{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c123314367","url":"https://data.qipu.org/usa/san-francisco/reports/c123314367/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c123314367/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C123314367","source_id":"C123314367","title":"FACE : what it is and how it work","year":1971,"n_pages":6,"creator":"San Francisco (Calif.). Department of Public Works","source_url":"https://archive.org/details/C123314367","issuer":"City and County of San Francisco, Department of Public Works","issuer_type":"government","gov_level":"city_county","prepared_by":null,"doc_kind":"other","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"meta","doc_kind_by":"model","jurisdiction_by":"meta","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":4,"statements_total":11,"statements_by_kind":{"finding":8,"proposal":0,"cites_decision":0,"background":3},"same_for_every_statement":{"source_id":"C123314367","source_url":"https://archive.org/details/C123314367","source_label":"IGS library: FACE : what it is and how it work","report_year":1971,"issuer":"City and County of San Francisco, Department of Public Works","issuer_type":"government","doc_kind":"other","t_from":"1971","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A Department of Public Works explainer on the FACE programme, which requires owners in designated areas to correct Housing Code violations, with federal low-interest loans and grants to help.","figures":[{"label":"Loan limit","value":"$17,400 per dwelling unit","claim_ids":["c:70a0247804cbcb0ba65e0480b2e7035d"]},{"label":"Grant","value":"up to $3,500","claim_ids":["c:795d47de8204bbfc795fefd06493d1e4"]},{"label":"Compliance cost","value":"$1,470 per building","claim_ids":["c:89f2df27c197ff29e3818806b3744ba0"]},{"label":"Tenant dislocation","value":"22 cases","claim_ids":["c:5875b55f5202875aaa169f10a877e26c"]}],"main_points":["c:680ef45f18d2e6775a4a6a970a155553","c:ef35adabaae2e853ef82be3d73d05d41","c:5875b55f5202875aaa169f10a877e26c"],"board_decisions_after":[],"board_decisions_before":[],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:680ef45f18d2e6775a4a6a970a155553","page_id":"C123314367:1","page_url":"https://archive.org/details/C123314367/page/n0","statement_kind":"background","subject_label":"FACE program","summary":"Under the FACE program, all buildings within a designated area are inspected and owners are required to correct Housing Code violations.","property":"other","quote":"Under the FACE | program, all buildings within a desig- nated area are inspected and the owners are required to correct violations of the City’s Housing Code.","anchor":"s-680ef45f18d2","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Under the FACE program, all buildings within a designated area are inspected"},{"claim_id":"c:624984cf8d2ea1002e040c0c472beff6","page_id":"C123314367:2","page_url":"https://archive.org/details/C123314367/page/n1","statement_kind":"finding","subject_label":"FACE loans","summary":"Low interest (3%) loans direct from the Federal government are available to property owners in FACE areas.","property":"other","value_text":"3%","value_num":3.0,"unit":"percent","quote":"Low interest (3%) loans direct from the Federal government are avail- able to property owners in FACE areas.","anchor":"s-624984cf8d2e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Low interest (3%) loans direct from the Federal government"},{"claim_id":"c:70a0247804cbcb0ba65e0480b2e7035d","page_id":"C123314367:2","page_url":"https://archive.org/details/C123314367/page/n1","statement_kind":"finding","subject_label":"FACE loan limits","summary":"No loan can exceed $17,400 (≈ $144,759 in 2026 dollars) per dwelling unit.","property":"other","value_text":"$17,400 per dwelling unit","value_num":17400.0,"unit":"USD","quote":"No loan can exceed $17,400 per dwelling unit and the property’s present indebtedness can also limit the size of the loan.","anchor":"s-70a0247804cb","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"No loan can exceed $17,400 per dwelling unit"},{"claim_id":"c:795d47de8204bbfc795fefd06493d1e4","page_id":"C123314367:2","page_url":"https://archive.org/details/C123314367/page/n1","statement_kind":"finding","subject_label":"FACE rehabilitation grants","summary":"Rehabilitation grants up to $3,500 (≈ $29,118 in 2026 dollars) are available for owner occupants with economic hardship.","property":"other","value_text":"up to $3,500","value_num":3500.0,"unit":"USD","quote":"Rehabilitation grants up to $3,500 are available for owner occupants with economic hardship.","anchor":"s-795d47de8204","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Rehabilitation grants up to $3,500 are available"},{"claim_id":"c:89f2df27c197ff29e3818806b3744ba0","page_id":"C123314367:2","page_url":"https://archive.org/details/C123314367/page/n1","statement_kind":"finding","subject_label":"FACE code compliance cost","summary":"In the first four FACE projects the average cost of code compliance was $1,470 (≈ $12,230 in 2026 dollars) per building.","property":"cost_usd","value_text":"$1,470 per building","value_num":1470.0,"unit":"USD","quote":"the average cost of code compliance was $1,470 per building, not including the buildings which had no code violations","anchor":"s-89f2df27c197","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In the first four FACE projects the average cost of code compliance"},{"claim_id":"c:ef35adabaae2e853ef82be3d73d05d41","page_id":"C123314367:2","page_url":"https://archive.org/details/C123314367/page/n1","statement_kind":"finding","subject_label":"FACE code compliance repairs","summary":"In the first four FACE neighborhoods, the most common repair need was handrails on exterior stairs, occurring on 62% of buildings with violations.","property":"finding","value_text":"62%","value_num":62.0,"unit":"percent","quote":"the most common need is for handrails on exte- rior stairs. This occurred on 62% of the buildings having violations.","anchor":"s-ef35adabaae2","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Experience in the City's first four FACE neighborhoods is that the most common need"},{"claim_id":"c:ef43ec48c371ba076e3bc842948e8a77","page_id":"C123314367:3","page_url":"https://archive.org/details/C123314367/page/n2","statement_kind":"finding","subject_label":"FACE compliance cost comparison","summary":"In the first FACE program, privately financed compliance averaged $687 (≈ $5,716 in 2026 dollars) per building, whereas FACE financed jobs averaged $3,900 (≈ $32,446 in 2026 dollars).","property":"cost_usd","value_text":"$687 per building","value_num":687.0,"unit":"USD","quote":"privately financed compliance av- eraged $687 per building, whereas FACE financed jobs averaged $3,900.","anchor":"s-ef43ec48c371","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In the first FACE pro- gram privately financed compliance av- eraged $687"},{"claim_id":"c:418ae739ebfec89e9ebb2b1510d8a0c0","page_id":"C123314367:4","page_url":"https://archive.org/details/C123314367/page/n3","statement_kind":"background","subject_label":"Board of Supervisors role","summary":"If city officials and the neighborhood conflict on improvements, the Board of Supervisors must determine official policy.","property":"other","quote":"the Board of Supervisors must determine official policy.","anchor":"s-418ae739ebfe","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Board of Supervisors must determine official policy"},{"claim_id":"c:5875b55f5202875aaa169f10a877e26c","page_id":"C123314367:4","page_url":"https://archive.org/details/C123314367/page/n3","statement_kind":"finding","subject_label":"FACE tenant relocation","summary":"Only 22 cases of tenant dislocation occurred in the first four FACE areas out of 4,047 rental units.","property":"households_displaced","value_text":"22 cases","value_num":22.0,"unit":"households","quote":"only 22 cases in the first four FACE areas out of 4,047 rental units","anchor":"s-5875b55f5202","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"only 22 cases in the first four FACE areas out of 4,047 rental units"},{"claim_id":"c:8281e5070ae0e8361d27112ad90fb1c6","page_id":"C123314367:4","page_url":"https://archive.org/details/C123314367/page/n3","statement_kind":"finding","subject_label":"FACE street improvements","summary":"The City pays a third of the project cost for street improvement and beautification under federal rules.","property":"other","value_text":"a third","quote":"Under the federal rules for code enforcement programs, the City pays a third of the project cost","anchor":"s-8281e5070ae0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Under the federal rules for code enforcement programs, the City pays a third"},{"claim_id":"c:f3c102e8aa4cafc62776c64e0d807a98","page_id":"C123314367:4","page_url":"https://archive.org/details/C123314367/page/n3","statement_kind":"background","subject_label":"FACE area selection","summary":"The application for a federal grant is forwarded to the Board of Supervisors, which holds a public hearing before authorizing submission.","property":"other","quote":"The application is forwarded to the Board of Supervisors who hold a public hearing before authorizing submitting it to the Federal Government.","anchor":"s-f3c102e8aa4c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The application is forwarded to the Board of Supervisors who hold a public hearing"}]}