{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c119705240","url":"https://data.qipu.org/usa/san-francisco/reports/c119705240/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c119705240/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C119705240","source_id":"C119705240","title":"Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping meeting : [San Francisco Gateway Project]","year":2021,"n_pages":30,"creator":null,"source_url":"https://archive.org/details/C119705240","issuer":"San Francisco Planning Department","issuer_type":"government","gov_level":"city_county","prepared_by":null,"doc_kind":"eir","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"model","doc_kind_by":"meta","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":10,"statements_total":34,"statements_by_kind":{"finding":1,"proposal":26,"cites_decision":0,"background":7},"same_for_every_statement":{"source_id":"C119705240","source_url":"https://archive.org/details/C119705240","source_label":"IGS library: Availability of notice of preparation of an environmental impact report and initial study and notice of public scoping m","report_year":2021,"issuer":"San Francisco Planning Department","issuer_type":"government","doc_kind":"eir","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A notice by the San Francisco Planning Department on a plan by Prologis Inc. to redevelop two industrial parcels, and on the scope of its environmental review.","figures":[{"label":"Floor area","value":"2,160,000 gross square feet","claim_ids":["c:7da0bed9aef8172e845e46d5c08edecc"]},{"label":"Height","value":"97 ft; maximum 115 ft","claim_ids":["c:0959682c387af7f2a9531503f3310923"]},{"label":"Demolished","value":"448,000 gross square feet","claim_ids":["c:3a84b76c2042ec941634d8def3750e95"]},{"label":"Soil excavated","value":"140,600 cubic yards","claim_ids":["c:40332346f32f6fb11a7fdfbac6095c89"]}],"main_points":["c:aa85a957e5834abce0462dc9ef4f871b","c:a840ed1dd01f3334f5deaecb88e800dc","c:40332346f32f6fb11a7fdfbac6095c89"],"board_decisions_after":["qipu:sf/decision/sfleg-1360824:7/3","qipu:sf/decision/sfleg-1360824:7/2","qipu:sf/decision/sfbos:bag120225|30","qipu:sf/decision/sfleg-1354791:14/1","qipu:sf/decision/sfleg-1349520:3/2","qipu:sf/decision/sfleg-1337708:17/2","qipu:sf/decision/sfleg-1297383:17/1"],"board_decisions_before":[],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:aa85a957e5834abce0462dc9ef4f871b","page_id":"C119705240:1","page_url":"https://archive.org/details/C119705240/page/n0","statement_kind":"proposal","subject_label":"San Francisco Gateway Project","summary":"The project sponsor proposes to redevelop two parcels in a core industrial area of the city.","property":"proposes","value_text":"two parcels","value_num":2.0,"t_from":"2021","quote":"The project sponsor, Prologis Inc., proposes to redevelop two parcels in a core industrial area of the City and County of San Francisco (city).","place_label":"749 Toland Street and 2000 McKinnon Avenue","place_precision":"address","place_id":"qipu:sf/place/address/eas-374861","resolved_by":"place links file","anchor":"s-aa85a957e583","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The San Francisco Planning Department (department) has issued a notice of preparation"},{"claim_id":"c:006faf058c32ebd97af1ea20c16207eb","page_id":"C119705240:2","page_url":"https://archive.org/details/C119705240/page/n1","statement_kind":"proposal","subject_label":"New PDR buildings","summary":"The two new buildings would total 2,160,000 gross square feet.","property":"floor_area_sqft","value_text":"2,160,000 gross square feet","value_num":2160000.0,"unit":"sqft","t_from":"2021","quote":"The two new buildings (including PDR space, logistics yard, vehicular circulation systems, and ground-floor retail spaces) would total 2,160,000 gross square feet.","place_label":"San Francisco Gateway Project site","anchor":"s-006faf058c32","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Planning Department","stance":"own_position","speaker_evidence":"The two new buildings (including PDR space, logistics yard"},{"claim_id":"c:154975eae77ccf55cc692ea3cb4cfa38","page_id":"C119705240:2","page_url":"https://archive.org/details/C119705240/page/n1","statement_kind":"proposal","subject_label":"Building heights","summary":"Each proposed building would be 97 feet tall, with a maximum height of 115 feet including rooftop appurtenances.","property":"height_ft","value_text":"97 feet tall","value_num":97.0,"unit":"ft","t_from":"2021","quote":"Each building would be 97 feet tall and would have a maximum height of 115 feet, including rooftop appurtenances.","place_label":"San Francisco Gateway Project site","anchor":"s-154975eae77c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Planning Department","stance":"own_position","speaker_evidence":"Each building would be 97 feet tall and would have a maximum height"},{"claim_id":"c:3a84b76c2042ec941634d8def3750e95","page_id":"C119705240:2","page_url":"https://archive.org/details/C119705240/page/n1","statement_kind":"proposal","subject_label":"Demolition of existing buildings","summary":"The project sponsor would demolish four existing single-story PDR buildings totaling 448,000 gross square feet.","property":"demolished","value_text":"448,000 gross square feet","value_num":448000.0,"unit":"sqft","t_from":"2021","quote":"The project sponsor would demolish the four existing single-story buildings that are currently occupied by PDR space, which encompass 448,000 gross square feet.","place_label":"San Francisco Gateway Project site","anchor":"s-3a84b76c2042","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Planning Department","stance":"own_position","speaker_evidence":"The project sponsor would demolish the four existing single-story buildings"},{"claim_id":"c:4ed9a685a045a545c00287b03fe108a7","page_id":"C119705240:2","page_url":"https://archive.org/details/C119705240/page/n1","statement_kind":"proposal","subject_label":"Sidewalks and curb cuts","summary":"The project would create seven new curb cuts for access to the new buildings.","property":"proposes","value_text":"seven new curb cuts","value_num":7.0,"t_from":"2021","quote":"would create seven new curb cuts of varying widths for access to each new building.","place_label":"project perimeter","anchor":"s-4ed9a685a045","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Planning Department","stance":"own_position","speaker_evidence":"would create seven new curb cuts of varying widths"},{"claim_id":"c:a33b5472f0df1a13aa1e6b1da1504bc5","page_id":"C119705240:2","page_url":"https://archive.org/details/C119705240/page/n1","statement_kind":"proposal","subject_label":"Kirkwood Avenue conversion","summary":"The project proposes to convert Kirkwood Avenue to a single-lane, eastbound one-way street.","property":"proposes","value_text":"single-lane, eastbound one-way street","t_from":"2021","quote":"The project proposes to convert Kirkwood Avenue (along the northern side of the project site, between Toland and Rankin streets) to a single-lane, eastbound one-way street;","place_label":"Kirkwood Avenue between Toland and Rankin streets","place_precision":"street_segment","place_id":"qipu:sf/place/street/kirkwood-ave","resolved_by":"place links file","anchor":"s-a33b5472f0df","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Planning Department","stance":"own_position","speaker_evidence":"The project proposes to convert Kirkwood Avenue"},{"claim_id":"c:d0f44525f13635a199b9f04a62d0af56","page_id":"C119705240:2","page_url":"https://archive.org/details/C119705240/page/n1","statement_kind":"proposal","subject_label":"McKinnon Avenue conversion","summary":"The project proposes to convert a portion of McKinnon Avenue to a single-lane, westbound one-way street.","property":"proposes","value_text":"single-lane, westbound one-way street","t_from":"2021","quote":"convert a portion of McKinnon Avenue (along the southern side of the project site, between Toland and Selby streets) to a single-lane, westbound one-way street.","place_label":"McKinnon Avenue between Toland and Selby streets","place_precision":"street_segment","place_id":"qipu:sf/place/street/mckinnon-ave","resolved_by":"place links file","anchor":"s-d0f44525f136","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Planning Department","stance":"own_position","speaker_evidence":"convert a portion of McKinnon Avenue (along the southern side"},{"claim_id":"c:32e2eec9d74d52fed11ebd6ec20ba0ed","page_id":"C119705240:3","page_url":"https://archive.org/details/C119705240/page/n2","statement_kind":"background","subject_label":"Comment period","summary":"Comments on the initial study and EIR scope are accepted for a 30-day period.","property":"other","value_text":"30-day period","value_num":30.0,"date_printed":"March 9, 2022 to April 8, 2022","t_from":"2022","quote":"Comments on the initial study as well as the scope of EIR will be received for a 30-day period, commencing on March 9, 2022 and ending on 5 pm April 8, 2022.","anchor":"s-32e2eec9d74d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Planning Department","stance":"own_position","speaker_evidence":"Notice of Availability of NOP, Initial Study, and Notice of Public Scoping Meeting"},{"claim_id":"c:40332346f32f6fb11a7fdfbac6095c89","page_id":"C119705240:3","page_url":"https://archive.org/details/C119705240/page/n2","statement_kind":"proposal","subject_label":"Soil excavation","summary":"Approximately 140,600 cubic yards of soil would be excavated for the proposed project.","property":"other","value_text":"140,600 cubic yards","value_num":140600.0,"t_from":"2021","quote":"Approximately 140,600 cubic yards of soil would be excavated for the proposed project.","place_label":"San Francisco Gateway Project site","anchor":"s-40332346f32f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Planning Department","stance":"own_position","speaker_evidence":"Approximately 140,600 cubic yards of soil would be excavated"},{"claim_id":"c:8442956fd72eac439570c6e8cdbf03ef","page_id":"C119705240:3","page_url":"https://archive.org/details/C119705240/page/n2","statement_kind":"background","subject_label":"Scope of the notice","summary":"Preparation of an NOP or EIR does not indicate a decision by the city to approve or disapprove the project.","property":"other","t_from":"2021","quote":"Preparation of an NOP or EIR does not indicate a decision by the city to approve or to disapprove the proposed project.","anchor":"s-8442956fd72e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Planning Department","stance":"own_position","speaker_evidence":"Purpose of Notice. Preparation of an NOP or EIR does not indicate a decision"},{"claim_id":"c:4fac57ac10e21abc6750929cbd6a50b1","page_id":"C119705240:5","page_url":"https://archive.org/details/C119705240/page/n4","statement_kind":"proposal","subject_label":"San Francisco Gateway Project redevelopment of two parcels","summary":"The project sponsor, Prologis Inc., proposes to redevelop two parcels in a central industrial area of the city.","property":"proposes","value_text":"two parcels","value_num":2.0,"t_from":"2021","quote":"El patrocinador del proyecto, Prologis Inc., propone volver a desarrollar dos parcelas en un area industrial central de la ciudad y el condado de San Francisco","place_label":"749 Toland Street and 2000 McKinnon Avenue","place_precision":"address","place_id":"qipu:sf/place/address/eas-374861","resolved_by":"place links file","anchor":"s-4fac57ac10e2","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Planning Department","stance":"own_position","speaker_evidence":"El Departamento de Planificacion de San Francisco (departamento) ha emitido un aviso de preparacion"},{"claim_id":"c:197b9b2594418f7fceea5bb48fded714","page_id":"C119705240:6","page_url":"https://archive.org/details/C119705240/page/n5","statement_kind":"proposal","subject_label":"Proposed new PDR buildings","summary":"The proposed project would build two new multi-story PDR buildings with a total of 2,160,000 gross square feet.","property":"floor_area_sqft","value_text":"2,160,000 gross sq ft","value_num":2160000.0,"unit":"sqft","t_from":"2021","quote":"suman un total de 2,160,000 pies cuadrados brutos (200,670 metros cuadrados)","place_label":"San Francisco Gateway Project site","anchor":"s-197b9b259441","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Planning Department","stance":"own_position","speaker_evidence":"Los dos edificios nuevos ... suman un total de 2,160,000 pies cuadrados brutos"},{"claim_id":"c:3ea2d124e017c87bd9b224b9c5366311","page_id":"C119705240:6","page_url":"https://archive.org/details/C119705240/page/n5","statement_kind":"proposal","subject_label":"Demolition of existing one-story buildings","summary":"The project sponsor would demolish four existing one-story buildings currently occupied by PDR space.","property":"demolished","value_text":"four one-story buildings, 448,000 sq ft","value_num":448000.0,"unit":"sqft","t_from":"2021","quote":"El patrocinador del proyecto demoleria los cuatro edificios existentes de un solo piso","place_label":"San Francisco Gateway Project site","anchor":"s-3ea2d124e017","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Planning Department","stance":"own_position","speaker_evidence":"El patrocinador del proyecto demoleria los cuatro edificios existentes"},{"claim_id":"c:469cc4e6474e3348662c8826cd679255","page_id":"C119705240:6","page_url":"https://archive.org/details/C119705240/page/n5","statement_kind":"proposal","subject_label":"Kirkwood Avenue street conversion","summary":"The project proposes converting Kirkwood Avenue to a one-lane eastbound street.","property":"proposes","value_text":"one-lane eastbound street","t_from":"2021","quote":"convertir la Avenue Kirkwood (a lo largo del lado norte del sitio del proyecto, entre las calles Toland y Rankin)","place_label":"Kirkwood Avenue between Toland and Rankin streets","place_precision":"street_segment","place_id":"qipu:sf/place/street/kirkwood-ave","resolved_by":"place links file","anchor":"s-469cc4e6474e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Planning Department","stance":"own_position","speaker_evidence":"El proyecto propone convertir la Avenue Kirkwood"},{"claim_id":"c:825c05e2b7f62647e55a49861783234f","page_id":"C119705240:6","page_url":"https://archive.org/details/C119705240/page/n5","statement_kind":"background","subject_label":"Plan area","summary":"The project site is located within the Bayview Hunters Point Area Plan.","property":"other","value_text":"Bayview Hunters Point Area Plan","t_from":"2021","quote":"El sitio del proyecto se encuentra en el Plan del Area de Bayview Hunters Point","place_label":"Bayview Hunters Point Area Plan","place_precision":"area","place_id":"qipu:sf/place/hood/bayview-hunters-point","resolved_by":"place links file","anchor":"s-825c05e2b7f6","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Planning Department","stance":"own_position","speaker_evidence":"El sitio del proyecto se encuentra en el Plan del Area de Bayview Hunters Point"},{"claim_id":"c:83270b320086221eceba818cb7a3ed72","page_id":"C119705240:6","page_url":"https://archive.org/details/C119705240/page/n5","statement_kind":"proposal","subject_label":"Height of proposed buildings A and B","summary":"Each proposed building would be 97 feet tall, with a maximum height of 115 feet including rooftop features.","property":"height_ft","value_text":"97 ft; maximum 115 ft","value_num":115.0,"unit":"ft","t_from":"2021","quote":"Cada edificio mediria 97 pies (29.5 metros) de alto y tendria una altura maxima de 115 pies (35 metros)","place_label":"San Francisco Gateway Project site","anchor":"s-83270b320086","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Planning Department","stance":"own_position","speaker_evidence":"Cada edificio mediria 97 pies (29.5 metros) de alto"},{"claim_id":"c:9abbfc8cf353e66227012db5ade2c4fa","page_id":"C119705240:6","page_url":"https://archive.org/details/C119705240/page/n5","statement_kind":"proposal","subject_label":"New sidewalks","summary":"The project would build new 10-foot-wide sidewalks along the site perimeter and seven new curb ramps.","property":"proposes","value_text":"10 ft sidewalks; seven ramps","value_num":10.0,"unit":"ft","t_from":"2021","quote":"construiria nuevas aceras de 10 pies (3 metros) de ancho a lo largo del perimetro del sitio","place_label":"Site perimeter including Selby Street","place_precision":"street","anchor":"s-9abbfc8cf353","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Planning Department","stance":"own_position","speaker_evidence":"El proyecto propuesto construiria nuevas aceras de 10 pies"},{"claim_id":"c:9bd80945de153594ad361ae5273f817c","page_id":"C119705240:6","page_url":"https://archive.org/details/C119705240/page/n5","statement_kind":"finding","subject_label":"Existing site conditions","summary":"An elevated part of Interstate 280 crosses the project site.","property":"other","value_text":"elevated Interstate 280 crosses site","t_from":"2021","quote":"Una parte elevada de la Interestatal 280 cruza el sitio del proyecto.","place_label":"Project site, Interstate 280","anchor":"s-9bd80945de15","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Planning Department","stance":"own_position","speaker_evidence":"Una parte elevada de la Interestatal 280 cruza el sitio del proyecto"},{"claim_id":"c:0959682c387af7f2a9531503f3310923","page_id":"C119705240:10","page_url":"https://archive.org/details/C119705240/page/n9","statement_kind":"proposal","subject_label":"Height of proposed buildings A and B","summary":"The proposed buildings would be 97 feet tall, with a maximum height of 115 feet including rooftop equipment.","property":"height_ft","value_text":"97 ft; maximum 115 ft","value_num":115.0,"unit":"ft","t_from":"2021","quote":"Ang bawat gusali ay 97 feet ang taas at magkakaroon ng pinakamataas na taas na 115 feet, kabilang ang mga kagamitan sa tuktok ng bubong.","place_label":"Project site","anchor":"s-0959682c387a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Paglalarawan sa Proyekto / Iminungkahing Proyekto"},{"claim_id":"c:499273c1472dda557840d33933ef2aef","page_id":"C119705240:10","page_url":"https://archive.org/details/C119705240/page/n9","statement_kind":"proposal","subject_label":"Stories of proposed buildings","summary":"The project would build two new buildings of three stories each, with working roofs.","property":"stories","value_text":"three stories","value_num":3.0,"unit":"stories","t_from":"2021","quote":"Susundan ito ng pagtatayo ng dalawang tatlong palapag na gusali (na may mga gumaganang bubong): mga gusali A at B.","place_label":"Project site","anchor":"s-499273c1472d","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Paglalarawan sa Proyekto / Iminungkahing Proyekto"},{"claim_id":"c:532300bb607f181830e077b6b1488771","page_id":"C119705240:10","page_url":"https://archive.org/details/C119705240/page/n9","statement_kind":"proposal","subject_label":"Project sponsor and redevelopment of industrial area","summary":"The sponsor, Prologis Inc., proposes to redevelop two parts of the city's main industrial area.","property":"proposes","value_text":"two parts of the industrial area","t_from":"2021","quote":"Ang isponsor ng proyekto, ang Prologis Inc., ay nagmumungkahi na muling gawin ang dalawang bahagi na pangunahing pang-industriyang lugar ng Lungsod at ng County ng San Francisco","place_label":"Bayview Hunters Point Area Plan","place_precision":"area","place_id":"qipu:sf/place/hood/bayview-hunters-point","resolved_by":"place links file","anchor":"s-532300bb607f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Paglalarawan sa Proyekto / Iminungkahing Proyekto"},{"claim_id":"c:7da0bed9aef8172e845e46d5c08edecc","page_id":"C119705240:10","page_url":"https://archive.org/details/C119705240/page/n9","statement_kind":"proposal","subject_label":"Floor area of proposed buildings","summary":"The two new buildings would total 2,160,000 gross square feet.","property":"floor_area_sqft","value_text":"2,160,000 gross square feet","value_num":2160000.0,"unit":"sqft","t_from":"2021","quote":"Ang dalawang bagong gusali (kabilang ang lugar ng PDR, bakuran ng logistik, mga sistema ng pansasakyang sirkulasyon, at mga ground-floor na lugar ng retail) ay magkakaroon ng 2,160,000 gross square feet.","place_label":"Project site","anchor":"s-7da0bed9aef8","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Paglalarawan sa Proyekto / Iminungkahing Proyekto"},{"claim_id":"c:a840ed1dd01f3334f5deaecb88e800dc","page_id":"C119705240:10","page_url":"https://archive.org/details/C119705240/page/n9","statement_kind":"proposal","subject_label":"Demolition of existing PDR buildings","summary":"The sponsor would demolish four existing one-story buildings totaling 448,000 gross square feet.","property":"demolished","value_text":"four one-story buildings, 448,000 gross square feet","value_num":448000.0,"unit":"sqft","t_from":"2021","quote":"Gigibain ng isponsor ng proyekto ang apat na umiiral na isang palapag na gusali na kasalukuyang inookupahan ng lugar ng PDR, na sumasaklaw sa 448,000 gross square feet.","place_label":"Project site","anchor":"s-a840ed1dd01f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Paglalarawan sa Proyekto / Iminungkahing Proyekto"},{"claim_id":"c:de67b0e1a5dbe12bb9b294edd8f7e82d","page_id":"C119705240:12","page_url":"https://archive.org/details/C119705240/page/n11","statement_kind":"background","subject_label":"Initial study and EIR scoping","summary":"The department prepared an initial study attached to the NOP to scope the EIR content.","property":"other","value_text":"initial study prepared","t_from":"2021","quote":"Ang departamento ay naghanda ng isang paunang pag-aaral, na nakalakip sa NOP, upang masaklaw ang mega nilalaman ng EIR.","anchor":"s-de67b0e1a5db","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Planning Department","stance":"own_position","speaker_evidence":"Ang departamento ay naghanda ng isang paunang pag-aaral"},{"claim_id":"c:e8af13b50cebda1308bb8e4a72620af3","page_id":"C119705240:12","page_url":"https://archive.org/details/C119705240/page/n11","statement_kind":"background","subject_label":"Comment period on initial study and EIR scope","summary":"Comments on the initial study and EIR scope are accepted for 30 days, from March 9, 2022 to April 8, 2022.","property":"other","value_text":"30 days, ending 5 pm April 8, 2022","value_num":30.0,"date_printed":"March 9, 2022 to April 8, 2022","t_from":"2022","quote":"Ang mga komento sa paunang pag-aaral pati na rin ang saklaw ng EIR ay matatanggap sa loob ng 30 araw, simula sa Marso 9, 2022 at magtatapos sa 5 pm ng Abril 8, 2022.","anchor":"s-e8af13b50ceb","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Planning Department","stance":"own_position","speaker_evidence":"Ang mga komento sa paunang pag-aaral pati na rin ang saklaw ng EIR ay matatanggap"},{"claim_id":"c:c7faf2cf2d9dc895c68c477ba2873d00","page_id":"C119705240:13","page_url":"https://archive.org/details/C119705240/page/n12","statement_kind":"background","subject_label":"Legal basis of the notice","summary":"The notice follows local requirements under the Mayor's Fifth Supplement to the local emergency declaration.","property":"other","value_text":"Fifth Supplement to Mayor's emergency proclamation","date_printed":"February 25, 2020","t_from":"2020","quote":"Ang abisong ito ay sumusunod sa mga lokal na iniaatas sa ilalim ng Marso 23 Ikalimang Suplemento sa Pahayag ng Mayor na Nagdedeklara sa Pagkakaroon ng Lokal na Emerhensiya, na may petsang Pebrero 25, 2020.","anchor":"s-c7faf2cf2d9d","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Planning Department","stance":"own_position","speaker_evidence":"Ang abisong ito ay sumusunod sa mga lokal na iniaatas"},{"claim_id":"c:2e02e1a31093f2630f832ff8aa35bcfa","page_id":"C119705240:20","page_url":"https://archive.org/details/C119705240/page/n19","statement_kind":"proposal","subject_label":"Each new building height","summary":"Each of the two three-story buildings would be 97 feet tall, with a maximum of 115 feet including rooftop features.","property":"height_ft","value_text":"97 feet (115 feet maximum)","value_num":97.0,"unit":"ft","t_from":"2021","quote":"Méi toa nha cao 97 feet va cd chiéu cao téi da 115 feet, bao gdm ca cdc hang muc mai.","anchor":"s-2e02e1a31093","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Mỗi tòa nhà cao 97 feet và có chiều cao tối đa 115 feet"},{"claim_id":"c:3d0c1a9fc248f53e391859a92bbc4e16","page_id":"C119705240:20","page_url":"https://archive.org/details/C119705240/page/n19","statement_kind":"proposal","subject_label":"Kirkwood Avenue","summary":"The project proposes converting Kirkwood Avenue to a one-way street heading east.","property":"proposes","value_text":"one-way eastbound","t_from":"2021","quote":"Dw an dé xuat chuyén déi Dai I6 Kirkwood (doc phia bac cla dia diém du an, gira cac con phé Toland va Rankin) thanh con phé mét lan, hu@ng d6éng;","place_label":"Kirkwood Avenue","place_precision":"street","place_id":"qipu:sf/place/street/kirkwood-ave","resolved_by":"place links file","anchor":"s-3d0c1a9fc248","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Dự án đề xuất chuyển đổi Đại Lộ Kirkwood thành con phố một làn"},{"claim_id":"c:744602a3ebef9f022fde670d832ed7b6","page_id":"C119705240:20","page_url":"https://archive.org/details/C119705240/page/n19","statement_kind":"proposal","subject_label":"Two new production, distribution and repair buildings","summary":"The proposal would build two new buildings with a combined 2,160,000 sq ft of floor area.","property":"floor_area_sqft","value_text":"2,160,000 sq ft combined","value_num":2160000.0,"unit":"sqft","t_from":"2021","quote":"Hai toa nha moi (bao gdm khéng gian PDR, bai kho van, hé théng Iwu théng phuong tién giao thong va khong gian ban lé & tang trét) cd tong cdng 2.160.000 foot vudng.","anchor":"s-744602a3ebef","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Hai tòa nhà mới (bao gồm không gian PDR) có tổng cộng 2.160.000 foot vuông"},{"claim_id":"c:9179e068b8794f42e683ce97bc102a05","page_id":"C119705240:20","page_url":"https://archive.org/details/C119705240/page/n19","statement_kind":"proposal","subject_label":"Existing one-story building","summary":"The project sponsor would demolish the existing one-story building with about 448,000 sq ft of PDR space.","property":"demolished","value_text":"448,000 sq ft PDR space","value_num":448000.0,"unit":"sqft","t_from":"2021","quote":"Nha tai tro dw an sé pha huy bén toa nha mot tang hién tai voi khong gian PDR cé t6ng dién tich 448.000 foot vudng.","anchor":"s-9179e068b879","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Nhà tài trợ dự án sẽ phá huỷ bên toà nhà một tầng hiện tại"},{"claim_id":"c:a1d0de55446af9e39cc1bdac17c4a720","page_id":"C119705240:20","page_url":"https://archive.org/details/C119705240/page/n19","statement_kind":"proposal","subject_label":"Production space in each building","summary":"Each building would have about 35,000 sq ft of ground-floor production space.","property":"floor_area_sqft","value_text":"35,000 sq ft production space","value_num":35000.0,"unit":"sqft","t_from":"2021","quote":"Méi toa nha sé cd dién tich tng cong 35.000 foot vuéng khéng gian san xuat & tang trét","anchor":"s-a1d0de55446a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Mỗi tòa nhà sẽ có diện tích tổng cộng 35.000 foot vuông không gian sản xuất"},{"claim_id":"c:f307495835e2b6eedf88a5c4a60b79cc","page_id":"C119705240:20","page_url":"https://archive.org/details/C119705240/page/n19","statement_kind":"proposal","subject_label":"San Francisco Gateway Project sponsor","summary":"Prologis Inc. proposes redevelopment of two sub-areas in the Bayview Hunters Point industrial area.","property":"proposes","value_text":"two sub-areas","value_num":2.0,"t_from":"2021","quote":"Nha tai tro dw an, Prologis Inc., dé xuat tai phat trién hai phan khu trong khu vu céng nghiép Idi cua Thanh phé","place_label":"Bayview Hunters Point","place_precision":"area","place_id":"qipu:sf/place/hood/bayview-hunters-point","resolved_by":"place links file","anchor":"s-f307495835e2","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Nhà tài trợ dự án, Prologis Inc., đề xuất tái phát triển hai phân khu"},{"claim_id":"c:1e833183eb35174dbc2d29e1d668974d","page_id":"C119705240:24","page_url":"https://archive.org/details/C119705240/page/n23","statement_kind":"proposal","subject_label":"Project at 749 Toland Street and 2000 McKinnon Avenue","summary":"The notice concerns a project located at 749 Toland Street and 2000 McKinnon Avenue.","property":"proposes","value_text":"project at 749 Toland Street and 2000 McKinnon Avenue","date_printed":"3/9/2022","t_from":"2022","quote":"The enclosed notice concerns a project located at 749 Toland Street and 2000 McKinnon Avenue (2015.012491ENV).","place_label":"749 Toland Street; 2000 McKinnon Avenue","place_precision":"address","place_id":"qipu:sf/place/address/eas-374861","resolved_by":"place links file","anchor":"s-1e833183eb35","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Planning Department","stance":"own_position","speaker_evidence":"Date: 3/9/2022 The San Francisco Planning Department is studying"},{"claim_id":"c:e20430237d2d80e1aab5e17e0c478276","page_id":"C119705240:24","page_url":"https://archive.org/details/C119705240/page/n23","statement_kind":"background","subject_label":"Environmental review of the project","summary":"The Planning Department is studying the project's potential environmental effects and welcomes comments.","property":"other","value_text":"studying potential environmental effects","date_printed":"3/9/2022","t_from":"2022","quote":"The San Francisco Planning Department is studying a project’s potential environmental effects and welcomes your comments.","anchor":"s-e20430237d2d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Planning Department","stance":"own_position","speaker_evidence":"The San Francisco Planning Department is studying a project's potential environmental effects"}]}