{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c101747408","url":"https://data.qipu.org/usa/san-francisco/reports/c101747408/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c101747408/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C101747408","source_id":"C101747408","title":"Peninsula Watershed management plan : [draft]","year":1998,"n_pages":260,"creator":null,"source_url":"https://archive.org/details/C101747408","issuer":"San Francisco Public Utilities Commission","issuer_type":"government","gov_level":"city_county","prepared_by":null,"doc_kind":"plan","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"meta","doc_kind_by":"model","jurisdiction_by":"meta","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":18,"statements_total":39,"statements_by_kind":{"finding":15,"proposal":19,"cites_decision":3,"background":2},"same_for_every_statement":{"source_id":"C101747408","source_url":"https://archive.org/details/C101747408","source_label":"IGS library: Peninsula Watershed management plan : [draft]","report_year":1998,"issuer":"San Francisco Public Utilities Commission","issuer_type":"government","doc_kind":"plan","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A draft plan by the San Francisco Public Utilities Commission for managing the Peninsula Watershed, covering land use, habitat, water quality, fire, and public access.","next":"The Board passed a resolution banning new golf courses in the Peninsula Watershed in June 1999.","next_decision":"qipu:sf/decision/journalaprjuneofproceed94sanfrich|g1271","figures":[{"label":"Period","value":"25 years","claim_ids":["c:47fa68c8e1112729362ae90f1bd8df75"]},{"label":"Paved roads","value":"100 miles of paved roads","claim_ids":["c:188ec038c8647f3a91021d6aad3690e2"]},{"label":"Stormwater supply share","value":"5 to 10 percent","claim_ids":["c:817dc6eee719547fddefc8851394fb04"]}],"main_points":["c:0e9f5b01831c9bb6a8c8c3677e67523b","c:e714a4768350e5c8b64cdcd9d84d3592","c:9179807ddf37af0e05efd27b01bed605"],"board_decisions_after":["qipu:sf/decision/journalaprjuneofproceed94sanfrich|g1271","qipu:sf/decision/journalaprjuneofproceed94sanfrich|g707","qipu:sf/decision/meetingminutes19982001san:165/2","qipu:sf/decision/meetingminutes19982001san|30"],"board_decisions_before":["qipu:sf/decision/journalofproceedjanapr92sanfrich:261/6"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:64d3ed90d0a73f762d97d6a204cc0799","page_id":"C101747408:18","page_url":"https://archive.org/details/C101747408/page/n17","statement_kind":"cites_decision","subject_label":"Southern Peninsula Watershed Golf Course Element","summary":"The Golf Course Element was prepared to address SFPUC Resolution No. 97-0059, which required consideration of a new golf course.","property":"other","value_text":"Resolution No. 97-0059","t_from":"1998","quote":"The Southern Peninsula Watershed Golf Course Element was prepared to address SFPUC Resolution No. 97-0059, which required consideration of a new golf course on the southern Peninsula Watershed","decided_by":"SFPUC","instrument_kind":"resolution","instrument_printed":"97-0059","place_label":"Southern Peninsula Watershed","anchor":"s-64d3ed90d0a7","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Southern Peninsula Watershed Golf Course Element was prepared to address SFPUC Resolution"},{"claim_id":"c:9179807ddf37af0e05efd27b01bed605","page_id":"C101747408:18","page_url":"https://archive.org/details/C101747408/page/n17","statement_kind":"proposal","subject_label":"Southern Peninsula Watershed golf course policies","summary":"The golf course policies are intended to ensure water quality, water supply and ecological resources are not compromised if a golf course is built.","property":"proposes","t_from":"1998","quote":"intended to ensure that, if a golf course is constructed on the southern Peninsula Watershed, water quality, water supply, and ecological resources will not be compromised.","place_label":"Southern Peninsula Watershed","anchor":"s-9179807ddf37","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The polices and actions set forth in this Element are intended to ensure"},{"claim_id":"c:cabb1acfca19c7ad1d88091837641c18","page_id":"C101747408:18","page_url":"https://archive.org/details/C101747408/page/n17","statement_kind":"proposal","subject_label":"Fire Management Element","summary":"The Fire Management Element addresses the management of hazardous fuels to reduce the risk of fire.","property":"proposes","t_from":"1998","quote":"The Fire Management Element addresses the management of hazardous fuels (e.g., brush, grass, etc.) to reduce the risk of fire.","place_label":"Peninsula Watershed","anchor":"s-cabb1acfca19","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Fire Management Element addresses the management of hazardous fuels"},{"claim_id":"c:0cd7aa2c07033e08db61b97c54d247d6","page_id":"C101747408:27","page_url":"https://archive.org/details/C101747408/page/n26","statement_kind":"finding","subject_label":"Watershed management goals","summary":"The Watershed Planning Committee established one primary and six secondary goals at the outset of the project.","property":"other","value_text":"one primary and six secondary goals","value_num":7.0,"t_from":"1998","quote":"One primary and six secondary goals for watershed management were established at the outset of the project by the Watershed Planning Committee (WPC)","anchor":"s-0cd7aa2c0703","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"1.5 Planning Process; One primary and six secondary goals"},{"claim_id":"c:d4d2205dffaf67acaaa77b8fbc4da235","page_id":"C101747408:27","page_url":"https://archive.org/details/C101747408/page/n26","statement_kind":"finding","subject_label":"Watershed management planning process","summary":"The watershed management planning process commenced in August 1992 and has spanned five years.","property":"event","value_text":"five years","value_num":5.0,"date_printed":"August 1992","t_from":"1992","quote":"The watershed management planning process commenced in August 1992 and has spanned five years.","place_label":"Peninsula and Alameda Watersheds","anchor":"s-d4d2205dffaf","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The watershed management planning process commenced in August 1992"},{"claim_id":"c:0e9f5b01831c9bb6a8c8c3677e67523b","page_id":"C101747408:33","page_url":"https://archive.org/details/C101747408/page/n32","statement_kind":"proposal","subject_label":"New golf courses","summary":"The Plan prohibits new golf courses on the remainder of the watershed, apart from the Southern Peninsula golf course.","property":"other","value_text":"prohibited","t_from":"1998","quote":"With the exception of the Southern Peninsula Watershed Golf Course, the Plan prohibits new golf courses on the remainder of the watershed","place_label":"Peninsula Watershed","anchor":"s-0e9f5b01831c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Draft April 1998 watershed management plan text; the Plan prohibits new golf courses"},{"claim_id":"c:dbcb9c7b37c0588b310b063568c20a47","page_id":"C101747408:33","page_url":"https://archive.org/details/C101747408/page/n32","statement_kind":"cites_decision","subject_label":"Southern Peninsula Watershed golf course consideration","summary":"The Plan will consider a new golf course on the Southern Peninsula Watershed as requested by SFPUC Resolution No. 97-0069.","property":"other","value_text":"Resolution No. 97-0069","t_from":"1998","quote":"The Plan will also consider a new golf course on the Southern Peninsula Watershed as requested by SFPUC Resolution No. 97-0069.","decided_by":"SFPUC","instrument_kind":"resolution","instrument_printed":"97-0069","place_label":"Southern Peninsula Watershed","anchor":"s-dbcb9c7b37c0","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Plan will also consider a new golf course on the Southern Peninsula"},{"claim_id":"c:eb68ae46e39180151ddc0dda95f50309","page_id":"C101747408:33","page_url":"https://archive.org/details/C101747408/page/n32","statement_kind":"proposal","subject_label":"Existing golf courses","summary":"The Plan proposes to retain existing golf courses and consider expansion in low vulnerability or sensitivity areas.","property":"proposes","t_from":"1998","quote":"Existing golf courses will be retained and expansion of existing golf courses will be considered in low vulnerability/sensitivity areas.","place_label":"Peninsula Watershed","anchor":"s-eb68ae46e391","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Existing golf courses will be retained and expansion"},{"claim_id":"c:fb0c51f1eea0577fa4a9d903e92cc8f9","page_id":"C101747408:33","page_url":"https://archive.org/details/C101747408/page/n32","statement_kind":"finding","subject_label":"Crystal Springs Golf Course","summary":"There is currently one 18-hole golf course on the Peninsula Watershed, the Crystal Springs Golf Course.","property":"other","value_text":"18-hole Crystal Springs Golf Course","value_num":18.0,"t_from":"1998","quote":"There is currently one golf course on the Peninsula Watershed—the 18-hole Crystal Springs Golf Course.","place_label":"Peninsula Watershed","anchor":"s-fb0c51f1eea0","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"There is currently one golf course on the Peninsula Watershed"},{"claim_id":"c:7a8abf4aaa8999395a32d69a7c64e57f","page_id":"C101747408:50","page_url":"https://archive.org/details/C101747408/page/n49","statement_kind":"finding","subject_label":"Cultural resource sensitivity zones","summary":"The Known Cultural Resources and Potential Sensitivity Zones map indicates zones of high and moderate cultural resource sensitivity on the watershed.","property":"finding","value_text":"high and moderate cultural resource sensitivity zones","t_from":"1998","quote":"The Known Cultural Resources and Po- tential Sensitivity Zones map, illustrated in Figure 2-8, indicates zones of high and moderate cultural resource sensitivity","place_label":"Peninsula Watershed","anchor":"s-7a8abf4aaa89","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Known Cultural Resources and Potential Sensitivity Zones map"},{"claim_id":"c:87279a411f685561b21fbffe7ddb6b02","page_id":"C101747408:50","page_url":"https://archive.org/details/C101747408/page/n49","statement_kind":"finding","subject_label":"Eastern watershed visibility","summary":"The eastern side of the watershed is quite visible from Interstate 280 and several population centers.","property":"other","value_text":"visible from I-280","t_from":"1998","quote":"The eastern side of the watershed is quite visible from Interstate 280 (1-280) and several population centers, heightening concerns","place_label":"Interstate 280","anchor":"s-87279a411f68","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The eastern side of the watershed is quite visible from Interstate 280"},{"claim_id":"c:e5671278798f2d607e14846fe654abaa","page_id":"C101747408:50","page_url":"https://archive.org/details/C101747408/page/n49","statement_kind":"finding","subject_label":"Peninsula Watershed historic resources","summary":"Two historic resources in the Peninsula Watershed are listed with the National Register of Historic Places.","property":"historic_rating","value_text":"listed on National Register of Historic Places","value_num":2.0,"t_from":"1998","quote":"Two historic resources are currently listed with the National Register of Historic Places (NRHP): the San Francisco Bay Discov- ery Site","place_label":"Peninsula Watershed","anchor":"s-e5671278798f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Two historic resources are currently listed with the National Register"},{"claim_id":"c:f82a665968d8f66577a0fcdde4470ff7","page_id":"C101747408:50","page_url":"https://archive.org/details/C101747408/page/n49","statement_kind":"finding","subject_label":"Pulgas Water Temple","summary":"The Pulgas Water Temple is designated as a California State Historic Landmark.","property":"historic_rating","value_text":"California State Historic Landmark","date_printed":"circa 1938","t_from":"1938","quote":"The circa 1938 Pulgas Water Temple, designed to cel- ebrate the arrival of Hetch Hetchy water to the Peninsula Watershed","place_label":"Pulgas Water Temple","anchor":"s-f82a665968d8","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The circa 1938 Pulgas Water Temple, designed to cel- ebrate"},{"claim_id":"c:fc4cb83d8db4269f5d9e1ef7fa6f65c7","page_id":"C101747408:50","page_url":"https://archive.org/details/C101747408/page/n49","statement_kind":"background","subject_label":"Scenic Easement","summary":"The Scenic Easement overlays the western two-thirds of the watershed to protect those lands from harmful activities.","property":"other","value_text":"western two-thirds of the watershed","t_from":"1998","quote":"The Scenic Easement, which overlays the western two-thirds of the watershed, is to protect those lands from activities that would harm","place_label":"Peninsula Watershed","anchor":"s-fc4cb83d8db4","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Scenic Easement, which overlays the western two-thirds"},{"claim_id":"c:40bd7ef00f06ae35e22ea097747550fb","page_id":"C101747408:71","page_url":"https://archive.org/details/C101747408/page/n70","statement_kind":"finding","subject_label":"Emergency planning","summary":"The report identifies a need for additional emergency planning and pre-incident preparation to protect natural resources.","property":"finding","value_text":"need for additional emergency planning","t_from":"1998","quote":"Need for additional emergency plan- ning and pre-incident preparation for the protection of natural resources during emergency response","place_label":"Peninsula Watershed","anchor":"s-40bd7ef00f06","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"3.4.5 Emergency Planning"},{"claim_id":"c:6830f87e6add768841a8fc02c08a254a","page_id":"C101747408:71","page_url":"https://archive.org/details/C101747408/page/n70","statement_kind":"finding","subject_label":"Watershed habitat","summary":"The watershed habitat that exists today developed with the exclusion of fire and differs from a naturally occurring fire regime.","property":"finding","value_text":"habitat developed with exclusion of fire","t_from":"1998","quote":"The watershed habitat that exists to- day developed with the exclusion of fire. This habitat is considerably dif- ferent than the habitat","place_label":"Peninsula Watershed","anchor":"s-6830f87e6add","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The watershed habitat that exists today developed with the exclusion of fire"},{"claim_id":"c:0cc1b3acb5cf99bcbf0ccd7911f40112","page_id":"C101747408:75","page_url":"https://archive.org/details/C101747408/page/n74","statement_kind":"finding","subject_label":"Permit fees","summary":"Permit fees do not always cover the costs of permit administration.","property":"finding","value_text":"permit fees do not always cover costs","t_from":"1998","quote":"Permit fees do not always cover the costs of permit administration; Additional treatment costs related to watershed activities","anchor":"s-0cc1b3acb5cf","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Permit fees do not always cover the costs of permit administration"},{"claim_id":"c:b84e728d4ff8b6b92fdddab3553f3f07","page_id":"C101747408:75","page_url":"https://archive.org/details/C101747408/page/n74","statement_kind":"finding","subject_label":"Lessee water rates","summary":"Some lessees are paying a discounted rate for water and are not required to implement water conservation practices.","property":"finding","value_text":"discounted water rate for some lessees","t_from":"1998","quote":"Some lessees are paying a discounted rate for water and are not required to implement water conservation practices","anchor":"s-b84e728d4ff8","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Some lessees are paying a discounted rate for water and are not required to implement water conservation practices"},{"claim_id":"c:eb7bce483f11290041c59278b216bb7d","page_id":"C101747408:75","page_url":"https://archive.org/details/C101747408/page/n74","statement_kind":"finding","subject_label":"Cost of water service","summary":"The cost of providing high quality water to SFPUC customers is borne primarily by the rate payer.","property":"finding","value_text":"borne primarily by the rate payer","t_from":"1998","quote":"The cost of providing high qual- ity water to SFPUC customers is borne primarily by the rate payer, with additional sources of funds from leases or permits","anchor":"s-eb7bce483f11","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The cost of providing high quality water to SFPUC customers is borne primarily by the rate payer"},{"claim_id":"c:772858129264673dd82dec6285e4264e","page_id":"C101747408:96","page_url":"https://archive.org/details/C101747408/page/n95","statement_kind":"proposal","subject_label":"Cultural resource impact assessment policy CR9","summary":"Policy CR9 would require a site-specific analysis for facility and infrastructure projects that disturb soils.","property":"recommendation","value_text":"site-specific analysis before soil-disturbing projects","t_from":"1998","quote":"Analyses shall be conducted in accordance with all applicable State and Federal laws, statutes, and guidelines","anchor":"s-772858129264","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Policy CR9 Require a site-specific analysis prior to"},{"claim_id":"c:6ecbbe047e26925654789adc8e5b2a66","page_id":"C101747408:110","page_url":"https://archive.org/details/C101747408/page/n109","statement_kind":"cites_decision","subject_label":"Fifield/[name withheld]","summary":"The SFPUC adopted Resolution 97-0177, modifying the watershed plan to include a possible Bay Area Ridge Trail route.","property":"adopted","value_text":"Resolution No. 97-0177","date_printed":"June 10, 1997","t_from":"1997","quote":"Fifield/[name withheld] Trail Resolution No. 97-0177, adopted by the SFPUC on June 10, 1997, modified the Peninsula Watershed Management Plan to include the possibility","decided_by":"San Francisco Public Utilities Commission","instrument_kind":"resolution","instrument_printed":"97-0177","instrument_date_printed":"June 10, 1997","place_label":"Fifield and Cahill Ridges","anchor":"s-6ecbbe047e26","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Resolution No. 97-0177, adopted by the SFPUC on June 10, 1997"},{"claim_id":"c:e714a4768350e5c8b64cdcd9d84d3592","page_id":"C101747408:110","page_url":"https://archive.org/details/C101747408/page/n109","statement_kind":"proposal","subject_label":"Southern Peninsula Watershed Golf Course lease","summary":"The plan proposes that the golf course lease let the SFPUC and the City revoke the lease if the course is not operated satisfactorily.","property":"proposes","t_from":"1998","quote":"Require that the golf course lease include a provision for the SFPUC and the City and County of San Francisco to revoke the lease if the golf course is not operated","place_label":"Southern Peninsula Watershed","anchor":"s-e714a4768350","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Policy WA60 Require that the golf course lease include a provision"},{"claim_id":"c:e9e897a71111e95341bade8c54105292","page_id":"C101747408:110","page_url":"https://archive.org/details/C101747408/page/n109","statement_kind":"proposal","subject_label":"Fifield/[name withheld] public access","summary":"Four alternative projects and the No Project Alternative have been developed to achieve public access along the ridge route.","property":"alternative","value_text":"Four alternative projects","value_num":4.0,"t_from":"1998","quote":"Four alternative projects (de- scribed in Chapter 5) as well as the No Project Alternative have been developed to achieve public access along this route.","place_label":"Fifield and Cahill Ridges","anchor":"s-e9e897a71111","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Four alternative projects (described in Chapter 5) as well as the No Project Alternative have been developed"},{"claim_id":"c:47fa68c8e1112729362ae90f1bd8df75","page_id":"C101747408:119","page_url":"https://archive.org/details/C101747408/page/n118","statement_kind":"background","subject_label":"Watershed management actions","summary":"The management actions are intended to be implemented over the next 25 years.","property":"other","value_text":"25 years","value_num":25.0,"t_from":"1998","quote":"Management ac- tions are intended to be implemented over the next 25 years and are included here","anchor":"s-47fa68c8e111","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Management actions are intended to be implemented over the next 25 years"},{"claim_id":"c:188ec038c8647f3a91021d6aad3690e2","page_id":"C101747408:125","page_url":"https://archive.org/details/C101747408/page/n124","statement_kind":"finding","subject_label":"Paved and unpaved roads on the Peninsula Watershed","summary":"The report states the Peninsula Watershed has about 100 miles of paved roads and 39 miles of unpaved roads and trails.","property":"other","value_text":"100 miles of paved roads","value_num":100.0,"unit":"miles","t_from":"1998","quote":"Approximately 100 miles of paved roads and 39 miles of unpaved roads (including I-280, Highway 92, Skyline Boulevard, Canada Road, and Edgewood Road)","place_label":"Peninsula Watershed","anchor":"s-188ec038c864","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"5.2 Stormwater (sto) ... Approximately 100 miles of paved roads"},{"claim_id":"c:4b2f73e1f24c54ec7311a99a89fed683","page_id":"C101747408:125","page_url":"https://archive.org/details/C101747408/page/n124","statement_kind":"proposal","subject_label":"Stormwater drainage assessment at SFPUC facilities","summary":"Action sto1 proposes assessing on-site stormwater collection and drainage systems at SFPUC facilities and remediating where necessary.","property":"recommendation","value_text":"Action sto1 (Phase 2A)","t_from":"1998","quote":"Assess the on-site stormwater collection and drainage systems at SFPUC facilities, Pulgas Water Temple, Peninsula Recreational Corridor parking lots, Crystal Springs Golf Course","place_label":"Pulgas Water Temple; Crystal Springs Golf Course; Skyline Quarry","anchor":"s-4b2f73e1f24c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Action sto1 (Phase 2A) Assess the on-site stormwater collection"},{"claim_id":"c:817dc6eee719547fddefc8851394fb04","page_id":"C101747408:125","page_url":"https://archive.org/details/C101747408/page/n124","statement_kind":"finding","subject_label":"Stormwater contribution to water supply","summary":"The report states that stormwater from the local watersheds contributes about 5 to 10 percent of the water system's total supply.","property":"other","value_text":"5 to 10 percent","unit":"percent","t_from":"1998","quote":"contributes approximately 5 to 10 percent of the water system’s total supply.","place_label":"Peninsula Watershed","anchor":"s-817dc6eee719","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Stormwater from the local watersheds contributes approximately 5 to 10 percent"},{"claim_id":"c:a7a73e15bb9a38ec22730c4089b843d9","page_id":"C101747408:146","page_url":"https://archive.org/details/C101747408/page/n145","statement_kind":"proposal","subject_label":"Trail and facility safety maintenance","summary":"The plan's action directs regular inspection and maintenance of facilities used by the public, with responsibilities assigned to the appropriate agency.","property":"recommendation","t_from":"1998","quote":"Regularly in- spect and maintain the facilities and areas used by the public, and assign re- sponsibilities for maintenance","anchor":"s-a7a73e15bb9a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Action saf4 (Phase 1B) Regularly inspect and maintain the facilities"},{"claim_id":"c:13da1f42246304bf4b123896b50cd725","page_id":"C101747408:155","page_url":"https://archive.org/details/C101747408/page/n154","statement_kind":"finding","subject_label":"Special-status species localities","summary":"The plan lists Douglas fir/upland redwood forest as locale for California bottlebrush grass and nesting habitat for the marbled murrelet.","property":"other","t_from":"1998","quote":"Douglas Fir/Upland Redwood For- est: Locale for California bottlebrush grass (Elymus californicus) (FC) and nesting habitat for the marbled murrelet","anchor":"s-13da1f422463","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Draft N S U LA W A TFT EF R S H EVD MAN A G E M E N T P tA N"},{"claim_id":"c:d11f6584c54059229644bf3b393d3570","page_id":"C101747408:155","page_url":"https://archive.org/details/C101747408/page/n154","statement_kind":"proposal","subject_label":"Grading plan requirement","summary":"The plan's action requires a grading plan prepared by the project proponent and approved by [name withheld] before construction involving grading.","property":"recommendation","t_from":"1998","quote":"Prior to the initiation of any construction project in- volving grading, a grading plan shall be prepared by the project proponent and approved by appropriate [name withheld]","anchor":"s-d11f6584c540","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Action veg4 (Phase A) Prior to the initiation of any construction project"},{"claim_id":"c:136c0baf270d3fc16653ed01df52d700","page_id":"C101747408:159","page_url":"https://archive.org/details/C101747408/page/n158","statement_kind":"proposal","subject_label":"Pesticide use near water","summary":"The plan requires LRMS approval for pesticide uses involving direct application to aquatic environments or high and moderate WQVZs.","property":"recommendation","t_from":"1998","quote":"LRMS approval is required for all pesticide uses that involve direct ap- plication to aquatic environments, use in high and moderate WQVZs and ESZs","anchor":"s-136c0baf270d","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Guidelines specific to implementation of the IPMP on watershed lands include"},{"claim_id":"c:8d266534e0276c2f7c718ed549a4fbce","page_id":"C101747408:159","page_url":"https://archive.org/details/C101747408/page/n158","statement_kind":"proposal","subject_label":"Integrated pest management on watershed lands","summary":"The plan's guidelines call for surveying pest control problems on watershed lands, including invasive shrubs and feral animals.","property":"recommendation","t_from":"1998","quote":"Survey pest control problems on wa- tershed lands, including: weed and gopher control on golf courses; in- vasive shrubs in brushlands","anchor":"s-8d266534e027","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Guidelines specific to implementation of the IPMP on watershed lands include"},{"claim_id":"c:b315a766eb5200b3aa225b506bed9895","page_id":"C101747408:169","page_url":"https://archive.org/details/C101747408/page/n168","statement_kind":"proposal","subject_label":"Sediment Transport Study","summary":"The plan proposes a Sediment Transport Study to identify stream segments with excessive bank erosion or channel sedimentation.","property":"recommendation","t_from":"1998","quote":"Conduct a Sediment Transport Study to identify stream segments with excessive bank ero- sion or channel sedimentation","anchor":"s-b315a766eb52","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Action aqu6 (Phase 1) Conduct a Sediment Transport Study"},{"claim_id":"c:f24c7e85269b1aed04541c0f6a8be92a","page_id":"C101747408:169","page_url":"https://archive.org/details/C101747408/page/n168","statement_kind":"proposal","subject_label":"Wetland creation","summary":"The plan proposes creating new wetland habitat as part of a wetland mitigation banking system to offset impacts from SFPUC activities.","property":"proposes","t_from":"1998","quote":"Create new wetland habitat, where water sources are adequate, as part of a wetland mitiga- tion banking system to be used to offset impacts","anchor":"s-f24c7e85269b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Action aqu9 (Phase A) Create new wetland habitat"},{"claim_id":"c:149549a10949e5b15747284cd025ab49","page_id":"C101747408:192","page_url":"https://archive.org/details/C101747408/page/n191","statement_kind":"proposal","subject_label":"Watershed restoration projects in schools","summary":"The plan proposes identifying and implementing watershed ecological restoration projects in Bay Area schools and universities.","property":"proposes","date_printed":"Phase 3","t_from":"1998","quote":"projects or monitoring studies as components of a watershed-based","anchor":"s-149549a10949","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Public Utilities Commission","stance":"own_position","speaker_evidence":"Action pub17 (Phase 3) Identify and implement watershed ecological restoration projects"},{"claim_id":"c:0fae6b644c8f0024663bc30077d501e1","page_id":"C101747408:202","page_url":"https://archive.org/details/C101747408/page/n201","statement_kind":"proposal","subject_label":"Database check before activities near sensitive resources","summary":"The plan proposes requesting a database check from the watershed GIS technician before activities near sensitive resources.","property":"proposes","date_printed":"Phase A","t_from":"1998","quote":"for any known sensitive ecological or cultural resources or areas within the vicinity of the proposed activity.","anchor":"s-0fae6b644c8f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Action inf4 (Phase A) Prior to any operations and maintenance"},{"claim_id":"c:907a7e9fdbf379442f0875f79410827d","page_id":"C101747408:202","page_url":"https://archive.org/details/C101747408/page/n201","statement_kind":"proposal","subject_label":"GIS resource database updates","summary":"The plan proposes entering new resource data into the SFPUC GIS database using standard entries.","property":"proposes","date_printed":"Phase A","t_from":"1998","quote":"enter data into the SFPUC GIS database using standard entries for data source, ID code, type, name","anchor":"s-907a7e9fdbf3","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Action inf3 (Phase A) As new natural, cultural, and other resource data"},{"claim_id":"c:c51a3307315555392a0512d200d2bfcb","page_id":"C101747408:213","page_url":"https://archive.org/details/C101747408/page/n212","statement_kind":"proposal","subject_label":"Fifield/[name withheld] trail alignment alternatives","summary":"The figure shows Alternatives A, B, C and D for the Fifield/[name withheld] trail alignments.","property":"alternative","value_text":"Alternatives A, B, C and D","t_from":"1998","quote":"Fifield / Cahill Ridge Service Road By Sneath Lane Parking Alternatives A and B:","place_label":"Fifield / Cahill Ridge","anchor":"s-c51a33073155","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Figure 5-3 Alternative Fifield / Cahill Ridge Trail Alignments legend"},{"claim_id":"c:2da07556f030ce257730ef0aef816365","page_id":"C101747408:235","page_url":"https://archive.org/details/C101747408/page/n234","statement_kind":"proposal","subject_label":"Sensitive species database","summary":"The plan proposes maintaining an up-to-date database on sensitive species within the watershed.","property":"proposes","date_printed":"Phase 1","t_from":"1998","quote":"Maintain an up-to-date database on sensitive species within the watershed. USFWS, CDFG","place_label":"watershed","anchor":"s-2da07556f030","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Table 6-1 Implementation of the Peninsula Watershed Management Actions by Phase Page 7 of 19"}]}