{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124879378","url":"https://data.qipu.org/usa/san-francisco/reports/c124879378/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124879378/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124879378","source_id":"C124879378","title":"Market Street planning project, interim report","year":1984,"n_pages":27,"creator":null,"source_url":"https://archive.org/details/C124879378","issuer":"Public Utilities Commission, City and County of San Francisco","issuer_type":"government","gov_level":"city_county","prepared_by":null,"doc_kind":"plan","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"meta","doc_kind_by":"model","jurisdiction_by":"meta","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":15,"statements_total":47,"statements_by_kind":{"finding":17,"proposal":19,"cites_decision":7,"background":4},"same_for_every_statement":{"source_id":"C124879378","source_url":"https://archive.org/details/C124879378","source_label":"IGS library: Market Street planning project, interim report","report_year":1984,"issuer":"Public Utilities Commission, City and County of San Francisco","issuer_type":"government","doc_kind":"plan","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"An interim report by the Public Utilities Commission on the Market Street planning project, recommending street design, boarding islands and an E/F streetcar line.","figures":[{"label":"Planning period","value":"18-month Market Street Planning Project","page_url":"https://archive.org/details/C124879378/page/n1","quote":"SFPUC staff have undertaken the 18-month Market Street Plannin Project 1n Order to move a Market Street Capital project to engineering and construction."},{"label":"Streetcar fleet","value":"13 vehicles","claim_ids":["c:d1678f9cab20eb5bac92ec672cdf9b8c"]},{"label":"Daily riders","value":"over 23,000 daily riders","claim_ids":["c:e0b7e8246feab02ac82be0e31625fde6"]},{"label":"Lane width","value":"minimum 12 feet","claim_ids":["c:8f2ed56f4e772bed16ee35a5ae56c67b"]}],"main_points":["c:52c295e91e93ca28d45a85f16d6586e9","c:8f2ed56f4e772bed16ee35a5ae56c67b","c:ccbdbacbdbdd9299bd55d1e7cc9aea91"],"board_decisions_after":[],"board_decisions_before":["qipu:sf/decision/journalofproceed63sanfrich|49","qipu:sf/decision/journaljulydecofproceed76sanfrich:329/1","qipu:sf/decision/journalofproceedjanjune78sanfrich|79"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:8141cc5b371a7062fe3bce7137a8347b","page_id":"C124879378:2","page_url":"https://archive.org/details/C124879378/page/n1","statement_kind":"background","subject_label":"Market Street Planning Project purpose","summary":"[name withheld] undertook the 18-month Market Street Planning Project to move a capital project to engineering and construction.","property":"other","value_text":"18-month","value_num":18.0,"t_from":"1984","quote":"[name withheld] have undertaken the 18-month Market Street Plannin Project 1n Order to move a Market Street Capital project to engineering and construction.","place_label":"Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-8141cc5b371a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"SFPUC Planning & Development (transmittal memorandum by the issuer)","stance":"own_position","speaker_evidence":"MEMORANDUM ... SFPUC staff have undertaken the 18-month Market Street Planning Project"},{"claim_id":"c:52c295e91e93ca28d45a85f16d6586e9","page_id":"C124879378:3","page_url":"https://archive.org/details/C124879378/page/n2","statement_kind":"proposal","subject_label":"Final Market Street plan","summary":"The project team hopes the Board will concur in a final plan to move a capital project to engineering in 1985-86.","property":"proposes","value_text":"final plan","date_printed":"1985-86","t_from":"1985","quote":"It is hoped that all public steps will be completed and Board concurrence obtained on a final plan in order to move a Market Street capital project to engineering during 1985-86","place_label":"Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-52c295e91e93","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"It is hoped that all public steps will be completed"},{"claim_id":"c:e0875bbc43e42e22d61b90f0702d9a9f","page_id":"C124879378:3","page_url":"https://archive.org/details/C124879378/page/n2","statement_kind":"cites_decision","subject_label":"Market Street Beautification policy","summary":"The Board of Supervisors adopted Resolution 160-83, amending City policy on the Market Street Beautification Project.","property":"adopted","value_text":"Resolution 160-83","date_printed":"February 1983","t_from":"1983","quote":"In February 1983, the San Francisco Board of Supervisors unanimously adopted Resolution 160-83, amending City policy with respect to the Market Street Beautification Project","decided_by":"San Francisco Board of Supervisors","instrument_kind":"resolution","instrument_printed":"160-83","instrument_date_printed":"February 1983","place_label":"Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-e0875bbc43e4","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"In February 1983, the San Francisco Board of Supervisors unanimously adopted Resolution 160-83","links":[{"show_target_kind":"decision","show_target_id":"qipu:sf/decision/journalofproceedjanjune78sanfrich|79","show_url":"https://data.qipu.org/usa/san-francisco/record/?id=qipu%3Asf%2Fdecision%2Fjournalofproceedjanjune78sanfrich%7C79"}]},{"claim_id":"c:2de1056cd7d27d341d2d177618298668","page_id":"C124879378:4","page_url":"https://archive.org/details/C124879378/page/n3","statement_kind":"background","subject_label":"Lower Market design basis","summary":"Street and sidewalk elements on Lower Market derive from the 1968 Market Street Beautification Project design.","property":"other","value_text":"1968","value_num":1968.0,"date_printed":"1968","t_from":"1968","quote":"The design basis for all street, sidewalk and other elements presently in place on Market Street and in adjacent plaza areas between Steuart and McCoppin Streets derives from the 1968 Market Street Beautification Project.","place_label":"Steuart and McCoppin Streets","place_precision":"intersection","place_id":"qipu:sf/place/street/steuart-st","resolved_by":"place links file","anchor":"s-2de1056cd7d2","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The design basis for all street, sidewalk"},{"claim_id":"c:2f244042bbe32fa16a64ebc61c450ab5","page_id":"C124879378:4","page_url":"https://archive.org/details/C124879378/page/n3","statement_kind":"finding","subject_label":"Lower Market construction","summary":"Construction began in 1984 on the Market Street Guideway Project, Rehabilitation of Trolley Overhead.","property":"other","value_text":"1984","value_num":1984.0,"date_printed":"1984","t_from":"1984","quote":"This hiatus ended in 1984 with the commencing of construction on the Market Street Guideway Project","place_label":"Lower Market","place_precision":"area","anchor":"s-2f244042bbe3","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"This hiatus ended in 1984 with the commencing"},{"claim_id":"c:4a184bb395511b2e5194e5ec003349f2","page_id":"C124879378:4","page_url":"https://archive.org/details/C124879378/page/n3","statement_kind":"cites_decision","subject_label":"1968 Plan revision for transit","summary":"The Board revised the 1968 Plan to permit continued electric transit operation on Market Street.","property":"adopted","value_text":"Res. 213-78","date_printed":"1978","t_from":"1978","quote":"the 1968 Plan was revised to permit continued operation of electrically-powered transit vehicles on Market Street","place_label":"Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-4a184bb39551","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the 1968 Plan was revised to permit continued operation"},{"claim_id":"c:a3cf5b1b0ae83efb4343a60312d8826e","page_id":"C124879378:4","page_url":"https://archive.org/details/C124879378/page/n3","statement_kind":"finding","subject_label":"Overhead Project","summary":"The $15 million (≈ $48.6 million in 2026 dollars) Overhead Project will remove over 100 poles from lower Market sidewalks.","property":"cost_usd","value_text":"$15 million","value_num":15000000.0,"unit":"USD","date_printed":"1984","t_from":"1984","quote":"Scheduled to span an 18-month period, the $15 million","place_label":"Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-a3cf5b1b0ae8","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Scheduled to span an 18-month period, the $15 million"},{"claim_id":"c:ae3ce2ddee63ed073fcc4799f73b01b8","page_id":"C124879378:4","page_url":"https://archive.org/details/C124879378/page/n3","statement_kind":"cites_decision","subject_label":"Market Street Beautification bond issue","summary":"Voters approved a $24.5 million (≈ $237.2 million in 2026 dollars) bond issue for the Market Street Beautification Project.","property":"approved","value_text":"$24.5 million","value_num":24500000.0,"unit":"USD","date_printed":"1968","t_from":"1968","quote":"forwarded a Market Street Beautification Project bond issue referendum to the voters totalling $24.5 million, which was approved","place_label":"Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-ae3ce2ddee63","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"forwarded a Market Street Beautification Project bond issue"},{"claim_id":"c:cb0308c53e15ea4bc49df2730a42ef54","page_id":"C124879378:4","page_url":"https://archive.org/details/C124879378/page/n3","statement_kind":"cites_decision","subject_label":"1968 Market Street design plan","summary":"The Board adopted a specific design plan for Market Street envisioning elimination of streetcar service.","property":"adopted","value_text":"Res. 116-68","date_printed":"1968","t_from":"1968","quote":"1968 (Res. 116-68) Adopted a specific design plan for Market Street and adjacent areas which envisioned the elimination of streetcar and trolley bus service","decided_by":"Board of Supervisors","instrument_kind":"resolution","instrument_printed":"116-68","instrument_date_printed":"1968","place_label":"Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-cb0308c53e15","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"1968 (Res. 116-68) Adopted a specific design plan","links":[{"show_target_kind":"decision","show_target_id":"qipu:sf/decision/journalofproceed63sanfrich|49","show_url":"https://data.qipu.org/usa/san-francisco/record/?id=qipu%3Asf%2Fdecision%2Fjournalofproceed63sanfrich%7C49"}]},{"claim_id":"c:8543136b0dde0b247d1e8f6dd6fc240e","page_id":"C124879378:5","page_url":"https://archive.org/details/C124879378/page/n4","statement_kind":"finding","subject_label":"Downtown segment lanes","summary":"The downtown segment has four travel lanes, two in each direction, and no curb parking.","property":"other","value_text":"four travel lanes","value_num":4.0,"t_from":"1984","quote":"Four travel lanes (two in each direction) are accom- modated, with no curb parking.","place_label":"Steuart Street to Eighth Street","place_precision":"intersection","place_id":"qipu:sf/place/street/steuart-st","resolved_by":"place links file","anchor":"s-8543136b0dde","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Segment 1: Downtown. The Street cross-section along this segment maximizes the pedestrian environment"},{"claim_id":"c:8ab4b6415ee309b5080cae28097663e1","page_id":"C124879378:5","page_url":"https://archive.org/details/C124879378/page/n4","statement_kind":"finding","subject_label":"Neighborhood Commercial segment width","summary":"The western segment is 88 feet wide, with two curb parking lanes and a streetcar right-of-way.","property":"other","value_text":"88 feet","value_num":88.0,"unit":"ft","t_from":"1984","quote":"Street width expands to 88 feet (72 feet at the bulbed intersection), and at present accommodates four travel lanes, two curb parking lanes","place_label":"Twelfth Street to McCoppin Street","place_precision":"intersection","place_id":"qipu:sf/place/street/12th-st","resolved_by":"place links file","anchor":"s-8ab4b6415ee3","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Segment 3: Neighborhood Commercial. The western extremity of lower Market extends from Twelfth to McCoppin Streets"},{"claim_id":"c:9364e3666bc491a1c7ba868767de658e","page_id":"C124879378:5","page_url":"https://archive.org/details/C124879378/page/n4","statement_kind":"finding","subject_label":"Civic Center / Van Ness segment width","summary":"The street width between Eighth and Twelfth Streets expands to 68 feet, with six travel lanes at present.","property":"other","value_text":"68 feet","value_num":68.0,"unit":"ft","t_from":"1984","quote":"The curb-to-curb street width expands to 68 feet, allowing six travel lanes at present with no curb parking.","place_label":"Eighth Street to Twelfth Street","place_precision":"intersection","place_id":"qipu:sf/place/street/08th-st","resolved_by":"place links file","anchor":"s-9364e3666bc4","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Segment 2: Civic Center / Van Ness. Stretching between Eighth and Twelfth Streets"},{"claim_id":"c:6df58b1dbd61ae85b0ae75a6192c77db","page_id":"C124879378:6","page_url":"https://archive.org/details/C124879378/page/n5","statement_kind":"background","subject_label":"1968 urban design plan","summary":"The 1968 Plan foresaw Market Street passing through a downtown with four districts.","property":"other","value_text":"four districts","value_num":4.0,"date_printed":"1968","t_from":"1968","quote":"The 1968 Plan foresaw Market Street passing through a downtown with four districts identified along its length.","place_label":"Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-6df58b1dbd61","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The 1968 Plan foresaw Market Street passing through a downtown"},{"claim_id":"c:890cea321ac975f4e4dfaa17d1d04ebf","page_id":"C124879378:6","page_url":"https://archive.org/details/C124879378/page/n5","statement_kind":"cites_decision","subject_label":"Market Street revitalization","summary":"The revitalization of Market Street began anew following adoption of a Schematic Street Design Plan in 1968.","property":"adopted","value_text":"Schematic Street Design Plan","date_printed":"1968","t_from":"1968","quote":"revitalization of Market Street began anew following adoption of a Schematic Street Design Plan in 1968.","place_label":"Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-890cea321ac9","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"revitalization of Market Street began anew following adoption"},{"claim_id":"c:c2f96aa36313aa6444bf0bfb1ae3f677","page_id":"C124879378:6","page_url":"https://archive.org/details/C124879378/page/n5","statement_kind":"finding","subject_label":"Market Street development","summary":"Only portions of the 1968 urban design plan for Market Street have been achieved.","property":"finding","value_text":"only portions achieved","t_from":"1984","quote":"Twenty years later, only portions of this grand urban design plan have been achieved.","place_label":"Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-c2f96aa36313","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Twenty years later, only portions of this grand urban design plan"},{"claim_id":"c:8064b09521a134cce47d5261e2ea92f6","page_id":"C124879378:8","page_url":"https://archive.org/details/C124879378/page/n7","statement_kind":"cites_decision","subject_label":"Market Street policy intent","summary":"The Board of Supervisors unanimously resolved to amend the policy intent of the 1968 Market Street Design Plan.","property":"adopted","value_text":"amend policy intent","date_printed":"February 1983","t_from":"1983","quote":"In February 1983, the Board of Supervisors unanimously resolved to amend policy intent of the 1968 Market Street Design Plan","place_label":"Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-8064b09521a1","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In February 1983, the Board of Supervisors unanimously resolved"},{"claim_id":"c:8b58779a67b31c8cf42bc96216852026","page_id":"C124879378:8","page_url":"https://archive.org/details/C124879378/page/n7","statement_kind":"finding","subject_label":"Market Street traffic volume","summary":"Lower Market Street serves a relatively minor traffic circulation function.","property":"finding","value_text":"10,000 to 18,000 vehicles per day","unit":"vehicles per day","t_from":"1984","quote":"lower Market Street presently serves a relatively minor traffic circulation function, with average daily volumes ranging between 10,000 and 18,000 vehicles per day.","place_label":"lower Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-8b58779a67b3","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"According to Department of Public Works cordon counts"},{"claim_id":"c:5458451509ced6052a5246bb2a5ad168","page_id":"C124879378:12","page_url":"https://archive.org/details/C124879378/page/n11","statement_kind":"finding","subject_label":"Market Street between Twelfth and McCoppin","summary":"No recommended street design plan was developed for Market Street between Twelfth and McCoppin.","property":"finding","value_text":"no plan developed","t_from":"1984","quote":"a recommended street design plan for Jarket Street between Twelfth and McCoppin was","place_label":"Jarket Street between Twelfth and McCoppin","place_precision":"street_segment","anchor":"s-5458451509ce","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Market Street Design Recommendations; a recommended street design plan for Jarket Street"},{"claim_id":"c:8f2ed56f4e772bed16ee35a5ae56c67b","page_id":"C124879378:12","page_url":"https://archive.org/details/C124879378/page/n11","statement_kind":"proposal","subject_label":"Curbside travel lanes","summary":"The report recommends that curbside travel lanes be at least 12 feet wide.","property":"proposes","value_text":"minimum 12 feet","value_num":12.0,"unit":"ft","t_from":"1984","quote":"curbside travel lanes should be a minimum of 12 feet wide.","place_label":"Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-8f2ed56f4e77","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Curbside Travel Lanes; curbside travel lanes should be a minimum of 12 feet wide"},{"claim_id":"c:ccbdbacbdbdd9299bd55d1e7cc9aea91","page_id":"C124879378:12","page_url":"https://archive.org/details/C124879378/page/n11","statement_kind":"proposal","subject_label":"Passenger boarding islands","summary":"The report recommends boarding islands six to seven feet wide, instead of their present five feet.","property":"proposes","value_text":"six to seven feet","value_num":6.0,"unit":"ft","t_from":"1984","quote":"Passenger boarding islands on Market Street should be six to seven feet wide compared with their present width of just five feet","place_label":"Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-ccbdbacbdbdd","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Boarding Islands; Passenger boarding islands on Market Street should be six to seven feet wide"},{"claim_id":"c:dc106ae3bc8c88d59fc32f830c512e92","page_id":"C124879378:12","page_url":"https://archive.org/details/C124879378/page/n11","statement_kind":"proposal","subject_label":"DKS Associates Alternative A","summary":"Alternative A would remove all existing tracks installed by BART between Second and Third Streets.","property":"alternative","value_text":"removes all existing BART tracks","t_from":"1984","quote":"Alternative A removes all existing tracks as in- stalled by BART from east of Second to west of Third.","place_label":"Second to Third Streets","anchor":"s-dc106ae3bc8c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Second to Third Streets; Alternative A removes all existing tracks"},{"claim_id":"c:e382aed64a6c5bd1a58f281d028fa486","page_id":"C124879378:12","page_url":"https://archive.org/details/C124879378/page/n11","statement_kind":"proposal","subject_label":"Right turn only lanes","summary":"The report recommends a minimum lane width of 10 feet for right turning traffic.","property":"proposes","value_text":"minimum 10 feet","value_num":10.0,"unit":"ft","t_from":"1984","quote":"Minimum lane width for right turning traffic should be 10 feet.","place_label":"Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-e382aed64a6c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Other; Right turn only lanes - Minimum lane width for right turning traffic should be 10 feet"},{"claim_id":"c:f72617c74cbebcac599bfd78e01a50ff","page_id":"C124879378:12","page_url":"https://archive.org/details/C124879378/page/n11","statement_kind":"finding","subject_label":"DKS six lane plan","summary":"The six lane DKS plan using 10-foot lanes between Eighth and Ninth is no longer valid.","property":"finding","value_text":"no longer valid","t_from":"1984","quote":"based on updated Department of Public Works criteria, the six lane plan developed by DKS for this sec- zion using 10-foot lane widths is no longer valid.","place_label":"Block between Eighth and Ninth","anchor":"s-f72617c74cbe","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"West of Eighth; based on updated Department of Public Works criteria, the six lane plan"},{"claim_id":"c:3539ad4a1e39ea5aafce0b1714a3be8a","page_id":"C124879378:15","page_url":"https://archive.org/details/C124879378/page/n14","statement_kind":"finding","subject_label":"Original T transit shelters","summary":"The original T shelters have not functioned well for a variety of reasons.","property":"finding","value_text":"not functioned well","t_from":"1984","quote":"The so-called 'T' shelters installed as part of the original project have not functioned well for a variety of reasons","place_label":"Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-3539ad4a1e39","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Market Street Design Recommendations; Transit Shelters"},{"claim_id":"c:9f21cee07a3e2d1922a69d0b0147229a","page_id":"C124879378:15","page_url":"https://archive.org/details/C124879378/page/n14","statement_kind":"proposal","subject_label":"Citywide shelter program","summary":"The report says the citywide shelter program will require a private firm to erect and maintain shelters.","property":"proposes","value_text":"private firm erects and maintains shelters","date_printed":"1985","t_from":"1985","quote":"The citywide shelter program, scheduled to begin in 1985, will require a private firm to erect","place_label":"citywide","anchor":"s-9f21cee07a3e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Final Market Street shelter design will complement a separate PUC transit shelter program"},{"claim_id":"c:a14cd7f5d3e2d6bada1369baf20d3cd4","page_id":"C124879378:17","page_url":"https://archive.org/details/C124879378/page/n16","statement_kind":"proposal","subject_label":"Bus loading length on Market Street islands","summary":"The report says two articulated buses require 110 feet of lineal curb space for loading.","property":"other","value_text":"110 feet","value_num":110.0,"unit":"ft","t_from":"1984","quote":"Two articulated buses, which will be the longest vehicles to be served, require 110 feet of lineal curb space for loading.","place_label":"Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-a14cd7f5d3e2","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Boarding Island Design / Length - Island lengths should provide"},{"claim_id":"c:c0b7bf9c4c8399964843fc039eb18cf1","page_id":"C124879378:17","page_url":"https://archive.org/details/C124879378/page/n16","statement_kind":"background","subject_label":"Pedestrian safety law","summary":"The report cites the California Vehicle Code limiting vehicle speeds to 10 mph when passing a loading transit vehicle.","property":"other","value_text":"10 mph","value_num":10.0,"t_from":"1984","quote":"The California Vehicle Code (Sec. 21756) re- stricts vehicular speeds to 10 mph when pass- ing a transit vehicle loading passengers at a safety zone","anchor":"s-c0b7bf9c4c83","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Safety - Placing structures and pedestrians in a street right-of-way"},{"claim_id":"c:666acbfbab5d795fa97d72b9bc80a291","page_id":"C124879378:18","page_url":"https://archive.org/details/C124879378/page/n17","statement_kind":"proposal","subject_label":"Muni stop locations","summary":"The Muni Planning Department has proposed locating curb and island stops along near-side block faces from First to Van Ness.","property":"proposes","t_from":"1984","quote":"Muni's Planning Department has proposed to locate all curb and island stops, in both directions to the degree possible, along near (approach) side block faces of all numbered street intersections from First to Van Ness.","place_label":"First to Van Ness","place_precision":"intersection","place_id":"qipu:sf/place/street/01st-st","resolved_by":"place links file","anchor":"s-666acbfbab5d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Muni's Planning Department has proposed to locate all curb and island stops"},{"claim_id":"c:8992ec7f7a99c47dae100976f77f343d","page_id":"C124879378:18","page_url":"https://archive.org/details/C124879378/page/n17","statement_kind":"proposal","subject_label":"Boarding island appearance","summary":"The report says boarding islands should be designed to blend into the existing streetscape.","property":"recommendation","t_from":"1984","quote":"Since passenger boarding islands were not part of the original 1968 Design Plan, they should be designed to blend into the exist- ing streetscape.","anchor":"s-8992ec7f7a99","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Since passenger boarding islands were not part of the original 1968 Design Plan"},{"claim_id":"c:f6bdc69b46fd8ab4afc473170a7d053f","page_id":"C124879378:18","page_url":"https://archive.org/details/C124879378/page/n17","statement_kind":"proposal","subject_label":"Transit travel time savings on Market Street","summary":"The report projects transit travel times between Main Street and Van Ness Avenue may be reduced by four to eight minutes.","property":"other","value_text":"four to eight minutes","unit":"minutes","t_from":"1984","quote":"may be reduced by between four and eight minutes according to Muni Planning calculations","place_label":"Main Street and Van Ness Avenue","place_precision":"intersection","place_id":"qipu:sf/place/street/main-st","resolved_by":"place links file","anchor":"s-f6bdc69b46fd","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"Muni Planning calculations","stance":"quotes_to_report","speaker_evidence":"according to Muni Planning calculations"},{"claim_id":"c:4a1d80d6a94ec90fad8dd2b9585f5454","page_id":"C124879378:19","page_url":"https://archive.org/details/C124879378/page/n18","statement_kind":"finding","subject_label":"Historic streetcar service on Market Street","summary":"Rail cars ran on Market for 122 years before their removal in 1980.","property":"event","value_text":"122 years","value_num":122.0,"date_printed":"1980","t_from":"1980","quote":"Rail cars ran on Market for 122 years prior to their removal in 1980, making it the longest continu- ously operated rail service","place_label":"Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-4a1d80d6a94e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Background; Rail cars ran on Market for 122 years"},{"claim_id":"c:6d494983e2453417aa00aea895e4f54f","page_id":"C124879378:19","page_url":"https://archive.org/details/C124879378/page/n18","statement_kind":"finding","subject_label":"Muni Metro ridership","summary":"Muni Metro carries nearly twice the daily ridership of earlier streetcars, 125,000 versus 70,000.","property":"units","value_text":"125,000 daily riders","value_num":125000.0,"unit":"persons","t_from":"1984","quote":"Muni Metro is carrying near- ly twice the daily ridership (125,000 vs 70,000) carried by earlier streetcars","place_label":"Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-6d494983e245","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Increasing ridership demand; Muni Metro is carrying nearly twice the daily ridership"},{"claim_id":"c:8d557effb2d36c61fcee63cfc268c3f8","page_id":"C124879378:19","page_url":"https://archive.org/details/C124879378/page/n18","statement_kind":"finding","subject_label":"Downtown office growth","summary":"Approximately 25 million square feet of office space was added downtown between 1965 and 1980.","property":"floor_area_sqft","value_text":"25 million square feet","value_num":25000000.0,"unit":"sqft","date_printed":"1965 to 1980","t_from":"1965","quote":"between 1965 and 1980 approximately 25 million square feet of office space was added in the downtown area.","place_label":"Downtown","anchor":"s-8d557effb2d3","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Yet, between 1965 and 1980 approximately 25 million square feet"},{"claim_id":"c:9c80eaff5a5040fc9be7a395c065c04f","page_id":"C124879378:19","page_url":"https://archive.org/details/C124879378/page/n18","statement_kind":"cites_decision","subject_label":"Market Street surface transit routes and streetcars","summary":"The Board acted in 1978 to retain all surface routes on Market and resolved in 1983 to expand transit to a 4-lane operation including historic streetcars.","property":"adopted","value_text":"1978 and 1983","date_printed":"1978; 1983","t_from":"1978","quote":"first by acting in 1978 to retain all surface routes on Market, and resolving in 1983 to expand transit to a 4-lane operation including historic streetcars.","place_label":"Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-9c80eaff5a50","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Board recognized these trends, first by acting in 1978"},{"claim_id":"c:e0b7e8246feab02ac82be0e31625fde6","page_id":"C124879378:19","page_url":"https://archive.org/details/C124879378/page/n18","statement_kind":"proposal","subject_label":"E/F streetcar daily ridership","summary":"Muni Planning projects over 23,000 daily riders would use the E/F streetcars initially.","property":"population","value_text":"over 23,000 daily riders","value_num":23000.0,"unit":"persons","t_from":"1984","quote":"Muni Planning projects that over 23,000* daily riders would use the E/F Streetcars initially, with a capacity to absorb nearly twice as many.","place_label":"E/F streetcar route","anchor":"s-e0b7e8246fea","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Muni Planning","stance":"own_position","speaker_evidence":"Muni Planning projects that over 23,000* daily riders"},{"claim_id":"c:e683a17710dc38143b53ec1b297c0bf6","page_id":"C124879378:19","page_url":"https://archive.org/details/C124879378/page/n18","statement_kind":"proposal","subject_label":"E/F streetcar round trip running time","summary":"The report gives a round trip running time of 92 minutes, based on current 8-Market and 32-Embarcadero schedules.","property":"other","value_text":"92 minutes","value_num":92.0,"t_from":"1984","quote":"A round trip running time of 92 minutes* jis based on the current 8-Market and 32-Embarcadero schedules.","place_label":"Castro/Market to Pier 39","place_precision":"area","place_id":"qipu:sf/place/hood/castro-upper-market","resolved_by":"place links file","anchor":"s-e683a17710dc","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Muni","stance":"own_position","speaker_evidence":"Muni estimates that a schedule; A round trip running time of 92 minutes"},{"claim_id":"c:07e44eff529c9f71d5991e7460ed4d8b","page_id":"C124879378:20","page_url":"https://archive.org/details/C124879378/page/n19","statement_kind":"finding","subject_label":"Existing F Line track segments","summary":"All remaining track segments already exist on Market Street between Fremont and Seventh.","property":"other","t_from":"1984","quote":"All remaining track segments already exist on Market Street between Fremont and Seventh (as well as west to Duboce), and need only be re- placed","place_label":"Market Street between Fremont and Seventh","anchor":"s-07e44eff529c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"All remaining track segments already exist on Market Street"},{"claim_id":"c:625941ff09d88e7b3296a2f01442b657","page_id":"C124879378:20","page_url":"https://archive.org/details/C124879378/page/n19","statement_kind":"finding","subject_label":"F Line alignment recommendation","summary":"The City's Technical Advisory Committee for I-280 has tentatively recommended an F Line alignment east along Market to Steuart.","property":"recommendation","t_from":"1984","quote":"The City's Technical Advisory Committee for 1-280 has tentatively recommended an 'F' Line aliaqnment east along Market from First/Fremont to Steuart","place_label":"Market Street from First/Fremont to Steuart","place_precision":"street_segment","anchor":"s-625941ff09d8","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"City's Technical Advisory Committee for I-280","stance":"quotes_to_report","speaker_evidence":"The City's Technical Advisory Committee for 1-280 has tentatively recommended"},{"claim_id":"c:6dc60d4d7b907e3886bdeef28081b79a","page_id":"C124879378:20","page_url":"https://archive.org/details/C124879378/page/n19","statement_kind":"proposal","subject_label":"F Line capital works","summary":"The report proposes track reconstruction, boarding islands and repaving from Fremont Street west to the Civic Center vicinity.","property":"proposes","t_from":"1984","quote":"Track reconstruction and realignment, instal- lation of boarding islands and repaving along existing streetcar right-of-way from Fremont Street west to at least the Civic Center vicinity","place_label":"Fremont Street to Civic Center","anchor":"s-6dc60d4d7b90","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Capital Elements Implementation of the 'F' Market streetcar service requires four basic capital initiatives"},{"claim_id":"c:d1678f9cab20eb5bac92ec672cdf9b8c","page_id":"C124879378:20","page_url":"https://archive.org/details/C124879378/page/n19","statement_kind":"proposal","subject_label":"E/F streetcar fleet","summary":"The report says 13 vehicles would initially be required to operate along the E/F route.","property":"other","value_text":"13 vehicles","value_num":13.0,"t_from":"1984","quote":"Initially, 13 vehicles would be required to op- erate along the E/F route.","place_label":"E/F route","anchor":"s-d1678f9cab20","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Initially, 13 vehicles would be required to op- erate along the E/F route."},{"claim_id":"c:010b0a57ff57ca3d5639a0af58be2c07","page_id":"C124879378:21","page_url":"https://archive.org/details/C124879378/page/n20","statement_kind":"proposal","subject_label":"Added project cost elements","summary":"The report says utility, streetcar and facility costs have been added and will be evaluated during the planning project.","property":"proposes","t_from":"1984","quote":"the following elements have been added and will be evaluated during the course of the Market Street Planning Project","anchor":"s-010b0a57ff57","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The project scope at that time, however, was necessarily limited"},{"claim_id":"c:cdd801c9dcdc6731865f6844534e9b07","page_id":"C124879378:21","page_url":"https://archive.org/details/C124879378/page/n20","statement_kind":"finding","subject_label":"Market Street capital cost estimates","summary":"The Market Street Design Planning Study produced capital cost estimates in its 1982 report.","property":"finding","date_printed":"1982","t_from":"1982","quote":"The Market Street Design Planning Study produced capital cost estimates in its 1982 report for the reconstruction of lower Market Street","place_label":"Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-cdd801c9dcdc","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Market Street Design Planning Study produced capital cost estimates in its 1982 report"},{"claim_id":"c:353f874c98eddb23b490b62816e83e15","page_id":"C124879378:22","page_url":"https://archive.org/details/C124879378/page/n21","statement_kind":"proposal","subject_label":"Street maintenance budgets","summary":"The report expects Department of Public Works street maintenance budgets to remain at a relatively constant level.","property":"proposes","t_from":"1984","quote":"Street maintenance budgets for the Department of Public Works will remain at a relatively constant level, notwithstanding one-time infrastructure allocations","anchor":"s-353f874c98ed","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Street and Sidewalk Maintenance Street maintenance budgets for the Department of Public Works will remain"},{"claim_id":"c:8788588757f00a71cc13586a6f5e5605","page_id":"C124879378:22","page_url":"https://archive.org/details/C124879378/page/n21","statement_kind":"finding","subject_label":"Damaged street furniture on Market Street","summary":"DPW representatives note that much damaged street furniture on Market Street is beyond repair.","property":"finding","t_from":"1984","quote":"damaged street furniture already on Market Street is effectively beyond repair due to a variety of unique features","place_label":"Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-8788588757f0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"DPW representatives note that a substantial portion of damaged street furniture"},{"claim_id":"c:3fcd9e396f4c9e7a6ffb1ffbcbe0e82c","page_id":"C124879378:23","page_url":"https://archive.org/details/C124879378/page/n22","statement_kind":"proposal","subject_label":"Muni curb and island stops on Market Street","summary":"The report says a final determination must be made on relocating curb and island stops on Market Street.","property":"recommendation","t_from":"1984","quote":"A final determination must be made for relocating curb and island stops to enhance the efficiency and speed of Muni service on Market Street","place_label":"Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-3fcd9e396f4c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Muni Operating Plan: A final determination must be made"},{"claim_id":"c:62687c891a8444b430cca4bf009ea288","page_id":"C124879378:23","page_url":"https://archive.org/details/C124879378/page/n22","statement_kind":"proposal","subject_label":"Street design west of Eighth to McCoppin","summary":"The report says new design alternatives must be developed for the street area west of Eighth to McCoppin.","property":"proposes","t_from":"1984","quote":"New design alternatives must be developed and recommendations made for the street area west of Eighth to McCoppin","place_label":"west of Eighth to McCoppin","place_precision":"street_segment","anchor":"s-62687c891a84","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"STREET REDESICN Street Geometrics: New design alternatives must be developed"},{"claim_id":"c:f15cae9c31ccb14910205e81fdaca4d1","page_id":"C124879378:23","page_url":"https://archive.org/details/C124879378/page/n22","statement_kind":"proposal","subject_label":"Street design east of Eighth to Steuart","summary":"The report says a street plan must be selected for the segment east of Eighth to Steuart.","property":"proposes","t_from":"1984","quote":"selection of a street plan for east of Eighth to Steuart","place_label":"east of Eighth to Steuart","place_precision":"street_segment","anchor":"s-f15cae9c31cc","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Project's most important design variable involves the selection of a street plan"}]}