{"id":null,"ids":[],"kind":"named in documents","name":"Southeast Plant","tied_by":"name","block":null,"release":"v0.7.1","rows_columns":["t","id","year","y","date","kind","topic","outcome","summary","tier","source","leaf","scan","addr","quote","note","title","how","g","rec","sc"],"rows":[["d","qipu:sf/decision/journalofproceed51sanfrich:417/1",1956,1956,"1956-06-18","resolution","water-sewers","passed","City approves an agreement with the Navy to treat sewage from the Hunters Point shipyard at the Southeast plant.","quoted","journalofproceed51sanfrich",417,"https://archive.org/details/journalofproceed51sanfrich/page/n416",null,null,null,null,"n","a",0,2.61],["d","qipu:sf/decision/annualreportofd1962sanf_0|1",1961,1961,null,"other",null,null,"The Southeast plant stands at Jerrold Avenue and Phelps Street.",null,"annualreportofd1962sanf_0",19,"https://archive.org/details/annualreportofd1962sanf_0/page/n18",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/journalofproceed60sanfrich|g317",1965,1965,"1965-03-22",null,"works","passed","Route approved for extending Southeast plant's outflow sewer","unverified","journalofproceed60sanfrich",181,"https://archive.org/details/journalofproceed60sanfrich/page/n180",null,null,null,null,"n","a",0,1.99],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123314428:47/1",1974,1974,"","project","plan",null,"Phase I San Francisco wastewater program · proposes: Secondary treatment at Southeast plant","unverified","C123314428",47,"https://archive.org/details/C123314428/page/n46",null,null,null,"Tentative water quality control plan : San Francisco Bay Basin (2) : abstract","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915027:25/1",1974,1974,"","site","environmental impact report",null,"Southeast plant · other: provides secondary treatment during the major portion of the year","unverified","C124915027",25,"https://archive.org/details/C124915027/page/n24",null,null,null,"Draft environmental impact report and statement : San Francisco wastewater master plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124915027:4/1",1974,1974,"","site","environmental impact report",null,"Southeast Water Pollution Control Plant · proposes: secondary treatment of wastes","unverified","C124915027",4,"https://archive.org/details/C124915027/page/n3",null,null,null,"Draft environmental impact report and statement : San Francisco wastewater master plan","n","a",0,-1.0],["d","qipu:sf/decision/journalofproceed69sanfrich:303/3",1974,1974,"1974-03-10","motion","water-sewers","passed","Public Works was asked to start sewage plant operations with supervisory staff, pumping sludge from North Point to Southeast Plant.","quoted","journalofproceed69sanfrich",303,"https://archive.org/details/journalofproceed69sanfrich/page/n298",null,null,null,null,"n","a",0,2.24],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123314428:48/2",1974,1974,"Phase II","project","plan",null,"Southeast plant bayside outfall (San Francisco municipal wastewater) · proposes: Bayside outfall abandoned; secondary effluent from Southeast and Richmond-Sunset plants pumped to Lake Merced for ocean outfall","unverified","C123314428",48,"https://archive.org/details/C123314428/page/n47",null,null,null,"Tentative water quality control plan : San Francisco Bay Basin (2) : abstract","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124903355:45/1",1975,1975,"","project","study or report",null,"S.F. Southeast Plant · cost usd: $100 million","unverified","C124903355",45,"https://archive.org/details/C124903355/page/n44",null,null,null,"San Francisco Bay Region wastewater management facilities project coordination program report ... for BASSA, Bay Area Sewage Services Agency","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124903355:61/2",1975,1975,"","recommendation","study or report",null,"Southeast Plant · other: effluent to be relocated to ocean discharge after secondary treatment","unverified","C124903355",61,"https://archive.org/details/C124903355/page/n60",null,null,null,"San Francisco Bay Region wastewater management facilities project coordination program report ... for BASSA, Bay Area Sewage Services Agency","n","a",0,-1.0],["d","qipu:sf/decision/journaljanjuneofproceed70sanfrich|g2480",1975,1975,"1975-06-16","resolution","works","pending","Policy to build expanded sewage plant next to Southeast plant put off.","quoted","journaljanjuneofproceed70sanfrich",715,"https://archive.org/details/journaljanjuneofproceed70sanfrich/page/n712",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journaljanjuneofproceed70sanfrich|g2481",1975,1975,"1975-06-16",null,"works","pending","Policy to build expanded sewage plant next to Southeast plant put off.","unverified","journaljanjuneofproceed70sanfrich",715,"https://archive.org/details/journaljanjuneofproceed70sanfrich/page/n712",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/journaljanjuneofproceed70sanfrich:755/4",1975,1975,"1975-06-23","resolution","water-sewers","passed","Board adopted a policy to locate an expanded sewage treatment plant next to the Southeast plant.","quoted","journaljanjuneofproceed70sanfrich",755,"https://archive.org/details/journaljanjuneofproceed70sanfrich/page/n752",null,null,null,null,"n","a",0,2.36],["d","qipu:sf/decision/journalofjulydecproceed70sanfrich|g302",1975,1975,"1975-07-21","resolution","utilities","passed","Expanded sewage plant to go beside the existing Southeast plant","quoted","journalofjulydecproceed70sanfrich",83,"https://archive.org/details/journalofjulydecproceed70sanfrich/page/n83",null,null,null,null,"n","a",0,3.6],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124903355:56/10002",1975,1975,"after 1980","project","study or report",null,"San Francisco projects completed after 1980 · other: secondary treatment at Southeast Plant, finally ocean discharge","unverified","C124903355",56,"https://archive.org/details/C124903355/page/n55",null,null,null,"San Francisco Bay Region wastewater management facilities project coordination program report ... for BASSA, Bay Area Sewage Services Agency","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124903355:56/2",1975,1975,"after 1980","building","study or report",null,"Southeast Plant · proposes: secondary treatment at the Southeast Plant, then ocean discharge","unverified","C124903355",56,"https://archive.org/details/C124903355/page/n55",null,null,null,"San Francisco Bay Region wastewater management facilities project coordination program report ... for BASSA, Bay Area Sewage Services Agency","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124884875:239/3",1975,1975,"pending","project","study or report",null,"Interim Bay Outfall, Southeast Plant Expansion · lead agency: Department of Public Works",null,"C124884875",239,"https://archive.org/details/C124884875/page/n238",null,null,null,"Grants report : How much of what is in the second city budget","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124884875:239/4",1975,1975,"pending","project","study or report",null,"Interim Bay Outfall, Southeast Plant Expansion · cost usd: 750,000","unverified","C124884875",239,"https://archive.org/details/C124884875/page/n238",null,null,null,"Grants report : How much of what is in the second city budget","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124903355:27/2",1975,1975,"winter 1977-8","project","study or report",null,"San Francisco Southeast Plant · other: large plant with significant water quality impact, bid scheduled winter 1977-8 in a cluster with South Bay Interceptor","unverified","C124903355",27,"https://archive.org/details/C124903355/page/n26",null,null,null,"San Francisco Bay Region wastewater management facilities project coordination program report ... for BASSA, Bay Area Sewage Services Agency","n","a",0,-1.0],["d","qipu:sf/decision/journalofjanjuneproceed72sanfrich|g1012",1977,1977,"1977-04-04",null,"works","unknown","Grant money for interim work at Southeast plant; outcome unclear.","unverified","journalofjanjuneproceed72sanfrich",324,"https://archive.org/details/journalofjanjuneproceed72sanfrich/page/n323",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/journalofjanjuneproceed72sanfrich|g2282",1977,1977,"1977-06-27",null,"utilities","passed","City to explore uses beyond planned park at Southeast plant","unverified","journalofjanjuneproceed72sanfrich",689,"https://archive.org/details/journalofjanjuneproceed72sanfrich/page/n688",null,null,null,null,"n","a",0,2.1],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123307400:1/4",1980,1980,"","project","other",null,"Southeast Plant secondary treatment · cost usd: $410 million in improvements","unverified","C123307400",1,"https://archive.org/details/C123307400/page/n0",null,null,null,"Clean water reporter. June 1980","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123307400:3/2",1980,1980,"","project","other",null,"Southeast Plant · other: will handle sewage from the eastern half of the City; being expanded","unverified","C123307400",3,"https://archive.org/details/C123307400/page/n2",null,null,null,"Clean water reporter. June 1980","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123307400:3/3",1980,1980,"","project","other",null,"Southeast Plant · other: maximum dry weather rate of 140 million gallons a day","unverified","C123307400",3,"https://archive.org/details/C123307400/page/n2",null,null,null,"Clean water reporter. June 1980","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123307400:3/4",1980,1980,"","project","other",null,"Southeast Plant · other: excess of up to 460 million gallons per day could be diverted across the City through the Crosstown Transport","unverified","C123307400",3,"https://archive.org/details/C123307400/page/n2",null,null,null,"Clean water reporter. June 1980","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123307400:3/5",1980,1980,"","project","other",null,"Southeast Plant · other: when expanded, secondary treatment will be provided, removing some 90 percent of pollutants","unverified","C123307400",3,"https://archive.org/details/C123307400/page/n2",null,null,null,"Clean water reporter. June 1980","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123307400:3/6",1980,1980,"","project","other",null,"Southeast Community Center · other: being planned adjacent to the Southeast Plant site as a mitigation measure","unverified","C123307400",3,"https://archive.org/details/C123307400/page/n2",null,null,null,"Clean water reporter. June 1980","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124903355:59/1",1975,1980,"1980","finding","study or report",null,"San Francisco North Point discharge · other: Transfer of North Point discharge to Southeast Plant site, a bit south of Bay Bridge, raises South Bay concentrations between Bay Bridge and Dumbarton Bridge","unverified","C124903355",59,"https://archive.org/details/C124903355/page/n58",null,null,null,"San Francisco Bay Region wastewater management facilities project coordination program report ... for BASSA, Bay Area Sewage Services Agency","n","a",0,-1.0],["d","qipu:sf/decision/journalofjulydecproceed77sanfrich:35/4",1982,1982,"1982-07-12","resolution","water-sewers","passed","Resolution 537-82 lets Public Works hire a contractor for emergency electrical and mechanical repairs at Channel Pump Station and Southeast plant.","quoted","journalofjulydecproceed77sanfrich",35,"https://archive.org/details/journalofjulydecproceed77sanfrich/page/n34",null,null,null,null,"n","a",0,2.24],["d","qipu:sf/decision/journalofseptoctproceed86sanfrich:428/2",1991,1991,"1991-12-09","ordinance","water-sewers","referred","Proposed $4,491,000 (≈ $11.1 million in 2026 dollars) appropriation for Public Works' Islais Pump Station and Southeast Plant design; sent to Finance Committee.","quoted","journalofseptoctproceed86sanfrich",428,"https://archive.org/details/journalofseptoctproceed86sanfrich/page/n425",null,null,null,null,"n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902272:26/3",1992,1992,"","property_record","other",null,"Southeast Plant · owned by city: Department of Public Works, Bureau of Water Pollution Control","unverified","C124902272",26,"https://archive.org/details/C124902272/page/n25","750 Phelps St.",null,null,"How to do business with the city and county of San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124902272:35/6",1992,1992,"","property_record","other",null,"Bureau of Water Pollution Control, Southeast Plant · owned by city: Bureau of Water Pollution Control","unverified","C124902272",35,"https://archive.org/details/C124902272/page/n34","750 Phelps St.",null,null,"How to do business with the city and county of San Francisco","n","m",0,-1.0],["d","qipu:sf/decision/journalofjanjunproceed87sanfrich:85/3",1992,1992,"1992-01-21","ordinance","water-sewers","passed first reading","The Board passed on first reading an ordinance appropriating $4,750,000 (≈ $11.4 million in 2026 dollars) for Islais Pump Station and Southeast Plant design.","quoted","journalofjanjunproceed87sanfrich",85,"https://archive.org/details/journalofjanjunproceed87sanfrich/page/n85",null,null,null,null,"n","a",0,3.01],["d","qipu:sf/decision/journalofjanjunproceed87sanfrich:104/2",1992,1992,"1992-01-27","ordinance","water-sewers","passed","Public Works was appropriated $4,750,000 (≈ $11.4 million in 2026 dollars) for Islais Pump Station and Southeast Plant design, with $250,000 (≈ $600,392 in 2026 dollars) placed on reserve; finally passed.","quoted","journalofjanjunproceed87sanfrich",104,"https://archive.org/details/journalofjanjunproceed87sanfrich/page/n104",null,null,null,null,"n","a",0,3.01],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922850:150/5",1996,1996,"","finding","environmental impact report",null,"Southeast Water Pollution Control Plant service area · finding: no capacity constraints that would restrict future development","unverified","C124922850",150,"https://archive.org/details/C124922850/page/n149",null,null,null,"Draft EIR : long range development plan, University of California, San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922850:569/3",1996,1996,"","finding","environmental impact report",null,"UCSF LRDP wastewater generation · other: Wastewater generation approximately 0.525 mgd average dry weather flow, an increase of 0.9 percent over current Southeast Plant flows","unverified","C124922850",569,"https://archive.org/details/C124922850/page/n568",null,null,null,"Draft EIR : long range development plan, University of California, San Francisco","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922850:569/4",1996,1996,"","finding","environmental impact report",null,"Southeast Plant · other: LRDP wastewater would use about two percent of the Plant's current surplus capacity","unverified","C124922850",569,"https://archive.org/details/C124922850/page/n568",null,null,null,"Draft EIR : long range development plan, University of California, San Francisco","n","a",0,-1.0],["d","qipu:sf/decision/journalofproceed93sanfrich:37/5",1998,1998,"1998-01-12","ordinance","water-sewers","referred","Proposed $3,500,000 (≈ $7.2 million in 2026 dollars) for Southeast Plant sewage treatment construction was referred to the Finance Committee.","quoted","journalofproceed93sanfrich",37,"https://archive.org/details/journalofproceed93sanfrich/page/n36",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/journalofproceed93sanfrich:76/2",1998,1998,"1998-02-02","ordinance","water-sewers","passed first reading","Controller's $3.4M (≈ $7.0 million in 2026 dollars) appropriation for Southeast Plant aeration basin and pump station work passed for second reading.","quoted","journalofproceed93sanfrich",76,"https://archive.org/details/journalofproceed93sanfrich/page/n75",null,null,null,null,"n","a",0,3.84],["d","qipu:sf/decision/journalofproceed93sanfrich:89/1",1998,1998,"1998-02-09","ordinance","water-sewers","passed","Appropriates $3,468,646 (≈ $7.2 million in 2026 dollars) from the Clean Water fund for Southeast Plant aeration basins and a pump station upgrade.","quoted","journalofproceed93sanfrich",89,"https://archive.org/details/journalofproceed93sanfrich/page/n88",null,null,null,null,"n","a",0,3.84],["d","qipu:sf/decision/7minutes1999sanf|28",1999,1999,"1999-12-01","resolution","land-and-building",null,"$250,000 (≈ $505,612 in 2026 dollars) sought for land to expand the Southeast plant pump station","quoted","7minutes1999sanf",307,"https://archive.org/details/7minutes1999sanf/page/n306",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/map:7minutes1999sanf/306/4847da8b",1999,1999,"1999-12-01","resolution",null,null,"$250,000 (≈ $505,612 in 2026 dollars) sought for land to expand the Southeast plant pump station","unverified","7minutes1999sanf",307,"https://archive.org/details/7minutes1999sanf/page/n306",null,null,null,null,"n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922522:332/1",2000,2000,"","site","environmental impact report",null,"Southeast plant · other: over 80% of all City discharges enter the plant","unverified","C124922522",332,"https://archive.org/details/C124922522/page/n331",null,null,null,"Final environmental impact statement for the disposal and reuse of Hunters Point Shipyard","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922522:332/2",2000,2000,"","finding","environmental impact report",null,"Public Utilities Commission Technical Review Committee · finding: if a plant is creating odors then it is not effectively working and is overloaded","unverified","C124922522",332,"https://archive.org/details/C124922522/page/n331",null,null,null,"Final environmental impact statement for the disposal and reuse of Hunters Point Shipyard","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101694962:122/1",2002,2002,"","recommendation","study or report",null,"Southeast Plant upgrades · recommendation: upgrades at the Southeast Plant should be on the critical projects list to solve solids handling and odor problems","unverified","C101694962",122,"https://archive.org/details/C101694962/page/n121",null,null,null,"San Francisco Public Utilities Infrastructure Task Force : final report : June 1, 2000-June 17, 2002","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101694962:72/4",2002,2002,"","finding","study or report",null,"Southeast Plant · other: 80 % of the City's sewage is treated at the plant centralized in the Bayview","unverified","C101694962",72,"https://archive.org/details/C101694962/page/n71",null,null,null,"San Francisco Public Utilities Infrastructure Task Force : final report : June 1, 2000-June 17, 2002","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101694962:78/1",2002,2002,"","recommendation","study or report",null,"Southeast Plant · recommendation: Shrink the footprint and reduce the maintenance requirements","unverified","C101694962",78,"https://archive.org/details/C101694962/page/n77",null,null,null,"San Francisco Public Utilities Infrastructure Task Force : final report : June 1, 2000-June 17, 2002","n","a",0,-1.0],["d","qipu:sf/decision/meetingminutesseptdec97sanfrich:78/2",2002,2002,"2002-09-30","resolution","water-sewers","referred","Public Utilities Commission's $441,000 (≈ $825,962 in 2026 dollars) emergency contract for pump drives at the Southeast plant was sent to Finance Committee.","quoted","meetingminutesseptdec97sanfrich",78,"https://archive.org/details/meetingminutesseptdec97sanfrich/page/n77",null,null,null,null,"n","a",0,0.0],["d","qipu:sf/decision/meetingminutesb2004sanf_1:370/3",2004,2004,null,"resolution","water-sewers",null,"Public Utilities Commission's $1.8 million (≈ $3.2 million in 2026 dollars) design-build contract with [name withheld] for a solar plant at the Southeast plant was proposed.","quoted","meetingminutesb2004sanf_1",370,"https://archive.org/details/meetingminutesb2004sanf_1/page/n369",null,null,null,null,"n","a",0,3.0],["d","qipu:sf/decision/meetingminutes2004sanf|35",2004,2004,"2004-02-04","ordinance","public-money",null,"$5 million (≈ $8.9 million in 2026 dollars) sought for Southeast plant odor control","unverified","meetingminutes2004sanf",232,"https://archive.org/details/meetingminutes2004sanf/page/n231",null,null,null,null,"n","a",0,2.8],["d","qipu:sf/decision/meetingminutesb2004sanf_2:35/1",2004,2004,"2004-09-14","resolution","water-sewers","referred","The Public Utilities Commission may accept a state loan of about $1,622,940 (≈ $2.9 million in 2026 dollars) for solar and energy upgrades at the Southeast plant.","quoted","meetingminutesb2004sanf_2",35,"https://archive.org/details/meetingminutesb2004sanf_2/page/n34",null,null,null,null,"n","a",0,0.0],["d","qipu:sf/decision/meetingminutesb2004sanf_2:94/3",2004,2004,"2004-09-28","resolution","water-sewers","passed","Public Utilities Commission may accept a $1.6M (≈ $2.9 million in 2026 dollars) state loan for efficiency and solar work at the Southeast plant.","quoted","meetingminutesb2004sanf_2",94,"https://archive.org/details/meetingminutesb2004sanf_2/page/n93",null,null,null,null,"n","a",0,4.65],["d","qipu:sf/decision/meetingminutesb2013sanf_0:223/3",2013,2013,"2013-05-21","contract","water-sewers","referred","Public Utilities Commission emergency contract of up to $9M (≈ $13.0 million in 2026 dollars) to replace unstable roofs at the Southeast plant at 750 Phelps Street was sent to committee.","quoted","meetingminutesb2013sanf_0",223,"https://archive.org/details/meetingminutesb2013sanf_0/page/n222",null,null,null,null,"n","a",0,0.0],["d","qipu:sf/decision/meetingminutesb2013sanf_1:31/5",2013,2013,"2013-06-04","contract","water-sewers","referred","Proposed $80M (≈ $115.7 million in 2026 dollars), ten-year contract with Brown and Caldwell for planning and engineering at the Southeast Plant digester project.","quoted","meetingminutesb2013sanf_1",31,"https://archive.org/details/meetingminutesb2013sanf_1/page/n30",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/meetingminutesb2013sanf_1|g100",2013,2013,"2013-06-04",null,"utilities","pending","Up to $80M (≈ $115.7 million in 2026 dollars) engineering contract for sewage plant upgrade sent to committee.","unverified","meetingminutesb2013sanf_1",31,"https://archive.org/details/meetingminutesb2013sanf_1/page/n30",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/meetingminutesb2013sanf_1|g530",2013,2013,"2013-07-16",null,"works","passed","Up to $80 million (≈ $115.7 million in 2026 dollars) for consultants on sewage plant upgrade approved","unverified","meetingminutesb2013sanf_1",156,"https://archive.org/details/meetingminutesb2013sanf_1/page/n155",null,null,null,null,"n","m",0,1.99],["d","qipu:sf/decision/meetingminutesb2013sanf_1|g531",2013,2013,"2013-07-16","resolution","works","passed","Up to $80 million (≈ $115.7 million in 2026 dollars) for consultants on sewage plant upgrade approved.","quoted","meetingminutesb2013sanf_1",156,"https://archive.org/details/meetingminutesb2013sanf_1/page/n155",null,null,null,null,"n","m",0,3.24],["d","qipu:sf/decision/meetingminutesd2013sanf_0:39/4",2013,2013,"2013-07-16","resolution","water-sewers","passed","The Public Utilities Commission may sign an agreement of up to $80M (≈ $115.7 million in 2026 dollars) with Brown and Caldwell for [name withheld] sewer engineering.","quoted","meetingminutesd2013sanf_0",39,"https://archive.org/details/meetingminutesd2013sanf_0/page/n38",null,null,null,null,"n","a",0,5.19],["d","qipu:sf/decision/meetingminutesd2013sanf_0|g100",2013,2013,"2013-07-16",null,"works","passed","Up to $80 million (≈ $115.7 million in 2026 dollars) for Southeast sewage plant digester design approved","unverified","meetingminutesd2013sanf_0",39,"https://archive.org/details/meetingminutesd2013sanf_0/page/n38",null,null,null,null,"n","m",0,1.99],["d","qipu:sf/decision/meetingminutesb2013sanf_2:276/3",2013,2013,"2014-06-03","contract","water-sewers","referred","Public Utilities Commission seeks retroactive approval of an emergency contract, up to $225,000 (≈ $325,431 in 2026 dollars), to repair gas monitoring at the Southeast plant; sent to committee.","quoted","meetingminutesb2013sanf_2",276,"https://archive.org/details/meetingminutesb2013sanf_2/page/n275",null,null,null,null,"n","a",0,0.0],["d","qipu:sf/decision/meetingminutesb2014sanf_2:108/3",2014,2014,"2014-04-29","contract","water-sewers","referred","Proposed increase to $14.5M (≈ $20.6 million in 2026 dollars) emergency contract for repairing five digesters at the Southeast plant was sent to committee.","quoted","meetingminutesb2014sanf_2",108,"https://archive.org/details/meetingminutesb2014sanf_2/page/n107",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/sfbos:bag111516|147",2016,2016,"2016-11-15","resolution","city-services",null,"Carollo Engineers' sewage plant design contract raised to $33,500,000 (≈ $47.0 million in 2026 dollars), referred","unverified",null,null,"https://sfbos.org/sites/default/files/bag111516_minutes.pdf#page=32",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag120616|39",2016,2016,"2016-12-06","resolution","city-services",null,"$33.5M (≈ $47.0 million in 2026 dollars) engineering contract with Carollo Engineers proposed for Southeast plant","unverified",null,null,"https://sfbos.org/sites/default/files/bag120616_minutes.pdf#page=8",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/sfbos:bag120616|40",2016,2016,"2016-12-06","resolution","running-the-city","passed","Southeast plant design contract raised to $33.5 million (≈ $47.0 million in 2026 dollars), approved","unverified",null,null,"https://sfbos.org/sites/default/files/bag120616_minutes.pdf#page=8",null,null,null,null,"n","a",0,1.39],["d","qipu:sf/decision/sfbos:bag041117|78",2017,2017,"2017-04-11","resolution","city-services",null,"Brown and Caldwell's biosolids digester contract raised to $153,500,000 (≈ $211.0 million in 2026 dollars), referred","unverified",null,null,"https://sfbos.org/sites/default/files/bag041117_minutes.pdf#page=17",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag050917|36",2017,2017,"2017-05-09","resolution","city-services","passed","Sewage digester design contract raised $73.5 million (≈ $101.0 million in 2026 dollars), approved","unverified",null,null,"https://sfbos.org/sites/default/files/bag050917_minutes.pdf#page=9",null,null,null,null,"n","m",0,2.23],["d","qipu:sf/decision/sfbos:bag050917|37",2017,2017,"2017-05-09","resolution","running-the-city",null,"Brown and Caldwell digester contract raised to $153,500,000 (≈ $211.0 million in 2026 dollars), approved","unverified",null,null,"https://sfbos.org/sites/default/files/bag050917_minutes.pdf#page=9",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag040318|46",2018,2018,"2018-04-03","resolution","city-services",null,"Parsons offered up to $35,000,000 (≈ $47.0 million in 2026 dollars) to manage Southeast plant work","unverified",null,null,"https://sfbos.org/sites/default/files/bag040318_minutes.pdf#page=10",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/sfbos:bag121719|36",2019,2019,"2019-12-17","resolution","running-the-city","passed","$5.5M (≈ $7.2 million in 2026 dollars) emergency repair to sewage pipe at Southeast plant approved","unverified",null,null,"https://sfbos.org/sites/default/files/bag121719_minutes.pdf#page=10",null,null,null,null,"n","a",0,1.39],["d","qipu:sf/decision/sfbos:bag060920|64",2020,2020,"2020-06-09","resolution","city-services",null,"$54,500,000 (≈ $71.0 million in 2026 dollars) engineering deal for the Southeast plant sent to committee","unverified",null,null,"https://sfbos.org/sites/default/files/bag060920_minutes.pdf#page=19",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/sfbos:bag072820|35",2020,2020,"2020-07-28","resolution","city-services",null,"Carollo Engineers' Southeast plant contract proposed at $54,500,000 (≈ $71.0 million in 2026 dollars)","unverified",null,null,"https://sfbos.org/sites/default/files/bag072820_minutes.pdf#page=10",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/sfbos:bag071222|152",2022,2022,"2022-07-12","resolution","city-services",null,"$208.5M (≈ $240.1 million in 2026 dollars) digester design contract with Brown and Caldwell referred","unverified",null,null,"https://sfbos.org/sites/default/files/bag071222_minutes.pdf#page=38",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag092722|29",2022,2022,"2022-09-27","resolution","city-services",null,"$208.5M (≈ $240.1 million in 2026 dollars) engineering deal with Brown and Caldwell proposed for Southeast Plant","unverified",null,null,"https://sfbos.org/sites/default/files/bag092722_minutes.pdf#page=9",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/sfbos:bag092722|30",2022,2022,"2022-09-27","resolution","running-the-city","passed","Southeast sewage plant design services up to $208.5M (≈ $240.1 million in 2026 dollars) approved","unverified",null,null,"https://sfbos.org/sites/default/files/bag092722_minutes.pdf#page=9",null,null,null,null,"n","m",0,1.59],["d","qipu:sf/decision/sfbos:bag072523|119",2023,2023,"2023-07-25","resolution","city-services",null,"$47,000,000 (≈ $52.0 million in 2026 dollars) proposed for Southeast plant construction management","unverified",null,null,"https://sfbos.org/sites/default/files/bag072523_minutes.pdf#page=24",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/sfbos:bag051424|84",2024,2024,"2024-05-14","resolution","city-services",null,"$3,000,000 (≈ $3.2 million in 2026 dollars) more proposed for Southeast Plant headworks engineering","unverified",null,null,"https://sfbos.org/sites/default/files/bag051424_minutes.pdf#page=22",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/sfbos:bag071624|59",2024,2024,"2024-07-16","resolution","city-services",null,"$57.5M (≈ $61.8 million in 2026 dollars) Carollo Engineering headworks design contract increase proposed","unverified",null,null,"https://sfbos.org/sites/default/files/bag071624_minutes.pdf#page=16",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag071624|60",2024,2024,"2024-07-16","resolution","running-the-city","passed","Southeast sewage plant design contract amendment approved","unverified",null,null,"https://sfbos.org/sites/default/files/bag071624_minutes.pdf#page=16",null,null,null,null,"n","m",0,1.39],["d","qipu:sf/decision/sfbos:bag012726|140",2026,2026,"2026-01-27","resolution",null,null,"Free easement to bring more gas to the Southeast plant",null,null,null,"https://sfbos.org/sites/default/files/bag012726_minutes.pdf#page=29",null,null,null,null,"n","a",0,-1.0]]}