,"Report to the Board of Supervisors of the City and County of San Francisco : review of the report of the Mayor's Stadium Task Force","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124878444:99/9",1984,1984,"","finding","study or report",null,"Southern Pacific Mission Bay Project · other: future development could increase parking supply significantly","unverified","C124878444",99,"https://archive.org/details/C124878444/page/n98",null,null,null,"Report to the Board of Supervisors of the City and County of San Francisco : review of the report of the Mayor's Stadium Task Force","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922850:753/1",1996,1985,"1985","measure","environmental impact report",null,"1985 SEIR project site · other: thirteen geo-seismic mitigation measures included in the project","unverified","C124922850",753,"https://archive.org/details/C124922850/page/n752",null,null,null,"Draft EIR : long range development plan, University of California, San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922850:753/2",1996,1985,"1985","measure","environmental impact report",null,"1985 SEIR project site · other: grades not to exceed 1.5:1 and average 2.25:1 slope gradient","unverified","C124922850",753,"https://archive.org/details/C124922850/page/n752",null,null,null,"Draft EIR : long range development plan, University of California, San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922850:753/3",1996,1985,"1985","measure","environmental impact report",null,"1985 SEIR project site · other: interceptor drainage system installed and maintained along the upper slopes","unverified","C124922850",753,"https://archive.org/details/C124922850/page/n752",null,null,null,"Draft EIR : long range development plan, University of California, San Francisco","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:138/1",1998,1987,"1987; 1996","site","environmental impact report",null,"Chinatown/North Beach Campus project site · other: Historical and architectural resources evaluated in 1987 FEIR and 1996 SEIR","unverified","C101697894",138,"https://archive.org/details/C101697894/page/n137",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:153/5",1998,1996,"1996","project","environmental impact report",null,"Kearny Street/Columbus Avenue Project Site A · units: 15-story residential tower with 104 units for low-income residents","unverified","C101697812",153,"https://archive.org/details/C101697812/page/n152","Kearny Street",null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:153/7",1998,1996,"1996","alternative","environmental impact report",null,"Kearny Street/Columbus Avenue Project Site B · alternative: 94-ft.-tall, ten-story residential building containing 70 units and 9,900 sq. ft. of ground-floor retail space","unverified","C101697812",153,"https://archive.org/details/C101697812/page/n152",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:174/1",1998,1996,"1996","finding","environmental impact report",null,"Colombo Building · finding: potential unavoidable significant adverse impact on historic resources","unverified","C101697812",174,"https://archive.org/details/C101697812/page/n173",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:179/3",1998,1996,"1996","event","environmental impact report",null,"Underground storage tanks at project site · other: Three underground storage tanks and associated pipes removed","unverified","C101697812",179,"https://archive.org/details/C101697812/page/n178",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:72/5",1998,1996,"1996","finding","environmental impact report",null,"Chinatown/North Beach Campus project site · other: historical and architectural resources evaluated in 1987 FEIR and 1996 SEIR","unverified","C101697812",72,"https://archive.org/details/C101697812/page/n71",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:107/4",1998,1996,"1996","measure","environmental impact report",null,"Chinatown/North Beach Campus project cultural resources mitigation · other: Mitigation measures reduce cultural resources impacts to less than significant, same as 1996 SEIR for Lots 4 and 5","unverified","C101697894",107,"https://archive.org/details/C101697894/page/n106",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:126/11",1998,1996,"1996; 1987","alternative","environmental impact report",null,"Alternative A2 · alternative: environmental analysis performed in the 1996 SEIR and 1987 FEIR for Lots 4 and 5, incorporated by reference","unverified","C101697812",126,"https://archive.org/details/C101697812/page/n125",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:11/2",1997,1997,"","site","environmental impact report",null,"SOTA project site · other: block bounded by Van Ness Avenue, Hayes Street, Franklin Street and Fell Street","unverified","C124919865",11,"https://archive.org/details/C124919865/page/n10","Van Ness Avenue",null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:11/6",1997,1997,"","site","environmental impact report",null,"SOTA project site courtyard · other: parking for approximately 60 cars","unverified","C124919865",11,"https://archive.org/details/C124919865/page/n10","Franklin Street",null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:121/1",1997,1997,"","site","environmental impact report",null,"Project site · other: only site of sufficient size to house an expanded SOTA, anticipated student body of 1,000","unverified","C124919865",121,"https://archive.org/details/C124919865/page/n120",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:121/2",1997,1997,"","alternative","environmental impact report",null,"Project site · finding: not suitable for use as a grammar school","unverified","C124919865",121,"https://archive.org/details/C124919865/page/n120","Van Ness Avenue",null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:121/5",1997,1997,"","alternative","environmental impact report",null,"Variant 2 · alternative: relocation of SOTA to the proposed project site","unverified","C124919865",121,"https://archive.org/details/C124919865/page/n120",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:121/6",1997,1997,"","alternative","environmental impact report",null,"Variant 2 · other: entire complex of buildings seismically upgraded and rehabilitated","unverified","C124919865",121,"https://archive.org/details/C124919865/page/n120",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:130/1",1997,1997,"","alternative","environmental impact report",null,"Variant 2 of Preservation Alternative · alternative: would increase daily on-site population and generate the same new vehicle-trips as the proposed project","unverified","C124919865",130,"https://archive.org/details/C124919865/page/n129",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:130/4",1997,1997,"","finding","environmental impact report",null,"Variant 2 of Preservation Alternative · rejected: rejected by the project sponsor","unverified","C124919865",130,"https://archive.org/details/C124919865/page/n129",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:150/3",1997,1997,"","alternative","environmental impact report",null,"Alternative C · other: approximately 47 net new vehicle-trips during the weekday AM peak hour","unverified","C124919865",150,"https://archive.org/details/C124919865/page/n149",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:150/4",1997,1997,"","project","environmental impact report",null,"Proposed project and Alternative B · other: 485 net new vehicle-trips (285 inbound and 200 outbound) in weekday AM peak hour","unverified","C124919865",150,"https://archive.org/details/C124919865/page/n149",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:161/2",1997,1997,"","site","environmental impact report",null,"School of the Arts project site · other: Block bounded by Van Ness Avenue, Hayes Street, Franklin Street and Fell Street","unverified","C124919865",161,"https://archive.org/details/C124919865/page/n160","Van Ness Avenue",null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:161/3",1997,1997,"","site","environmental impact report",null,"School of the Arts project site · other: Interior court used for parking for approximately sixty automobiles","unverified","C124919865",161,"https://archive.org/details/C124919865/page/n160","Franklin Street",null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:165/8",1997,1997,"","site","environmental impact report",null,"project site · use: administrative offices of the San Francisco Unified School District","unverified","C124919865",165,"https://archive.org/details/C124919865/page/n164",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:165/9",1997,1997,"","site","environmental impact report",null,"project site · other: on the south west edge of the Civic Center complex","unverified","C124919865",165,"https://archive.org/details/C124919865/page/n164",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:167/6",1997,1997,"","finding","environmental impact report",null,"School of the Arts master plan · finding: not significant impacts from the project related to geology","unverified","C124919865",167,"https://archive.org/details/C124919865/page/n166",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:168/1",1997,1997,"","finding","environmental impact report",null,"School of the Arts (SOTA) project · finding: Project site is not in a Special Geologic Study Area","unverified","C124919865",168,"https://archive.org/details/C124919865/page/n167",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:168/2",1997,1997,"","finding","environmental impact report",null,"School of the Arts (SOTA) project · finding: Site not in area susceptible to liquefaction or subsidence, nor within potential tsunami or flooding area","unverified","C124919865",168,"https://archive.org/details/C124919865/page/n167",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:168/4",1997,1997,"","measure","environmental impact report",null,"School of the Arts (SOTA) project · other: Evacuation and emergency response plan to be developed","unverified","C124919865",168,"https://archive.org/details/C124919865/page/n167",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:168/5",1997,1997,"","finding","environmental impact report",null,"School of the Arts (SOTA) project · finding: No further analysis of geology and seismicity required in the EIR","unverified","C124919865",168,"https://archive.org/details/C124919865/page/n167",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:171/3",1997,1997,"","finding","environmental impact report",null,"School of the Arts (SOTA) master plan project · other: would not provide vehicle parking and there would be no vehicular access to the site","unverified","C124919865",171,"https://archive.org/details/C124919865/page/n170",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:171/4",1997,1997,"","finding","environmental impact report",null,"School of the Arts (SOTA) master plan project · other: excavation and construction could temporarily affect local air quality for 24 months","unverified","C124919865",171,"https://archive.org/details/C124919865/page/n170",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:172/1",1997,1997,"","finding","environmental impact report",null,"School of the Arts master plan · finding: Biological resources: no plants or animals could be affected; no further analysis required, not included in EIR","unverified","C124919865",172,"https://archive.org/details/C124919865/page/n171",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:172/2",1997,1997,"","finding","environmental impact report",null,"School of the Arts master plan · finding: Energy impacts require no further analysis and will not be discussed in the EIR","unverified","C124919865",172,"https://archive.org/details/C124919865/page/n171",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:173/3",1997,1997,"","project","environmental impact report",null,"School of the Arts project · finding: friable asbestos, LBPs, pigeon feces and PCB ballast light fixtures to be removed or contained","unverified","C124919865",173,"https://archive.org/details/C124919865/page/n172",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:174/2",1997,1997,"","project","environmental impact report",null,"SOTA project · other: construction period including demolition approximately 24 months","unverified","C124919865",174,"https://archive.org/details/C124919865/page/n173",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:175/3",1997,1997,"","project","environmental impact report",null,"School of the Arts master plan · other: Project would not include pile driving","unverified","C124919865",175,"https://archive.org/details/C124919865/page/n174",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:175/4",1997,1997,"","finding","environmental impact report",null,"School of the Arts master plan · finding: Project construction noise requires no further analysis and will not be addressed in the EIR","unverified","C124919865",175,"https://archive.org/details/C124919865/page/n174",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:175/5",1997,1997,"","finding","environmental impact report",null,"School of the Arts master plan · finding: Operational noise requires no further analysis and will not be discussed in the EIR","unverified","C124919865",175,"https://archive.org/details/C124919865/page/n174",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:176/3",1997,1997,"","finding","environmental impact report",null,"SOTA project · finding: demand would not require additional personnel or equipment","unverified","C124919865",176,"https://archive.org/details/C124919865/page/n175",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:176/4",1997,1997,"","finding","environmental impact report",null,"SOTA project · finding: public services effect requires no further analysis; not discussed in EIR","unverified","C124919865",176,"https://archive.org/details/C124919865/page/n175",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:176/5",1997,1997,"","finding","environmental impact report",null,"SOTA project · finding: utilities and service systems effect requires no further analysis; not discussed in EIR","unverified","C124919865",176,"https://archive.org/details/C124919865/page/n175",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:20/2",1997,1997,"","alternative","environmental impact report",null,"Alternative C · alternative: SOTA not relocated to project site; on-site buildings used by District administrative staff","unverified","C124919865",20,"https://archive.org/details/C124919865/page/n19",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:25/2",1997,1997,"","site","environmental impact report",null,"Project site, Lot 1 of Assessor's Block 815 · other: Proposed project located on Lot 1 of Assessor's Block 815 in the Civic Center","unverified","C124919865",25,"https://archive.org/details/C124919865/page/n24",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:42/1",1997,1997,"","site","environmental impact report",null,"School of the Arts project site · other: block bounded by Van Ness Avenue, Hayes Street, Fell Street, and Franklin Avenue","unverified","C124919865",42,"https://archive.org/details/C124919865/page/n41","Van Ness Avenue",null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:42/5",1997,1997,"","site","environmental impact report",null,"School of the Arts project site · other: interior courtyard used for parking approximately 60 automobiles with access via Franklin Street","unverified","C124919865",42,"https://archive.org/details/C124919865/page/n41","Franklin Street",null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:44/5",1997,1997,"","site","environmental impact report",null,"School of the Arts project site · other: located in a P (Public) Use District","unverified","C124919865",44,"https://archive.org/details/C124919865/page/n43",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:44/6",1997,1997,"","site","environmental impact report",null,"School of the Arts project site · other: 160-H Height and Bulk District allowing buildings up to 160 feet","unverified","C124919865",44,"https://archive.org/details/C124919865/page/n43",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:46/3",1997,1997,"","finding","environmental impact report",null,"School of the Arts project · finding: Intensification of land uses would be less than significant impact; no mitigation required","unverified","C124919865",46,"https://archive.org/details/C124919865/page/n45",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:49/1",1997,1997,"","site","environmental impact report",null,"School of the Arts project site · other: adjacent to Civic Center district, two blocks south and one block west of City Hall","unverified","C124919865",49,"https://archive.org/details/C124919865/page/n48",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:49/2",1997,1997,"","site","environmental impact report",null,"School of the Arts project site · finding: outside the National Historic Landmark District (NHLD)","unverified","C124919865",49,"https://archive.org/details/C124919865/page/n48",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:49/8",1997,1997,"","site","environmental impact report",null,"School of the Arts project site · other: complex of three buildings at block perimeter enclosing interior courtyard used as parking lot","unverified","C124919865",49,"https://archive.org/details/C124919865/page/n48","Fell Street; Van Ness Avenue",null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:72/1",1997,1997,"","site","environmental impact report",null,"School of the Arts project site · other: entire block bounded by Van Ness Avenue, Franklin Street, Hayes Street, and Fell Street","unverified","C124919865",72,"https://archive.org/details/C124919865/page/n71","Van Ness Avenue",null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:72/2",1997,1997,"","site","environmental impact report",null,"School of the Arts project site courtyard · other: on-site parking at the courtyard accessible via Franklin Street","unverified","C124919865",72,"https://archive.org/details/C124919865/page/n71","Franklin Street",null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:73/1",1997,1997,"","site","environmental impact report",null,"Market Street · other: two lanes in each direction; major transit corridor near project site","unverified","C124919865",73,"https://archive.org/details/C124919865/page/n72","Market Street",null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:73/2",1997,1997,"","site","environmental impact report",null,"Van Ness Avenue · other: eastern boundary of project site; three travel lanes in each direction","unverified","C124919865",73,"https://archive.org/details/C124919865/page/n72","Van Ness Avenue",null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:73/4",1997,1997,"","site","environmental impact report",null,"Gough Street · other: one block west of project site; three southbound travel lanes","unverified","C124919865",73,"https://archive.org/details/C124919865/page/n72","Gough Street",null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:73/5",1997,1997,"","site","environmental impact report",null,"Hayes Street · other: northern boundary of project site; one-way westbound; three travel lanes","unverified","C124919865",73,"https://archive.org/details/C124919865/page/n72","Hayes Street",null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:73/6",1997,1997,"","site","environmental impact report",null,"Fell Street · other: southern boundary of project site; one-way eastbound; three travel lanes","unverified","C124919865",73,"https://archive.org/details/C124919865/page/n72","Fell Street",null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:76/1",1997,1997,"","finding","environmental impact report",null,"On-street parking survey, School of the Arts · other: approximately 1,275 on-street parking spaces in survey area","unverified","C124919865",76,"https://archive.org/details/C124919865/page/n75",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:77/1",1997,1997,"","finding","environmental impact report",null,"School of the Arts (SOTA) project parking survey · other: 33 off-street parking facilities (24 public, 9 private)","unverified","C124919865",77,"https://archive.org/details/C124919865/page/n76",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:77/2",1997,1997,"","finding","environmental impact report",null,"School of the Arts (SOTA) project parking survey · other: approximately 2,945 total off-street parking spaces (2,620 public, 325 private)","unverified","C124919865",77,"https://archive.org/details/C124919865/page/n76",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:90/3",1997,1997,"","measure","environmental impact report",null,"School of the Arts master plan · other: Eighteen MUNI lines stop within two blocks of the project site","unverified","C124919865",90,"https://archive.org/details/C124919865/page/n89",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:93/10",1997,1997,"","finding","environmental impact report",null,"School of the Arts construction traffic · finding: potential truck queuing, lane closures and peak hour impacts","unverified","C124919865",93,"https://archive.org/details/C124919865/page/n92",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:93/2",1997,1997,"","finding","environmental impact report",null,"School of the Arts pedestrian movements · finding: increase in pedestrian volume at crosswalks","unverified","C124919865",93,"https://archive.org/details/C124919865/page/n92",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:93/6",1997,1997,"","project","environmental impact report",null,"School of the Arts · other: estimated delivery/service demand","unverified","C124919865",93,"https://archive.org/details/C124919865/page/n92",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:93/9",1997,1997,"","recommendation","environmental impact report",null,"School of the Arts · recommendation: provide passenger loading zones for SOTA related activities","unverified","C124919865",93,"https://archive.org/details/C124919865/page/n92",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:94/3",1997,1997,"","action","environmental impact report",null,"SOTA project construction trucks · other: Average of 10 to 15 truck trips per day to and from the site","unverified","C124919865",94,"https://archive.org/details/C124919865/page/n93",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922692:358/10005",1997,1997,"","finding","ordinance or legislation",null,"Mission Bay hazardous waste mitigation measures · finding: Hazardous waste mitigation measures N.1 and N.2 rejected; information to be generated for DPH and SWQCB","unverified","C124922692",358,"https://archive.org/details/C124922692/page/n357",null,null,null,"San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922692:359/3",1997,1997,"","finding","ordinance or legislation",null,"Mission Bay Project site · finding: Mitigation Measure E.5 (Area Wide TMP) is hereby rejected; site-specific TMP required before first Certificate of Occupancy","unverified","C124922692",359,"https://archive.org/details/C124922692/page/n358",null,null,null,"San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922692:359/4",1997,1997,"","finding","ordinance or legislation",null,"Mission Bay Project site · other: Project site exempted from the area wide Transportation Management Program","unverified","C124922692",359,"https://archive.org/details/C124922692/page/n358",null,null,null,"San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922692:391/7",1997,1997,"","finding","ordinance or legislation",null,"Ballpark project · finding: no existing neighborhood-serving retail on the project site or displaced","unverified","C124922692",391,"https://archive.org/details/C124922692/page/n390",null,null,null,"San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922692:391/8",1997,1997,"","finding","ordinance or legislation",null,"Ballpark project · finding: no existing housing on the project site or displaced","unverified","C124922692",391,"https://archive.org/details/C124922692/page/n390",null,null,null,"San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922692:392/1",1997,1997,"","site","ordinance or legislation",null,"Ballpark Project site · other: small industrial and service-oriented businesses, some to be relocated to other property","unverified","C124922692",392,"https://archive.org/details/C124922692/page/n391",null,null,null,"San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922692:410/5",1997,1997,"","finding","ordinance or legislation",null,"Beale/Bryant-Site D RP/SB Amendments · finding: No existing housing on the Project site or displaced by the Project","unverified","C124922692",410,"https://archive.org/details/C124922692/page/n409","Beale Street",null,null,"San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:104/1",1997,1997,"1997","finding","environmental impact report",null,"School of the Arts Draft EIR · finding: Significant impact from ambient traffic noise exceeding classroom standards; mitigated to less-than-significant by [name withheld] E1","unverified","C124919865",104,"https://archive.org/details/C124919865/page/n103",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:104/5",1997,1997,"1997","finding","environmental impact report",null,"School of the Arts building interiors · other: Existing daytime average indoor noise about 49 DBA, maximum 61 DBA with windows open; too high for classroom, office and performing arts uses","unverified","C124919865",104,"https://archive.org/details/C124919865/page/n103",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922692:409/5",1997,1997,"1997","finding","ordinance or legislation",null,"Northeastern Waterfront Plan · other: policy limits height of Project Site to 24 feet","unverified","C124922692",409,"https://archive.org/details/C124922692/page/n408",null,null,null,"San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:93/8",1997,1997,"average hour","project","environmental impact report",null,"School of the Arts · other: loading demand during average hour","unverified","C124919865",93,"https://archive.org/details/C124919865/page/n92",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:93/7",1997,1997,"peak hour","project","environmental impact report",null,"School of the Arts · other: loading demand during peak hour","unverified","C124919865",93,"https://archive.org/details/C124919865/page/n92",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:76/2",1997,1997,"weekday midday period","finding","environmental impact report",null,"On-street parking survey, School of the Arts · finding: on-street occupancy approximately 88 percent weekday midday","unverified","C124919865",76,"https://archive.org/details/C124919865/page/n75",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:77/3",1997,1997,"weekday midday period","finding","environmental impact report",null,"School of the Arts (SOTA) project parking survey · other: weekday midday off-street occupancy 62 percent in public facilities","unverified","C124919865",77,"https://archive.org/details/C124919865/page/n76",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:77/4",1997,1997,"weekday midday period","finding","environmental impact report",null,"School of the Arts (SOTA) project parking survey · other: weekday midday off-street occupancy 65 percent in private facilities","unverified","C124919865",77,"https://archive.org/details/C124919865/page/n76",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:76/3",1997,1997,"weekend evening period","finding","environmental impact report",null,"On-street parking survey, School of the Arts · finding: on-street occupancy 86 percent weekend evening","unverified","C124919865",76,"https://archive.org/details/C124919865/page/n75",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:77/5",1997,1997,"weekend evening period","finding","environmental impact report",null,"School of the Arts (SOTA) project parking survey · other: weekend evening off-street occupancy 30 percent in public facilities","unverified","C124919865",77,"https://archive.org/details/C124919865/page/n76",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919865:77/6",1997,1997,"weekend evening period","finding","environmental impact report",null,"School of the Arts (SOTA) project parking survey · other: weekend evening off-street occupancy 35 percent in private facilities","unverified","C124919865",77,"https://archive.org/details/C124919865/page/n76",null,null,null,"School of the Arts master plan : San Francisco Unified School District : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:104/1",1998,1998,"","site","environmental impact report",null,"City College of San Francisco Chinatown/North Beach campus project site · finding: Water table about 2 to 5 feet below ground surface in loose granular materials and organic soils along Columbus Avenue","unverified","C101697812",104,"https://archive.org/details/C101697812/page/n103","Columbus Avenue",null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:104/2",1998,1998,"","site","environmental impact report",null,"City College of San Francisco Chinatown/North Beach campus project site · finding: Water table about 10 to 14 feet below ground surface in dense marine deposits toward the center of the site","unverified","C101697812",104,"https://archive.org/details/C101697812/page/n103",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:104/5",1998,1998,"","finding","environmental impact report",null,"City College of San Francisco Chinatown/North Beach campus project site · finding: Project site is not in an Alquist-Priolo Earthquake Fault Zone","unverified","C101697812",104,"https://archive.org/details/C101697812/page/n103",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:106/1",1998,1998,"","finding","environmental impact report",null,"City College of San Francisco Chinatown/North Beach campus · finding: project site underlain partly by Bay Mud and partly by dense sandy silt; will respond differentially to seismic vibrations","unverified","C101697812",106,"https://archive.org/details/C101697812/page/n105",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:106/2",1998,1998,"","finding","environmental impact report",null,"City College of San Francisco Chinatown/North Beach campus · finding: minimum anticipated ground acceleration at the site is at least 0.5g","unverified","C101697812",106,"https://archive.org/details/C101697812/page/n105",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:106/3",1998,1998,"","recommendation","environmental impact report",null,"City College of San Francisco Chinatown/North Beach campus · recommendation: geotechnical report on ground shaking, soil support and liquefaction to be prepared by District geotechnical team before design phase","unverified","C101697812",106,"https://archive.org/details/C101697812/page/n105",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:11/6",1998,1998,"","site","environmental impact report",null,"Project site Lot 4 · other: project site Lot 4 (1-21 Columbus Avenue and 610-622 Washington Avenue)","unverified","C101697812",11,"https://archive.org/details/C101697812/page/n10","1-21 Columbus Avenue",null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:11/7",1998,1998,"","site","environmental impact report",null,"Project site Lot 5 · other: project site Lot 5, unoccupied and vacant","unverified","C101697812",11,"https://archive.org/details/C101697812/page/n10",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:11/8",1998,1998,"","site","environmental impact report",null,"Project site Lot 12 · other: project site Lot 12 (49-55 Columbus Avenue)","unverified","C101697812",11,"https://archive.org/details/C101697812/page/n10","49-55 Columbus Avenue",null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:12/8",1998,1998,"","finding","environmental impact report",null,"Land use and zoning · finding: would not have a significant land use impact","unverified","C101697812",12,"https://archive.org/details/C101697812/page/n11",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:126/1",1998,1998,"","alternative","environmental impact report",null,"Alternative A2 (office scheme) · alternative: eight-story, 110-foot-high office building with 81,300 gsf of office space","unverified","C101697812",126,"https://archive.org/details/C101697812/page/n125",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:126/10",1998,1998,"","finding","environmental impact report",null,"Kearny Street/Columbus Avenue Project · other: 27 PM peak hour vehicle-trips, compared to 84 under the Chinatown/North Beach Campus Project","unverified","C101697812",126,"https://archive.org/details/C101697812/page/n125",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:126/2",1998,1998,"","measure","environmental impact report",null,"Alternative A2 (office scheme) · height ft: 110 ft (including mechanical penthouse)","unverified","C101697812",126,"https://archive.org/details/C101697812/page/n125",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:126/3",1998,1998,"","measure","environmental impact report",null,"Alternative A2 (office scheme) · stories: eight stories","unverified","C101697812",126,"https://archive.org/details/C101697812/page/n125",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:126/4",1998,1998,"","measure","environmental impact report",null,"Alternative A2 (office scheme) · floor area sqft: 81,300 gsf of office space","unverified","C101697812",126,"https://archive.org/details/C101697812/page/n125",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:126/5",1998,1998,"","measure","environmental impact report",null,"Alternative A2 (office scheme) · other: 15 self-park or 31 valet parking spaces","unverified","C101697812",126,"https://archive.org/details/C101697812/page/n125",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:126/6",1998,1998,"","measure","environmental impact report",null,"Residential scheme on Lots 4 and 5 (Kearny Street/Columbus Avenue Project) · units: 46 market-rate housing units","unverified","C101697812",126,"https://archive.org/details/C101697812/page/n125",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:126/7",1998,1998,"","measure","environmental impact report",null,"Residential scheme on Lots 4 and 5 (Kearny Street/Columbus Avenue Project) · floor area sqft: approximately 9,500 sq. ft. of ground-floor retail use","unverified","C101697812",126,"https://archive.org/details/C101697812/page/n125",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:126/9",1998,1998,"","finding","environmental impact report",null,"Colombo Building · finding: significant and unavoidable impact of demolishing the Colombo Building, eligible for listing on the National Register of Historic Places","unverified","C101697812",126,"https://archive.org/details/C101697812/page/n125",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:13/1",1998,1998,"","building","environmental impact report",null,"Fong Building · other: loss of 21 housing units from demolition","unverified","C101697812",13,"https://archive.org/details/C101697812/page/n12",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:13/10003",1998,1998,"","site","environmental impact report",null,"Chinatown/North Beach campus project site · other: 65-D-2 Height and Bulk District, height limit 65 feet","unverified","C101697812",13,"https://archive.org/details/C101697812/page/n12",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:13/2",1998,1998,"","finding","environmental impact report",null,"Fong Building housing demolition · finding: significant environmental impact","unverified","C101697812",13,"https://archive.org/details/C101697812/page/n12",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:13/3",1998,1998,"","building","environmental impact report",null,"Colombo Building · demolished: eligible for National Register; to be demolished as part of the project","unverified","C101697812",13,"https://archive.org/details/C101697812/page/n12",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:13/4",1998,1998,"","measure","environmental impact report",null,"65-D-2 Height and Bulk District · height ft: limits building height to 65 feet","unverified","C101697812",13,"https://archive.org/details/C101697812/page/n12",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:13/5",1998,1998,"","measure","environmental impact report",null,"65-D-2 Height and Bulk District · height ft: maximum 200-foot height as a Conditional Use","unverified","C101697812",13,"https://archive.org/details/C101697812/page/n12",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:13/6",1998,1998,"","measure","environmental impact report",null,"65-D-2 Height and Bulk District · other: maximum bulk of 110 and 140 feet (length and diagonal dimensions)","unverified","C101697812",13,"https://archive.org/details/C101697812/page/n12",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:14/1",1998,1998,"","building","environmental impact report",null,"Chinatown/North Beach campus building, Lots 4 and 5 · height ft: up to 119 feet","unverified","C101697812",14,"https://archive.org/details/C101697812/page/n13",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:14/2",1998,1998,"","building","environmental impact report",null,"Chinatown/North Beach campus building, Lot 12 · height ft: 94 feet","unverified","C101697812",14,"https://archive.org/details/C101697812/page/n13",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:14/4",1998,1998,"","building","environmental impact report",null,"Colombo Building · demolished: proposed for demolition by the project","unverified","C101697812",14,"https://archive.org/details/C101697812/page/n13",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:14/5",1998,1998,"","building","environmental impact report",null,"Colombo Building · historic rating: significant contributor to the historic character of Chinatown (Chinatown Plan rating)","unverified","C101697812",14,"https://archive.org/details/C101697812/page/n13",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:14/6",1998,1998,"","building","environmental impact report",null,"Colombo Building · recommendation: recommended for City Landmark status by Landmarks Preservation Advisory Board; Planning Commission never acted","unverified","C101697812",14,"https://archive.org/details/C101697812/page/n13",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:14/7",1998,1998,"","finding","environmental impact report",null,"Colombo Building demolition · finding: significant adverse impact on historic resources of the project site","unverified","C101697812",14,"https://archive.org/details/C101697812/page/n13",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:14/8",1998,1998,"","finding","environmental impact report",null,"Chinatown/North Beach campus aesthetics · finding: no significant adverse aesthetic effects","unverified","C101697812",14,"https://archive.org/details/C101697812/page/n13",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:145/2",1998,1998,"","site","environmental impact report",null,"Chinatown/North Beach Campus project site, 620 Washington Street · acquired: Assessor's Block 195, Lot 4","unverified","C101697812",145,"https://archive.org/details/C101697812/page/n144","620 Washington St.",null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:145/3",1998,1998,"","site","environmental impact report",null,"Chinatown/North Beach Campus project site, 630 Washington Street · acquired: Assessor's Block 195, Lot 5","unverified","C101697812",145,"https://archive.org/details/C101697812/page/n144","630 Washington St.",null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:145/4",1998,1998,"","site","environmental impact report",null,"Chinatown/North Beach Campus project site, 53-55 Columbus Avenue · acquired: Assessor's Block 195, Lot 12","unverified","C101697812",145,"https://archive.org/details/C101697812/page/n144","53-55 Columbus Avenue",null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:15/5",1998,1998,"","finding","environmental impact report",null,"Project site · finding: not within the Chinatown Historic District or the Jackson Square Historic District","unverified","C101697812",15,"https://archive.org/details/C101697812/page/n14",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:153/8",1998,1998,"","project","environmental impact report",null,"Kearny Street/Columbus Avenue Project Site A · approved: amended project on Site A, with a slightly smaller school than proposed","unverified","C101697812",153,"https://archive.org/details/C101697812/page/n152","Kearny Street",null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:169/1",1998,1998,"","finding","environmental impact report",null,"Chinatown/North Beach Campus · finding: would not have the potential to cause adverse wind accelerations in pedestrian areas adjacent to the site","unverified","C101697812",169,"https://archive.org/details/C101697812/page/n168",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:169/4",1998,1998,"","event","environmental impact report",null,"Chinatown/North Beach Campus EIR · finding: Wind effects will not be discussed in the EIR","unverified","C101697812",169,"https://archive.org/details/C101697812/page/n168",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:171/1",1998,1998,"","project","environmental impact report",null,"City College of San Francisco Chinatown/North Beach campus · other: about 900 daily vehicle trips","unverified","C101697812",171,"https://archive.org/details/C101697812/page/n170",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:171/2",1998,1998,"","project","environmental impact report",null,"City College of San Francisco Chinatown/North Beach campus · floor area sqft: about 219,400 square feet","unverified","C101697812",171,"https://archive.org/details/C101697812/page/n170",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:172/2",1998,1998,"","finding","environmental impact report",null,"Archaeological resources mitigation measures · finding: reduce potentially significant archaeological resource impacts to less than significance","unverified","C101697812",172,"https://archive.org/details/C101697812/page/n171",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:172/3",1998,1998,"","recommendation","environmental impact report",null,"Archaeological pre-excavation testing program · recommendation: pre-excavation testing program during demolition, foundation removal and excavation","unverified","C101697812",172,"https://archive.org/details/C101697812/page/n171",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:177/5",1998,1998,"","site","environmental impact report",null,"CCSF Chinatown/North Beach campus project site · other: 5 to 10 feet of sandy fill material over native sand, silty-sand, dense sand and clay (Bay Mud)","unverified","C101697812",177,"https://archive.org/details/C101697812/page/n176",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:177/6",1998,1998,"","site","environmental impact report",null,"Intermixed sand and clay soils west of project site · other: intermixed sand and clay soils to approximately 80 feet below ground surface","unverified","C101697812",177,"https://archive.org/details/C101697812/page/n176",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:177/7",1998,1998,"","project","environmental impact report",null,"Proposed underground parking structure · proposes: underground parking structure extending deep enough to encounter clay-containing materials","unverified","C101697812",177,"https://archive.org/details/C101697812/page/n176",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:179/1",1998,1998,"","action","environmental impact report",null,"City College Chinatown/North Beach campus project site · other: Preliminary Site Assessment and Phase II Investigation completed","unverified","C101697812",179,"https://archive.org/details/C101697812/page/n178",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:179/2",1998,1998,"","action","environmental impact report",null,"City College Chinatown/North Beach campus project site · other: Phase 1 Site Assessment for Lot 12 being conducted","unverified","C101697812",179,"https://archive.org/details/C101697812/page/n178",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:179/4",1998,1998,"","finding","environmental impact report",null,"City College Chinatown/North Beach campus project site · finding: Not listed on State Hazardous Waste and [name withheld]","unverified","C101697812",179,"https://archive.org/details/C101697812/page/n178",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:179/5",1998,1998,"","finding","environmental impact report",null,"City College Chinatown/North Beach campus project site · finding: Not located bayward of historic high tide line (Maher Ordinance)","unverified","C101697812",179,"https://archive.org/details/C101697812/page/n178",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:179/6",1998,1998,"","site","environmental impact report",null,"City College Chinatown/North Beach campus project site · other: Historic uses included furniture and mattress manufacturing, paint shop, garment factory, printing, tin shop, gunsmith, cleaners","unverified","C101697812",179,"https://archive.org/details/C101697812/page/n178",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:182/3",1998,1998,"","finding","environmental impact report",null,"Chinatown/North Beach Campus site · finding: Project site does not contain any state or locally classified mineral resources; mineral resources not discussed in EIR","unverified","C101697812",182,"https://archive.org/details/C101697812/page/n181",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:184/1",1998,1998,"","finding","environmental impact report",null,"CCSF Chinatown/North Beach campus · other: pile-driving noise about 90 dBA at about 100 ft from the site","unverified","C101697812",184,"https://archive.org/details/C101697812/page/n183",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:184/2",1998,1998,"","action","environmental impact report",null,"CCSF Chinatown/North Beach campus · other: pile driving expected to last about two to four weeks","unverified","C101697812",184,"https://archive.org/details/C101697812/page/n183",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:184/3",1998,1998,"","finding","environmental impact report",null,"CCSF Chinatown/North Beach campus · finding: short-term pile-driving noise effects would be less than significant with mitigation","unverified","C101697812",184,"https://archive.org/details/C101697812/page/n183",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:184/4",1998,1998,"","recommendation","environmental impact report",null,"CCSF Chinatown/North Beach campus · recommendation: predrill pile holes to maximum feasible depth to minimize noise and vibration","unverified","C101697812",184,"https://archive.org/details/C101697812/page/n183",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:19/4",1998,1998,"","finding","environmental impact report",null,"Project site geology · finding: underlain partly by Bay Mud and partly by dense sandy silt","unverified","C101697812",19,"https://archive.org/details/C101697812/page/n18",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:20/2",1998,1998,"","finding","environmental impact report",null,"City College of San Francisco Chinatown/North Beach campus · finding: deep foundations required for major structures to prevent liquefaction effects","unverified","C101697812",20,"https://archive.org/details/C101697812/page/n19",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:44/5",1998,1998,"","action","environmental impact report",null,"Chinatown/North Beach campus site · acquired: Board plans to acquire the site with City bond funds for educational purposes, after Final EIR and Board approval","unverified","C101697812",44,"https://archive.org/details/C101697812/page/n43",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:50/1",1998,1998,"","building","environmental impact report",null,"Holiday Inn · height ft: 300-foot-tall","unverified","C101697812",50,"https://archive.org/details/C101697812/page/n49","Washington Street",null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:50/2",1998,1998,"","building","environmental impact report",null,"Montgomery/Washington office and residential building · height ft: 300-foot-tall","unverified","C101697812",50,"https://archive.org/details/C101697812/page/n49","Montgomery Street",null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:50/3",1998,1998,"","building","environmental impact report",null,"Transamerica Pyramid · height ft: 850-foot-tall office building","unverified","C101697812",50,"https://archive.org/details/C101697812/page/n49","Montgomery Street",null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:52/11",1998,1998,"","site","environmental impact report",null,"Chinatown/North Beach campus project site · other: Lots 4, 5, and 12 comprise the project site","unverified","C101697812",52,"https://archive.org/details/C101697812/page/n51",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:52/13",1998,1998,"","site","environmental impact report",null,"Lot 5 · other: vacant, excavated to about 10 feet below street grade","unverified","C101697812",52,"https://archive.org/details/C101697812/page/n51",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:56/1",1998,1998,"","site","environmental impact report",null,"Chinatown/North Beach Campus · other: Portion of site within CCB District is less than 20,000 square feet; no off-street parking required","unverified","C101697812",56,"https://archive.org/details/C101697812/page/n55",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:56/2",1998,1998,"","site","environmental impact report",null,"Chinatown/North Beach Campus · other: Entire project site exceeds 20,000 square feet and is not exempt from off-street parking requirements","unverified","C101697812",56,"https://archive.org/details/C101697812/page/n55",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:56/4",1998,1998,"","project","environmental impact report",null,"Chinatown/North Beach Campus · other: one off-street parking space per two classrooms required","unverified","C101697812",56,"https://archive.org/details/C101697812/page/n55",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:57/1",1998,1998,"","building","environmental impact report",null,"Colombo Building · demolished: Colombo Building demolished","unverified","C101697812",57,"https://archive.org/details/C101697812/page/n56",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:57/2",1998,1998,"","building","environmental impact report",null,"Colombo Building · floor area sqft: about 11,600 square feet of retail and office space in two stories","unverified","C101697812",57,"https://archive.org/details/C101697812/page/n56",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:57/3",1998,1998,"","building","environmental impact report",null,"Fong Building · demolished: Fong Building demolished","unverified","C101697812",57,"https://archive.org/details/C101697812/page/n56",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:57/4",1998,1998,"","building","environmental impact report",null,"Fong Building · stories: three-story","unverified","C101697812",57,"https://archive.org/details/C101697812/page/n56",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:57/5",1998,1998,"","building","environmental impact report",null,"Fong Building · units: 21 residential units","unverified","C101697812",57,"https://archive.org/details/C101697812/page/n56",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:57/6",1998,1998,"","building","environmental impact report",null,"Chinatown/North Beach Campus · floor area sqft: 158,000 gsf facility","unverified","C101697812",57,"https://archive.org/details/C101697812/page/n56",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:57/7",1998,1998,"","finding","environmental impact report",null,"Chinatown/North Beach Campus · finding: not a significant impact on land use","unverified","C101697812",57,"https://archive.org/details/C101697812/page/n56",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:57/8",1998,1998,"","site","environmental impact report",null,"Chinatown/North Beach Campus site · population: no longer 50 permanent residents at the site","unverified","C101697812",57,"https://archive.org/details/C101697812/page/n56",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:59/1",1998,1998,"","building","environmental impact report",null,"Colombo Building · demolished: would be demolished as part of the project","verified","C101697812",59,"https://archive.org/details/C101697812/page/n58",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:59/2",1998,1998,"","building","environmental impact report",null,"Colombo Building · historic rating: eligible for the National Register of Historic Places","unverified","C101697812",59,"https://archive.org/details/C101697812/page/n58",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:59/3",1998,1998,"","site","environmental impact report",null,"Chinatown/North Beach Campus · other: immediate vicinity identified in the General Plan as a site for a Community College District facility","unverified","C101697812",59,"https://archive.org/details/C101697812/page/n58",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:59/4",1998,1998,"","finding","environmental impact report",null,"Chinatown/North Beach Campus · finding: substantially consistent with the design goals of the Urban Design Element","unverified","C101697812",59,"https://archive.org/details/C101697812/page/n58",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:63/3",1998,1998,"","site","environmental impact report",null,"Proposed project site · other: includes Lot 12","unverified","C101697812",63,"https://archive.org/details/C101697812/page/n62",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:63/4",1998,1998,"","site","environmental impact report",null,"Surrounding development north, east and west of project site · stories: two to eight stories","unverified","C101697812",63,"https://archive.org/details/C101697812/page/n62",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:64/4",1998,1998,"","site","environmental impact report",null,"Project site · other: Lots 4, 5, and 12 bounded by Columbus and Washington Streets","unverified","C101697812",64,"https://archive.org/details/C101697812/page/n63","Columbus Avenue",null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:77/7",1998,1998,"","property_record","environmental impact report",null,"project site · other: Neither building designated a City Landmark under Article 10; site not within an Article 10 historic district","unverified","C101697812",77,"https://archive.org/details/C101697812/page/n76",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:78/1",1998,1998,"","finding","environmental impact report",null,"Colombo Building · finding: Demolition of the Colombo Building would cause a significant adverse impact on the historic resources of the project site","unverified","C101697812",78,"https://archive.org/details/C101697812/page/n77",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:78/3",1998,1998,"","finding","environmental impact report",null,"Colombo Building · finding: Mitigation reduces the adverse effect of demolition but the impact would remain significant and unavoidable","unverified","C101697812",78,"https://archive.org/details/C101697812/page/n77",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:84/4",1998,1998,"","site","environmental impact report",null,"Muni stop at project site on Columbus at Washington · other: Stop serves Muni routes 15 and 30X","unverified","C101697812",84,"https://archive.org/details/C101697812/page/n83","Columbus Avenue",null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","m",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:93/3",1998,1998,"","finding","environmental impact report",null,"CCSF Chinatown/North Beach campus parking · finding: parking within a two-block radius is generally occupied during the midday peak period","unverified","C101697812",93,"https://archive.org/details/C101697812/page/n92",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:96/10002",1998,1998,"","action","environmental impact report",null,"Demolition of two existing buildings · other: demolition requires approximately four to six weeks","unverified","C101697812",96,"https://archive.org/details/C101697812/page/n95",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:97/5",1998,1998,"","measure","environmental impact report",null,"Construction truck movement · other: truck movement permitted only 9:00 AM to 3:30 PM and 6:30 PM to 7:00 AM","unverified","C101697812",97,"https://archive.org/details/C101697812/page/n96",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:97/6",1998,1998,"","agency","environmental impact report",null,"Lane and sidewalk closures · lead agency: San Francisco Department of Public Works (DPW) review and approval","unverified","C101697812",97,"https://archive.org/details/C101697812/page/n96",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:97/8",1998,1998,"","finding","environmental impact report",null,"Construction transportation effects · finding: construction impacts insignificant","unverified","C101697812",97,"https://archive.org/details/C101697812/page/n96",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:107/2",1998,1998,"","finding","environmental impact report",null,"Chinatown/North Beach Campus project cultural resources · finding: Findings on potential impacts and recommendations are similar to those of the investigations previously conducted on Lots 4 and 5","unverified","C101697894",107,"https://archive.org/details/C101697894/page/n106",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:108/1",1998,1998,"","finding","environmental impact report",null,"Colombo Building · finding: eligible for listing on the National Register of Historic Places; demolition would be a significant impact","unverified","C101697894",108,"https://archive.org/details/C101697894/page/n107",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:108/2",1998,1998,"","finding","environmental impact report",null,"Chinatown/North Beach Campus project site · finding: project site is not within the boundaries of the Jackson Square Historic District","unverified","C101697894",108,"https://archive.org/details/C101697894/page/n107",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:108/4",1998,1998,"","project","environmental impact report",null,"Chinatown/North Beach Campus project building design · other: design is only schematic and subject to change","unverified","C101697894",108,"https://archive.org/details/C101697894/page/n107",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:113/1",1998,1998,"","building","environmental impact report",null,"Transamerica Pyramid · height ft: 850-foot-tall office building","unverified","C101697894",113,"https://archive.org/details/C101697894/page/n112","Montgomery Street",null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:117/1",1998,1998,"","finding","environmental impact report",null,"Colombo Building · finding: demolition inconsistent with Urban Design Element Objective 2 Policy 4","unverified","C101697894",117,"https://archive.org/details/C101697894/page/n116",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:117/2",1998,1998,"","finding","environmental impact report",null,"City College Chinatown/North Beach campus project · finding: consistent with Objective 8 of the Community Facilities Element","unverified","C101697894",117,"https://archive.org/details/C101697894/page/n116",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:117/3",1998,1998,"","finding","environmental impact report",null,"Public School Facilities Plan, Map 6 · finding: does not indicate a City College campus at the project site location","unverified","C101697894",117,"https://archive.org/details/C101697894/page/n116",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:118/4",1998,1998,"","site","environmental impact report",null,"project site · finding: entry to North Beach","unverified","C101697894",118,"https://archive.org/details/C101697894/page/n117",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:126/3",1998,1998,"","finding","environmental impact report",null,"Intersections in the vicinity of the Chinatown/North Beach campus · finding: intersections operate at LOS B and would continue to do so with the project","unverified","C101697894",126,"https://archive.org/details/C101697894/page/n125",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:127/2",1998,1998,"","finding","environmental impact report",null,"City College of San Francisco Chinatown/North Beach campus · other: 12 Muni transit bus lines within a two-block radius of the project","unverified","C101697894",127,"https://archive.org/details/C101697894/page/n126",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:130/1",1998,1998,"","project","environmental impact report",null,"City College of San Francisco Chinatown/North Beach campus · population: projected population of 6,630 students at the project site","unverified","C101697894",130,"https://archive.org/details/C101697894/page/n129",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:133/2",1998,1998,"","site","environmental impact report",null,"Project site Lot 12 · other: existing housing use; property available for sale via private transaction","unverified","C101697894",133,"https://archive.org/details/C101697894/page/n132",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:138/2",1998,1998,"","building","environmental impact report",null,"Colombo Building · finding: Found eligible for listing on the National Register; demolition would be a significant and unavoidable impact","unverified","C101697894",138,"https://archive.org/details/C101697894/page/n137",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:138/3",1998,1998,"","building","environmental impact report",null,"Fong Building · finding: Not considered eligible for the National Register","unverified","C101697894",138,"https://archive.org/details/C101697894/page/n137",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:142/10001",1998,1998,"","site","environmental impact report",null,"Kearny Street / Columbus Avenue Project Site A (former International Hotel site) · other: Site A extends on Kearny Street between Kearny-Jackson intersection and a point approximately 180 feet to the south","unverified","C101697894",142,"https://archive.org/details/C101697894/page/n141","Kearny Street",null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:144/5",1998,1998,"","building","environmental impact report",null,"Project site buildings facing Chinatown · demolished: Buildings on the project site facing the Chinatown area demolished","unverified","C101697894",144,"https://archive.org/details/C101697894/page/n143",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:145/1",1998,1998,"","building","environmental impact report",null,"Holiday Inn · other: Marks northernmost edge of downtown development on blocks 208 and 207, across Washington Street from the project site","unverified","C101697894",145,"https://archive.org/details/C101697894/page/n144","Washington Street",null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:173/1",1998,1998,"","project","environmental impact report",null,"CCSF Chinatown/North Beach campus · height ft: eight-story project","unverified","C101697894",173,"https://archive.org/details/C101697894/page/n172",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:173/7",1998,1998,"","finding","environmental impact report",null,"CCSF Chinatown/North Beach campus · other: pedestrian trips in 5:00 PM to 6:00 PM peak hour from 855 trips analysis","unverified","C101697894",173,"https://archive.org/details/C101697894/page/n172",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:231/1",1998,1998,"","action","environmental impact report",null,"City College of San Francisco Chinatown/North Beach campus · demolished: Existing buildings on the project site would be demolished prior to construction of the proposed campus","unverified","C101697894",231,"https://archive.org/details/C101697894/page/n230",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:240/4",1998,1998,"","finding","environmental impact report",null,"Project site · other: Project site is outside the Jackson Square Historic District boundaries","unverified","C101697894",240,"https://archive.org/details/C101697894/page/n239",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:244/4",1998,1998,"","finding","environmental impact report",null,"Chinatown/North Beach Center EIR project site, Lots 4, 5 and 12 · finding: archaeological resources report makes similar findings for Lots 4, 5 and 12","unverified","C101697894",244,"https://archive.org/details/C101697894/page/n243",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:258/2",1998,1998,"","site","environmental impact report",null,"Kearny Street / Columbus Avenue Project site · other: Northern edge of downtown development; across Washington Street from the project site","unverified","C101697894",258,"https://archive.org/details/C101697894/page/n257","Washington Street",null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:38/1",1998,1998,"","project","environmental impact report",null,"proposed project (Chelsea Development Company LLC, Letter 3) · height ft: 94- to 119-foot-tall project","unverified","C101697894",38,"https://archive.org/details/C101697894/page/n37",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:38/3",1998,1998,"","measure","environmental impact report",null,"65-D-2 Height and Bulk District · other: permits structures up to 200 feet as a Conditional Use","unverified","C101697894",38,"https://archive.org/details/C101697894/page/n37",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:38/6",1998,1998,"","finding","environmental impact report",null,"proposed project · units: loss of 21 units of residential housing","unverified","C101697894",38,"https://archive.org/details/C101697894/page/n37",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:45/10001",1998,1998,"","site","environmental impact report",null,"CCSF Chinatown/North Beach campus project site · height ft: 65-D-2 Height and Bulk District: heights above 65 feet permitted up to 200 feet as Conditional Use","unverified","C101697894",45,"https://archive.org/details/C101697894/page/n44",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:45/2",1998,1998,"","site","environmental impact report",null,"Chinatown/North Beach Campus · height ft: 65-foot height limit, 65-D-2 Height and Bulk District","unverified","C101697894",45,"https://archive.org/details/C101697894/page/n44",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:45/3",1998,1998,"","site","environmental impact report",null,"Chinatown/North Beach Campus · height ft: maximum 200 feet as a Conditional Use from the City Planning Commission","unverified","C101697894",45,"https://archive.org/details/C101697894/page/n44",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:45/4",1998,1998,"","finding","environmental impact report",null,"Chinatown/North Beach Campus · units: loss of 21 units of residential housing","unverified","C101697894",45,"https://archive.org/details/C101697894/page/n44",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:46/2",1998,1998,"","alternative","environmental impact report",null,"8-story office tower on the project site · approved: 8-story office tower approved by the City","unverified","C101697894",46,"https://archive.org/details/C101697894/page/n45",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:46/3",1998,1998,"","alternative","environmental impact report",null,"7-story residential tower on the project site · approved: 7-story residential tower approved by the City as alternative","unverified","C101697894",46,"https://archive.org/details/C101697894/page/n45",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:74/1",1998,1998,"","project","environmental impact report",null,"City College Chinatown/North Beach campus · floor area sqft: approximately 158,000 gross square feet","unverified","C101697894",74,"https://archive.org/details/C101697894/page/n73",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:74/2",1998,1998,"","project","environmental impact report",null,"City College Chinatown/North Beach campus · height ft: up to 119 feet high","unverified","C101697894",74,"https://archive.org/details/C101697894/page/n73",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:74/3",1998,1998,"","project","environmental impact report",null,"City College Chinatown/North Beach campus · population: 6,630 students","unverified","C101697894",74,"https://archive.org/details/C101697894/page/n73",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:74/4",1998,1998,"","project","environmental impact report",null,"City College Chinatown/North Beach campus · jobs: 150 faculty","unverified","C101697894",74,"https://archive.org/details/C101697894/page/n73",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:74/8",1998,1998,"","event","environmental impact report",null,"project site residents · population: 50 permanent residents","unverified","C101697894",74,"https://archive.org/details/C101697894/page/n73",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:74/9",1998,1998,"","finding","environmental impact report",null,"DEIR land use analysis · finding: would not have a significant land use impact","unverified","C101697894",74,"https://archive.org/details/C101697894/page/n73",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:75/4",1998,1998,"","site","environmental impact report",null,"Chinatown/North Beach campus project site · other: project site located at terminus of [name withheld] and Chinatown Historic Districts","unverified","C101697894",75,"https://archive.org/details/C101697894/page/n74",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:79/7",1998,1998,"","finding","environmental impact report",null,"campus project · finding: would significantly and adversely affect public views and vistas","unverified","C101697894",79,"https://archive.org/details/C101697894/page/n78",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:97/3",1998,1998,"","finding","environmental impact report",null,"Colombo and Fong buildings demolition · finding: no substantial adverse impact on historic districts","unverified","C101697894",97,"https://archive.org/details/C101697894/page/n96",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:98/3",1998,1998,"","finding","environmental impact report",null,"Colombo Building · finding: Demolition identified as significant unavoidable impact","unverified","C101697894",98,"https://archive.org/details/C101697894/page/n97",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:98/4",1998,1998,"","finding","environmental impact report",null,"Project site buildings · finding: Outside boundaries of both [name withheld] and Chinatown Historic Districts","unverified","C101697894",98,"https://archive.org/details/C101697894/page/n97",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:99/1",1998,1998,"","project","environmental impact report",null,"Section 106 Area of Potential Effect · other: all parcels within a one-block radius of the project site","unverified","C101697894",99,"https://archive.org/details/C101697894/page/n98",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119703507:63/1",1998,1998,"","property_record","environmental impact report",null,"Mission Campus project site · height ft: legislated height limit up to 65 feet","unverified","C119703507",63,"https://archive.org/details/C119703507/page/n62",null,null,null,"City College of San Francisco Mission Campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119703507:67/1",1998,1998,"","finding","environmental impact report",null,"City College of San Francisco Mission Campus · finding: no significant transportation impacts shown to result from the proposed project","unverified","C119703507",67,"https://archive.org/details/C119703507/page/n66",null,null,null,"City College of San Francisco Mission Campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119703507:67/2",1998,1998,"","finding","environmental impact report",null,"City College of San Francisco Mission Campus · finding: site fully served by necessary public services and utilities; location already fully developed","unverified","C119703507",67,"https://archive.org/details/C119703507/page/n66",null,null,null,"City College of San Francisco Mission Campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119703507:67/4",1998,1998,"","finding","environmental impact report",null,"City College of San Francisco Mission Campus · finding: construction noise mitigation measures included in the project","unverified","C119703507",67,"https://archive.org/details/C119703507/page/n66",null,null,null,"City College of San Francisco Mission Campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119703507:69/2",1998,1998,"","finding","environmental impact report",null,"Mission Campus project site · finding: Project site is not in a special geologic study zone and is not close to an active fault","unverified","C119703507",69,"https://archive.org/details/C119703507/page/n68",null,null,null,"City College of San Francisco Mission Campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119703507:71/3",1998,1998,"","finding","environmental impact report",null,"Mission Campus transportation impacts · finding: no significant traffic, parking or bicycle impacts; no mitigation required","unverified","C119703507",71,"https://archive.org/details/C119703507/page/n70",null,null,null,"City College of San Francisco Mission Campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124910717:582/2",1998,1998,"","finding","environmental impact report",null,"Candlestick Point Stadium and Retail/Entertainment Center · finding: Freeway LOS substantially degraded; U.S. 101 and I-280 would operate at LOS F","unverified","C124910717",582,"https://archive.org/details/C124910717/page/n581","U.S. 101; I-280",null,null,"Revised draft environmental impact statement/environmental impact report for the disposal and reuse of Hunters Point Shipyard","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:399/1",1998,1998,"","measure","environmental impact report",null,"Third Street Light Rail Project Site Mitigation Report · recommendation: One Site Mitigation Report prepared for the entire Light Rail Alternative","unverified","C124915258",399,"https://archive.org/details/C124915258/page/n398","Third Street",null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","m",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:101/1",1998,1998,"1998","measure","environmental impact report",null,"City College of San Francisco Chinatown/North Beach campus project · other: 114 parking spaces proposed","unverified","C101697812",101,"https://archive.org/details/C101697812/page/n100",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:101/2",1998,1998,"1998","measure","environmental impact report",null,"City College of San Francisco Chinatown/North Beach campus project · other: about 23 parking spaces required under Planning Code Section 151","unverified","C101697812",101,"https://archive.org/details/C101697812/page/n100",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:101/3",1998,1998,"1998","measure","environmental impact report",null,"City College of San Francisco Chinatown/North Beach campus project · other: Lot 12 located in CRNC District; portion in CCB District","unverified","C101697812",101,"https://archive.org/details/C101697812/page/n100",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:113/1",1998,1998,"1998","site","environmental impact report",null,"City College Chinatown/North Beach campus project site · finding: not listed on the State of California Hazardous Waste and [name withheld]","unverified","C101697812",113,"https://archive.org/details/C101697812/page/n112",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:118/1",1998,1998,"1998","measure","environmental impact report",null,"CR-1 Archaeological Testing · recommendation: District to retain an archaeologist to carry out a pre-excavation testing program on the project site","unverified","C101697812",118,"https://archive.org/details/C101697812/page/n117",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:168/8",1998,1998,"1998","finding","environmental impact report",null,"structures west and north of project site · stories: generally two to six stories","unverified","C101697812",168,"https://archive.org/details/C101697812/page/n167",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:174/2",1998,1998,"1998","alternative","environmental impact report",null,"Colombo Building · alternative: preservation alternative to be presented in EIR","unverified","C101697812",174,"https://archive.org/details/C101697812/page/n173",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:175/1",1998,1998,"1998","finding","environmental impact report",null,"City College of San Francisco Chinatown/North Beach campus project · other: A preliminary estimate indicates energy consumption about 12.7 x 10° Btu per year, an increase over current uses at the project site","unverified","C101697812",175,"https://archive.org/details/C101697812/page/n174",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:175/2",1998,1998,"1998","finding","environmental impact report",null,"City College of San Francisco Chinatown/North Beach campus project site · finding: Not located within an Alquist-Priolo Earthquake Fault Zone; no impact related to fault rupture","unverified","C101697812",175,"https://archive.org/details/C101697812/page/n174",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:175/3",1998,1998,"1998","finding","environmental impact report",null,"City College of San Francisco Chinatown/North Beach campus project site · finding: Located in an area that could be subject to strong groundshaking from regional earthquakes","unverified","C101697812",175,"https://archive.org/details/C101697812/page/n174",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:177/2",1998,1998,"1998","finding","environmental impact report",null,"CCSF Chinatown/North Beach campus project site · finding: liquefaction hazard potentially significant, to be further evaluated in EIR","unverified","C101697812",177,"https://archive.org/details/C101697812/page/n176",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:177/3",1998,1998,"1998","finding","environmental impact report",null,"CCSF Chinatown/North Beach campus project site · finding: site-specific liquefaction mitigation design features not yet identified","unverified","C101697812",177,"https://archive.org/details/C101697812/page/n176",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:177/4",1998,1998,"1998","finding","environmental impact report",null,"CCSF Chinatown/North Beach campus project site · finding: no unique geological features identified, no impact","unverified","C101697812",177,"https://archive.org/details/C101697812/page/n176",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:180/1",1998,1998,"1998","finding","environmental impact report",null,"City College of San Francisco Chinatown/North Beach campus project site · finding: Soil excavated from the site can be exported without any restrictions","unverified","C101697812",180,"https://archive.org/details/C101697812/page/n179",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:180/2",1998,1998,"1998","finding","environmental impact report",null,"City College of San Francisco Chinatown/North Beach campus project site · finding: Groundwater pollutant concentrations are below the criteria for discharge into the sewer","unverified","C101697812",180,"https://archive.org/details/C101697812/page/n179",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:44/6",1998,1998,"1998","project","environmental impact report",null,"Chinatown/North Beach campus · other: state funding uncertain; would likely take two to five years to obtain","unverified","C101697812",44,"https://archive.org/details/C101697812/page/n43",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:56/5",1998,1998,"1998","building","environmental impact report",null,"Chinatown/North Beach Campus · stories: seven- to eight-story building replacing vacant site and two- to three-story structures","unverified","C101697812",56,"https://archive.org/details/C101697812/page/n55",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:110/4",1998,1998,"1998","site","environmental impact report",null,"Residential uses near project site · other: residential uses concentrated along Grant Avenue, Kearny Street, and Jackson Street west of Kearny Street","unverified","C101697894",110,"https://archive.org/details/C101697894/page/n109","Grant Avenue; Kearny Street; Jackson Street",null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:112/2",1998,1998,"1998","finding","environmental impact report",null,"Chinatown/North Beach campus · population: a maximum of about 1,875 students could be accommodated on the project site","unverified","C101697894",112,"https://archive.org/details/C101697894/page/n111",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:112/5",1998,1998,"1998","finding","environmental impact report",null,"Chinatown/North Beach campus · other: block would transition from retail, office and residential character to retail, office, and institutional nature","unverified","C101697894",112,"https://archive.org/details/C101697894/page/n111",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:25/5",1998,1998,"1998","finding","environmental impact report",null,"Chinatown/North Beach Campus project site · finding: project site area is essentially built-out and has existing fire and police protection services","unverified","C101697894",25,"https://archive.org/details/C101697894/page/n24",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119703507:43/2",1998,1998,"1998","finding","environmental impact report",null,"City College of San Francisco Mission Campus EIR · finding: Pedestrian conditions are not crowded in the area near the proposed project site (Draft EIR p. III.40)","unverified","C119703507",43,"https://archive.org/details/C119703507/page/n42",null,null,null,"City College of San Francisco Mission Campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119703507:55/1",1998,1998,"1998","finding","environmental impact report",null,"City College Mission Campus project · finding: No local intersection shown to deteriorate below LOS D under existing-plus-project or cumulative conditions; no significant traffic impact","unverified","C119703507",55,"https://archive.org/details/C119703507/page/n54",null,null,null,"City College of San Francisco Mission Campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:102/1",1998,1998,"1998-04-23","project","environmental impact report",null,"Chinatown/North Beach Campus · other: Chinatown/North Beach Campus project geologic and soils evaluation","unverified","C101697812",102,"https://archive.org/details/C101697812/page/n101",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:102/2",1998,1998,"1998-04-23","finding","environmental impact report",null,"Chinatown/North Beach Campus · finding: project site underlain by fill, Bay Mud, and marine deposits","unverified","C101697812",102,"https://archive.org/details/C101697812/page/n101",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:176/1",1998,1998,"1998-04-23","finding","environmental impact report",null,"City College of San Francisco Chinatown/North Beach campus project site · finding: Project site is in a Seismic Hazard Zone for liquefaction potential","unverified","C101697812",176,"https://archive.org/details/C101697812/page/n175",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:176/3",1998,1998,"1998-04-23","finding","environmental impact report",null,"Liquefaction hazard at City College Chinatown/North Beach campus project site · finding: Liquefaction hazard is potentially significant and will be evaluated in the EIR","unverified","C101697812",176,"https://archive.org/details/C101697812/page/n175",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:54/1",1998,1998,"1998-04-23","site","environmental impact report",null,"Chinatown/North Beach campus project site · rezoned: Lots 4 and 5 in CCB district; Lot 12 in CRNC district","unverified","C101697812",54,"https://archive.org/details/C101697812/page/n53",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:54/2",1998,1998,"1998-04-23","site","environmental impact report",null,"Chinatown/North Beach campus project site · other: 65-D-2 Height and Bulk District, limits buildings to 65 feet","unverified","C101697812",54,"https://archive.org/details/C101697812/page/n53",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:54/3",1998,1998,"1998-04-23","measure","environmental impact report",null,"Chinatown/North Beach campus project site · other: Heights above 65 feet, to a maximum of 200 feet, may be approved by the City Planning Commission as a Conditional Use","unverified","C101697812",54,"https://archive.org/details/C101697812/page/n53",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:58/1",1998,1998,"1998-04-23","finding","environmental impact report",null,"City College of San Francisco Chinatown/North Beach campus · units: loss of 21 housing units","unverified","C101697812",58,"https://archive.org/details/C101697812/page/n57",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:58/2",1998,1998,"1998-04-23","finding","environmental impact report",null,"City College of San Francisco Chinatown/North Beach campus · finding: loss of 21 residential units substantially inconsistent with General Plan housing policies","unverified","C101697812",58,"https://archive.org/details/C101697812/page/n57",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119703507:61/1",1998,1998,"1998-07-15","finding","environmental impact report",null,"Mission Campus project · finding: no significant architectural resources on the project site; preservation of existing buildings not required to be considered","unverified","C119703507",61,"https://archive.org/details/C119703507/page/n60",null,null,null,"City College of San Francisco Mission Campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119703507:61/3",1998,1998,"1998-07-15","finding","environmental impact report",null,"Mission Campus project · finding: expected building height generally established to conform with overall building heights in the neighborhood; no specific building designs prepared","unverified","C119703507",61,"https://archive.org/details/C119703507/page/n60",null,null,null,"City College of San Francisco Mission Campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:239/4",1998,1998,"1998-07-16","project","environmental impact report",null,"City College of San Francisco Chinatown/North Beach campus · height ft: proposed seven- and eight-story building","unverified","C101697894",239,"https://archive.org/details/C101697894/page/n238","Columbus Avenue",null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:95/4",1998,1998,"August 1996","finding","environmental impact report",null,"August 1996 Page & Turnbull study · other: background information for the 1996 SEIR on architectural and historical resources near the project site","unverified","C101697894",95,"https://archive.org/details/C101697894/page/n94",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:25/3",1998,1998,"December 1996","project","environmental impact report",null,"Senior housing, Catholic Center/School and parking project · approved: approved for senior housing, a Catholic Center/School, and parking","unverified","C101697812",25,"https://archive.org/details/C101697812/page/n24",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:148/4",1998,1998,"May 20, 1998","event","environmental impact report",null,"Landmarks Preservation Advisory Board · event: Board lacked a quorum to jointly consider the Draft EIR, so comments were given individually","unverified","C101697894",148,"https://archive.org/details/C101697894/page/n147",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:148/1",1998,1998,"May 22, 1998","finding","environmental impact report",null,"Columbo Building · finding: Demolition would cause a significant adverse impact on the historic resources of the project site","unverified","C101697894",148,"https://archive.org/details/C101697894/page/n147",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:148/2",1998,1998,"May 22, 1998","finding","environmental impact report",null,"Columbo Building · finding: Proposed mitigations would not reduce the demolition impact to a non-significant level","unverified","C101697894",148,"https://archive.org/details/C101697894/page/n147",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697894:148/3",1998,1998,"May 22, 1998","finding","environmental impact report",null,"Columbo Building · finding: Commenter disagrees that the demolition impact is unavoidable (DEIR p. 68)","unverified","C101697894",148,"https://archive.org/details/C101697894/page/n147",null,null,null,"City College of San Francisco Chinatown/North Beach campus : comments and responses","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101697812:179/7",1998,1998,"a few months after 1996 tank removal","finding","environmental impact report",null,"City College Chinatown/North Beach campus project site · finding: Soil samples found no volatile or semivolatile organic compounds, PAHs, or petroleum hydrocarbons","unverified","C101697812",179,"https://archive.org/details/C101697812/page/n178",null,null,null,"City College of San Francisco Chinatown/North Beach campus : draft environmental impact report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922531:530/3",2000,2015,"2015","finding","environmental impact report",null,"Candlestick Point Stadium and Retail/Entertainment Center project · finding: Freeway LOS substantially degraded; U.S. 101 and I-280 in project vicinity would operate at LOS F","unverified","C124922531",530,"https://archive.org/details/C124922531/page/n529","U.S. 101; I-280",null,null,"Final environmental impact statement for the disposal and reuse of Hunters Point Shipyard","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:2/10",2021,2021,"","measure","environmental impact report",null,"San Francisco Gateway Project · other: seven new curb cuts of varying widths","unverified","C119705240",2,"https://archive.org/details/C119705240/page/n1",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:2/11",2021,2021,"","building","environmental impact report",null,"Buildings A and B · floor area sqft: 35,000 gross square feet of ground-floor maker space each","unverified","C119705240",2,"https://archive.org/details/C119705240/page/n1",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:2/12",2021,2021,"","building","environmental impact report",null,"Buildings A and B · floor area sqft: 8,400 gross square feet of ground-floor retail space each","unverified","C119705240",2,"https://archive.org/details/C119705240/page/n1",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:2/13",2021,2021,"","action","environmental impact report",null,"San Francisco Gateway Project · other: approximately 7,000 vibratory replacement stone columns extended 25 feet deep","unverified","C119705240",2,"https://archive.org/details/C119705240/page/n1",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:2/2",2021,2021,"","action","environmental impact report",null,"San Francisco Gateway Project · demolished: four existing single-story buildings, 448,000 gross square feet","unverified","C119705240",2,"https://archive.org/details/C119705240/page/n1",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:2/3",2021,2021,"","project","environmental impact report",null,"San Francisco Gateway Project · floor area sqft: two new buildings total 2,160,000 gross square feet","unverified","C119705240",2,"https://archive.org/details/C119705240/page/n1",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:2/4",2021,2021,"","building","environmental impact report",null,"Buildings A and B · height ft: 97 feet tall","unverified","C119705240",2,"https://archive.org/details/C119705240/page/n1",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:2/5",2021,2021,"","building","environmental impact report",null,"Buildings A and B · height ft: maximum height 115 feet including rooftop appurtenances","unverified","C119705240",2,"https://archive.org/details/C119705240/page/n1",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:2/6",2021,2021,"","building","environmental impact report",null,"Buildings A and B · stories: three-story buildings","unverified","C119705240",2,"https://archive.org/details/C119705240/page/n1",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:2/9",2021,2021,"","measure","environmental impact report",null,"San Francisco Gateway Project · other: new 10-foot-wide sidewalks along the site perimeter","unverified","C119705240",2,"https://archive.org/details/C119705240/page/n1","Selby Street",null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:20/2",2021,2021,"","site","environmental impact report",null,"San Francisco Gateway Project site · other: Site bounded by Kirkwood Avenue to the north, Rankin Street to the east, McKinnon Avenue to the south and Toland Street to the west","unverified","C119705240",20,"https://archive.org/details/C119705240/page/n19","Kirkwood Avenue",null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:20/3",2021,2021,"","property_record","environmental impact report",null,"existing one-story PDR building · demolished: existing one-story building with PDR space","unverified","C119705240",20,"https://archive.org/details/C119705240/page/n19",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:20/4",2021,2021,"","building","environmental impact report",null,"Gateway new buildings · height ft: each new building 97 feet tall, maximum height 115 feet including roof structures","unverified","C119705240",20,"https://archive.org/details/C119705240/page/n19",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:20/5",2021,2021,"","project","environmental impact report",null,"Gateway new buildings · floor area sqft: two new buildings total floor area including PDR space, parking and ground-floor retail","unverified","C119705240",20,"https://archive.org/details/C119705240/page/n19",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:20/6",2021,2021,"","building","environmental impact report",null,"Gateway new buildings · floor area sqft: each building has 35,000 sq ft of ground-floor production space","unverified","C119705240",20,"https://archive.org/details/C119705240/page/n19",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:6/2",2021,2021,"","site","environmental impact report",null,"San Francisco Gateway Project site · other: Site bounded by Kirkwood Avenue to north, Rankin Street to east, McKinnon Avenue to south, Toland Street to west","unverified","C119705240",6,"https://archive.org/details/C119705240/page/n5","Kirkwood Avenue",null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:6/3",2021,2021,"","measure","environmental impact report",null,"San Francisco Gateway Project · demolished: Four existing one-story buildings occupied by PDR space","unverified","C119705240",6,"https://archive.org/details/C119705240/page/n5",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:7/1",2021,2021,"","alternative","environmental impact report",null,"San Francisco Gateway Project · alternative: Variante ampliada del paisaje urbano (expanded streetscape variant)","unverified","C119705240",7,"https://archive.org/details/C119705240/page/n6",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:7/2",2021,2021,"","finding","environmental impact report",null,"San Francisco Gateway Project · finding: EIR required before any final decision on project approval","unverified","C119705240",7,"https://archive.org/details/C119705240/page/n6",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:7/4",2021,2021,"","project","environmental impact report",null,"San Francisco Gateway Project · other: Approximately 7,000 replacement stone columns, 25 ft deep, for ground improvement","unverified","C119705240",7,"https://archive.org/details/C119705240/page/n6",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:7/5",2021,2021,"","project","environmental impact report",null,"San Francisco Gateway Project · other: Approximately 900 auger cast-in-place piles, 60 ft deep, no pile driving","unverified","C119705240",7,"https://archive.org/details/C119705240/page/n6",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:7/6",2021,2021,"","project","environmental impact report",null,"San Francisco Gateway Project · other: Foundation excavation about 10 ft below existing grade","unverified","C119705240",7,"https://archive.org/details/C119705240/page/n6",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:7/7",2021,2021,"","project","environmental impact report",null,"San Francisco Gateway Project · other: Approximately 140,600 cubic yards of soil excavated","unverified","C119705240",7,"https://archive.org/details/C119705240/page/n6",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:7/3",2021,2021,"9 de marzo de 2022 a 8 de abril de 2022","event","environmental impact report",null,"San Francisco Gateway Project · event: Comment period on initial study and EIR scope (30 days, ends 5 p.m.)","unverified","C119705240",7,"https://archive.org/details/C119705240/page/n6",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:21/1",2021,2021,"March 2022","project","environmental impact report",null,"San Francisco Gateway Project · other: Approximately 140,600 cubic yards of soil would be excavated","unverified","C119705240",21,"https://archive.org/details/C119705240/page/n20",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:21/2",2021,2021,"March 2022","project","environmental impact report",null,"San Francisco Gateway Project · other: Drilled piles to a depth of 60 feet to support adaptive reuse buildings","unverified","C119705240",21,"https://archive.org/details/C119705240/page/n20",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:11/4",2021,2021,"Marso 2022","measure","environmental impact report",null,"San Francisco Gateway Project · proposes: seven new driveway ramps of varying widths, one for each new building","unverified","C119705240",11,"https://archive.org/details/C119705240/page/n10",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:11/5",2021,2021,"Marso 2022","measure","environmental impact report",null,"San Francisco Gateway Project · other: approximately 7,000 replacement stone columns to 25 feet deep for ground improvement","unverified","C119705240",11,"https://archive.org/details/C119705240/page/n10",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:11/6",2021,2021,"Marso 2022","measure","environmental impact report",null,"San Francisco Gateway Project · other: approximately 900 auger cast piles to 60 feet deep","unverified","C119705240",11,"https://archive.org/details/C119705240/page/n10",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C119705240:11/7",2021,2021,"Marso 2022","measure","environmental impact report",null,"San Francisco Gateway Project · other: approximately 140,600 cubic yards of soil to be excavated","unverified","C119705240",11,"https://archive.org/details/C119705240/page/n10",null,null,null,"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","n","a",0,-1.0]]}