{"id":null,"ids":[],"kind":"named in documents","name":"Treasure Island shoreline","tied_by":"name","block":null,"release":"v0.7.1","rows_columns":["t","id","year","y","date","kind","topic","outcome","summary","tier","source","leaf","scan","addr","quote","note","title","how","g","rec","sc"],"rows":[["f","dl-sf-facts-v1.1-haiku55-2026-10/C101747471:209/4",2002,2002,"","finding","environmental impact report",null,"Treasure Island shoreline groundwater · finding: Tidally influenced ground water table fluctuations observed 90 to 250 feet inland","unverified","C101747471",209,"https://archive.org/details/C101747471/page/n208",null,null,null,"Disposal and reuse of Naval Station Treasure Island : draft environmental impact statement","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101747471:210/1",2002,2002,"","finding","environmental impact report",null,"Treasure Island ground water · finding: Tidal mixing with ground water noted up to about 100 feet inland from shoreline, resulting in brackish ground water","unverified","C101747471",210,"https://archive.org/details/C101747471/page/n209",null,null,null,"Disposal and reuse of Naval Station Treasure Island : draft environmental impact statement","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101747471:498/2",2002,2002,"","alternative","environmental impact report",null,"Treasure Island shoreline dike · other: dike remains at present height of 14 feet (4 m) NGVD, with modest widening","unverified","C101747471",498,"https://archive.org/details/C101747471/page/n497",null,null,null,"Disposal and reuse of Naval Station Treasure Island : draft environmental impact statement","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101747471:498/3",2002,2002,"","alternative","environmental impact report",null,"Treasure Island shoreline open space corridor · other: 100-foot wide shoreline open space corridor with landscaping, paths and overlooks","unverified","C101747471",498,"https://archive.org/details/C101747471/page/n497",null,null,null,"Disposal and reuse of Naval Station Treasure Island : draft environmental impact statement","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101747471:69/1",2002,2002,"","measure","environmental impact report",null,"Treasure Island causeway and shoreline seismic stabilization, Alternative 1 · other: Stone columns within a 50-foot wide band along the shoreline","unverified","C101747471",69,"https://archive.org/details/C101747471/page/n68",null,null,null,"Disposal and reuse of Naval Station Treasure Island : draft environmental impact statement","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101747471:69/2",2002,2002,"","measure","environmental impact report",null,"Treasure Island causeway and shoreline seismic stabilization, Alternative 1 · other: Soil cement columns in shoreline subject to rotational dike failure","unverified","C101747471",69,"https://archive.org/details/C101747471/page/n68",null,null,null,"Disposal and reuse of Naval Station Treasure Island : draft environmental impact statement","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101747471:73/2",2002,2002,"","alternative","environmental impact report",null,"Treasure Island shoreline open space · other: widened from 25 to 50 feet to approximately 100 feet","unverified","C101747471",73,"https://archive.org/details/C101747471/page/n72",null,null,null,"Disposal and reuse of Naval Station Treasure Island : draft environmental impact statement","n","a",0,-1.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C101747471:387/5",2002,2002,"2002","recommendation","environmental impact report",null,"Pedestrian and bicycle access, Treasure Island · recommendation: Consider safe pedestrian and bicycle access to Treasure Island, particularly shoreline areas","unverified","C101747471",387,"https://archive.org/details/C101747471/page/n386",null,null,null,"Disposal and reuse of Naval Station Treasure Island : draft environmental impact statement","n","a",0,-1.0]]}