{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c123303273","url":"https://data.qipu.org/usa/san-francisco/reports/c123303273/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c123303273/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C123303273","source_id":"C123303273","title":"Golden Gate Bridge seismic evaluation","year":1990,"n_pages":180,"creator":"Ketchum, Mark A","source_url":"https://archive.org/details/C123303273","issuer":"Golden Gate Bridge, Highway and Transportation District","issuer_type":"government","gov_level":"regional","prepared_by":"T. Y. Lin International (Mark A. Ketchum)","doc_kind":"study","jurisdiction":"SF Bay Area","jurisdiction_id":"region:bay-area","city":null,"issuer_by":"model","doc_kind_by":"model","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":17,"statements_total":49,"statements_by_kind":{"finding":38,"proposal":7,"cites_decision":1,"background":3},"same_for_every_statement":{"source_id":"C123303273","source_url":"https://archive.org/details/C123303273","source_label":"IGS library: Golden Gate Bridge seismic evaluation","report_year":1990,"issuer":"Golden Gate Bridge, Highway and Transportation District","issuer_type":"government","doc_kind":"study","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-claims-20p-haiku55-cli-2026-10-23","city":"sf","prompt_version":"igs-sf-claims-cli-v1"},"summary":{"what":"A seismic evaluation by the Golden Gate Bridge, Highway and Transportation District, judging the bridge's earthquake resistance and recommending retrofits.","figures":[{"label":"Main span","value":"4200 ft","page_url":"https://archive.org/details/C123303273/page/n15","quote":"a center span of 4200 ft and two side spans of 1125 ft each"},{"label":"Overall length","value":"9151 ft","page_url":"https://archive.org/details/C123303273/page/n15","quote":"The 9151 ft overall length of the Golden Gate Bridge"}],"main_points":["c:5b46f9f619630719dfd97dd537836835","c:80547eba8656f5e808ff35becb1f1f81","c:a80aeaf8bb7957aa8c594c28c6fef97a"],"board_decisions_after":[],"board_decisions_before":[],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:29cd7dbed12a6bbbbd07b3035d726dd7","page_id":"C123303273:21","page_url":"https://archive.org/details/C123303273/page/n20","statement_kind":"finding","subject_label":"Golden Gate Bridge original seismic design","summary":"The study notes that the original design treated earthquake and wind forces as horizontal static effects although their actions are dynamic.","property":"finding","t_from":"1990","quote":"Earthquake and wind forces were considered as horizontal static effects although their actions are actually dynamic.","place_label":"Golden Gate Bridge","place_precision":"area","anchor":"s-29cd7dbed12a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The bridge was designed using the most advanced theories"},{"claim_id":"c:59d0dc32b2eb1399c6f7b4cdeea3d86e","page_id":"C123303273:21","page_url":"https://archive.org/details/C123303273/page/n20","statement_kind":"finding","subject_label":"Golden Gate Bridge original design","summary":"The study concludes the bridge is quite flexible but has a high reserve in vertical load capacity, due to conservative original design.","property":"finding","value_text":"quite flexible, high vertical load reserve","t_from":"1990","quote":"The result is a bridge which is quite flexible and which has a high reserve in vertical load capacity.","place_label":"Golden Gate Bridge","place_precision":"area","anchor":"s-59d0dc32b2eb","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The result is a bridge which is quite flexible"},{"claim_id":"c:803b013c88fa3a5e423186d6ae64c7ce","page_id":"C123303273:21","page_url":"https://archive.org/details/C123303273/page/n20","statement_kind":"background","subject_label":"Golden Gate Bridge original design","summary":"The study reports that Joseph Strauss proposed a hybrid cantilever suspension bridge across the Golden Gate in 1921.","property":"event","value_text":"1921","date_printed":"1921","t_from":"1921","quote":"In 1921, Joseph Strauss proposed a hybrid cantilever suspension bridge across the Golden Gate and used this concept for his promotion of the bridge","place_label":"Golden Gate Bridge","place_precision":"area","privacy_flag":"may_name_private_person_after_1950","privacy_class":"private_person","public_after_year":2065,"anchor":"s-803b013c88fa","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"2.1 ORIGINAL DESIGN AND CONSTRUCTION"},{"claim_id":"c:b1a1a2ffd0e0170b6f150b475d7d3881","page_id":"C123303273:21","page_url":"https://archive.org/details/C123303273/page/n20","statement_kind":"finding","subject_label":"Golden Gate Bridge main span","summary":"The study finds that the main span length was fixed at 4200 ft in 1930, with a 90 ft cable spacing.","property":"finding","value_text":"4200 ft","value_num":4200.0,"unit":"ft","date_printed":"1930","t_from":"1930","quote":"It was not until 1930 that the final length of the span was determined at 4200 ft and a cable spacing of 90 ft was selected.","place_label":"Golden Gate Bridge","place_precision":"area","anchor":"s-b1a1a2ffd0e0","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"2.1 ORIGINAL DESIGN AND CONSTRUCTION"},{"claim_id":"c:8772c1a118dbbc2c5ad73f287a4689c7","page_id":"C123303273:25","page_url":"https://archive.org/details/C123303273/page/n24","statement_kind":"finding","subject_label":"Golden Gate Bridge deck replacement weight","summary":"The study finds the deck replacement cut the suspension bridge's weight by about eleven thousand tons.","property":"finding","value_text":"about eleven thousand tons","value_num":11000.0,"unit":"tons","t_from":"1990","quote":"This replacement resulted in a net reduction in weight of the suspension bridge of about eleven thousand tons.","place_label":"Golden Gate Bridge suspension bridge","place_precision":"area","anchor":"s-8772c1a118db","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"2.2.4 Deck Replacement; This replacement resulted in a net reduction"},{"claim_id":"c:993103b339deeddeae23d240d61b9da8","page_id":"C123303273:25","page_url":"https://archive.org/details/C123303273/page/n24","statement_kind":"finding","subject_label":"Golden Gate Bridge deck replacement","summary":"The study reports the deck was replaced with a lightweight orthotropic steel deck two ft wider between 1981 and 1985.","property":"event","value_text":"two ft wider","value_num":2.0,"unit":"ft","date_printed":"1981 and 1985","t_from":"1981","quote":"between 1981 and 1985 the original concrete deck slabs were removed and replaced with a lightweight orthotropic steel deck system two ft wider than the original.","place_label":"Golden Gate Bridge deck","place_precision":"area","anchor":"s-993103b339de","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"2.2.4 Deck Replacement; between 1981 and 1985 the original concrete deck"},{"claim_id":"c:b748348c21f64c8ddf4688559e2ff7be","page_id":"C123303273:25","page_url":"https://archive.org/details/C123303273/page/n24","statement_kind":"finding","subject_label":"Golden Gate Bridge approaches seismic retrofit","summary":"The study reports that the District retrofitted the bridge approaches in 1982 using Caltrans guidelines.","property":"event","value_text":"1982","date_printed":"1982","t_from":"1982","quote":"The Golden Gate Bridge, Highway and Transportation District retrofitted the approaches of the Golden Gate Bridge using the Caltrans guidelines in 1982.","decided_by":"Golden Gate Bridge, Highway and Transportation District","place_label":"Golden Gate Bridge approaches","place_precision":"area","anchor":"s-b748348c21f6","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"2.2.3 Seismic Retrofit; The Golden Gate Bridge, Highway and Transportation District retrofitted"},{"claim_id":"c:cbd3e86e682fa5a54d438cd7c9889e36","page_id":"C123303273:25","page_url":"https://archive.org/details/C123303273/page/n24","statement_kind":"finding","subject_label":"Fort Point arch span","summary":"The study reports the Fort Point arch span was fitted with vertical restrainers at its bearings in the 1982 retrofit.","property":"finding","t_from":"1990","quote":"The Fort Point arch span was fitted with vertical restrainers at the bearings supporting the springline of the arch ribs","place_label":"Golden Gate Bridge Fort Point arch span","place_precision":"area","anchor":"s-cbd3e86e682f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"2.2.3 Seismic Retrofit; The Fort Point arch span was fitted with vertical"},{"claim_id":"c:d3d225f9b904b46b8754e7056f37f099","page_id":"C123303273:25","page_url":"https://archive.org/details/C123303273/page/n24","statement_kind":"finding","subject_label":"Golden Gate Bridge seismic resisting system","summary":"The study finds that no overall upgrade of the bridge's seismic resisting system was performed in the earlier retrofit.","property":"finding","value_text":"no overall upgrade","t_from":"1990","quote":"In keeping with the Caltrans policy at that time, no overall upgrade of the seismic resisting system was performed.","place_label":"Golden Gate Bridge","place_precision":"area","anchor":"s-d3d225f9b904","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"2.2.3 Seismic Retrofit; In keeping with the Caltrans policy"},{"claim_id":"c:33b4c7542310cecc7274a22b535839b1","page_id":"C123303273:30","page_url":"https://archive.org/details/C123303273/page/n29","statement_kind":"finding","subject_label":"Golden Gate Bridge tower elastic analysis ([name withheld] review)","summary":"The quoted review states [name withheld] analyses were elastic, with no apparent consideration of plastic action or ductility.","property":"finding","t_from":"1990","quote":"The analyses performed were on an elastic basis with no apparent consideration for plastic action and acceptable ductility ratios.","place_label":"Golden Gate Bridge tower","place_precision":"area","privacy_flag":"may_name_private_person_after_1950","privacy_class":"private_person","public_after_year":2065,"anchor":"s-33b4c7542310","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"a reviewer of the tower stress analysis, quoted in the report","stance":"quotes_to_report","speaker_evidence":"The major points of the review include the following excerpts"},{"claim_id":"c:3ad815b3b755c32ed2af03b4b5238929","page_id":"C123303273:30","page_url":"https://archive.org/details/C123303273/page/n29","statement_kind":"background","subject_label":"Caltrans 1973 Earthquake Design Criteria","summary":"The quoted review notes that the Caltrans 1973 Earthquake Design Criteria use a spectra reduction factor of 4 for plastic action.","property":"other","value_text":"factor of 4","value_num":4.0,"date_printed":"1973","t_from":"1973","quote":"A spectra reduction factor equal to 4 is used [in the Caltrans 1973 Earthquake Design Criteria for Bridges] to account for plastic action.","place_label":"San Francisco","place_precision":"city","anchor":"s-3ad815b3b755","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"another body","stance":"quotes_to_report","speaker_evidence":"The major points of the review include the following excerpts"},{"claim_id":"c:9875391cd75fb67005bfb531dfe8075f","page_id":"C123303273:30","page_url":"https://archive.org/details/C123303273/page/n29","statement_kind":"finding","subject_label":"Golden Gate Bridge tower stress analysis ([name withheld] review)","summary":"The quoted review states that correcting Professor [name withheld] calculation lowers the tower's maximum stresses to 51.6 ksi compression and 36.6 ksi tension.","property":"finding","value_text":"51.6 ksi compression","value_num":51.6,"unit":"ksi","t_from":"1990","quote":"The appropriate correction of his calculation reduces the maximum stresses from 54.2 to 51.6 ksi compression, and from 39.6 to 36.6 ski tension.","place_label":"Golden Gate Bridge tower","place_precision":"area","privacy_flag":"may_name_private_person_after_1950","privacy_class":"private_person","public_after_year":2065,"anchor":"s-9875391cd75f","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"a reviewer of the tower stress analysis, quoted in the report","stance":"quotes_to_report","speaker_evidence":"The major points of the review include the following excerpts"},{"claim_id":"c:ca88982fdb8625f21abb16ea963e1f69","page_id":"C123303273:30","page_url":"https://archive.org/details/C123303273/page/n29","statement_kind":"finding","subject_label":"Golden Gate Bridge tower base fixity assumption","summary":"The quoted review states that [name withheld] stress analysis depends on an assumption of complete fixity at the tower base, which it calls unrealistic.","property":"finding","t_from":"1990","quote":"The assumption of complete fixity at bottom of the tower is basic to Professor [name withheld] stress analysis.","place_label":"Golden Gate Bridge tower base","place_precision":"area","privacy_flag":"may_name_private_person_after_1950","privacy_class":"private_person","public_after_year":2065,"anchor":"s-ca88982fdb86","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"a reviewer of the tower stress analysis, quoted in the report","stance":"quotes_to_report","speaker_evidence":"The major points of the review include the following excerpts"},{"claim_id":"c:74f64f02381b22d16199a1c7a5d9540e","page_id":"C123303273:39","page_url":"https://archive.org/details/C123303273/page/n38","statement_kind":"finding","subject_label":"San Andreas fault slip rate","summary":"The study reports that the San Andreas slip rate decreases northward to about 12 mm/year along the San Francisco Peninsula.","property":"other","value_text":"about 12 mm/year","value_num":12.0,"unit":"mm/year","t_from":"1990","quote":"The Holocene and historical slip rate of the San Andreas decreases northward from 32 mm/year near Bitterwater to about 12 mm/year along the San Francisco Peninsula.","place_label":"San Francisco Peninsula","place_precision":"area","anchor":"s-74f64f02381b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"3.3.1 The San Andreas Fault"},{"claim_id":"c:c7fcb220ac1875550a33e9644c0ff7f4","page_id":"C123303273:39","page_url":"https://archive.org/details/C123303273/page/n38","statement_kind":"finding","subject_label":"Faults critical to Golden Gate Bridge seismic risk","summary":"The study identifies the San Andreas, Hayward and Calaveras faults as the faults most critical to seismic risk at the Golden Gate Bridge.","property":"other","value_text":"San Andreas, Hayward, Calaveras faults","t_from":"1990","quote":"The faults most critical to the seismic risk at the Golden Gate Bridge are the San Andreas fault, the Hayward fault, and the Calaveras fault.","place_label":"Golden Gate Bridge","place_precision":"none","anchor":"s-c7fcb220ac18","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"3.3 FAULTS AND FAULT ACTIVITY IN THE AREA"},{"claim_id":"c:cac2d4b0a79cddc5b7b353dfeded2234","page_id":"C123303273:39","page_url":"https://archive.org/details/C123303273/page/n38","statement_kind":"finding","subject_label":"Golden Gate Bridge seismic analysis ground motion","summary":"The study states that a uniform shear wave velocity of 4000 ft per second was considered reasonable for the analyses of materials under the Golden Gate.","property":"other","value_text":"4000 ft/s","value_num":4000.0,"unit":"ft/s","t_from":"1990","quote":"a uniform shear wave velocity of 4000 ft per second was considered reasonable for the analyses","place_label":"Golden Gate","place_precision":"none","anchor":"s-cac2d4b0a79c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"3.2 GEOLOGICAL AND GEOTECHNICAL STUDIES"},{"claim_id":"c:bb71f7dfddfb9043a0eac283c7aeec9d","page_id":"C123303273:47","page_url":"https://archive.org/details/C123303273/page/n46","statement_kind":"finding","subject_label":"San Andreas fault modeling for structural analysis","summary":"The analysis divided the San Andreas fault into four portions to model the effect of traveling waves and ground motion coherency.","property":"other","value_text":"four segments","value_num":4.0,"t_from":"1990","quote":"the San Andreas fault was segmented into four different portions, each reflecting different reasonable average estimates","place_label":"Golden Gate Bridge","place_precision":"none","anchor":"s-bb71f7dfddfb","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"To model the effect of the traveling wave and the incoherency and coherency of the ground motions, the San Andreas fault was segmented"},{"claim_id":"c:bc93a85ee9c5e8dd34eeb2624aab68e5","page_id":"C123303273:52","page_url":"https://archive.org/details/C123303273/page/n51","statement_kind":"proposal","subject_label":"Golden Gate Bridge lane closure duration","summary":"The study proposes that lane closures or lane load reductions after an earthquake should not last more than two weeks.","property":"proposes","value_text":"two weeks","value_num":2.0,"unit":"weeks","t_from":"1990","quote":"The lane closure or lane load reductions should not last more than two weeks.","place_label":"Golden Gate Bridge","place_precision":"none","anchor":"s-bc93a85ee9c5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The durations of lane closures are somewhat arbitrary"},{"claim_id":"c:c87a8a08522f552044f92af9cde6454e","page_id":"C123303273:52","page_url":"https://archive.org/details/C123303273/page/n51","statement_kind":"proposal","subject_label":"Golden Gate Bridge post-earthquake closure criteria","summary":"The study proposes that the bridge should not be closed for more than one day after any of the considered performance cases.","property":"proposes","value_text":"one day","value_num":1.0,"unit":"days","t_from":"1990","quote":"In any of the above cases, the bridge should not be closed for more than one day.","place_label":"Golden Gate Bridge","place_precision":"none","anchor":"s-c87a8a08522f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In any of the above cases, the bridge should not be closed"},{"claim_id":"c:b8cc6c9aa28aa0ad58158e343e08270d","page_id":"C123303273:57","page_url":"https://archive.org/details/C123303273/page/n56","statement_kind":"finding","subject_label":"Golden Gate Bridge tower splice connections","summary":"The study finds that tower horizontal splice rivets were designed to resist only half the yield capacity of the joined plates.","property":"other","value_text":"[name withheld] the yield capacity","value_num":0.5,"unit":"percent","t_from":"1990","quote":"by fracture of the rivets in the horizontal splices, which were designed to resist [name withheld] the yield capacity of the joined plates.","place_label":"Golden Gate Bridge towers","place_precision":"none","anchor":"s-b8cc6c9aa28a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"4.3.2 Tower Capacity Criteria; In tension, the probable failure mode"},{"claim_id":"c:1e911e58587712f6ea5d56d112d4bd30","page_id":"C123303273:66","page_url":"https://archive.org/details/C123303273/page/n65","statement_kind":"finding","subject_label":"Golden Gate Bridge global model degrees of freedom","summary":"The global model of the bridge has about 4000 active degrees of freedom.","property":"other","value_text":"about 4000","value_num":4000.0,"unit":"degrees of freedom","t_from":"1990","quote":"The total number of active degrees of freedom is about 4000.","place_label":"Golden Gate Bridge","place_precision":"none","anchor":"s-1e911e585877","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The global model of the bridge is shown in Figure 5.1. The total number"},{"claim_id":"c:556bcd7133fe456189ae15b90396ef4b","page_id":"C123303273:66","page_url":"https://archive.org/details/C123303273/page/n65","statement_kind":"finding","subject_label":"Golden Gate Bridge tower base buckling","summary":"The analysis finds the average filament compressive stress reached buckling level only when base rotation reached about 22 x 10-4 radians.","property":"other","value_text":"about 22 x 10-4 rad","value_num":0.0022,"unit":"rad","t_from":"1990","quote":"the average filament compressive stress reached buckling stress level (as defined earlier) only when the base rotation reached about 22 x 10-4 rad.","place_label":"Golden Gate Bridge towers","place_precision":"none","anchor":"s-556bcd7133fe","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"5.2.4 Non-linear Moment/Rotation Relationship"},{"claim_id":"c:a5ec196e833395aaf6232715cf6b4c7d","page_id":"C123303273:66","page_url":"https://archive.org/details/C123303273/page/n65","statement_kind":"finding","subject_label":"Golden Gate Bridge tower base yield moment","summary":"The study gives the yield moment at initial rivet shear failure of the tower base as Mzy = 900,000 kip-ft.","property":"other","value_text":"900,000 kip-ft","value_num":900000.0,"unit":"kip-ft","t_from":"1990","quote":"The yield moments corresponding to initial rivet shear failure are Mzy = 900,000 Kip-ft.","place_label":"Golden Gate Bridge towers","place_precision":"none","anchor":"s-a5ec196e8333","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"5.2.4 Non-linear Moment/Rotation Relationship"},{"claim_id":"c:b49744af2506decea6e479966a5e1845","page_id":"C123303273:66","page_url":"https://archive.org/details/C123303273/page/n65","statement_kind":"finding","subject_label":"Golden Gate Bridge tower base analytical model","summary":"The model applied a constraint axial load of 70,870 kip at the tower base, corresponding to tower weight and vertical cable load.","property":"other","value_text":"70,870 kip","value_num":70870.0,"unit":"kip","t_from":"1990","quote":"under a constraint axial load of 70,870 kip, which corresponds to the tower weight and vertical component of the cable load","place_label":"Golden Gate Bridge towers","place_precision":"none","anchor":"s-b49744af2506","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"5.2.4 Non-linear Moment/Rotation Relationship"},{"claim_id":"c:e7f15bb36c5e2571ce97d60acebbe304","page_id":"C123303273:66","page_url":"https://archive.org/details/C123303273/page/n65","statement_kind":"finding","subject_label":"Golden Gate Bridge global model first mode","summary":"The global model's first mode is transverse vibration of the main span deck with a natural period of 20.56 seconds.","property":"other","value_text":"20.56 sec","value_num":20.56,"unit":"seconds","t_from":"1990","quote":"The first mode is the transverse vibration of the main span deck with a natural period of 20.56 sec.","place_label":"Golden Gate Bridge","place_precision":"none","anchor":"s-e7f15bb36c5e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"5.3.1 Global Model"},{"claim_id":"c:2ed34cca60ab5056065a27b479a02375","page_id":"C123303273:67","page_url":"https://archive.org/details/C123303273/page/n66","statement_kind":"finding","subject_label":"Main tower computer model","summary":"The study reports that computed and measured tower vibration periods correlated closely, validating the tower model.","property":"finding","value_text":"Very close correlation","t_from":"1990","quote":"Very close correlation between computed and measured values were obtained that essentially validated the computer model developed.","place_label":"Golden Gate Bridge main towers","place_precision":"none","anchor":"s-2ed34cca60ab","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Very close correlation between computed and measured values were obtained"},{"claim_id":"c:0571e6990a748e6a41eb28d3c5097b4e","page_id":"C123303273:75","page_url":"https://archive.org/details/C123303273/page/n74","statement_kind":"finding","subject_label":"Main span of Golden Gate Bridge","summary":"The maximum longitudinal displacement of the main span was 2.3 ft, about 53% above the 18-inch one-way movement of the expansion joints.","property":"other","value_text":"2.3 ft","value_num":2.3,"unit":"ft","t_from":"1990","quote":"The maximum longitudinal displacement of the main span was 2.3 ft, which is about 53% higher than the one-way movement of 18 in. provided by the expansion joints.","place_label":"Golden Gate Bridge main span","place_precision":"none","anchor":"s-0571e6990a74","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Maximum longitudinal displacement of the main span was 2.3 ft"},{"claim_id":"c:3d259188a0d6ea34d4f941bc93d6c411","page_id":"C123303273:75","page_url":"https://archive.org/details/C123303273/page/n74","statement_kind":"finding","subject_label":"Response spectrum analysis of suspended structure","summary":"The study says response spectrum results could be unconservative because too few modes were included, especially for transverse excitation.","property":"finding","value_text":"could be unconservative","t_from":"1990","quote":"because the number of modes included was not sufficient, particularly for the transverse earthquake excitation, results could be unconservative in some cases.","place_label":"Golden Gate Bridge suspended structure","place_precision":"none","anchor":"s-3d259188a0d6","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"because the number of modes included was not sufficient"},{"claim_id":"c:6659c93d03fddd793a1c9d86f2ee6945","page_id":"C123303273:75","page_url":"https://archive.org/details/C123303273/page/n74","statement_kind":"finding","subject_label":"Side spans of Golden Gate Bridge","summary":"The maximum longitudinal side span displacements were 3.2 ft on the San Francisco side and 3.75 ft on the Marin side.","property":"other","value_text":"3.2 ft (SF side); 3.75 ft (Marin side)","value_num":3.75,"unit":"ft","t_from":"1990","quote":"The maximum longitudinal displacement of the side spans was 3.2 ft on the San Francisco side and 3.75 ft on the Marin side.","place_label":"Golden Gate Bridge side spans","place_precision":"none","anchor":"s-6659c93d03fd","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The maximum longitudinal displacement of the side spans was 3.2 ft"},{"claim_id":"c:ad6db3595038bf2c151f3b27d8a438ba","page_id":"C123303273:75","page_url":"https://archive.org/details/C123303273/page/n74","statement_kind":"finding","subject_label":"Side span expansion joints","summary":"The study finds both side span movements exceed the capacity of the side span expansion joints.","property":"finding","value_text":"exceed joint capacity","t_from":"1990","quote":"Both movements exceed the capacity of the side span expansion joints.","place_label":"Golden Gate Bridge side span expansion joints","place_precision":"none","anchor":"s-ad6db3595038","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Both movements exceed the capacity of the side span expansion joints."},{"claim_id":"c:c2bb962aa8a570efee35961bb99e33ec","page_id":"C123303273:75","page_url":"https://archive.org/details/C123303273/page/n74","statement_kind":"finding","subject_label":"Center of main span deck","summary":"At the center of the main span the deck moved 11.76 ft laterally and 6.76 ft vertically, which the study calls not unusual.","property":"other","value_text":"11.76 ft lateral; 6.76 ft vertical","value_num":11.76,"unit":"ft","t_from":"1990","quote":"At center of the main span, the deck experienced lateral displacement of 11.76 ft and vertical displacement of 6.76 ft which are not unusual.","place_label":"Golden Gate Bridge main span center","place_precision":"none","anchor":"s-c2bb962aa8a5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"At center of the main span, the deck experienced lateral displacement"},{"claim_id":"c:2a20bd5379b34c64545a395e39ebe465","page_id":"C123303273:88","page_url":"https://archive.org/details/C123303273/page/n87","statement_kind":"finding","subject_label":"North and south main towers","summary":"The longitudinal response of the north tower was much higher than that of the south tower, while transverse responses were practically the same.","property":"finding","value_text":"north much higher longitudinally","t_from":"1990","quote":"The longitudinal response of the north tower was much higher than that of the south tower while the transverse responses in both towers were practically the same.","place_label":"Golden Gate Bridge north and south towers","place_precision":"none","anchor":"s-2a20bd5379b3","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Displacement response of the main towers was based on the global response analysis"},{"claim_id":"c:ab7a93a98d22a60e77956a7b514f858c","page_id":"C123303273:88","page_url":"https://archive.org/details/C123303273/page/n87","statement_kind":"proposal","subject_label":"Main tower evaluation","summary":"The study recommends evaluating both towers on the worst-case basis because seismic input uncertainty is high.","property":"recommendation","value_text":"evaluate both towers on worst case","t_from":"1990","quote":"both towers should be evaluated based on the worst case.","place_label":"Golden Gate Bridge main towers","place_precision":"none","anchor":"s-ab7a93a98d22","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"both towers should be evaluated based on the worst case."},{"claim_id":"c:e0ad3f7c00ec2085c8787df529088d0e","page_id":"C123303273:88","page_url":"https://archive.org/details/C123303273/page/n87","statement_kind":"finding","subject_label":"Side span cable equivalent spring","summary":"The equivalent longitudinal spring stiffness used at the tower top for the side span cable was 15,700 kip/ft.","property":"other","value_text":"15,700 kip/ft","value_num":15700.0,"t_from":"1990","quote":"For side span cable, the equivalent stiffness was 15,700 kip/ft; for main span cable, 5200 kip/ft.","place_label":"Golden Gate Bridge side span cable","place_precision":"none","anchor":"s-e0ad3f7c00ec","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"For side span cable, the equivalent stiffness was 15,700 kip/ft"},{"claim_id":"c:0e0786047e8ecc3b3273189eb153b8de","page_id":"C123303273:97","page_url":"https://archive.org/details/C123303273/page/n96","statement_kind":"finding","subject_label":"Main tower relative support movement","summary":"The tower structure can tolerate about 3 ft of relative movement at the top without significant base nonlinearity, absent vibrational effects.","property":"finding","value_text":"about 3 ft","value_num":3.0,"unit":"ft","t_from":"1990","quote":"the tower structure can tolerate about 3 ft relative movement at the top","place_label":"Golden Gate Bridge main tower","place_precision":"none","anchor":"s-0e0786047e8e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In the absence of vibrational effects, the tower structure can tolerate"},{"claim_id":"c:80ec76b69fb941b6224fdaf78f24a21f","page_id":"C123303273:97","page_url":"https://archive.org/details/C123303273/page/n96","statement_kind":"finding","subject_label":"Side span to tower hinge connection","summary":"About 80% of the longitudinal inertia force in the side span deck is delivered to the tower through the hinge connection.","property":"finding","value_text":"80%","value_num":80.0,"unit":"percent","t_from":"1990","quote":"About 80% of the longitudinal inertia force developed in the side span deck will be delivered to the tower through a hinge connection.","place_label":"Golden Gate Bridge side span hinge connection","place_precision":"none","anchor":"s-80ec76b69fb9","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"5.7.1 Interaction of the Side Span and the Tower"},{"claim_id":"c:9d0a4dd024df1cc77e9f21a730b0b118","page_id":"C123303273:97","page_url":"https://archive.org/details/C123303273/page/n96","statement_kind":"finding","subject_label":"Side span to tower hinge connection","summary":"The study judges it unlikely the hinge connection can sustain the high force, since the original design seismic coefficient was only 0.05g.","property":"finding","value_text":"0.05g original design vs 0.75g spectral","value_num":0.05,"t_from":"1990","quote":"it is unlikely that the hinge connection can sustain such a high force.","place_label":"Golden Gate Bridge side span hinge connection","place_precision":"none","anchor":"s-9d0a4dd024df","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Since the seismic coefficient used in the original design was only 0.05g"},{"claim_id":"c:ea52cd0b2f1473463d211fd1fb3c81d7","page_id":"C123303273:97","page_url":"https://archive.org/details/C123303273/page/n96","statement_kind":"finding","subject_label":"Main tower relative support movement","summary":"The study concludes the flexible tower has sufficient capacity to tolerate relative support movement on the order of 1 ft.","property":"finding","value_text":"order of 1 ft","value_num":1.0,"unit":"ft","t_from":"1990","quote":"the flexible tower structure has sufficient capacity to tolerate relative support movement in the order of 1 ft.","place_label":"Golden Gate Bridge main tower","place_precision":"none","anchor":"s-ea52cd0b2f14","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Based on the results and considering the additional vibrational effect"},{"claim_id":"c:57963c699aae49038a7759c9b3372e7f","page_id":"C123303273:103","page_url":"https://archive.org/details/C123303273/page/n102","statement_kind":"finding","subject_label":"Structural truss idealization","summary":"The study concludes the simpler truss idealization adequately captures the overall dynamics and seismic behavior of the structural system.","property":"finding","value_text":"adequately captured","t_from":"1990","quote":"The overall dynamics (i.e. frequencies and mode shapes) and the seismic behavior of the structural system, however, are adequately captured using the simpler truss idealization.","place_label":"Golden Gate Bridge approach and suspended structures","place_precision":"none","anchor":"s-57963c699aae","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The overall dynamics (i.e. frequencies and mode shapes) and the seismic behavior"},{"claim_id":"c:8759e14f6bea4c05e14addd6cb590321","page_id":"C123303273:103","page_url":"https://archive.org/details/C123303273/page/n102","statement_kind":"background","subject_label":"Approach structure bearing restrainers","summary":"Restrainers were installed across the approach structure bearings in a seismic upgrade performed in 1982.","property":"event","value_text":"1982 seismic upgrade","value_num":1982.0,"date_printed":"1982","t_from":"1982","quote":"Restrainers were installed across the bearings of the approach structures in a seismic upgrade performed in 1982.","place_label":"Golden Gate Bridge approach structures","place_precision":"none","anchor":"s-8759e14f6bea","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Restrainers were installed across the bearings of the approach structures"},{"claim_id":"c:84f4af1d859b4c006beacf48c190d936","page_id":"C123303273:113","page_url":"https://archive.org/details/C123303273/page/n112","statement_kind":"finding","subject_label":"Golden Gate Bridge viaduct members","summary":"The study states that members not in compliance with the design criteria, and therefore in need of seismic upgrade, are illustrated in Fig. 6.11.","property":"finding","value_text":"members not in compliance need seismic upgrade","t_from":"1990","quote":"Members not in compliance with the design criteria and therefore in need of seismic upgrade are illustrated in Fig. 6.11.","place_label":"Golden Gate Bridge","place_precision":"area","anchor":"s-84f4af1d859b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Members not in compliance with the design criteria and therefore in need of seismic upgrade are illustrated in Fig. 6.11."},{"claim_id":"c:5b46f9f619630719dfd97dd537836835","page_id":"C123303273:123","page_url":"https://archive.org/details/C123303273/page/n122","statement_kind":"finding","subject_label":"Golden Gate Bridge approach viaduct critical components","summary":"The study finds the most critical components for retrofit are the foundations, supporting frames, structural bearings, and expansion joint restrainers.","property":"finding","value_text":"foundations, supporting frames, structural bearings, expansion joint restrainers","t_from":"1990","quote":"The most critical components for retrofit are the foundations, supporting frames, structural bearings supporting the trusses, and the expansion joint restrainers.","place_label":"Golden Gate Bridge approach viaducts","place_precision":"area","anchor":"s-5b46f9f61963","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The most critical components for retrofit are the foundations"},{"claim_id":"c:80547eba8656f5e808ff35becb1f1f81","page_id":"C123303273:123","page_url":"https://archive.org/details/C123303273/page/n122","statement_kind":"finding","subject_label":"Golden Gate Bridge steel approach viaducts","summary":"The study finds the steel approach viaducts need to be made two to six times stronger in seismic resistance.","property":"finding","value_text":"two to six times stronger","t_from":"1990","quote":"The steel approach viaducts need to be made two to six times stronger with respect to seismic resistance","place_label":"Golden Gate Bridge approach viaducts","place_precision":"area","anchor":"s-80547eba8656","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The steel approach viaducts need to be made two to six times stronger"},{"claim_id":"c:a80aeaf8bb7957aa8c594c28c6fef97a","page_id":"C123303273:123","page_url":"https://archive.org/details/C123303273/page/n122","statement_kind":"proposal","subject_label":"Golden Gate Bridge approach viaducts seismic systems","summary":"The study recommends that some retrofitting of the seismic resisting systems of the approaches be undertaken, in addition to component retrofitting.","property":"recommendation","value_text":"some retrofitting of seismic resisting systems of approaches should be undertaken","t_from":"1990","quote":"some retrofitting of the seismic resisting systems of the approaches should be undertaken.","place_label":"Golden Gate Bridge approaches","place_precision":"area","anchor":"s-a80aeaf8bb79","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"some retrofitting of the seismic resisting systems of the approaches should be undertaken"},{"claim_id":"c:14db68388d8803e559803c4fc8b808f2","page_id":"C123303273:129","page_url":"https://archive.org/details/C123303273/page/n128","statement_kind":"proposal","subject_label":"Golden Gate Bridge side span fixed pin relocation","summary":"The study suggests moving the fixed pin of the suspension bridge side span from the main towers to the adjacent concrete pylons.","property":"proposes","value_text":"move fixed pin of side span to adjacent concrete pylons","t_from":"1990","quote":"Another possible application involves moving the fixed pin of the side span of the suspension bridge from its present location at the main towers to the opposite end","place_label":"Golden Gate Bridge side span","place_precision":"area","anchor":"s-14db68388d88","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Another possible application involves moving the fixed pin"},{"claim_id":"c:882cd8d1ef18b52941745ef904a12926","page_id":"C123303273:129","page_url":"https://archive.org/details/C123303273/page/n128","statement_kind":"proposal","subject_label":"Golden Gate Bridge lock-up devices","summary":"The study says lock-up devices may warrant further consideration, while structural fuses may not apply to the bridge.","property":"recommendation","value_text":"lock-up devices may warrant further consideration","t_from":"1990","quote":"Structural fuses may not have any application to the Golden Gate Bridge but the lock-up devices may warrant further consideration.","place_label":"Golden Gate Bridge","place_precision":"area","anchor":"s-882cd8d1ef18","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Structural fuses may not have any application to the Golden Gate Bridge"},{"claim_id":"c:de7745948213ab3b74d3c9b01498ec3f","page_id":"C123303273:129","page_url":"https://archive.org/details/C123303273/page/n128","statement_kind":"proposal","subject_label":"Golden Gate Bridge side span stiffening trusses","summary":"The study proposes that the pedestrian sidewalk be made to work compositely with the upper chords of the side span stiffening trusses, and that composite action be investigated.","property":"proposes","value_text":"pedestrian sidewalk composite action with upper chords","t_from":"1990","quote":"A possible solution is to make the pedestrian sidewalk work compositely with the upper chords of the stiffening","place_label":"Golden Gate Bridge side span stiffening trusses","place_precision":"area","anchor":"s-de7745948213","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"A possible solution is to make the pedestrian sidewalk work compositely"},{"claim_id":"c:e2419fef57ecd41ae172d5c9c1c1b81c","page_id":"C123303273:129","page_url":"https://archive.org/details/C123303273/page/n128","statement_kind":"finding","subject_label":"Golden Gate Bridge pylons","summary":"The study states the pylons need retrofitting anyway.","property":"finding","value_text":"pylons need retrofitting","t_from":"1990","quote":"The pylons need retrofitting anyway and with a little additional reinforcement, the pylons may be able to take the increase in loading.","place_label":"Golden Gate Bridge pylons","place_precision":"area","anchor":"s-e2419fef57ec","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The pylons need retrofitting anyway and with a little additional reinforcement"},{"claim_id":"c:1b7155b7cb8dd2f7f4e1a555edf31c73","page_id":"C123303273:135","page_url":"https://archive.org/details/C123303273/page/n134","statement_kind":"cites_decision","subject_label":"Golden Gate Bridge seismic evaluation","summary":"The seismic evaluation was commissioned by the Board of Directors of the Golden Gate Bridge, Highway & Transportation District.","property":"event","value_text":"commissioned November and December 1989","date_printed":"1989","t_from":"1989","quote":"This seismic evaluation was commissioned by the Board of Directors of the Golden Gate Bridge, Highway & Transportation District in November and December 1989.","decided_by":"Board of Directors of the Golden Gate Bridge, Highway & Transportation District","place_label":"Golden Gate Bridge","place_precision":"area","anchor":"s-1b7155b7cb8d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"9. ACKNOWLEDGEMENTS This seismic evaluation was commissioned"}]}