{"id":null,"ids":[],"kind":"named in documents","name":"San Francisco-Oakland Bay Bridge East Span","tied_by":"name","block":null,"release":"v0.7.1","rows_columns":["t","id","year","y","date","kind","topic","outcome","summary","tier","source","leaf","scan","addr","quote","note","title","how","g","rec","sc"],"rows":[["f","dl-sf-facts-v1.1-haiku55-2026-10/C101747471:132/3",2002,2001,"2001","project","environmental impact report",null,"San Francisco-Oakland Bay Bridge east span replacement · approved: 11,526 foot new east span approved by FHWA and Caltrans","unverified","C101747471",132,"https://archive.org/details/C101747471/page/n131",null,null,null,"Disposal and reuse of Naval Station Treasure Island : draft environmental impact statement","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101747471:539/3",2002,2002,"","project","environmental impact report",null,"SFOBB east span replacement · proposes: new replacement span constructed in place of the existing bridge","unverified","C101747471",539,"https://archive.org/details/C101747471/page/n538",null,null,null,"Disposal and reuse of Naval Station Treasure Island : draft environmental impact statement","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101747471:359/6",2002,2002,"July 11, 2001","alternative","environmental impact report",null,"SFOBB East Spans Seismic Safety Project · approved: Replacement Alternative N-6 with self-anchored suspension bridge design option selected","unverified","C101747471",359,"https://archive.org/details/C101747471/page/n358",null,null,null,"Disposal and reuse of Naval Station Treasure Island : draft environmental impact statement","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101747471:359/7",2002,2002,"July 11, 2001","alternative","environmental impact report",null,"SFOBB East Spans Seismic Safety Project · alternative: Replacement Alternative N-6 with the self-anchored suspension bridge design option","unverified","C101747471",359,"https://archive.org/details/C101747471/page/n358",null,null,null,"Disposal and reuse of Naval Station Treasure Island : draft environmental impact statement","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101747471:359/8",2002,2007,"2007","event","environmental impact report",null,"SFOBB East Spans Seismic Safety Project · event: construction scheduled to be completed","unverified","C101747471",359,"https://archive.org/details/C101747471/page/n358",null,null,null,"Disposal and reuse of Naval Station Treasure Island : draft environmental impact statement","n","a",0,-1.0]]}