{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c123307400","url":"https://data.qipu.org/usa/san-francisco/reports/c123307400/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c123307400/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C123307400","source_id":"C123307400","title":"Clean water reporter. June 1980","year":1980,"n_pages":4,"creator":null,"source_url":"https://archive.org/details/C123307400","issuer":"City and County of San Francisco, Clean Water Program","issuer_type":"government","gov_level":"city_county","prepared_by":null,"doc_kind":"news_newsletter","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"model","doc_kind_by":"model","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":2,"statements_total":18,"statements_by_kind":{"finding":6,"proposal":7,"cites_decision":3,"background":2},"same_for_every_statement":{"source_id":"C123307400","source_url":"https://archive.org/details/C123307400","source_label":"IGS library: Clean water reporter. June 1980","report_year":1980,"issuer":"City and County of San Francisco, Clean Water Program","issuer_type":"government","doc_kind":"news_newsletter","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A newsletter report on the Clean Water Program's progress, sewage overflows, beach closures, and the proposed construction schedule for sewage treatment.","next":"In March 1985 the Board approved a schedule for building sewage treatment works to comply with the Clean Water Act.","next_decision":"qipu:sf/decision/journaljanjuneofproceed80sanfrich:317/2","figures":[{"label":"Cost","value":"more than $2.3 billion","claim_ids":["c:ccbbb440237829dd2788ed47db8c2dd3"]},{"label":"Beach closures","value":"an average of 120 days a year","claim_ids":["c:205ba97cb79da7f30a09582becd093ae"]},{"label":"Sewage overflows","value":"an average of 80 times each year","claim_ids":["c:50b12100f6e6016cd8f1ab78872b5e00"]}],"main_points":["c:129029f2d4633b22d364a407fed04cf3","c:cdbf2c11ba4ed39d05ed8d9705d65430","c:ccbbb440237829dd2788ed47db8c2dd3"],"board_decisions_after":["qipu:sf/decision/journaljanjuneofproceed80sanfrich:317/2","qipu:sf/decision/journaljanjuneofproceed80sanfrich:243/7","qipu:sf/decision/journaljanjuneofproceed80sanfrich:517/2","qipu:sf/decision/journaljanjuneofproceed80sanfrich:665/2","qipu:sf/decision/journaljanjuneofproceed80sanfrich:769/4","qipu:sf/decision/journaljanjuneofproceed80sanfrich:770/1","qipu:sf/decision/journaljanjuneofproceed80sanfrich:381/2","qipu:sf/decision/journaljanjuneofproceed80sanfrich:632/4"],"board_decisions_before":["qipu:sf/decision/journaljanjuneofproceed76sanfrich:647/1"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:129029f2d4633b22d364a407fed04cf3","page_id":"C123307400:1","page_url":"https://archive.org/details/C123307400/page/n0","statement_kind":"proposal","subject_label":"Construction by 1985 of most plan components","summary":"The next effort would bring construction of most plan components by 1985, with expenditures reaching $1.6 billion (≈ $5.0 billion in 2026 dollars).","property":"cost_usd","value_text":"$1.6 billion","value_num":1600000000.0,"unit":"USD","date_printed":"1985","t_from":"1985","quote":"The next effort would see construction _ by 1985 of most plan components (see ~ map, page 2), bringing expenditures to | SL.6billion.","anchor":"s-129029f2d463","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The next effort would see construction by 1985"},{"claim_id":"c:205ba97cb79da7f30a09582becd093ae","page_id":"C123307400:1","page_url":"https://archive.org/details/C123307400/page/n0","statement_kind":"finding","subject_label":"Beach closures","summary":"Beaches are closed an average of 120 days a year because of sewage discharges.","property":"other","value_text":"an average of 120 days a year","value_num":120.0,"unit":"days","t_from":"1980","quote":"Beaches are closed an,average of 120 days a year because of this.","anchor":"s-205ba97cb79d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Chief Administrative Officer","stance":"own_position","speaker_evidence":"San Francisco's Wastewater Program by Roger Boas, Chief Administrative Officer"},{"claim_id":"c:50b12100f6e6016cd8f1ab78872b5e00","page_id":"C123307400:1","page_url":"https://archive.org/details/C123307400/page/n0","statement_kind":"finding","subject_label":"Sewage overflows","summary":"The City dumps untreated sewage into the bay about 80 times each year during storm runoffs.","property":"other","value_text":"an average of 80 times each year","value_num":80.0,"t_from":"1980","quote":"It happens an-average of 80 times each year when storm runoffs inundate our sewer treat- ment plants.","anchor":"s-50b12100f6e6","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Chief Administrative Officer","stance":"own_position","speaker_evidence":"San Francisco's Wastewater Program by Roger Boas, Chief Administrative Officer"},{"claim_id":"c:5176e37f19c065ee9c721a15bc608e82","page_id":"C123307400:1","page_url":"https://archive.org/details/C123307400/page/n0","statement_kind":"cites_decision","subject_label":"Program master plan approval","summary":"The Environmental agencies approved the Program Master Plan in 1974 after public hearings.","property":"approved","value_text":"approved in 1974","date_printed":"1974","t_from":"1974","quote":"This had been. approved i in 1974, after [name withheld] extensive public hearings by the City and by State and Federal environmental reg- ulatory agencies.","decided_by":"San Francisco voters","instrument_kind":"proposition","instrument_printed":"T","anchor":"s-5176e37f19c0","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"This had been approved in 1974, after extensive public hearings"},{"claim_id":"c:5622be58426d40ce14d83b51cb6a3c08","page_id":"C123307400:1","page_url":"https://archive.org/details/C123307400/page/n0","statement_kind":"background","subject_label":"Federal and State standards","summary":"The Federal Water Control Act of 1972 and regional boards led State and Federal agencies to set sewage treatment standards.","property":"other","value_text":"Federal Water Control Act in 1972","date_printed":"1972","t_from":"1972","quote":"With passage of the Federal Water Control Act in 1972, and with the crea- tion of State and regional Water Quality Control Boards","anchor":"s-5622be58426d","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Chief Administrative Officer","stance":"own_position","speaker_evidence":"San Francisco's Wastewater Program by Roger Boas, Chief Administrative Officer"},{"claim_id":"c:bf469dd300b89f1cd266495c457ba31d","page_id":"C123307400:1","page_url":"https://archive.org/details/C123307400/page/n0","statement_kind":"finding","subject_label":"Federal and State funding share","summary":"State and Federal governments are paying more than 80 percent of the program costs.","property":"other","value_text":"more than 80 percent","value_num":80.0,"unit":"percent","t_from":"1980","quote":"Concerns about the availability of money from the State and Federal gov- ernments, which are paying more than 80 percent of the costs","anchor":"s-bf469dd300b8","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Concerns about the availability of money from the State and Federal governments"},{"claim_id":"c:c31bbd9afb462b173ecc0fee34cb922d","page_id":"C123307400:1","page_url":"https://archive.org/details/C123307400/page/n0","statement_kind":"cites_decision","subject_label":"Proposition T","summary":"Voters rejected Proposition T, which would have halted sale of previously authorized bonds.","property":"rejected","value_text":"rejected Proposition T","t_from":"1980","quote":"by rejecting Proposition T. Passage would have stopped everythingin. mid-stream by halting sale of the previ- ously authorized bonds","decided_by":"San Francisco voters","instrument_kind":"proposition","instrument_printed":"T","anchor":"s-c31bbd9afb46","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"voters gave a strong vote of confidence by rejecting Proposition T"},{"claim_id":"c:ccbbb440237829dd2788ed47db8c2dd3","page_id":"C123307400:1","page_url":"https://archive.org/details/C123307400/page/n0","statement_kind":"finding","subject_label":"Clean Water Program cost","summary":"Inflation pushed the expected cost of the program to more than $2.3 billion (≈ $9.4 billion in 2026 dollars).","property":"cost_usd","value_text":"more than $2.3 billion","value_num":2300000000.0,"unit":"USD","t_from":"1980","quote":"Inflation pushed the expected cost of the program to end the City's pollution of the bay and ocean by 1986 to more than $2.3 billion.","anchor":"s-ccbbb4402378","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Inflation pushed the expected cost of the program"},{"claim_id":"c:cdbf2c11ba4ed39d05ed8d9705d65430","page_id":"C123307400:1","page_url":"https://archive.org/details/C123307400/page/n0","statement_kind":"proposal","subject_label":"Staged construction schedule","summary":"The proposed three-stage schedule would prevent construction of white elephant facilities.","property":"proposes","value_text":"three-stage schedule","t_from":"1980","quote":"The solution appears to be a three- stage schedule that will prevent construc- tion of any white elephants—facilities that wouldn't be useful","anchor":"s-cdbf2c11ba4e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Chief Administrative Officer","stance":"own_position","speaker_evidence":"The solution appears to be a three-stage schedule, Boas said"},{"claim_id":"c:e9d6b6fc81b91a0bbf24a04e2e581040","page_id":"C123307400:1","page_url":"https://archive.org/details/C123307400/page/n0","statement_kind":"cites_decision","subject_label":"1976 bond issuance","summary":"Voters approved the issuance of $240 million (≈ $1.4 billion in 2026 dollars) in bonds for sewage treatment construction in 1976.","property":"approved","value_text":"$240 million in bonds","value_num":240000000.0,"unit":"USD","date_printed":"1976","t_from":"1976","quote":"In 1976, voters gave a strong mandate to the clean water program by approving : the issuance of $240 million in bonds","decided_by":"San Francisco voters","instrument_kind":"proposition","instrument_printed":"T","anchor":"s-e9d6b6fc81b9","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In 1976, voters gave a strong mandate to the clean water program"},{"claim_id":"c:eb11c32e4071f656173236705de1d3db","page_id":"C123307400:1","page_url":"https://archive.org/details/C123307400/page/n0","statement_kind":"finding","subject_label":"Chief Administrative Officer order","summary":"Chief Administrative Officer Roger Boas ordered a staff re-evaluation of the program.","property":"other","value_text":"staff re-evaluation","t_from":"1980","quote":"led Chief Administrative Officer F Roger Boas to order a. staff re- evaluation of tht stey rMas","anchor":"s-eb11c32e4071","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"led Chief Administrative Officer Roger Boas to order a staff re-evaluation"},{"claim_id":"c:f93fe231063389127eedc9694ce615bc","page_id":"C123307400:1","page_url":"https://archive.org/details/C123307400/page/n0","statement_kind":"background","subject_label":"Fines for violations","summary":"The City may be fined from $10,000 (≈ $40,891 in 2026 dollars) to $55,000 (≈ $224,899 in 2026 dollars) for each day it violates the standards.","property":"other","value_text":"$10,000 to $55,000 per day","value_num":10000.0,"unit":"USD","t_from":"1980","quote":"For each day San Francisco violates the standards, the City may be fined from $10,000 to $55,000.","anchor":"s-f93fe2310633","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Chief Administrative Officer","stance":"own_position","speaker_evidence":"For each day San Francisco violates the standards, the City may be fined"},{"claim_id":"c:1fc680d8982eb5bc200803844cf0a612","page_id":"C123307400:2","page_url":"https://archive.org/details/C123307400/page/n1","statement_kind":"proposal","subject_label":"Sunnydale-Yosemite Transport","summary":"The Sunnydale-Yosemite Transport would reduce overflows to an average of one per year, with construction beginning in late 1982.","property":"proposes","value_text":"one overflow per year average","value_num":1.0,"unit":"other","date_printed":"late 1982","t_from":"1982","quote":"Reducing sewage overflows into the Sunnydale and Yosemite basins to an average of one per year is the goal here. Construction will begin in late 1982.","place_label":"Sunnydale and Yosemite basins","anchor":"s-1fc680d8982e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Reducing sewage overflows into the Sunnydale and Yosemite basins"},{"claim_id":"c:505ba150a5c32465529d29695ec1aa36","page_id":"C123307400:2","page_url":"https://archive.org/details/C123307400/page/n1","statement_kind":"proposal","subject_label":"Southeast Treatment Plant","summary":"Upon completion of its expansion in 1982, the Southeast Treatment Plant would treat about 80% of the City's sewage.","property":"proposes","value_text":"about 80%","value_num":80.0,"unit":"percent","date_printed":"1982","t_from":"1982","quote":"Upon completion of its expansion in 1982, this ptant will treat about 80% of the City's sewage.","place_label":"Southeast Treatment Plant","anchor":"s-505ba150a5c3","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Upon completion of its expansion in 1982, this ptant will treat"},{"claim_id":"c:516478b9c3972fbf35ae283706e8f531","page_id":"C123307400:2","page_url":"https://archive.org/details/C123307400/page/n1","statement_kind":"proposal","subject_label":"Program cost beyond system","summary":"Achieving full treatment of all sewage would require about $700 million (≈ $2.9 billion in 2026 dollars) more than the $1.6 billion (≈ $6.5 billion in 2026 dollars) system.","property":"cost_usd","value_text":"approximately $700 million more","value_num":700000000.0,"unit":"USD","t_from":"1980","quote":"it will be necessary to spend approximately $700 million more than is required to provide the $1.6 billion system depicted above.","anchor":"s-516478b9c397","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"it will be necessary to spend approximately $700 million more"},{"claim_id":"c:d59ed8d8340a0da9e06f287f5f79940d","page_id":"C123307400:2","page_url":"https://archive.org/details/C123307400/page/n1","statement_kind":"proposal","subject_label":"Westside Transport length","summary":"The main Westside Transport would extend from Fulton Street to south of Sloat Boulevard, about two and a half miles.","property":"proposes","value_text":"approximately two-and-a-half miles","value_num":2.5,"unit":"other","t_from":"1980","quote":"The main Transport will extend from Fulton Street to south of Sloat Boulevard, approximately two-and-a-half miles.","place_label":"Fulton Street to south of Sloat Boulevard","place_precision":"intersection","place_id":"qipu:sf/place/street/fulton-st","resolved_by":"place links file","anchor":"s-d59ed8d8340a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The main Transport will extend from Fulton Street to south of Sloat Boulevard"},{"claim_id":"c:d7b9fa2c2fde90922236ce673bc43c11","page_id":"C123307400:2","page_url":"https://archive.org/details/C123307400/page/n1","statement_kind":"finding","subject_label":"Westside sewage overflows","summary":"Diluted raw sewage runs into the ocean on the western side of the City an average of 114 times a year.","property":"other","value_text":"an average of 114 times a year","value_num":114.0,"t_from":"1980","quote":"diluted raw sewage now runs freely into the ocean an average of 114 times a year.","place_label":"Richmond-Sunset area","anchor":"s-d7b9fa2c2fde","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"diluted raw sewage now runs freely into the ocean an average of 114 times a year"},{"claim_id":"c:ea0c23443114a15edec3120bc44cbaa3","page_id":"C123307400:2","page_url":"https://archive.org/details/C123307400/page/n1","statement_kind":"proposal","subject_label":"Westside Transport","summary":"The Westside Transport would capture rainwater and sewage flows for processing at the Southwest Treatment Plant.","property":"proposes","value_text":"Westside Transport","t_from":"1980","quote":"The Westside Transport will capture rainwater and sewage flows and store them briefly for processing at the South- west Treatment Plant.","place_label":"Westside of the City","anchor":"s-ea0c23443114","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Westside Transport will capture rainwater and sewage flows"}]}