{"id":null,"ids":[],"kind":"named in documents","name":"Transbay Transit Terminal","tied_by":"name","block":null,"release":"v0.7.1","rows_columns":["t","id","year","y","date","kind","topic","outcome","summary","tier","source","leaf","scan","addr","quote","note","title","how","g","rec","sc"],"rows":[["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:15/1",1995,1939,"1939","building","study or report",null,"Transbay Transit Terminal · built: completed","unverified","C124914193",15,"https://archive.org/details/C124914193/page/n15",null,null,null,"Transbay area plan : background data report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:21/1",1995,1939,"1939","building","study or report",null,"Transbay Transit Terminal · built year: opened in 1939","unverified","C124914193",21,"https://archive.org/details/C124914193/page/n21",null,null,null,"Transbay area plan : background data report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:13/1",1993,1939,"1939","building","study or report",null,"Transbay Transit Terminal · built: completed 1939 as part of Bay Bridge construction","unverified","C124914494",13,"https://archive.org/details/C124914494/page/n12",null,null,null,"Transit terminal study","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:10/1",1993,1939,"1939","building","study or report",null,"Transbay Transit Terminal · built: constructed as part of the San Francisco-Oakland Bay Bridge railway","unverified","C124914713",10,"https://archive.org/details/C124914713/page/n9",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:32/2",1995,1958,"1958","event","study or report",null,"Transbay Transit Terminal bus deck · event: removal of rail service; AC Transit and Greyhound commuter service became the only bus deck operators","unverified","C124914193",32,"https://archive.org/details/C124914193/page/n32",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:21/3",1995,1959,"1959","building","study or report",null,"Transbay Transit Terminal · other: revamped to serve as a bus terminal","unverified","C124914193",21,"https://archive.org/details/C124914193/page/n21",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:10/2",1993,1959,"1959","building","study or report",null,"Transbay Transit Terminal · use: converted to bus only use","unverified","C124914713",10,"https://archive.org/details/C124914713/page/n9",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124878301:189/5",1970,1970,"","site","study or report",null,"Transbay Transit Terminal · finding: Contributes to commuter flow each morning; routes needed to connect to Market Street area","unverified","C124878301",189,"https://archive.org/details/C124878301/page/n188",null,null,null,"Housing and urban resource development for the city of San Francisco : an interdisciplinary study in systems design at Stanford University, winter and spring quarters 1970 : final report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124878301:191/3",1970,1970,"1970","alternative","study or report",null,"Tram service to Transbay Transit Terminal and BART station · proposes: Trams to serve the Transbay Transit Terminal and the BART station at the Pine, Beale, and Market intersection","unverified","C124878301",191,"https://archive.org/details/C124878301/page/n190","Market Street",null,null,"Housing and urban resource development for the city of San Francisco : an interdisciplinary study in systems design at Stanford University, winter and spring quarters 1970 : final report","n","m",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:10/4",1993,1972,"1972","event","study or report",null,"Transbay Transit Terminal · recommendation: study recommended replacement of the existing Terminal and construction of a mixed use long-haul and commuter bus transit terminal and office complex","unverified","C124914713",10,"https://archive.org/details/C124914713/page/n9",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,3.0],["d","qipu:sf/decision/journalofproceed67sanfrich|g1791",1972,1972,"1972-06-26","resolution","transport","passed","City backs new transit terminal at Transbay site","quoted","journalofproceed67sanfrich",613,"https://archive.org/details/journalofproceed67sanfrich/page/n612",null,null,null,null,"n","m",0,3.28],["d","qipu:sf/decision/journalofproceed67sanfrich|g1792",1972,1972,"1972-06-26",null,"transport","passed","City backs new transit terminal at Transbay site.","unverified","journalofproceed67sanfrich",613,"https://archive.org/details/journalofproceed67sanfrich/page/n612",null,null,null,null,"n","m",0,2.03],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123304019:166/1",null,1974,"1974","project","plan",null,"San Francisco Bay Area Transportation Terminal Authority regional transit terminal · proposes: regional transit terminal in San Francisco on and immediately adjacent to the site of the existing Transbay Transit Terminal","unverified","C123304019",166,"https://archive.org/details/C123304019/page/n165",null,null,null,"Transit development program for the San Francisco Bay Area","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123304019:166/3",null,1974,"1974","agency","plan",null,"San Francisco Bay Area Transportation Terminal Authority · cost usd: $75,000 state appropriation to match other funds for terminal development","unverified","C123304019",166,"https://archive.org/details/C123304019/page/n165",null,null,null,"Transit development program for the San Francisco Bay Area","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:10/5",1993,1975,"1975","agency","study or report",null,"San Francisco Bay Area Transportation Terminal Authority (SFBATTA) · lead agency: established to oversee the operations and planning of the Terminal","unverified","C124914713",10,"https://archive.org/details/C124914713/page/n9",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C123304019:166/2",null,1976,"calendar 1976","project","plan",null,"Regional transit terminal project development (Transbay Transit Terminal site) · cost usd: not less than $682,000","unverified","C123304019",166,"https://archive.org/details/C123304019/page/n165",null,null,null,"Transit development program for the San Francisco Bay Area","n","a",0,-1.0],["d","qipu:sf/decision/journaljulydecofproceed73sanfrich:743/2",1978,1978,"1978-12-26","hearing","transit","referred","Pelosi asked for a hearing on a new regional transit terminal at the Transbay Transit Terminal site; referred to Streets and Transportation Committee.","quoted","journaljulydecofproceed73sanfrich",743,"https://archive.org/details/journaljulydecofproceed73sanfrich/page/n743",null,null,null,null,"n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:51/4",1995,1978,"1978-81","project","study or report",null,"SFBATTA Regional Transit Terminal Facility · other: Study of bus transit facilities and service needs, including joint development potential and urban design issues (Phase III)","unverified","C124914193",51,"https://archive.org/details/C124914193/page/n51",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:32/4",1995,1980,"1980 and 1992/1993","finding","study or report",null,"Transbay Transit Terminal bus deck · finding: nearly 700 more weekday vehicle arrivals and departures in 1980 than in 1992/1993","unverified","C124914193",32,"https://archive.org/details/C124914193/page/n32",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:32/3",1995,1981,"1981","finding","study or report",null,"SFBATTA Phase III Project Development Proposal · finding: three operators besides AC Transit used the bus deck","unverified","C124914193",32,"https://archive.org/details/C124914193/page/n32",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:10/6",1993,1981,"1981","finding","study or report",null,"Transbay Transit Terminal · recommendation: Terminal be rehabilitated by adding a second bus deck, a new roof, seismic safety upgrades and other mechanical and electrical upgrades","unverified","C124914713",10,"https://archive.org/details/C124914713/page/n9",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124877529:17/3",1984,1984,"","measure","study or report",null,"Improved and expanded Transbay Transit Terminal · proposes: Category IB, optional but completion recommended","unverified","C124877529",17,"https://archive.org/details/C124877529/page/n16",null,null,null,"An analysis, the financial feasibility of public transit recommendations in the San Francisco downtown plan","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922081:194/3",1984,1984,"","project","study or report",null,"Regional Transbay Transit Terminal · proposes: Upgrade existing Transbay Terminal to accommodate commuter bus services and some long-haul bus service","unverified","C124922081",194,"https://archive.org/details/C124922081/page/n193",null,null,null,"Regional plan for San Francisco Bay Area naval shore activities : functional systems analyses/regional issues and options report","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:10/7",1993,1989,"1989","finding","study or report",null,"Transbay Transit Terminal revitalization · cost usd: total cost of the improvements were estimated to be $54 million","unverified","C124914713",10,"https://archive.org/details/C124914713/page/n9",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:12/10",1993,1991,"1991-92","building","study or report",null,"Transbay Transit Terminal · other: about $1.6 million lease revenues collected from building tenants in 1991-92","unverified","C124914713",12,"https://archive.org/details/C124914713/page/n11",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:12/9",1993,1991,"1991-92","building","study or report",null,"Transbay Transit Terminal · other: Caltrans operating costs approximately $2.9 million in 1991-92","unverified","C124914713",12,"https://archive.org/details/C124914713/page/n11",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:11/1",1995,1992,"1992","site","study or report",null,"Transbay Transit Terminal · other: about 660 bus arrivals and departures during morning peak period (6:30 a.m. to 9:00 a.m.) in 1992","unverified","C124914193",11,"https://archive.org/details/C124914193/page/n11",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:11/2",1995,1992,"1992","site","study or report",null,"Transbay Transit Terminal · other: about 740 bus arrivals and departures during afternoon peak period (4:00 to 6:30 p.m.)","unverified","C124914193",11,"https://archive.org/details/C124914193/page/n11",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:15/3",1995,1992,"1992","finding","study or report",null,"Transbay Transit Terminal · finding: needed substantial upgrades to meet current seismic and other fire/life/safety codes","unverified","C124914193",15,"https://archive.org/details/C124914193/page/n15",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:15/4",1995,1992,"1992","measure","study or report",null,"Transbay Transit Terminal basic seismic and code upgrades · cost usd: about $34 million","unverified","C124914193",15,"https://archive.org/details/C124914193/page/n15",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:21/7",1995,1992,"1992","measure","study or report",null,"Transbay Transit Terminal · other: more than 31,000 passengers used the Terminal and adjacent street bus stops daily","unverified","C124914193",21,"https://archive.org/details/C124914193/page/n21",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:22/1",1995,1992,"1992","event","study or report",null,"AC Transit · other: 653 weekday bus arrivals and departures at Terminal building","unverified","C124914193",22,"https://archive.org/details/C124914193/page/n22",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:22/3",1995,1992,"1992","event","study or report",null,"Muni · other: 1,003 weekday buses using the hump area outside the Terminal","unverified","C124914193",22,"https://archive.org/details/C124914193/page/n22",null,null,null,"Transbay area plan : background data report","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:53/5",1995,1992,"1992","finding","study or report",null,"Seismic Evaluation of the Transbay Transit Terminal · cost usd: $11.9 - 18.3 million (in 1992) for three seismic strengthening schemes","unverified","C124914193",53,"https://archive.org/details/C124914193/page/n53",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:7/1",1995,1992,"1992","finding","study or report",null,"Transbay area plan background data report · other: Table 1: 1992 Weekday Transit Ridership at and Around the Transbay Transit Terminal","unverified","C124914193",7,"https://archive.org/details/C124914193/page/n7",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:13/3",1993,1992,"1992","site","study or report",null,"Transbay Transit Terminal area · other: more than 31,000 passengers daily in the Terminal and surrounding streets","unverified","C124914494",13,"https://archive.org/details/C124914494/page/n12",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:13/6",1993,1992,"1992","measure","study or report",null,"AC Transit · other: 653 arrivals and departures on weekdays at the Terminal building (1992)","unverified","C124914494",13,"https://archive.org/details/C124914494/page/n12",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:21/2",1993,1992,"1992","finding","study or report",null,"Transbay Transit Terminal · finding: Terminal building needed substantial upgrades to meet current seismic and other fire/life/safety codes","unverified","C124914494",21,"https://archive.org/details/C124914494/page/n20",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:15/2",1993,1992,"1992-1994","project","study or report",null,"Interim Transbay Terminal Projects 92-93 and 93-94 · cost usd: TOTAL 5,900,000","unverified","C124914713",15,"https://archive.org/details/C124914713/page/n14",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:23/3",1995,1992,"1992-93","building","study or report",null,"Transbay Transit Terminal three buildings · use: parking","unverified","C124914193",23,"https://archive.org/details/C124914193/page/n23",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:27/1",1995,1992,"1992-93","site","study or report",null,"Transbay Transit Terminal area space utilization · floor area sqft: 302,130 sq ft grand total","unverified","C124914193",27,"https://archive.org/details/C124914193/page/n27",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:27/2",1995,1992,"1992-93","property_record","study or report",null,"Transbay Transit Terminal space utilization, third and fourth rows · owned by city: City property","unverified","C124914193",27,"https://archive.org/details/C124914193/page/n27",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:7/2",1995,1992,"1992-93","finding","study or report",null,"Transbay area plan background data report · other: Table 2: 1992-93 Space Utilization at the Transbay Transit Terminal Area","unverified","C124914193",7,"https://archive.org/details/C124914193/page/n7",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:17/1",1993,1992,"1992-93","property_record","study or report",null,"Passenger Loading/Unloading on City Sidewalks · floor area sqft: 47,000 sqft","unverified","C124914494",17,"https://archive.org/details/C124914494/page/n16",null,null,null,"Transit terminal study","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:17/2",1993,1992,"1992-93","property_record","study or report",null,"Passenger Loading/Unloading (Caltrans Property) · floor area sqft: 33,400 sqft, Caltrans Property","unverified","C124914494",17,"https://archive.org/details/C124914494/page/n16",null,null,null,"Transit terminal study","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:17/3",1993,1992,"1992-93","property_record","study or report",null,"Transbay Transit Terminal space utilization · floor area sqft: 137,380 sqft grand total","unverified","C124914494",17,"https://archive.org/details/C124914494/page/n16",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:10/1",1993,1993,"","alternative","study or report",null,"Alternative A · alternative: new underground and surface level transit terminal on Transbay Transit Terminal site and adjacent properties","unverified","C124914494",10,"https://archive.org/details/C124914494/page/n9",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:10/4",1993,1993,"","action","study or report",null,"Modified Transbay Transit Terminal (Alternative X) · other: 12-15 months environmental review, if a Negative Declaration were appropriate","unverified","C124914494",10,"https://archive.org/details/C124914494/page/n9",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:10/5",1993,1993,"","action","study or report",null,"Alternatives A and B · other: environmental review estimated at 29 to 40 months, based on an EIR","unverified","C124914494",10,"https://archive.org/details/C124914494/page/n9",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:13/2",1993,1993,"","building","study or report",null,"Transbay Transit Terminal · other: 12 commute, non-commute and tour bus operators using the Terminal building","unverified","C124914494",13,"https://archive.org/details/C124914494/page/n12",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:13/8",1993,1993,"","building","study or report",null,"Transbay Transit Terminal building structure · other: occupies portions of three city blocks between Second, Mission, Beale and Howard Streets","unverified","C124914494",13,"https://archive.org/details/C124914494/page/n12","Second, Mission, Beale and Howard Streets",null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:13/9",1993,1993,"","building","study or report",null,"Transbay Transit Terminal main building · other: located on the central block between First, Mission, Fremont and Natoma Streets","unverified","C124914494",13,"https://archive.org/details/C124914494/page/n12","First, Mission, Fremont and Natoma Streets",null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:21/1",1993,1993,"","building","study or report",null,"Transbay Transit Terminal · owned by city: California Department of Transportation (Caltrans)","unverified","C124914494",21,"https://archive.org/details/C124914494/page/n20",null,null,null,"Transit terminal study","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:21/3",1993,1993,"","measure","study or report",null,"Transbay Transit Terminal basic upgrades · cost usd: about $36 million","unverified","C124914494",21,"https://archive.org/details/C124914494/page/n20",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:22/1",1993,1993,"","action","study or report",null,"Transbay Transit Terminal building · other: first phase improvements: temporary roof replacement, seismic bracing and shear walls, proceeding","unverified","C124914494",22,"https://archive.org/details/C124914494/page/n21",null,null,null,"Transit terminal study","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:22/3",1993,1993,"","event","study or report",null,"Transbay Transit Terminal · other: Board deferred action because Transit Needs Study not yet completed by MTC and Caltrans","unverified","C124914494",22,"https://archive.org/details/C124914494/page/n21",null,null,null,"Transit terminal study","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:22/6",1993,1993,"","site","study or report",null,"Transbay Transit Terminal · other: located between Mission, First, Natoma and Fremont Streets, with bus access ramps","unverified","C124914494",22,"https://archive.org/details/C124914494/page/n21","Mission, First, Natoma, Fremont",null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:26/2",1993,1993,"","project","study or report",null,"F-line interim terminal · other: interim F-line terminal until waterfront service can be established","unverified","C124914494",26,"https://archive.org/details/C124914494/page/n25",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:27/4",1993,1993,"","finding","study or report",null,"AC Transit service at Transbay Transit Terminal · other: AC Transit projects service increase of 169 percent","unverified","C124914494",27,"https://archive.org/details/C124914494/page/n26",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:27/5",1993,1993,"","finding","study or report",null,"Greyhound service at Transbay Transit Terminal · other: Greyhound expects service increase of 80 percent if projected growth occurs","unverified","C124914494",27,"https://archive.org/details/C124914494/page/n26",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:27/6",1993,1993,"","recommendation","study or report",null,"AC Transit bus berths at Transbay Transit Terminal · other: Forty bus berths required on the third floor deck","unverified","C124914494",27,"https://archive.org/details/C124914494/page/n26",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:27/7",1993,1993,"","finding","study or report",null,"Transbay Transit Terminal bus berths · other: Passenger boarding areas increase from existing 61 to 82","unverified","C124914494",27,"https://archive.org/details/C124914494/page/n26",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:27/8",1993,1993,"","finding","study or report",null,"Transbay Transit Terminal rail extensions · other: Four rail services with a terminus at or near the Terminal site were considered","unverified","C124914494",27,"https://archive.org/details/C124914494/page/n26",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:29/1",1993,1993,"","building","study or report",null,"Transbay Transit Terminal · finding: does not have capacity for projected bus service needs without significant modifications","unverified","C124914494",29,"https://archive.org/details/C124914494/page/n28",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:29/7",1993,1993,"","finding","study or report",null,"Vertical second bus deck at Transbay Terminal · finding: upper deck may not be viable for existing bus operators; option not developed","unverified","C124914494",29,"https://archive.org/details/C124914494/page/n28",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:30/1",1993,1993,"","alternative","study or report",null,"Alternative X · alternative: Retain existing Terminal facade and reconfigure existing bus deck without vertical expansion","unverified","C124914494",30,"https://archive.org/details/C124914494/page/n29",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:30/2",1993,1993,"","alternative","study or report",null,"Alternative X · cost usd: $93 million estimated construction cost for modified Terminal","unverified","C124914494",30,"https://archive.org/details/C124914494/page/n29",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:30/3",1993,1993,"","alternative","study or report",null,"Alternative X · other: Bus deck reconfigured from three lanes to four lanes","unverified","C124914494",30,"https://archive.org/details/C124914494/page/n29",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:30/4",1993,1993,"","alternative","study or report",null,"Alternative X · other: Would foreclose direct Caltrain or other rail service into the Terminal","unverified","C124914494",30,"https://archive.org/details/C124914494/page/n29",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:30/6",1993,1993,"","finding","study or report",null,"Alternative X · finding: Joint development potential would likely be limited","unverified","C124914494",30,"https://archive.org/details/C124914494/page/n29",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:30/8",1993,1993,"","finding","study or report",null,"Alternative X · finding: AC Transit midday storage may be met on-site but off-site storage likely needed if growth materializes","unverified","C124914494",30,"https://archive.org/details/C124914494/page/n29",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:30/9",1993,1993,"","action","study or report",null,"Transbay Transit Terminal · other: Interim bus terminal needed while existing Terminal is revamped and constructed","unverified","C124914494",30,"https://archive.org/details/C124914494/page/n29",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:49/9",1993,1993,"","alternative","study or report",null,"Alternative B new transit terminal · other: Alternative B would maximize land use development opportunities on the existing Transbay Transit Terminal site","unverified","C124914494",49,"https://archive.org/details/C124914494/page/n48",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:57/1",1993,1993,"","project","study or report",null,"Modification of existing Transbay Transit Terminal · cost usd: approximately $93 million","unverified","C124914494",57,"https://archive.org/details/C124914494/page/n56",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:60/1",1993,1993,"","alternative","study or report",null,"Alternative X · alternative: Modifications to Existing Transbay Transit Terminal to [name withheld]","unverified","C124914494",60,"https://archive.org/details/C124914494/page/n59",null,null,null,"Transit terminal study","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:60/2",1993,1993,"","finding","study or report",null,"Alternative X · finding: less cost effective than for building a new transit terminal","unverified","C124914494",60,"https://archive.org/details/C124914494/page/n59",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:60/3",1993,1993,"","finding","study or report",null,"Alternative X · finding: private land acquisition not required to meet future bus service needs","unverified","C124914494",60,"https://archive.org/details/C124914494/page/n59",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:60/4",1993,1993,"","alternative","study or report",null,"Alternative A · alternative: New Transit Terminal at Transbay Transit Terminal Site","unverified","C124914494",60,"https://archive.org/details/C124914494/page/n59",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:60/5",1993,1993,"","finding","study or report",null,"Alternative A · finding: cost effective, especially if combined with joint development","unverified","C124914494",60,"https://archive.org/details/C124914494/page/n59",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:60/6",1993,1993,"","site","study or report",null,"Terminal Separator Structure · other: options for the Terminal Separator Structure could be affected by any alternative","unverified","C124914494",60,"https://archive.org/details/C124914494/page/n59",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:64/4",1993,1993,"","alternative","study or report",null,"Alternative A · alternative: new transit terminal with other land uses stacked above at existing Transbay Transit Terminal site","unverified","C124914494",64,"https://archive.org/details/C124914494/page/n63",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:64/5",1993,1993,"","alternative","study or report",null,"Alternative X · alternative: revamp existing Transbay Transit Terminal to meet future service needs; least desirable","unverified","C124914494",64,"https://archive.org/details/C124914494/page/n63",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:86/2",1993,1993,"","project","study or report",null,"Transbay Transit Terminal · other: General indication of bus and rail transit needs for the terminal over the next 20 years","unverified","C124914494",86,"https://archive.org/details/C124914494/page/n85",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:87/4",1993,1993,"","recommendation","study or report",null,"Transbay Transit Terminal auto access · recommendation: no changes to existing traffic circulation pattern in South-of-Market area","unverified","C124914494",87,"https://archive.org/details/C124914494/page/n86",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:10/3",1993,1993,"","action","study or report",null,"Transbay Transit Terminal · finding: AC Transit stores up to 80 buses on the ramp system during the midday","unverified","C124914713",10,"https://archive.org/details/C124914713/page/n9",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:12/1",1993,1993,"","building","study or report",null,"Transbay Transit Terminal · cost usd: around $6 million","unverified","C124914713",12,"https://archive.org/details/C124914713/page/n11",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:12/2",1993,1993,"","building","study or report",null,"Transbay Transit Terminal · other: approximately $25 million remaining to complete the code upgrade project","unverified","C124914713",12,"https://archive.org/details/C124914713/page/n11",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:12/3",1993,1993,"","building","study or report",null,"Transbay Transit Terminal · owned by city: Caltrans","unverified","C124914713",12,"https://archive.org/details/C124914713/page/n11","Mission Street",null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:12/4",1993,1993,"","building","study or report",null,"Transbay Transit Terminal · other: approximately 10 acres including buildings and ramps as far south as Folsom Street","unverified","C124914713",12,"https://archive.org/details/C124914713/page/n11","Folsom Street",null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:12/5",1993,1993,"","building","study or report",null,"Transbay Transit Terminal · stories: three floors and a basement floor","unverified","C124914713",12,"https://archive.org/details/C124914713/page/n11",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:12/6",1993,1993,"","building","study or report",null,"Transbay Transit Terminal · other: bus deck with three lanes and 41 bus stop locations","unverified","C124914713",12,"https://archive.org/details/C124914713/page/n11",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:12/7",1993,1993,"","building","study or report",null,"Transbay Transit Terminal · other: operator ticketing and passenger waiting areas approximately 40,000 square feet","unverified","C124914713",12,"https://archive.org/details/C124914713/page/n11",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:12/8",1993,1993,"","building","study or report",null,"Transbay Transit Terminal · other: retail space approximately 7,800 square feet","unverified","C124914713",12,"https://archive.org/details/C124914713/page/n11",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:15/1",1993,1993,"","project","study or report",null,"Transbay Transit Terminal Building Renovation · cost usd: TOTAL 29,144,000","unverified","C124914713",15,"https://archive.org/details/C124914713/page/n14",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:15/4",1993,1993,"","project","study or report",null,"Transbay Transit Terminal grand total project · cost usd: GRAND TOTAL PROJECT COST 35,044,000","unverified","C124914713",15,"https://archive.org/details/C124914713/page/n14",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:16/3",1993,1993,"","site","study or report",null,"Transbay Transit Terminal · other: Bus loading areas and sidewalk space encompass about 170,000 square feet","unverified","C124914713",16,"https://archive.org/details/C124914713/page/n15",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:16/5",1993,1993,"","site","study or report",null,"Transbay Transit Terminal third floor bus deck · other: 67% of bus stops and 61% of boardings and alightings","unverified","C124914713",16,"https://archive.org/details/C124914713/page/n15",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:18/6",1993,1993,"","site","study or report",null,"Transbay Transit Terminal · other: Four S.F. MUNI bus lines access the hump at the mezzanine level (Second Floor)","unverified","C124914713",18,"https://archive.org/details/C124914713/page/n17",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:25/1",1993,1993,"","finding","study or report",null,"Transbay Transit Terminal third floor bus deck · finding: most utilized area of the Terminal; all 27 public bus stop locations fully and continuously utilized at peak","unverified","C124914713",25,"https://archive.org/details/C124914713/page/n24",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:25/2",1993,1993,"","finding","study or report",null,"Transbay Transit Terminal third floor bus deck · finding: 8 of 13 bus stop locations reserved for Greyhound utilized","unverified","C124914713",25,"https://archive.org/details/C124914713/page/n24",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:25/3",1993,1993,"","finding","study or report",null,"Transbay Transit Terminal dedicated Bay Bridge bus ramps · finding: AC Transit operates 217 bus arrivals and departures on the ramps during the p.m. peak, about one bus every 30 seconds","unverified","C124914713",25,"https://archive.org/details/C124914713/page/n24",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:25/4",1993,1993,"","finding","study or report",null,"Transbay Transit Terminal dedicated Bay Bridge bus ramps · finding: AC Transit stores 32 buses on the ramps on school days and up to 80 on school holidays","unverified","C124914713",25,"https://archive.org/details/C124914713/page/n24",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:25/5",1993,1993,"","finding","study or report",null,"Transbay Transit Terminal mezzanine level hump · finding: S.F. MUNI provides over 1,000 arrivals and departures from the hump each day","unverified","C124914713",25,"https://archive.org/details/C124914713/page/n24",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:25/6",1993,1993,"","finding","study or report",null,"Transbay Transit Terminal Greyhound passenger waiting area · finding: headhouse waiting area on bus deck not large enough for Greyhound patronage","unverified","C124914713",25,"https://archive.org/details/C124914713/page/n24",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:25/7",1993,1993,"","finding","study or report",null,"Transbay Transit Terminal first floor passenger waiting area · finding: underutilized; 24,300 square feet; could warrant reduction of 35% to 65%","unverified","C124914713",25,"https://archive.org/details/C124914713/page/n24",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:25/8",1993,1993,"","finding","study or report",null,"Transbay Transit Terminal common area restrooms · finding: underutilized; approximately 3,000 square feet","unverified","C124914713",25,"https://archive.org/details/C124914713/page/n24",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:25/9",1993,1993,"","finding","study or report",null,"Transbay Transit Terminal West Unit auto parking garages · floor area sqft: garage areas in basements and mezzanine/first floor of West Unit leased for auto parking, approximately 156,000 square feet","unverified","C124914713",25,"https://archive.org/details/C124914713/page/n24",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-4.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:27/10001",1993,1993,"","finding","study or report",null,"Transbay Transit Terminal bus deck · other: all 27 bus stop locations reserved for public providers fully and continuously utilized during peak periods","unverified","C124914713",27,"https://archive.org/details/C124914713/page/n26",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:27/10002",1993,1993,"","finding","study or report",null,"Transbay Transit Terminal bus deck · other: 8 of 13 bus stop locations reserved for Greyhound utilized during peak periods","unverified","C124914713",27,"https://archive.org/details/C124914713/page/n26",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:27/10003",1993,1993,"","finding","study or report",null,"Transbay Transit Terminal first floor common passenger waiting area · finding: minimally used and the most underutilized transit-related area of the Terminal","unverified","C124914713",27,"https://archive.org/details/C124914713/page/n26",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:27/10004",1993,1993,"","finding","study or report",null,"Transbay Transit Terminal · other: Terminal serves as a hub allowing transit patrons to transfer between bus systems, not a significant origin/destination for GGBHTD and SamTrans passengers","unverified","C124914713",27,"https://archive.org/details/C124914713/page/n26",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:30/1",1993,1993,"","finding","study or report",null,"Transbay Transit Terminal · other: AC Transit projects its service will continue 24 hours per day, seven days per week to the Terminal","unverified","C124914713",30,"https://archive.org/details/C124914713/page/n29",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:30/10",1993,1993,"","recommendation","study or report",null,"Transbay Transit Terminal · other: Eight bus stop locations needed on surface streets adjacent to the Terminal (Fremont Street) for GGBHTD","unverified","C124914713",30,"https://archive.org/details/C124914713/page/n29","Fremont Street",null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:30/2",1993,1993,"","finding","study or report",null,"Transbay Transit Terminal · other: AC Transit buses will arrive at the Terminal every 10 to 20 seconds during am and pm peak periods","unverified","C124914713",30,"https://archive.org/details/C124914713/page/n29",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:30/3",1993,1993,"","recommendation","study or report",null,"Transbay Transit Terminal · other: Forty bus stop locations needed on the third floor bus deck for AC Transit","unverified","C124914713",30,"https://archive.org/details/C124914713/page/n29",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:30/4",1993,1993,"","recommendation","study or report",null,"Transbay Transit Terminal · other: Space to park up to 160 buses during the midday needed for AC Transit","unverified","C124914713",30,"https://archive.org/details/C124914713/page/n29",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:30/5",1993,1993,"","recommendation","study or report",null,"Transbay Transit Terminal · other: Bus cycle from Bay Bridge (I-80) into Terminal and back in at most 4 minutes excluding loading time","unverified","C124914713",30,"https://archive.org/details/C124914713/page/n29",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-3.5],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:30/6",1993,1993,"","recommendation","study or report",null,"Transbay Transit Terminal · other: Approximately 3,660 square feet of additional ticketing/office space needed by doubling existing space","unverified","C124914713",30,"https://archive.org/details/C124914713/page/n29",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:30/9",1993,1993,"","recommendation","study or report",null,"Transbay Transit Terminal · other: Five bus stop locations needed on the third floor bus deck for GGBHTD","unverified","C124914713",30,"https://archive.org/details/C124914713/page/n29",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:32/3",1993,1993,"","recommendation","study or report",null,"Greyhound · other: Thirteen (13) bus bay locations on the third floor bus deck, which Greyhound currently has available","unverified","C124914713",32,"https://archive.org/details/C124914713/page/n31",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:32/4",1993,1993,"","recommendation","study or report",null,"Greyhound · floor area sqft: approximately 35,000 square feet for ticketing, passenger waiting, and baggage handling","unverified","C124914713",32,"https://archive.org/details/C124914713/page/n31",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:34/1",1993,1993,"","finding","study or report",null,"Transbay Transit Terminal · finding: Number of bus stops required for future service levels cannot be accommodated by the current Terminal design","unverified","C124914713",34,"https://archive.org/details/C124914713/page/n33",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:34/2",1993,1993,"","finding","study or report",null,"Transbay Transit Terminal · finding: SamTrans projects need for current number of stops but needs additional space for articulated buses","unverified","C124914713",34,"https://archive.org/details/C124914713/page/n33",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:35/1",1993,1993,"","finding","study or report",null,"Transbay Transit Terminal · finding: Bus stops for future service levels cannot be accommodated by current Terminal design","unverified","C124914713",35,"https://archive.org/details/C124914713/page/n34",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:35/2",1993,1993,"","finding","study or report",null,"Transbay Transit Terminal · finding: AC Transit requires storage for 160 buses on school holidays and other times schools are not in session","unverified","C124914713",35,"https://archive.org/details/C124914713/page/n34",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:35/3",1993,1993,"","finding","study or report",null,"Transbay Transit Terminal · finding: 80 storage spaces needed when schools are in session","unverified","C124914713",35,"https://archive.org/details/C124914713/page/n34",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:35/4",1993,1993,"","finding","study or report",null,"Transbay Transit Terminal · finding: Area identified as underutilized; estimated range of warranted reduction in space","unverified","C124914713",35,"https://archive.org/details/C124914713/page/n34",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:45/1",1993,1993,"","recommendation","study or report",null,"Transbay Transit Terminal · recommendation: any terminal proposal must account for and not preclude requirements for potential rail service proposals","unverified","C124914713",45,"https://archive.org/details/C124914713/page/n44",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:47/1",1993,1993,"","measure","study or report",null,"Transbay Transit Terminal · other: 82 bus stop locations required, able to accommodate articulated 60-foot buses","unverified","C124914713",47,"https://archive.org/details/C124914713/page/n46",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:47/2",1993,1993,"","measure","study or report",null,"Transbay Transit Terminal · other: 23,520 square feet for ticket sales and office area for 6 operators","unverified","C124914713",47,"https://archive.org/details/C124914713/page/n46",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:48/1",1993,1993,"","building","study or report",null,"Transbay Transit Terminal passenger waiting room · floor area sqft: between 13,600 and 22,400 square feet","unverified","C124914713",48,"https://archive.org/details/C124914713/page/n47",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:48/2",1993,1993,"","building","study or report",null,"Transbay Transit Terminal baggage and package area · floor area sqft: 12,500 square feet minimum","unverified","C124914713",48,"https://archive.org/details/C124914713/page/n47",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:48/3",1993,1993,"","building","study or report",null,"Greyhound passenger waiting area, Transbay Terminal · floor area sqft: 2,600","unverified","C124914713",48,"https://archive.org/details/C124914713/page/n47",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:48/4",1993,1993,"","building","study or report",null,"Amtrak passenger waiting area, Transbay Terminal · floor area sqft: 840","unverified","C124914713",48,"https://archive.org/details/C124914713/page/n47",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:48/5",1993,1993,"","building","study or report",null,"Greyhound baggage area, Transbay Terminal · floor area sqft: 16,830","unverified","C124914713",48,"https://archive.org/details/C124914713/page/n47",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:48/6",1993,1993,"","building","study or report",null,"Amtrak baggage area, Transbay Terminal · floor area sqft: 300","unverified","C124914713",48,"https://archive.org/details/C124914713/page/n47",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:48/7",1993,1993,"","recommendation","study or report",null,"Transbay Transit Terminal transit information program · recommendation: Provide a comprehensive transit information and directional signage program within the Terminal","unverified","C124914713",48,"https://archive.org/details/C124914713/page/n47",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:48/8",1993,1993,"","recommendation","study or report",null,"Transbay Transit Terminal pedestrian walk times · recommendation: maintain pedestrian walk times from/to the terminal at or near their current levels","unverified","C124914713",48,"https://archive.org/details/C124914713/page/n47",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:5/1",1993,1993,"","project","study or report",null,"Transbay Transit Terminal Building Renovation Project · other: Figure 2 - Transbay Transit Terminal Building Renovation Project Budget","unverified","C124914713",5,"https://archive.org/details/C124914713/page/n4",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:7/1",1993,1993,"","site","study or report",null,"Transbay Transit Terminal · finding: Terminal is and will continue to be a significant regional transit hub for downtown San Francisco","unverified","C124914713",7,"https://archive.org/details/C124914713/page/n6",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:7/2",1993,1993,"","project","study or report",null,"Transbay Transit Terminal area development solicitation · other: Caltrans and City plans to jointly solicit private sector proposals to develop and potentially modify the area","unverified","C124914713",7,"https://archive.org/details/C124914713/page/n6",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:7/3",1993,1993,"","finding","study or report",null,"Transbay Transit Terminal · finding: Terminal needs improving; exploring joint development opportunities to improve the Terminal is warranted","unverified","C124914713",7,"https://archive.org/details/C124914713/page/n6",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:9/1",1993,1993,"","project","study or report",null,"Transbay Transit Terminal Transit Needs Study · lead agency: Metropolitan Transportation Commission and Caltrans District 4","unverified","C124914713",9,"https://archive.org/details/C124914713/page/n8",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:9/2",1993,1993,"","project","study or report",null,"Transbay Transit Terminal · other: Study of current and potential long-term transit services accessing the Terminal and necessary layout and features","unverified","C124914713",9,"https://archive.org/details/C124914713/page/n8",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:16/3",1995,1993,"1993","project","study or report",null,"Transbay Transit Terminal · other: Caltrans agreed to postpone additional improvements for six months to explore joint development opportunities","unverified","C124914193",16,"https://archive.org/details/C124914193/page/n16",null,null,null,"Transbay area plan : background data report","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:16/5",1995,1993,"1993","action","study or report",null,"Transbay Transit Terminal building · other: Caltrans proceeded with temporary replacement of the roof and seismic bracing and shear walls","unverified","C124914193",16,"https://archive.org/details/C124914193/page/n16",null,null,null,"Transbay area plan : background data report","n","a",0,-3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:16/7",1995,1993,"1993","event","study or report",null,"Transbay Transit Terminal · other: Board deferred action because Transit Needs Study was not yet completed","unverified","C124914193",16,"https://archive.org/details/C124914193/page/n16",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:169/3",1995,1993,"1993","building","study or report",null,"Transbay Transit Terminal · other: region's major public transit bus hub","unverified","C124914193",169,"https://archive.org/details/C124914193/page/n169",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:169/4",1995,1993,"1993","recommendation","study or report",null,"Transbay Transit Terminal · recommendation: building code upgrades plus changes in the appearance of and mix of existing retail tenants","unverified","C124914193",169,"https://archive.org/details/C124914193/page/n169",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:21/6",1995,1993,"1993","event","study or report",null,"Transbay Transit Terminal · other: 12 local, regional, intercity and tour bus operators used the Terminal building","unverified","C124914193",21,"https://archive.org/details/C124914193/page/n21",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:23/8",1995,1993,"1993","finding","study or report",null,"AC Transit at Transbay Terminal · other: 107 buses in morning peak hour","unverified","C124914193",23,"https://archive.org/details/C124914193/page/n23",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:23/9",1995,1993,"1993","finding","study or report",null,"AC Transit at Transbay Terminal · other: 104 buses in afternoon peak hour","unverified","C124914193",23,"https://archive.org/details/C124914193/page/n23",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:12/3",1993,1993,"1993","alternative","study or report",null,"Alternative A · proposes: new transit terminal at the existing Transbay Transit Terminal with other land uses stacked above","unverified","C124914494",12,"https://archive.org/details/C124914494/page/n11",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:12/4",1993,1993,"1993","alternative","study or report",null,"Alternative A · cost usd: $79 million","unverified","C124914494",12,"https://archive.org/details/C124914494/page/n11",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:17/4",1993,1993,"1993","property_record","study or report",null,"Transbay Transit Terminal third and fourth rows · owned by city: City property","unverified","C124914494",17,"https://archive.org/details/C124914494/page/n16",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:35/1",1993,1993,"1993","finding","study or report",null,"Transbay Transit Terminal · finding: Modification of existing terminal has significant disadvantages","unverified","C124914494",35,"https://archive.org/details/C124914494/page/n34",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:35/3",1993,1993,"1993","alternative","study or report",null,"Alternative A - New terminal at existing terminal site · other: Six bus platforms and twenty-two bus berths","unverified","C124914494",35,"https://archive.org/details/C124914494/page/n34",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:35/5",1993,1993,"1993","alternative","study or report",null,"Existing Transbay Transit Terminal site · other: Existing Terminal site made available for development of new land uses under Alternative B","unverified","C124914494",35,"https://archive.org/details/C124914494/page/n34",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:5/1",1993,1993,"1993","project","study or report",null,"Transbay Transit Terminal · alternative: Alternative A - New Terminal at Existing Terminal Site","unverified","C124914494",5,"https://archive.org/details/C124914494/page/n4",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:5/2",1993,1993,"1993","project","study or report",null,"Transbay Transit Terminal · alternative: Alternative B - New Terminal at Main/Beale Site","unverified","C124914494",5,"https://archive.org/details/C124914494/page/n4",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:61/6",1993,1993,"1993","alternative","study or report",null,"Existing Transbay Transit Terminal site · other: would become available for new land uses with potential linkages to private financing under Alternative B","unverified","C124914494",61,"https://archive.org/details/C124914494/page/n60",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:61/9",1993,1993,"1993","finding","study or report",null,"Transbay Transit Terminal · owned by city: Caltrans, which owns and operates the Terminal and its bus ramps","unverified","C124914494",61,"https://archive.org/details/C124914494/page/n60",null,null,null,"Transit terminal study","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:7/2",1993,1993,"1993","alternative","study or report",null,"Alternative A - New Transit Terminal · alternative: New transit terminal at existing Transbay site, on grade and underground","unverified","C124914494",7,"https://archive.org/details/C124914494/page/n6",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:9/1",1993,1993,"1993","site","study or report",null,"Transbay Transit Terminal · owned by city: Caltrans","unverified","C124914494",9,"https://archive.org/details/C124914494/page/n8",null,null,null,"Transit terminal study","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:9/2",1993,1993,"1993","finding","study or report",null,"Transbay Transit Terminal · other: does not provide the number of bus berths nor midday bus storage space potentially needed in the future","unverified","C124914494",9,"https://archive.org/details/C124914494/page/n8",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:9/3",1993,1993,"1993","finding","study or report",null,"Transbay Transit Terminal · other: modification could be a complex and expensive undertaking with limited opportunities for enhancing development potential","unverified","C124914494",9,"https://archive.org/details/C124914494/page/n8",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:9/4",1993,1993,"1993","recommendation","study or report",null,"new downtown transit terminal · alternative: development of a new terminal could create better opportunities to meet future transit needs","unverified","C124914494",9,"https://archive.org/details/C124914494/page/n8",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:15/3",1993,1993,"1993","project","study or report",null,"Interim Transbay Terminal Projects roof replacement · cost usd: Roof Replacement 4,000,000","unverified","C124914713",15,"https://archive.org/details/C124914713/page/n14",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:26/1",1993,1993,"1993","site","study or report",null,"Transbay Transit Terminal · other: necessary and significant regional transit hub serving 12 bus carriers","unverified","C124914713",26,"https://archive.org/details/C124914713/page/n25",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:26/2",1993,1993,"1993","site","study or report",null,"Transbay Transit Terminal · other: 31,000 passengers per weekday","unverified","C124914713",26,"https://archive.org/details/C124914713/page/n25",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:26/3",1993,1993,"1993","site","study or report",null,"Transbay Transit Terminal · other: location is prime for regional bus services, in the financial district in downtown San Francisco","unverified","C124914713",26,"https://archive.org/details/C124914713/page/n25",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:26/4",1993,1993,"1993","finding","study or report",null,"Transbay Transit Terminal · finding: commute period is the most significant usage; about 1,300 bus arrivals and departures and over 16,000 passengers per day in peak periods","unverified","C124914713",26,"https://archive.org/details/C124914713/page/n25",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:26/5",1993,1993,"1993","recommendation","study or report",null,"Transbay Transit Terminal · recommendation: implement minor passenger amenity upgrades as soon as possible: signage, bench/landscaping, painting, public address system, lighting and shelters","unverified","C124914713",26,"https://archive.org/details/C124914713/page/n25",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:26/6",1993,1993,"1993","measure","study or report",null,"Muni hump in front of Transbay Transit Terminal · other: improved lighting, bus shelters, and roadway paving proposed","unverified","C124914713",26,"https://archive.org/details/C124914713/page/n25",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","m",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:42/1",1993,1993,"1993","finding","study or report",null,"Transbay Transit Terminal · finding: Existing hump area is not adequate to accommodate Muni's bus and potential rail services","unverified","C124914713",42,"https://archive.org/details/C124914713/page/n41",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:42/2",1993,1993,"1993","recommendation","study or report",null,"Transbay Transit Terminal · recommendation: Redesigned off-street, at or close to grade area for Muni bus loading and rail services, with vertical clearance for overhead catenary","unverified","C124914713",42,"https://archive.org/details/C124914713/page/n41",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:42/5",1993,1993,"1993","finding","study or report",null,"AC Transit · finding: Will account for 61% of the bus service patronage at the Terminal","unverified","C124914713",42,"https://archive.org/details/C124914713/page/n41",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:42/6",1993,1993,"1993","finding","study or report",null,"Transbay Transit Terminal third floor bus deck · finding: Total of 59 bus stop locations on the third floor bus deck needed to accommodate projected bus services","unverified","C124914713",42,"https://archive.org/details/C124914713/page/n41",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:32/1",1993,1993,"20 year time frame","project","study or report",null,"Greyhound · other: about 110 daily arrivals and departures, up from 86 (about 30% growth over 20 years)","unverified","C124914713",32,"https://archive.org/details/C124914713/page/n31",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:32/2",1993,1993,"20 year time frame","project","study or report",null,"Greyhound · other: about 4,500 passengers per day, an 80% increase from current patronage","unverified","C124914713",32,"https://archive.org/details/C124914713/page/n31",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:32/6",1993,1993,"20 year time frame","project","study or report",null,"Gray Line Tours · other: about 60 daily arrivals and departures, up from 45 (about 30% growth over 20 years)","unverified","C124914713",32,"https://archive.org/details/C124914713/page/n31",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:32/7",1993,1993,"20 year time frame","project","study or report",null,"Gray Line Tours · other: about 3,000 passengers per day, a 20% increase from current patronage","unverified","C124914713",32,"https://archive.org/details/C124914713/page/n31",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:26/8",1993,1993,"August 1993","action","study or report",null,"Transbay Transit Terminal signage, landscaping and painting improvements · other: federal Transportation Enhancements funding application by Caltrans","unverified","C124914713",26,"https://archive.org/details/C124914713/page/n25",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:21/4",1993,1993,"December 1992","event","study or report",null,"Transbay Transit Terminal · proposes: Mayor asked Caltrans to consider removal of the Terminal and replacement with a smaller facility","unverified","C124914494",21,"https://archive.org/details/C124914494/page/n20",null,null,null,"Transit terminal study","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:16/6",1993,1993,"June 18, 1993","event","study or report",null,"Amtrak bus service · other: Amtrak ceased bus operations at the Terminal","unverified","C124914713",16,"https://archive.org/details/C124914713/page/n15",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:1/1",1993,1993,"November, 1993","project","study or report",null,"Transbay Transit Terminal · other: Current and Future Transit Needs Study, staff working paper final","unverified","C124914713",1,"https://archive.org/details/C124914713/page/n0",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:27/1",1993,1993,"October 1993","finding","study or report",null,"Transit Needs Study staff working paper · other: Prepared by MTC and Caltrans to identify current uses, deficiencies and future needs of the Transbay Transit Terminal","unverified","C124914494",27,"https://archive.org/details/C124914494/page/n26",null,null,null,"Transit terminal study","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:86/1",1993,1993,"October 1993","project","study or report",null,"Transbay Transit Terminal · other: Transit program requirement based on the October 1993 MTC/Caltrans Staff Working Paper","unverified","C124914494",86,"https://archive.org/details/C124914494/page/n85",null,null,null,"Transit terminal study","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:22/4",1993,1993,"September 1, 1993","event","study or report",null,"Transbay Transit Terminal and Terminal Separator Structure issues · event: Board of Supervisors to report back to Caltrans on its position","unverified","C124914494",22,"https://archive.org/details/C124914494/page/n21",null,null,null,"Transit terminal study","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:24/12",1993,1993,"a decade ago","event","study or report",null,"Transbay Transit Terminal area · rezoned: Downtown Plan zoned area around the Terminal for high density development","unverified","C124914494",24,"https://archive.org/details/C124914494/page/n23",null,null,null,"Transit terminal study","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:42/4",1993,1993,"am peak hour","finding","study or report",null,"AC Transit transbay bus service · finding: Projected to carry approximately 6,125 westbound transbay passengers during the am peak hour, 112% more than currently","unverified","C124914713",42,"https://archive.org/details/C124914713/page/n41",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:26/7",1993,1993,"end of 1993","project","study or report",null,"Transbay Transit Terminal exterior lighting upgrade · lead agency: Caltrans intends to advertise a project to significantly upgrade exterior lighting by end of 1993","unverified","C124914713",26,"https://archive.org/details/C124914713/page/n25",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:21/8",1993,1993,"late October 1993","event","study or report",null,"Transit Needs Study · event: Staff working paper of the Transit Needs Study prepared","unverified","C124914494",21,"https://archive.org/details/C124914494/page/n20",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:16/4",1993,1993,"midday","site","study or report",null,"Transbay Transit Terminal ramps · other: About 47,000 square feet used for storage of up to 80 AC Transit buses during midday","unverified","C124914713",16,"https://archive.org/details/C124914713/page/n15",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:27/2",1993,1993,"next twenty years","finding","study or report",null,"Transbay Transit Terminal · other: Bus service to the Terminal may increase by 60 percent over the next twenty years","unverified","C124914494",27,"https://archive.org/details/C124914494/page/n26",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:27/3",1993,1993,"next twenty years","finding","study or report",null,"Transbay Transit Terminal · other: Number of passengers using the Terminal facility may almost double","unverified","C124914494",27,"https://archive.org/details/C124914494/page/n26",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:12/7",1993,1993,"second half of 1997","event","study or report",null,"Transbay Transit Terminal modifications · event: could be completed by the second half of 1997 if a Negative Declaration were appropriate","unverified","C124914494",12,"https://archive.org/details/C124914494/page/n11",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:16/1",1993,1993,"weekday","site","study or report",null,"Transbay Transit Terminal · other: 2,750 bus trips on 83 routes each weekday","unverified","C124914713",16,"https://archive.org/details/C124914713/page/n15",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:16/2",1993,1993,"weekday","site","study or report",null,"Transbay Transit Terminal · other: about 31,000 passengers board and alight each weekday","unverified","C124914713",16,"https://archive.org/details/C124914713/page/n15",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:22/2",1995,1994,"1994","event","study or report",null,"AC Transit · other: 769 buses and 14,208 passenger arrivals and departures","unverified","C124914193",22,"https://archive.org/details/C124914193/page/n22",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:43/1",1995,1994,"1994","finding","study or report",null,"Transbay Transit Terminal site · other: total midday bus storage requirement of 220 buses (SamTrans projected midday storage increased from 20 to 40 buses)","unverified","C124914193",43,"https://archive.org/details/C124914193/page/n43",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:80/1",1995,1994,"1994","finding","study or report",null,"Transbay Transit Terminal · finding: not identified for funding in the 1994 RTP","unverified","C124914193",80,"https://archive.org/details/C124914193/page/n80",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["d","qipu:sf/decision/journalofseptdecproceed89sanfrich:241/3",1994,1994,"1994-12-05","resolution","redevelopment","passed","Transbay Transit Terminal survey area at Beale and Market Streets adopted as amended for redevelopment study.","quoted","journalofseptdecproceed89sanfrich",241,"https://archive.org/details/journalofseptdecproceed89sanfrich/page/n240",null,null,null,null,"n","a",0,6.91],["d","qipu:sf/decision/journalofseptdecproceed89sanfrich:242/1",1994,1994,"1994-12-05","resolution","redevelopment","passed","The Board adopted, as amended, a resolution designating a Transbay Transit Terminal redevelopment survey area at Beale and Market Streets.","quoted","journalofseptdecproceed89sanfrich",242,"https://archive.org/details/journalofseptdecproceed89sanfrich/page/n241",null,null,null,null,"n","a",0,7.16],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:11/11",1995,1995,"","site","study or report",null,"Transbay Transit Terminal · other: central downtown location with bus access ramps; Caltrans and Muni occupy property on the north side (hump and crescent)","unverified","C124914193",11,"https://archive.org/details/C124914193/page/n11",null,null,null,"Transbay area plan : background data report","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:11/3",1995,1995,"","finding","study or report",null,"Transbay Transit Terminal area traffic · finding: traffic volumes on surface streets increased in South of Market area, particularly near Transbay Terminal, after earthquake damage and freeway removal","unverified","C124914193",11,"https://archive.org/details/C124914193/page/n11",null,null,null,"Transbay area plan : background data report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:11/5",1995,1995,"","finding","study or report",null,"Transbay Transit Terminal · finding: post-earthquake freeway access to East Bay and Peninsula only provided through ramps in South of Market area","unverified","C124914193",11,"https://archive.org/details/C124914193/page/n11",null,null,null,"Transbay area plan : background data report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:12/1",1995,1995,"","site","study or report",null,"Transbay Transit Terminal · other: located between Mission, First, Natoma, and Fremont Streets, with ramps forming a loop to the Bay Bridge and city streets","unverified","C124914193",12,"https://archive.org/details/C124914193/page/n12","Mission Street",null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:132/6",1995,1995,"","finding","study or report",null,"Transbay Transit Terminal · finding: ABAG projections assume in-fill near the terminal but no upgrade to the Terminal or CalTrain extension","unverified","C124914193",132,"https://archive.org/details/C124914193/page/n132",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:15/2",1995,1995,"","building","study or report",null,"Transbay Transit Terminal · owned by city: California Department of Transportation (Caltrans)","unverified","C124914193",15,"https://archive.org/details/C124914193/page/n15",null,null,null,"Transbay area plan : background data report","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:15/5",1995,1995,"","recommendation","study or report",null,"Transbay Transit Terminal · recommendation: demolition of the existing facility and replacement with a new terminal","unverified","C124914193",15,"https://archive.org/details/C124914193/page/n15",null,null,null,"Transbay area plan : background data report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:169/1",1995,1995,"","building","study or report",null,"Transbay Transit Terminal · cost usd: $32 million for seismic and other code upgrades","unverified","C124914193",169,"https://archive.org/details/C124914193/page/n169",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:17/1",1995,1995,"","finding","study or report",null,"Transbay Transit Terminal alternatives A and B · finding: Alternatives A and B would satisfy principal requirements for a new transit terminal and create development opportunities","unverified","C124914193",17,"https://archive.org/details/C124914193/page/n17",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:17/2",1995,1995,"","finding","study or report",null,"Transbay Transit Terminal Alternative X · finding: Alternative X would satisfy principal requirements but created more limited opportunities for joint development","unverified","C124914193",17,"https://archive.org/details/C124914193/page/n17",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:17/5",1995,1995,"","finding","study or report",null,"Transbay Transit Terminal · finding: Findings for the existing Terminal site are less relevant to the Transbay Area Plan","unverified","C124914193",17,"https://archive.org/details/C124914193/page/n17",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:21/2",1995,1995,"","building","study or report",null,"Transbay Transit Terminal · other: busiest transit terminal on the West Coast","unverified","C124914193",21,"https://archive.org/details/C124914193/page/n21",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:21/4",1995,1995,"","building","study or report",null,"Transbay Transit Terminal · other: six tracks on upper floor, 5 minute loading and unloading period","unverified","C124914193",21,"https://archive.org/details/C124914193/page/n21",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:21/8",1995,1995,"","site","study or report",null,"Transbay Transit Terminal north outside areas · owned by city: Caltrans property, heavily used by Muni (hump) and SamTrans (crescent)","unverified","C124914193",21,"https://archive.org/details/C124914193/page/n21",null,null,null,"Transbay area plan : background data report","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:22/10001",1995,1995,"","building","study or report",null,"Transbay Transit Terminal · other: Terminal building structure occupies portions of three city blocks","unverified","C124914193",22,"https://archive.org/details/C124914193/page/n22",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:22/10002",1995,1995,"","building","study or report",null,"Transbay Transit Terminal main building · other: main building located on central block","unverified","C124914193",22,"https://archive.org/details/C124914193/page/n22",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:22/8",1995,1995,"","building","study or report",null,"Transbay Transit Terminal · other: main building on central block between First, Mission, Fremont and Natoma Streets","unverified","C124914193",22,"https://archive.org/details/C124914193/page/n22","First Street",null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:22/9",1995,1995,"","building","study or report",null,"Transbay Transit Terminal · other: occupies portions of three city blocks between Second, Mission, Beale and Howard Streets","unverified","C124914193",22,"https://archive.org/details/C124914193/page/n22","Second Street",null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:24/1",1995,1995,"","finding","study or report",null,"Transbay Transit Terminal carpool drop-offs · finding: Casual carpool drop-offs around the terminal significantly affect traffic and pedestrians","unverified","C124914193",24,"https://archive.org/details/C124914193/page/n24",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:32/1",1995,1995,"","site","study or report",null,"Transbay Transit Terminal bus deck · other: AC Transit provides service exclusively to the bus deck","unverified","C124914193",32,"https://archive.org/details/C124914193/page/n32",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:41/4",1995,1995,"","finding","study or report",null,"AC Transit transbay bus service · other: AC Transit projected its service would increase by 169 percent","unverified","C124914193",41,"https://archive.org/details/C124914193/page/n41",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:41/5",1995,1995,"","finding","study or report",null,"Greyhound bus service at the Terminal · other: Greyhound expected its service would increase by 80 percent","unverified","C124914193",41,"https://archive.org/details/C124914193/page/n41",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:42/1",1995,1995,"","finding","study or report",null,"Transbay Transit Terminal · other: AC Transit would require forty bus berths on the third floor deck","unverified","C124914193",42,"https://archive.org/details/C124914193/page/n42",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:42/2",1995,1995,"","finding","study or report",null,"Transbay Transit Terminal site and adjacent streets · other: bus passenger boarding areas increase from existing 61 to 82","unverified","C124914193",42,"https://archive.org/details/C124914193/page/n42",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:42/3",1995,1995,"","finding","study or report",null,"Transbay Transit Terminal · finding: existing terminal building lacks capacity for projected bus service needs without significant modifications","unverified","C124914193",42,"https://archive.org/details/C124914193/page/n42",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:42/4",1995,1995,"","finding","study or report",null,"Transbay Transit Terminal · finding: rail proposals would require significant redesign and could likely require rebuilding of the facility","unverified","C124914193",42,"https://archive.org/details/C124914193/page/n42",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:54/6",1995,1995,"","site","study or report",null,"Transbay Transit Terminal · use: AC Transit and other operators use the ramps for midday bus storage","unverified","C124914193",54,"https://archive.org/details/C124914193/page/n54",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:57/1",1995,1995,"","project","study or report",null,"Transbay Transit Terminal Bus Deck Interim Seismic Strengthening · proposes: strengthening the vertical columns of the bus deck by installing 29 structural braces to the existing roofing frame","unverified","C124914193",57,"https://archive.org/details/C124914193/page/n57",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:57/2",1995,1995,"","building","study or report",null,"Transbay Transit Terminal · historic rating: considered eligible for the National Register of Historic Places","unverified","C124914193",57,"https://archive.org/details/C124914193/page/n57",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:57/3",1995,1995,"","finding","study or report",null,"Transbay Transit Terminal Bus Deck Interim Seismic Strengthening · finding: Only impact identified for preferred alternative is modification of an historic structure","unverified","C124914193",57,"https://archive.org/details/C124914193/page/n57",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:57/4",1995,1995,"","finding","study or report",null,"No Project alternative, Transbay Transit Terminal · finding: Impact, not significant, from exposing people to seismic hazard","unverified","C124914193",57,"https://archive.org/details/C124914193/page/n57",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:76/2",1995,1995,"","project","study or report",null,"F-Line streetcar · other: interim F-Line terminal at the Transbay Transit Terminal","unverified","C124914193",76,"https://archive.org/details/C124914193/page/n76",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:93/1",1995,1995,"","site","study or report",null,"Transbay Transit Terminal · other: occupies a central location within downtown San Francisco","unverified","C124914193",93,"https://archive.org/details/C124914193/page/n93",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:93/4",1995,1995,"","site","study or report",null,"Transbay Transit Terminal · other: located between Mission, First, Natoma, and Fremont Streets","unverified","C124914193",93,"https://archive.org/details/C124914193/page/n93","Mission Street",null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:97/2",1995,1995,"","building","study or report",null,"Transbay Transit Terminal · historic rating: considered eligible for the National Register of Historic Places","unverified","C124914193",97,"https://archive.org/details/C124914193/page/n97",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:22/6",1995,1995,"1995","event","study or report",null,"SFO Airporter · other: scheduled to move into the Terminal","unverified","C124914193",22,"https://archive.org/details/C124914193/page/n22",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:56/2",1995,1995,"1995","alternative","study or report",null,"Alternative A · cost usd: $79 million","unverified","C124914193",56,"https://archive.org/details/C124914193/page/n56",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:56/3",1995,1995,"1995","alternative","study or report",null,"Alternative X · cost usd: $93 million","unverified","C124914193",56,"https://archive.org/details/C124914193/page/n56",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:56/5",1995,1995,"1995","alternative","study or report",null,"Alternative A · proposes: new transit terminal at the existing Transbay Transit Terminal with other land uses stacked above","unverified","C124914193",56,"https://archive.org/details/C124914193/page/n56",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:56/6",1995,1995,"1995","alternative","study or report",null,"Alternative X · proposes: expanded the existing terminal vertically by adding a second bus deck","unverified","C124914193",56,"https://archive.org/details/C124914193/page/n56",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:68/1",1995,1995,"1995","alternative","study or report",null,"Proposed Downtown Terminal (Transbay Transit Terminal site) · proposes: Proposed downtown terminal at site of existing Transbay Transit Terminal","unverified","C124914193",68,"https://archive.org/details/C124914193/page/n68","Mission Street",null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:9/1",1995,1995,"1995","project","study or report",null,"Transbay Transit Terminal · alternative: Two alternative sites: existing terminal site between First and Fremont Streets at Mission Street, and a site near Main, Mission, Beale and Howard Streets","unverified","C124914193",9,"https://archive.org/details/C124914193/page/n9","Mission Street",null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:56/7",1995,1995,"Aug 1994","project","study or report",null,"Transbay Transit Terminal bus deck interim seismic strengthening · other: Final EIR assessing environmental impacts of strengthening the terminal","unverified","C124914193",56,"https://archive.org/details/C124914193/page/n56",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:57/5",1995,1995,"August 1994","event","study or report",null,"Transbay Transit Terminal Bus Deck Interim Seismic Strengthening EIR · event: EIR certified as complying with CEQA","unverified","C124914193",57,"https://archive.org/details/C124914193/page/n57",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:15/6",1995,1995,"December 1992","recommendation","study or report",null,"Transbay Transit Terminal · proposes: removal of the terminal and replacement with a smaller facility","unverified","C124914193",15,"https://archive.org/details/C124914193/page/n15",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:55/2",1995,1995,"December 1993","recommendation","study or report",null,"[name withheld] and [name withheld] · recommendation: Recommends minimum facility requirements and planning process for development","unverified","C124914193",55,"https://archive.org/details/C124914193/page/n55",null,null,null,"Transbay area plan : background data report","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:49/1",1995,1995,"July 1965","finding","study or report",null,"Study of the Transbay Transit Terminal (Caltrans District 4 Right of Way Office) · finding: Not relevant due to dated assumptions; status superseded","unverified","C124914193",49,"https://archive.org/details/C124914193/page/n49",null,null,null,"Transbay area plan : background data report","n","m",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:53/4",1995,1995,"June 1992","finding","study or report",null,"Seismic Evaluation of the Transbay Transit Terminal · other: Existing facility structurally divided into six separate buildings","unverified","C124914193",53,"https://archive.org/details/C124914193/page/n53",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:73/10003",1995,1995,"June 1992","alternative","study or report",null,"Transbay Transit Terminal · alternative: Two alternative sites considered by the Joint Powers Board for sharing the CalTrain extension","unverified","C124914193",73,"https://archive.org/details/C124914193/page/n73",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:73/3",1995,1995,"June 1992","finding","study or report",null,"Transbay Transit Terminal · alternative: Accommodating high-speed rail is one of the criteria in the analysis of alternatives for a Transbay Transit Terminal","unverified","C124914193",73,"https://archive.org/details/C124914193/page/n73",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:16/1",1995,1995,"March 22, 1993","project","study or report",null,"Transbay Transit Terminal · other: Board of Supervisors resolution requesting Caltrans work with City to study alternatives to rehabilitation of the Terminal and reconstruction of the Terminal Separator Structure","unverified","C124914193",16,"https://archive.org/details/C124914193/page/n16",null,null,null,"Transbay area plan : background data report","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:50/1",1995,1995,"November 1973","finding","study or report",null,"Seismic Investigation of the Transbay Transit Terminal Site (Caltrans Translab, November 1973) · finding: analysis of ground under building site, no reference to the structure","unverified","C124914193",50,"https://archive.org/details/C124914193/page/n50",null,null,null,"Transbay area plan : background data report","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:55/3",1995,1995,"November 1993","alternative","study or report",null,"Transit Terminal Study, Alternative A · alternative: New underground and surface level transit terminal on the existing Transbay Transit Terminal site and adjacent properties, with joint development above ground level","unverified","C124914193",55,"https://archive.org/details/C124914193/page/n55",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:16/4",1995,1995,"October 1993","finding","study or report",null,"Transit Needs Study · event: Released as a working paper in late October 1993","unverified","C124914193",16,"https://archive.org/details/C124914193/page/n16",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:41/1",1995,1995,"October 1993","finding","study or report",null,"Transit Needs Study staff working paper · other: Staff working paper prepared by MTC and Caltrans to identify existing uses, deficiencies and future needs of the Transbay Transit Terminal","unverified","C124914193",41,"https://archive.org/details/C124914193/page/n41",null,null,null,"Transbay area plan : background data report","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:54/7",1995,1995,"October 1993","building","study or report",null,"Transbay Transit Terminal · other: historic resource evaluation documenting significant features and integrity of the Terminal","unverified","C124914193",54,"https://archive.org/details/C124914193/page/n54",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:55/1",1995,1995,"October 1993","finding","study or report",null,"Transbay Transit Terminal Historic Resource Evaluation Report · finding: Focuses on architectural elements that contribute significantly to the Terminal's historical landmark status and details how they have been compromised","unverified","C124914193",55,"https://archive.org/details/C124914193/page/n55",null,null,null,"Transbay area plan : background data report","n","a",0,3.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:51/1",1995,1995,"Sept 1976","finding","study or report",null,"A Study to Establish Guidelines (SFBATTA regional transit terminal) · finding: Recommended Development Guidelines grouped under five headings: General, Finance, Use and Circulation, Urban Design, and Operational & Program","unverified","C124914193",51,"https://archive.org/details/C124914193/page/n51",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:51/2",1995,1995,"Sept 1976","finding","study or report",null,"A Study to Establish Guidelines (SFBATTA regional transit terminal) · finding: The facility in all alternatives accommodates bus transit service only","unverified","C124914193",51,"https://archive.org/details/C124914193/page/n51",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:51/3",1995,1995,"Sept 1976","agency","study or report",null,"A Study to Establish Guidelines (SFBATTA regional transit terminal) · lead agency: San Francisco Bay Area Transportation Terminal Authority","unverified","C124914193",51,"https://archive.org/details/C124914193/page/n51",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:16/8",1995,1995,"September 1993","alternative","study or report",null,"Alternative A · alternative: New underground and surface transit terminal on existing Transbay Terminal site and adjacent properties, with joint development above ground","unverified","C124914193",16,"https://archive.org/details/C124914193/page/n16",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:169/2",1995,1995,"September 1993","building","study or report",null,"Transbay Transit Terminal · other: six-month delay to September 1993 for code upgrades, requested by the City and County of San Francisco","unverified","C124914193",169,"https://archive.org/details/C124914193/page/n169",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:32/5",1995,1995,"early 1980s","finding","study or report",null,"Transbay Transit Terminal bus deck · finding: much more heavily utilized in the early 1980's than today","unverified","C124914193",32,"https://archive.org/details/C124914193/page/n32",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:15/7",1995,1995,"early 1993","event","study or report",null,"Transbay Transit Terminal joint real estate development · event: Caltrans drafted a Request For Proposal in which the City of San Francisco was asked to jointly participate","unverified","C124914193",15,"https://archive.org/details/C124914193/page/n15",null,null,null,"Transbay area plan : background data report","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:22/7",1995,1995,"late 1995","event","study or report",null,"Historic streetcar F Line · other: scheduled to end at the Terminal","unverified","C124914193",22,"https://archive.org/details/C124914193/page/n22",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914874:11/6",1996,1996,"","project","study or report",null,"new Transbay transit terminal · proposes: transit terminal on block south of Howard Street between Main and Beale Streets","unverified","C124914874",11,"https://archive.org/details/C124914874/page/n10","Howard Street",null,null,"Transbay area plan : Transbay 2020, preliminary land use and urban design alternative","n","m",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124921892:209/6",1996,1996,"","project","audit",null,"MUNI headquarters building · proposes: six sites under consideration for new headquarters building","unverified","C124921892",209,"https://archive.org/details/C124921892/page/n208",null,null,null,"Management audit of the San Francisco Municipal Railway","n","a",0,0.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124921892:210/1",1996,1996,"","site","audit",null,"Transbay Transit Terminal site · other: MUNI has started analysis of financial feasibility of developing the site","unverified","C124921892",210,"https://archive.org/details/C124921892/page/n209",null,null,null,"Management audit of the San Francisco Municipal Railway","n","a",0,0.0],["d","qipu:sf/decision/journalofproceed91sanfrich|156",1996,1996,"1996-03-04","resolution","getting-around","passed","Main and Beale Streets favoured for a new Transbay transit terminal","quoted","journalofproceed91sanfrich",181,"https://archive.org/details/journalofproceed91sanfrich/page/n180",null,null,null,null,"n","a",0,1.9],["d","qipu:sf/decision/map:journalofproceed91sanfrich/180/16aa9197",1996,1996,"1996-03-04","resolution",null,"passed","Main and Beale Streets favoured for a new Transbay transit terminal","unverified","journalofproceed91sanfrich",181,"https://archive.org/details/journalofproceed91sanfrich/page/n180",null,null,null,null,"n","a",0,-1.0],["d","qipu:sf/decision/journalofmayaugproceed92sanfrich:32/3",1997,1997,"1997-05-12","resolution","transit","passed","Endorsement of a Main/Beale South design for a replacement Transbay transit terminal, urging the Mayor to complete planning.","quoted","journalofmayaugproceed92sanfrich",32,"https://archive.org/details/journalofmayaugproceed92sanfrich/page/n31",null,null,null,null,"n","a",0,6.28],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:11/6",1995,2013,"2013","finding","study or report",null,"Transbay Transit Terminal · proposes: bus service to the Terminal would increase by 2013 and passengers would almost double over the same period","unverified","C124914193",11,"https://archive.org/details/C124914193/page/n11",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:11/7",1995,2013,"2013","finding","study or report",null,"Transbay Transit Terminal · other: AC Transit would require forty bus berths on the third floor deck","unverified","C124914193",11,"https://archive.org/details/C124914193/page/n11",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:41/2",1995,2013,"2013","finding","study or report",null,"Transbay Transit Terminal · other: bus service to the Terminal would increase by 2013","unverified","C124914193",41,"https://archive.org/details/C124914193/page/n41",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:41/3",1995,2013,"2013","finding","study or report",null,"Transbay Transit Terminal · other: number of passengers using the Terminal would almost double","unverified","C124914193",41,"https://archive.org/details/C124914193/page/n41",null,null,null,"Transbay area plan : background data report","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914494:28/1",1993,2013,"2013","finding","study or report",null,"Transbay Transit Terminal site · other: Table 5: 1992 and projected 2013 daily bus operations at the site (table values garbled on page)","unverified","C124914494",28,"https://archive.org/details/C124914494/page/n27",null,null,null,"Transit terminal study","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:28/5",1993,2013,"2013","project","study or report",null,"Transbay Transit Terminal future bus and rail services · other: bus service level projected for 20 years (2013)","unverified","C124914713",28,"https://archive.org/details/C124914713/page/n27",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:30/7",1993,2013,"2013","finding","study or report",null,"GGBHTD bus services · other: Approximately 20% growth in bus services by 2013, to 767 total daily bus arrivals and departures","unverified","C124914713",30,"https://archive.org/details/C124914713/page/n29",null,null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914713:30/8",1993,2013,"2013","finding","study or report",null,"GGBHTD bus services · other: About 720 daily passengers within the Terminal and about 4,050 daily passengers on First and Fremont Streets","unverified","C124914713",30,"https://archive.org/details/C124914713/page/n29","First Street and Fremont Street",null,null,"Transbay Transit Terminal current and future needs study : staff working paper : final","n","a",0,-1.0]]}