{"id":null,"ids":[],"kind":"named in documents","name":"Van Ness Corridor","tied_by":"name","block":null,"release":"v0.7.1","rows_columns":["t","id","year","y","date","kind","topic","outcome","summary","tier","source","leaf","scan","addr","quote","note","title","how","g","rec","sc"],"rows":[["f","dl-sf-facts-v1.1-haiku55-2026-10/C124924016:67/2",1979,1979,"","finding","study or report",null,"[name withheld] corridor · height ft: maximum heights of 130 feet; base FAR of 10, up to 12.5 on corner lots","unverified","C124924016",67,"https://archive.org/details/C124924016/page/n66","Van Ness Avenue",null,null,"Downtown San Francisco conservation and development planning program : phase I, reconnaissance and programming","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124924016:67/3",1979,1979,"","finding","study or report",null,"[name withheld] corridor · finding: Spillover most likely to occur in [name withheld] corridor, where development capacity exceeds Proposition O limits","unverified","C124924016",67,"https://archive.org/details/C124924016/page/n66","Van Ness Avenue",null,null,"Downtown San Francisco conservation and development planning program : phase I, reconnaissance and programming","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124878958:11/7",1983,1983,"","finding","study or report",null,"[name withheld] land use shift · finding: 129 acres shifting from local-serving uses to residential and mixed use","unverified","C124878958",11,"https://archive.org/details/C124878958/page/n10","Van Ness Avenue",null,null,"Local development policy survey update for San Francisco","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/c124897620:41/4",1983,1983,"","recommendation","plan",null,"Support commercial and secondary office · proposes: Absorb demand at Market Street west of Fifth Street, south of Market west of YBC, [name withheld] corridor, Second Street corridor, [name withheld], northern waterfront","unverified","c124897620",41,"https://archive.org/details/c124897620/page/n40",null,null,null,"The downtown plan : proposal for citizen review","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124885198:40/10",1984,1984,"","site","plan",null,"[name withheld] · other: 1,000","unverified","C124885198",40,"https://archive.org/details/C124885198/page/n39",null,null,null,"Residence : the residence element of the comprehensive plan of the city and County of San Francisco","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124891981:28/4",1984,1984,"","site","study or report",null,"[name withheld] corridor · other: city policies encourage replacing existing structures with high density housing above commercial uses","unverified","C124891981",28,"https://archive.org/details/C124891981/page/n26","Van Ness Avenue",null,null,"Sun, wind, and comfort : a study of open spaces and sidewalks in four downtown areas","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124891981:28/5",1984,1984,"","site","study or report",null,"Study areas (Chinatown/North Beach, South of Market, Tenderloin, [name withheld] corridor) · other: existing 3 to 8 story buildings under pressure for replacement with much larger buildings","unverified","C124891981",28,"https://archive.org/details/C124891981/page/n26",null,null,null,"Sun, wind, and comfort : a study of open spaces and sidewalks in four downtown areas","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124885198:42/1",1984,1984,"1984","alternative","plan",null,"Housing Opportunities on [name withheld] · proposes: Mixed residential-commercial use areas selected for housing on publicly owned land","unverified","C124885198",42,"https://archive.org/details/C124885198/page/n41",null,null,null,"Residence : the residence element of the comprehensive plan of the city and County of San Francisco","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124891981:8/3",1984,1984,"1984","site","study or report",null,"[name withheld] · other: Portion of the [name withheld] studied as study area","unverified","C124891981",8,"https://archive.org/details/C124891981/page/n6","Van Ness Avenue",null,null,"Sun, wind, and comfort : a study of open spaces and sidewalks in four downtown areas","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124878958:19/7",1983,1985,"1985-2000","site","study or report",null,"[name withheld] · acreage: 84 acres of development potential","unverified","C124878958",19,"https://archive.org/details/C124878958/page/n18","[name withheld]",null,null,"Local development policy survey update for San Francisco","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124878958:19/8",1983,1985,"1985-2000","site","study or report",null,"[name withheld] · units: 10,600 housing units","unverified","C124878958",19,"https://archive.org/details/C124878958/page/n18","[name withheld]",null,null,"Local development policy survey update for San Francisco","n","a",0,2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124894734:121/1",1989,1989,"","project","study or report",null,"[name withheld] · adopted: new permanent zoning controls preserving existing housing and encouraging housing above commercial at 3 sq ft housing to 1 sq ft non-residential","unverified","C124894734",121,"https://archive.org/details/C124894734/page/n120","Van Ness Avenue",null,null,"An affordable housing action plan for San Francisco : draft report","n","a",0,2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124894734:89/1",1989,1989,"June 1988","site","study or report",null,"[name withheld] · other: 10,000 (OCR: 10.00) potential units, selected mixed residential-commercial use area","unverified","C124894734",89,"https://archive.org/details/C124894734/page/n88","Van Ness Avenue",null,null,"An affordable housing action plan for San Francisco : draft report","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124905937:38/1",1990,1990,"","finding","study or report",null,"Polk/[name withheld] corridor UMBs · other: 40% of all UMBs of the garage building type","unverified","C124905937",38,"https://archive.org/details/C124905937/page/n37",null,null,null,"Seismic retrofitting alternatives for San Francisco's unreinforced masonry buildings : socioeconomic and land use implications of alternative requirements","n","a",0,-5.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124905937:38/2",1990,1990,"","finding","study or report",null,"Polk/[name withheld] corridor UMBs · other: About 25% of UMB space is in garage facilities","unverified","C124905937",38,"https://archive.org/details/C124905937/page/n37",null,null,null,"Seismic retrofitting alternatives for San Francisco's unreinforced masonry buildings : socioeconomic and land use implications of alternative requirements","n","a",0,-5.0],["d","qipu:sf/decision/journalofseptoctproceed86sanfrich|41",1991,1991,"1991-09-16","resolution","running-the-city","referred","Traffic plan urged for FEMA money and the [name withheld] corridor","quoted","journalofseptoctproceed86sanfrich",94,"https://archive.org/details/journalofseptoctproceed86sanfrich/page/n93",null,null,null,null,"n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124914193:81/3",1995,1994,"1994","project","study or report",null,"[name withheld] corridor studies · other: funded for preliminary planning considerations only","unverified","C124914193",81,"https://archive.org/details/C124914193/page/n81","[name withheld]",null,null,"Transbay area plan : background data report","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124922708:77/4",2000,2000,"","finding","plan",null,"[name withheld] · finding: No significant planning analyses have been completed","unverified","C124922708",77,"https://archive.org/details/C124922708/page/n76","[name withheld]",null,null,"San Francisco countywide transportation plan : draft for public review","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124923818:266/4",2000,2000,"","project","plan",null,"[name withheld] · proposes: LRT from Sixteenth Street and Mission to Aquatic Park, central section subway","unverified","C124923818",266,"https://archive.org/details/C124923818/page/n265","Van Ness Avenue",null,null,"Bay area transportation blueprint for the 21st century. Project notebook of candidate projects","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124923818:266/5",2000,2000,"","project","plan",null,"[name withheld] · proposes: subway from South Market to Pacific Avenue","unverified","C124923818",266,"https://archive.org/details/C124923818/page/n265","Van Ness Avenue",null,null,"Bay area transportation blueprint for the 21st century. Project notebook of candidate projects","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124923818:266/6",2000,2000,"","finding","plan",null,"[name withheld] · other: not eligible for SFCTA sales tax construction funds","unverified","C124923818",266,"https://archive.org/details/C124923818/page/n265","Van Ness Avenue",null,null,"Bay area transportation blueprint for the 21st century. Project notebook of candidate projects","n","a",0,-2.0],["f","dl-sf-facts-v1.1-haiku55-2026-10/C124923818:300/1",2000,2000,"2000","project","plan",null,"Fixed Guideway Routes · proposes: Geary Corridor, North Beach Corridor, [name withheld]","unverified","C124923818",300,"https://archive.org/details/C124923818/page/n299","Geary; [name withheld]",null,null,"Bay area transportation blueprint for the 21st century. Project notebook of candidate projects","n","a",0,-2.0],["d","qipu:sf/decision/meetingminutesbo2015sanf:94/1",2015,2015,"2015-02-10","ordinance",null,"passed","Planning Code amended to consolidate awning, canopy and marquee rules and bar General Advertising Signs from the Embarcadero and [name withheld] corridor.","quoted","meetingminutesbo2015sanf",94,"https://archive.org/details/meetingminutesbo2015sanf/page/n93",null,null,null,null,"n","a",0,-1.75],["d","qipu:sf/decision/sfbos:bag091316|120",2016,2016,"2016-09-13","resolution","running-the-city",null,"Transit agency urged to save the Van Ness Avenue streetlamps","unverified",null,null,"https://sfbos.org/sites/default/files/bag091316_minutes.pdf#page=25",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag092016|62",2016,2016,"2016-09-20","resolution",null,null,"A speaker backs historic preservation of the [name withheld]",null,null,null,"https://sfbos.org/sites/default/files/bag092016_minutes.pdf#page=14",null,null,null,null,"n","a",0,-2.0],["d","qipu:sf/decision/sfbos:bag092016|63",2016,2016,"2016-09-20","resolution",null,null,"A speaker backs historic preservation of the [name withheld]",null,null,null,"https://sfbos.org/sites/default/files/bag092016_minutes.pdf#page=14",null,null,null,null,"n","a",0,-2.0],["d","qipu:sf/decision/sfbos:bag092016|64",2016,2016,"2016-09-20","resolution",null,null,"A speaker backs historic preservation of the [name withheld]",null,null,null,"https://sfbos.org/sites/default/files/bag092016_minutes.pdf#page=14",null,null,null,null,"n","a",0,-2.0],["d","qipu:sf/decision/sfbos:bag092016|65",2016,2016,"2016-09-20","resolution",null,null,"A speaker backs historic preservation of the [name withheld]",null,null,null,"https://sfbos.org/sites/default/files/bag092016_minutes.pdf#page=14",null,null,null,null,"n","a",0,-2.0],["d","qipu:sf/decision/sfbos:bag092016|67",2016,2016,"2016-09-20","resolution",null,null,"A speaker backs historic preservation of the [name withheld]",null,null,null,"https://sfbos.org/sites/default/files/bag092016_minutes.pdf#page=14",null,null,null,null,"n","a",0,-2.0],["d","qipu:sf/decision/sfbos:bag092016|68",2016,2016,"2016-09-20","resolution",null,null,"A speaker backs the new [name withheld] preservation resolution",null,null,null,"https://sfbos.org/sites/default/files/bag092016_minutes.pdf#page=14",null,null,null,null,"n","a",0,-2.0],["d","qipu:sf/decision/sfbos:bag092016|90",2016,2016,"2016-09-20","resolution","running-the-city",null,"Transit agency urged to save the Van Ness Avenue streetlamps","unverified",null,null,"https://sfbos.org/sites/default/files/bag092016_minutes.pdf#page=16",null,null,null,null,"n","m",0,-1.0],["d","qipu:sf/decision/sfbos:bag092016|91",2016,2016,"2016-09-20","resolution","land-and-building",null,"[name withheld] preservation resolution amended on counts and street names","unverified",null,null,"https://sfbos.org/sites/default/files/bag092016_minutes.pdf#page=16",null,null,null,null,"n","m",0,-2.0],["d","qipu:sf/decision/sfbos:bag092016|92",2016,2016,"2016-09-20","resolution","running-the-city","passed","[name withheld] preservation request to transit agency approved with changes","unverified",null,null,"https://sfbos.org/sites/default/files/bag092016_minutes.pdf#page=16",null,null,null,null,"n","m",0,0.72]]}