{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c101737381","url":"https://data.qipu.org/usa/san-francisco/reports/c101737381/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c101737381/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C101737381","source_id":"C101737381","title":"Draft waterfront land use plan","year":1994,"n_pages":320,"creator":"San Francisco (Calif.). Waterfront Plan Advisory Board","source_url":"https://archive.org/details/C101737381","issuer":"City and County of San Francisco, Waterfront Plan Advisory Board","issuer_type":"government","gov_level":"city_county","prepared_by":null,"doc_kind":"plan","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"meta","doc_kind_by":"meta","jurisdiction_by":"meta","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":15,"statements_total":58,"statements_by_kind":{"finding":23,"proposal":27,"cites_decision":4,"background":4},"same_for_every_statement":{"source_id":"C101737381","source_url":"https://archive.org/details/C101737381","source_label":"IGS library: Draft waterfront land use plan","report_year":1994,"issuer":"City and County of San Francisco, Waterfront Plan Advisory Board","issuer_type":"government","doc_kind":"plan","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A draft plan by the Waterfront Plan Advisory Board setting land uses for over seven miles of Port waterfront property, with design, access and financing proposals.","figures":[{"label":"Area","value":"approximately 15 acres","claim_ids":["c:ce0e9909dac355314bcfedb6cf5d5a28"]},{"label":"Subsidy","value":"approximately $1.25 million annual subsidy","claim_ids":["c:5c997f61ce44dd688c2d227dcff79768"]},{"label":"Owed","value":"$25 million","page_url":"https://archive.org/details/C101737381/page/n28","quote":"a $25 million backlog of deferred maintenance which continues to accumulate at approximately $2.5 million per year"}],"main_points":["c:6c1d9e9c755f7bf492b7ab98895abf8c","c:afe54588517fa981d769395e6545efdc","c:5c997f61ce44dd688c2d227dcff79768"],"board_decisions_after":["qipu:sf/decision/journalofseptdecproceed89sanfrich:287/3","qipu:sf/decision/journalofseptdecproceed89sanfrich:270/2","qipu:sf/decision/journalofjanaprproceed90sanfrich|130","qipu:sf/decision/journalofproceed93sanfrich|2","qipu:sf/decision/journalofproceed92septdecsanfrich|156","qipu:sf/decision/2meetingminutes2003sanf:151/1","qipu:sf/decision/meetingminutesb2003sanf_1:238/2","qipu:sf/decision/meetingminutesb2003sanf_2:417/3"],"board_decisions_before":["qipu:sf/decision/journalofjuldecproceed87sanfrich:500/2","qipu:sf/decision/journalofjuldecproceed87sanfrich:555/2"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:6c1d9e9c755f7bf492b7ab98895abf8c","page_id":"C101737381:1","page_url":"https://archive.org/details/C101737381/page/n0","statement_kind":"proposal","subject_label":"Draft Waterfront Land Use Plan","summary":"The draft plan specifies land uses for over seven miles of Port waterfront property.","property":"proposes","value_text":"over seven miles","t_from":"1994","quote":"The Draft Plan specifies land uses for the over seven miles of waterfront property under Port jurisdiction, from Aquatic Park to India Basin","place_label":"Aquatic Park to India Basin","anchor":"s-6c1d9e9c755f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Port of San Francisco Waterfront Plan Staff","stance":"own_position","speaker_evidence":"FROM: Waterfront Plan Staff Port of San Francisco Planning and Development Division"},{"claim_id":"c:38083442548d3199a53dfbaed1cc6e8a","page_id":"C101737381:9","page_url":"https://archive.org/details/C101737381/page/n8","statement_kind":"proposal","subject_label":"Waterfront transformation funding","summary":"The report says private capital will be attracted once San Franciscans reach consensus on the land use plan.","property":"other","t_from":"1994","quote":"Private capital will be attracted to the waterfront, once San Franciscans achieve consensus on the land use plan, providing the certainty","anchor":"s-38083442548d","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Private capital will be attracted to the waterfront"},{"claim_id":"c:1fa2cae39ec4d2907f4271b28fff136a","page_id":"C101737381:23","page_url":"https://archive.org/details/C101737381/page/n22","statement_kind":"finding","subject_label":"Seawall Lot 321 office and health club proposal","summary":"The 1988 proposal for an office and health club on Seawall Lot 321 failed.","property":"rejected","date_printed":"1988","t_from":"1988","quote":"In 1988, a proposal for an office and health club development on Seawall Lot (SWL) 321 failed, in part because","place_label":"Seawall Lot (SWL) 321","anchor":"s-1fa2cae39ec4","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In 1988, a proposal for an office and health club development on Seawall Lot"},{"claim_id":"c:8445f5df934fae4e6b2ecce015d1c953","page_id":"C101737381:23","page_url":"https://archive.org/details/C101737381/page/n22","statement_kind":"finding","subject_label":"Pier 45 residential condominium proposal","summary":"A mid-1980s proposal for residential condominiums on Pier 45 was ruled an invalid public trust use.","property":"rejected","date_printed":"mid-1980s","t_from":"1994","quote":"For example, a controversial proposal in the mid-1980s for residential condominiums on Pier 45 was ruled an invalid public trust use.","place_label":"Pier 45","place_precision":"site","place_id":"qipu:sf/place/landmark/pier-45","resolved_by":"place links file","anchor":"s-8445f5df934f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"For example, a controversial proposal in the mid-1980s for residential condominiums on Pier 45"},{"claim_id":"c:96ea74510bbcc886635048b4c9908571","page_id":"C101737381:23","page_url":"https://archive.org/details/C101737381/page/n22","statement_kind":"finding","subject_label":"Port investment obligations","summary":"The State reduced the Port's investment obligations from $100 million (≈ $227.4 million in 2026 dollars) to $25 million (≈ $56.8 million in 2026 dollars).","property":"other","value_text":"$25 million","value_num":25000000.0,"unit":"USD","t_from":"1994","quote":"reducing the Port's investment obligations from $100 million to $25 million","anchor":"s-96ea74510bbc","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"by reducing the Port's investment obligations from $100 million to $25 million"},{"claim_id":"c:cc7402403875de213baec1668595a92a","page_id":"C101737381:23","page_url":"https://archive.org/details/C101737381/page/n22","statement_kind":"cites_decision","subject_label":"BCDC Special Area Plan, Piers 1 and 3","summary":"BCDC approved non-maritime office use on Piers 1 and 3 in its Special Area Plan.","property":"approved","value_text":"non-maritime office use","t_from":"1990","quote":"although BCDC had approved non-maritime office use on Piers 1 and 3 in its Special Area Plan","decided_by":"San Francisco voters","instrument_kind":"proposition","instrument_printed":"H","instrument_date_printed":"1990","place_label":"Piers 1 and 3","anchor":"s-cc7402403875","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"although BCDC had approved non-maritime office use on Piers 1 and 3 in its Special Area Plan"},{"claim_id":"c:f9df32b453a9cf3e90421732e9f7c1d9","page_id":"C101737381:23","page_url":"https://archive.org/details/C101737381/page/n22","statement_kind":"cites_decision","subject_label":"Sailing Center with hotel, Piers 24 and 26","summary":"Voters defeated a Sailing Center with a hotel on Piers 24 and 26 by passing Proposition H in 1990.","property":"rejected","value_text":"Proposition H","date_printed":"1990","t_from":"1990","quote":"Most recently, a proposal for a Sailing Center with a hotel on Piers 24 and 26, although permitted by BCDC and State Lands regulations, was defeated by San Francisco voters' passage of Proposition H in 1990.","decided_by":"San Francisco voters","instrument_kind":"proposition","instrument_printed":"H","instrument_date_printed":"1990","place_label":"Piers 24 and 26","anchor":"s-f9df32b453a9","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Most recently, a proposal for a Sailing Center with a hotel on Piers 24 and 26"},{"claim_id":"c:0db34dc280bea7a990aed015a7762575","page_id":"C101737381:31","page_url":"https://archive.org/details/C101737381/page/n30","statement_kind":"finding","subject_label":"Waterfront Transportation Projects","summary":"The City is proceeding with construction of the north and south segments of the Waterfront Transportation Projects.","property":"other","t_from":"1994","quote":"While this redesign effort is underway, the City is proceeding with construction of the north and south segments of the projects.","place_label":"The Embarcadero","place_precision":"street","place_id":"qipu:sf/place/street/the-embarcadero","resolved_by":"place links file","anchor":"s-0db34dc280be","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Chapter 1: Introduction To The Port; Port staff narrative on redesign and construction status"},{"claim_id":"c:bfb0819c8c5d2a8c13041ab5c06f2894","page_id":"C101737381:31","page_url":"https://archive.org/details/C101737381/page/n30","statement_kind":"finding","subject_label":"Embarcadero Freeway","summary":"The 1989 Loma Prieta earthquake severely damaged the Embarcadero Freeway.","property":"other","date_printed":"1989","t_from":"1989","quote":"In 1989, the Loma Prieta earthquake severely damaged the Freeway, and its subsequent demolition provided an exciting new opportunity","place_label":"The Embarcadero","place_precision":"street","place_id":"qipu:sf/place/street/the-embarcadero","resolved_by":"place links file","anchor":"s-bfb0819c8c5d","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Chapter 1: Introduction To The Port; narrative on Loma Prieta earthquake and Freeway"},{"claim_id":"c:07f4947962627c0c81e45b5b5c9df1ef","page_id":"C101737381:45","page_url":"https://archive.org/details/C101737381/page/n44","statement_kind":"proposal","subject_label":"Waterfront access network","summary":"The Plan proposes a network of parks, plazas, walkways and open spaces to improve public access to the Bay.","property":"proposes","t_from":"1994","quote":"A network of parks, plazas, walkways, open spaces and integrated transportation improvements should improve access to, and enhance the enjoyment and appreciation of, the Bay environment.","place_label":"Waterfront","anchor":"s-07f494796262","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Chapter 2: Guiding Principles, Access Along The Waterfront"},{"claim_id":"c:3525a6c78649535bf11bf99d3dca7a18","page_id":"C101737381:45","page_url":"https://archive.org/details/C101737381/page/n44","statement_kind":"proposal","subject_label":"Recreational boat moorings and waterborne transportation","summary":"The Plan encourages new recreational boat moorings and other waterborne transportation improvements alongside new commercial and recreational uses.","property":"proposes","t_from":"1994","quote":"Encouraging new recreational boat moorings and other waterborne transportation improvements in conjunction with new commercial and recreational uses.","place_label":"Waterfront","anchor":"s-3525a6c78649","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Plan encourages access improvements that allow all people"},{"claim_id":"c:bd620d984ba5de35362cdc109546e258","page_id":"C101737381:45","page_url":"https://archive.org/details/C101737381/page/n44","statement_kind":"proposal","subject_label":"Protected wetlands","summary":"The Plan proposes designating protected wetlands in the southern waterfront.","property":"proposes","value_text":"protected wetlands","t_from":"1994","quote":"Designating protected wetlands in the southern waterfront.","place_label":"Southern waterfront","anchor":"s-bd620d984ba5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Plan encourages access improvements that allow all people"},{"claim_id":"c:7402dd972f6f237d3e1d39bb4c66eb76","page_id":"C101737381:69","page_url":"https://archive.org/details/C101737381/page/n68","statement_kind":"finding","subject_label":"Under-utilized Port open spaces","summary":"The report finds that many Port open spaces do not provide maximum public benefit.","property":"finding","t_from":"1994","quote":"Unfortunately, not all the open spaces at the Port have been improved to their full potential, and many do not provide maximum public benefit.","place_label":"Port property","anchor":"s-7402dd972f6f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Chapter 3: General Land Use Policies, Open Spaces and Public Access"},{"claim_id":"c:c78c7e592c7df6672be7621983981056","page_id":"C101737381:69","page_url":"https://archive.org/details/C101737381/page/n68","statement_kind":"finding","subject_label":"Pier 7 fishing and open space pier","summary":"The report states that Pier 7 was completed in 1990 and is the most recent open space amenity built at the Port.","property":"built","value_text":"completed in 1990","value_num":1990.0,"date_printed":"1990","t_from":"1990","quote":"The Pier 7 fishing and open space pier, completed in 1990, is the most recent and perhaps most successful open space amenity constructed at the Port.","place_label":"Pier 7","anchor":"s-c78c7e592c7d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Pier 7 fishing and open space pier, completed in 1990"},{"claim_id":"c:d83be694f929d631138c46c223cb6130","page_id":"C101737381:69","page_url":"https://archive.org/details/C101737381/page/n68","statement_kind":"proposal","subject_label":"Maritime activity substitution policy","summary":"The draft policy would permit substitution of one maritime activity for another as maritime industry trends change.","property":"proposes","t_from":"1994","quote":"permit substitution of one maritime activity for another, as needed to meet changing maritime industry trends.","anchor":"s-d83be694f929","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Additional General Policies for Existing Maritime, Maritime Expansion"},{"claim_id":"c:dea39af402253f986f385eef0a048036","page_id":"C101737381:69","page_url":"https://archive.org/details/C101737381/page/n68","statement_kind":"finding","subject_label":"Proposed or approved Port open spaces not yet developed","summary":"The report notes that several Port sites have been proposed or approved as major open spaces but are not yet developed.","property":"finding","value_text":"not yet developed","t_from":"1994","quote":"Other Port sites have been proposed or approved as major open space resources, but have not yet been developed.","place_label":"Rincon Park; South Beach Parks","anchor":"s-dea39af40225","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Other Port sites have been proposed or approved as major open space"},{"claim_id":"c:9a3215d126a0e321570c7ef750d5c3d5","page_id":"C101737381:91","page_url":"https://archive.org/details/C101737381/page/n90","statement_kind":"proposal","subject_label":"Campus plan before development","summary":"The plan proposes that a campus plan addressing public access and transportation be prepared before development.","property":"proposes","t_from":"1994","quote":"Prior to development, prepare a campus plan that addresses the following: a) Provision of public access improvements.","anchor":"s-9a3215d126a0","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Draft Waterfront Land Use Plan for Advisory Board Review Chapter 3: General Land Use Policies"},{"claim_id":"c:d952074aed3267271e2ace5998b346c9","page_id":"C101737381:91","page_url":"https://archive.org/details/C101737381/page/n90","statement_kind":"finding","subject_label":"Port financial condition","summary":"The report finds that the Port's weak financial condition has prevented investment in its deteriorating properties.","property":"finding","value_text":"weak financial condition","t_from":"1994","quote":"The Port’s weak financial condition has precluded the Port from making investments in its deteriorating properties.","place_label":"Port property","anchor":"s-d952074aed32","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Port's ongoing management responsibilities, in combination with the following facts"},{"claim_id":"c:e001027d97ee903fc555f4e912bc2b57","page_id":"C101737381:91","page_url":"https://archive.org/details/C101737381/page/n90","statement_kind":"finding","subject_label":"Interim use regulation","summary":"The report states that there is currently no clear, consistent regulation of interim uses on Port property.","property":"finding","t_from":"1994","quote":"Currently, there is no clear consistent regulation of interim uses on Port property.","place_label":"Port property","anchor":"s-e001027d97ee","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Interim Uses Currently, there is no clear consistent regulation of interim uses"},{"claim_id":"c:79cbf94910cbf50bc5f71164ea353294","page_id":"C101737381:181","page_url":"https://archive.org/details/C101737381/page/n180","statement_kind":"proposal","subject_label":"Design of new pier activities near historic district","summary":"The plan proposes that new pier architecture be sensitive to and enhance the Northeast Waterfront Historic District.","property":"proposes","value_text":"design sensitive to historic district","t_from":"1994","quote":"Ensure that the exterior architectural and design aspects of new pier activities is sensitive to and enhances the rich historic industrial maritime character of the adjacent Northeast Waterfront Historic District.","place_label":"Northeast Waterfront Historic District","anchor":"s-79cbf94910cb","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Port of San Francisco Waterfront Plan Staff (the issuer)","stance":"own_position","speaker_evidence":"Development Standards: Ensure that the exterior architectural and design aspects"},{"claim_id":"c:afe54588517fa981d769395e6545efdc","page_id":"C101737381:181","page_url":"https://archive.org/details/C101737381/page/n180","statement_kind":"proposal","subject_label":"Urban design guidelines for pier and seawall lot area","summary":"The plan proposes developing urban design guidelines for the Northeast Waterfront piers and seawall lots before individual developments.","property":"proposes","value_text":"urban design guidelines","t_from":"1994","quote":"If feasible, develop urban design guidelines for the area including Piers 9, 15-17, 19-23, 27-29, and Seawall Lots 321, 323, 324, prior to pursuing individual developments.","place_label":"Piers 9, 15-17, 19-23, 27-29; Seawall Lots 321, 323, 324","anchor":"s-afe54588517f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Port of San Francisco Waterfront Plan Staff (the issuer)","stance":"own_position","speaker_evidence":"Plan new uses on these piers with an understanding"},{"claim_id":"c:e624c34cfc700650a38a57dd367f9e3a","page_id":"C101737381:181","page_url":"https://archive.org/details/C101737381/page/n180","statement_kind":"proposal","subject_label":"Transitional Maritime sites, Northeast Waterfront","summary":"The plan proposes family-oriented entertainment uses if the Transitional Maritime sites are no longer needed for cargo uses.","property":"proposes","value_text":"family-oriented entertainment mix","t_from":"1994","quote":"Provide outlets for family-oriented entertainment, incorporating cultural, educational or other themes that appeal particularly to residents of the City and Bay Area.","place_label":"Northeast Waterfront","anchor":"s-e624c34cfc70","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Port of San Francisco Waterfront Plan Staff (the issuer)","stance":"own_position","speaker_evidence":"Provide outlets for family-oriented entertainment"},{"claim_id":"c:fb85c8f8e07af8133cc6de4140811b40","page_id":"C101737381:181","page_url":"https://archive.org/details/C101737381/page/n180","statement_kind":"proposal","subject_label":"Pier 7 open space improvements","summary":"The plan proposes kiosks, public restrooms and pushcart refreshment sales at Pier 7 to increase active use.","property":"proposes","value_text":"kiosks, restrooms, pushcarts","t_from":"1994","quote":"Provide improvements, such as public information kiosks, nearby public restrooms, and sales of refreshments from a limited number of pushcarts that increase active use and enjoyment of this charming waterfront open space resource.","place_label":"Pier 7","anchor":"s-fb85c8f8e07a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Port of San Francisco Waterfront Plan Staff (the issuer)","stance":"own_position","speaker_evidence":"Development Standards: Provide improvements, such as public information kiosks"},{"claim_id":"c:1fc21bdb747fa4b34056240080ebebef","page_id":"C101737381:205","page_url":"https://archive.org/details/C101737381/page/n204","statement_kind":"background","subject_label":"Pier 40 redevelopment plan designation","summary":"The Redevelopment Plan designated Pier 40 for general office use to produce surplus revenues to subsidize the Harbor.","property":"other","value_text":"general office use designation","t_from":"1994","quote":"The Redevelopment Plan addressed this deficit by designating Pier 40 for general office use that would produce surplus revenues to subsidize the Harbor.","place_label":"Pier 40","anchor":"s-1fc21bdb747f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Redevelopment Plan addressed this deficit by designating Pier 40"},{"claim_id":"c:5c997f61ce44dd688c2d227dcff79768","page_id":"C101737381:205","page_url":"https://archive.org/details/C101737381/page/n204","statement_kind":"finding","subject_label":"South Beach Harbor operating subsidy","summary":"The report finds the Harbor currently requires an annual subsidy of about $1.25 million (≈ $2.8 million in 2026 dollars).","property":"other","value_text":"approximately $1.25 million annual subsidy","value_num":1250000.0,"unit":"USD","t_from":"1994","quote":"The Harbor currently requires an annual subsidy of approximately $1.25 million.","place_label":"South Beach Harbor","anchor":"s-5c997f61ce44","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Harbor currently requires an annual subsidy of approximately"},{"claim_id":"c:6ef9e458fc06c062bb885537e9e9e806","page_id":"C101737381:205","page_url":"https://archive.org/details/C101737381/page/n204","statement_kind":"proposal","subject_label":"Excursion boat expansion at Pier 38","summary":"The report says Pier 38 could accommodate expanded excursion boat operations.","property":"proposes","value_text":"expansion of excursion boat operations","t_from":"1994","quote":"Pier 38 could accommodate the expansion of Pier 40 water-related activities, such as excursion boat operations which need better facilities.","place_label":"Pier 38","anchor":"s-6ef9e458fc06","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Pier 38 could accommodate the expansion of Pier 40"},{"claim_id":"c:a950c0fee7bee65a7759cdb823c11759","page_id":"C101737381:205","page_url":"https://archive.org/details/C101737381/page/n204","statement_kind":"proposal","subject_label":"Pier 38 restaurant renovation","summary":"The Redevelopment Agency has proposed renovating part of the Pier 38 bulkhead structure for restaurant use.","property":"proposes","value_text":"restaurant use in Pier 38 bulkhead","t_from":"1994","quote":"In the meantime, the Redevelopment Agency has proposed to renovate a portion of the space in the Pier 38 bulkhead structure for restaurant use.","place_label":"Pier 38","anchor":"s-a950c0fee7be","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the Redevelopment Agency has proposed to renovate a portion"},{"claim_id":"c:adff487da34068bc584088c360c48d5b","page_id":"C101737381:205","page_url":"https://archive.org/details/C101737381/page/n204","statement_kind":"proposal","subject_label":"Demolition of Pier 36","summary":"The report suggests demolishing Pier 36 to make way for shoreline access improvements.","property":"proposes","value_text":"demolition of Pier 36","t_from":"1994","quote":"Since it has little, if any, utility as a maritime asset, demolition of the pier to make way for shoreline access improvements may best meet the objectives of the Waterfront Plan.","place_label":"Pier 36","anchor":"s-adff487da340","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Since it has little, if any, utility as a maritime asset"},{"claim_id":"c:c41f39d38e604d6009466f259967cab7","page_id":"C101737381:205","page_url":"https://archive.org/details/C101737381/page/n204","statement_kind":"cites_decision","subject_label":"State ruling on office use at Pier 40","summary":"The State Attorney General ruled general office use inconsistent with the public trust.","property":"other","value_text":"general office use inconsistent with public trust","t_from":"1994","quote":"After the Redevelopment Plan was adopted in 1984, the State Attorney General ruled general office use to be inconsistent with the public trust.","place_label":"Pier 40","anchor":"s-c41f39d38e60","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"the State Attorney General ruled general office use to be inconsistent"},{"claim_id":"c:1eb26855668e2b7d03cced7d373f1f00","page_id":"C101737381:225","page_url":"https://archive.org/details/C101737381/page/n224","statement_kind":"proposal","subject_label":"Shoreline Park design","summary":"The draft plan recommends coordinating Shoreline Park design with Pier 98 improvements.","property":"proposes","t_from":"1994","quote":"The design of the Shoreline Park should be coordinated with Pier 98 improvements to create contiguous access along the Bay","place_label":"Shoreline Park","anchor":"s-1eb26855668e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Draft Waterfront Land Use Plan for Advisory Board Review (June 6, 1994) The Southern Waterfront"},{"claim_id":"c:3cab99af06838e11125775639fd2388d","page_id":"C101737381:225","page_url":"https://archive.org/details/C101737381/page/n224","statement_kind":"finding","subject_label":"Renovation of Union Iron Works buildings","summary":"The draft plan says renovating these buildings would be prohibitive for maritime businesses and most public uses.","property":"finding","value_text":"prohibitive","t_from":"1994","quote":"The cost of renovating these buildings would be prohibitive for maritime businesses and most public uses.","place_label":"Union Iron Works buildings","anchor":"s-3cab99af0683","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The cost of renovating these buildings would be prohibitive for maritime businesses"},{"claim_id":"c:3d0b3ada90d6723a41183df44cdaad69","page_id":"C101737381:225","page_url":"https://archive.org/details/C101737381/page/n224","statement_kind":"finding","subject_label":"Union Iron Works buildings","summary":"Two of the Union Iron Works structures are unreinforced masonry and contain asbestos and lead.","property":"finding","value_text":"two structures","value_num":2.0,"t_from":"1994","quote":"Two of the structures are built of unreinforced masonry, requiring substantial repair and seismic re-engineering before they can be reused","place_label":"Union Iron Works buildings","anchor":"s-3d0b3ada90d6","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Two of the structures are built of unreinforced masonry, requiring substantial repair"},{"claim_id":"c:3edcad6be56c105c4d502e00966f0a23","page_id":"C101737381:225","page_url":"https://archive.org/details/C101737381/page/n224","statement_kind":"proposal","subject_label":"Public access at Seawall Lot 345","summary":"The draft plan proposes public access improvements to the water's edge next to Seawall Lot 345.","property":"proposes","t_from":"1994","quote":"Include public access improvements extending to the water’s edge in the area adjacent to Seawall Lot 345","place_label":"Seawall Lot 345","anchor":"s-3edcad6be56c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Development Standards Include public access improvements extending to the water's edge"},{"claim_id":"c:a5a47581906b8f4347e5b0a76b4b8b6b","page_id":"C101737381:225","page_url":"https://archive.org/details/C101737381/page/n224","statement_kind":"proposal","subject_label":"Non-maritime use of Union Iron Works buildings","summary":"The draft plan proposes permitting non-maritime uses that preserve the Union Iron Works buildings.","property":"proposes","t_from":"1994","quote":"Permit non-maritime land uses that result in preservation and adaptive reuse of the Union Iron Works buildings","place_label":"Union Iron Works buildings","anchor":"s-a5a47581906b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Development Standards Permit non-maritime land uses that result in preservation"},{"claim_id":"c:ce0e9909dac355314bcfedb6cf5d5a28","page_id":"C101737381:225","page_url":"https://archive.org/details/C101737381/page/n224","statement_kind":"proposal","subject_label":"Pier 70 Mixed Use Opportunity Area","summary":"The draft plan identifies about 15 acres near Pier 70 as a Mixed Use Opportunity Area.","property":"acreage","value_text":"approximately 15 acres","value_num":15.0,"unit":"acres","t_from":"1994","quote":"Approximately 15 acres between 18th street and 21st Street in the vicinity of Pier 70 have been identified as a Mixed Use Opportunity Area.","place_label":"Pier 70 Mixed Use Opportunity Area","place_precision":"building","anchor":"s-ce0e9909dac3","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Pier 70 Mixed Use Opportunity Area. Approximately 15 acres between 18th street"},{"claim_id":"c:d911a8a2a474f6c06fa6e5c41346f63f","page_id":"C101737381:225","page_url":"https://archive.org/details/C101737381/page/n224","statement_kind":"proposal","subject_label":"Southern Waterfront facilities","summary":"The draft plan says Southern Waterfront facilities are planned for Shoreline Park.","property":"proposes","t_from":"1994","quote":"The Southern Waterfront facilities are planned for the Shoreline Park.","place_label":"Shoreline Park","anchor":"s-d911a8a2a474","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Southern Waterfront facilities are planned for the Shoreline Park."},{"claim_id":"c:2296f033e6334c550cca32ce58452d3d","page_id":"C101737381:233","page_url":"https://archive.org/details/C101737381/page/n232","statement_kind":"proposal","subject_label":"Warm Water Cove security","summary":"The draft plan proposes lighting and public telephones at Warm Water Cove to improve security.","property":"proposes","t_from":"1994","quote":"Provide lighting, public telephones and other amenities to improve security of the open space.","place_label":"Warm Water Cove","place_precision":"park","place_id":"qipu:sf/place/institution/warm-water-cove-e80cc1","resolved_by":"place links file","anchor":"s-2296f033e633","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer (Waterfront Plan Advisory Board / Port planning staff)","stance":"own_position","speaker_evidence":"Standards for Existing and New Open Spaces and Public Access Areas; Warm Water Cove"},{"claim_id":"c:4f8cd1172256f002f24c8f93799feb03","page_id":"C101737381:233","page_url":"https://archive.org/details/C101737381/page/n232","statement_kind":"proposal","subject_label":"Interim leases in Southern Waterfront","summary":"The draft plan proposes 10-20 year interim leases, and in exceptional cases 30 years.","property":"leased","value_text":"10-20 years; exceptionally 30 years","t_from":"1994","quote":"Lease terms of 10-20 years, and in exceptional cases 30 years, should permit amortization of tenant improvements or construction of interim facilities.","place_label":"Southern Waterfront","anchor":"s-4f8cd1172256","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer (Waterfront Plan Advisory Board / Port planning staff)","stance":"own_position","speaker_evidence":"The Southern Waterfront Development Standards"},{"claim_id":"c:8f8245fa443a39aced47a5339339568d","page_id":"C101737381:233","page_url":"https://archive.org/details/C101737381/page/n232","statement_kind":"proposal","subject_label":"Warm Water Cove recreation facilities","summary":"The draft plan proposes accessory commercial or water-oriented recreation facilities at Warm Water Cove.","property":"proposes","t_from":"1994","quote":"Develop accessory commercial or water-oriented recreation facilities, such as recreational boating, to improve public access to the Bay","place_label":"Warm Water Cove","place_precision":"park","place_id":"qipu:sf/place/institution/warm-water-cove-e80cc1","resolved_by":"place links file","anchor":"s-8f8245fa443a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer (Waterfront Plan Advisory Board / Port planning staff)","stance":"own_position","speaker_evidence":"Standards for Existing and New Open Spaces and Public Access Areas; Warm Water Cove"},{"claim_id":"c:e136f034f2808bd4e8d7b284ca2ffe4f","page_id":"C101737381:233","page_url":"https://archive.org/details/C101737381/page/n232","statement_kind":"proposal","subject_label":"Interim use of unimproved space","summary":"The draft plan proposes making unused space or empty buildings available for interim use.","property":"proposes","t_from":"1994","quote":"Unimproved space or empty buildings that are not anticipated to be utilized for maritime purposes within the next 10-20 years should be made available for interim use.","place_label":"Southern Waterfront","anchor":"s-e136f034f280","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer (Waterfront Plan Advisory Board / Port planning staff)","stance":"own_position","speaker_evidence":"The Southern Waterfront Development Standards"},{"claim_id":"c:e148ab3b388b5f7e31df5dc2caac4d8d","page_id":"C101737381:233","page_url":"https://archive.org/details/C101737381/page/n232","statement_kind":"proposal","subject_label":"Interim uses at Seawall Lot 352 and Pier 70","summary":"The draft plan proposes that interim uses meet landfill closure requirements of the Regional Water Quality Control Board.","property":"proposes","t_from":"1994","quote":"Proposed interim uses at Seawall Lot 352 and Pier 70 must be compatible with landfill closure requirements imposed by the Regional Water Quality Control Board.","place_label":"Seawall Lot 352; Pier 70","place_precision":"area","anchor":"s-e148ab3b388b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer (Waterfront Plan Advisory Board / Port planning staff)","stance":"own_position","speaker_evidence":"The Southern Waterfront Development Standards"},{"claim_id":"c:4157d34347fbc32ba53b89594d66fbfa","page_id":"C101737381:249","page_url":"https://archive.org/details/C101737381/page/n248","statement_kind":"background","subject_label":"Attorney General opinion on pier repairs","summary":"The Attorney General's 1986 informal opinion said substantial pier repairs would require case-by-case review.","property":"other","value_text":"case-by-case review","date_printed":"October 8, 1986","t_from":"1986","quote":"concluding that proposed development that involves more than routine repairs to the pier or substructure would require case-by-case review.","anchor":"s-4157d34347fb","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"an opinion was issued, concluding that proposed development"},{"claim_id":"c:4fd2f2d54cdeb56d5dbeb075d5ea671a","page_id":"C101737381:249","page_url":"https://archive.org/details/C101737381/page/n248","statement_kind":"cites_decision","subject_label":"BCDC Special Area Plan","summary":"BCDC adopted its Special Area Plan in 1975.","property":"adopted","value_text":"adopted","date_printed":"1975","t_from":"1975","quote":"BCDC’s Special Area Plan, adopted in 1975, identified uses for several of those piers","anchor":"s-4fd2f2d54cde","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"BCDC's Special Area Plan, adopted in 1975, identified uses"},{"claim_id":"c:7eece1ce048810684ff4d09e8f53685d","page_id":"C101737381:249","page_url":"https://archive.org/details/C101737381/page/n248","statement_kind":"background","subject_label":"Replacement fill policy","summary":"The Bay Plan allowed up to 50% of a removed pier's area to be used for Bay-oriented commercial recreation or public assembly.","property":"other","value_text":"up to 50%","value_num":50.0,"unit":"percent","t_from":"1994","quote":"only up to 50% of area of the pier being removed could be used for Bay-oriented commercial recreation or Bay-oriented public assembly","anchor":"s-7eece1ce0488","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"(Bay Plan, p. 37.) The remainder of the replacement fill"},{"claim_id":"c:be02c12f7792d3bded8911c447f51c23","page_id":"C101737381:249","page_url":"https://archive.org/details/C101737381/page/n248","statement_kind":"finding","subject_label":"Port maritime office uses","summary":"The new interpretation of the McAteer-Petris Act effectively prohibited maritime-related office uses on pile-supported structures needing substantial repair.","property":"finding","t_from":"1994","quote":"effectively prohibited maritime-related office uses, otherwise a permissible public trust use","anchor":"s-be02c12f7792","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Port was concerned because the new interpretation"},{"claim_id":"c:366550ef6ac1e52bf7428185360fab7e","page_id":"C101737381:257","page_url":"https://archive.org/details/C101737381/page/n256","statement_kind":"finding","subject_label":"State Lands Commission and Burton Act delegation","summary":"The State Lands Commission questioned the validity of the Burton Act's legislative delegation to the Port Commission.","property":"finding","t_from":"1994","quote":"in the context of the South Beach-Rincon Point Redevelopment program, the State Lands Commission questioned the validity","place_label":"South Beach-Rincon Point Redevelopment area","place_precision":"area","place_id":"qipu:sf/place/hood/financial-district-south-beach","resolved_by":"place links file","anchor":"s-366550ef6ac1","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Waterfront Plan Advisory Board / Port planning staff (report's own narrative)","stance":"own_position","speaker_evidence":"Draft Waterfront Land Use Plan for Advisory Board Review; Chapter 5: Implementation"},{"claim_id":"c:5063c3e590e63f3f9d2e547b4500baa8","page_id":"C101737381:257","page_url":"https://archive.org/details/C101737381/page/n256","statement_kind":"proposal","subject_label":"State legislation for the Waterfront Land Use Plan","summary":"State legislative action will likely be required to implement the Waterfront Land Use Plan.","property":"other","t_from":"1994","quote":"Consequently, State legislative action, either to reaffirm and clarify the original intent of the Burton Act or, if necessary, to specifically authorize a lease for non-trust purposes, will likely be required","anchor":"s-5063c3e590e6","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Consequently, State legislative action, either to reaffirm"},{"claim_id":"c:5a0dbdc60e69c701abbaa6da3985d45f","page_id":"C101737381:257","page_url":"https://archive.org/details/C101737381/page/n256","statement_kind":"proposal","subject_label":"Plan implementation objectives","summary":"The draft plan says the implementation structure should meet maritime, public access, environmental and financial objectives.","property":"other","t_from":"1994","quote":"Implementation Objectives. The implementation structure for the Port’s Waterfront Land Use Plan should be designed to meet the following objectives","anchor":"s-5a0dbdc60e69","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Implementation Objectives. The implementation structure for the Port's Waterfront"},{"claim_id":"c:9013cb1aed9a624444cedc16fa77c8b5","page_id":"C101737381:257","page_url":"https://archive.org/details/C101737381/page/n256","statement_kind":"finding","subject_label":"Non-trust residential lease approval","summary":"The Port agreed to ask the State Legislature to authorize non-trust residential use of surplus property.","property":"finding","t_from":"1994","quote":"the Port acceded to State Lands’ demand that the State Legislature be asked to specifically authorize the non-trust residential use of the property","anchor":"s-9013cb1aed9a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Therefore, in order to allow the project to proceed in a timely fashion, the Port acceded"},{"claim_id":"c:b46b417a560cc16b53014d2e2c302ef2","page_id":"C101737381:257","page_url":"https://archive.org/details/C101737381/page/n256","statement_kind":"finding","subject_label":"Timing of implementing legislation","summary":"The legislative actions needed to implement the plan cannot be approved until the Plan's EIR is completed.","property":"other","t_from":"1994","quote":"The legislative actions necessary to implement the Waterfront Land Use Plan cannot be approved until the Waterfront Plan Environmental Impact Report is completed.","anchor":"s-b46b417a560c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The legislative actions necessary to implement the Waterfront Land Use Plan cannot be approved"},{"claim_id":"c:180e0f68f05a6083fe893c4a64e47d9e","page_id":"C101737381:297","page_url":"https://archive.org/details/C101737381/page/n296","statement_kind":"finding","subject_label":"Ceremonial berthing demand at the Port","summary":"Demand for ceremonial berthing has been erratic because promotional and special events are not routine.","property":"finding","value_text":"erratic demand","t_from":"1994","quote":"demand for this use has been erratic because promotional and special events are not routine","anchor":"s-180e0f68f05a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Port also provides berthing for ceremonial ships."},{"claim_id":"c:642b0307795f69090ca0ad04fb941e4e","page_id":"C101737381:297","page_url":"https://archive.org/details/C101737381/page/n296","statement_kind":"finding","subject_label":"Regional dredged material disposal strategy (LTMS)","summary":"The regional LTMS study for dredged material disposal is underway at a cost of $16 million (≈ $36.4 million in 2026 dollars).","property":"cost_usd","value_text":"$16 million","value_num":16000000.0,"unit":"USD","t_from":"1994","quote":"A $16 million regional \"Long-Term Management Strategy for Dredged Material Disposal\" (\"LTMS\")is underway","anchor":"s-642b0307795f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"A $16 million regional Long-Term Management Strategy for Dredged Material Disposal is underway"},{"claim_id":"c:7b90e9502787e3c5814f0edf87dbed02","page_id":"C101737381:297","page_url":"https://archive.org/details/C101737381/page/n296","statement_kind":"finding","subject_label":"Dredging costs at Piers 27-29","summary":"Dredging costs for newsprint cargo operations at Piers 27-29 rose from 6% to about 85% of total revenues.","property":"finding","value_text":"6% to about 85% of total revenues","value_num":85.0,"unit":"percent","date_printed":"1991/92","t_from":"1991","quote":"dredging costs for newsprint cargo shipping operations at Piers 27-29 went from 6% of total revenues","place_label":"Piers 27-29","anchor":"s-7b90e9502787","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"dredging costs for newsprint cargo shipping operations at Piers 27-29 went from 6%"},{"claim_id":"c:d92320d8c323a165af03bc45476f2171","page_id":"C101737381:297","page_url":"https://archive.org/details/C101737381/page/n296","statement_kind":"finding","subject_label":"Ceremonial berthing visits","summary":"Ceremonial berthing visits varied from 45 in 1990 to 78 in 1991.","property":"finding","value_text":"78 visits in 1991","value_num":78.0,"date_printed":"1991","t_from":"1991","quote":"the demand for ceremonial berthing varied from 45 visits in 1990, to 78 in 1991","anchor":"s-d92320d8c323","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In recent years, the demand for ceremonial berthing varied from 45 visits in 1990"},{"claim_id":"c:dbceb2bffec9be7835d79752be1957cf","page_id":"C101737381:297","page_url":"https://archive.org/details/C101737381/page/n296","statement_kind":"finding","subject_label":"Port monitoring and permit obligations","summary":"The Port is now required to fund water quality regional monitoring programs and new permit fees.","property":"finding","value_text":"required to fund monitoring and new permit fees","t_from":"1994","quote":"the Port is now required to fund water quality regional monitoring programs and new permit fees","anchor":"s-dbceb2bffec9","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the Port is now required to fund water quality regional monitoring programs"},{"claim_id":"c:dcabd56797c5c5b6e6ab5e789a5fa369","page_id":"C101737381:297","page_url":"https://archive.org/details/C101737381/page/n296","statement_kind":"finding","subject_label":"Port dredging reduction","summary":"The Port has reduced its annual dredging to serve only facilities with urgent and immediate needs.","property":"finding","value_text":"reduced annual dredging","t_from":"1994","quote":"the Port of San Francisco has reduced its annual dredging to serve only those facilities that have urgent and immediate needs","anchor":"s-dcabd56797c5","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In the meantime, the Port of San Francisco has reduced its annual dredging"},{"claim_id":"c:eb249454c460b7ef73acbc7b7a77809f","page_id":"C101737381:297","page_url":"https://archive.org/details/C101737381/page/n296","statement_kind":"proposal","subject_label":"China Basin break-bulk terminal re-leasing","summary":"The report estimates the China Basin terminal will most likely be re-leased for uses that do not require deep water access.","property":"leased","value_text":"re-leased for uses not requiring deep water","t_from":"1994","quote":"the China Basin terminal will most likely be re-leased for uses that do not require deep water access","place_label":"China Basin break-bulk terminal","anchor":"s-eb249454c460","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the China Basin terminal will most likely be re-leased for uses that do not require deep water access"},{"claim_id":"c:f09f41e5dcd86eedf0e4984715349a8e","page_id":"C101737381:309","page_url":"https://archive.org/details/C101737381/page/n308","statement_kind":"background","subject_label":"Amendment of the ordinance","summary":"The ordinance may be amended or repealed only by a vote of the electors of San Francisco, except for listed additions.","property":"other","value_text":"amendment only by voter approval","t_from":"1994","quote":"No part of this ordinance or the amendments made pursuant to Section 7 hereof may be amended or repealed except by a vote of the electors","anchor":"s-f09f41e5dcd8","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Section 9. -- Amendment and Repeal"}]}