{"id":null,"ids":[],"kind":"named in documents","name":"redevelopment area","tied_by":"name","block":null,"release":"v0.7.1","rows_columns":["t","id","year","y","date","kind","topic","outcome","summary","tier","source","leaf","scan","addr","quote","note","title","how","g","rec","sc"],"rows":[["d","qipu:sf/decision/journalofproceed412sanfrich:1048/1",1946,1946,"1946-04-08","communication","redevelopment","referred","City Planning Commission sent a report recommending a redevelopment area in San Francisco, referred to the Public Buildings committee.","quoted","journalofproceed412sanfrich",1048,"https://archive.org/details/journalofproceed412sanfrich/page/n1048",null,"From the City Planning Commission, making report and recommendations concerning establishment of a redevelopment area",null,null,"n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:55/2",1957,1948,"1948","site","plan",null,"Redevelopment Area D · use: industrial, 45 acres","unverified","C124886280",55,"https://archive.org/details/C124886280/page/n54",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:23/1",1957,1948,"1948 and 1956","finding","plan",null,"South of Market Redevelopment Area D · other: gain of 6.6 acres in industrial use, the most striking change in use in the area","unverified","C124886280",23,"https://archive.org/details/C124886280/page/n22",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:23/3",1957,1948,"1948 to 1956","finding","plan",null,"South of Market Redevelopment Area D · other: loss of one acre of residential use between the 1948 and 1956 surveys","unverified","C124886280",23,"https://archive.org/details/C124886280/page/n22",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:23/2",1957,1948,"1948 to survey of fall 1956","finding","plan",null,"South of Market Redevelopment Area D · other: vacant land reduced from 4.56 acres in 1948 to 2 acres at the time of the survey","unverified","C124886280",23,"https://archive.org/details/C124886280/page/n22",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["d","qipu:sf/decision/journalofproceed43sanfrich:225/2",1948,1948,"1948-03-29","resolution","redevelopment","passed","Resolution set the location and time for a public hearing on a proposed redevelopment area ordinance, held in Civic Auditorium.","quoted","journalofproceed43sanfrich",225,"https://archive.org/details/journalofproceed43sanfrich/page/n224",null,"Designating Location and Time for Special Meeting of Board of Supervisors for Purpose of Public Hearing",null,null,"n","a",0,6.79],["d","qipu:sf/decision/journalofproceed43sanfrich:480/1",1948,1948,"1948-06-02","ordinance","redevelopment","continued","Proposed ordinance designating a redevelopment area was held in abeyance pending a June 3 public hearing on urban redevelopment.","quoted","journalofproceed43sanfrich",480,"https://archive.org/details/journalofproceed43sanfrich/page/n479",null,"Ordinance Designating and Describing a Redevelopment Area Within the City and County of San Francisco as Defined",null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed43sanfrich:485/1",1948,1948,"1948-06-03","ordinance","redevelopment",null,"Public hearing held on Bill No. 5253 proposing to establish a redevelopment area under state community redevelopment law.","quoted","journalofproceed43sanfrich",485,"https://archive.org/details/journalofproceed43sanfrich/page/n484",null,"to read Bill No. 5253, establishing a redevelopment area pursuant to the provisions of the Community Redevelopment Act",null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed43sanfrich:557/1",1948,1948,"1948-07-12","ordinance","redevelopment","continued","Ordinance designating a redevelopment area in San Francisco was deferred after Committee of the Whole discussion, continued to July 12, 1948.","quoted","journalofproceed43sanfrich",557,"https://archive.org/details/journalofproceed43sanfrich/page/n556",null,"An Ordinance Designating and Describing a Redevelopment Area Within the City and County of San",null,null,"n","a",0,0.5],["d","qipu:sf/decision/journalofproceed43sanfrich:558/1",1948,1948,"1948-07-12","ordinance","redevelopment","continued","Consideration of a Western Addition redevelopment area ordinance was continued one week amid eviction concerns.","quoted","journalofproceed43sanfrich",558,"https://archive.org/details/journalofproceed43sanfrich/page/n557",null,"An Ordinance Designating and Describing a Redevelopment Area Within the City and County of San Francisco as Defined in",null,null,"n","a",0,6.0],["d","qipu:sf/decision/journalofproceed43sanfrich:585/1",1948,1948,"1948-07-19","ordinance","redevelopment","passed first reading","Supervisor MacPhee moved that an ordinance designating a redevelopment area pass; displaced tenants' return rights were questioned.","quoted","journalofproceed43sanfrich",585,"https://archive.org/details/journalofproceed43sanfrich/page/n584",null,"An Ordinance Designating and Describing a Redevelopment Area Within the City and County",null,null,"n","a",0,4.0],["d","qipu:sf/decision/journalofproceed43sanfrich:622/2",1948,1948,"1948-08-02","ordinance","redevelopment",null,"Ordinance designating a redevelopment area was debated; Supervisor Mead's remarks on moving 80,000 Western Addition residents were ruled out of order.","quoted","journalofproceed43sanfrich",622,"https://archive.org/details/journalofproceed43sanfrich/page/n621",null,"An Ordinance Designating and Describing a Redevelopment Area Within the City and County of San Francisco as Defined in",null,null,"n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:37/2",1957,1948,"1948-1956","finding","plan",null,"South of Market Redevelopment Area D ground floor use table · other: Source: Department of City Planning Land Use Maps","unverified","C124886280",37,"https://archive.org/details/C124886280/page/n36",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:55/4",1957,1948,"1948-1956","site","plan",null,"Redevelopment Area D · other: one acre taken out of residential use","unverified","C124886280",55,"https://archive.org/details/C124886280/page/n54",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124924478:13/1",1964,1948,"1948-1964","event","study or report",null,"Western Addition Redevelopment Area A · adopted: Board of Supervisors designated the Western Addition as Redevelopment Area A by ordinances","unverified","C124924478",13,"https://archive.org/details/C124924478/page/n12",null,null,null,"Report on the redevelopment plan for the Western Addition approved redevelopment project area A-2","n","m",0,4.0],["d","qipu:sf/decision/annualreportofd1948sanf_0|59",1950,1950,null,"other",null,null,"Redevelopment area west of Van Ness advised on sewer rebuilding needs","unverified","annualreportofd1948sanf_0",617,"https://archive.org/details/annualreportofd1948sanf_0/page/n616",null,"The Agency was also advised as to existing sewers and future reconstruction required in their redevelopment area west of Van Ness Avenue between Geary and Eddy Streets.",null,null,"n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:93/5",1957,1950,"1950","finding","plan",null,"South of Market Redevelopment Area D dwelling units · other: overcrowding three times the City average","unverified","C124886280",93,"https://archive.org/details/C124886280/page/n92",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:93/6",1957,1950,"1950","finding","plan",null,"South of Market Redevelopment Area D dwelling units · other: 54.5% of dwelling units lacked private toilet and bathing facilities or were dilapidated","unverified","C124886280",93,"https://archive.org/details/C124886280/page/n92",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:93/7",1957,1950,"1950","finding","plan",null,"South of Market Redevelopment Area D dwelling units · other: 17.6% of dwelling units lacked running water or were dilapidated","unverified","C124886280",93,"https://archive.org/details/C124886280/page/n92",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["d","qipu:sf/decision/journalofproceed45sanfrich:659/3",1950,1950,"1950-07-03","ordinance","redevelopment","continued","Consideration of Redevelopment Area B in Diamond Heights was continued one week on Halley's motion.","quoted","journalofproceed45sanfrich",659,"https://archive.org/details/journalofproceed45sanfrich/page/n656",null,"Designating and Describing. Within the City and County of San Francisco, a Redevelopment Area as Defined in and Pursuant to the Community",null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed45sanfrich:671/1",1950,1950,"1950-07-10","ordinance","redevelopment","passed","Diamond Heights designated as Redevelopment Area B and adopted after the Board's roll call, with Redevelopment Agency explanation.","quoted","journalofproceed45sanfrich",671,"https://archive.org/details/journalofproceed45sanfrich/page/n668",null,"Designating and Describing. Within the City and County of San Francisco, a Redevelopment Area as Defined in and Pursuant",null,null,"n","a",0,6.16],["d","qipu:sf/decision/journalofproceed45sanfrich|407",1950,1950,"1950-07-10","ordinance","the-street","passed first reading","Redevelopment area between Portola Drive and Laidley Street; passed first reading only","unverified","journalofproceed45sanfrich",671,"https://archive.org/details/journalofproceed45sanfrich/page/n668",null,"Ordinance No (Series of 1939). (Proposed boundaries of area: On the North. Clipper Street Extension and Portola Drive; on the west, O'Shaughntv<sy Boulevard; along the southern boundary. Bosworth. Elk, .Sussex. Castro and Laidlcy Streets; along the eastern boundary. Laidley. Thirtieth. Castro, Valle",null,null,"n","a",0,6.61],["d","qipu:sf/decision/journalofproceed45sanfrich:709/4",1950,1950,"1950-07-24","ordinance","redevelopment","passed","Diamond Heights designated Redevelopment Area B, bounded by Portola Drive, O'Shaughnessy Boulevard and Douglass Street; finally passed.","quoted","journalofproceed45sanfrich",709,"https://archive.org/details/journalofproceed45sanfrich/page/n706",null,"Designating and Describing, Within the City and County of San Francisco, a Redevelopment Area as Defined in and Pursuant to the Community",null,null,"n","a",0,9.79],["d","qipu:sf/decision/journalofproceed47sanfrich:80/1",1952,1952,"1952-01-28","resolution","redevelopment","referred","Supervisors sent back to committee the proposed John McLaren Park redevelopment area designation.","quoted","journalofproceed47sanfrich",80,"https://archive.org/details/journalofproceed47sanfrich/page/n79",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed47sanfrich|64",1952,1952,"1952-01-28","motion","running-the-city","referred","[name withheld] redevelopment area sent back to committee","unverified","journalofproceed47sanfrich",80,"https://archive.org/details/journalofproceed47sanfrich/page/n79",null,null,null,null,"n","a",0,2.0],["d","qipu:sf/decision/journalofproceed47sanfrich:111/5",1952,1952,"1952-02-11","resolution","redevelopment","referred","A proposed redevelopment area around John McLaren Park was re-referred to committee after Supervisor Lewis doubted new areas.","quoted","journalofproceed47sanfrich",111,"https://archive.org/details/journalofproceed47sanfrich/page/n110",null,null,null,null,"n","a",0,1.5],["d","qipu:sf/decision/journalofproceed47sanfrich:112/1",1952,1952,"1952-02-11","resolution","redevelopment","referred","Proposed Redevelopment Area C around John McLaren Park was sent back to committee on a 5-4 vote.","quoted","journalofproceed47sanfrich",112,"https://archive.org/details/journalofproceed47sanfrich/page/n111",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed47sanfrich|89",1952,1952,"1952-02-11","resolution","public-money","referred","New redevelopment area sent back to committee","unverified","journalofproceed47sanfrich",111,"https://archive.org/details/journalofproceed47sanfrich/page/n110",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed47sanfrich:318/3",1952,1952,"1952-04-07","resolution","redevelopment","continued","Designation of the John McLaren Park redevelopment area was continued for one week.","quoted","journalofproceed47sanfrich",318,"https://archive.org/details/journalofproceed47sanfrich/page/n315",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed47sanfrich:336/1",1952,1952,"1952-04-14","resolution","redevelopment","passed","Redevelopment Area C around John McLaren Park designated, with boundaries from Brussels Street to Spreckels Street.","quoted","journalofproceed47sanfrich",336,"https://archive.org/details/journalofproceed47sanfrich/page/n333",null,null,null,null,"n","a",0,7.29],["d","qipu:sf/decision/journalofproceed47sanfrich:795/5",1952,1952,"1952-09-08","resolution","redevelopment","passed","The Board adopted a contract for a federal advance to fund final planning of the Diamond Heights redevelopment area B-1.","quoted","journalofproceed47sanfrich",795,"https://archive.org/details/journalofproceed47sanfrich/page/n792",null,null,null,null,"n","a",0,6.66],["d","qipu:sf/decision/journalofproceed47sanfrich:798/1",1952,1952,"1952-09-08","ordinance","redevelopment","passed first reading","Ordinance correcting the legal description and western boundary of the Western Additional Redevelopment Area passed for second reading.","quoted","journalofproceed47sanfrich",798,"https://archive.org/details/journalofproceed47sanfrich/page/n795",null,null,null,null,"n","a",0,6.29],["d","qipu:sf/decision/journalofproceed47sanfrich:844/3",1952,1952,"1952-09-22","ordinance","redevelopment","passed","Western Addition Redevelopment Area legal description corrected and its western boundary relocated, passed into law.","quoted","journalofproceed47sanfrich",844,"https://archive.org/details/journalofproceed47sanfrich/page/n841",null,null,null,null,"n","a",0,6.54],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:117/6",1957,1953,"1953","event","plan",null,"South of Market Redevelopment Area D · adopted: Area D designated by the Board of Supervisors upon recommendation of the Redevelopment Agency","unverified","C124886280",117,"https://archive.org/details/C124886280/page/n116",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:121/3",1957,1953,"1953","finding","plan",null,"South of Market Redevelopment Area project feasibility study · finding: a project could not be established that would be self-sustaining or eligible for federal aid","unverified","C124886280",121,"https://archive.org/details/C124886280/page/n120",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:13/1",1957,1953,"1953","event","plan",null,"Redevelopment Area D · approved: Board of Supervisors first designated Redevelopment Area D in the South of Market district","unverified","C124886280",13,"https://archive.org/details/C124886280/page/n12",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:41/4",1957,1953,"1953 - 1954","event","plan",null,"South of Market Redevelopment Area D housing survey · other: Housing Survey South of Market 1953-1954 by San Francisco Department of Health, with Department of City Planning field survey","unverified","C124886280",41,"https://archive.org/details/C124886280/page/n40",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["d","qipu:sf/decision/journalofproceed48sanfrich:53/2",1953,1953,"1953-01-19","ordinance","redevelopment","passed first reading","Western Addition Project Area Number One tentative plan passed for second reading, establishing a redevelopment area.","quoted","journalofproceed48sanfrich",53,"https://archive.org/details/journalofproceed48sanfrich/page/n53",null,null,null,null,"n","a",0,7.29],["d","qipu:sf/decision/journalofproceed48sanfrich:65/5",1953,1953,"1953-01-26","ordinance","redevelopment","passed","Tentative plan adopted and Western Addition Project Area Number One established as a redevelopment area; passed.","quoted","journalofproceed48sanfrich",65,"https://archive.org/details/journalofproceed48sanfrich/page/n65",null,null,null,null,"n","a",0,7.16],["d","qipu:sf/decision/journalofproceed48sanfrich:258/2",1953,1953,"1953-03-30","resolution","redevelopment","referred","The South of Market Redevelopment Area D was adopted by vote, with Supervisor Christopher excused, then re-referred to committee.","quoted","journalofproceed48sanfrich",258,"https://archive.org/details/journalofproceed48sanfrich/page/n258",null,null,null,null,"n","a",0,1.5],["d","qipu:sf/decision/journalofproceed48sanfrich|203",1953,1953,"1953-03-30","resolution","land-and-building","passed","South of Market blocks designated Redevelopment Area D","unverified","journalofproceed48sanfrich",258,"https://archive.org/details/journalofproceed48sanfrich/page/n258",null,null,null,null,"n","a",0,6.24],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:43/1",1957,1953,"1953-54","site","plan",null,"South of Market Redevelopment Area D · population: Table IV population by block, 1950 Census and 1953-54 health department and survey counts, white and non-white","unverified","C124886280",43,"https://archive.org/details/C124886280/page/n42",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123314419:7/2",1954,1954,"1954","project","other",null,"Western Addition redevelopment area · other: most in need of redevelopment; to be completed first","unverified","C123314419",7,"https://archive.org/details/C123314419/page/n6",null,null,null,"You asked about redevelopment in San Francisco ... here are the answers","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123314419:7/3",1954,1954,"1954","project","other",null,"Diamond Heights redevelopment area · other: most in need of redevelopment; to be completed first","unverified","C123314419",7,"https://archive.org/details/C123314419/page/n6",null,null,null,"You asked about redevelopment in San Francisco ... here are the answers","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:73/4",1957,1954,"1954","event","plan",null,"National Housing Act · event: Act amended to allow funds for non-residential redevelopment projects like South of Market","unverified","C124886280",73,"https://archive.org/details/C124886280/page/n72",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["d","qipu:sf/decision/journalofproceed49sanfrich:736/3",1954,1954,"1954-08-16","resolution","redevelopment","continued","Board continued for one week a contract amending federal planning-fund advances for the Western Addition redevelopment area.","quoted","journalofproceed49sanfrich",736,"https://archive.org/details/journalofproceed49sanfrich/page/n735",null,null,null,null,"n","a",0,4.0],["d","qipu:sf/decision/journalofproceed49sanfrich:736/4",1954,1954,"1954-08-16","resolution","redevelopment","continued","Requisition for federal planning and survey funds for the Western Addition redevelopment area is before the Board.","quoted","journalofproceed49sanfrich",736,"https://archive.org/details/journalofproceed49sanfrich/page/n735",null,null,null,null,"n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:121/1",1957,1955,"1955","event","plan",null,"Redevelopment Area D (South of Market) · adopted: Board of Supervisors added four blocks to Redevelopment Area D","unverified","C124886280",121,"https://archive.org/details/C124886280/page/n120",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,4.0],["d","qipu:sf/decision/journalofproceed50sanfrich:123/2",1955,1955,"1955-02-14","resolution","redevelopment",null,"Designation of the South Basin Area as Redevelopment Area F was deferred and remains undecided after debate over delay.","quoted","journalofproceed50sanfrich",123,"https://archive.org/details/journalofproceed50sanfrich/page/n122",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed50sanfrich:124/2",1955,1955,"1955-02-14","resolution","redevelopment","continued","Board voted to continue for one week the proposed Redevelopment Area E covering the Wholesale Produce Market.","quoted","journalofproceed50sanfrich",124,"https://archive.org/details/journalofproceed50sanfrich/page/n123",null,null,null,null,"n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124885426:101/4",1958,1955,"1955-02-21","project","study or report",null,"Redevelopment Area E · adopted: Found and determined blighted by Board of Supervisors Resolution No. 15288, adopted February 21, 1955","unverified","C124885426",101,"https://archive.org/details/C124885426/page/n100",null,null,null,"Embarcadero-Lower Market Redevelopment Project Area E-1 : a report on the tentative redevelopment plan","n","a",0,4.0],["d","qipu:sf/decision/journalofproceed50sanfrich:317/2",1955,1955,"1955-05-09","communication","redevelopment","referred","Redevelopment Agency's progress report on declaring the South Basin Area a redevelopment area was referred to committee.","quoted","journalofproceed50sanfrich",317,"https://archive.org/details/journalofproceed50sanfrich/page/n316",null,null,null,null,"n","a",0,1.5],["d","qipu:sf/decision/journalofproceed50sanfrich:445/7",1955,1955,"1955-06-13","ordinance","redevelopment","passed first reading","$5,000 (≈ $62,862 in 2026 dollars) for plans and services in the South Basin Redevelopment Area passed on first reading.","quoted","journalofproceed50sanfrich",445,"https://archive.org/details/journalofproceed50sanfrich/page/n444",null,null,null,null,"n","a",0,6.41],["d","qipu:sf/decision/journalofproceed50sanfrich:788/4",1955,1955,"1955-10-03","motion","redevelopment","passed","The Board agreed without objection to hear the final plans for the [name withheld] as a special order on October 10.","quoted","journalofproceed50sanfrich",788,"https://archive.org/details/journalofproceed50sanfrich/page/n787",null,null,null,null,"n","a",0,1.16],["d","qipu:sf/decision/journalofproceed50sanfrich:854/3",1955,1955,"1955-10-31","ordinance","redevelopment","passed first reading","Electricity Department funds of $9,405 (≈ $118,243 in 2026 dollars) for underground districts in the Western Addition redevelopment area passed for second reading.","quoted","journalofproceed50sanfrich",854,"https://archive.org/details/journalofproceed50sanfrich/page/n853",null,null,null,null,"n","a",0,6.41],["d","qipu:sf/decision/journalofproceed50sanfrich:891/2",1955,1955,"1955-11-21","resolution","redevelopment","continued","Designation of Redevelopment Area D was put off one week after members amended it to exclude a Mission Street parking site.","quoted","journalofproceed50sanfrich",891,"https://archive.org/details/journalofproceed50sanfrich/page/n890",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed50sanfrich:898/1",1955,1955,"1955-11-28","resolution","redevelopment","continued","Proposal to designate Redevelopment Area D and rescind Resolution 13180 was continued for two weeks.","quoted","journalofproceed50sanfrich",898,"https://archive.org/details/journalofproceed50sanfrich/page/n897",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed50sanfrich:940/2",1955,1955,"1955-12-12","resolution","redevelopment","continued","Consideration of Redevelopment Area D, covering the South of Market area, was continued for two weeks.","quoted","journalofproceed50sanfrich",940,"https://archive.org/details/journalofproceed50sanfrich/page/n939",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed50sanfrich:971/3",1955,1955,"1955-12-27","resolution","redevelopment","passed","Board adopted a resolution designating Redevelopment Area D and rescinding Resolution 13180 despite business objections.","quoted","journalofproceed50sanfrich",971,"https://archive.org/details/journalofproceed50sanfrich/page/n970",null,null,null,null,"n","a",0,7.04],["d","qipu:sf/decision/journalofproceed50sanfrich:972/1",1955,1955,"1955-12-27","resolution","redevelopment","passed","The Board adopted a resolution designating Redevelopment Area \"D\" and rescinding Resolution No. 13180, over one dissenting vote.","quoted","journalofproceed50sanfrich",972,"https://archive.org/details/journalofproceed50sanfrich/page/n971",null,null,null,null,"n","a",0,9.41],["d","qipu:sf/decision/journalofproceed50sanfrich:975/4",1955,1955,"1955-12-27","ordinance","redevelopment","passed first reading","Appropriates $25,000 (≈ $314,310 in 2026 dollars) for City Planning to study Redevelopment Area E; passed for second reading, McMahon opposed.","quoted","journalofproceed50sanfrich",975,"https://archive.org/details/journalofproceed50sanfrich/page/n974",null,null,null,null,"n","a",0,8.41],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:113/2",1957,1956,"1956","action","plan",null,"Redevelopment Area D · other: designated as Redevelopment Area D","unverified","C124886280",113,"https://archive.org/details/C124886280/page/n112",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:117/1",1957,1956,"1956","finding","plan",null,"South of Market Redevelopment Area D · finding: Earlier conditions of residential blight still exist in the South of Market Area","unverified","C124886280",117,"https://archive.org/details/C124886280/page/n116",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:117/2",1957,1956,"1956","project","plan",null,"South of Market Redevelopment Area D · proposes: Twelve and one-third blocks proposed for project study and financial assistance","unverified","C124886280",117,"https://archive.org/details/C124886280/page/n116",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:117/3",1957,1956,"1956","project","plan",null,"South of Market Redevelopment Area D · recommendation: Remaining originally designated 19 blocks and four Swig blocks recommended for de-designation","unverified","C124886280",117,"https://archive.org/details/C124886280/page/n116",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:117/4",1957,1956,"1956","project","plan",null,"South of Market Redevelopment Area D · other: Proposed rescission of Redevelopment Area D designation, proposed by Supervisor Halley","unverified","C124886280",117,"https://archive.org/details/C124886280/page/n116",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:117/5",1957,1956,"1956","project","plan",null,"South of Market Redevelopment Area D · proposes: Clear blighted residential properties principally on interior alleys; revise obsolete alley pattern","unverified","C124886280",117,"https://archive.org/details/C124886280/page/n116",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:13/2",1957,1956,"1956","event","plan",null,"Redevelopment Area D · other: designated area modified and decreased in size","unverified","C124886280",13,"https://archive.org/details/C124886280/page/n12",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:13/3",1957,1956,"1956","event","plan",null,"Redevelopment Area D · other: Board of Supervisors retained the designation despite an effort to rescind it","unverified","C124886280",13,"https://archive.org/details/C124886280/page/n12",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:39/1",1957,1956,"1956","measure","plan",null,"South of Market Redevelopment Area D, Table II · other: Approximate number of structures, open uses and vacant lots by block, from 1956 field survey","unverified","C124886280",39,"https://archive.org/details/C124886280/page/n38",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:55/3",1957,1956,"1956","site","plan",null,"Redevelopment Area D · use: industrial, 52 acres","unverified","C124886280",55,"https://archive.org/details/C124886280/page/n54",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["d","qipu:sf/decision/journalofproceed51sanfrich:12/2",1956,1956,"1956-01-03","ordinance","redevelopment","passed","City approved $25,000 (≈ $309,688 in 2026 dollars) for City Planning to study Redevelopment Area E; Supervisor Ferdon dissented.","quoted","journalofproceed51sanfrich",12,"https://archive.org/details/journalofproceed51sanfrich/page/n11",null,null,null,null,"n","a",0,9.54],["d","qipu:sf/decision/journalofproceed51sanfrich:78/3",1956,1956,"1956-01-30","motion","redevelopment","passed","Request asks City Planning Commission to explain its Chicago firm contract for the wholesale produce redevelopment area, favoring local firms.","quoted","journalofproceed51sanfrich",78,"https://archive.org/details/journalofproceed51sanfrich/page/n77",null,null,null,null,"n","a",0,6.91],["d","qipu:sf/decision/journalofproceed51sanfrich:367/4",1956,1956,"1956-05-28","ordinance","redevelopment","passed first reading","Appropriation of $62,450 (≈ $773,599 in 2026 dollars) for underground street lighting in the Western Addition redevelopment area passed for second reading.","quoted","journalofproceed51sanfrich",367,"https://archive.org/details/journalofproceed51sanfrich/page/n366",null,null,null,null,"n","a",0,6.54],["d","qipu:sf/decision/journalofproceed51sanfrich:382/6",1956,1956,"1956-06-04","ordinance","redevelopment","passed","Ordinance passed appropriating $62,450 (≈ $773,599 in 2026 dollars) to put street lighting underground in the Western Addition Redevelopment Area.","quoted","journalofproceed51sanfrich",382,"https://archive.org/details/journalofproceed51sanfrich/page/n381",null,null,null,null,"n","a",0,6.41],["d","qipu:sf/decision/journalofproceed51sanfrich:607/3",1956,1956,"1956-08-27","resolution","redevelopment","referred","Proposal to repeal the Redevelopment Area D designation was referred to the Public Buildings, Lands and City Planning Committee.","quoted","journalofproceed51sanfrich",607,"https://archive.org/details/journalofproceed51sanfrich/page/n606",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed51sanfrich:640/6",1956,1956,"1956-09-11","resolution","redevelopment","passed","The Board adopted a resolution accepting a $2,500 (≈ $30,969 in 2026 dollars) gift for the City Planning Commission's development plan for Redevelopment Area E, the Wholesale Produce District.","quoted","journalofproceed51sanfrich",640,"https://archive.org/details/journalofproceed51sanfrich/page/n639",null,null,null,null,"n","a",0,7.41],["d","qipu:sf/decision/journalofproceed51sanfrich:684/4",1956,1956,"1956-10-01","resolution","redevelopment","passed","Board adopted a resolution rescinding the redevelopment area designation for certain land in McLaren Park.","quoted","journalofproceed51sanfrich",684,"https://archive.org/details/journalofproceed51sanfrich/page/n683",null,null,null,null,"n","a",0,6.41],["d","qipu:sf/decision/journalofproceed51sanfrich|481",1956,1956,"1956-10-01","resolution","land-and-building",null,"Land in McLaren Park named Redevelopment Area C","unverified","journalofproceed51sanfrich",684,"https://archive.org/details/journalofproceed51sanfrich/page/n683",null,null,null,null,"n","a",0,2.42],["d","qipu:sf/decision/journalofproceed51sanfrich:719/5",1956,1956,"1956-10-22","resolution","redevelopment","passed","The Board adopted a resolution accepting $23,750 (≈ $294,203 in 2026 dollars) in gifts for planning work in Redevelopment Area E, the Wholesale Produce District.","quoted","journalofproceed51sanfrich",719,"https://archive.org/details/journalofproceed51sanfrich/page/n718",null,null,null,null,"n","a",0,6.41],["d","qipu:sf/decision/journalofproceed51sanfrich:796/2",1956,1956,"1956-11-26","resolution","redevelopment","passed","The Board designated Redevelopment Area D, rescinding two earlier blight designations, so improvement plans can proceed in that district.","quoted","journalofproceed51sanfrich",796,"https://archive.org/details/journalofproceed51sanfrich/page/n795",null,null,null,null,"n","a",0,7.04],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124885426:17/2",1958,1956,"August 23, 1956","action","study or report",null,"Redevelopment Area E · cost usd: Federal capital grant reservation of $5,000,000","unverified","C124885426",17,"https://archive.org/details/C124885426/page/n16",null,null,null,"Embarcadero-Lower Market Redevelopment Project Area E-1 : a report on the tentative redevelopment plan","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:5/2",1957,1956,"December 26, 1956","action","plan",null,"Redevelopment Area D preliminary planning · cost usd: $5,000 appropriated by Board of Supervisors by Ordinance No. 10050","unverified","C124886280",5,"https://archive.org/details/C124886280/page/n4",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:101/1",1957,1957,"","finding","plan",null,"South of Market Redevelopment Area D · finding: Area qualifies as a blighted area under the California Community Redevelopment Laws","unverified","C124886280",101,"https://archive.org/details/C124886280/page/n100",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:105/1",1957,1957,"","finding","plan",null,"South of Market Redevelopment Area D · finding: qualifies as eligible for Federal aid as a slum area and a deteriorated and deteriorating area","unverified","C124886280",105,"https://archive.org/details/C124886280/page/n104",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:105/2",1957,1957,"","finding","plan",null,"South of Market Redevelopment Area D · finding: contains a substantial number of slum, blighted, deteriorated, or deteriorating dwellings; not appropriate for predominantly residential uses","unverified","C124886280",105,"https://archive.org/details/C124886280/page/n104",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:105/3",1957,1957,"","finding","plan",null,"South of Market Redevelopment Area D · finding: elimination of blight which has produced dangerous and unhealthful living conditions and economic stagnation","unverified","C124886280",105,"https://archive.org/details/C124886280/page/n104",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:105/4",1957,1957,"","action","plan",null,"South of Market Redevelopment Area D · proposes: making available new sites for industrial and commercial purposes","unverified","C124886280",105,"https://archive.org/details/C124886280/page/n104",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:105/5",1957,1957,"","action","plan",null,"South of Market Redevelopment Area D · other: more job opportunities, increased payrolls, reduced municipal expenditures and increased tax yield to the city","unverified","C124886280",105,"https://archive.org/details/C124886280/page/n104",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:109/1",1957,1957,"","finding","plan",null,"South of Market Redevelopment Area D · finding: Area not appropriate for redevelopment for predominantly residential uses due to commercial and industrial nature","unverified","C124886280",109,"https://archive.org/details/C124886280/page/n108",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:109/2",1957,1957,"","measure","plan",null,"South of Market Redevelopment Area D · cost usd: Federal Capital Grant reservation requested $4,000,000","unverified","C124886280",109,"https://archive.org/details/C124886280/page/n108",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:109/3",1957,1957,"","measure","plan",null,"South of Market Redevelopment Area D · cost usd: Disposition proceeds $3,570,000","unverified","C124886280",109,"https://archive.org/details/C124886280/page/n108",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:109/4",1957,1957,"","measure","plan",null,"South of Market Redevelopment Area D · cost usd: Net project cost $6,000,000","unverified","C124886280",109,"https://archive.org/details/C124886280/page/n108",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:109/5",1957,1957,"","measure","plan",null,"South of Market Redevelopment Area D · cost usd: Local grants-in-aid required $2,000,000","unverified","C124886280",109,"https://archive.org/details/C124886280/page/n108",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:111/1",1957,1957,"","project","plan",null,"Preliminary Redevelopment Plan, Project Area D-1, South of Market Redevelopment Area · other: Project area bounded by the center lines of Eighth, Harrison, Hawthorne, Folsom, Third, Natoma and Fourth Streets","unverified","C124886280",111,"https://archive.org/details/C124886280/page/n110","Eighth Street",null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:111/2",1957,1957,"","project","plan",null,"Preliminary Redevelopment Plan, Project Area D-1, South of Market Redevelopment Area · other: Comprises Assessor's Blocks 3734, 3751, 3752, 3753, 3754, 3755, and portions of Assessor's Blocks 3723 and 3750","unverified","C124886280",111,"https://archive.org/details/C124886280/page/n110",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:111/3",1957,1957,"","measure","plan",null,"Project Area D-1 land use · use: Predominately industrial: C-M Heavy Commercial and M-1 Light Industrial, plus a public park area","unverified","C124886280",111,"https://archive.org/details/C124886280/page/n110",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:113/4",1957,1957,"","project","plan",null,"South of Market Redevelopment Area D project · proposes: elimination or widening of narrow interior alleys so all parcels accessible from a street at least 50 feet wide","unverified","C124886280",113,"https://archive.org/details/C124886280/page/n112",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:115/1",1957,1957,"","finding","plan",null,"Proposed redevelopment (South of Market Redevelopment Area) · finding: conforms to the Master Plan of San Francisco","unverified","C124886280",115,"https://archive.org/details/C124886280/page/n114",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:119/1",1957,1957,"","project","plan",null,"Redevelopment Area South of Market (Area D) · other: designated by the legislative body to remove residential pockets and create larger industrial parcels","unverified","C124886280",119,"https://archive.org/details/C124886280/page/n118",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:119/2",1957,1957,"","finding","plan",null,"South of Market redevelopment area cleared portions · other: industrial use is in conformity with the Land Use Plan and zoning ordinance, which classify the area as industrial","unverified","C124886280",119,"https://archive.org/details/C124886280/page/n118",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:121/2",1957,1957,"","finding","plan",null,"Four blocks added to Redevelopment Area D · finding: only one and one-third blocks sufficiently blighted to qualify under Community Redevelopment Law","unverified","C124886280",121,"https://archive.org/details/C124886280/page/n120",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:125/1",1957,1957,"","recommendation","plan",null,"Redevelopment Area D · recommendation: Modify boundaries of Redevelopment Area D to include the twelve and one-third blocks now eligible for federal aid","unverified","C124886280",125,"https://archive.org/details/C124886280/page/n124","Ninth, Mission, Sixth, Folsom, Fourth, Natoma, Third, Folsom, Hawthorne, Harrison, Eighth, Howard",null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:125/2",1957,1957,"","recommendation","plan",null,"Redevelopment Area D · other: Remove two and two-thirds Swig blocks, the freeway blocks, and two blocks below Bryant Street from the designated area","unverified","C124886280",125,"https://archive.org/details/C124886280/page/n124",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:125/3",1957,1957,"","recommendation","plan",null,"Redevelopment Area D project · recommendation: Board of Supervisors to authorize a project application to the federal government for a planning advance and capital grant","unverified","C124886280",125,"https://archive.org/details/C124886280/page/n124",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:125/4",1957,1957,"","recommendation","plan",null,"Redevelopment Area D project · recommendation: Project to be carried out as spot clearance of nonindustrial or blighted industrial uses, not total clearance","unverified","C124886280",125,"https://archive.org/details/C124886280/page/n124",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:129/1",1957,1957,"","action","plan",null,"South of Market Redevelopment Area D utility maps · other: Maps of existing and private utilities prepared at a scale of 100 feet to one inch, on file in the Department of City Planning","unverified","C124886280",129,"https://archive.org/details/C124886280/page/n128",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:13/4",1957,1957,"","recommendation","plan",null,"Redevelopment Area D · proposes: removal of residential uses from the area","unverified","C124886280",13,"https://archive.org/details/C124886280/page/n12",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:13/5",1957,1957,"","recommendation","plan",null,"Redevelopment Area D · proposes: creation of larger parcels of land for industrial use","unverified","C124886280",13,"https://archive.org/details/C124886280/page/n12",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:13/7",1957,1957,"","site","plan",null,"Redevelopment Area D · other: bounded by Mission, Ninth, Howard, Eighth, Harrison, Hawthorne, Folsom, Third, Natoma, Fourth, Folsom, Sixth and Mission Streets","unverified","C124886280",13,"https://archive.org/details/C124886280/page/n12","Mission Street",null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:13/8",1957,1957,"","site","plan",null,"Redevelopment Area D · other: includes southern one-third of Assessor's Block 3723 and all of Blocks 3726, 3728, 3730, 3731","unverified","C124886280",13,"https://archive.org/details/C124886280/page/n12",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:13/9",1957,1957,"","site","plan",null,"Redevelopment Area D · other: includes all of Blocks 3734 and 3751-3755 and western half of Block 3750","unverified","C124886280",13,"https://archive.org/details/C124886280/page/n12",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:17/2",1957,1957,"","finding","plan",null,"South of Market Redevelopment Area D · finding: many industries have left the city for greener pastures across the Bay or down the Peninsula","unverified","C124886280",17,"https://archive.org/details/C124886280/page/n16",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:17/3",1957,1957,"","finding","plan",null,"South of Market Redevelopment Area D · finding: an almost total lack of off-street parking and loading space","unverified","C124886280",17,"https://archive.org/details/C124886280/page/n16",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:17/4",1957,1957,"","recommendation","plan",null,"South of Market Redevelopment Area D · recommendation: additional land be made available to conserve industrial plants and allow off-street parking and loading","unverified","C124886280",17,"https://archive.org/details/C124886280/page/n16",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:25/1",1957,1957,"","site","plan",null,"South of Market Redevelopment Area D · other: approximately 990 lots and more than 800 separate owners","unverified","C124886280",25,"https://archive.org/details/C124886280/page/n24",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:25/10",1957,1957,"","site","plan",null,"Local service stores in South of Market Redevelopment Area D · other: 69 vacancies in local service stores, 63 in blocks with hotels","unverified","C124886280",25,"https://archive.org/details/C124886280/page/n24",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:25/11",1957,1957,"","site","plan",null,"Restaurants in South of Market Redevelopment Area D · other: 39 restaurants","unverified","C124886280",25,"https://archive.org/details/C124886280/page/n24",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:25/12",1957,1957,"","site","plan",null,"Bars in South of Market Redevelopment Area D · other: 32 bars","unverified","C124886280",25,"https://archive.org/details/C124886280/page/n24",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:25/13",1957,1957,"","site","plan",null,"Laundries and cleaners in South of Market Redevelopment Area D · other: 14 local service laundries or cleaners","unverified","C124886280",25,"https://archive.org/details/C124886280/page/n24",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:25/14",1957,1957,"","site","plan",null,"Grocery stores in South of Market Redevelopment Area D · other: 13 grocery stores, two with city-wide clientele","unverified","C124886280",25,"https://archive.org/details/C124886280/page/n24",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:25/15",1957,1957,"","site","plan",null,"Second-hand stores in South of Market Redevelopment Area D · other: 13 second-hand stores in operation","unverified","C124886280",25,"https://archive.org/details/C124886280/page/n24",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:25/16",1957,1957,"","site","plan",null,"Barber shops in South of Market Redevelopment Area D · other: nine barber shops","unverified","C124886280",25,"https://archive.org/details/C124886280/page/n24",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:25/2",1957,1957,"","site","plan",null,"South of Market Redevelopment Area D · units: 1533 dwelling units","unverified","C124886280",25,"https://archive.org/details/C124886280/page/n24",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:25/3",1957,1957,"","building","plan",null,"South of Market Redevelopment Area D · other: 67 two-family buildings","unverified","C124886280",25,"https://archive.org/details/C124886280/page/n24",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:25/4",1957,1957,"","building","plan",null,"South of Market Redevelopment Area D · other: 108 apartment houses for three or four families","unverified","C124886280",25,"https://archive.org/details/C124886280/page/n24",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:25/5",1957,1957,"","building","plan",null,"South of Market Redevelopment Area D · other: some 66 apartment houses containing five or more dwelling units","unverified","C124886280",25,"https://archive.org/details/C124886280/page/n24",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:25/6",1957,1957,"","site","plan",null,"Hotels in South of Market Redevelopment Area D · other: 77 hotels","unverified","C124886280",25,"https://archive.org/details/C124886280/page/n24","Third Street",null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:25/7",1957,1957,"","site","plan",null,"Hotels in South of Market Redevelopment Area D · other: 58 hotels clustered along Third Street, Howard Street and Sixth Street","unverified","C124886280",25,"https://archive.org/details/C124886280/page/n24","Third Street",null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:25/8",1957,1957,"","site","plan",null,"Hotels in South of Market Redevelopment Area D · other: 19 hotels scattered throughout the area","unverified","C124886280",25,"https://archive.org/details/C124886280/page/n24",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:25/9",1957,1957,"","site","plan",null,"Local service stores in South of Market Redevelopment Area D · other: 204 local service stores, 176 in blocks with hotels","unverified","C124886280",25,"https://archive.org/details/C124886280/page/n24",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:29/5",1957,1957,"","finding","plan",null,"South of Market Redevelopment Area D · other: approximately 35 percent of current welfare cases are old-age security cases","unverified","C124886280",29,"https://archive.org/details/C124886280/page/n28",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:29/6",1957,1957,"","finding","plan",null,"South of Market Redevelopment Area D · other: adult population is approximately 75 percent male","unverified","C124886280",29,"https://archive.org/details/C124886280/page/n28",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:33/3",1957,1957,"","finding","plan",null,"South of Market Redevelopment Area D · other: approximately 35 percent of low-income displaced families are non-white","unverified","C124886280",33,"https://archive.org/details/C124886280/page/n32",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:33/4",1957,1957,"","finding","plan",null,"South of Market Redevelopment Area D · other: one third of persons now living in the area eligible for low-rent public housing","unverified","C124886280",33,"https://archive.org/details/C124886280/page/n32",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:35/2",1957,1957,"","recommendation","plan",null,"South of Market Redevelopment Area relocation · recommendation: census of the population to be displaced","unverified","C124886280",35,"https://archive.org/details/C124886280/page/n34",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:37/1",1957,1957,"","site","plan",null,"South of Market Redevelopment Area D · other: Ground floor uses by block, area in acres (Table I)","unverified","C124886280",37,"https://archive.org/details/C124886280/page/n36",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:47/2",1957,1957,"","site","plan",null,"Redevelopment Area D · other: industrial addresses surveyed by questionnaire mailed in the twelve blocks","unverified","C124886280",47,"https://archive.org/details/C124886280/page/n46",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:49/1",1957,1957,"","finding","plan",null,"South of Market Redevelopment Area D industries survey · finding: 75 percent of industries rent or lease their property","unverified","C124886280",49,"https://archive.org/details/C124886280/page/n48",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:49/2",1957,1957,"","finding","plan",null,"South of Market Redevelopment Area D industries survey · finding: Two firms reporting payroll of 265 persons each, the highest number reported","unverified","C124886280",49,"https://archive.org/details/C124886280/page/n48",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:49/3",1957,1957,"","finding","plan",null,"South of Market Redevelopment Area D industries survey · finding: Interest in redevelopment participation: 55 firms would acquire adjacent property, 65 firms would acquire new sites, 84 firms would occupy new facilities","unverified","C124886280",49,"https://archive.org/details/C124886280/page/n48",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:61/2",1957,1957,"","project","plan",null,"Redevelopment Project Area D-1 · acreage: 61 acres","unverified","C124886280",61,"https://archive.org/details/C124886280/page/n60",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:61/3",1957,1957,"","project","plan",null,"South of Market Redevelopment Area D · acreage: 102 acres","unverified","C124886280",61,"https://archive.org/details/C124886280/page/n60",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:77/1",1957,1957,"","finding","plan",null,"South of Market Redevelopment Area D · other: Financing method and amount cannot be definitely decided until Redevelopment Agency submits application for Capital Grant Reservation and Preliminary Planning Advance to Urban Renewal Administration","unverified","C124886280",77,"https://archive.org/details/C124886280/page/n76",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:77/2",1957,1957,"","action","plan",null,"South of Market Redevelopment Area D Preliminary Plan · approved: Recommended Preliminary Plan, when accepted by City Planning Commission, fulfills the State Law initial planning requirement","unverified","C124886280",77,"https://archive.org/details/C124886280/page/n76",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:77/3",1957,1957,"","action","plan",null,"South of Market Redevelopment Area D Tentative Plan · recommendation: Redevelopment Agency to develop a Tentative Plan and subsequently a Final Plan","unverified","C124886280",77,"https://archive.org/details/C124886280/page/n76",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:79/1",1957,1957,"","project","plan",null,"South of Market Redevelopment Area D · other: Redevelopment Agency has no budget for planning in the South of Market Area","unverified","C124886280",79,"https://archive.org/details/C124886280/page/n78",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:91/3",1957,1957,"","finding","plan",null,"South of Market Redevelopment Area D · finding: Mixed land uses produce especially undesirable effects upon the living environment","unverified","C124886280",91,"https://archive.org/details/C124886280/page/n90",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:95/1",1957,1957,"","finding","plan",null,"South of Market Redevelopment Area D · finding: 450 lots on 7 blocks, owned by approximately 400 persons or concerns","unverified","C124886280",95,"https://archive.org/details/C124886280/page/n94",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:95/2",1957,1957,"","finding","plan",null,"South of Market Redevelopment Area D · finding: three of the most blighted blocks each possess over 90 lots","unverified","C124886280",95,"https://archive.org/details/C124886280/page/n94",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:95/3",1957,1957,"","finding","plan",null,"South of Market Redevelopment Area D · finding: one block has 120 parcels, with a lot area of 2000 square feet or less on slightly more than one-half","unverified","C124886280",95,"https://archive.org/details/C124886280/page/n94",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:95/4",1957,1957,"","finding","plan",null,"South of Market Redevelopment Area D · finding: 13 lots with area of 1380 square feet (20 x 69 feet) or less, 10 of which have residential structures","unverified","C124886280",95,"https://archive.org/details/C124886280/page/n94",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:95/5",1957,1957,"","finding","plan",null,"South of Market Redevelopment Area D · finding: narrow streets and alleys range from 20 to 40 feet in width","unverified","C124886280",95,"https://archive.org/details/C124886280/page/n94",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:97/1",1957,1957,"","finding","plan",null,"South of Market Redevelopment Area D · finding: greater portion of the 112-block area upon filled land, the site of the old Mission swamp","unverified","C124886280",97,"https://archive.org/details/C124886280/page/n96",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:123/1",1957,1957,"1957","finding","plan",null,"South of Market Redevelopment Area D · finding: contains some of the most blighted housing in the city","unverified","C124886280",123,"https://archive.org/details/C124886280/page/n122",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:133/1",1957,1957,"1957","project","plan",null,"South of Market Redevelopment Area D · proposes: Study of feasibility and plan for redevelopment for industrial use","unverified","C124886280",133,"https://archive.org/details/C124886280/page/n132",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:133/2",1957,1957,"1957","project","plan",null,"South of Market Redevelopment Area D · other: Remove the existing housing","unverified","C124886280",133,"https://archive.org/details/C124886280/page/n132",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:133/3",1957,1957,"1957","project","plan",null,"South of Market Redevelopment Area D · other: Many sites available for expansion of industries and commercial enterprises after clearance","unverified","C124886280",133,"https://archive.org/details/C124886280/page/n132",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:19/1",1957,1957,"1957","measure","plan",null,"South of Market Redevelopment Area D · other: two-fold goal: removing blighted residences from central core and providing land for industry","unverified","C124886280",19,"https://archive.org/details/C124886280/page/n18",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:27/1",1957,1957,"1957","site","plan",null,"South of Market Redevelopment Area D · population: 7850 persons","unverified","C124886280",27,"https://archive.org/details/C124886280/page/n26",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:27/2",1957,1957,"1957","site","plan",null,"South of Market Redevelopment Area D · households displaced: approximately 1700 families","unverified","C124886280",27,"https://archive.org/details/C124886280/page/n26",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:27/3",1957,1957,"1957","site","plan",null,"South of Market Redevelopment Area D · other: some 3600 single individuals","unverified","C124886280",27,"https://archive.org/details/C124886280/page/n26",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:27/4",1957,1957,"1957","site","plan",null,"South of Market Redevelopment Area D · other: less than 10 percent owner occupants","unverified","C124886280",27,"https://archive.org/details/C124886280/page/n26",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:27/5",1957,1957,"1957","site","plan",null,"South of Market Redevelopment Area D · other: about one quarter of total population estimated non-white","unverified","C124886280",27,"https://archive.org/details/C124886280/page/n26",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:53/1",1957,1957,"1957","finding","plan",null,"South of Market Redevelopment Area D · finding: More than half the firms reporting state that present parking provisions are inadequate","unverified","C124886280",53,"https://archive.org/details/C124886280/page/n52",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:53/2",1957,1957,"1957","finding","plan",null,"South of Market Redevelopment Area D · finding: Dissatisfactions with the area as an industrial location stem primarily from the mixture of residential uses with industrial uses","unverified","C124886280",53,"https://archive.org/details/C124886280/page/n52",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:55/1",1957,1957,"1957","site","plan",null,"Redevelopment Area D · acreage: 102 net acres","unverified","C124886280",55,"https://archive.org/details/C124886280/page/n54",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:55/5",1957,1957,"1957","finding","plan",null,"Redevelopment Area D · finding: industrial growth precluded by inability to acquire parcels from unwilling owners and unattractive environment","unverified","C124886280",55,"https://archive.org/details/C124886280/page/n54",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:57/1",1957,1957,"1957","project","plan",null,"South of Market Redevelopment Area D · proposes: preliminary redevelopment plan recommended for a specific project area","unverified","C124886280",57,"https://archive.org/details/C124886280/page/n56",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:57/4",1957,1957,"1957","measure","plan",null,"South of Market Redevelopment Area D · other: outmoded residential properties acquired, narrow alleys widened or closed, small parcels consolidated, off-street parking and loading provided","unverified","C124886280",57,"https://archive.org/details/C124886280/page/n56",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:63/1",1957,1957,"1957","finding","plan",null,"South of Market Redevelopment Area D project area · other: The tier of blocks between Third and Fourth Streets cuts into the heart of so-called Skid Row","unverified","C124886280",63,"https://archive.org/details/C124886280/page/n62","Third Street",null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:63/2",1957,1957,"1957","project","plan",null,"South of Market Redevelopment Area D project area · other: approximately 450 lots and more than 400 separate owners","unverified","C124886280",63,"https://archive.org/details/C124886280/page/n62",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:63/3",1957,1957,"1957","project","plan",null,"South of Market Redevelopment Area D project area · proposes: clearance of all residential structures","unverified","C124886280",63,"https://archive.org/details/C124886280/page/n62",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:63/4",1957,1957,"1957","project","plan",null,"South of Market Redevelopment Area D project area · proposes: closing of some interior streets and widening and opening of others as shown on Map 2","unverified","C124886280",63,"https://archive.org/details/C124886280/page/n62",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:63/5",1957,1957,"1957","finding","plan",null,"South of Market Redevelopment Area D project area · finding: almost one quarter of structures entirely residential, occupying one tenth of net ground area","unverified","C124886280",63,"https://archive.org/details/C124886280/page/n62",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:63/6",1957,1957,"1957","finding","plan",null,"South of Market Redevelopment Area D project area · units: 503 dwelling units","unverified","C124886280",63,"https://archive.org/details/C124886280/page/n62",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:63/7",1957,1957,"1957","finding","plan",null,"South of Market Redevelopment Area D project area · other: 57 hotels in the project area","unverified","C124886280",63,"https://archive.org/details/C124886280/page/n62",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:63/8",1957,1957,"1957","finding","plan",null,"South of Market Redevelopment Area D project area · other: 43 hotels in blocks along Third Street","unverified","C124886280",63,"https://archive.org/details/C124886280/page/n62","Third Street",null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:67/1",1957,1957,"1957","recommendation","plan",null,"South of Market Redevelopment Area D · proposes: Major bounding streets (Harrison, Folsom, Howard, Eighth through Third, Hawthorne) not changed","unverified","C124886280",67,"https://archive.org/details/C124886280/page/n66","Harrison, Folsom, Howard, Eighth, Seventh, Sixth, Fifth, Fourth, Third, Hawthorne",null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:67/10",1957,1957,"1957","project","plan",null,"South of Market Redevelopment Area D · cost usd: Net project cost including overhead six million dollars","unverified","C124886280",67,"https://archive.org/details/C124886280/page/n66",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:67/11",1957,1957,"1957","project","plan",null,"South of Market Redevelopment Area D · cost usd: Capital grant of four million dollars if federally aided","unverified","C124886280",67,"https://archive.org/details/C124886280/page/n66",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:67/12",1957,1957,"1957","project","plan",null,"South of Market Redevelopment Area D · cost usd: Local aid of two million dollars if federally aided","unverified","C124886280",67,"https://archive.org/details/C124886280/page/n66",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:67/2",1957,1957,"1957","measure","plan",null,"South of Market Redevelopment Area D · proposes: Close some interior alleys and widen remaining alleys to minimum width of 50 feet","unverified","C124886280",67,"https://archive.org/details/C124886280/page/n66",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:67/3",1957,1957,"1957","recommendation","plan",null,"South of Market Redevelopment Area D · recommendation: Divide project area into parcels no smaller than 5000 square feet","unverified","C124886280",67,"https://archive.org/details/C124886280/page/n66",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:67/4",1957,1957,"1957","recommendation","plan",null,"South of Market Redevelopment Area D · recommendation: Allowable floor area not greater than five times lot size","unverified","C124886280",67,"https://archive.org/details/C124886280/page/n66",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:67/5",1957,1957,"1957","recommendation","plan",null,"South of Market Redevelopment Area D · recommendation: One off-street parking space for each 1500 square feet of floor area","unverified","C124886280",67,"https://archive.org/details/C124886280/page/n66",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:67/6",1957,1957,"1957","recommendation","plan",null,"South of Market Redevelopment Area D · recommendation: Pooled off-street parking should be within 800 feet of the building served","unverified","C124886280",67,"https://archive.org/details/C124886280/page/n66",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:67/7",1957,1957,"1957","project","plan",null,"South of Market Redevelopment Area D · acquired: Estimated 1,140,000 square feet of land to be acquired","unverified","C124886280",67,"https://archive.org/details/C124886280/page/n66",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:67/8",1957,1957,"1957","project","plan",null,"South of Market Redevelopment Area D · cost usd: Land and improvements acquisition estimated at eight dollars per square foot average","unverified","C124886280",67,"https://archive.org/details/C124886280/page/n66",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:67/9",1957,1957,"1957","project","plan",null,"South of Market Redevelopment Area D · sold: Cleared land to sell at average three dollars per square foot","unverified","C124886280",67,"https://archive.org/details/C124886280/page/n66",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:69/1",1957,1957,"1957","project","plan",null,"South of Market Redevelopment Area D · other: Creation of desirable sites for industry through the redevelopment process","unverified","C124886280",69,"https://archive.org/details/C124886280/page/n68",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:69/2",1957,1957,"1957","recommendation","plan",null,"South of Market Redevelopment Area D · recommendation: Project area is recommended as feasible and its success expected to stimulate future redevelopment","unverified","C124886280",69,"https://archive.org/details/C124886280/page/n68",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:71/1",1957,1957,"1957","measure","plan",null,"South of Market Redevelopment Area D · proposes: Streets to be vacated","unverified","C124886280",71,"https://archive.org/details/C124886280/page/n70",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:71/2",1957,1957,"1957","measure","plan",null,"South of Market Redevelopment Area D · proposes: Buildings and uses to remain","unverified","C124886280",71,"https://archive.org/details/C124886280/page/n70",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:73/1",1957,1957,"1957","finding","plan",null,"South of Market Project · finding: Costs of land acquisition and clearance are considerably higher than the price at which cleared land can be sold to private developers","unverified","C124886280",73,"https://archive.org/details/C124886280/page/n72",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:73/2",1957,1957,"1957","measure","plan",null,"National Housing Act capital grants · other: Total capital grant funds available to all states","unverified","C124886280",73,"https://archive.org/details/C124886280/page/n72",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:73/3",1957,1957,"1957","measure","plan",null,"National Housing Act capital grants · other: California's share of capital grant funds limited to nine million dollars","unverified","C124886280",73,"https://archive.org/details/C124886280/page/n72",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:75/1",1957,1957,"1957","project","plan",null,"South of Market Redevelopment Area D · cost usd: estimated net project cost is six million dollars","unverified","C124886280",75,"https://archive.org/details/C124886280/page/n74",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:75/2",1957,1957,"1957","project","plan",null,"South of Market Redevelopment Area D · other: San Francisco may seek a capital grant of four million dollars, the Federal contribution of two-thirds of the net project cost","unverified","C124886280",75,"https://archive.org/details/C124886280/page/n74",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:75/3",1957,1957,"1957","project","plan",null,"South of Market Redevelopment Area D · cost usd: City's share of this net project cost is two million dollars","unverified","C124886280",75,"https://archive.org/details/C124886280/page/n74",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:75/4",1957,1957,"1957","project","plan",null,"South of Market Redevelopment Area D · cost usd: cash grants of approximately 1.7 million dollars will be required","unverified","C124886280",75,"https://archive.org/details/C124886280/page/n74",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:93/1",1957,1957,"1957","finding","plan",null,"South of Market Redevelopment Area D · other: average density 300 persons per net residential acre in the blighted core","unverified","C124886280",93,"https://archive.org/details/C124886280/page/n92",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:93/2",1957,1957,"1957","finding","plan",null,"South of Market Redevelopment Area D · other: density exceeds 360 persons per net residential acre in certain blocks","unverified","C124886280",93,"https://archive.org/details/C124886280/page/n92",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:93/3",1957,1957,"1957","finding","plan",null,"South of Market Redevelopment Area D · other: residential coverage averages 89 per cent in typical blocks","unverified","C124886280",93,"https://archive.org/details/C124886280/page/n92",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:93/4",1957,1957,"1957","finding","plan",null,"South of Market Redevelopment Area D residential lots · other: common lot size 25 x 80 feet (2000 sq ft)","unverified","C124886280",93,"https://archive.org/details/C124886280/page/n92",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["d","qipu:sf/decision/journalofproceed52sanfrich:101/4",1957,1957,"1957-02-11","resolution","redevelopment","passed","Resolution rescinds the 1939 designation of Redevelopment Area F in San Francisco, on committee recommendation.","quoted","journalofproceed52sanfrich",101,"https://archive.org/details/journalofproceed52sanfrich/page/n100",null,null,null,null,"n","a",0,6.41],["d","qipu:sf/decision/journalofproceed52sanfrich:137/1",1957,1957,"1957-03-04","other","redevelopment",null,"City Planning Commission presented the first planning phase of Redevelopment Area E, the Wholesale Produce District, to the Board.","quoted","journalofproceed52sanfrich",137,"https://archive.org/details/journalofproceed52sanfrich/page/n136",null,null,null,null,"n","a",0,4.0],["d","qipu:sf/decision/journalofproceed52sanfrich:418/4",1957,1957,"1957-05-27","resolution","redevelopment","passed","A $3,750 (≈ $44,965 in 2026 dollars) gift was accepted to fund planning work in Redevelopment Area E.","quoted","journalofproceed52sanfrich",418,"https://archive.org/details/journalofproceed52sanfrich/page/n417",null,null,null,null,"n","a",0,6.41],["d","qipu:sf/decision/journalofproceed52sanfrich:473/2",1957,1957,"1957-06-17","ordinance","redevelopment","passed first reading","Redevelopment Agency given $37,500 (≈ $449,653 in 2026 dollars) to appraise Redevelopment Area E, the Wholesale Produce Area; passed for second reading.","quoted","journalofproceed52sanfrich",473,"https://archive.org/details/journalofproceed52sanfrich/page/n472",null,null,null,null,"n","a",0,9.41],["d","qipu:sf/decision/journalofproceed52sanfrich:484/3",1957,1957,"1957-06-24","ordinance","redevelopment","passed","Board finally passed $37,500 (≈ $449,653 in 2026 dollars) for appraisals in Redevelopment Area E, the Wholesale Produce Area.","quoted","journalofproceed52sanfrich",484,"https://archive.org/details/journalofproceed52sanfrich/page/n483",null,null,null,null,"n","a",0,8.54],["d","qipu:sf/decision/journalofproceed52sanfrich:683/4",1957,1957,"1957-09-03","ordinance","redevelopment","passed first reading","The Board passed on first reading a $300 (≈ $3,597 in 2026 dollars) appropriation for land acquisition in the [name withheld].","quoted","journalofproceed52sanfrich",683,"https://archive.org/details/journalofproceed52sanfrich/page/n682",null,null,null,null,"n","a",0,1.09],["d","qipu:sf/decision/journalofproceed52sanfrich:695/1",1957,1957,"1957-09-10","ordinance","redevelopment","passed","Ordinance appropriating $300 (≈ $3,597 in 2026 dollars) for land acquisition in the [name withheld] passed finally.","quoted","journalofproceed52sanfrich",695,"https://archive.org/details/journalofproceed52sanfrich/page/n694",null,null,null,null,"n","a",0,1.29],["d","qipu:sf/decision/journalofproceed52sanfrich:769/4",1957,1957,"1957-10-07","resolution","redevelopment","passed","Board adopted an amendment reducing the boundaries of Redevelopment Area D in South of Market.","quoted","journalofproceed52sanfrich",769,"https://archive.org/details/journalofproceed52sanfrich/page/n768",null,null,null,null,"n","a",0,6.91],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:91/1",1957,1957,"December 1956","site","plan",null,"South of Market Redevelopment Area D · other: Total net area in land use survey","unverified","C124886280",91,"https://archive.org/details/C124886280/page/n90",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:91/2",1957,1957,"December 1956","site","plan",null,"South of Market Redevelopment Area D · other: Total gross area including streets","unverified","C124886280",91,"https://archive.org/details/C124886280/page/n90",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:79/3",1957,1957,"January 1, 1958","event","plan",null,"South of Market Redevelopment Area D · event: Federal planning funds may not be available until January 1, 1958","unverified","C124886280",79,"https://archive.org/details/C124886280/page/n78",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:5/3",1957,1957,"May 1, 1957","action","plan",null,"Preliminary plan study, Redevelopment Area D · other: study completed by staffs of City Planning and Redevelopment Agency","unverified","C124886280",5,"https://archive.org/details/C124886280/page/n4",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:1/1",1957,1957,"May 1957","project","plan",null,"South of Market Redevelopment Area \"D\" · other: preliminary plan for a project, report to the City Planning Commission and the Redevelopment Agency","unverified","C124886280",1,"https://archive.org/details/C124886280/page/n0",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:11/1",1957,1957,"Nov. 26, 1956","site","plan",null,"South of Market Redevelopment Area D · adopted: Board of Supervisors Resolution 17269 designated the boundary of Redevelopment Area D","unverified","C124886280",11,"https://archive.org/details/C124886280/page/n10",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:17/1",1957,1957,"November 19, 1956","finding","plan",null,"South of Market Redevelopment Area D · finding: the area contains the most exaggerated type of urban residential slums anywhere in California or the west","unverified","C124886280",17,"https://archive.org/details/C124886280/page/n16",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:113/1",1957,1957,"November 28, 1956","finding","plan",null,"South of Market area (Redevelopment Area D) · finding: found and determined to be a blighted area by Resolution No. 17269 (Series of 1939)","unverified","C124886280",113,"https://archive.org/details/C124886280/page/n112",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:5/1",1957,1957,"November 28, 1956","action","plan",null,"Redevelopment Area D, South of Market · approved: Resolution No. 17269 modified the boundaries of Redevelopment Area D","unverified","C124886280",5,"https://archive.org/details/C124886280/page/n4",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:115/5",1957,1957,"October 18, 1956","action","plan",null,"South of Market Redevelopment Area designation · approved: City Planning Commission approved the designation of the South of Market Redevelopment Area","unverified","C124886280",115,"https://archive.org/details/C124886280/page/n114",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:113/3",1957,1957,"October 23, 1956","agency","plan",null,"Redevelopment Agency of San Francisco · approved: report and recommendation of the City Planning Commission","unverified","C124886280",113,"https://archive.org/details/C124886280/page/n112",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:41/1",1957,1957,"Sept. 1956","finding","plan",null,"South of Market Redevelopment Area D housing and service survey, Table III · other: Block 3726 row: 381 8 605 28 (dwelling units, transient rooms and local service stores as printed; column order not clear on this scan)","unverified","C124886280",41,"https://archive.org/details/C124886280/page/n40",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:41/2",1957,1957,"Sept. 1956","finding","plan",null,"South of Market Redevelopment Area D housing and service survey, Table III · other: Block 3727 row: 155 2 189 8 (dwelling units, transient rooms and local service stores as printed; column order not clear on this scan)","unverified","C124886280",41,"https://archive.org/details/C124886280/page/n40",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:41/3",1957,1957,"Sept. 1956","finding","plan",null,"South of Market Redevelopment Area D housing and service survey, Table III · other: Block 3728 row: 98 1 39 3 (dwelling units, transient rooms and local service stores as printed; column order not clear on this scan)","unverified","C124886280",41,"https://archive.org/details/C124886280/page/n40",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:79/2",1957,1957,"early 1957","event","plan",null,"South of Market Redevelopment Area D · event: Urban Renewal Administration curtailed capital grant commitments pending allocation of additional funds by the Congress","unverified","C124886280",79,"https://archive.org/details/C124886280/page/n78",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124886280:15/2",1957,1957,"fifty-one years ago","event","plan",null,"South of Market Redevelopment Area D · other: gradual but steady decrease of residential uses since the earthquake and fire","unverified","C124886280",15,"https://archive.org/details/C124886280/page/n14",null,null,null,"A preliminary plan for a project in the South of Market Redevelopment Area \"D\" : report to the City Planning Commission and the Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124885426:19/1",1958,1958,"","project","study or report",null,"Project Area E-1 · acreage: approximately 44.61 acres","unverified","C124885426",19,"https://archive.org/details/C124885426/page/n18",null,null,null,"Embarcadero-Lower Market Redevelopment Project Area E-1 : a report on the tentative redevelopment plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124885426:23/5",1958,1958,"","finding","study or report",null,"Redevelopment Project Area E-1 · jobs: about 870 office workers now employed","unverified","C124885426",23,"https://archive.org/details/C124885426/page/n22",null,null,null,"Embarcadero-Lower Market Redevelopment Project Area E-1 : a report on the tentative redevelopment plan","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124885426:23/6",1958,1958,"","finding","study or report",null,"Redevelopment Project Area E-1 · other: tax revenues would be greatly increased by redevelopment","unverified","C124885426",23,"https://archive.org/details/C124885426/page/n22",null,null,null,"Embarcadero-Lower Market Redevelopment Project Area E-1 : a report on the tentative redevelopment plan","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124885426:23/7",1958,1958,"","recommendation","study or report",null,"Redevelopment Project Area E-1 · other: wholesale produce and food industries would move by groups to new locations","unverified","C124885426",23,"https://archive.org/details/C124885426/page/n22",null,null,null,"Embarcadero-Lower Market Redevelopment Project Area E-1 : a report on the tentative redevelopment plan","n","a",0,3.0],["d","qipu:sf/decision/journalofproceed53sanfrich:114/1",1958,1958,"1958-02-17","motion","redevelopment","referred","Supervisor Halley proposed dedesignating part of Redevelopment Area E deleted by the Redevelopment Agency; sent to Finance Committee.","quoted","journalofproceed53sanfrich",114,"https://archive.org/details/journalofproceed53sanfrich/page/n114",null,null,null,null,"n","a",0,4.0],["d","qipu:sf/decision/journalofproceed53sanfrich:549/1",1958,1958,"1958-07-14","hearing","redevelopment","continued","[name withheld] and [name withheld] assessment appeal for two parcels in a redevelopment area was continued one week.","quoted","journalofproceed53sanfrich",549,"https://archive.org/details/journalofproceed53sanfrich/page/n549",null,null,null,null,"n","a",0,-5.0],["d","qipu:sf/decision/journalofproceed53sanfrich:606/2",1958,1958,"1958-08-11","resolution","redevelopment","referred","Supervisor Halley proposed rescinding the Redevelopment Area D designation, and the proposal was referred to the Finance Committee.","quoted","journalofproceed53sanfrich",606,"https://archive.org/details/journalofproceed53sanfrich/page/n606",null,null,null,null,"n","a",0,4.0],["d","qipu:sf/decision/journalofproceed53sanfrich:707/5",1958,1958,"1958-09-22","resolution","redevelopment","passed","Rescinded the designation of South of Market lands as Redevelopment Area D, bounded by Folsom, Fourth, Natoma, Third and Eighth Streets.","quoted","journalofproceed53sanfrich",707,"https://archive.org/details/journalofproceed53sanfrich/page/n707",null,null,null,null,"n","a",0,6.66],["d","qipu:sf/decision/journalofproceed53sanfrich:711/1",1958,1958,"1958-09-22","resolution","redevelopment","passed","Strict code enforcement requested to remove substandard conditions in former Redevelopment Area D, South of Market; adopted.","quoted","journalofproceed53sanfrich",711,"https://archive.org/details/journalofproceed53sanfrich/page/n711",null,null,null,null,"n","a",0,6.41],["d","qipu:sf/decision/journalofproceed53sanfrich:755/1",1958,1958,"1958-10-14","ordinance","redevelopment","passed","The Embarcadero-Lower Market Redevelopment Project Area E-1 tentative plan was finally passed, designating the area as an approved redevelopment area.","quoted","journalofproceed53sanfrich",755,"https://archive.org/details/journalofproceed53sanfrich/page/n755",null,null,null,null,"n","a",0,9.29],["d","qipu:sf/decision/journalofproceed53sanfrich:755/2",1958,1958,"1958-10-14","resolution","redevelopment","passed","The Board adopted a policy for moving the wholesale produce industry out of the Embarcadero-Lower Market redevelopment area and Assessor's Blocks 202 and 203.","quoted","journalofproceed53sanfrich",755,"https://archive.org/details/journalofproceed53sanfrich/page/n755",null,null,null,null,"n","a",0,8.79],["d","qipu:sf/decision/journalofproceed53sanfrich|489",1958,1958,"1958-10-14","resolution","running-the-city","passed first reading","$2,600 (≈ $30,313 in 2026 dollars) for engineering in redevelopment area E-1 passes second reading","quoted","journalofproceed53sanfrich",759,"https://archive.org/details/journalofproceed53sanfrich/page/n759",null,null,null,null,"n","a",0,5.12],["d","qipu:sf/decision/journalofproceed53sanfrich|504",1958,1958,"1958-10-20","ordinance","running-the-city","passed","$2,600 (≈ $30,313 in 2026 dollars) for engineering in redevelopment area E-1 approved","quoted","journalofproceed53sanfrich",771,"https://archive.org/details/journalofproceed53sanfrich/page/n771",null,null,null,null,"n","a",0,5.39],["d","qipu:sf/decision/journalofproceed53sanfrich:792/2",1958,1958,"1958-10-27","ordinance","redevelopment","passed first reading","Supervisors passed on first reading an ordinance changing the legal description of the Western Addition Redevelopment Area.","quoted","journalofproceed53sanfrich",792,"https://archive.org/details/journalofproceed53sanfrich/page/n792",null,null,null,null,"n","a",0,6.79],["d","qipu:sf/decision/journalofproceed53sanfrich:804/2",1958,1958,"1958-11-03","ordinance","redevelopment","passed","The Board passed an ordinance changing the legal description of the Western Addition Redevelopment Area and deleting one area from it.","quoted","journalofproceed53sanfrich",804,"https://archive.org/details/journalofproceed53sanfrich/page/n804",null,null,null,null,"n","a",0,6.79],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124885426:19/2",1958,1958,"April 10, 1958","project","study or report",null,"Preliminary Redevelopment Plan, Project Area E-1 · adopted: adopted by San Francisco City Planning Commission by Resolution Number 4864","unverified","C124885426",19,"https://archive.org/details/C124885426/page/n18",null,null,null,"Embarcadero-Lower Market Redevelopment Project Area E-1 : a report on the tentative redevelopment plan","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124885426:23/8",1958,1958,"December, 1954","finding","study or report",null,"Redevelopment Project Area E-1 · finding: blight conditions cited in Staff Report on Wholesale Produce Market Area","unverified","C124885426",23,"https://archive.org/details/C124885426/page/n22",null,null,null,"Embarcadero-Lower Market Redevelopment Project Area E-1 : a report on the tentative redevelopment plan","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124885426:17/1",1958,1958,"February 21, 1955","event","study or report",null,"Redevelopment Area E · approved: Found and determined blighted by the Board of Supervisors, Resolution Number 15288","unverified","C124885426",17,"https://archive.org/details/C124885426/page/n16",null,null,null,"Embarcadero-Lower Market Redevelopment Project Area E-1 : a report on the tentative redevelopment plan","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124885426:17/4",1958,1958,"June 19, 1957","action","study or report",null,"Redevelopment Agency application for Federal survey and planning funds · approved: Application for Federal survey and planning funds approved by Finance Committee of the Board of Supervisors","unverified","C124885426",17,"https://archive.org/details/C124885426/page/n16",null,null,null,"Embarcadero-Lower Market Redevelopment Project Area E-1 : a report on the tentative redevelopment plan","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124885426:23/1",1958,1958,"June, 1957","finding","study or report",null,"Redevelopment Project Area E-1 · jobs: 94 wholesale produce and food firms","unverified","C124885426",23,"https://archive.org/details/C124885426/page/n22",null,null,null,"Embarcadero-Lower Market Redevelopment Project Area E-1 : a report on the tentative redevelopment plan","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124885426:23/2",1958,1958,"June, 1957","finding","study or report",null,"Redevelopment Project Area E-1 · jobs: 320 non-produce and industrial firms","unverified","C124885426",23,"https://archive.org/details/C124885426/page/n22",null,null,null,"Embarcadero-Lower Market Redevelopment Project Area E-1 : a report on the tentative redevelopment plan","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124885426:23/3",1958,1958,"June, 1957","finding","study or report",null,"Redevelopment Project Area E-1 · jobs: 87 retail establishments","unverified","C124885426",23,"https://archive.org/details/C124885426/page/n22",null,null,null,"Embarcadero-Lower Market Redevelopment Project Area E-1 : a report on the tentative redevelopment plan","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124885426:23/4",1958,1958,"June, 1957","finding","study or report",null,"Redevelopment Project Area E-1 · jobs: total approximately 500 firms in the Area","unverified","C124885426",23,"https://archive.org/details/C124885426/page/n22",null,null,null,"Embarcadero-Lower Market Redevelopment Project Area E-1 : a report on the tentative redevelopment plan","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124885426:17/5",1958,1958,"May 29, 1956","project","study or report",null,"Market Analysis of Redevelopment Area E · other: Report by Real Estate Research Corporation analysing and projecting market potential in the area","unverified","C124885426",17,"https://archive.org/details/C124885426/page/n16",null,null,null,"Embarcadero-Lower Market Redevelopment Project Area E-1 : a report on the tentative redevelopment plan","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124885426:17/3",1958,1958,"May 31, 1957","project","study or report",null,"The Golden Gateway, Redevelopment Area E · proposes: Concept of total development for the area (General Development Plan by Skidmore, Owings & Merrill)","unverified","C124885426",17,"https://archive.org/details/C124885426/page/n16",null,null,null,"Embarcadero-Lower Market Redevelopment Project Area E-1 : a report on the tentative redevelopment plan","n","a",0,3.0],["d","qipu:sf/decision/journalofproceed54sanfrich:378/1",1959,1959,"1959-05-18","resolution","redevelopment","passed","Board adopted Resolution 408-59, removing blocks outside Project Area E-1 from Redevelopment Area E near the Embarcadero.","quoted","journalofproceed54sanfrich",378,"https://archive.org/details/journalofproceed54sanfrich/page/n373",null,null,null,null,"n","a",0,6.79],["d","qipu:sf/decision/journalofproceed54sanfrich:418/3",1959,1959,"1959-05-26","other","redevelopment",null,"Supervisor Dobbs called File 257-59 from committee on immediate land use in a Redevelopment Area, for June 8 presentation.","quoted","journalofproceed54sanfrich",418,"https://archive.org/details/journalofproceed54sanfrich/page/n413",null,null,null,null,"n","a",0,4.0],["d","qipu:sf/decision/journalofproceed55sanfrich|g1848",1960,1960,"1960-11-21",null,"redevelopment","passed","Official map of Western Addition redevelopment area A-1 adopted","unverified","journalofproceed55sanfrich",765,"https://archive.org/details/journalofproceed55sanfrich/page/n758",null,null,null,null,"n","a",0,6.04],["d","qipu:sf/decision/journalofproceed56sanfrich:318/1",1961,1961,"1961-05-22","resolution","redevelopment","passed","Board adopted intention to vacate portions of Geary and other streets within the Western Addition redevelopment area A-1.","quoted","journalofproceed56sanfrich",318,"https://archive.org/details/journalofproceed56sanfrich/page/n317",null,null,null,null,"n","a",0,7.04],["d","qipu:sf/decision/journalofproceed56sanfrich:322/3",1961,1961,"1961-05-26","other","redevelopment","referred","Board asked to rescind street vacations in Western Addition A1 redevelopment area and send a new resolution to committee.","quoted","journalofproceed56sanfrich",322,"https://archive.org/details/journalofproceed56sanfrich/page/n321",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed56sanfrich:325/1",1961,1961,"1961-05-29","resolution","redevelopment",null,"Supervisor Ferdon moved to declare intention to vacate certain streets in Western Addition Redevelopment Area A-1, repealing Resolution 314-61.","quoted","journalofproceed56sanfrich",325,"https://archive.org/details/journalofproceed56sanfrich/page/n324",null,null,null,null,"n","a",0,4.0],["d","qipu:sf/decision/journalofproceed56sanfrich:377/2",1961,1961,"1961-06-19","ordinance","redevelopment","passed first reading","Board passed on first reading an ordinance vacating several streets and Endicott Park in the Western Addition redevelopment area.","quoted","journalofproceed56sanfrich",377,"https://archive.org/details/journalofproceed56sanfrich/page/n376",null,null,null,null,"n","m",0,5.79],["d","qipu:sf/decision/journalofproceed56sanfrich:392/2",1961,1961,"1961-06-26","ordinance","redevelopment","passed","Portions of Geary, Octavia, Broderick and other Western Addition streets vacated within redevelopment area A-1, finally passed.","quoted","journalofproceed56sanfrich",392,"https://archive.org/details/journalofproceed56sanfrich/page/n391",null,null,null,null,"n","a",0,6.54],["d","qipu:sf/decision/journalofproceed56sanfrich:410/2",1961,1961,"1961-07-03","motion","redevelopment","passed","Supervisor Blake asked the Parking Authority and Redevelopment Agency to study temporary parking on cleared Redevelopment Area E sites.","quoted","journalofproceed56sanfrich",410,"https://archive.org/details/journalofproceed56sanfrich/page/n409",null,null,null,null,"n","a",0,0.29],["d","qipu:sf/decision/journalofproceed56sanfrich:702/4",1961,1961,"1961-11-27","other","redevelopment","referred","Proposal to add Board of Education property at Fifth and Market to the South of Market redevelopment area was referred to committee.","quoted","journalofproceed56sanfrich",702,"https://archive.org/details/journalofproceed56sanfrich/page/n701",null,null,null,null,"n","a",0,1.5],["d","qipu:sf/decision/journalofproceed56sanfrich|449",1961,1961,"1961-11-27","ordinance","running-the-city","passed first reading","Redevelopment area asked to expand to Fifth and Market Streets","unverified","journalofproceed56sanfrich",702,"https://archive.org/details/journalofproceed56sanfrich/page/n701",null,null,null,null,"n","a",0,5.54],["d","qipu:sf/decision/journalofproceed56sanfrich:708/2",1961,1961,"1961-12-04","resolution","redevelopment","continued","Board continued consideration of designating South of Market as Redevelopment Area D; property owners complained they got no meeting notice.","quoted","journalofproceed56sanfrich",708,"https://archive.org/details/journalofproceed56sanfrich/page/n707",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed56sanfrich:709/1",1961,1961,"1961-12-04","resolution","redevelopment","continued","Designation of Redevelopment Area D South of Market was continued one week after owners said they got no notice.","quoted","journalofproceed56sanfrich",709,"https://archive.org/details/journalofproceed56sanfrich/page/n708",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed56sanfrich|g1316",1961,1961,"1961-12-04",null,"redevelopment","pending","South of Market redevelopment area plan still pending.","unverified","journalofproceed56sanfrich",708,"https://archive.org/details/journalofproceed56sanfrich/page/n707",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed56sanfrich:718/2",1961,1961,"1961-12-11","resolution","redevelopment",null,"Redevelopment Area D in South of Market proposed; speakers for and against heard, final vote pending.","quoted","journalofproceed56sanfrich",718,"https://archive.org/details/journalofproceed56sanfrich/page/n717",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed57sanfrich:75/2",1962,1962,"1962-01-29","ordinance","redevelopment","referred","Supervisor Blake's proposal to vacate certain streets in the Western Addition A-1 redevelopment area was referred to committee.","quoted","journalofproceed57sanfrich",75,"https://archive.org/details/journalofproceed57sanfrich/page/n74",null,null,null,null,"n","a",0,1.5],["d","qipu:sf/decision/journalofproceed57sanfrich:85/3",1962,1962,"1962-02-05","resolution","redevelopment","continued","Board temporarily postponed amending the Embarcadero-Lower Market redevelopment area to include Block 202.","quoted","journalofproceed57sanfrich",85,"https://archive.org/details/journalofproceed57sanfrich/page/n84",null,null,null,null,"n","a",0,-4.0],["d","qipu:sf/decision/journalofproceed57sanfrich:89/2",1962,1962,"1962-02-05","resolution","redevelopment","passed","The Board adopted a resolution adding Block 202 to the Embarcadero-Lower Market Redevelopment Area E boundaries.","quoted","journalofproceed57sanfrich",89,"https://archive.org/details/journalofproceed57sanfrich/page/n88",null,null,null,null,"n","a",0,6.54],["d","qipu:sf/decision/journalofproceed57sanfrich|61",1962,1962,"1962-02-05","resolution","land-and-building","passed","A block returns to the redevelopment area with federal money","unverified","journalofproceed57sanfrich",89,"https://archive.org/details/journalofproceed57sanfrich/page/n88",null,null,null,null,"n","a",0,6.91],["d","qipu:sf/decision/journalofproceed57sanfrich|g122",1962,1962,"1962-02-05",null,"redevelopment","pending","Block 202 added to Embarcadero-Lower Market redevelopment area; vote put off.","unverified","journalofproceed57sanfrich",85,"https://archive.org/details/journalofproceed57sanfrich/page/n84",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed57sanfrich|g123",1962,1962,"1962-02-05","ordinance","redevelopment","pending","Block 202 redevelopment vote put off until agency representative arrives.","quoted","journalofproceed57sanfrich",85,"https://archive.org/details/journalofproceed57sanfrich/page/n84",null,null,null,null,"n","m",0,3.0],["d","qipu:sf/decision/journalofproceed57sanfrich|g140",1962,1962,"1962-02-05",null,"redevelopment","unknown","Block 202 added to Embarcadero-Lower Market area; vote not shown.","unverified","journalofproceed57sanfrich",89,"https://archive.org/details/journalofproceed57sanfrich/page/n88",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/journalofproceed57sanfrich:159/1",1962,1962,"1962-03-12","ordinance","redevelopment","passed first reading","Streets in the Western Addition redevelopment area, near O'Farrell and Buchanan Streets, passed for second reading to be vacated.","quoted","journalofproceed57sanfrich",159,"https://archive.org/details/journalofproceed57sanfrich/page/n154",null,null,null,null,"n","a",0,6.41],["d","qipu:sf/decision/journalofproceed57sanfrich:177/4",1962,1962,"1962-03-19","other","redevelopment",null,"Supervisor Boas disclosed that his Boas Pontiac Company bought a 14,000 square foot parcel in the Western Addition A-1 redevelopment area.","quoted","journalofproceed57sanfrich",177,"https://archive.org/details/journalofproceed57sanfrich/page/n172",null,null,null,null,"n","a",0,4.0],["d","qipu:sf/decision/journalofproceed57sanfrich:365/1",1962,1962,"1962-06-18","ordinance","redevelopment","continued","Board continued for one week a $10,773 (≈ $120,194 in 2026 dollars) appropriation to seek federal funds for planning the Hunters Point redevelopment area.","quoted","journalofproceed57sanfrich",365,"https://archive.org/details/journalofproceed57sanfrich/page/n358",null,null,null,null,"n","a",0,4.0],["d","qipu:sf/decision/journalofproceed57sanfrich:399/1",1962,1962,"1962-07-02","resolution","redevelopment","passed","Board adopted, as amended, a resolution declaring intention to vacate Clark, Front and Oregon streets in the Embarcadero-Lower Market redevelopment area.","quoted","journalofproceed57sanfrich",399,"https://archive.org/details/journalofproceed57sanfrich/page/n392",null,null,null,null,"n","a",0,6.66],["d","qipu:sf/decision/journalofproceed57sanfrich:470/1",1962,1962,"1962-07-30","ordinance","redevelopment","passed","Board adopted Resolution 435-62 ordering the vacation of parts of certain streets within the Embarcadero-Lower Market redevelopment area.","quoted","journalofproceed57sanfrich",470,"https://archive.org/details/journalofproceed57sanfrich/page/n463",null,null,null,null,"n","a",0,6.54],["d","qipu:sf/decision/journalofproceed57sanfrich:471/2",1962,1962,"1962-07-30","ordinance","redevelopment","passed","The Board finally passed $10,773 (≈ $120,194 in 2026 dollars) to prepare a federal funding application for planning the Hunters Point Redevelopment Area.","quoted","journalofproceed57sanfrich",471,"https://archive.org/details/journalofproceed57sanfrich/page/n464",null,null,null,null,"n","a",0,9.79],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101695212:27/4",1962,1962,"December 1, 1961","project","plan",null,"South of Market Project D-1 · adopted: Redevelopment Area D (South of Market) designated; resolution approving surveys and plans adopted","unverified","C101695212",27,"https://archive.org/details/C101695212/page/n26",null,null,null,"A community renewal program for the city and county of San Francisco : application to the Housing and Home Finance Agency for a federal grant to assist in the preparation of a community renewal program","n","a",0,3.0],["d","qipu:sf/decision/journalofproceed58sanfrich:30/1",1963,1963,"1963-01-14","resolution","redevelopment","passed","Streets inside the Golden Gateway redevelopment area, including parts of Pacific Avenue and Drumm Street, were vacated by resolution.","quoted","journalofproceed58sanfrich",30,"https://archive.org/details/journalofproceed58sanfrich/page/n29",null,null,null,null,"n","a",0,6.91],["d","qipu:sf/decision/journalofproceed58sanfrich:48/2",1963,1963,"1963-01-21","resolution","redevelopment","referred","Supervisor Boas proposed amending the boundaries of Redevelopment Area D in South of Market, referred to committee.","quoted","journalofproceed58sanfrich",48,"https://archive.org/details/journalofproceed58sanfrich/page/n47",null,null,null,null,"n","a",0,1.5],["d","qipu:sf/decision/journalofproceed58sanfrich|g60",1963,1963,"1963-01-21","motion","redevelopment","pending","Redevelopment area boundary change in South of Market sent to committee.","quoted","journalofproceed58sanfrich",48,"https://archive.org/details/journalofproceed58sanfrich/page/n47",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed58sanfrich|g198",1963,1963,"1963-02-18",null,"redevelopment","pending","South of Market redevelopment area decision put off again.","unverified","journalofproceed58sanfrich",118,"https://archive.org/details/journalofproceed58sanfrich/page/n117",null,null,null,null,"n","a",0,6.04],["d","qipu:sf/decision/journalofproceed58sanfrich:109/5",1963,1963,"1963-02-25","resolution","redevelopment","referred","Resolution amending the South of Market redevelopment area designation was sent back to committee on McMahon's motion.","quoted","journalofproceed58sanfrich",109,"https://archive.org/details/journalofproceed58sanfrich/page/n108",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed58sanfrich:110/1",1963,1963,"1963-02-25","resolution","redevelopment","referred","Board sent back a proposal to expand Redevelopment Area D in South of Market so affected owners can be heard.","quoted","journalofproceed58sanfrich",110,"https://archive.org/details/journalofproceed58sanfrich/page/n109",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed58sanfrich|g187",1963,1963,"1963-02-25",null,"redevelopment","unknown","South of Market redevelopment area boundaries considered; final vote not shown.","unverified","journalofproceed58sanfrich",109,"https://archive.org/details/journalofproceed58sanfrich/page/n108",null,null,null,null,"n","a",0,6.04],["d","qipu:sf/decision/journalofproceed58sanfrich:118/2",1963,1963,"1963-03-04","resolution","redevelopment","continued","Board temporarily continued consideration of amending the South of Market Redevelopment Area D designation.","quoted","journalofproceed58sanfrich",118,"https://archive.org/details/journalofproceed58sanfrich/page/n117",null,null,null,null,"n","a",0,-4.0],["d","qipu:sf/decision/journalofproceed58sanfrich|g204",1963,1963,"1963-03-04",null,"redevelopment","passed","South of Market redevelopment area approved, 9 votes to 1","unverified","journalofproceed58sanfrich",121,"https://archive.org/details/journalofproceed58sanfrich/page/n120",null,null,null,null,"n","a",0,8.04],["d","qipu:sf/decision/journalofproceed58sanfrich:779/3",1963,1963,"1963-12-23","resolution","redevelopment","passed","Committee recommended designating a Rapid Transit Corridor Study Area as a redevelopment area; Supervisor Boas dissented.","quoted","journalofproceed58sanfrich",779,"https://archive.org/details/journalofproceed58sanfrich/page/n766",null,null,null,null,"n","a",0,4.0],["d","qipu:sf/decision/journalofproceed58sanfrich:781/2",1963,1963,"1963-12-23","resolution","redevelopment","passed","Redevelopment Area G, covering Hunters Point, designated under state redevelopment law.","quoted","journalofproceed58sanfrich",781,"https://archive.org/details/journalofproceed58sanfrich/page/n768",null,null,null,null,"n","a",0,7.04],["d","qipu:sf/decision/journalofproceed58sanfrich|g1354",1963,1963,"1963-12-23","resolution","redevelopment","passed","Hunters Point named a redevelopment area","quoted","journalofproceed58sanfrich",781,"https://archive.org/details/journalofproceed58sanfrich/page/n768",null,null,null,null,"n","a",0,9.41],["d","qipu:sf/decision/journalofproceed58sanfrich:791/4",1963,1963,"1963-12-30","ordinance","redevelopment",null,"Roadways and curbs of certain Diamond Heights streets in redevelopment area B-1 were set for final passage.","quoted","journalofproceed58sanfrich",791,"https://archive.org/details/journalofproceed58sanfrich/page/n778",null,null,null,null,"n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101694731:81/2",1963,1963,"January 1959","site","study or report",null,"Redevelopment Area EM · other: Report to Parking Authority on Proposed Garages in Redevelopment Area EM","unverified","C101694731",81,"https://archive.org/details/C101694731/page/n80",null,null,null,"San Francisco community renewal program : phase 1, Research design : technical reports to the Dept. of City Planning of the City and County of San Francisco","n","a",0,3.0],["d","qipu:sf/decision/journalofproceed59sanfrich:98/1",1964,1964,"1964-02-10","ordinance","redevelopment","continued","Board continued for one week the ordinance adding more properties to the Western Addition Redevelopment Area A.","quoted","journalofproceed59sanfrich",98,"https://archive.org/details/journalofproceed59sanfrich/page/n95",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed59sanfrich:99/1",1964,1964,"1964-02-10","ordinance","redevelopment","referred","Proposal to add properties to the Western Addition Redevelopment Area A was sent back to committee.","quoted","journalofproceed59sanfrich",99,"https://archive.org/details/journalofproceed59sanfrich/page/n96",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed59sanfrich|g77",1964,1964,"1964-02-10",null,"redevelopment","pending","Western Addition redevelopment area expansion put off a week.","unverified","journalofproceed59sanfrich",98,"https://archive.org/details/journalofproceed59sanfrich/page/n95",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed59sanfrich|g79",1964,1964,"1964-02-17",null,"redevelopment","pending","Western Addition redevelopment area expansion sent back to committee.","unverified","journalofproceed59sanfrich",99,"https://archive.org/details/journalofproceed59sanfrich/page/n96",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed59sanfrich|g80",1964,1964,"1964-02-17",null,"redevelopment","pending","Western Addition redevelopment area expansion sent back to committee.","unverified","journalofproceed59sanfrich",99,"https://archive.org/details/journalofproceed59sanfrich/page/n96",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed59sanfrich:174/2",1964,1964,"1964-03-02","ordinance","redevelopment","passed","Western Addition Redevelopment Area A would take in four more blocks; the change is proposed and still pending.","quoted","journalofproceed59sanfrich",174,"https://archive.org/details/journalofproceed59sanfrich/page/n171",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed59sanfrich|g193",1964,1964,"1964-03-02",null,"redevelopment","pending","Block removal from redevelopment area proposed; sent back to committee.","unverified","journalofproceed59sanfrich",174,"https://archive.org/details/journalofproceed59sanfrich/page/n171",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed59sanfrich:188/1",1964,1964,"1964-03-09","ordinance","redevelopment","passed","Four blocks added to Western Addition Redevelopment Area A were passed, then rescinded on reconsideration.","quoted","journalofproceed59sanfrich",188,"https://archive.org/details/journalofproceed59sanfrich/page/n185",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed59sanfrich|g219",1964,1964,"1964-03-09",null,"redevelopment","passed","More blocks added to Western Addition redevelopment area; vote reopened.","unverified","journalofproceed59sanfrich",188,"https://archive.org/details/journalofproceed59sanfrich/page/n185",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed59sanfrich:288/1",1964,1964,"1964-04-13","other","redevelopment","referred","Supervisor Morrison asked a committee to study relocation of people displaced by the Western Addition Redevelopment Area 2 program; referred to committee.","quoted","journalofproceed59sanfrich",288,"https://archive.org/details/journalofproceed59sanfrich/page/n285",null,null,null,null,"n","a",0,1.5],["d","qipu:sf/decision/journalofproceed59sanfrich:564/2",1964,1964,"1964-07-13","ordinance","redevelopment","passed","Board finally passed an amendment enlarging Ferry Park and widening part of Washington Street in the Embarcadero-Lower Market redevelopment area.","quoted","journalofproceed59sanfrich",564,"https://archive.org/details/journalofproceed59sanfrich/page/n561",null,null,null,null,"n","a",0,6.66],["d","qipu:sf/decision/journalofproceed59sanfrich:795/2",1964,1964,"1964-09-28","motion","redevelopment","passed","A motion rescinding the earlier referral of the Redevelopment Area A-2 public hearing to committee was adopted.","quoted","journalofproceed59sanfrich",795,"https://archive.org/details/journalofproceed59sanfrich/page/n792",null,null,null,null,"n","a",0,6.29],["d","qipu:sf/decision/journalofproceed59sanfrich:899/1",1964,1964,"1964-11-16","resolution","redevelopment","passed","Golden Gateway Redevelopment Area site designated for a public off-street parking facility, with a joint working agreement requested.","quoted","journalofproceed59sanfrich",899,"https://archive.org/details/journalofproceed59sanfrich/page/n896",null,null,null,null,"n","a",0,6.54],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124924478:19/2",1964,1964,"August 6, 1948","action","study or report",null,"Redevelopment Area A · adopted: Ordinance No. 5082 (Series of 1939)","unverified","C124924478",19,"https://archive.org/details/C124924478/page/n18",null,null,null,"Report on the redevelopment plan for the Western Addition approved redevelopment project area A-2","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124924478:19/3",1964,1964,"September 22, 1952","action","study or report",null,"Redevelopment Area A · other: modifications to designation by Ordinance No. 7506","unverified","C124924478",19,"https://archive.org/details/C124924478/page/n18",null,null,null,"Report on the redevelopment plan for the Western Addition approved redevelopment project area A-2","n","a",0,3.0],["d","qipu:sf/decision/journalofproceed60sanfrich:242/2",1965,1965,"1965-04-19","resolution","redevelopment","passed","Supervisors adopted Resolution 224-65 approving a fourth amendment to a federal loan and grant contract for the Diamond Heights redevelopment area.","quoted","journalofproceed60sanfrich",242,"https://archive.org/details/journalofproceed60sanfrich/page/n241",null,null,null,null,"n","a",0,6.29],["d","qipu:sf/decision/journalofproceed60sanfrich:719/3",1965,1965,"1965-10-18","ordinance","redevelopment","referred","Francois proposed barring building permits in Western Addition Redevelopment Area A-2 unless health or safety requires work; referred to Rules Committee.","quoted","journalofproceed60sanfrich",719,"https://archive.org/details/journalofproceed60sanfrich/page/n718",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed60sanfrich:720/2",1965,1965,"1965-10-18","resolution","whats-being-built","passed","Building permits in Western Addition Redevelopment Area A-2 suspended for 90 days, adopted by the Board.","quoted","journalofproceed60sanfrich",720,"https://archive.org/details/journalofproceed60sanfrich/page/n719",null,null,null,null,"n","a",0,6.82],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124885301:53/1",1966,1966,"","project","study or report",null,"Yerba Buena Redevelopment area · approved: project approved; 100% retail growth anticipated there","unverified","C124885301",53,"https://archive.org/details/C124885301/page/n52",null,null,null,"Street and sidewalk-widths and uses","n","a",0,3.0],["d","qipu:sf/decision/journalofproceed61sanfrich:13/1",1966,1966,"1966-01-03","resolution","redevelopment","passed","Board approved sending Requisition No. 9 for $11,902,000 (≈ $123.8 million in 2026 dollars) advance payment to the Housing and Home Finance Agency for Embarcadero-Lower Market redevelopment area E-1.","quoted","journalofproceed61sanfrich",13,"https://archive.org/details/journalofproceed61sanfrich/page/n12",null,null,null,null,"n","a",0,9.01],["d","qipu:sf/decision/journalofproceed61sanfrich:789/1",1966,1966,"1966-08-29","other","redevelopment","passed","The Board adopted an order vacating an unnamed public street on Lot 2, Block 3714 in the Golden Gateway redevelopment area.","quoted","journalofproceed61sanfrich",789,"https://archive.org/details/journalofproceed61sanfrich/page/n788",null,null,null,null,"n","a",0,6.41],["d","qipu:sf/decision/journalofproceed61sanfrich|g1709",1966,1966,"1966-10-31",null,"redevelopment","passed","Temporary loan approved for Diamond Heights redevelopment area","unverified","journalofproceed61sanfrich",968,"https://archive.org/details/journalofproceed61sanfrich/page/n967",null,null,null,null,"n","a",0,-3.46],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123313895:153/1",1967,1967,"","project","study or report",null,"Housing for the Elderly · units: 300 units planned","unverified","C123313895",153,"https://archive.org/details/C123313895/page/n152",null,null,null,"A report on housing in San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123313895:83/1",1967,1967,"","event","study or report",null,"A-2 redevelopment area · other: Relocation schedule extended to five years","unverified","C123313895",83,"https://archive.org/details/C123313895/page/n82",null,null,null,"A report on housing in San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123313895:83/5",1967,1967,"","finding","study or report",null,"A-2 redevelopment · other: At least $4.2 million more a year in tax revenues from completion of A-2 redevelopment","unverified","C123313895",83,"https://archive.org/details/C123313895/page/n82",null,null,null,"A report on housing in San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123313895:83/6",1967,1967,"","recommendation","study or report",null,"A-2 redevelopment tax revenue increase · recommendation: Invest up to one-half of the tax revenue increase in measures to reduce housing costs for displaced persons","unverified","C123313895",83,"https://archive.org/details/C123313895/page/n82",null,null,null,"A report on housing in San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123313895:83/7",1967,1967,"","recommendation","study or report",null,"A-2 redevelopment relocation · recommendation: Relocation should be extended as long as necessary to find a decent dwelling for everyone who must move","unverified","C123313895",83,"https://archive.org/details/C123313895/page/n82",null,null,null,"A report on housing in San Francisco","n","a",0,3.0],["d","qipu:sf/decision/journalofproceed62sanfrich:55/4",1967,1967,"1967-01-16","other","redevelopment","referred","Federal government refused the city's grant request for surveys and plans for the Butchertown redevelopment area; referred to committee.","quoted","journalofproceed62sanfrich",55,"https://archive.org/details/journalofproceed62sanfrich/page/n54",null,null,null,null,"n","a",0,1.5],["d","qipu:sf/decision/journalofproceed62sanfrich:214/1",1967,1967,"1967-03-20","resolution","redevelopment","continued","Proposal to vacate parts of certain streets in the Golden Gateway redevelopment area was temporarily postponed.","quoted","journalofproceed62sanfrich",214,"https://archive.org/details/journalofproceed62sanfrich/page/n213",null,null,null,null,"n","a",0,-4.0],["d","qipu:sf/decision/journalofproceed62sanfrich:218/2",1967,1967,"1967-03-20","resolution","redevelopment","passed","Portions of certain streets in the Golden Gateway redevelopment area ordered vacated; resolution adopted.","quoted","journalofproceed62sanfrich",218,"https://archive.org/details/journalofproceed62sanfrich/page/n217",null,null,null,null,"n","a",0,6.66],["d","qipu:sf/decision/journalofproceed62sanfrich:230/3",1967,1967,"1967-03-27","ordinance","redevelopment","referred","Underground District No. 211 in the Western Addition redevelopment area was sent back to committee for review.","quoted","journalofproceed62sanfrich",230,"https://archive.org/details/journalofproceed62sanfrich/page/n229",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed62sanfrich:853/2",1967,1967,"1967-09-18","motion","redevelopment","referred","Supervisor McCarthy proposed hearings on a sports arena and convention center in the Yerba Buena redevelopment area, and the matter was referred to committee.","quoted","journalofproceed62sanfrich",853,"https://archive.org/details/journalofproceed62sanfrich/page/n852",null,null,null,null,"n","a",0,1.5],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124878408:67/10001",1970,1968,"1968","finding","study or report",null,"Golden Gateway redevelopment area (tract A-16) · finding: Residential units constructed in Golden Gateway by end of 1968; residential uses were new in the Northern Waterfront","unverified","C124878408",67,"https://archive.org/details/C124878408/page/n66",null,null,null,"Housing and urban resource development for the city of San Francisco : an interdisciplinary study in systems design at Stanford University, winter and spring quarters 1970 : final report","n","m",0,3.0],["d","qipu:sf/decision/journalofproceed63sanfrich:85/2",1968,1968,"1968-01-29","resolution","housing","referred","Supervisor Morrison proposed a policy on relocating families in the Western Addition A-2 Redevelopment Area, sent to committee.","quoted","journalofproceed63sanfrich",85,"https://archive.org/details/journalofproceed63sanfrich/page/n84",null,null,null,null,"n","a",0,4.0],["d","qipu:sf/decision/journalofproceed63sanfrich:161/1",1968,1968,"1968-02-26","resolution","redevelopment","passed","Portions of Dunbar Alley inside the Chinese Cultural and Trade Center redevelopment area were vacated.","quoted","journalofproceed63sanfrich",161,"https://archive.org/details/journalofproceed63sanfrich/page/n156",null,null,null,null,"n","a",0,6.41],["d","qipu:sf/decision/journalofproceed63sanfrich|151",1968,1968,"1968-04-29","ordinance","land-and-building",null,"Five acres of Market Street proposed for a redevelopment area.","unverified","journalofproceed63sanfrich",383,"https://archive.org/details/journalofproceed63sanfrich/page/n378",null,null,null,null,"n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124891592:65/4",1984,1969,"1969","event","other",null,"Hunters Point redevelopment plan · approved: Redevelopment plan for a 137 acre area in Hunters Point approved by Board of Supervisors","unverified","C124891592",65,"https://archive.org/details/C124891592/page/n64",null,null,null,"Proposal to Pacific Fleet Battleship Homeporting Team","n","a",0,4.0],["d","qipu:sf/decision/journalofproceed64sanfrich:911/3",1969,1969,"1969-09-29","ordinance","whats-being-built","continued","Consideration was continued on rezoning several blocks in the Hunters Point Redevelopment Area, including parts of Webster Street.","quoted","journalofproceed64sanfrich",911,"https://archive.org/details/journalofproceed64sanfrich/page/n911",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed64sanfrich:932/1",1969,1969,"1969-10-06","ordinance","whats-being-built","passed","Board rezoned the Hunters Point Redevelopment Area from R-1-D to R-2 use district, passing the ordinance.","quoted","journalofproceed64sanfrich",932,"https://archive.org/details/journalofproceed64sanfrich/page/n932",null,null,null,null,"n","a",0,6.82],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124878408:104/4",1970,1970,"","finding","study or report",null,"A-2 redevelopment area · finding: More housing has been planned for public housing or housing with rent supplements since A-2 was first planned","unverified","C124878408",104,"https://archive.org/details/C124878408/page/n103",null,null,null,"Housing and urban resource development for the city of San Francisco : an interdisciplinary study in systems design at Stanford University, winter and spring quarters 1970 : final report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124878408:137/2",1970,1970,"","measure","study or report",null,"San Francisco Redevelopment Agency redevelopment area · other: 50 percent of work force must be residents of the Area","unverified","C124878408",137,"https://archive.org/details/C124878408/page/n136",null,null,null,"Housing and urban resource development for the city of San Francisco : an interdisciplinary study in systems design at Stanford University, winter and spring quarters 1970 : final report","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124878408:137/3",1970,1970,"","measure","study or report",null,"San Francisco Redevelopment Agency contracts · other: contractor must hire one resident trainee for each non-resident employee","unverified","C124878408",137,"https://archive.org/details/C124878408/page/n136",null,null,null,"Housing and urban resource development for the city of San Francisco : an interdisciplinary study in systems design at Stanford University, winter and spring quarters 1970 : final report","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124878408:139/3",1970,1970,"","finding","study or report",null,"Hunter's Point redevelopment area · finding: 50% minority precedent in Affirmative Action programs, requested by Hunter's Point community","unverified","C124878408",139,"https://archive.org/details/C124878408/page/n138",null,null,null,"Housing and urban resource development for the city of San Francisco : an interdisciplinary study in systems design at Stanford University, winter and spring quarters 1970 : final report","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124878408:84/2",1970,1970,"","finding","study or report",null,"Hunter's Point-Bayview redevelopment area · finding: industry was leaving San Francisco, weakening the tax base","unverified","C124878408",84,"https://archive.org/details/C124878408/page/n83",null,null,null,"Housing and urban resource development for the city of San Francisco : an interdisciplinary study in systems design at Stanford University, winter and spring quarters 1970 : final report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124878408:84/3",1970,1970,"","finding","study or report",null,"Hunter's Point-Bayview redevelopment area · finding: area in poor physical condition; federal funds could be obtained to redevelop it","unverified","C124878408",84,"https://archive.org/details/C124878408/page/n83",null,null,null,"Housing and urban resource development for the city of San Francisco : an interdisciplinary study in systems design at Stanford University, winter and spring quarters 1970 : final report","n","m",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902184:64/3",1987,1970,"1970 to 1980","event","study or report",null,"South Bayshore new construction · built: 1,088 new housing units completed, mostly in the Hunters Point Redevelopment area","unverified","C124902184",64,"https://archive.org/details/C124902184/page/n63",null,null,null,"Issues report for the South Bayshore Study Area","n","a",0,3.0],["d","qipu:sf/decision/journalofproceed65sanfrich|g908",1970,1970,"1970-05-25","resolution","redevelopment","passed","Hunters Point redevelopment area grows by 3.3 acres","quoted","journalofproceed65sanfrich",480,"https://archive.org/details/journalofproceed65sanfrich/page/n479",null,null,null,null,"n","a",0,7.04],["d","qipu:sf/decision/journalofproceed65sanfrich:681/3",1970,1970,"1970-07-27","hearing","redevelopment","passed","After a public hearing, the Board adopted the vacation of certain streets within the Western Addition A-2 redevelopment area.","quoted","journalofproceed65sanfrich",681,"https://archive.org/details/journalofproceed65sanfrich/page/n680",null,null,null,null,"n","a",0,6.41],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124878408:67/3",1970,1970,"April 1969","project","study or report",null,"Western Addition A-2 redevelopment area · units: 218 units scheduled for construction","unverified","C124878408",67,"https://archive.org/details/C124878408/page/n66",null,null,null,"Housing and urban resource development for the city of San Francisco : an interdisciplinary study in systems design at Stanford University, winter and spring quarters 1970 : final report","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C033375608:53/1",1971,1971,"","site","study or report",null,"Hunters Point Redevelopment Area · other: Hunters Point Redevelopment Area shown on map","unverified","C033375608",53,"https://archive.org/details/C033375608/page/n52",null,null,null,"Bayview-Hunters Point : urban design study: Third Street commercial, community center, residential streets","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123314321:102/2",1971,1971,"","project","plan",null,"Glenridge Tenants Association housing project · built: Two mini-playgrounds completed","unverified","C123314321",102,"https://archive.org/details/C123314321/page/n101",null,null,null,"Workable program for community improvement : application and recertification, January 1, 1972-December 21, 1973","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123314321:106/1",1971,1971,"","project","plan",null,"Regal Pale Redevelopment Area · other: small renewal project area within the Mission Model Neighborhood Area, awaiting Federal funding","unverified","C123314321",106,"https://archive.org/details/C123314321/page/n105",null,null,null,"Workable program for community improvement : application and recertification, January 1, 1972-December 21, 1973","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123314321:106/2",1971,1971,"","agency","plan",null,"Regal Pale Redevelopment Area · lead agency: Redevelopment Agency","unverified","C123314321",106,"https://archive.org/details/C123314321/page/n105",null,null,null,"Workable program for community improvement : application and recertification, January 1, 1972-December 21, 1973","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123314321:107/4",1971,1971,"","agency","plan",null,"Western Addition Project Area Committee (WAPAC) · approved: first offering of sites for market rate housing","unverified","C123314321",107,"https://archive.org/details/C123314321/page/n106",null,null,null,"Workable program for community improvement : application and recertification, January 1, 1972-December 21, 1973","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123314321:107/5",1971,1971,"","agency","plan",null,"Western Addition Project Area Committee (WAPAC) · recommendation: recommendations on building sites for seven displaced churches, temporary and permanent mini-parks, and street widenings","unverified","C123314321",107,"https://archive.org/details/C123314321/page/n106",null,null,null,"Workable program for community improvement : application and recertification, January 1, 1972-December 21, 1973","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123314321:108/1",1971,1971,"","project","plan",null,"Yerba Buena Center Redevelopment Area · acreage: 87 acres","unverified","C123314321",108,"https://archive.org/details/C123314321/page/n107",null,null,null,"Workable program for community improvement : application and recertification, January 1, 1972-December 21, 1973","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123314321:108/2",1971,1971,"","building","plan",null,"[name withheld] · units: 276 units of public housing","unverified","C123314321",108,"https://archive.org/details/C123314321/page/n107",null,null,null,"Workable program for community improvement : application and recertification, January 1, 1972-December 21, 1973","n","a",0,2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123314321:108/5",1971,1971,"","project","plan",null,"Yerba Buena Center Redevelopment Area · population: about 800 individuals remaining","unverified","C123314321",108,"https://archive.org/details/C123314321/page/n107",null,null,null,"Workable program for community improvement : application and recertification, January 1, 1972-December 21, 1973","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123314321:108/6",1971,1971,"","project","plan",null,"Yerba Buena Center Redevelopment Area · other: about 25 families remaining","unverified","C123314321",108,"https://archive.org/details/C123314321/page/n107",null,null,null,"Workable program for community improvement : application and recertification, January 1, 1972-December 21, 1973","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123314321:78/3",1971,1971,"","site","plan",null,"Public housing sites in Western Addition Redevelopment Area A-2 · units: Sites for 300 units approved; none built","unverified","C123314321",78,"https://archive.org/details/C123314321/page/n77",null,null,null,"Workable program for community improvement : application and recertification, January 1, 1972-December 21, 1973","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123314321:97/1",1971,1971,"","project","plan",null,"[name withheld] · units: Approximately 100 non-assisted dwelling units for home ownership","unverified","C123314321",97,"https://archive.org/details/C123314321/page/n96",null,null,null,"Workable program for community improvement : application and recertification, January 1, 1972-December 21, 1973","n","a",0,-2.0],["d","qipu:sf/decision/journalofproceed66sanfrich:80/2",1971,1971,"1971-02-01","resolution","redevelopment","passed","Intention to vacate part of Tehama Street in the Verba Buena redevelopment area was declared by resolution, adopted.","quoted","journalofproceed66sanfrich",80,"https://archive.org/details/journalofproceed66sanfrich/page/n80",null,null,null,null,"n","a",0,6.16],["d","qipu:sf/decision/journalofproceed66sanfrich:151/2",1971,1971,"1971-03-01","resolution","redevelopment","passed","Board adopted the vacation of part of Tehama Street south of Fourth Street within Verba Buena Redevelopment Area D-1.","quoted","journalofproceed66sanfrich",151,"https://archive.org/details/journalofproceed66sanfrich/page/n151",null,null,null,null,"n","a",0,6.29],["d","qipu:sf/decision/journalofproceed66sanfrich:191/1",1971,1971,"1971-03-15","ordinance","redevelopment","passed first reading","Proposed underground utility district 294 on certain Western Addition streets in the A-2 redevelopment area; passed for second reading.","quoted","journalofproceed66sanfrich",191,"https://archive.org/details/journalofproceed66sanfrich/page/n191",null,null,null,null,"n","a",0,6.54],["d","qipu:sf/decision/journalofproceed66sanfrich:566/1",1971,1971,"1971-07-12","resolution","housing","continued","Consideration of transient housing units in the Verba Buena Center redevelopment area was continued one week.","quoted","journalofproceed66sanfrich",566,"https://archive.org/details/journalofproceed66sanfrich/page/n566",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed66sanfrich:578/1",1971,1971,"1971-07-19","resolution","housing","passed","Proposed resolution finds a need for extra transient housing units in the Yerba Buena Center redevelopment area; debate continues.","quoted","journalofproceed66sanfrich",578,"https://archive.org/details/journalofproceed66sanfrich/page/n578",null,null,null,null,"n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123314321:96/1",1971,1971,"February 12, 1971","finding","plan",null,"Western Addition Area A-2 redevelopment area on-site rehousing (Table V) · other: 322 families and individuals not displaced but rehoused directly into new on-site housing","unverified","C123314321",96,"https://archive.org/details/C123314321/page/n95",null,null,null,"Workable program for community improvement : application and recertification, January 1, 1972-December 21, 1973","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123314321:96/2",1971,1971,"February 12, 1971","finding","plan",null,"Western Addition Area A-2 redevelopment area on-site rehousing estimate · other: Rehousing details based on workload figures as of February 12, 1971, subject to change after a complete survey","unverified","C123314321",96,"https://archive.org/details/C123314321/page/n95",null,null,null,"Workable program for community improvement : application and recertification, January 1, 1972-December 21, 1973","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123314321:95/1",1971,1971,"January 1, 1972 - December 31, 1973","project","plan",null,"Hunters Point Redevelopment Area · other: 256 families and individuals who will not be displaced but will be rehoused into new on-site housing","unverified","C123314321",95,"https://archive.org/details/C123314321/page/n94",null,null,null,"Workable program for community improvement : application and recertification, January 1, 1972-December 21, 1973","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123314321:108/3",1971,1971,"May, 1971","building","plan",null,"[name withheld] · built: completed","unverified","C123314321",108,"https://archive.org/details/C123314321/page/n107",null,null,null,"Workable program for community improvement : application and recertification, January 1, 1972-December 21, 1973","n","a",0,2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123314321:108/4",1971,1971,"November 9, 1970","event","plan",null,"Yerba Buena Center Redevelopment Area · other: Court Order in TOOR v. HUD, et al. accepting Agency proposal for resident committee","unverified","C123314321",108,"https://archive.org/details/C123314321/page/n107",null,null,null,"Workable program for community improvement : application and recertification, January 1, 1972-December 21, 1973","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123314321:107/1",1971,1971,"November, 1970","agency","plan",null,"Western Addition Project Area Committee (WAPAC) · approved: second annual contract for a one-year period","unverified","C123314321",107,"https://archive.org/details/C123314321/page/n106",null,null,null,"Workable program for community improvement : application and recertification, January 1, 1972-December 21, 1973","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123314321:102/1",1971,1971,"first part of 1971","event","plan",null,"Fairmount Hill housing proposal (Alpha Land Company) · proposes: Developer modified housing proposal after resident participation","unverified","C123314321",102,"https://archive.org/details/C123314321/page/n101","Fairmount",null,null,"Workable program for community improvement : application and recertification, January 1, 1972-December 21, 1973","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123314321:104/3",1971,1971,"next year","project","plan",null,"Child care centers, Hunters Point Redevelopment Area · built: child care centers to be completed next year","unverified","C123314321",104,"https://archive.org/details/C123314321/page/n103",null,null,null,"Workable program for community improvement : application and recertification, January 1, 1972-December 21, 1973","n","a",0,3.0],["d","qipu:sf/decision/journalofproceed67sanfrich:286/3",1972,1972,"1972-03-27","resolution","redevelopment","passed","The Yerba Buena Center redevelopment area resolution, removing lands outside Project Area D-1, was adopted.","quoted","journalofproceed67sanfrich",286,"https://archive.org/details/journalofproceed67sanfrich/page/n285",null,null,null,null,"n","a",0,6.54],["d","qipu:sf/decision/journalofproceed67sanfrich:340/1",1972,1972,"1972-04-10","motion","redevelopment","referred","Supervisor Kopp's request on racial integration in the Western Addition A-2 redevelopment area was referred to the Planning and Development Committee.","quoted","journalofproceed67sanfrich",340,"https://archive.org/details/journalofproceed67sanfrich/page/n339",null,null,null,null,"n","a",0,4.0],["d","qipu:sf/decision/journalofproceed67sanfrich:356/1",1972,1972,"1972-04-17","resolution","redevelopment","continued","Board refused adoption of a resolution asking the Planning Commission to designate a redevelopment area for a HUD application; reconsideration was continued to April 24, 1972.","unverified","journalofproceed67sanfrich",356,"https://archive.org/details/journalofproceed67sanfrich/page/n355",null,null,null,null,"n","a",0,1.5],["d","qipu:sf/decision/journalofproceed67sanfrich:846/1",1972,1972,"1972-09-05","resolution","redevelopment","passed","Vacation of part of Hawes Street inside the Hunters Point redevelopment area was adopted after a hearing with no protest.","quoted","journalofproceed67sanfrich",846,"https://archive.org/details/journalofproceed67sanfrich/page/n845",null,null,null,null,"n","a",0,9.54],["d","qipu:sf/decision/journalofproceed67sanfrich:941/1",1972,1972,"1972-09-25","resolution","redevelopment","referred","A resolution to vacate parts of several streets in the [name withheld] redevelopment area was referred to the Streets and Transportation Committee.","quoted","journalofproceed67sanfrich",941,"https://archive.org/details/journalofproceed67sanfrich/page/n940",null,null,null,null,"n","a",0,2.0],["d","qipu:sf/decision/journalofproceed67sanfrich:1043/1",1972,1972,"1972-10-30","hearing","redevelopment","passed","Hearing held on proposed vacation of underground part of Howard Street between Third and Fourth in Yerba Buena redevelopment area.","quoted","journalofproceed67sanfrich",1043,"https://archive.org/details/journalofproceed67sanfrich/page/n1042",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed67sanfrich:1070/1",1972,1972,"1972-11-06","motion","redevelopment","passed","Board adopted a motion asking the contractor to suspend construction on Everson Street in Diamond Heights redevelopment area.","quoted","journalofproceed67sanfrich",1070,"https://archive.org/details/journalofproceed67sanfrich/page/n1069",null,null,null,null,"n","a",0,5.54],["d","qipu:sf/decision/journalofproceed68sanfrich:606/1",1973,1973,"1973-06-11","ordinance","housing","passed","Board passed an ordinance reallocating hotel room tax funds to build low-income housing in the Yerba Buena redevelopment area.","quoted","journalofproceed68sanfrich",606,"https://archive.org/details/journalofproceed68sanfrich/page/n606",null,null,null,null,"n","a",0,6.63],["d","qipu:sf/decision/journalofproceed69sanfrich:27/1",1974,1974,"1974-01-07","ordinance","redevelopment","passed","Ordinance giving up part of Jerrold Avenue in the Hunters Point redevelopment area passed final reading.","quoted","journalofproceed69sanfrich",27,"https://archive.org/details/journalofproceed69sanfrich/page/n26",null,null,null,null,"n","a",0,6.41],["d","qipu:sf/decision/journalofproceed69sanfrich:1301/1",1974,1974,"1974-10-28","ordinance","redevelopment","passed","Board finally passed $223,000 (≈ $1.5 million in 2026 dollars) for administrative expenses of the Yerba Buena Center redevelopment area.","quoted","journalofproceed69sanfrich",1301,"https://archive.org/details/journalofproceed69sanfrich/page/n1292",null,null,null,null,"n","a",0,9.49],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124883817:45/1",1974,1974,"February 15, 1968","project","study or report",null,"Hunters Point Redevelopment Project · adopted: Project area selected by City Planning Commission Resolution Number 6180","unverified","C124883817",45,"https://archive.org/details/C124883817/page/n44",null,null,null,"Establishment of Mayor's Office of Economic Development in San Francisco : first year final report","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124883817:45/2",1974,1974,"February 29, 1968","project","study or report",null,"Hunters Point Redevelopment Project · adopted: Preliminary plan formulated by City Planning Commission Resolution Number 6184","unverified","C124883817",45,"https://archive.org/details/C124883817/page/n44",null,null,null,"Establishment of Mayor's Office of Economic Development in San Francisco : first year final report","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124884963:49/1",1975,1975,"","recommendation","study or report",null,"South of Market redevelopment area near [name withheld] · recommendation: Redevelopment limited to northern section near [name withheld]","unverified","C124884963",49,"https://archive.org/details/C124884963/page/n48",null,null,null,"Commercial and industrial activity in San Francisco : present characteristics and future trends : report to San Francisco Department of City Planning","n","m",0,2.0],["d","qipu:sf/decision/journaljanjuneofproceed70sanfrich:118/1",1975,1975,"1975-02-03","resolution","redevelopment","passed","Board adopted a resolution ordering the vacation of portions of certain streets within the Verba Buena Center redevelopment area.","quoted","journaljanjuneofproceed70sanfrich",118,"https://archive.org/details/journaljanjuneofproceed70sanfrich/page/n115",null,null,null,null,"n","a",0,6.79],["d","qipu:sf/decision/journaljanjuneofproceed70sanfrich:118/2",1975,1975,"1975-02-03","hearing","redevelopment","passed","Public hearing held on proposed vacation of parts of Howard and Mission Streets and air space in Verba Buena redevelopment area.","quoted","journaljanjuneofproceed70sanfrich",118,"https://archive.org/details/journaljanjuneofproceed70sanfrich/page/n115",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journaljanjuneofproceed70sanfrich:119/2",1975,1975,"1975-02-03","hearing","redevelopment","passed","Public hearing held on proposed vacation of part of Stevenson Street in the Verba Buena redevelopment area; objectors spoke.","quoted","journaljanjuneofproceed70sanfrich",119,"https://archive.org/details/journaljanjuneofproceed70sanfrich/page/n116",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofjulydecproceed70sanfrich:659/2",1975,1975,"1975-12-15","other","housing","referred","Hearings requested on low-income housing for the elderly in the Yerba Buena Center redevelopment area; referred to committee.","quoted","journalofjulydecproceed70sanfrich",659,"https://archive.org/details/journalofjulydecproceed70sanfrich/page/n659",null,null,null,null,"n","a",0,0.5],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123320752:38/1",1976,1976,"","recommendation","plan",null,"Golden Gateway Redevelopment Area · proposes: Encourage residential use, especially on undeveloped properties within the Golden Gateway Redevelopment Area","unverified","C123320752",38,"https://archive.org/details/C123320752/page/n37",null,null,null,"The plan for the northeastern waterfront : a part of the Master plan of the City and County of San Francisco and a revision of the existing Northern waterfront plan : a proposal for citizen review","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124906302:44/14",1977,1976,"1976","recommendation","study or report",null,"Yerba Buena redevelopment project · approved: Convention center underground with urban theme park on top, approved by voters","unverified","C124906302",44,"https://archive.org/details/C124906302/page/n43",null,null,null,"Indirect environmental impacts : technical memorandum","n","a",0,3.0],["d","qipu:sf/decision/journaljanaprofproceed71sanfrich|g1158",1976,1976,"1976-03-29",null,"redevelopment","passed","Action for [name withheld] area at Evans and Fairfax Avenues approved","unverified","journaljanaprofproceed71sanfrich",338,"https://archive.org/details/journaljanaprofproceed71sanfrich/page/n337",null,null,null,null,"n","m",0,1.04],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123307561:115/1",1977,1977,"","recommendation","plan",null,"Bayview Hunters Point Neighborhood Improvement Plan · recommendation: construction of new housing throughout the area, including the Hunters Point Redevelopment Area","unverified","C123307561",115,"https://archive.org/details/C123307561/page/n114",null,null,null,"Bayview Hunters Point Non-Profit Community Development Corporation's program submission for February 1, 1978 to January 3, 1979 : submitted to the Mayor's Office of Community Development","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124899682:63/4",1978,1978,"","project","study or report",null,"Yerba Buena Center · other: redevelopment boundaries expanded to include BART station areas","unverified","C124899682",63,"https://archive.org/details/C124899682/page/n62",null,null,null,"Land use and urban development project : program-wide case studies","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124899682:63/5",1978,1978,"","project","study or report",null,"Golden Gateway · other: redevelopment boundaries expanded to include BART station areas",null,"C124899682",63,"https://archive.org/details/C124899682/page/n62",null,null,null,"Land use and urban development project : program-wide case studies","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124924016:59/1",1979,1979,"","finding","study or report",null,"Yerba Buena Redevelopment Area · other: development allocation reflects building space programs developed by San Francisco Redevelopment Agency","unverified","C124924016",59,"https://archive.org/details/C124924016/page/n58",null,null,null,"Downtown San Francisco conservation and development planning program : phase I, reconnaissance and programming","n","a",0,4.0],["d","qipu:sf/decision/journaljulydecofproceed74sanfrich:168/1",1979,1979,"1979-08-06","resolution","redevelopment","passed","Resolution ordering the vacation of Masset Place and part of Hunt Street in the Yerba Buena Center redevelopment area was adopted.","quoted","journaljulydecofproceed74sanfrich",168,"https://archive.org/details/journaljulydecofproceed74sanfrich/page/n167",null,null,null,null,"n","a",0,6.54],["d","qipu:sf/decision/journaljulydecofproceed74sanfrich:292/1",1979,1979,"1979-09-04","resolution","redevelopment","passed","Vacation of portions of Keith and Newhall Streets within the [name withheld] was ordered.","quoted","journaljulydecofproceed74sanfrich",292,"https://archive.org/details/journaljulydecofproceed74sanfrich/page/n291",null,null,null,null,"n","a",0,1.54],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123307279:69/3",1980,1980,"","site","study or report",null,"Yerba Buena Redevelopment area · other: 6.23 percent of Hotel Tax revenue set aside for low income housing","unverified","C123307279",69,"https://archive.org/details/C123307279/page/n68",null,null,null,"San Francisco arts policy : a background paper","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902184:63/11",1987,1980,"1980-1986","property_record","study or report",null,"Hunters Point Redevelopment area · units: 445 units completed","unverified","C124902184",63,"https://archive.org/details/C124902184/page/n62",null,null,null,"Issues report for the South Bayshore Study Area","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124878958:17/12",1983,1980,"1980-85 land supply","project","study or report",null,"[name withheld] · acreage: 29.2 acres","unverified","C124878958",17,"https://archive.org/details/C124878958/page/n16",null,null,null,"Local development policy survey update for San Francisco","n","a",0,-2.0],["d","qipu:sf/decision/journaljulydecofproceed76sanfrich:387/2",1981,1981,"1981-10-26","ordinance","redevelopment","passed first reading","The Board passed on first reading an ordinance expanding the Yerba Buena Center redevelopment area, adding downtown retail and housing.","quoted","journaljulydecofproceed76sanfrich",387,"https://archive.org/details/journaljulydecofproceed76sanfrich/page/n386",null,null,null,null,"n","a",0,9.16],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902184:28/2",1987,1982,"1982","finding","study or report",null,"[name withheld] redevelopment area · jobs: Approximately 4000 jobs created since 1980, principally from U.[name withheld] general distribution center constructed in 1982","unverified","C124902184",28,"https://archive.org/details/C124902184/page/n27",null,null,null,"Issues report for the South Bayshore Study Area","n","a",0,2.0],["d","qipu:sf/decision/journalofjanjuneproceed77sanfrich:65/4",1982,1982,"1982-01-18","resolution","housing","passed","Board adopted a $1,343,000 (≈ $4.7 million in 2026 dollars) advance of Community Development Funds for the North of Market Hotel Program, drawn from Rincon Point South Beach redevelopment area.","quoted","journalofjanjuneproceed77sanfrich",65,"https://archive.org/details/journalofjanjuneproceed77sanfrich/page/n64",null,null,null,null,"n","a",0,7.97],["d","qipu:sf/decision/journalofjanjuneproceed77sanfrich:71/4",1982,1982,"1982-01-18","other","redevelopment","referred","Supervisor Kopp's proposal to consider an indoor sports arena in the Yerba Buena Redevelopment Area was referred to committee.","quoted","journalofjanjuneproceed77sanfrich",71,"https://archive.org/details/journalofjanjuneproceed77sanfrich/page/n70",null,null,null,null,"n","a",0,1.5],["d","qipu:sf/decision/journalofjanjuneproceed77sanfrich:248/1",1982,1982,"1982-03-01","resolution","housing","passed","Board approved an amended $23,072,105 (≈ $80.6 million in 2026 dollars) Community Development Program covering federal block grant funds, including deferrals affecting the Bayview Industrial Triangle Redevelopment area.","quoted","journalofjanjuneproceed77sanfrich",248,"https://archive.org/details/journalofjanjuneproceed77sanfrich/page/n247",null,null,null,null,"n","a",0,10.21],["f","dl-sf-facts-v1.1-haiku55-2026-10/c124897684:19/8",1983,1983,"1983","project","study or report",null,"South Beach Redevelopment area · finding: in the planning stage","unverified","c124897684",19,"https://archive.org/details/c124897684/page/n18",null,null,null,"Stadium feasibility analysis : task force report to the mayor, October 1983","n","m",0,3.0],["d","qipu:sf/decision/journaljulydecofproceed79sanfrich:572/3",1984,1984,"1984-11-26","resolution","redevelopment",null,"Resolution finding Verba Buena cultural facilities benefit the redevelopment area was moved for adoption; vote continues on next page.","quoted","journaljulydecofproceed79sanfrich",572,"https://archive.org/details/journaljulydecofproceed79sanfrich/page/n571",null,null,null,null,"n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124879916:105/1",1985,1985,"","site","plan",null,"Rincon Point-South Beach Redevelopment Area · proposes: two new shoreline parks planned","unverified","C124879916",105,"https://archive.org/details/C124879916/page/n104",null,null,null,"Recreation and open space element of the master plan : proposal for citizen review","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124887752:107/1",1985,1985,"","site","ordinance or legislation",null,"Yerba Buena Center Redevelopment Project Area · other: exempt from amendments of Ordinance No. 414-85 (other than Code Sections 320-324)","unverified","C124887752",107,"https://archive.org/details/C124887752/page/n106",null,null,null,"Downtown plan : an ordinance of the City and County of San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124887752:107/2",1985,1985,"","site","ordinance or legislation",null,"Rincon Point Sub-area of the Rincon Point-South Beach Redevelopment Area · other: exempt from amendments of Ordinance No. 414-85 (other than Code Sections 320-324)",null,"C124887752",107,"https://archive.org/details/C124887752/page/n106",null,null,null,"Downtown plan : an ordinance of the City and County of San Francisco","n","a",0,3.0],["d","qipu:sf/decision/journaljanjuneofproceed80sanfrich:61/4",1985,1985,"1985-01-14","ordinance","redevelopment","passed first reading","Ordinance appropriating and rescinding $12,844 (≈ $40,220 in 2026 dollars) for Public Works capital work in the Golden Gateway Redevelopment Area passed on first reading.","quoted","journaljanjuneofproceed80sanfrich",61,"https://archive.org/details/journaljanjuneofproceed80sanfrich/page/n50",null,null,null,null,"n","a",0,6.16],["d","qipu:sf/decision/journaljanjuneofproceed80sanfrich:62/3",1985,1985,"1985-01-14","ordinance","redevelopment","passed first reading","A $12,844 (≈ $40,220 in 2026 dollars) capital budget change for Golden Gateway Redevelopment Area works passed for second reading.","quoted","journaljanjuneofproceed80sanfrich",62,"https://archive.org/details/journaljanjuneofproceed80sanfrich/page/n51",null,null,null,null,"n","a",0,5.91],["d","qipu:sf/decision/journaljanjuneofproceed80sanfrich:87/1",1985,1985,"1985-01-22","ordinance","redevelopment","passed","Public Works capital budget of $12,844 (≈ $40,220 in 2026 dollars) for the Golden Gateway Redevelopment Area was appropriated and rescinded, then finally passed.","quoted","journaljanjuneofproceed80sanfrich",87,"https://archive.org/details/journaljanjuneofproceed80sanfrich/page/n76",null,null,null,null,"n","a",0,6.29],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124889370:33/2",1986,1986,"","site","ordinance or legislation",null,"Yerba Buena Center redevelopment area · other: redevelopment area containing Yerba Buena Gardens","unverified","C124889370",33,"https://archive.org/details/C124889370/page/n32",null,null,null,"Legal effect of Proposition M","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124889370:35/2",1986,1986,"April 25, 1966","event","ordinance or legislation",null,"Redevelopment Plan · adopted: adopted by the Board of Supervisors","unverified","C124889370",35,"https://archive.org/details/C124889370/page/n34",null,null,null,"Legal effect of Proposition M","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124889705:127/7",1987,1987,"","finding","study or report",null,"Redevelopment area south of Geary · finding: proposed developments could spur increased future demand for upscale restaurants and retail shops","unverified","C124889705",127,"https://archive.org/details/C124889705/page/n126",null,null,null,"Neighborhood commercial rezoning : economic impact assessment","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902184:63/1",1987,1987,"","property_record","study or report",null,"Hunters Point Redevelopment area · units: 144 single family units, 146 elderly units, 395 cooperative units, 689 rental apartments","unverified","C124902184",63,"https://archive.org/details/C124902184/page/n62",null,null,null,"Issues report for the South Bayshore Study Area","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902184:65/11",1987,1987,"","finding","study or report",null,"Hunters Point Redevelopment area · finding: a number of boarded up buildings remain near the western edge","unverified","C124902184",65,"https://archive.org/details/C124902184/page/n64",null,null,null,"Issues report for the South Bayshore Study Area","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902184:65/8",1987,1987,"","project","study or report",null,"Hunters Point Redevelopment area rehabilitation · units: preservation of 22 units","unverified","C124902184",65,"https://archive.org/details/C124902184/page/n64",null,null,null,"Issues report for the South Bayshore Study Area","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902184:65/9",1987,1987,"","project","study or report",null,"Mariners Village · units: restoration of 100 units","unverified","C124902184",65,"https://archive.org/details/C124902184/page/n64",null,null,null,"Issues report for the South Bayshore Study Area","n","a",0,3.0],["d","qipu:sf/decision/journalofproceed82septdecsanfrich:230/5",1987,1987,"1987-10-19","hearing","redevelopment","referred","Supervisor Walker's request to reconsider the Fisherman's Wharf Redevelopment area boundaries was sent to the Land Use Committee.","quoted","journalofproceed82septdecsanfrich",230,"https://archive.org/details/journalofproceed82septdecsanfrich/page/n229",null,null,null,null,"n","a",0,4.0],["d","qipu:sf/decision/journalofproceed82septdecsanfrich:232/2",1987,1987,"1987-10-19","motion","redevelopment",null,"Walker asks the City Attorney to draft a resolution resetting the Fisherman's Wharf Redevelopment Area boundaries and rescinding File 395-87-1.","quoted","journalofproceed82septdecsanfrich",232,"https://archive.org/details/journalofproceed82septdecsanfrich/page/n231",null,null,null,null,"n","a",0,4.0],["d","qipu:sf/decision/journalofproceed82septdecsanfrich:292/2",1987,1987,"1987-11-02","ordinance","redevelopment","passed first reading","Plan amendment for the Western Addition redevelopment area, allowing hotels and changing land uses, passed for second reading as amended.","quoted","journalofproceed82septdecsanfrich",292,"https://archive.org/details/journalofproceed82septdecsanfrich/page/n291",null,null,null,null,"n","a",0,7.16],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902184:61/9",1987,1987,"since 1970","property_record","study or report",null,"Hunters Point Redevelopment area housing · built: approximately 1,374 housing units constructed since 1970","unverified","C124902184",61,"https://archive.org/details/C124902184/page/n60",null,null,null,"Issues report for the South Bayshore Study Area","n","a",0,3.0],["d","qipu:sf/decision/journalofjanaprproceed83sanfrich:156/5",1988,1988,"1988-02-01","resolution","redevelopment","referred","Proposed resolution declaring intent to vacate subsurface street areas in the Yerba Buena Center redevelopment area.","quoted","journalofjanaprproceed83sanfrich",156,"https://archive.org/details/journalofjanaprproceed83sanfrich/page/n156",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofjanaprproceed83sanfrich:280/1",1988,1988,"1988-02-29","ordinance","housing","passed","Ordinance passed directing hotel tax money to low-income housing outside the Yerba Buena Center redevelopment area.","quoted","journalofjanaprproceed83sanfrich",280,"https://archive.org/details/journalofjanaprproceed83sanfrich/page/n280",null,null,null,null,"n","a",0,6.51],["d","qipu:sf/decision/journalofjanaprproceed83sanfrich:416/4",1988,1988,"1988-03-14","hearing","redevelopment","passed first reading","A public hearing was held on the proposed vacation of subsurface street areas in the Yerba Buena Center redevelopment area.","quoted","journalofjanaprproceed83sanfrich",416,"https://archive.org/details/journalofjanaprproceed83sanfrich/page/n416",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofjanaprproceed83sanfrich:563/2",1988,1988,"1988-04-11","ordinance","redevelopment","passed first reading","Sidewalk widths on various streets in the South Beach Redevelopment area amended and passed for second reading.","quoted","journalofjanaprproceed83sanfrich",563,"https://archive.org/details/journalofjanaprproceed83sanfrich/page/n563",null,null,null,null,"n","a",0,-0.59],["d","qipu:sf/decision/journalmayaugofproceed83sanfrich:616/3",1988,1988,"1988-08-22","ordinance","redevelopment","tabled","Proposed ordinance would merge the Embarcadero-Lower Market redevelopment area with several other project areas into one project.","quoted","journalmayaugofproceed83sanfrich",616,"https://archive.org/details/journalmayaugofproceed83sanfrich/page/n616",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalmayaugofproceed83sanfrich:617/3",1988,1988,"1988-08-22","ordinance","redevelopment","tabled","Proposed ordinance merging the Hunters Point redevelopment area into a larger project was tabled.","quoted","journalmayaugofproceed83sanfrich",617,"https://archive.org/details/journalmayaugofproceed83sanfrich/page/n617",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalmayaugofproceed83sanfrich:618/3",1988,1988,"1988-08-22","ordinance","redevelopment","tabled","A proposed ordinance merging the Western Addition redevelopment area A-2 into a merged project continues to the next page.","quoted","journalmayaugofproceed83sanfrich",618,"https://archive.org/details/journalmayaugofproceed83sanfrich/page/n618",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalmayaugofproceed83sanfrich:620/1",1988,1988,"1988-08-22","ordinance","redevelopment","tabled","Board tabled the ordinance merging the Yerba Buena Center redevelopment area into a larger merged redevelopment project.","quoted","journalmayaugofproceed83sanfrich",620,"https://archive.org/details/journalmayaugofproceed83sanfrich/page/n620",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalmayaugofproceed83sanfrich:621/1",1988,1988,"1988-08-22","ordinance","redevelopment","tabled","Proposal to merge the India Basin Industrial Park redevelopment area into a larger merged project was tabled.","quoted","journalmayaugofproceed83sanfrich",621,"https://archive.org/details/journalmayaugofproceed83sanfrich/page/n621",null,null,null,null,"n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124905627:75/4",1989,1989,"","recommendation","study or report",null,"Kiska Road redevelopment site · proposes: Designate proposed commercial site on Kiska Road in Hunters Point Redevelopment Area as secondary node","unverified","C124905627",75,"https://archive.org/details/C124905627/page/n74","Kiska Road",null,null,"South Bayshore plan : a proposal for citizen review","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124905450:107/1",1991,1989,"1989","finding","plan",null,"Redevelopment Area housing projects · finding: White persons made up the majority of renters of apartments set aside for low and moderate income renters","unverified","C124905450",107,"https://archive.org/details/C124905450/page/n106",null,null,null,"1992 comprehensive housing affordability strategy, city and county of San Francisco","n","a",0,3.0],["d","qipu:sf/decision/journalofproceedjanjune85sanfrich:315/1",1990,1990,"1990-03-12","ordinance","landmarks-old-buildings","passed first reading","Ordinance designating the South End Historic District, including parts of the Rincon Point/South Beach redevelopment area, passed for second reading.","quoted","journalofproceedjanjune85sanfrich",315,"https://archive.org/details/journalofproceedjanjune85sanfrich/page/n315",null,null,null,null,"n","a",0,7.19],["d","qipu:sf/decision/journalofmayaugproceed86sanfrich:520/5",1991,1991,"1991-08-19","resolution","redevelopment","referred","CEQA findings for the Rincon Point - South Beach Redevelopment Area amendment were sent to a joint public hearing.","quoted","journalofmayaugproceed86sanfrich",520,"https://archive.org/details/journalofmayaugproceed86sanfrich/page/n519",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofmayaugproceed86sanfrich:549/2",1991,1991,"1991-08-26","resolution","redevelopment","continued","Board continued to September 9, 1991 the CEQA findings resolution for the Rincon Point South Beach redevelopment area amendment.","quoted","journalofmayaugproceed86sanfrich",549,"https://archive.org/details/journalofmayaugproceed86sanfrich/page/n548",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/journalofmayaugproceed86sanfrich:549/3",1991,1991,"1991-08-26","ordinance","redevelopment","continued","Board continued to September 9, 1991 an ordinance allowing housing, offices and taller buildings in the Rincon Point South Beach redevelopment area.","quoted","journalofmayaugproceed86sanfrich",549,"https://archive.org/details/journalofmayaugproceed86sanfrich/page/n548",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/journalofseptoctproceed86sanfrich:55/1",1991,1991,"1991-09-09","resolution","redevelopment","continued","Board continued environmental findings for the Rincon Point-South Beach redevelopment area amendment until September 16, 1991.","quoted","journalofseptoctproceed86sanfrich",55,"https://archive.org/details/journalofseptoctproceed86sanfrich/page/n54",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofseptoctproceed86sanfrich:112/2",1991,1991,"1991-09-23","resolution","redevelopment","continued","CEQA findings on the Rincon Point-South Beach redevelopment area amendment were continued to October 7, 1991.","quoted","journalofseptoctproceed86sanfrich",112,"https://archive.org/details/journalofseptoctproceed86sanfrich/page/n111",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/journalofseptoctproceed86sanfrich:172/2",1991,1991,"1991-10-07","resolution","redevelopment","continued","Board continued CEQA findings for the Rincon Point-South Beach Redevelopment Area amendment to November 12, 1991.","quoted","journalofseptoctproceed86sanfrich",172,"https://archive.org/details/journalofseptoctproceed86sanfrich/page/n171",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofseptoctproceed86sanfrich|159",1991,1991,"1991-11-12","ordinance","land-and-building","passed first reading","Housing and 160-foot heights proposed for the South Beach redevelopment area","unverified","journalofseptoctproceed86sanfrich",329,"https://archive.org/details/journalofseptoctproceed86sanfrich/page/n326",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofseptoctproceed86sanfrich|161",1991,1991,"1991-11-12","ordinance","land-and-building","passed first reading","Housing and 160-foot heights proposed for the South Beach redevelopment area","unverified","journalofseptoctproceed86sanfrich",330,"https://archive.org/details/journalofseptoctproceed86sanfrich/page/n327",null,null,null,null,"n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124903911:121/1",1992,1992,"","site","audit",null,"Rincon Point-South Beach redevelopment area · other: RP-SB: Rincon Point-South Beach redevelopment area","unverified","C124903911",121,"https://archive.org/details/C124903911/page/n120",null,null,null,"Report to the San Francisco Board of Supervisors : management audit of the San Francisco Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124903911:121/2",1992,1992,"","site","audit",null,"Bayview Industrial Triangle redevelopment area · other: BIT: Bayview Industrial Triangle redevelopment area","unverified","C124903911",121,"https://archive.org/details/C124903911/page/n120",null,null,null,"Report to the San Francisco Board of Supervisors : management audit of the San Francisco Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124903911:121/3",1992,1992,"","site","audit",null,"India Basin Industrial Park redevelopment area · other: IBIP: India Basin Industrial Park redevelopment area","unverified","C124903911",121,"https://archive.org/details/C124903911/page/n120",null,null,null,"Report to the San Francisco Board of Supervisors : management audit of the San Francisco Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124903911:121/4",1992,1992,"","site","audit",null,"Mariners Village redevelopment area · other: MV: Mariners Village redevelopment area","unverified","C124903911",121,"https://archive.org/details/C124903911/page/n120",null,null,null,"Report to the San Francisco Board of Supervisors : management audit of the San Francisco Redevelopment Agency","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124908577:91/2",1992,1992,"","site","study or report",null,"South Beach Harbor · other: developed as the centerpiece in attracting residential development in the South Beach Redevelopment Area","unverified","C124908577",91,"https://archive.org/details/C124908577/page/n90",null,null,null,"[Public information documents relating to Port of San Francisco waterfront plan project]","n","a",0,3.0],["d","qipu:sf/decision/journalofjanjunproceed87sanfrich:393/7",1992,1992,"1992-03-30","ordinance","redevelopment",null,"Proposed expansion of the Rincon Point-South Beach redevelopment area by a small parcel, with public hearing set for May 4, 1992.","quoted","journalofjanjunproceed87sanfrich",393,"https://archive.org/details/journalofjanjunproceed87sanfrich/page/n393",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofjanjunproceed87sanfrich|170",1992,1992,"1992-03-30","ordinance","land-and-building",null,"Rincon Point redevelopment area to be widened by 3,446 square feet","unverified","journalofjanjunproceed87sanfrich",393,"https://archive.org/details/journalofjanjunproceed87sanfrich/page/n393",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/map:journalofjanjunproceed87sanfrich/393/0714e7b7",1992,1992,"1992-03-30","ordinance",null,null,"Rincon Point redevelopment area to be widened by 3,446 square feet","unverified","journalofjanjunproceed87sanfrich",393,"https://archive.org/details/journalofjanjunproceed87sanfrich/page/n393",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofjanjunproceed87sanfrich:521/2",1992,1992,"1992-05-04","ordinance","redevelopment","passed first reading","An ordinance to add a 3,446 square foot lot to the Rincon Point-South Beach redevelopment area passed for second reading.","quoted","journalofjanjunproceed87sanfrich",521,"https://archive.org/details/journalofjanjunproceed87sanfrich/page/n521",null,null,null,null,"n","a",0,6.41],["d","qipu:sf/decision/journalofjanjunproceed87sanfrich:522/1",1992,1992,"1992-05-04","ordinance","redevelopment","passed first reading","Ordinance expanding the Rincon Point-South Beach redevelopment area by a small lot and extending eminent domain powers passed second reading.","quoted","journalofjanjunproceed87sanfrich",522,"https://archive.org/details/journalofjanjunproceed87sanfrich/page/n522",null,null,null,null,"n","a",0,6.54],["d","qipu:sf/decision/journalofjanjunproceed87sanfrich|216",1992,1992,"1992-05-04","ordinance","land-and-building",null,"Rincon Point redevelopment area to be widened by 3,446 square feet","unverified","journalofjanjunproceed87sanfrich",521,"https://archive.org/details/journalofjanjunproceed87sanfrich/page/n521",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofjanjunproceed87sanfrich:549/3",1992,1992,"1992-05-11","ordinance","redevelopment","passed","The Board finally passed an ordinance adding a small Rincon Point lot to the South Beach redevelopment area and extending eminent domain for five years.","quoted","journalofjanjunproceed87sanfrich",549,"https://archive.org/details/journalofjanjunproceed87sanfrich/page/n549",null,null,null,null,"n","a",0,6.54],["d","qipu:sf/decision/journalofjanjunproceed87sanfrich|226",1992,1992,"1992-05-11","ordinance","land-and-building",null,"Rincon Point redevelopment area to be widened by 3,446 square feet","unverified","journalofjanjunproceed87sanfrich",549,"https://archive.org/details/journalofjanjunproceed87sanfrich/page/n549",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofjanjunproceed87sanfrich|280",1992,1992,"1992-06-22","ordinance","land-and-building",null,"Rincon Point redevelopment area to be widened by 3,446 square feet","unverified","journalofjanjunproceed87sanfrich",758,"https://archive.org/details/journalofjanjunproceed87sanfrich/page/n758",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofjuldecproceed87sanfrich:152/1",1992,1992,"1992-08-03","ordinance","redevelopment","passed first reading","Western Addition Redevelopment Area A-2 plan amendment raising the tax-increment limit to $190.3 million (≈ $457.0 million in 2026 dollars) passed for second reading.","quoted","journalofjuldecproceed87sanfrich",152,"https://archive.org/details/journalofjuldecproceed87sanfrich/page/n152",null,null,null,null,"n","a",0,11.72],["d","qipu:sf/decision/journalofjuldecproceed87sanfrich|47",1992,1992,"1992-08-03","ordinance","land-and-building",null,"Rincon Point redevelopment area to be widened near the Embarcadero Freeway; passed first reading only, later finally passed","unverified","journalofjuldecproceed87sanfrich",150,"https://archive.org/details/journalofjuldecproceed87sanfrich/page/n150",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofjuldecproceed87sanfrich|54",1992,1992,"1992-08-10","ordinance","land-and-building",null,"Rincon Point redevelopment area widened, land-taking power extended five years","unverified","journalofjuldecproceed87sanfrich",174,"https://archive.org/details/journalofjuldecproceed87sanfrich/page/n174",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalseptdecofproceed88sanfrich:320/1",1993,1993,"1993-11-15","ordinance","redevelopment","referred","Proposal to merge the India Basin Industrial Park redevelopment area into one merged project, referred to a December 13 joint hearing.","quoted","journalseptdecofproceed88sanfrich",320,"https://archive.org/details/journalseptdecofproceed88sanfrich/page/n320",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalseptdecofproceed88sanfrich:458/2",1993,1993,"1993-12-13","ordinance","redevelopment","continued","Proposed merger of the South of Market Earthquake Recovery redevelopment area into a larger project is continued to December 20, 1993.","unverified","journalseptdecofproceed88sanfrich",458,"https://archive.org/details/journalseptdecofproceed88sanfrich/page/n458",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/journalseptdecofproceed88sanfrich:461/1",1993,1993,"1993-12-13","ordinance","redevelopment","continued","Proposal to merge the Rincon Point-South Beach redevelopment area into a larger merged project was continued to December 20, 1993.","quoted","journalseptdecofproceed88sanfrich",461,"https://archive.org/details/journalseptdecofproceed88sanfrich/page/n461",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/journalseptdecofproceed88sanfrich:462/1",1993,1993,"1993-12-13","ordinance","redevelopment","continued","Proposed ordinance to merge the Rincon Point-South Beach redevelopment area into a combined project was continued to December 20, 1993.","unverified","journalseptdecofproceed88sanfrich",462,"https://archive.org/details/journalseptdecofproceed88sanfrich/page/n462",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/journalseptdecofproceed88sanfrich:494/1",1993,1993,"1993-12-20","ordinance","redevelopment","tabled","Proposal to merge the Hunters Point redevelopment area into a larger redevelopment project was tabled.","quoted","journalseptdecofproceed88sanfrich",494,"https://archive.org/details/journalseptdecofproceed88sanfrich/page/n494",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalseptdecofproceed88sanfrich:494/2",1993,1993,"1993-12-20","ordinance","redevelopment","tabled","Proposal to merge the South of Market Earthquake Recovery redevelopment area into a larger project was tabled.","quoted","journalseptdecofproceed88sanfrich",494,"https://archive.org/details/journalseptdecofproceed88sanfrich/page/n494",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalseptdecofproceed88sanfrich:496/1",1993,1993,"1993-12-20","ordinance","redevelopment","tabled","Proposal to merge the Golden Gateway redevelopment area into a larger merged project was tabled.","quoted","journalseptdecofproceed88sanfrich",496,"https://archive.org/details/journalseptdecofproceed88sanfrich/page/n496",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalseptdecofproceed88sanfrich:496/3",1993,1993,"1993-12-20","ordinance","redevelopment",null,"Proposal to merge the Rincon Point-South Beach redevelopment area into a larger merged project; outcome continues on next page.","quoted","journalseptdecofproceed88sanfrich",496,"https://archive.org/details/journalseptdecofproceed88sanfrich/page/n496",null,null,null,null,"n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101737381:265/2",1994,1994,"1994","site","ordinance or legislation",null,"South Beach-Rincon Point Redevelopment Area · use: new restaurants classified as principal permitted uses","unverified","C101737381",265,"https://archive.org/details/C101737381/page/n264",null,null,null,"Draft waterfront land use plan","n","a",0,3.0],["d","qipu:sf/decision/journalmayaugofproceed89sanfrich:173/2",1994,1994,"1994-06-27","ordinance","redevelopment","passed","Hotel occupancy tax suspended in the Chinese Cultural and Trade Center redevelopment area, allowing a 12 percent tax, finally passed.","quoted","journalmayaugofproceed89sanfrich",173,"https://archive.org/details/journalmayaugofproceed89sanfrich/page/n173",null,null,null,null,"n","a",0,6.66],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124908106:162/2",1994,1994,"1994-11-04","finding","ordinance or legislation",null,"Port property restaurant use authorization · finding: New restaurants are principal permitted uses in C-3 district and South Beach-Rincon Point Redevelopment Area, but require conditional use authorization on Port property; can add six months or more","unverified","C124908106",162,"https://archive.org/details/C124908106/page/n161",null,null,null,"Port of San Francisco : draft waterfront land use plan","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:118/1",1995,1995,"","project","study or report",null,"Embarcadero - Lower Market (Golden Gateway) Redevelopment Project · built: 1,400 new housing units","unverified","C124914193",118,"https://archive.org/details/C124914193/page/n118",null,null,null,"Transbay area plan : background data report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:118/2",1995,1995,"","project","study or report",null,"Embarcadero - Lower Market (Golden Gateway) Redevelopment Project · floor area sqft: 3 million s.f. of office/commercial space","unverified","C124914193",118,"https://archive.org/details/C124914193/page/n118",null,null,null,"Transbay area plan : background data report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:118/3",1995,1995,"","project","study or report",null,"Embarcadero - Lower Market (Golden Gateway) Redevelopment Project · acreage: 51 acre project area","unverified","C124914193",118,"https://archive.org/details/C124914193/page/n118",null,null,null,"Transbay area plan : background data report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914759:107/5",1995,1995,"","alternative","ordinance or legislation",null,"Alternative B--No Change in the 1980 Redevelopment Plan · jobs: About 800 fewer job opportunities than the proposed project","unverified","C124914759",107,"https://archive.org/details/C124914759/page/n106",null,null,null,"Amendments to the master plan adopted between September 1988 and March 1995","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914759:107/6",1995,1995,"","alternative","ordinance or legislation",null,"Alternative C--Change in Designation of Sites C-1 and D Only · units: Reduces housing possible by nearly 300 units; infeasible","unverified","C124914759",107,"https://archive.org/details/C124914759/page/n106",null,null,null,"Amendments to the master plan adopted between September 1988 and March 1995","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914759:108/3",1995,1995,"","alternative","ordinance or legislation",null,"Alternative E - Alternate Residential/Parking Use at Sites I-1 and I-3 · alternative: reduction of 29,000 sq. ft. of retail in the Redevelopment Area","unverified","C124914759",108,"https://archive.org/details/C124914759/page/n107",null,null,null,"Amendments to the master plan adopted between September 1988 and March 1995","n","a",0,3.0],["d","qipu:sf/decision/journalseptdecofproceed90sanfrich:93/1",1995,1995,"1995-10-02","ordinance","redevelopment","referred","Proposed ordinance would merge the South of Market Earthquake Recovery redevelopment area with Golden Gateway; referred to committee.","quoted","journalseptdecofproceed90sanfrich",93,"https://archive.org/details/journalseptdecofproceed90sanfrich/page/n90",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/journalseptdecofproceed90sanfrich:93/2",1995,1995,"1995-10-02","ordinance","redevelopment","referred","Proposed ordinance would merge Golden Gateway Project Area E-1 with the South of Market redevelopment area; referred to committee.","quoted","journalseptdecofproceed90sanfrich",93,"https://archive.org/details/journalseptdecofproceed90sanfrich/page/n90",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/journalseptdecofproceed90sanfrich:210/6",1995,1995,"1995-11-20","ordinance","redevelopment","passed first reading","Supervisors passed on first reading a Fourth Amendment to a Port lease option for properties in the South Beach Redevelopment Area.","quoted","journalseptdecofproceed90sanfrich",210,"https://archive.org/details/journalseptdecofproceed90sanfrich/page/n207",null,null,null,null,"n","a",0,-0.71],["d","qipu:sf/decision/journalseptdecofproceed90sanfrich:227/7",1995,1995,"1995-12-04","ordinance","redevelopment","passed","Port and Redevelopment Agency amend an option to lease properties in South Beach Redevelopment Area, passed on final reading.","quoted","journalseptdecofproceed90sanfrich",227,"https://archive.org/details/journalseptdecofproceed90sanfrich/page/n224",null,null,null,null,"n","a",0,0.41],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916687:72/1",1996,1996,"","project","study or report",null,"South of Market Redevelopment Area · units: About 1600 new or rehabilitated family and small size units planned","unverified","C124916687",72,"https://archive.org/details/C124916687/page/n71",null,null,null,"Community safety element : summary background report","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916687:72/2",1996,1996,"","project","study or report",null,"South of Market Redevelopment Area · units: 600 new SRO units planned","unverified","C124916687",72,"https://archive.org/details/C124916687/page/n71",null,null,null,"Community safety element : summary background report","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124919102:25/2",1996,1996,"","recommendation","plan",null,"Proposed commercial site on Kiska Road · proposes: Designate as secondary commercial area with Neighborhood Commercial zoning","unverified","C124919102",25,"https://archive.org/details/C124919102/page/n24","Kiska Road",null,null,"South Bayshore : a new beginning : citizen's guide to the South Bayshore plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916687:72/3",1996,1996,"August 1995","project","study or report",null,"South of Market Redevelopment Area · units: 228 units completed","unverified","C124916687",72,"https://archive.org/details/C124916687/page/n71",null,null,null,"Community safety element : summary background report","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916687:72/4",1996,1996,"August 1995","project","study or report",null,"South of Market Redevelopment Area · units: 109 units under construction","unverified","C124916687",72,"https://archive.org/details/C124916687/page/n71",null,null,null,"Community safety element : summary background report","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916687:72/5",1996,1996,"August 1995","project","study or report",null,"South of Market Redevelopment Area · units: 230 units in pre-development process","unverified","C124916687",72,"https://archive.org/details/C124916687/page/n71",null,null,null,"Community safety element : summary background report","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922692:122/6",1997,1997,"","alternative","ordinance or legislation",null,"Alternative C--Change in Designation of Sites C-1 and D Only · units: reduce housing possible in Redevelopment Area by nearly 300 units","unverified","C124922692",122,"https://archive.org/details/C124922692/page/n121",null,null,null,"San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922692:123/4",1997,1997,"","alternative","ordinance or legislation",null,"Alternative E, Redevelopment Area retail · alternative: Reduction of 29,000 sq. ft. of retail in the Redevelopment Area, no new retail on Site I-3","unverified","C124922692",123,"https://archive.org/details/C124922692/page/n122",null,null,null,"San Francisco general plan : amendments to the general plan : adopted between September 1988 and July 1997","n","a",0,3.0],["d","qipu:sf/decision/journalofproceedjanapr92sanfrich:30/1",1997,1997,"1997-01-13","ordinance","redevelopment","referred","Supervisor Yaki proposed adding residential use and density to east block 1 of the Yerba Buena Center redevelopment area; referred to the Board.","quoted","journalofproceedjanapr92sanfrich",30,"https://archive.org/details/journalofproceedjanapr92sanfrich/page/n30",null,null,null,null,"n","a",0,4.0],["d","qipu:sf/decision/journalofproceedjanapr92sanfrich:104/3",1997,1997,"1997-02-10","resolution","redevelopment","passed","Resolution confirming members of the Project Area Committee for the South Bayshore/Hunters Point redevelopment area was adopted.","quoted","journalofproceedjanapr92sanfrich",104,"https://archive.org/details/journalofproceedjanapr92sanfrich/page/n104",null,null,null,null,"n","a",0,6.41],["d","qipu:sf/decision/journalofmayaugproceed92sanfrich:84/2",1997,1997,"1997-05-27","ordinance","redevelopment","referred","Ordinance to add South Beach waterfront lots and piers to the Rincon Point-South Beach redevelopment area was referred to the Board.","quoted","journalofmayaugproceed92sanfrich",84,"https://archive.org/details/journalofmayaugproceed92sanfrich/page/n83",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofmayaugproceed92sanfrich:191/2",1997,1997,"1997-06-30","ordinance","redevelopment","passed first reading","The Board passed on first reading, as amended, an ordinance expanding the Rincon Point-South Beach redevelopment area to include piers and seawall lots.","quoted","journalofmayaugproceed92sanfrich",191,"https://archive.org/details/journalofmayaugproceed92sanfrich/page/n190",null,null,null,null,"n","a",0,7.16],["d","qipu:sf/decision/journalofmayaugproceed92sanfrich:206/3",1997,1997,"1997-07-07","ordinance","redevelopment","passed","Rincon Point-South Beach redevelopment area expanded to add piers, seawall lots and streets near the ballpark.","quoted","journalofmayaugproceed92sanfrich",206,"https://archive.org/details/journalofmayaugproceed92sanfrich/page/n205",null,null,null,null,"n","a",0,7.04],["d","qipu:sf/decision/journalofmayaugproceed92sanfrich:212/4",1997,1997,"1997-07-07","ordinance","redevelopment","referred","Proposed expansion of the Rincon Point-South Beach redevelopment area to Block 3766 sent to committee.","quoted","journalofmayaugproceed92sanfrich",212,"https://archive.org/details/journalofmayaugproceed92sanfrich/page/n211",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofmayaugproceed92sanfrich|118",1997,1997,"1997-07-07","ordinance","land-and-building","referred","Rincon Point-South Beach redevelopment area to grow at Beale and Bryant; sent to committee, no final vote found","unverified","journalofmayaugproceed92sanfrich",212,"https://archive.org/details/journalofmayaugproceed92sanfrich/page/n211",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofmayaugproceed92sanfrich:311/2",1997,1997,"1997-08-11","hearing","redevelopment","passed first reading","Public hearing held on expanding the Rincon Point-South Beach redevelopment area to Block 3766 at Beale and Bryant Streets; committee reported without recommendation.","quoted","journalofmayaugproceed92sanfrich",311,"https://archive.org/details/journalofmayaugproceed92sanfrich/page/n310",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofmayaugproceed92sanfrich:312/2",1997,1997,"1997-08-11","ordinance","redevelopment","passed first reading","The Board passed on first reading an ordinance expanding the Rincon Point-South Beach redevelopment area to part of Block 3766 at Beale and Bryant Streets.","quoted","journalofmayaugproceed92sanfrich",312,"https://archive.org/details/journalofmayaugproceed92sanfrich/page/n311",null,null,null,null,"n","a",0,6.54],["d","qipu:sf/decision/journalofmayaugproceed92sanfrich|214",1997,1997,"1997-08-11","ordinance","land-and-building",null,"South Beach redevelopment area proposed to grow at Beale and Bryant","unverified","journalofmayaugproceed92sanfrich",311,"https://archive.org/details/journalofmayaugproceed92sanfrich/page/n310",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofmayaugproceed92sanfrich|215",1997,1997,"1997-08-11","ordinance","land-and-building","passed first reading","South Beach redevelopment area proposed to grow at Beale and Bryant","unverified","journalofmayaugproceed92sanfrich",312,"https://archive.org/details/journalofmayaugproceed92sanfrich/page/n311",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofmayaugproceed92sanfrich:333/1",1997,1997,"1997-08-18","ordinance","redevelopment","passed","Ordinance finally passed expanding the Rincon Point-South Beach redevelopment area to add land at Beale and Bryant Streets.","quoted","journalofmayaugproceed92sanfrich",333,"https://archive.org/details/journalofmayaugproceed92sanfrich/page/n332",null,null,null,null,"n","a",0,6.66],["d","qipu:sf/decision/journalofmayaugproceed92sanfrich:346/4",1997,1997,"1997-08-18","ordinance","redevelopment","referred","Proposed merger of the South of Market Earthquake Recovery redevelopment area into a larger project was referred to committee.","quoted","journalofmayaugproceed92sanfrich",346,"https://archive.org/details/journalofmayaugproceed92sanfrich/page/n345",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/journalofmayaugproceed92sanfrich:346/5",1997,1997,"1997-08-18","ordinance","redevelopment","referred","Proposed merger of the Embarcadero-Lower Market redevelopment area into a larger project was referred to the Committee of the Whole.","quoted","journalofmayaugproceed92sanfrich",346,"https://archive.org/details/journalofmayaugproceed92sanfrich/page/n345",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofmayaugproceed92sanfrich|234",1997,1997,"1997-08-18","ordinance","land-and-building",null,"South Beach redevelopment area proposed to grow at Beale and Bryant","unverified","journalofmayaugproceed92sanfrich",332,"https://archive.org/details/journalofmayaugproceed92sanfrich/page/n331",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed92septdecsanfrich:21/6",1997,1997,"1997-09-15","ordinance","redevelopment","referred","A substitute ordinance merging the Embarcadero-Lower Market redevelopment area into a larger project was referred to Committee of the Whole.","quoted","journalofproceed92septdecsanfrich",21,"https://archive.org/details/journalofproceed92septdecsanfrich/page/n20",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/journalofproceed92septdecsanfrich:21/7",1997,1997,"1997-09-15","ordinance","redevelopment","referred","A substitute ordinance merging the South of Market Earthquake Recovery redevelopment area was referred to Committee of the Whole.","quoted","journalofproceed92septdecsanfrich",21,"https://archive.org/details/journalofproceed92septdecsanfrich/page/n20",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/journalofproceed92septdecsanfrich:73/2",1997,1997,"1997-10-06","ordinance","redevelopment","passed first reading","Ordinance merging the South of Market Earthquake Recovery redevelopment area into one merged project passed for second reading.","quoted","journalofproceed92septdecsanfrich",73,"https://archive.org/details/journalofproceed92septdecsanfrich/page/n72",null,null,null,null,"n","a",0,6.66],["d","qipu:sf/decision/journalofproceed92septdecsanfrich:168/4",1997,1997,"1997-11-10","hearing","redevelopment","continued","The Board continued the hearing on expanding the Rincon Point-South Beach redevelopment area to January 12, 1998.","quoted","journalofproceed92septdecsanfrich",168,"https://archive.org/details/journalofproceed92septdecsanfrich/page/n167",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed92septdecsanfrich:169/1",1997,1997,"1997-11-10","ordinance","redevelopment","continued","Proposed expansion of the Rincon Point-South Beach redevelopment area to add Block 3774 land was continued to January 12, 1998.","quoted","journalofproceed92septdecsanfrich",169,"https://archive.org/details/journalofproceed92septdecsanfrich/page/n168",null,null,null,null,"n","a",0,0.5],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124910717:401/2",1998,1998,"","project","environmental impact report",null,"Bayview-Hunters Point redevelopment area · proposes: proposed Bayview-Hunters Point redevelopment area","unverified","C124910717",401,"https://archive.org/details/C124910717/page/n400",null,null,null,"Revised draft environmental impact statement/environmental impact report for the disposal and reuse of Hunters Point Shipyard","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124910717:739/1",1998,1998,"","project","environmental impact report",null,"Hunters Point Shipyard Redevelopment Area · approved: Redevelopment Plan approved by the San Francisco Board of Supervisors","unverified","C124910717",739,"https://archive.org/details/C124910717/page/n738",null,null,null,"Revised draft environmental impact statement/environmental impact report for the disposal and reuse of Hunters Point Shipyard","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124910717:739/2",1998,1998,"","project","environmental impact report",null,"Hunters Point Shipyard Design for Development · approved: approved by the City Planning Commission and the Redevelopment Agency Commission","unverified","C124910717",739,"https://archive.org/details/C124910717/page/n738",null,null,null,"Revised draft environmental impact statement/environmental impact report for the disposal and reuse of Hunters Point Shipyard","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:235/1",1998,1998,"","property_record","environmental impact report",null,"Golden Gateway Redevelopment Plan · units: 1,654 multifamily dwelling units proposed","unverified","C124915258",235,"https://archive.org/details/C124915258/page/n234",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:235/3",1998,1998,"","property_record","environmental impact report",null,"Golden Gateway Redevelopment Plan · floor area sqft: Maximum of 27,100 square meters (292,000 square feet) of commercial development proposed","unverified","C124915258",235,"https://archive.org/details/C124915258/page/n234",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:235/4",1998,1998,"","building","environmental impact report",null,"Embarcadero Center · other: Six office towers with commercial uses at lower levels","unverified","C124915258",235,"https://archive.org/details/C124915258/page/n234",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:64/16",1998,1998,"","project","environmental impact report",null,"Rincon Entertainment Center/US Postal Service Project · proposes: Development in the proposed Transbay Redevelopment Area, including the Rincon Entertainment Center/US Postal Service Project","unverified","C124915258",64,"https://archive.org/details/C124915258/page/n63",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:64/22",1998,1998,"","project","environmental impact report",null,"Proposed Transbay Redevelopment Plan · proposes: Proposed Transbay Redevelopment Plan","unverified","C124915258",64,"https://archive.org/details/C124915258/page/n63",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922683:22/4",1998,1998,"","finding","ordinance or legislation",null,"Port properties in South Beach · use: Port properties developed with housing within Rincon Point-South Beach Redevelopment Area will continue to support housing uses","unverified","C124922683",22,"https://archive.org/details/C124922683/page/n21",null,null,null,"San Francisco general plan : amendments to the general plan : adopted between August 1997 and June 1998","n","a",0,3.0],["d","qipu:sf/decision/journalofproceed93sanfrich:22/4",1998,1998,"1998-01-05","ordinance","redevelopment","continued","Proposed expansion of the Rincon Point-South Beach redevelopment area to add [name withheld] land at Block 3774 was postponed to March 30, 1998.","quoted","journalofproceed93sanfrich",22,"https://archive.org/details/journalofproceed93sanfrich/page/n21",null,null,null,null,"n","a",0,2.0],["d","qipu:sf/decision/journalofproceed93sanfrich:223/3",1998,1998,"1998-03-30","hearing","redevelopment","tabled","Hearing on expanding the Rincon Point-South Beach redevelopment area to part of Block 3774 was tabled.","quoted","journalofproceed93sanfrich",223,"https://archive.org/details/journalofproceed93sanfrich/page/n222",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journalofproceed93sanfrich:223/4",1998,1998,"1998-03-30","ordinance","redevelopment","tabled","Ordinance expanding the Rincon Point-South Beach redevelopment area to part of Block 3774 was tabled.","quoted","journalofproceed93sanfrich",223,"https://archive.org/details/journalofproceed93sanfrich/page/n222",null,null,null,null,"n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124910717:59/3",1998,1998,"August 1997","measure","environmental impact report",null,"Design for Development · adopted: Adopted by San Francisco Redevelopment Agency and Planning Commission","unverified","C124910717",59,"https://archive.org/details/C124910717/page/n58",null,null,null,"Revised draft environmental impact statement/environmental impact report for the disposal and reuse of Hunters Point Shipyard","n","a",0,4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:234/8",1998,1998,"early 1960s","project","environmental impact report",null,"Golden Gateway Redevelopment Plan · other: fundamentally built out; implementation began early 1960s","unverified","C124915258",234,"https://archive.org/details/C124915258/page/n233",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915258:235/2",1998,1998,"to date","property_record","environmental impact report",null,"Golden Gateway Redevelopment Plan · units: Approximately 1,400 dwelling units created to date","unverified","C124915258",235,"https://archive.org/details/C124915258/page/n234",null,null,null,"Draft environmental impact statement/draft environmental impact report for the Third Street light rail project in the City and County of San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124923818:249/4",2000,2000,"","site","plan",null,"Transbay Terminal · other: Downtown station would serve a redevelopment area around Transbay Terminal","unverified","C124923818",249,"https://archive.org/details/C124923818/page/n248",null,null,null,"Bay area transportation blueprint for the 21st century. Project notebook of candidate projects","n","a",0,3.0],["d","qipu:sf/decision/map:meetingminutesmayaug95sanfrich/429/5c3d5861",2000,2000,"2000-07-10","ordinance",null,null,"Redevelopment area to grow by the Market and Fifth Street block","unverified","meetingminutesmayaug95sanfrich",432,"https://archive.org/details/meetingminutesmayaug95sanfrich/page/n429",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meetingminutesb2000sanf_0:356/3",2000,2000,"2000-07-10","ordinance","redevelopment","referred","Supervisor Yaki proposed changing sidewalk widths on Mission and Jessie Streets for the Emporium site redevelopment area.","quoted","meetingminutesb2000sanf_0",356,"https://archive.org/details/meetingminutesb2000sanf_0/page/n355",null,null,null,null,"n","a",0,-3.0],["d","qipu:sf/decision/meetingminutesb2000sanf_0:362/3",2000,2000,"2000-07-10","hearing","redevelopment",null,"Hearing scheduled on a proposed expansion of the Verba Buena Center redevelopment area to add land near Mission Street.","quoted","meetingminutesb2000sanf_0",362,"https://archive.org/details/meetingminutesb2000sanf_0/page/n361",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meetingminutesmayaug95sanfrich:426/1",2000,2000,"2000-07-10","ordinance","redevelopment","referred","Ordinance to add the Emporium site block to the Yerba Buena Center redevelopment area was received and referred to the Board of Supervisors.","quoted","meetingminutesmayaug95sanfrich",426,"https://archive.org/details/meetingminutesmayaug95sanfrich/page/n423",null,null,null,null,"n","a",0,4.0],["d","qipu:sf/decision/meetingminutesmayaug95sanfrich|270",2000,2000,"2000-07-10","ordinance","getting-around",null,"Redevelopment area to grow by the Market and Fifth Street block","unverified","meetingminutesmayaug95sanfrich",426,"https://archive.org/details/meetingminutesmayaug95sanfrich/page/n423",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meetingminutesmayaug95sanfrich|276",2000,2000,"2000-07-10","ordinance","getting-around",null,"Redevelopment area to grow by the Market and Fifth Street block","unverified","meetingminutesmayaug95sanfrich",432,"https://archive.org/details/meetingminutesmayaug95sanfrich/page/n429",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/4minutes2000sanf|21",2000,2000,"2000-08-23","resolution","running-the-city",null,"Yerba Buena redevelopment area to be extended over the Emporium site","unverified","4minutes2000sanf",449,"https://archive.org/details/4minutes2000sanf/page/n448",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/hand:bos-2000-46371d9e",2000,2000,"2000-08-23","other",null,null,"Plan to extend Yerba Buena area over Emporium site near Jessie Street","unverified",null,null,"https://archive.org/details/4minutes2000sanf/page/n448/mode/1up","",null,"hand",null,"n","m",0,-1.0],["d","qipu:sf/decision/map:4minutes2000sanf/448/17e95fa7",2000,2000,"2000-08-23","resolution",null,null,"Yerba Buena redevelopment area to be extended over the Emporium site","unverified","4minutes2000sanf",449,"https://archive.org/details/4minutes2000sanf/page/n448",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meetingminutesb2000sanf_0:546/1",2000,2000,"2000-08-28","hearing","redevelopment","continued","Hearing on expanding the Yerba Buena Center redevelopment area to add Emporium site land was continued to September 18, 2000.","quoted","meetingminutesb2000sanf_0",546,"https://archive.org/details/meetingminutesb2000sanf_0/page/n545",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/meetingminutesb2000sanf_0:546/2",2000,2000,"2000-08-28","ordinance","redevelopment","continued","Ordinance to add Emporium site land to the Yerba Buena Center redevelopment area was continued on first reading to September 18, 2000.","quoted","meetingminutesb2000sanf_0",546,"https://archive.org/details/meetingminutesb2000sanf_0/page/n545",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meetingminutesmayaug95sanfrich:616/1",2000,2000,"2000-08-28","hearing","redevelopment","continued","Hearing on expanding the Yerba Buena Center redevelopment area to add Emporium site land was continued to September 18, 2000.","quoted","meetingminutesmayaug95sanfrich",616,"https://archive.org/details/meetingminutesmayaug95sanfrich/page/n613",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/meetingminutesmayaug95sanfrich:616/2",2000,2000,"2000-08-28","ordinance","redevelopment","continued","Proposed ordinance to add a Market-Fourth-Mission-Fifth block portion to the Yerba Buena Center redevelopment area was continued on first reading to September 18, 2000.","quoted","meetingminutesmayaug95sanfrich",616,"https://archive.org/details/meetingminutesmayaug95sanfrich/page/n613",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meetingminutesb2000sanf_1:16/1",2000,2000,"2000-09-18","ordinance","redevelopment","continued","Supervisor Yaki's ordinance to expand the Yerba Buena Center redevelopment area by adding Emporium site land was continued to September 25.","quoted","meetingminutesb2000sanf_1",16,"https://archive.org/details/meetingminutesb2000sanf_1/page/n15",null,null,null,null,"n","a",0,1.5],["d","qipu:sf/decision/meetingseptdecminutes95sanfrich|10",2000,2000,"2000-09-18","ordinance","getting-around",null,"Expansion of the Fifth and Mission redevelopment area put off","unverified","meetingseptdecminutes95sanfrich",18,"https://archive.org/details/meetingseptdecminutes95sanfrich/page/n15",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meetingseptdecminutes95sanfrich|9",2000,2000,"2000-09-18","ordinance","getting-around","continued","Hearing on expanding the Fifth and Mission redevelopment area put off","unverified","meetingseptdecminutes95sanfrich",17,"https://archive.org/details/meetingseptdecminutes95sanfrich/page/n14",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meetingseptdecminutes95sanfrich:54/1",2000,2000,"2000-09-25","hearing","redevelopment",null,"Public hearing held on adding an Emporium block at Market, Fourth, Mission and Fifth Streets to the Yerba Buena redevelopment area.","quoted","meetingseptdecminutes95sanfrich",54,"https://archive.org/details/meetingseptdecminutes95sanfrich/page/n51",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meetingseptdecminutes95sanfrich:55/1",2000,2000,"2000-09-25","ordinance","redevelopment","continued","Ordinance adding Emporium site land, Assessor's Block 3705, to the Yerba Buena redevelopment area was amended and continued.","quoted","meetingseptdecminutes95sanfrich",55,"https://archive.org/details/meetingseptdecminutes95sanfrich/page/n52",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meetingseptdecminutes95sanfrich|42",2000,2000,"2000-09-25","ordinance","getting-around",null,"Public hearing held on expanding the Fifth and Mission redevelopment area","unverified","meetingseptdecminutes95sanfrich",54,"https://archive.org/details/meetingseptdecminutes95sanfrich/page/n51",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meetingseptdecminutes95sanfrich|43",2000,2000,"2000-09-25","ordinance","getting-around",null,"Expansion of the Fifth and Mission redevelopment area amended","unverified","meetingseptdecminutes95sanfrich",55,"https://archive.org/details/meetingseptdecminutes95sanfrich/page/n52",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meetingminutesb2000sanf_1:79/2",2000,2000,"2000-10-02","ordinance","redevelopment","passed first reading","Ordinance proposed to expand the Yerba Buena Center redevelopment area to a block bounded by Market, Fourth, Mission and Fifth Streets; passed on first reading.","quoted","meetingminutesb2000sanf_1",79,"https://archive.org/details/meetingminutesb2000sanf_1/page/n78",null,null,null,null,"n","a",0,8.66],["d","qipu:sf/decision/meetingminutesb2000sanf_1|57",2000,2000,"2000-10-02","ordinance","getting-around","passed first reading","Redevelopment area near Fourth and Mission widened on first reading","unverified","meetingminutesb2000sanf_1",79,"https://archive.org/details/meetingminutesb2000sanf_1/page/n78",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meetingseptdecminutes95sanfrich|81",2000,2000,"2000-10-10","ordinance","getting-around","passed","Redevelopment area at Fifth and Mission to be expanded","unverified","meetingseptdecminutes95sanfrich",111,"https://archive.org/details/meetingseptdecminutes95sanfrich/page/n108",null,null,null,null,"n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124925153:74/2",2001,2001,"","project","study or report",null,"Rincon Point-South Beach Redevelopment area · other: includes two new shoreline parks","unverified","C124925153",74,"https://archive.org/details/C124925153/page/n73",null,null,null,"Data and needs analysis : part one of the Housing element revision : an element of the San Francisco general plan","n","a",0,3.0],["d","qipu:sf/decision/meetingminutesb2001sanf_1:103/6",2001,2001,"2001-10-09","hearing","redevelopment","referred","A hearing on the future of 1790 Post Street, a former Japantown Bowl site in the A-2 redevelopment area, was sent to committee.","quoted","meetingminutesb2001sanf_1",103,"https://archive.org/details/meetingminutesb2001sanf_1/page/n102",null,null,null,null,"n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101694856:80/2",2002,2002,"","project","plan",null,"Rincon Point-South Beach Redevelopment area · other: two new shoreline parks","unverified","C101694856",80,"https://archive.org/details/C101694856/page/n79",null,null,null,"Housing element : an element of the San Francisco general plan : draft for public review","n","a",0,3.0],["d","qipu:sf/decision/meetingminutesbo2003sanf:467/2",2003,2003,null,"hearing","redevelopment","referred","Supervisor Daly's hearing request on city redevelopment efforts and redevelopment area rules was referred to the Budget Committee.","quoted","meetingminutesbo2003sanf",467,"https://archive.org/details/meetingminutesbo2003sanf/page/n466",null,null,null,null,"n","a",0,1.5],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124925579:100/2",2003,2003,"","project","plan",null,"Rincon Point-South Beach Redevelopment area · other: includes two new shoreline parks","unverified","C124925579",100,"https://archive.org/details/C124925579/page/n99",null,null,null,"Housing element : an element of the San Francisco general plan : final draft for public review","n","a",0,3.0],["d","qipu:sf/decision/meetingminutesbo2003sanf:195/1",2003,2003,"2003-02-11","ordinance","whats-being-built","passed","Ordinance passed allowing development rights to transfer from historic buildings in the Yerba Buena Center redevelopment area to C-3-O districts.","quoted","meetingminutesbo2003sanf",195,"https://archive.org/details/meetingminutesbo2003sanf/page/n194",null,null,null,null,"n","a",0,6.44],["d","qipu:sf/decision/meetingminutesjanmar98sanfrich:189/1",2003,2003,"2003-02-11","ordinance","whats-being-built","passed","Ordinance passed letting historic buildings in the Verba Buena redevelopment area sell development rights to C-3 zoning districts.","quoted","meetingminutesjanmar98sanfrich",189,"https://archive.org/details/meetingminutesjanmar98sanfrich/page/n184",null,null,null,null,"n","a",0,6.69],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101746510:121/2",2004,2004,"","project","plan",null,"Rincon Point-South Beach Redevelopment area · other: two new shoreline parks","unverified","C101746510",121,"https://archive.org/details/C101746510/page/n120",null,null,null,"Housing element : an element of the San Francisco general plan","n","a",0,3.0],["d","qipu:sf/decision/meetingminutesbo2005sanf:346/3",2005,2005,null,"ordinance","redevelopment","continued","Supervisors continued to April 5, 2005 new special zoning controls for the Transbay Redevelopment area.","quoted","meetingminutesbo2005sanf",346,"https://archive.org/details/meetingminutesbo2005sanf/page/n345",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/meetingminutesbo2005sanf:347/1",2005,2005,null,"ordinance","whats-being-built","continued","Zoning map changes for the Transbay Redevelopment area were continued to April 5, 2005.","quoted","meetingminutesbo2005sanf",347,"https://archive.org/details/meetingminutesbo2005sanf/page/n346",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/meetingjanmar2005minutes100sanfrich:184/1",2005,2005,"2005-02-15","ordinance","whats-being-built","referred","Proposed zoning map changes for the Transbay Redevelopment area were sent to the Land Use Committee.","quoted","meetingjanmar2005minutes100sanfrich",184,"https://archive.org/details/meetingjanmar2005minutes100sanfrich/page/n184",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meetingaprmay2005minutes100sanfrich:10/1",2005,2005,"2005-04-05","ordinance","redevelopment","continued","Zoning map changes for the Transbay Redevelopment area were continued to May 10, 2005.","quoted","meetingaprmay2005minutes100sanfrich",10,"https://archive.org/details/meetingaprmay2005minutes100sanfrich/page/n9",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/meetingaprmay2005minutes100sanfrich:9/2",2005,2005,"2005-04-05","ordinance",null,"continued","General plan amendments for the Transbay redevelopment area were continued to May 10, 2005.","quoted","meetingaprmay2005minutes100sanfrich",9,"https://archive.org/details/meetingaprmay2005minutes100sanfrich/page/n8",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/meetingaprmay2005minutes100sanfrich|g423",2005,2005,"2005-05-17","ordinance","redevelopment","pending","Plan changes for South of Market redevelopment area proposed.","quoted","meetingaprmay2005minutes100sanfrich",287,"https://archive.org/details/meetingaprmay2005minutes100sanfrich/page/n284",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meetingseptdec2006minutes101sanfrich:266/4",2006,2006,null,"ordinance","redevelopment",null,"Public Works proposed vacating a sewer and water line easement in former Hubbell Street within the Mission Bay South redevelopment area.","quoted","meetingseptdec2006minutes101sanfrich",266,"https://archive.org/details/meetingseptdec2006minutes101sanfrich/page/n265",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meeting2006aprmayminutes101sanfrich:91/2",2006,2006,"2006-04-18","ordinance","whats-being-built","referred","Supervisor Daly's proposed Planning Code zoning for the Transbay redevelopment area was assigned to Land Use Committee; the Mayor substituted a version.","unverified","meeting2006aprmayminutes101sanfrich",91,"https://archive.org/details/meeting2006aprmayminutes101sanfrich/page/n90",null,null,null,null,"n","a",0,4.0],["d","qipu:sf/decision/meeting2006aprmayminutes101sanfrich:92/2",2006,2006,"2006-04-18","ordinance","whats-being-built",null,"Proposed zoning map changes for the Transbay Redevelopment area remain before the Land Use Committee.","quoted","meeting2006aprmayminutes101sanfrich",92,"https://archive.org/details/meeting2006aprmayminutes101sanfrich/page/n91",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meeting2006aprmayminutes101sanfrich:116/1",2006,2006,"2006-04-25","ordinance","whats-being-built","continued","Zoning map changes for the Transbay redevelopment area were continued to May 2, 2006.","quoted","meeting2006aprmayminutes101sanfrich",116,"https://archive.org/details/meeting2006aprmayminutes101sanfrich/page/n115",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/meetingminutesdr2006sanf:300/1",2006,2006,"2006-04-25","ordinance","redevelopment","continued","Zoning map changes for the Transbay redevelopment area were continued to May 2, 2006.","quoted","meetingminutesdr2006sanf",300,"https://archive.org/details/meetingminutesdr2006sanf/page/n299",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/meetingminutesdr2006sanf:324/2",2006,2006,"2006-05-02","ordinance","whats-being-built","passed first reading","Proposed zoning map changes and a special use district for the Transbay Redevelopment area passed first reading as amended.","quoted","meetingminutesdr2006sanf",324,"https://archive.org/details/meetingminutesdr2006sanf/page/n323",null,null,null,null,"n","a",0,6.82],["d","qipu:sf/decision/meeting2006aprmayminutes101sanfrich:180/2",2006,2006,"2006-05-09","ordinance","whats-being-built","passed","Board finally passed special zoning controls for the Transbay redevelopment area, adding new Planning Code sections and bulk controls.","unverified","meeting2006aprmayminutes101sanfrich",180,"https://archive.org/details/meeting2006aprmayminutes101sanfrich/page/n179",null,null,null,null,"n","a",0,6.94],["d","qipu:sf/decision/meetingminutesdr2009sanf:193/1",2009,2009,"2009-04-14","ordinance","whats-being-built","continued","Visitacion Valley zoning map raised from 40-X to 55-X height in part of the redevelopment area; continued to April 21, 2009 after amendment.","quoted","meetingminutesdr2009sanf",193,"https://archive.org/details/meetingminutesdr2009sanf/page/n192",null,null,null,null,"n","a",0,0.5],["d","qipu:sf/decision/meetingminutesb2011sanf_0:79/1",2011,2011,null,"resolution","redevelopment","passed","Board approved $400,000 (≈ $599,167 in 2026 dollars) for Bayview Opera House renovations and $785,000 (≈ $1.2 million in 2026 dollars) for its plaza in the Bayview Hunters Point redevelopment area.","quoted","meetingminutesb2011sanf_0",79,"https://archive.org/details/meetingminutesb2011sanf_0/page/n78",null,null,null,null,"n","a",0,7.77],["d","qipu:sf/decision/meetingminutesbo2013sanf:144/3",2013,2013,"2013-03-05","ordinance","redevelopment","referred","Proposed Administrative Code amendment creating a citizens advisory committee for Zone 2 of the Bayview Hunters Point redevelopment area; referred to Rules Committee.","quoted","meetingminutesbo2013sanf",144,"https://archive.org/details/meetingminutesbo2013sanf/page/n143",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meetingminutesb2014sanf_0:161/1",2014,2014,"2014-10-28","resolution","redevelopment","referred","Recology, Inc. proposed a permit to build an underground waste collection system in Candlestick Point-Hunters Point redevelopment area; sent to committee.","quoted","meetingminutesb2014sanf_0",161,"https://archive.org/details/meetingminutesb2014sanf_0/page/n160",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meetingminutesb2015sanf_1:71/1",2015,2015,"2015-06-16","ordinance","redevelopment","passed","A minor amendment setting bulk limits for general office buildings in Zone One of the Transbay redevelopment area passed.","quoted","meetingminutesb2015sanf_1",71,"https://archive.org/details/meetingminutesb2015sanf_1/page/n70",null,null,null,null,"n","a",0,6.91],["d","qipu:sf/decision/sfbos:bag041420|44",2020,2020,"2020-04-14","ordinance","land-and-building",null,"Bayview industrial triangle rezoning passed on first reading","unverified",null,null,"https://sfbos.org/sites/default/files/bag041420_minutes.pdf#page=15",null,null,null,null,"n","m",0,3.0],["d","qipu:sf/decision/sfbos:bag042120|7",2020,2020,"2020-04-21","ordinance","land-and-building","passed","Bayview industrial triangle rezoned, with taller building heights allowed","unverified",null,null,"https://sfbos.org/sites/default/files/bag042120_minutes.pdf#page=5",null,null,null,null,"n","m",0,6.17]]}