{"id":null,"ids":[],"kind":"named in documents","name":"Transbay Transit Terminal building","tied_by":"name","block":null,"release":"v0.7.1","rows_columns":["t","id","year","y","date","kind","topic","outcome","summary","tier","source","leaf","scan","addr","quote","note","title","how","g","rec","sc"],"rows":[["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:22/1",1995,1992,"1992","event","study or report",null,"AC Transit · other: 653 weekday bus arrivals and departures at Terminal building","unverified","C124914193",22,"https://archive.org/details/C124914193/page/n22",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:22/3",1995,1992,"1992","event","study or report",null,"Muni · other: 1,003 weekday buses using the hump area outside the Terminal","unverified","C124914193",22,"https://archive.org/details/C124914193/page/n22",null,null,null,"Transbay area plan : background data report","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:13/6",1993,1992,"1992","measure","study or report",null,"AC Transit · other: 653 arrivals and departures on weekdays at the Terminal building (1992)","unverified","C124914494",13,"https://archive.org/details/C124914494/page/n12",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:21/2",1993,1992,"1992","finding","study or report",null,"Transbay Transit Terminal · finding: Terminal building needed substantial upgrades to meet current seismic and other fire/life/safety codes","unverified","C124914494",21,"https://archive.org/details/C124914494/page/n20",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:13/8",1993,1993,"","building","study or report",null,"Transbay Transit Terminal building structure · other: occupies portions of three city blocks between Second, Mission, Beale and Howard Streets","unverified","C124914494",13,"https://archive.org/details/C124914494/page/n12","Second, Mission, Beale and Howard Streets",null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:22/1",1993,1993,"","action","study or report",null,"Transbay Transit Terminal building · other: first phase improvements: temporary roof replacement, seismic bracing and shear walls, proceeding","unverified","C124914494",22,"https://archive.org/details/C124914494/page/n21",null,null,null,"Transit terminal study","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:15/1",1993,1993,"","project","study or report",null,"Transbay Transit Terminal Building Renovation · cost usd: TOTAL 29,144,000","unverified","C124914713",15,"https://archive.org/details/C124914713/page/n14",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:5/1",1993,1993,"","project","study or report",null,"Transbay Transit Terminal Building Renovation Project · other: Figure 2 - Transbay Transit Terminal Building Renovation Project Budget","unverified","C124914713",5,"https://archive.org/details/C124914713/page/n4",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:16/5",1995,1993,"1993","action","study or report",null,"Transbay Transit Terminal building · other: Caltrans proceeded with temporary replacement of the roof and seismic bracing and shear walls","unverified","C124914193",16,"https://archive.org/details/C124914193/page/n16",null,null,null,"Transbay area plan : background data report","n","a",0,-3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:22/2",1995,1994,"1994","event","study or report",null,"AC Transit · other: 769 buses and 14,208 passenger arrivals and departures","unverified","C124914193",22,"https://archive.org/details/C124914193/page/n22",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:42/3",1995,1995,"","finding","study or report",null,"Transbay Transit Terminal · finding: existing terminal building lacks capacity for projected bus service needs without significant modifications","unverified","C124914193",42,"https://archive.org/details/C124914193/page/n42",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0]]}