A draft environmental impact report on City College's plan to build a new Mission Campus on Bartlett Street, consolidating nearby facilities. Scan on the Internet Archive ↗

Area
about 134,000 gross square feetScan 102 ↗
Students
about 800 students and about 12 facultyScan 102 ↗
Parking
approximately 110 parking spaces undergroundScan 25 ↗
Enrollment
about 6,400 studentsScan 25 ↗

“[name withheld]” stands for a name the release withholds (Privacy).

Findings
  • The report concludes that the proposed project would have no significant unavoidable impacts.Scan 102 ↗
  • The report concludes that nearby intersections would continue to operate at LOS D or better with project traffic.Scan 12 ↗
Report recommendations
  • The report states that the included mitigation measures would reduce construction impacts to less-than-significant levels.Scan 82 ↗
Board decisions
  • Supervisor Teng requested a hearing on student safety at City College's main campus near Phelan Loop, referred to the Health, Public Safety and Environment Committee.Record · Journal page ↗
  • 1998 · This reportSan Francisco Community College District
  • Supervisor Ammiano's requested hearing on City College's expansion of Mission Campus into the old New Mission Theatre was sent to committee.Record · Journal page ↗
  • City College proposed expanding its Mission Campus into the former New Mission Theatre; referred to Finance and Labor Committee.Record · Journal page ↗
  • School board urged to back City College's Bartlett Street campusRecord · Journal page ↗
  • Resolution urging the SFUSD School Board to support a new City College of San Francisco campus at 106 and 110 Bartlett Street was referred.Record · Journal page ↗
  • Board adopted a resolution urging the SFUSD School Board to support a new City College campus at 106 and 110 Bartlett Street.Record · Journal page ↗
28 quotes from the scan

Printed words Quoted from the page as read from the scan.

Report recommendations-37775b46d73b

“The new facilities would have the capacity to accommodate up to about 800 additional students and faculty members for late afternoon and evening classes.”

Scan 12

Findings-6fa321bb2d39

“Intersections in the vicinity of the project site would continue to operate at acceptable levels of service (LOS D or better) with the addition of project traffic.”

Scan 12

Findings-8a681b4122b4

“This could result in about 145 additional vehicle trips to the area.”

Scan 12

Findings-f57e254e6fc2

“Over 80% of the students use transit, walk or carpool to the Campus; about 18% drive to the Campus.”

Scan 12

Report recommendations-49f33fd38645

“The parking garage would be about 44,000 sq. ft., the approximate size of the lot, and would require excavation to a depth of about 15 ft.”

Scan 25

Report recommendations-b97c8cd7d8cd

“One level of underground parking would provide approximately 110 parking spaces.”

Scan 25

Report recommendations-c55f4ecdb67c

“Under Design Scenario 2, the building would be a one-story multi-purpose room with a lower roofline than the adjacent Mission Market building.”

Scan 47

Findings-3f00fb416680

“Archival research does not suggest that post-Gold Rush historical archaeological artifacts that may be found upon excavating for a subsurface parking garage would be of particular significance.”

Scan 58

Findings-76cae36529b0

“Until the Gold Rush era, archival data supports the assessment that the proposed project site remained in a natural state.”

Scan 58

Findings-7e83b3f2327d

“It is therefore unlikely that subsurface cultural resources from the Spanish, Mexican, or Early American eras (1776-1848) would be encountered.”

Scan 58

Backgrounds-796f5e0ddc4e

“Mission Street is designated as a primary transit-oriented street, and is on the citywide pedestrian network.”

Scan 60

Findings-87dc3bfda515

“Mission Street has four travel lanes, with two lanes in each direction.”

Scan 60

Findings-b4a7d45474c8

“It is not designated in the Transportation Element of the San Francisco General Plan.”

Scan 60

Findings-7fb89147d9c9

“Therefore, the project would not cause any significant traffic impacts on neighborhood streets and intersections.”

Scan 70

Findings-eecfff5b2958

“As indicated, under both scenarios transit conditions would continue to operate within acceptable Muni and BART peak load thresholds.”

Scan 72

Report recommendations-009ea61bfb8d

“Implementation of these mitigation measures is included in the project and would reduce related impacts to less-than-significant levels.”

Scan 82

Report recommendations-262cfaa9a7c3

“Cover all trucks hauling soil, sand, and other loose materials or require all trucks to maintain at least two feet of freeboard.”

Scan 82

Report recommendations-f3f935727d48

“Water all active construction areas at least twice daily.”

Scan 82

Findings-1e64929dc3c9

“The [name withheld] building is an approximately 45-foot-tall (three-story) industrial building.”

Scan 92

Backgrounds-8e0fa1a21510

“According to the San Francisco Zoning Maps, the alternative site is located within an M-1 (light industrial) Zoning District and is in a 50-X Height and Bulk District.”

Scan 92

Backgrounds-aeeda5aa6775

“According to City Planning Code section 217 (g), post-secondary educational institutions are permitted within an M-1 zoning district.”

Scan 92

Findings-14c67e3fa99c

“As proposed, the project would have no significant unavoidable impacts.”

Scan 102

Report recommendations-20352dfbb4c1

“The proposed project would demolish the two buildings on the project site, both of which house retail uses.”

Scan 102

Findings-07f632727032

“The project site does not contain any state or locally classified mineral resource. Effects related to mineral resources will not be discussed in the EIR.”

Scan 135

Report recommendations-c1c29d0877da

“The EIR will discuss the conversion of the existing site land use from neighborhood commercial uses to educational/institutional uses.”

Scan 135

Findings-cd06540dc838

“No residents or housing would be displaced by the proposed project. Effects related to population and housing will not be discussed in the EIR.”

Scan 137

Findings-d7601c9add37

“The proposed project includes no housing, and would not induce substantial population growth in the area around the project site.”

Scan 137

Report recommendations-fa3cc7d397c0

“The project is consolidating current Mission Campus facilities from existing sites within two blocks of the proposed site.”