{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124887345","url":"https://data.qipu.org/usa/san-francisco/reports/c124887345/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124887345/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124887345","source_id":"C124887345","title":"Report to the Board of Supervisors : management audit of the Port of San Francisco","year":1986,"n_pages":144,"creator":"San Francisco (Calif.). Board of Supervisors. Budget Analyst","source_url":"https://archive.org/details/C124887345","issuer":"City and County of San Francisco, Board of Supervisors. Budget Analyst","issuer_type":"government","gov_level":"city_county","prepared_by":null,"doc_kind":"audit_financial","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"meta","doc_kind_by":"meta","jurisdiction_by":"meta","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":16,"statements_total":92,"statements_by_kind":{"finding":64,"proposal":19,"cites_decision":6,"background":3},"same_for_every_statement":{"source_id":"C124887345","source_url":"https://archive.org/details/C124887345","source_label":"IGS library: Report to the Board of Supervisors : management audit of the Port of San Francisco","report_year":1986,"issuer":"City and County of San Francisco, Board of Supervisors. Budget Analyst","issuer_type":"government","doc_kind":"audit_financial","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"An audit by the Budget Analyst of the Port of San Francisco's finances, property leasing, rent collection and facilities.","figures":[{"label":"Vacancy","value":"23.6 percent of Port properties","claim_ids":["c:3f2cb5cfb10980429babf151e2fc246d"]},{"label":"Owed","value":"over $175,000 back rent collected","claim_ids":["c:fbfe2d8613084a6f4fdf6c5e4874f3dc"]}],"main_points":["c:219d82a417b4dd69716dc71b68243513","c:b3a91a5983bec76aab477b443aa909c7","c:ca51ab81e217cfa393b25cb0bf95b791"],"board_decisions_after":["qipu:sf/decision/journalofmayaugproceed81sanfrich:213/4","qipu:sf/decision/journalofmayaugproceed81sanfrich:29/5","qipu:sf/decision/journalofmayaugproceed81sanfrich:214/1","qipu:sf/decision/journalseptdecofproceed81sanfrich:439/4"],"board_decisions_before":["qipu:sf/decision/journalofproceedjanjune78sanfrich:567/4","qipu:sf/decision/journalofproceedjanjune78sanfrich:568/1"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:807bd5e941d45c2076d337f725355450","page_id":"C124887345:3","page_url":"https://archive.org/details/C124887345/page/n2","statement_kind":"finding","subject_label":"Port on-dock intermodal container transfer facility","summary":"The Port has California's only on-dock intermodal container transfer facility, giving it a cost advantage over other west coast ports.","property":"other","value_text":"California's only on-dock intermodal container transfer facility","t_from":"1986","quote":"the Port has California's only on-dock intermodal container transfer facility which provides the Port with a cost advantage over other west coast ports","place_label":"Port of San Francisco","anchor":"s-807bd5e941d4","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Transmitted herewith is the Budget Analyst's management audit report"},{"claim_id":"c:aebc01b468f019fd6fd96612a8eb83a7","page_id":"C124887345:3","page_url":"https://archive.org/details/C124887345/page/n2","statement_kind":"finding","subject_label":"Port cargo line contracts","summary":"The Port has contracted with three new cargo lines to use its container cargo handling facilities.","property":"other","value_text":"three new cargo lines","value_num":3.0,"date_printed":"in the last six months","t_from":"1986","quote":"in the last six months, the Port has contracted with three new cargo lines for the purpose of using the Port's container cargo handling facilities","place_label":"Port of San Francisco","anchor":"s-aebc01b468f0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Dear Supervisor Walker: Transmitted herewith"},{"claim_id":"c:01141792cfe4ecb9d3beac0d9865a765","page_id":"C124887345:21","page_url":"https://archive.org/details/C124887345/page/n20","statement_kind":"finding","subject_label":"Port receivables past due","summary":"Of receivables 90 days past due, 47.5 percent of accounts have been forwarded to the City Attorney and are in litigation.","property":"other","value_text":"63.2% receivables 90 days past due; 47.5% in litigation","value_num":47.5,"unit":"percent","t_from":"1986","quote":"Of the 63.2% receivables 90 days past due, accounts representing 47.5% have been forwarded to the City Attorney and are in litigation.","place_label":"Port of San Francisco","anchor":"s-01141792cfe4","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"Port of San Francisco","stance":"quotes_to_dispute","speaker_evidence":"The Port dismisses this finding by stating"},{"claim_id":"c:1ff1f2c07005442c57fb26417ec38d2b","page_id":"C124887345:21","page_url":"https://archive.org/details/C124887345/page/n20","statement_kind":"finding","subject_label":"Port bad debt write-offs","summary":"The Port wrote off $700,000 (≈ $2.2 million in 2026 dollars) of bad debt in 1985, equal to 2.4 percent of total operating revenues.","property":"other","value_text":"$700,000 written off in 1985","value_num":700000.0,"unit":"USD","date_printed":"1985","t_from":"1985","quote":"The $700,000 written off in 1985 was 2.4% of total operating revenues; the $400,000 in 1984 was 1.4%.","place_label":"Port of San Francisco","anchor":"s-1ff1f2c07005","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"Port of San Francisco","stance":"quotes_to_dispute","speaker_evidence":"The Port dismisses this finding by stating"},{"claim_id":"c:28850ba4bb482c2efa3a3551f0088625","page_id":"C124887345:21","page_url":"https://archive.org/details/C124887345/page/n20","statement_kind":"cites_decision","subject_label":"Accounts receivable write-off policy","summary":"The Port Commission approved the Accounts Receivable Write-off Policy, in effect since July 1984.","property":"approved","value_text":"Accounts Receivable Write-off Policy","date_printed":"July 1984","t_from":"1984","quote":"The Accounts Receivable Write-off Policy was approved by the Port Commission and has been in effect since July 1984.","place_label":"Port of San Francisco","anchor":"s-28850ba4bb48","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"Port of San Francisco","stance":"quotes_to_dispute","speaker_evidence":"The Port dismisses this finding by stating"},{"claim_id":"c:3f2cb5cfb10980429babf151e2fc246d","page_id":"C124887345:21","page_url":"https://archive.org/details/C124887345/page/n20","statement_kind":"finding","subject_label":"Port vacancy rate","summary":"The Budget Analyst calculated the Port's vacancy rate for properties under its property management function at 23.6 percent.","property":"other","value_text":"23.6 percent","value_num":23.6,"unit":"percent","t_from":"1986","quote":"which we have correctly calculated to be 23.6 percent for those properties directly under the responsibility of the Port's property management function","place_label":"Port of San Francisco","anchor":"s-3f2cb5cfb109","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"which we have correctly calculated to be 23.6 percent"},{"claim_id":"c:5ab6582c957aa879d4fa0bc5ca6b7673","page_id":"C124887345:21","page_url":"https://archive.org/details/C124887345/page/n20","statement_kind":"finding","subject_label":"Port annual deferred maintenance cost","summary":"The Port's response cites a $20 million (≈ $61.5 million in 2026 dollars) annual cost to correct deferred maintenance problems.","property":"cost_usd","value_text":"$20 million annual","value_num":20000000.0,"unit":"USD","t_from":"1986","quote":"we do not include the $20 million annual cost to correct the Port's deferred maintenance problems","place_label":"Port of San Francisco","anchor":"s-5ab6582c957a","shown":false,"hidden":"quotes_to_dispute","part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_dispute","speaker_evidence":"Cost estimates are inconsistent — The Port's response states"},{"claim_id":"c:9344760d1754ef276b7d3a1a03b0774e","page_id":"C124887345:21","page_url":"https://archive.org/details/C124887345/page/n20","statement_kind":"finding","subject_label":"Value of Port property","summary":"A 1985 Chief Administrative Officer report valued Port properties at $1.0 billion (≈ $3.1 billion in 2026 dollars).","property":"assessed_value_usd","value_text":"$1.0 billion","value_num":1000000000.0,"unit":"USD","date_printed":"1985","t_from":"1985","quote":"the $1.0 billion was reported in a 1985 report by the Chief Administrative Officer","place_label":"Port of San Francisco","anchor":"s-9344760d1754","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"As stated in our report, the $1.0 billion was reported"},{"claim_id":"c:bbb3a6b8709b83e3d0dfb1d23c696acd","page_id":"C124887345:21","page_url":"https://archive.org/details/C124887345/page/n20","statement_kind":"finding","subject_label":"Port total operating and maintenance costs","summary":"The report found the Port does not know the total operating and maintenance costs of its specific facilities.","property":"finding","value_text":"no total cost data by facility","t_from":"1986","quote":"we reported that the Port does not know the total operating and maintenance costs of its specific facilities","place_label":"Port of San Francisco","anchor":"s-bbb3a6b8709b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"As one example, we reported that the Port does not know"},{"claim_id":"c:bcd93a769bb8bc19bf8bab2553618e26","page_id":"C124887345:21","page_url":"https://archive.org/details/C124887345/page/n20","statement_kind":"finding","subject_label":"Fishermans Wharf restaurant licenses","summary":"Restaurant parcels in Fishermans Wharf are held on month-to-month licenses that the Port can terminate on 30 days written notice.","property":"leased","value_text":"30 days written notice","value_num":30.0,"t_from":"1986","quote":"These licenses can be terminated by the Port upon 30 days written notice.","place_label":"Fishermans Wharf","place_precision":"site","place_id":"qipu:sf/place/landmark/fishermans-wharf","resolved_by":"place links file","anchor":"s-bcd93a769bb8","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"These licenses can be terminated by the Port upon 30 days written notice."},{"claim_id":"c:ddc608e11cc0af0a1d3133e2aa382d96","page_id":"C124887345:21","page_url":"https://archive.org/details/C124887345/page/n20","statement_kind":"proposal","subject_label":"Alternate uses for 30-day license parcels","summary":"The report recommends the Port consider alternate uses for parcels held on 30-day licenses if tenants will not renegotiate their leases.","property":"recommendation","value_text":"alternate uses for 30-day license parcels","t_from":"1986","quote":"recommending that, if the tenants are not willing to renegotiate their leases, then the Port should consider alternate uses for those Port parcels awarded on the basis of 30-day licenses","place_label":"Fishermans Wharf","place_precision":"site","place_id":"qipu:sf/place/landmark/fishermans-wharf","resolved_by":"place links file","anchor":"s-ddc608e11cc0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We have addressed this issue on pages 44 through 46 of our report recommending"},{"claim_id":"c:08ddda7de853dcbb76a1b45b99ac1077","page_id":"C124887345:39","page_url":"https://archive.org/details/C124887345/page/n38","statement_kind":"finding","subject_label":"Commercial Property lease and license review","summary":"The Commercial Property Department has just completed a review of the Port's 117 leases and is reviewing 415 licenses.","property":"finding","value_text":"117 leases; 415 licenses","value_num":117.0,"t_from":"1986","quote":"The Commercial Property Department staff has just completed a review of the Port's 117 leases and is now reviewing the 415 licenses awarded by the Port.","place_label":"Port of San Francisco","anchor":"s-08ddda7de853","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"THE CURRENT PORT MANAGERS HAVE ACHIEVED... Finance and Administration Division"},{"claim_id":"c:363356608b03ff7a6e33f595e00f8aea","page_id":"C124887345:39","page_url":"https://archive.org/details/C124887345/page/n38","statement_kind":"finding","subject_label":"Port operating expenses FY1984-85","summary":"Port operating expenses rose to $23,653,000 (≈ $76.7 million in 2026 dollars) in fiscal year 1984-85, leaving an operating surplus of $5,468,000 (≈ $17.7 million in 2026 dollars).","property":"finding","value_text":"$23,653,000","value_num":23653000.0,"unit":"USD","date_printed":"fiscal year 1984-85","t_from":"1984","quote":"In fiscal year 1984-85, operating revenues increased to $29,121,000 while operating expenses also increased to $23,653,000 for an operating surplus of $5,468,000.","place_label":"Port of San Francisco","anchor":"s-363356608b03","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Financial In fiscal year 1982-83, the Port had operating revenues"},{"claim_id":"c:84b30ea10c13e9e34e084fa6d8b66117","page_id":"C124887345:39","page_url":"https://archive.org/details/C124887345/page/n38","statement_kind":"proposal","subject_label":"Port net revenue projection FY1985-86","summary":"The Port expects to improve net revenue in fiscal year 1985-86 from rentals and containerized shipping.","property":"other","value_text":"improve net revenue","date_printed":"fiscal year 1985-86","t_from":"1985","quote":"For fiscal year 1985-86, the Port expects to improve net revenue because of increases in revenues from both commercial property rentals and containerized shipping which moves through the Port.","place_label":"Port of San Francisco","anchor":"s-84b30ea10c13","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"For fiscal year 1985-86, the Port expects to improve net revenue"},{"claim_id":"c:c509fbe4e58125c51677acd86d52327b","page_id":"C124887345:39","page_url":"https://archive.org/details/C124887345/page/n38","statement_kind":"finding","subject_label":"Commercial Property Department activity April 1984 to March 1986","summary":"The Commercial Property Department negotiated and processed 266 new rental agreements in the two years to March 1986.","property":"finding","value_text":"266 new rental agreements","value_num":266.0,"date_printed":"April 1984 through March 1986","t_from":"1984","quote":"Negotiated and processed 266 new rental agreements, almost all licenses;","place_label":"Port of San Francisco","anchor":"s-c509fbe4e581","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"During the two year period from April, 1984 through March, 1986"},{"claim_id":"c:e29c2c20cb42b6d448c473567a7e9826","page_id":"C124887345:39","page_url":"https://archive.org/details/C124887345/page/n38","statement_kind":"finding","subject_label":"Port operating surplus FY1983-84","summary":"The Port's operating surplus rose to $9,096,000 (≈ $30.8 million in 2026 dollars) in fiscal year 1983-84.","property":"finding","value_text":"$9,096,000","value_num":9096000.0,"unit":"USD","date_printed":"fiscal year 1983-84","t_from":"1983","quote":"These results were improved in fiscal year 1983-84 to $27,621,000, $18,525,000 and $9,096,000 respectively for a net increase in operating surplus of $2,703,000 or 42.3 percent.","place_label":"Port of San Francisco","anchor":"s-e29c2c20cb42","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Financial In fiscal year 1982-83, the Port had operating revenues"},{"claim_id":"c:e3f754f74b6d4d1b788816efa353ef89","page_id":"C124887345:39","page_url":"https://archive.org/details/C124887345/page/n38","statement_kind":"finding","subject_label":"Port operating revenues and expenses FY1982-83","summary":"The Port had operating revenues of $26,360,000 (≈ $92.0 million in 2026 dollars) and operating expenses of $19,967,000 (≈ $69.7 million in 2026 dollars) in fiscal year 1982-83.","property":"finding","value_text":"$26,360,000","value_num":26360000.0,"unit":"USD","date_printed":"fiscal year 1982-83","t_from":"1982","quote":"In fiscal year 1982-83, the Port had operating revenues of $26,360,000 and operating expenses of $19,967,000 for a net operating surplus of $6,393,000.","place_label":"Port of San Francisco","anchor":"s-e3f754f74b6d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Financial In fiscal year 1982-83, the Port had operating revenues"},{"claim_id":"c:fbfe2d8613084a6f4fdf6c5e4874f3dc","page_id":"C124887345:39","page_url":"https://archive.org/details/C124887345/page/n38","statement_kind":"finding","subject_label":"Back rent collected after lease audit","summary":"The Port audited 117 leases and collected over $175,000 (≈ $537,997 in 2026 dollars) in back rent payments.","property":"finding","value_text":"over $175,000","value_num":175000.0,"unit":"USD","t_from":"1986","quote":"Audited 117 leases and corrected their compliance deficiencies including the collection of over $175,000 in back rent payments;","place_label":"Port of San Francisco","anchor":"s-fbfe2d861308","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Audited 117 leases and corrected their compliance deficiencies"},{"claim_id":"c:32f4a3ee956b7b0e70e68e3cf7c80b83","page_id":"C124887345:55","page_url":"https://archive.org/details/C124887345/page/n54","statement_kind":"finding","subject_label":"Eviction process length","summary":"The eviction process takes a minimum of 54 days to complete.","property":"finding","value_text":"minimum of 54 days","value_num":54.0,"unit":"days","t_from":"1986","quote":"The thirty day rent deposit is inadequate for an eviction process that takes a minimum of 54 days to complete","place_label":"Port of San Francisco","anchor":"s-32f4a3ee956b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The thirty day rent deposit is inadequate"},{"claim_id":"c:639c365d61dbbac26a15e5e7bc80f968","page_id":"C124887345:55","page_url":"https://archive.org/details/C124887345/page/n54","statement_kind":"finding","subject_label":"Port rent deposit requirement","summary":"The Port requires tenants to post a bond equal to one month's rent as security.","property":"finding","value_text":"one month's rent","value_num":1.0,"unit":"months","t_from":"1986","quote":"The Port requires tenants of Port property to post a bond equal to one month's rent as security for the Port in the event that the tenant neglects to pay the required rent.","place_label":"Port of San Francisco","anchor":"s-639c365d61db","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Port requires tenants of Port property to post a bond"},{"claim_id":"c:7034c93f6434853ca567c6aff5cbd1ba","page_id":"C124887345:55","page_url":"https://archive.org/details/C124887345/page/n54","statement_kind":"finding","subject_label":"Port exposure to rent loss","summary":"The Port is exposing itself to a loss of at least 24 days rent because deposits do not cover eviction time.","property":"finding","value_text":"at least 24 days rent","value_num":24.0,"unit":"days","t_from":"1986","quote":"Thus, the Port is unnecessarily exposing itself to a loss of at least 24 days rent because the deposit amounts do not completely cover the rent","place_label":"Port of San Francisco","anchor":"s-7034c93f6434","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Thus, the Port is unnecessarily exposing itself"},{"claim_id":"c:89bb2d95f51464cd5c91846449d84237","page_id":"C124887345:55","page_url":"https://archive.org/details/C124887345/page/n54","statement_kind":"finding","subject_label":"Port bad debt write-offs","summary":"The Port wrote off bad debts of $477,501 (≈ $1.5 million in 2026 dollars) in 1984 and $753,321 (≈ $2.4 million in 2026 dollars) in 1985.","property":"finding","value_text":"$477,501 in 1984; $753,321 in 1985","value_num":477501.0,"unit":"USD","date_printed":"1984 and 1985","t_from":"1984","quote":"In 1984, the Port wrote off bad debts of $477,501 and in 1985 the Port wrote off $753,321.","place_label":"Port of San Francisco","anchor":"s-89bb2d95f514","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In 1984, the Port wrote off bad debts of $477,501"},{"claim_id":"c:b3a91a5983bec76aab477b443aa909c7","page_id":"C124887345:55","page_url":"https://archive.org/details/C124887345/page/n54","statement_kind":"proposal","subject_label":"Bad debts avoidable with deposits","summary":"The report estimates at least $40,000 (≈ $122,971 in 2026 dollars) annually need not have been written off.","property":"finding","value_text":"at least $40,000 annually","value_num":40000.0,"unit":"USD","t_from":"1986","quote":"we estimate that at least $40,000 annually need not have been written off by the","place_label":"Port of San Francisco","anchor":"s-b3a91a5983be","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"we estimate that at least $40,000 annually need not have been written off"},{"claim_id":"c:ed8cbaa262c54c4443fd3a7715d17071","page_id":"C124887345:55","page_url":"https://archive.org/details/C124887345/page/n54","statement_kind":"proposal","subject_label":"Tenant deposit increase","summary":"The report recommends increasing tenant deposits to the equivalent of two months' rent plus damage, security and moving amounts.","property":"recommendation","value_text":"two month's rent plus an amount for potential damage","value_num":2.0,"unit":"months","t_from":"1986","quote":"Therefore, we recommend that the deposit for tenants should be increased to the equivalent of only two month's rent plus an amount for potential damage","place_label":"Port of San Francisco","anchor":"s-ed8cbaa262c5","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Therefore, we recommend that the deposit for tenants should be increased"},{"claim_id":"c:12bbc34787b8a621d7f1b9c396055c05","page_id":"C124887345:58","page_url":"https://archive.org/details/C124887345/page/n57","statement_kind":"proposal","subject_label":"Private collection agencies","summary":"The report recommends the Port explore private collection services as an alternative to writing off accounts.","property":"recommendation","value_text":"explore private collection services","t_from":"1986","quote":"The Port should explore the use of these services as an alternative to completely writing off some of its accounts.","anchor":"s-12bbc34787b8","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Port should explore the use of these services"},{"claim_id":"c:16f0a4cf0e1c823aa278baaee75500e1","page_id":"C124887345:58","page_url":"https://archive.org/details/C124887345/page/n57","statement_kind":"finding","subject_label":"City Attorney delinquent case settlements","summary":"The City Attorney's Office settled seventeen delinquent cases and collected $264,577 (≈ $828,500 in 2026 dollars) in 1985.","property":"finding","value_text":"$264,577","value_num":264577.0,"unit":"USD","date_printed":"1985","t_from":"1985","quote":"In 1985, the City Attorney's Office settled seventeen cases, and collected $264,577.","anchor":"s-16f0a4cf0e1c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In 1985, the City Attorney's Office settled seventeen cases"},{"claim_id":"c:239d7281c3a92d861c24641a38cb634e","page_id":"C124887345:58","page_url":"https://archive.org/details/C124887345/page/n57","statement_kind":"finding","subject_label":"Port delinquent collection staffing","summary":"Two Port staff manage an estimated 350 delinquent accounts per year.","property":"finding","value_text":"350 accounts per year","value_num":350.0,"unit":"accounts","t_from":"1986","quote":"while the two Port staff assigned to delinquent collections manage an estimated 350 accounts per year that are delinquent by sixty days or more.","anchor":"s-239d7281c3a9","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"According to a representative from the Tax Collector's Bureau"},{"claim_id":"c:3a6a077be9813207134ab971acfcbb22","page_id":"C124887345:58","page_url":"https://archive.org/details/C124887345/page/n57","statement_kind":"proposal","subject_label":"Administrative Code amendment for returned checks","summary":"The report recommends amending the Administrative Code so the Port may retain insufficient-funds collections.","property":"recommendation","value_text":"amend Administrative Code","t_from":"1986","quote":"We recommend that the Administrative Code be amended so that the Port could unqualifiedly retain monies it collects for the insufficient funds account.","anchor":"s-3a6a077be981","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We recommend that the Administrative Code be amended"},{"claim_id":"c:3d8a6bf2bcafcf21d10b8ddf72846832","page_id":"C124887345:58","page_url":"https://archive.org/details/C124887345/page/n57","statement_kind":"finding","subject_label":"Port delinquent revenue collection","summary":"The Port does not participate in the Tax Collector's delinquent revenue collection program.","property":"finding","value_text":"does not participate","t_from":"1986","quote":"The Port does not participate in the delinquent revenue collection program administered by the Bureau of Delinquent Revenue Collection of the Tax Collectors Office","anchor":"s-3d8a6bf2bcaf","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Port does not participate in the delinquent revenue collection program"},{"claim_id":"c:3e5d0fa832ed43c8c5d5e989211c3f7a","page_id":"C124887345:58","page_url":"https://archive.org/details/C124887345/page/n57","statement_kind":"finding","subject_label":"City Attorney active delinquency cases","summary":"The City Attorney's Office has 33 active delinquency cases, 23 with suits filed.","property":"finding","value_text":"33 active cases; 23 with suits","value_num":33.0,"t_from":"1986","quote":"Presently, this Office has 33 active cases of which 23 now have suits filed against the delinquent tenant.","anchor":"s-3e5d0fa832ed","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Presently, this Office has 33 active cases"},{"claim_id":"c:c5a2f4a1401e507a52e876c6db4aeb0b","page_id":"C124887345:58","page_url":"https://archive.org/details/C124887345/page/n57","statement_kind":"finding","subject_label":"Returned check charge","summary":"The Port charges clients $10.00 (≈ $30.74 in 2026 dollars) for checks returned for insufficient funds, retaining the money.","property":"finding","value_text":"$10.00","value_num":10.0,"unit":"USD","t_from":"1986","quote":"clients are charged $10.00 for checks returned to the Port because of insufficient funds since the City's Administrative Code allows for a penalty of that amount.","anchor":"s-c5a2f4a1401e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"clients are charged $10.00 for checks returned"},{"claim_id":"c:ed9d4f0410305ce1ca201286aed3173f","page_id":"C124887345:58","page_url":"https://archive.org/details/C124887345/page/n57","statement_kind":"proposal","subject_label":"Rent billing timing","summary":"The report suggests mailing rent bills at least ten days before [name withheld]","property":"recommendation","value_text":"at least ten days before due","value_num":10.0,"unit":"days","t_from":"1986","quote":"billing notices for rent could be mailed to tenants at least ten days before they are due for collection, rather than on the first of the month","anchor":"s-ed9d4f041030","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"billing notices for rent could be mailed to tenants"},{"claim_id":"c:18f9328dfc7addfab34e3c1fb010d0dd","page_id":"C124887345:59","page_url":"https://archive.org/details/C124887345/page/n58","statement_kind":"proposal","subject_label":"Tenant rental notices","summary":"The report recommends that the Finance and Administration Division send tenants a rental notice ten days before rent is due.","property":"recommendation","value_text":"ten days","value_num":10.0,"t_from":"1986","quote":"Send tenants a rental notice ten days before the monthly rent is due.","anchor":"s-18f9328dfc7a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We recommend that the Finance and Administration Division"},{"claim_id":"c:27fbf8d477282b2ee85527debe3e2974","page_id":"C124887345:59","page_url":"https://archive.org/details/C124887345/page/n58","statement_kind":"finding","subject_label":"Port collections policy citations","summary":"The proposed policy statement does not cite the authority for the policies it describes.","property":"finding","t_from":"1986","quote":"The proposed policy statement generally does not cite the authority (State Law, City Charter Section, Port Resolution, etc.) to carry out the policies described.","anchor":"s-27fbf8d47728","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The proposed policy statement generally does not cite the authority"},{"claim_id":"c:789701c23c9e7afa571e88c3fdaf6059","page_id":"C124887345:59","page_url":"https://archive.org/details/C124887345/page/n58","statement_kind":"proposal","subject_label":"Tenant deposits","summary":"The report recommends increasing tenant deposits.","property":"recommendation","value_text":"increase","t_from":"1986","quote":"Increase tenant deposits; Develop a comprehensive procedures manual which addresses all such collection issues","anchor":"s-789701c23c9e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We recommend that the Finance and Administration Division"},{"claim_id":"c:c2d70f007af0ef3ce4015a1fd13f6a42","page_id":"C124887345:59","page_url":"https://archive.org/details/C124887345/page/n58","statement_kind":"finding","subject_label":"Port collections practices","summary":"The report finds collection practices are not as aggressive as they could be and deposits are insufficient.","property":"finding","t_from":"1986","quote":"collection practices are not as aggressive as they could be, deposits are insufficient, the number of bad debts is excessive and the Port's collections policy still needs additional clarification.","anchor":"s-c2d70f007af0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"CONCLUSION While, the Accounting Department has improved"},{"claim_id":"c:1bb3454d4056c7a312826948bbdfb1ea","page_id":"C124887345:62","page_url":"https://archive.org/details/C124887345/page/n61","statement_kind":"finding","subject_label":"Port cargo cranes","summary":"The Port has ordered two new cranes and is acquiring one used crane.","property":"acquired","value_text":"$6.9 million","value_num":6900000.0,"unit":"USD","t_from":"1986","quote":"THE PORT HAS ORDERED TWO NEW CRANES AND IS ACQUIRING ONE USED CRANE AT A COST OF $6.9 MILLION.","anchor":"s-1bb3454d4056","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"SECTION II.1 CAPITAL PROJECT PLANNING; THE PORT HAS ORDERED TWO NEW CRANES"},{"claim_id":"c:3d3b739450503c074fc7b65fa728b7d4","page_id":"C124887345:62","page_url":"https://archive.org/details/C124887345/page/n61","statement_kind":"proposal","subject_label":"Deferral of cargo handling spending","summary":"The report recommends deferring the proposed crane rebuild and an additional estimated four million dollars for other cargo handling improvements.","property":"recommendation","value_text":"$4 million","value_num":4000000.0,"unit":"USD","t_from":"1986","quote":"THEREFORE, THE PORT SHOULD DEFER THE PROPOSED g MILLION REBUILDING OF ITS CRANE AND DEFER AN ADDITIONAL ESTIMATED $4 MILLION FOR [name withheld] CARGO HANDLING IMPROVEMENTS.","anchor":"s-3d3b73945050","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"THEREFORE, THE PORT SHOULD DEFER THE PROPOSED"},{"claim_id":"c:4cc666014c4df53ed498bce8714563cc","page_id":"C124887345:62","page_url":"https://archive.org/details/C124887345/page/n61","statement_kind":"proposal","subject_label":"Rebuilding of a Port crane","summary":"The Port proposes to rebuild one of its own cranes.","property":"proposes","value_text":"$I million","unit":"USD","t_from":"1986","quote":"THE PORT PROPOSES TO REBUILD ONE OF ITS [name withheld] CRANES AT A COST OF $I MILLION EVEN THOUGH THE USE OF THE PORT'S CRANES IS FAR BELOW THE INDUSTRY AVERAGE.","anchor":"s-4cc666014c4d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"THE PORT PROPOSES TO REBUILD ONE OF ITS CRANES"},{"claim_id":"c:8c90f09d660c4111ce0a205683c92403","page_id":"C124887345:62","page_url":"https://archive.org/details/C124887345/page/n61","statement_kind":"proposal","subject_label":"Reuse of deferred cargo funds","summary":"The report proposes that five million dollars be used for commercial revenue-producing capital projects on Port property.","property":"proposes","value_text":"$5 million","value_num":5000000.0,"unit":"USD","t_from":"1986","quote":"THIS TOTAL OF $5 MILLION SHOULD BE PRODUCTIVELY USED FOR THE DEVELOPMENT OF SEVERAL COMMERCIAL REVENUE PRODUCING CAPITAL PROJECTS ON PORT PROPERTY.","anchor":"s-8c90f09d660c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"THIS TOTAL OF $5 MILLION SHOULD BE PRODUCTIVELY USED"},{"claim_id":"c:e5af49c8370257d57d8262ee43631511","page_id":"C124887345:62","page_url":"https://archive.org/details/C124887345/page/n61","statement_kind":"finding","subject_label":"Port crane usage","summary":"The Port's seven existing cranes are used less than five percent of their available time.","property":"finding","value_text":"less than five percent","value_num":5.0,"unit":"percent","t_from":"1986","quote":"FOR EACH OF ITS SEVEN EXISTING CRANES WHICH ARE NOW USED LESS THAN FIVE PERCENT OF THEIR AVAILABLE TIME.","anchor":"s-e5af49c83702","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"FOR EACH OF ITS SEVEN EXISTING CRANES WHICH ARE NOW USED"},{"claim_id":"c:2ac6f863a6cfcb75911a1913b0214d55","page_id":"C124887345:65","page_url":"https://archive.org/details/C124887345/page/n64","statement_kind":"finding","subject_label":"Tunnel modification cost","summary":"A Port consulting firm estimated the tunnel modification cost at three point three to four million dollars.","property":"cost_usd","value_text":"$3.3 million to $4.0 million","value_num":3300000.0,"unit":"USD","date_printed":"February, 1984","t_from":"1984","quote":"The Port's consulting firm for the project made a report to the Port in February, 1984, estimating the cost of this project to be from $3.3 million to $4.0 million.","anchor":"s-2ac6f863a6cf","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The Port's consulting firm for the project made a report to the Port"},{"claim_id":"c:66dfa8b69d420037912649a00d755eff","page_id":"C124887345:65","page_url":"https://archive.org/details/C124887345/page/n64","statement_kind":"finding","subject_label":"Southern Pacific and Santa Fe merger","summary":"The merger of Southern Pacific and Santa Fe railroads has not been approved.","property":"finding","value_text":"not approved","t_from":"1986","quote":"The merger between the Southern Pacific Railroad and the Santa Fe Railroad has not been approved, and according to the Maritime Affairs Division","anchor":"s-66dfa8b69d42","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"according to the Maritime Affairs Division, Southern Pacific Railroad has indicated"},{"claim_id":"c:790f0ac3002cb56fcc0db012b95b7319","page_id":"C124887345:65","page_url":"https://archive.org/details/C124887345/page/n64","statement_kind":"cites_decision","subject_label":"1984 Port bond issue","summary":"The voters approved a 42.5 million dollar bond issue for Port improvements in 1984.","property":"approved","value_text":"$42.5 million","value_num":42500000.0,"unit":"USD","date_printed":"1984","t_from":"1984","quote":"When the $42.5 million bond issue for Port improvements was approved by the voters in 1984, $6.4 million of the bond issue was allocated to Pier 96","anchor":"s-790f0ac3002c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"When the $42.5 million bond issue for Port improvements was approved by the voters in 1984"},{"claim_id":"c:8c8ac621fe65b9e3a54659a248709894","page_id":"C124887345:65","page_url":"https://archive.org/details/C124887345/page/n64","statement_kind":"finding","subject_label":"Tunnel modifications schedule","summary":"The projected completion date for the tunnel modifications has been set back by six months.","property":"finding","value_text":"six months","value_num":6.0,"unit":"months","t_from":"1986","quote":"The projected date for the completion of tunnel modifications has been set back by six months.","anchor":"s-8c8ac621fe65","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The projected date for the completion of tunnel modifications has been set back"},{"claim_id":"c:9663b90256629db808e13b0a80cb6797","page_id":"C124887345:65","page_url":"https://archive.org/details/C124887345/page/n64","statement_kind":"finding","subject_label":"Container shipping forecasts","summary":"Forecasts for present shipping lines using the Port show small increases.","property":"finding","value_text":"small increases","t_from":"1986","quote":"Forecasts for container shipping by present shipping lines (other than the Lykes Lines which has announced plans to discontinue San Francisco operations) using the Port show small increases.","anchor":"s-9663b9025662","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Forecasts for container shipping by present shipping lines"},{"claim_id":"c:a194a08ac8aa67d4f5aabbf446370632","page_id":"C124887345:65","page_url":"https://archive.org/details/C124887345/page/n64","statement_kind":"finding","subject_label":"Tunnel modification funding","summary":"The Port's Maritime Affairs Division is negotiating for the merged railroad to pay for the tunnel modification.","property":"other","value_text":"$4.0 million in Port monies","value_num":4000000.0,"unit":"USD","t_from":"1986","quote":"The Port's Maritime Affairs Division now states that they are negotiating with a management team that can represent the proposed merged railroad's interests","anchor":"s-a194a08ac8aa","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"the Port's Maritime Affairs Division","stance":"quotes_to_report","speaker_evidence":"The Port's Maritime Affairs Division now states that they are negotiating"},{"claim_id":"c:013a2bd0b6e62bfde6d316e323e7ecf6","page_id":"C124887345:73","page_url":"https://archive.org/details/C124887345/page/n72","statement_kind":"finding","subject_label":"Thirty-day Port licenses","summary":"Granting thirty-day licenses has resulted in certain Port land and facilities not being put out to competitive bid.","property":"finding","t_from":"1986","quote":"The practice of granting thirty-day licenses by the Port has resulted in not putting certain land and facilities out to competitive bid.","anchor":"s-013a2bd0b6e6","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The practice of granting thirty-day licenses by the Port"},{"claim_id":"c:7431f37c079d65e4a110562fca3567b1","page_id":"C124887345:73","page_url":"https://archive.org/details/C124887345/page/n72","statement_kind":"finding","subject_label":"Ferry Building litigation","summary":"The Port filed suit asking the Court to determine that its cancellation of the agreement was proper.","property":"other","t_from":"1986","quote":"The Port filed suit to ask the Court to determine that the Port's action was proper.","place_label":"Ferry Building Complex","place_precision":"building","anchor":"s-7431f37c079d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The Port filed suit to ask the Court to determine"},{"claim_id":"c:97622dd37e5e83acf22decce3e9f358d","page_id":"C124887345:73","page_url":"https://archive.org/details/C124887345/page/n72","statement_kind":"finding","subject_label":"Board approval of Port licenses","summary":"Such licenses are not subject to Board of Supervisors approval even when they run over ten years or produce over one million dollars.","property":"finding","value_text":"over $1 million","value_num":1000000.0,"unit":"USD","t_from":"1986","quote":"such licenses are not subject to approval from the Board of Supervisors even though they may remain in effect for over ten years or result in revenues of over $1 million to the Port.","anchor":"s-97622dd37e5e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"such licenses are not subject to approval from the Board of Supervisors"},{"claim_id":"c:a5986f5d028a49e476d826f901789f1b","page_id":"C124887345:73","page_url":"https://archive.org/details/C124887345/page/n72","statement_kind":"cites_decision","subject_label":"Ferry Building Complex agreement","summary":"The Port approved an agreement with a private firm to rebuild the Ferry Building Complex.","property":"approved","value_text":"agreement","date_printed":"1980","t_from":"1980","quote":"In 1980, the Port approved an agreement with a private firm to rebuild the Ferry Building Complex.","place_label":"Ferry Building Complex","place_precision":"building","anchor":"s-a5986f5d028a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In 1980, the Port approved an agreement with a private firm"},{"claim_id":"c:b497b4b6eacc68917349ce32c1133d71","page_id":"C124887345:73","page_url":"https://archive.org/details/C124887345/page/n72","statement_kind":"cites_decision","subject_label":"Ferry Building Complex agreement","summary":"The Port canceled the Ferry Building agreement in December 1985.","property":"other","value_text":"canceled","date_printed":"December, 1985","t_from":"1985","quote":"after many extensions to the original agreement, the Port canceled the agreement in December, 1985.","place_label":"Ferry Building Complex","place_precision":"building","anchor":"s-b497b4b6eacc","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the Port canceled the agreement in December, 1985."},{"claim_id":"c:f6e96355fca7e92dcb60a09d22e7f33c","page_id":"C124887345:73","page_url":"https://archive.org/details/C124887345/page/n72","statement_kind":"finding","subject_label":"Ferry Building office vacancy","summary":"Office space in the Ferry Building is currently twenty-five percent vacant.","property":"finding","value_text":"twenty-five percent","value_num":25.0,"unit":"percent","t_from":"1986","quote":"office space in the Ferry Building is currently twenty-five percent vacant.","place_label":"Ferry Building","place_precision":"building","place_id":"qipu:sf/place/landmark/ferry-building","resolved_by":"place links file","anchor":"s-f6e96355fca7","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"office space in the Ferry Building is currently twenty-five percent vacant."},{"claim_id":"c:3142194e11ba01019a93fcf85e129eeb","page_id":"C124887345:81","page_url":"https://archive.org/details/C124887345/page/n80","statement_kind":"finding","subject_label":"Fishermans Wharf restaurant leases","summary":"The Port entered into 1975 leases with Fishermans Wharf restaurants running sixty-one years, until 2036.","property":"other","value_text":"sixty-one years, until 2036","value_num":61.0,"date_printed":"1975","t_from":"1975","quote":"In 1975, the Port entered into leases with a number of restaurants in the Fishermans Wharf Zone for sixty-one years, until the year 2036.","place_label":"Fishermans Wharf Zone","anchor":"s-3142194e11ba","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"SECTION II1.3: LEASE ADJUSTMENTS FOR RESTAURANT TENANTS"},{"claim_id":"c:4f513a1416134e87c18215685e782abb","page_id":"C124887345:81","page_url":"https://archive.org/details/C124887345/page/n80","statement_kind":"finding","subject_label":"Lost restaurant rent revenue","summary":"The Budget Analyst estimates the Port has lost at least $675,000 (≈ $2.8 million in 2026 dollars) in revenue from restaurant tenants.","property":"other","value_text":"at least $675,000","value_num":675000.0,"unit":"USD","date_printed":"1980 and 1985","t_from":"1980","quote":"BY FAILING TO ADJUST TENANT RENTS IN 1985 AND 1980, THE PORT HAS LOST ESTIMATED REVENUES OF AT LEAST $675,000 FROM THEIR RESTAURANT TENANTS.","place_label":"Fishermans Wharf Zone","anchor":"s-4f513a141613","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"THE PORT HAS LOST ESTIMATED REVENUES OF AT LEAST $675,000"},{"claim_id":"c:50fdf42c782c901c6388a540f3b51ed6","page_id":"C124887345:81","page_url":"https://archive.org/details/C124887345/page/n80","statement_kind":"finding","subject_label":"Location of Fishermans Wharf restaurants","summary":"The report says the rent terms did not consider the strategic location of the Fishermans Wharf restaurants.","property":"finding","t_from":"1986","quote":"Unfortunately, consideration was not given to the strategic location of the Fishermans Wharf restaurants which gives them a significant advantage over other restaurants in the area but not on the Wharf.","place_label":"Fishermans Wharf Zone","anchor":"s-50fdf42c782c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"consideration was not given to the strategic location"},{"claim_id":"c:76b5408cd224aa084eaa010bebd141b2","page_id":"C124887345:81","page_url":"https://archive.org/details/C124887345/page/n80","statement_kind":"background","subject_label":"Burton Act lease term limit","summary":"The Burton Act sets sixty-six years as the longest term permitted for Port leases.","property":"other","value_text":"sixty-six years","value_num":66.0,"t_from":"1986","quote":"Sixty-six years is the longest term permitted for Port leases by the Burton Act which transferred the Port lands to the City in Trust.","anchor":"s-76b5408cd224","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Sixty-six years is the longest term permitted for Port leases"},{"claim_id":"c:76e98dab514d29c7af202c59f088dd95","page_id":"C124887345:81","page_url":"https://archive.org/details/C124887345/page/n80","statement_kind":"finding","subject_label":"Restaurant tenant rent adjustments","summary":"The Port has not adjusted restaurant leases for the five-year periods beginning in 1980 and 1985.","property":"other","value_text":"not adjusted for 1980 or 1985 periods","date_printed":"1980 and 1985","t_from":"1980","quote":"HOWEVER, THE PORT HAS NOT ADJUSTED THESE LEASES FOR EITHER OF THE FIVE-YEAR PERIODS BEGINNING IN 1980 AND IN 1985.","place_label":"Fishermans Wharf Zone","anchor":"s-76e98dab514d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"THE PORT HAS NOT ADJUSTED THESE LEASES"},{"claim_id":"c:b1751318f56751d9f2e1aa37d424c286","page_id":"C124887345:81","page_url":"https://archive.org/details/C124887345/page/n80","statement_kind":"finding","subject_label":"Percentage of gross receipts rent","summary":"Under the 1975 leases, Fishermans Wharf restaurants agreed to pay five percent of food sales and seven percent of alcohol and other revenues.","property":"other","value_text":"5% food, 7% alcohol, 7% other revenues","unit":"percent","date_printed":"1975","t_from":"1975","quote":"Under the 1975 leases, the Fishermans Wharf restaurants agreed to pay the Port five percent of their revenue from food sales, seven percent of their revenues from alcoholic beverage sales","place_label":"Fishermans Wharf Zone","anchor":"s-b1751318f567","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the Fishermans Wharf restaurants agreed to pay the Port five percent"},{"claim_id":"c:ca51ab81e217cfa393b25cb0bf95b791","page_id":"C124887345:81","page_url":"https://archive.org/details/C124887345/page/n80","statement_kind":"proposal","subject_label":"Restaurant rent increase","summary":"The report estimates that increasing restaurant rents as the leases provide would yield at least $380,000 (≈ $1.2 million in 2026 dollars) annually.","property":"other","value_text":"at least $380,000 annually","value_num":380000.0,"unit":"USD","t_from":"1986","quote":"INCREASING RENTS 10 ITS RESTAURANT TENANTS, IN ACCORDANCE WITH THE PORT'S LEASE PROVISIONS, WOULD RESULT IN ESTIMATED INCREASED REVENUES TO THE PORT OF AT LEAST $380,000 ANNUALLY.","place_label":"Fishermans Wharf Zone","anchor":"s-ca51ab81e217","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"INCREASING RENTS 10 ITS RESTAURANT TENANTS"},{"claim_id":"c:18fe605a481ea04683198ed27068ece0","page_id":"C124887345:91","page_url":"https://archive.org/details/C124887345/page/n90","statement_kind":"finding","subject_label":"China Basin berth revenue","summary":"The Port earned $9,600 (≈ $30,062 in 2026 dollars) in China Basin berth fees in 1985.","property":"other","value_text":"$9,600 in 1985","value_num":9600.0,"unit":"USD","date_printed":"1985","t_from":"1985","quote":"compared with the $9,600, or $12.90 per boat, earned by the Port in China Basin berth fees in 1985.","place_label":"China Basin","anchor":"s-18fe605a481e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Total China Basin berth revenues to the Port would thus total"},{"claim_id":"c:3221d6a9a51a18c57debfe125da64a1f","page_id":"C124887345:91","page_url":"https://archive.org/details/C124887345/page/n90","statement_kind":"cites_decision","subject_label":"Houseboat lease approval","summary":"The Port Commission approved the China Basin houseboat lease in November 1977, as the Association argues.","property":"approved","value_text":"approved by the Port Commission","date_printed":"November, 1977","t_from":"1977","quote":"because it was approved by the Port Commission in November, 1977.","place_label":"China Basin","anchor":"s-3221d6a9a51a","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"Mission Creek Harbor Association","stance":"quotes_to_report","speaker_evidence":"The Mission Creek Harbor Association, which represents the houseboat community"},{"claim_id":"c:601c7cdd8a81be9837afbf7b16aa9004","page_id":"C124887345:91","page_url":"https://archive.org/details/C124887345/page/n90","statement_kind":"proposal","subject_label":"Market berth fee at China Basin","summary":"The report estimates a $300 (≈ $922 in 2026 dollars) monthly market berth fee for the eighteen houseboats would yield $64,800 (≈ $199,213 in 2026 dollars) annually.","property":"other","value_text":"$64,800 annually","value_num":64800.0,"unit":"USD","t_from":"1986","quote":"If a market rate berth fee of $300 per month were charged to the eighteen houseboats at China Basin, the Port would receive $64,800 annually.","place_label":"China Basin","anchor":"s-601c7cdd8a81","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"If a market rate berth fee of $300 per month were charged"},{"claim_id":"c:9cefb81b6a6b9e30cbeb3476e3c529fd","page_id":"C124887345:91","page_url":"https://archive.org/details/C124887345/page/n90","statement_kind":"finding","subject_label":"China Basin property management","summary":"The report concludes the Port is clearly not managing its China Basin property profitably.","property":"finding","t_from":"1986","quote":"The Port is clearly not managing its property at China Basin profitably.","place_label":"China Basin","anchor":"s-9cefb81b6a6b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Port is clearly not managing its property at China Basin profitably."},{"claim_id":"c:a470d6445b70b49eb3c839635891f09d","page_id":"C124887345:91","page_url":"https://archive.org/details/C124887345/page/n90","statement_kind":"finding","subject_label":"Unsigned lease construction at China Basin","summary":"The Port built piers and utilities before a signed agreement, at estimated cost of $170,000 (≈ $522,626 in 2026 dollars) reimbursable and $200,000 (≈ $614,854 in 2026 dollars) non-reimbursable.","property":"cost_usd","value_text":"$170,000 reimbursable; $200,000 non-reimbursable","value_num":170000.0,"unit":"USD","t_from":"1986","quote":"The Port estimated that construction of these facilities entailed expenditures of $170,000 that would have been reimbursable under the proposed lease as well as non-reimbursable expenditures of $200,000.","place_label":"China Basin","anchor":"s-a470d6445b70","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The Port estimated that construction of these facilities entailed expenditures"},{"claim_id":"c:e8e20541ad09b854f77176f94ed7953b","page_id":"C124887345:91","page_url":"https://archive.org/details/C124887345/page/n90","statement_kind":"finding","subject_label":"Lost rent at China Basin","summary":"The Port has lost $106,000 (≈ $547,786 in 2026 dollars) in revenues from China Basin houseboat facilities since January 1978.","property":"other","value_text":"$106,000 lost revenues","value_num":106000.0,"unit":"USD","date_printed":"January 1978 to December","t_from":"1978","quote":"By not charging the amount permitted in the proposed lease, the Port has lost $106,000 in revenues between January","place_label":"China Basin","anchor":"s-e8e20541ad09","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"By not charging the amount permitted in the proposed lease, the Port has lost"},{"claim_id":"c:fdbbf66f8d22b4d01c7d35f8882ecee2","page_id":"C124887345:91","page_url":"https://archive.org/details/C124887345/page/n90","statement_kind":"finding","subject_label":"China Basin houseboat counts","summary":"China Basin has eighteen houseboats, thirty-one live-aboard boats and thirteen non-residential boats moored.","property":"other","value_text":"18 houseboats, 31 live-aboards, 13 non-residential boats","value_num":62.0,"unit":"boats","t_from":"1986","quote":"Currently, there are eighteen houseboats, thirty-one live-aboard boats and only thirteen non-residential boats moored there.","place_label":"China Basin","anchor":"s-fdbbf66f8d22","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Currently, there are eighteen houseboats, thirty-one live-aboard boats"},{"claim_id":"c:00962acb65a6f7b7e0103abc0417da3e","page_id":"C124887345:100","page_url":"https://archive.org/details/C124887345/page/n99","statement_kind":"proposal","subject_label":"Electrical conversion benefits","summary":"The report says conversion to PG&E power would simplify Port maintenance and reduce expenses and liability.","property":"recommendation","t_from":"1986","quote":"Conversion to PG&E power would simplify the Port's maintenance function, decrease the Port's maintenance service expenses","anchor":"s-00962acb65a6","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Conversion to PG&E power would simplify the Port's maintenance function"},{"claim_id":"c:1aacaa57939296ea9b1b6982e5871a22","page_id":"C124887345:100","page_url":"https://archive.org/details/C124887345/page/n99","statement_kind":"finding","subject_label":"Electrical conversion cost study","summary":"The World Trade Club studied in 1980 the cost of converting its Ferry Building electric service to PG&E standards.","property":"other","date_printed":"1980","t_from":"1980","quote":"In 1980, the World Trade Club made an analysis of the cost of converting the electric service in their portion of the Ferry Building Complex to PG&E standards","place_label":"Ferry Building Complex","place_precision":"building","anchor":"s-1aacaa579392","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"In 1980, the World Trade Club made an analysis of the cost"},{"claim_id":"c:219d82a417b4dd69716dc71b68243513","page_id":"C124887345:100","page_url":"https://archive.org/details/C124887345/page/n99","statement_kind":"proposal","subject_label":"Electrical conversion plan","summary":"The report recommends the Port plan electrical conversion to PG&E standards as part of upgrading all Port facilities.","property":"recommendation","t_from":"1986","quote":"In order to bring these systems up to PG&E standards, the Port should plan for the conversion as part of its upgrading of all Port facilities.","anchor":"s-219d82a417b4","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the Port should plan for the conversion as part of its upgrading"},{"claim_id":"c:e07b716ec32e9b001049e6de64007dda","page_id":"C124887345:100","page_url":"https://archive.org/details/C124887345/page/n99","statement_kind":"finding","subject_label":"Port electrical system standards","summary":"PG&E has said Port-installed meters, transformers and distribution systems are unacceptable until rebuilt to its standards.","property":"finding","t_from":"1986","quote":"PG&E has stated that a number of these Port installed meters, transformers and distribution systems are unacceptable and will not provide direct service to these tenants","place_label":"Piers 1 and 3","anchor":"s-e07b716ec32e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Pacific Gas and Electric Company (PG&E)","stance":"quotes_to_report","speaker_evidence":"PG&E has stated that a number of these Port installed meters"},{"claim_id":"c:e8ed7c0787552a31aa85679d7e591f11","page_id":"C124887345:100","page_url":"https://archive.org/details/C124887345/page/n99","statement_kind":"finding","subject_label":"Electrical service deposits","summary":"The Port does not require a deposit for electrical service, exposing it to bad debt losses.","property":"finding","t_from":"1986","quote":"The Port does not require a deposit for its electrical service to tenants, exposing the Port to potential financial loss from bad debts.","anchor":"s-e8ed7c078755","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Port does not require a deposit for its electrical service"},{"claim_id":"c:4b1dbf0e0c11b032f63b283e065a2772","page_id":"C124887345:110","page_url":"https://archive.org/details/C124887345/page/n109","statement_kind":"proposal","subject_label":"Minimum rent upgrade","summary":"The report says the area has potential for upgrading minimum rents from 1.7 cents to 5 cents per square foot per month.","property":"rent_usd","value_text":"|.7¢ to 5¢ per square foot per month","t_from":"1986","quote":"Area has potential for significant Upgrading from current minimum rents of |.7¢ to 5¢ per square foot per month.","place_label":"Illinois, Mariposa and China Basin Streets","anchor":"s-4b1dbf0e0c11","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Notes Area has potential for significant Upgrading from current minimum rents"},{"claim_id":"c:9d9f7c419aa6d4d8209dda9ea5c048a1","page_id":"C124887345:110","page_url":"https://archive.org/details/C124887345/page/n109","statement_kind":"finding","subject_label":"Empty industrial buildings","summary":"Three large empty industrial buildings near Amador Street are described as condemned or contaminated with PCBs.","property":"finding","value_text":"three empty buildings, two condemned, one contaminated","value_num":3.0,"t_from":"1986","quote":"Three large empty industrial buildin Ss two of which are comdemned and the other is contaminated with PCBs.","place_label":"Amador Street","place_precision":"street","place_id":"qipu:sf/place/street/amador-st","resolved_by":"place links file","anchor":"s-9d9f7c419aa6","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Notes Three large empty industrial buildings two of which are condemned"},{"claim_id":"c:b3c47df4f5075a43aaada0c4e7c56143","page_id":"C124887345:110","page_url":"https://archive.org/details/C124887345/page/n109","statement_kind":"finding","subject_label":"Port developer negotiations","summary":"The Port reports it is negotiating with two developers for a large empty area used for vehicle storage.","property":"finding","value_text":"two developers","value_num":2.0,"t_from":"1986","quote":"Port reports that it is negotiating with two developers at this time.","anchor":"s-b3c47df4f507","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Port reports that it is negotiating with two developers"},{"claim_id":"c:0b56aa52dcec06794b78165b48d6ae18","page_id":"C124887345:122","page_url":"https://archive.org/details/C124887345/page/n121","statement_kind":"finding","subject_label":"Pier 50 ship repair lease term","summary":"The Pier 50 ship repair operation was limited to five years and may not be renewed without a commitment to relocate.","property":"other","value_text":"five years","value_num":5.0,"unit":"years","t_from":"1986","quote":"This operation was limited to five years and may not be renewed without a commitment to relocate.","place_label":"Pier 50","anchor":"s-0b56aa52dcec","shown":false,"hidden":"response","part":"response","speaker":"another_body","speaker_role":"Port of San Francisco","stance":"own_position","speaker_evidence":"The Port's response: Pier 50 operation limited to five years"},{"claim_id":"c:0cdccccca34e5fd124a535c231342287","page_id":"C124887345:122","page_url":"https://archive.org/details/C124887345/page/n121","statement_kind":"finding","subject_label":"Pier 24 condition","summary":"Pier 24 is in poor structural condition and has to be rebuilt.","property":"other","value_text":"poor structural condition","t_from":"1986","quote":"Pier 24, designated by planners for mixed use development, 1S in poor structural condition and has to be rebuilt.","place_label":"Pier 24","anchor":"s-0cdccccca34e","shown":false,"hidden":"response","part":"response","speaker":"another_body","speaker_role":"Port of San Francisco","stance":"own_position","speaker_evidence":"Pier 24 ... is in poor structural condition and has to be rebuilt"},{"claim_id":"c:266ead019abc2f94a8c6a349710d71a2","page_id":"C124887345:122","page_url":"https://archive.org/details/C124887345/page/n121","statement_kind":"finding","subject_label":"Pier 45 redevelopment","summary":"The Port is moving ahead with a new pier and berthing for commercial fisheries and a hotel on Pier 45.","property":"proposes","value_text":"new pier and hotel","t_from":"1986","quote":"is moving ahead with a new pier and berthing for commercial fisheries and a hotel and public assembly uses on Pier 45","place_label":"Pier 45","place_precision":"site","place_id":"qipu:sf/place/landmark/pier-45","resolved_by":"place links file","anchor":"s-266ead019abc","shown":false,"hidden":"response","part":"response","speaker":"another_body","speaker_role":"Port of San Francisco","stance":"own_position","speaker_evidence":"The current Port administration ... is moving ahead with a new pier"},{"claim_id":"c:98ee2b6e3fefab35fe7b3df68bfc9d6c","page_id":"C124887345:122","page_url":"https://archive.org/details/C124887345/page/n121","statement_kind":"finding","subject_label":"Pier 50 ship repair operation","summary":"BCDC precluded the Port from putting a ship repair operation at Pier 50 under a long-term lease.","property":"rejected","value_text":"long-term lease precluded","t_from":"1986","quote":"When the Port wanted to put a ship repair operation at Pier 50 under a long-term lease, it was precluded from doing so by BCDC.","place_label":"Pier 50","anchor":"s-98ee2b6e3fef","shown":false,"hidden":"response","part":"response","speaker":"another_body","speaker_role":"Port of San Francisco","stance":"own_position","speaker_evidence":"When the Port wanted to put a ship repair operation at Pier 50"},{"claim_id":"c:a2d2a5e27ba1e62dbe7b51bcd2842deb","page_id":"C124887345:122","page_url":"https://archive.org/details/C124887345/page/n121","statement_kind":"finding","subject_label":"Pier 50 return to Port","summary":"The Pier 50 ship repair operation returns $750,000 (≈ $2.3 million in 2026 dollars) annually to the Port.","property":"other","value_text":"$750,000 annually","value_num":750000.0,"unit":"USD","t_from":"1986","quote":"But it presently returns to the Port $750,000 annually.","place_label":"Pier 50","anchor":"s-a2d2a5e27ba1","shown":false,"hidden":"response","part":"response","speaker":"another_body","speaker_role":"Port of San Francisco","stance":"own_position","speaker_evidence":"But it presently returns to the Port $750,000 annually"},{"claim_id":"c:af60fdf451b8aafb31a6ea71cc6680e3","page_id":"C124887345:122","page_url":"https://archive.org/details/C124887345/page/n121","statement_kind":"finding","subject_label":"Cost of one report recommendation","summary":"The report says one recommendation alone would cost $20 million (≈ $61.5 million in 2026 dollars) annually for ten years.","property":"cost_usd","value_text":"$20 million annually for ten years","value_num":20000000.0,"unit":"USD","t_from":"1986","quote":"one recommendation alone would cost $20 million annually for ten years and an undetermined amount of capital and personnel cost.","anchor":"s-af60fdf451b8","shown":false,"hidden":"response","part":"response","speaker":"another_body","speaker_role":"Port of San Francisco","stance":"quotes_to_dispute","speaker_evidence":"But the body of the Report states that one recommendation alone would cost $20 million"},{"claim_id":"c:b93ff20082f22225f39a6e792993aac4","page_id":"C124887345:122","page_url":"https://archive.org/details/C124887345/page/n121","statement_kind":"proposal","subject_label":"Cost of report recommendations","summary":"The report estimates implementing its recommendations at $50,000 (≈ $153,714 in 2026 dollars) annually plus $58,539 (≈ $179,965 in 2026 dollars) in one-time costs.","property":"cost_usd","value_text":"$50,000 annually","value_num":50000.0,"unit":"USD","t_from":"1986","quote":"estimates the cost to implement the Report’s recommendations at $50,000 annually plus $58,539 in one time costs.","anchor":"s-b93ff20082f2","shown":false,"hidden":"response","part":"response","speaker":"another_body","speaker_role":"Port of San Francisco","stance":"quotes_to_dispute","speaker_evidence":"The introduction to the report estimates the cost"},{"claim_id":"c:dd2146849bdfb9cadc1c942ad455492e","page_id":"C124887345:122","page_url":"https://archive.org/details/C124887345/page/n121","statement_kind":"finding","subject_label":"Port financial position","summary":"The Port had a net income of $5.8 million (≈ $18.2 million in 2026 dollars) in 1985, according to the Port response.","property":"other","value_text":"net income $5.8 million","value_num":5800000.0,"unit":"USD","date_printed":"1985","t_from":"1985","quote":"with a net income of $5.8 million in 1985.","anchor":"s-dd2146849bdf","shown":false,"hidden":"response","part":"response","speaker":"another_body","speaker_role":"Port of San Francisco","stance":"own_position","speaker_evidence":"a strong financial position at present, with a net income of $5.8 million"},{"claim_id":"c:eab44ff10936e0f1148c9b21b66c6e27","page_id":"C124887345:122","page_url":"https://archive.org/details/C124887345/page/n121","statement_kind":"background","subject_label":"Pier 24 rebuilding limits","summary":"Rebuilding Pier 24 can only be permitted for water-oriented uses under the McAteer-Petris Act.","property":"other","value_text":"water-oriented uses only","t_from":"1986","quote":"Rebuilding can only be permitted if the uses are water-oriented under the McAteer-Petris Act (BCDC legislation) and cannot be for office or commercial use.","place_label":"Pier 24","anchor":"s-eab44ff10936","shown":false,"hidden":"response","part":"response","speaker":"another_body","speaker_role":"Port of San Francisco","stance":"own_position","speaker_evidence":"Rebuilding can only be permitted if the uses are water-oriented"},{"claim_id":"c:f19cf0cfe37afb1ba4c79a7d1c04d320","page_id":"C124887345:122","page_url":"https://archive.org/details/C124887345/page/n121","statement_kind":"background","subject_label":"Percentage rent leases","summary":"Port leases provide for a minimum rent plus percentage rents based on development profitability.","property":"other","value_text":"minimum rent plus percentage rents","t_from":"1986","quote":"The leases provide that the Port participates in the profits from these developments receiving a minimum rent plus","anchor":"s-f19cf0cfe37a","shown":false,"hidden":"response","part":"response","speaker":"another_body","speaker_role":"Port of San Francisco","stance":"own_position","speaker_evidence":"The leases provide that the Port participates in the profits"},{"claim_id":"c:11068e1868cc52573474e22b8ab4a32c","page_id":"C124887345:131","page_url":"https://archive.org/details/C124887345/page/n130","statement_kind":"finding","subject_label":"Vacant Port space","summary":"The report states the Port has 908,109 sq. ft. of vacant sites and buildings.","property":"floor_area_sqft","value_text":"908,109 sq. ft.","value_num":908109.0,"unit":"sqft","t_from":"1986","quote":"the Port has 908,109 sq. ft. of vacant sites and buildings that could be developed for light industrial or Similar uses","anchor":"s-11068e1868cc","shown":false,"hidden":"response","part":"response","speaker":"another_body","speaker_role":"Port of San Francisco (responding department)","stance":"quotes_to_dispute","speaker_evidence":"This section of the Report states that the Port has"},{"claim_id":"c:502c4d3cb2666f99f1bd4ea43065a6ab","page_id":"C124887345:131","page_url":"https://archive.org/details/C124887345/page/n130","statement_kind":"finding","subject_label":"Waterfront Promenade","summary":"The Port states the waterfront Promenade represents 1,600 feet of Bay front land.","property":"other","value_text":"1,600 feet of Bay front","value_num":1600.0,"unit":"ft","t_from":"1986","quote":"the waterfront Promenade represents 1,600 feet of Bay front land.","place_label":"Promenade","anchor":"s-502c4d3cb266","shown":false,"hidden":"response","part":"response","speaker":"another_body","speaker_role":"Port of San Francisco (responding department)","stance":"own_position","speaker_evidence":"For example, the waterfront Promenade represents 1,600 feet"},{"claim_id":"c:89d2110ecc8f6c617abc53ddb46eb9bb","page_id":"C124887345:131","page_url":"https://archive.org/details/C124887345/page/n130","statement_kind":"cites_decision","subject_label":"Promenade open space designation","summary":"The Promenade is dedicated to open space under the Board's adopted South Beach / Rincon Point Redevelopment Plan.","property":"adopted","value_text":"open space dedication","t_from":"1986","quote":"It is dedicated to open space under the City's Northeast Waterfront Plan, the BCDC Special Area Plan, and the Board's adopted South Beach / Rincon Point Redevelopment Plan.","place_label":"Promenade","anchor":"s-89d2110ecc8f","shown":false,"hidden":"response","part":"response","speaker":"another_body","speaker_role":"Port of San Francisco (responding department)","stance":"own_position","speaker_evidence":"It is dedicated to open space under the City's Northeast Waterfront Plan"},{"claim_id":"c:c381321636e2c31ecd5fc6571ab403cb","page_id":"C124887345:131","page_url":"https://archive.org/details/C124887345/page/n130","statement_kind":"proposal","subject_label":"Seawall Lot 314 offering","summary":"The next Port offering will be Seawall Lot 314 at Bay and the Embarcadero.","property":"proposes","value_text":"Seawall Lot 314","t_from":"1986","quote":"The next offering will be Seawall Lot 314 (Bay at the Embarcadero).","place_label":"Seawall Lot 314","anchor":"s-c381321636e2","shown":false,"hidden":"response","part":"response","speaker":"another_body","speaker_role":"Port of San Francisco (responding department)","stance":"own_position","speaker_evidence":"The next offering will be [name] 314"},{"claim_id":"c:d0463e3d8d231f6dca7e1b50f6777b6b","page_id":"C124887345:131","page_url":"https://archive.org/details/C124887345/page/n130","statement_kind":"finding","subject_label":"Seawall Lot 318 offering","summary":"The first Port offering for major development was Seawall Lot 318, leased with the Magnin building rehabilitation.","property":"leased","value_text":"Seawall Lot 318","t_from":"1986","quote":"The first offering was Seawall Lot 318, leased as an adjunct to the rehabilitation of the Magnin building.","place_label":"Seawall Lot 318","anchor":"s-d0463e3d8d23","shown":false,"hidden":"response","part":"response","speaker":"another_body","speaker_role":"Port of San Francisco (responding department)","stance":"own_position","speaker_evidence":"The first offering was [name] 318"},{"claim_id":"c:f09c54de66437676c119414f1576b5cd","page_id":"C124887345:131","page_url":"https://archive.org/details/C124887345/page/n130","statement_kind":"finding","subject_label":"Accurate vacant area per Port","summary":"The Port says the accurate vacant total is about 1465729 sq ft after exclusions.","property":"floor_area_sqft","value_text":"about 1465729 sq tt","value_num":1465729.0,"unit":"sqft","t_from":"1986","quote":"the accurate total is about 1465729 sq tt.","anchor":"s-f09c54de6643","shown":false,"hidden":"response","part":"response","speaker":"another_body","speaker_role":"Port of San Francisco (responding department)","stance":"own_position","speaker_evidence":"the accurate total is about 1465729 sq tt."},{"claim_id":"c:5ada2acf2c030610651e75fcc676d71d","page_id":"C124887345:134","page_url":"https://archive.org/details/C124887345/page/n133","statement_kind":"finding","subject_label":"Mission Creek Harbor co-applicant","summary":"The Mission Creek Harbor Association was made co-applicant on the BCDC permit for the project.","property":"other","value_text":"co-applicant on BCDC permit","t_from":"1986","quote":"At Port staff's urging, the Harbor Association has been made a co-applicant on the Bay Conservation and Development Commission permit for the project.","place_label":"Mission Creek Harbor","place_precision":"other","anchor":"s-5ada2acf2c03","shown":false,"hidden":"response","part":"response","speaker":"another_body","speaker_role":"Port of San Francisco staff","stance":"own_position","speaker_evidence":"[name]"}]}