{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c123303802","url":"https://data.qipu.org/usa/san-francisco/reports/c123303802/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c123303802/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C123303802","source_id":"C123303802","title":"Coastal zone permit review procedures : amendments to Article 3, San Francisco city planning code","year":1985,"n_pages":22,"creator":"San Francisco (Calif.). Department of City Planning","source_url":"https://archive.org/details/C123303802","issuer":"City and County of San Francisco, Department of City Planning","issuer_type":"government","gov_level":"city_county","prepared_by":null,"doc_kind":"ordinance_act","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"meta","doc_kind_by":"model","jurisdiction_by":"meta","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":11,"statements_total":20,"statements_by_kind":{"finding":0,"proposal":4,"cites_decision":0,"background":16},"same_for_every_statement":{"source_id":"C123303802","source_url":"https://archive.org/details/C123303802","source_label":"IGS library: Coastal zone permit review procedures : amendments to Article 3, San Francisco city planning code","report_year":1985,"issuer":"City and County of San Francisco, Department of City Planning","issuer_type":"government","doc_kind":"ordinance_act","t_from":"1985","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"An ordinance by the Department of City Planning that sets out Coastal Zone Permit review procedures, amending Article 3 of the city planning code.","next":"In November 1985 the Board finally passed an ordinance setting procedures for reviewing Coastal Zone Permit Applications.","next_decision":"qipu:sf/decision/journalofjulydecproceed80sanfrich:580/2","figures":[{"label":"Appeal period","value":"10 working days","claim_ids":["c:979766019be58cadcecc91acab5ce737"]}],"main_points":["c:0d13bc71e01266e3813fc18531a8a442","c:c2f8385d60e1abeb6503d3c4e470e415","c:33fcf3c4d1dc16b844c5eb9ecf282265"],"board_decisions_after":["qipu:sf/decision/journalofjulydecproceed80sanfrich:580/2","qipu:sf/decision/journalofjulydecproceed80sanfrich:580/1","qipu:sf/decision/journalofjulydecproceed80sanfrich:549/3","qipu:sf/decision/journalofjulydecproceed80sanfrich:549/2","qipu:sf/decision/journalofjulydecproceed80sanfrich:548/4"],"board_decisions_before":[],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:0d13bc71e01266e3813fc18531a8a442","page_id":"C123303802:4","page_url":"https://archive.org/details/C123303802/page/n3","statement_kind":"proposal","subject_label":"Private projects requiring Coastal Zone Permit","summary":"The amendments would require private projects, except exempt ones, to apply to the Department of City Planning for a Coastal Zone Permit.","property":"proposes","quote":"All private projects, except those specifically exempt, shall be required to apply to the San Francisco Department of City Planning for a Coastal Zone Permit","place_label":"San Francisco Coastal Zone","anchor":"s-0d13bc71e012","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Sec. 330.1 PROJECTS REQUIRING COASTAL ZONE PERMIT REVIEW. All private projects"},{"claim_id":"c:6454276784dd7e6e13bb517cd0f0797b","page_id":"C123303802:4","page_url":"https://archive.org/details/C123303802/page/n3","statement_kind":"background","subject_label":"Purpose of Sections 330 to 330.16","summary":"The document states the purpose of Sections 330 through 330.16 is to implement coastal consistency review.","property":"other","quote":"The purpose of Section 330 through 330.16 is to implement the process of reviewing projects within the Coastal Zone for consistency with the San Francisco Local Coastal Program","place_label":"San Francisco Coastal Zone","anchor":"s-6454276784dd","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"(a) Purpose. The purpose of Section 330 through 330.16"},{"claim_id":"c:f3e0b8e95a22c141a4fb459b2278d313","page_id":"C123303802:4","page_url":"https://archive.org/details/C123303802/page/n3","statement_kind":"background","subject_label":"Local Coastal Program definition","summary":"The document defines the Local Coastal Program as the San Francisco Western Shoreline Plan and related implementing programs.","property":"other","quote":"shall be the San Francisco Western Shoreline Plan, a part of the City's Master Plan, and any of its implementation programs","anchor":"s-f3e0b8e95a22","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"(d) The \"Local Coastal Program\" shall be the San Francisco Western Shoreline Plan"},{"claim_id":"c:33fcf3c4d1dc16b844c5eb9ecf282265","page_id":"C123303802:5","page_url":"https://archive.org/details/C123303802/page/n4","statement_kind":"proposal","subject_label":"Exemption for single-family residence work","summary":"The amendments would exempt enlargement, alteration or reconstruction of existing single-family residences from Coastal Zone Permit review.","property":"proposes","quote":"Enlargement, alteration or reconstruction of any existing Single-family residence.","anchor":"s-33fcf3c4d1dc","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Sec. 330.3 PROJECTS EXEMPT FROM COASTAL ZONE PERMIT REVIEW. No Coastal Zone Permit shall be required"},{"claim_id":"c:70236d213b507b74a135a59b19719ded","page_id":"C123303802:5","page_url":"https://archive.org/details/C123303802/page/n4","statement_kind":"background","subject_label":"Definition of project","summary":"The amendments define a project to include construction, reconstruction, demolition or alteration of any building.","property":"other","quote":"Construction, reconstruction, demolition, or alteration of the size of any building, including any facility of any private, public or municipal utility.","anchor":"s-70236d213b50","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"(e) A \"project\" shall be any of the following:"},{"claim_id":"c:1d36b704b40b35677a58022ccc07f0c3","page_id":"C123303802:6","page_url":"https://archive.org/details/C123303802/page/n5","statement_kind":"proposal","subject_label":"Exemption for conversion to time-share or short-term use","summary":"The amendments would exempt conversion of multiple-unit residential structures to time-share or short-term use from permit review.","property":"proposes","quote":"The conversion of any existing multiple-unit residential structure to a time-share project, resort club, vacation club, estate, or other short-term use.","anchor":"s-1d36b704b40b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Sec. 330.2 definitions list of exclusions and projects in the planning code text"},{"claim_id":"c:c2f8385d60e1abeb6503d3c4e470e415","page_id":"C123303802:6","page_url":"https://archive.org/details/C123303802/page/n5","statement_kind":"proposal","subject_label":"Projects subject to Coastal Zone Permit review","summary":"The amendments would subject construction of residential or commercial buildings in the coastal zone to Coastal Zone Permit review.","property":"proposes","quote":"Construction of any residential or commercial building, structure, or project as defined in Section 330.2(d).","anchor":"s-c2f8385d60e1","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Sec. 330.4 PROJECTS SUBJECT TO COASTAL ZONE PERMIT REVIEW (a) Construction of any residential or commercial building"},{"claim_id":"c:c64b67c6d7ddc2aff9772d6d76f2134e","page_id":"C123303802:7","page_url":"https://archive.org/details/C123303802/page/n6","statement_kind":"background","subject_label":"Coastal Commission permit jurisdiction","summary":"The California Coastal Commission retains coastal permit review jurisdiction over tidelands and submerged lands below the mean high tide.","property":"other","quote":"The California Coastal Commission shall retain coastal permit review jurisdiction over all tidelands, submerged lands below the mean high tide","place_label":"Sectional Maps CZ4, CZ5, and CZ13","anchor":"s-c64b67c6d7dd","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Sec. 330.4.1 PROJECTS REQUIRING A COASTAL ZONE PERMIT"},{"claim_id":"c:84f0bb1b14bcca737c89d3b7d017e12f","page_id":"C123303802:8","page_url":"https://archive.org/details/C123303802/page/n7","statement_kind":"background","subject_label":"Local Coastal Program amendments","summary":"No more than three Local Coastal Program amendment submittals may be made per calendar year.","property":"other","value_text":"three submittals per calendar year","value_num":3.0,"quote":"No more than three submittals may be made per calendar year.","anchor":"s-84f0bb1b14bc","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Any proposed amendments, set-back proceedings, zoning map changes"},{"claim_id":"c:d39752d313d7341025e5e47b396fa92a","page_id":"C123303802:8","page_url":"https://archive.org/details/C123303802/page/n7","statement_kind":"background","subject_label":"Local Coastal Program amendments","summary":"Proposed Local Coastal Program amendments must be submitted to the California Coastal Commission for review.","property":"other","quote":"shall be submitted as a request for an amendment of the Local Coastal Progam for review by the California Coastal Commission.","anchor":"s-d39752d313d7","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"shall be submitted as a request for an amendment of the Local Coastal Progam"},{"claim_id":"c:ee6c5e4ddddabef61d1d39851a5c55f6","page_id":"C123303802:9","page_url":"https://archive.org/details/C123303802/page/n8","statement_kind":"background","subject_label":"Coastal Commission notification","summary":"The Department of City Planning must mail written notice to the California Coastal Commission within ten days of filing a Coastal Zone Permit Application.","property":"other","value_text":"ten (10) calendar days","value_num":10.0,"quote":"A written notice to the California Coastal Commission shall be mailed within ten (10) calendar days of filing of a Coastal Zone Permit Application","anchor":"s-ee6c5e4dddda","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Sec. 330.6 COASTAL COMMISSION NOTIFICATION. The Department of City Planning shall notify"},{"claim_id":"c:15a128a908f214c9f3e72d9b083ab10d","page_id":"C123303802:10","page_url":"https://archive.org/details/C123303802/page/n9","statement_kind":"background","subject_label":"Emergency coastal zone permits","summary":"The Director may grant an emergency permit upon reasonable terms and conditions, including an expiration date.","property":"other","quote":"The Director may grant an emergency permit upon reasonable terms and conditions, including an expiration date","anchor":"s-15a128a908f2","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Department of City Planning","stance":"own_position","speaker_evidence":"(b) The Director shall verify the facts; The Director may grant an emergency permit"},{"claim_id":"c:8a0a5801119152801e7f6457c2fcef38","page_id":"C123303802:10","page_url":"https://archive.org/details/C123303802/page/n9","statement_kind":"background","subject_label":"Emergency coastal zone permits in Commission areas","summary":"The Director shall not issue an Emergency Coastal Zone Permit for work in areas where the Coastal Commission retains direct permit review authority.","property":"other","quote":"The Director shall not issue an Emergency Coastal Zone Permit for any work that falls within an area that the Coastal Commission retains direct permit review authority","place_label":"Sectional Maps CZ4, CZ5, and CZ13","anchor":"s-8a0a58011191","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Department of City Planning","stance":"own_position","speaker_evidence":"(c) The Director shall not issue an Emergency Coastal Zone Permit for any work"},{"claim_id":"c:979766019be58cadcecc91acab5ce737","page_id":"C123303802:11","page_url":"https://archive.org/details/C123303802/page/n10","statement_kind":"background","subject_label":"Deadline for appeals to the California Coastal Commission","summary":"A Coastal Zone Permit may be appealed to the California Coastal Commission within 10 working days after the Commission receives notice of final action.","property":"other","value_text":"10 working days","value_num":10.0,"quote":"within 10 working days after the California Coastal Commission receives notice of final action from the Department of City Planning.","anchor":"s-979766019be5","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Department of City Planning","stance":"own_position","speaker_evidence":"Sec. 330.2 appeal provisions, Department of City Planning code text"},{"claim_id":"c:b906ba7ebe6c1043b60844e1c4c6ae69","page_id":"C123303802:11","page_url":"https://archive.org/details/C123303802/page/n10","statement_kind":"background","subject_label":"Appeals of Coastal Zone Permits to the California Coastal Commission","summary":"Appeal to the California Coastal Commission is available only for approved projects in the appealable area of the Coastal Zone.","property":"other","value_text":"approved projects in the appealable area","quote":"Appeal to the California Coastal Commission is available only for approved projects in the appealable area of the Coastal Zone","place_label":"Coastal Zone","anchor":"s-b906ba7ebe6c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Department of City Planning","stance":"own_position","speaker_evidence":"(b) Appeal to the California Coastal Commission is available only for approved projects"},{"claim_id":"c:da176768db798d8b9aab60055e5f2829","page_id":"C123303802:11","page_url":"https://archive.org/details/C123303802/page/n10","statement_kind":"background","subject_label":"Major public works and energy facilities","summary":"Major public works and energy facilities within the Coastal Zone may be appealed to the California Coastal Commission whether approved or not by the local government.","property":"other","value_text":"whether approved or not","quote":"Major public works and energy facilities within the Coastal Zone may be appealed to the California Coastal Commission whether approved or not by the local government.","place_label":"Coastal Zone","anchor":"s-da176768db79","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Department of City Planning","stance":"own_position","speaker_evidence":"Major public works and energy facilities within the Coastal Zone may be appealed"},{"claim_id":"c:6e2283564bb67cc5c48eb635f780a907","page_id":"C123303802:12","page_url":"https://archive.org/details/C123303802/page/n11","statement_kind":"background","subject_label":"Permit approval by operation of law","summary":"If the City Planning Department fails to act on a Coastal Zone Permit Application within one year of the application being accepted as complete, the applicant may claim approval by operation of law.","property":"other","value_text":"one year","value_num":1.0,"quote":"If the City Planning Department has failed to act on a Coastal Zone Permit Application within a one year period from the date of which the application has been accepted as complete.","anchor":"s-6e2283564bb6","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Sec. 330.12 PERMIT APPROVAL BY OPERATION OF LAW. (a) If the City Planning Department has failed"},{"claim_id":"c:da441c052c3045cbe009f863eda20c2f","page_id":"C123303802:13","page_url":"https://archive.org/details/C123303802/page/n12","statement_kind":"background","subject_label":"Fees for Coastal Zone Permit appeals","summary":"No fees shall be established for appealing any Coastal Zone Permit.","property":"other","value_text":"no fees for appeals","quote":"No fees shall be established for appealing any Coastal Zone Permit.","anchor":"s-da441c052c30","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Department of City Planning","stance":"own_position","speaker_evidence":"Sec. 330.15 COASTAL ZONE PERMIT FEES. No fees shall be established for appealing any Coastal Zone Permit."},{"claim_id":"c:fd3d74357af269fcb11dc917876cc250","page_id":"C123303802:13","page_url":"https://archive.org/details/C123303802/page/n12","statement_kind":"background","subject_label":"Expiration of Coastal Zone Permits","summary":"A Coastal Zone Permit expires one year from the date of issuance unless otherwise modified by approval conditions.","property":"other","value_text":"one year from the date of issuance","value_num":1.0,"quote":"A Coastal Zone Permit shall expire one year from the date of issuance unless otherwise explicitly modified by approval conditions for the project.","anchor":"s-fd3d74357af2","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Department of City Planning","stance":"own_position","speaker_evidence":"Sec. 330.14 EXPIRATION DATE AND EXTENSIONS. A Coastal Zone Permit shall expire one year"},{"claim_id":"c:dafeeaaff9b9ff1b50ac073df3f5be04","page_id":"C123303802:19","page_url":"https://archive.org/details/C123303802/page/n18","statement_kind":"background","subject_label":"Olympic Country Club Area","summary":"The map shows a segmentation of the Olympic Country Club Area by the California Coastal Commission.","property":"other","quote":"Segmentation of Olympic Country Club Area by the Califomia Coastal Commission","place_label":"Olympic Country Club Area","anchor":"s-dafeeaaff9b9","shown":false,"hidden":"cover_or_contents","part":"cover_or_contents","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"ZUNING MAP UF THE CllY AND COUNTY OF SAN. FRANCISCO"}]}