Street and sidewalk-widths and uses (1966)

Street and sidewalk-widths and uses

A 1966 study by the City and County of San Francisco, Transit Task Force about Market Street. Scan on the Internet Archive ↗

Sidewalk width
about 35-foot sidewalksScan 20 ↗
Bus-lane plan width
70 feetScan 78 ↗
Emergency clearance
about 22 feetScan 92 ↗
Findings
  • The report says the five lane plan has almost nothing to recommend it from traffic, transit, service or pedestrian viewpoints.Scan 98 ↗
Report recommendations
  • The Consultants feel the recommended increase in sidewalk width on Market Street will be essential.Scan 86 ↗
  • The report says Market Street should and will become a Great Street through a continuing series of policy decisions.Scan 110 ↗
21 quotes from the scan

Printed words Quoted from the page as read from the scan.

Report recommendations-16ea60f6e44c

“Report No. 3 of the Consultants, submitted on June 28, 1965, did develop and recommend such a scheme, identified in that Report as Design Proposal B.”

Scan 20

Report recommendations-2c91bdcdf567

“That proposal, refined and studied in more detail than was then possible, is basically Circulation Plan Four- Lanes B as described in the present Report.”

Scan 20

Report recommendations-2e7d30722626

“All of these qualities should add up to a great, lively, human street.”

Scan 32

Findings-6b28c0213d3b

“Here they have been condensed to five design criteria, specifically related to the question of pedestrian and vehicular circulation.”

Scan 36

Report recommendations-f142a7bc2e5f

“Planned office growth alone, however, if it is completed within ten years, would average 5.4% annually.”

Scan 50

Report recommendations-0b7f9a9c3b48

“The task force staff has suggested a maximum density, and used it to determine sidewalk needs.”

Scan 54

Findings-da223323a658

“Although the sidewalk would be 1-1/2 feet wider than the existing sidewalk, the Consultants do not consider this acceptable.”

Scan 68

Report recommendations-47150c46d76f

“Buses stop in the center traffic lanes on the approach sides of the intersections to load and unload passengers at the pedestrian islands.”

Scan 78

Report recommendations-8ffbd295752b

“The clearance for pedestrians around BARTD entrances is 6-1/2 feet to the curb and 14-1/2 feet to the building line.”

Scan 78

Report recommendations-a9f7ae7fb259

“Special purpose bays 9 feet wide leave a 26 foot wide sidewalk adjoining.”

Scan 78

Report recommendations-2ca92139a94a

“The street cars will be moved underground leaving buses as the only transit vehicles on the street.”

Scan 86

Report recommendations-8e7548fe45cb

“Therefore, sidewalks 26 feet to 35 feet wide outside station area are of importance to pedestrians.”

Scan 86

Findings-19f4a7fd3fa3

“Four lane Scheme C is probably less desirable for the operation of emergency vehicles than any of the other plans.”

Scan 92

Findings-b831e3f386f6

“Scheme B would leave about 13 feet clear if buses were stopped near an intersection.”

Scan 92

Findings-f045b3956adc

“The five lane plan would be less desirable for the operation of emergency vehicles.”

Scan 92

Findings-11d52e82bff5

“The five lane plan has almost nothing to recommend it either from a traffic, transit, service and delivery or pedestrian point of view.”

Scan 98

FindingPrinted words, misread in placess-b19e2793feb3

“The four lane Scheme C provides well for pedestrians. It offers some advantages for bus operations which are still questionable, however.”

Scan 98

Findings-e804f389f131

“However, it is the least desirable plan for pedestrians and from the stand point of improving the appearance of Market Street.”

Scan 98

Report recommendations-5722b5973445

“Further development of parking facilities, and development of an overall plan, should be coordinated with policy on use of the Street.”

Scan 108

Report recommendations-81d6c0bc4fc7

“Sidewalk paving, of a quality and design in keeping with the scale and importance of the widened sidewalk.”

Scan 108

Identifier ia:C124885301