{"id":null,"ids":[],"kind":"named in documents","name":"SF distribution system","tied_by":"name","block":null,"release":"v0.7.1","rows_columns":["t","id","year","y","date","kind","topic","outcome","summary","tier","source","leaf","scan","addr","quote","note","title","how","g","rec","sc"],"rows":[["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:89/1",1997,1981,"1981","finding","study or report",null,"SF distribution system · other: average invested cost of distribution plant per customer $845 in SF, versus $990 for PG&E system (about 85%)","unverified","C124916234",89,"https://archive.org/details/C124916234/page/n88",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:89/2",1997,1981,"1981","finding","study or report",null,"SF distribution system · other: SF net plant approximately 85% of system average","unverified","C124916234",89,"https://archive.org/details/C124916234/page/n88",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:105/2",1997,1982,"year end 1982","measure","study or report",null,"PG&E SF distribution system · cost usd: RCNLD of $795-million as of year end 1982 (PG&E valuation)","unverified","C124916234",105,"https://archive.org/details/C124916234/page/n104",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:97/1",1997,1996,"1996","finding","study or report",null,"SF distribution system · finding: A significant portion of the SF distribution system's assets have service lives that exceed 30 years","unverified","C124916234",97,"https://archive.org/details/C124916234/page/n96",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:103/1",1997,1997,"","finding","study or report",null,"PG&E SF distribution system · other: net-income-method value $505 million","unverified","C124916234",103,"https://archive.org/details/C124916234/page/n102",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:103/3",1997,1997,"","finding","study or report",null,"PG&E SF distribution system · cost usd: physical severance costs $5 million","unverified","C124916234",103,"https://archive.org/details/C124916234/page/n102",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:105/1",1997,1997,"","finding","study or report",null,"PG&E SF distribution system · finding: No comparable sales could realistically be used to set a transfer price","unverified","C124916234",105,"https://archive.org/details/C124916234/page/n104",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:105/4",1997,1997,"","measure","study or report",null,"SF municipalization acquisition bonds · other: Effective interest rate of 7.5% on bonds to acquire PG&E SF distribution system","unverified","C124916234",105,"https://archive.org/details/C124916234/page/n104",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:107/1",1997,1997,"","finding","study or report",null,"PG&E SF distribution system · finding: useful and serviceable condition","unverified","C124916234",107,"https://archive.org/details/C124916234/page/n106",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:140/3",1997,1997,"","finding","study or report",null,"SF Distribution System Acquisition Valuation Premium · other: +5.9% / -0.4% / +10.3% change across base, low and high cases","unverified","C124916234",140,"https://archive.org/details/C124916234/page/n139",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:188/2",1997,1997,"","alternative","study or report",null,"SF distribution system municipalization · cost usd: about $800-million maximum bonds at 4 cents per kWh","unverified","C124916234",188,"https://archive.org/details/C124916234/page/n187",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:188/3",1997,1997,"","alternative","study or report",null,"SF distribution system municipalization · cost usd: about $315-million maximum bonds at 5 cents per kWh","unverified","C124916234",188,"https://archive.org/details/C124916234/page/n187",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:188/5",1997,1997,"","finding","study or report",null,"SF distribution system municipalization · other: debt capacity between $300-million and $800-million","unverified","C124916234",188,"https://archive.org/details/C124916234/page/n187",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:53/2",1997,1997,"","finding","study or report",null,"SF distribution system acquisition cost · finding: Acquisition cost is one of the two most important variables determining whether municipalization lowers or raises rates","unverified","C124916234",53,"https://archive.org/details/C124916234/page/n52",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:53/3",1997,1997,"","finding","study or report",null,"SF distribution system acquisition cost · finding: A low acquisition cost increases the probability that a municipal electric utility will produce lower rates","unverified","C124916234",53,"https://archive.org/details/C124916234/page/n52",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:54/3",1997,1997,"","finding","study or report",null,"CCSF cost to acquire PG&E SF distribution system · finding: three factors determine acquisition cost: valuation methods allowed in condemnation case, application of the method to SF assets, and the valuation date","unverified","C124916234",54,"https://archive.org/details/C124916234/page/n53",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","m",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:84/4",1997,1997,"","finding","study or report",null,"PG&E SF distribution system · other: ETAG estimate of original cost and replacement value of PG&E's SF distribution system and associated assets","unverified","C124916234",84,"https://archive.org/details/C124916234/page/n83",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:11/2",1997,1997,"1997","finding","study or report",null,"SF Distribution System Acquisition Valuation Premium · finding: Illusory item in the CCSF rates column of Table ES-1","unverified","C124916234",11,"https://archive.org/details/C124916234/page/n10",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:93/1",1997,1997,"1997","finding","study or report",null,"SF distribution system (PG&E) · other: serves 334,000 electricity customers in SF","unverified","C124916234",93,"https://archive.org/details/C124916234/page/n92",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:105/3",1997,2001,"2001","finding","study or report",null,"PG&E SF distribution system · finding: RCNLD value escalated to 2001 is much higher than the study's own estimate, which uses economic depreciation","unverified","C124916234",105,"https://archive.org/details/C124916234/page/n104",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:57/2",1997,2001,"2001","finding","study or report",null,"PG&E SF distribution system · cost usd: $505-million (Income Capitalization method, [name withheld] case)","unverified","C124916234",57,"https://archive.org/details/C124916234/page/n56",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","m",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:57/3",1997,2001,"2001","finding","study or report",null,"PG&E SF distribution system · cost usd: $795-million (RCL-SL method, [name withheld])","unverified","C124916234",57,"https://archive.org/details/C124916234/page/n56",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","m",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:57/1",1997,2001,"year-end 2001","finding","study or report",null,"PG&E SF distribution system · cost usd: $999-million (RCL-SF method, [name withheld] case)","unverified","C124916234",57,"https://archive.org/details/C124916234/page/n56",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","m",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:103/2",1997,2002,"2002","finding","study or report",null,"PG&E SF distribution system · other: net present value of additional equity return in SF $183 million","unverified","C124916234",103,"https://archive.org/details/C124916234/page/n102",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:103/4",1997,2002,"2002","finding","study or report",null,"PG&E SF distribution system · other: discount rate of PG&E equity return 11.6%","unverified","C124916234",103,"https://archive.org/details/C124916234/page/n102",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124916234:103/5",1997,2002,"2002-2031","finding","study or report",null,"PG&E SF distribution system · other: return on equity differential forecast for 2002 through 2031","unverified","C124916234",103,"https://archive.org/details/C124916234/page/n102",null,null,null,"Final report on the feasibility of electric system municipalization in San Francisco","n","m",0,-1.0]]}