{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124887655","url":"https://data.qipu.org/usa/san-francisco/reports/c124887655/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124887655/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124887655","source_id":"C124887655","title":"A study of the infrastructure of the city and county of San Francisco : submitted to the Mayor and the Board of Supervisors, November 25, 1985","year":1985,"n_pages":18,"creator":"San Francisco (Calif.). Capital Improvement Advisory Committee","source_url":"https://archive.org/details/C124887655","issuer":"City and County of San Francisco, Capital Improvement Advisory Committee","issuer_type":"government","gov_level":"city_county","prepared_by":null,"doc_kind":"study","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"meta","doc_kind_by":"model","jurisdiction_by":"meta","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":11,"statements_total":57,"statements_by_kind":{"finding":25,"proposal":28,"cites_decision":2,"background":2},"same_for_every_statement":{"source_id":"C124887655","source_url":"https://archive.org/details/C124887655","source_label":"IGS library: A study of the infrastructure of the city and county of San Francisco : submitted to the Mayor and the Board of Supervis","report_year":1985,"issuer":"City and County of San Francisco, Capital Improvement Advisory Committee","issuer_type":"government","doc_kind":"study","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A study by the city's Capital Improvement Advisory Committee on repairing and financing the city's aging infrastructure and maintenance backlog.","figures":[{"label":"Replacement value","value":"$15.4 billion","claim_ids":["c:311558f1f563e6e2658a92e5ad9ee78e"]},{"label":"Impairment","value":"$1.162 billion","claim_ids":["c:17c9135788a34bc610e8321b96742669"]},{"label":"Annual maintenance need","value":"$205 million per year","claim_ids":["c:022601694768bfa2d85a8fab2ed54318"]},{"label":"Maintenance spending","value":"$155 million per year","claim_ids":["c:742463ea097ece0dfd447dc17c9db73c"]}],"main_points":["c:e0e358ceb291c30cb56aebb29c558380","c:4978818ab1eb1a1b5942045d55dcc8f5","c:c7915e80dcafcdc6f9f1af94fc6f52e5"],"board_decisions_after":["qipu:sf/decision/journalmayaugofproceed89sanfrich:240/3","qipu:sf/decision/journalofmayaugproceed86sanfrich:415/3","qipu:sf/decision/journalofjanjunproceed87sanfrich:202/2","qipu:sf/decision/journalofproceed88janaprsanfrich:136/3","qipu:sf/decision/journalmayaugofproceed89sanfrich:194/6","qipu:sf/decision/journalofmayaugproceed90sanfrich:212/1","qipu:sf/decision/journalofmayaugproceed90sanfrich:242/2","qipu:sf/decision/journalofmayaugproceed90sanfrich:264/3"],"board_decisions_before":["qipu:sf/decision/journalofjulydecproceed80sanfrich:161/2"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:05679e0c0efee85d047e0ac9abc04b72","page_id":"C124887655:2","page_url":"https://archive.org/details/C124887655/page/n1","statement_kind":"finding","subject_label":"City maintenance spending","summary":"The city invested $930 million (≈ $4.8 billion in 2026 dollars) in 1985 dollars in maintenance over six fiscal years.","property":"cost_usd","value_text":"$930 million","value_num":930000000.0,"unit":"USD","date_printed":"1978-79 through 1983-84","t_from":"1978","quote":"From 1978-79 through 1983-84, the city invested $930 million in 1985 dollars in maintenance","place_label":"City and County of San Francisco","anchor":"s-05679e0c0efe","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"SUMMARY Purpose; the city invested $930 million"},{"claim_id":"c:17c9135788a34bc610e8321b96742669","page_id":"C124887655:2","page_url":"https://archive.org/details/C124887655/page/n1","statement_kind":"finding","subject_label":"Infrastructure impairment","summary":"Impairment of the infrastructure is estimated at $1.162 billion.","property":"cost_usd","value_text":"$1.162 billion","value_num":1162000000.0,"unit":"USD","t_from":"1985","quote":"Impairment of the infrastructure amounts toan estimated $1.162 billion.","place_label":"City and County of San Francisco","anchor":"s-17c9135788a3","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Impairment of the infrastructure amounts to"},{"claim_id":"c:311558f1f563e6e2658a92e5ad9ee78e","page_id":"C124887655:2","page_url":"https://archive.org/details/C124887655/page/n1","statement_kind":"finding","subject_label":"City infrastructure replacement value","summary":"The infrastructure has an estimated total current replacement value of $15.4 billion (≈ $48.2 billion in 2026 dollars).","property":"cost_usd","value_text":"$15.4 billion","value_num":15400000000.0,"unit":"USD","t_from":"1985","quote":"The infrastructure has 11 different types of capital assets with an estimated total current replacement value of $15.4 billion.","place_label":"City and County of San Francisco","anchor":"s-311558f1f563","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Replacement Value The infrastructure has 11 different types"},{"claim_id":"c:3750555bb3ad9d8b2dccd1aa018b947c","page_id":"C124887655:2","page_url":"https://archive.org/details/C124887655/page/n1","statement_kind":"cites_decision","subject_label":"Proposition 13","summary":"Proposition 13 was passed in 1978 and constrained the CIAC's capital project review.","property":"approved","value_text":"passed in 1978","date_printed":"1978","t_from":"1978","quote":"the constraints imposed by Proposition 13, passed in 1978.","decided_by":"voters","instrument_kind":"proposition","instrument_printed":"13","instrument_date_printed":"1978","anchor":"s-3750555bb3ad","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Need for a Broad Review In recent years, the CIAC"},{"claim_id":"c:43b70be4b060c1f6d285b9c637d020ff","page_id":"C124887655:2","page_url":"https://archive.org/details/C124887655/page/n1","statement_kind":"finding","subject_label":"Infrastructure deterioration","summary":"Deterioration accounts for at least $914.3 million (≈ $2.9 billion in 2026 dollars) of the $1.162 billion impairment.","property":"cost_usd","value_text":"$914.3 million","value_num":914300000.0,"unit":"USD","t_from":"1985","quote":"Infrastructure deterioration estimates total at least $914.3 million of the $1.162 billion.","place_label":"City and County of San Francisco","anchor":"s-43b70be4b060","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Deterioration Infrastructure deterioration estimates total"},{"claim_id":"c:8242d48a99dec10c63f231ca1469c050","page_id":"C124887655:2","page_url":"https://archive.org/details/C124887655/page/n1","statement_kind":"finding","subject_label":"Other infrastructure impairment problems","summary":"Other problems such as seismic vulnerability and asbestos exposure are estimated to cost $248 million (≈ $776.6 million in 2026 dollars) to repair.","property":"cost_usd","value_text":"$248 million","value_num":248000000.0,"unit":"USD","t_from":"1985","quote":"The city’s infrastructure also is impaired by other problems estimated to cost $248 million of the total $1.162 billion to repair.","place_label":"City and County of San Francisco","anchor":"s-8242d48a99de","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Other Impairment Problems The city's infrastructure also is impaired"},{"claim_id":"c:022601694768bfa2d85a8fab2ed54318","page_id":"C124887655:3","page_url":"https://archive.org/details/C124887655/page/n2","statement_kind":"finding","subject_label":"Annual maintenance need","summary":"The city needs an estimated $205 million (≈ $641.9 million in 2026 dollars) per year for maintenance to keep up with normal wear and tear.","property":"cost_usd","value_text":"$205 million per year","value_num":205000000.0,"unit":"USD","t_from":"1985","quote":"The city needs to spend an estimated $205 million per year on maintenance to keep up with normal wear and tear","place_label":"City and County of San Francisco","anchor":"s-022601694768","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Annual Maintenance Needed: The city needs to spend an estimated $205 million per year"},{"claim_id":"c:06212ef1afac72e23046e5ff68927430","page_id":"C124887655:3","page_url":"https://archive.org/details/C124887655/page/n2","statement_kind":"finding","subject_label":"San Bruno jail","summary":"The San Bruno jail is cited as a heavily deteriorated asset.","property":"finding","value_text":"heavily deteriorated","t_from":"1985","quote":"the repair of a heavily deteriorated asset such as the San Bruno jail","place_label":"San Bruno jail","anchor":"s-06212ef1afac","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Priorities: urgent projects such as the San Bruno jail should be repaired first"},{"claim_id":"c:5c3cc40147bd7c5676b54fbadf67c130","page_id":"C124887655:3","page_url":"https://archive.org/details/C124887655/page/n2","statement_kind":"proposal","subject_label":"General obligation bonds for safety and health repairs","summary":"The CIAC recommends general obligation bonds of $327 million (≈ $1.0 billion in 2026 dollars) for safety and health repairs.","property":"proposes","value_text":"$327 million","value_num":327000000.0,"unit":"USD","date_printed":"June 1986","t_from":"1986","quote":"General obligation bonds for resolving safety and health matters in departments without access to user fees, provided Proposition 46","place_label":"City and County of San Francisco","anchor":"s-5c3cc40147bd","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The CIAC recommends three financing programs: General obligation bonds"},{"claim_id":"c:9064324f22240ff12b6f5c35eb8b2fcd","page_id":"C124887655:3","page_url":"https://archive.org/details/C124887655/page/n2","statement_kind":"proposal","subject_label":"Sales tax backup if Proposition 46 fails","summary":"The CIAC recommends increasing the sales tax and using sales tax revenue bonds if Proposition 46 fails.","property":"proposes","value_text":"sales tax increase and revenue bonds","date_printed":"June 1986","t_from":"1986","quote":"If Proposition 46 fails in June, the CIAC recommends increasing the sales tax and using sales tax revenue bonds as an alternative.","place_label":"City and County of San Francisco","anchor":"s-9064324f2224","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"If Proposition 46 fails in June, the CIAC recommends increasing the sales tax"},{"claim_id":"c:c0f2c3e5126117abb34c3bdd2c27e19e","page_id":"C124887655:3","page_url":"https://archive.org/details/C124887655/page/n2","statement_kind":"proposal","subject_label":"User fee increases","summary":"The CIAC recommends user fee increases for departments that can impose them, totaling $417 million (≈ $1.3 billion in 2026 dollars).","property":"proposes","value_text":"$417 million","value_num":417000000.0,"unit":"USD","t_from":"1985","quote":"User fee increases for departments that can impose them ($417 million): The fees that would be increased","place_label":"Port maritime and rental fees, water charge, sewer service charge","anchor":"s-c0f2c3e51261","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"User fee increases for departments that can impose them ($417 million)"},{"claim_id":"c:c7915e80dcafcdc6f9f1af94fc6f52e5","page_id":"C124887655:3","page_url":"https://archive.org/details/C124887655/page/n2","statement_kind":"proposal","subject_label":"Sales and business tax increases","summary":"The CIAC recommends sales and business tax increases of equal amounts totaling $418 million (≈ $1.3 billion in 2026 dollars) for other repairs.","property":"proposes","value_text":"$418 million","value_num":418000000.0,"unit":"USD","t_from":"1985","quote":"Sales tax and business tax increases, in equal amounts, for other repairs in departments without access to user fees ($418 million)","place_label":"City and County of San Francisco","anchor":"s-c7915e80dcaf","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Sales tax and business tax increases, in equal amounts, for other repairs"},{"claim_id":"c:e0e358ceb291c30cb56aebb29c558380","page_id":"C124887655:3","page_url":"https://archive.org/details/C124887655/page/n2","statement_kind":"proposal","subject_label":"Eighteen-year maintenance program","summary":"The CIAC recommends an 18-year maintenance program based on sensible priorities.","property":"proposes","value_text":"18-year maintenance program","value_num":18.0,"t_from":"1985","quote":"The CIAC therefore recommends an 18-year-long maintenance program, based on the establishment of sensible priorities","place_label":"City and County of San Francisco","anchor":"s-e0e358ceb291","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The CIAC therefore recommends an 18-year-long maintenance program"},{"claim_id":"c:396b432aa6ebc0c8ce196c4f252f8e2f","page_id":"C124887655:6","page_url":"https://archive.org/details/C124887655/page/n5","statement_kind":"finding","subject_label":"Infrastructure impairment","summary":"The CIAC estimates that about $1.2 billion (≈ $3.8 billion in 2026 dollars) is required to remedy the existing impairment of the city's infrastructure.","property":"cost_usd","value_text":"$1.2 billion","value_num":1200000000.0,"unit":"USD","t_from":"1985","quote":"The CIAC estimates that approximately $1.2 billion is required to remedy the existing impairment of the city’s infrastructure.","place_label":"City and County of San Francisco","anchor":"s-396b432aa6eb","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"FINDINGS AND RECOMMENDATIONS The CIAC estimates that approximately $1.2 billion"},{"claim_id":"c:7e591029684de1c1749b53ec8cab903a","page_id":"C124887655:6","page_url":"https://archive.org/details/C124887655/page/n5","statement_kind":"finding","subject_label":"Replacement value of city infrastructure","summary":"The CIAC estimates the replacement value of the city's infrastructure at $15.4 billion (≈ $48.2 billion in 2026 dollars).","property":"cost_usd","value_text":"$15.4 billion","value_num":15400000000.0,"unit":"USD","t_from":"1985","quote":"The CIAC estimates the replacement value of the city’s infrastructure to be $15.4 billion.","place_label":"City and County of San Francisco","anchor":"s-7e591029684d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"FINDINGS AND RECOMMENDATIONS Replacement Value The CIAC estimates the replacement value"},{"claim_id":"c:6d1bc6ed2c01606b8266e35aa72a41c3","page_id":"C124887655:7","page_url":"https://archive.org/details/C124887655/page/n6","statement_kind":"proposal","subject_label":"Seismic studies of pre-1948 buildings","summary":"The report recommends that similar seismic studies be made immediately of all major city buildings built before 1948.","property":"recommendation","t_from":"1985","quote":"We think that similar studies should be made immediately of all major city buildings constructed before 1948.","place_label":"City and County of San Francisco","anchor":"s-6d1bc6ed2c01","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We think that similar studies should be made immediately"},{"claim_id":"c:8a8fe29ccb44ad6b1a1508587e567458","page_id":"C124887655:7","page_url":"https://archive.org/details/C124887655/page/n6","statement_kind":"finding","subject_label":"Old sewer system","summary":"The report says the city has 245 miles of sewers, 27% of the system, that are over 93 years old.","property":"other","value_text":"245 miles","value_num":245.0,"t_from":"1985","quote":"It has 245 miles of sewers (27% of the sewer system) that are over 93 years old.","place_label":"City and County of San Francisco","anchor":"s-8a8fe29ccb44","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"It has 245 miles of sewers (27% of the sewer system)"},{"claim_id":"c:a217f4b10975a15058c70b825d2275dd","page_id":"C124887655:7","page_url":"https://archive.org/details/C124887655/page/n6","statement_kind":"finding","subject_label":"Laguna Honda Hospital seismic work","summary":"A seismic study of Laguna Honda Hospital shows major seismic work costing $31 million (≈ $97.1 million in 2026 dollars) is needed.","property":"cost_usd","value_text":"$31 million","value_num":31000000.0,"unit":"USD","t_from":"1985","quote":"The study shows that major seismic work needs to be done at a total cost of $31 million.","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-a217f4b10975","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The study shows that major seismic work needs to be done"},{"claim_id":"c:e1037e41d96e12fd16bd84029169e3cd","page_id":"C124887655:7","page_url":"https://archive.org/details/C124887655/page/n6","statement_kind":"finding","subject_label":"Cost of repairing existing deterioration","summary":"The CIAC estimates that repairing existing deterioration of the city's infrastructure costs $914 million (≈ $2.9 billion in 2026 dollars).","property":"cost_usd","value_text":"$914 million","value_num":914000000.0,"unit":"USD","t_from":"1985","quote":"CIAC estimates that the cost of repairing the existing deterioration to the city’s infrastructure is $914 million.","place_label":"City and County of San Francisco","anchor":"s-e1037e41d96e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The CIAC estimates that the cost of repairing the existing deterioration"},{"claim_id":"c:e27ade54195985a5de47f0e6385c1066","page_id":"C124887655:7","page_url":"https://archive.org/details/C124887655/page/n6","statement_kind":"finding","subject_label":"Pre-1948 buildings and seismic vulnerability","summary":"The report says about 30% of city buildings were built before seismic regulations of 1948.","property":"other","value_text":"30%","value_num":30.0,"unit":"percent","t_from":"1985","quote":"Approximately 30% of the city’s buildings fall into this category.","place_label":"City and County of San Francisco","anchor":"s-e27ade541959","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Approximately 30% of the city's buildings fall into this category."},{"claim_id":"c:f6326b1f680f39309eeb364c34de7c3f","page_id":"C124887655:7","page_url":"https://archive.org/details/C124887655/page/n6","statement_kind":"finding","subject_label":"Seismic correction in all city buildings","summary":"The CIAC estimates that seismic correction in all city buildings costs $190 million (≈ $595.0 million in 2026 dollars).","property":"cost_usd","value_text":"$190 million","value_num":190000000.0,"unit":"USD","t_from":"1985","quote":"Reasoning from the Laguna Honda situation, the CIAC estimates that the cost of seismic correction in all city buildings is $190 million.","place_label":"City and County of San Francisco","anchor":"s-f6326b1f680f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Reasoning from the Laguna Honda situation, the CIAC estimates"},{"claim_id":"c:2d354d5638d22c2ef686001a7727c52f","page_id":"C124887655:8","page_url":"https://archive.org/details/C124887655/page/n7","statement_kind":"finding","subject_label":"Fire safety requirements in city buildings","summary":"The CIAC estimates meeting fire safety requirements in city buildings costs $25 million (≈ $78.3 million in 2026 dollars).","property":"cost_usd","value_text":"$25 million","value_num":25000000.0,"unit":"USD","t_from":"1985","quote":"The CIAC estimates that the cost of meeting these requirements is $25 million.","place_label":"City and County of San Francisco","anchor":"s-2d354d5638d2","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The CIAC estimates that the cost of meeting these requirements"},{"claim_id":"c:62a866c0e7aa3f8a522c368cb094aff0","page_id":"C124887655:8","page_url":"https://archive.org/details/C124887655/page/n7","statement_kind":"finding","subject_label":"Asbestos in city buildings","summary":"About 320 city buildings were built before asbestos use was discontinued in 1975.","property":"other","value_text":"about 320 buildings","value_num":320.0,"unit":"units","date_printed":"1975","t_from":"1975","quote":"Asbestos use was discontinued in 1975, but about 320 city buildings were built prior to that date.","place_label":"City and County of San Francisco","anchor":"s-62a866c0e7aa","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Asbestos use was discontinued in 1975, but about 320 city buildings"},{"claim_id":"c:67f8f64fbe27981131e95ab2f46d4ca6","page_id":"C124887655:8","page_url":"https://archive.org/details/C124887655/page/n7","statement_kind":"proposal","subject_label":"Program length for infrastructure work","summary":"The report suggests work be programmed over 18 years to keep annual financial requirements manageable.","property":"recommendation","value_text":"18 years","value_num":18.0,"t_from":"1985","quote":"We further suggest that work should be programmed over 18 years in order to keep the annual financial requirements manageable.","anchor":"s-67f8f64fbe27","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We further suggest that work should be programmed over 18 years"},{"claim_id":"c:740205e41671e56a742c2055d1b1c402","page_id":"C124887655:8","page_url":"https://archive.org/details/C124887655/page/n7","statement_kind":"proposal","subject_label":"General obligation bonds contingent on Proposition 46","summary":"The report proposes general obligation bonds, provided Proposition 46 is approved in the June 1986 election.","property":"proposes","value_text":"general obligation bonds","date_printed":"June 1986","t_from":"1986","quote":"provided Proposition 46, the amendment of Proposition 13, is approved in the June 1986 election.","place_label":"City and County of San Francisco","anchor":"s-740205e41671","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"provided Proposition 46, the amendment of Proposition 13"},{"claim_id":"c:82a7acd78c849337760ec3c3e192d5ec","page_id":"C124887655:8","page_url":"https://archive.org/details/C124887655/page/n7","statement_kind":"finding","subject_label":"Working conditions in city offices","summary":"The CIAC estimates $16 million (≈ $50.1 million in 2026 dollars) is needed to improve working conditions in city offices and shops.","property":"cost_usd","value_text":"$16 million","value_num":16000000.0,"unit":"USD","t_from":"1985","quote":"The CIAC estimates that $16 million is needed to improve these conditions.","place_label":"City and County of San Francisco","anchor":"s-82a7acd78c84","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The CIAC estimates that $16 million is needed"},{"claim_id":"c:88fe67f4765eee3e9fdbbc30633d7fd5","page_id":"C124887655:8","page_url":"https://archive.org/details/C124887655/page/n7","statement_kind":"finding","subject_label":"Cost of asbestos corrections","summary":"The CIAC estimates asbestos corrections cost $17 million (≈ $53.2 million in 2026 dollars).","property":"cost_usd","value_text":"$17 million","value_num":17000000.0,"unit":"USD","t_from":"1985","quote":"The CIAC estimates that the cost to make the necessary corrections is $17 million.","place_label":"City and County of San Francisco","anchor":"s-88fe67f4765e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The CIAC estimates that the cost to make the necessary corrections"},{"claim_id":"c:9ab47077b20678949a1314b08ea26455","page_id":"C124887655:8","page_url":"https://archive.org/details/C124887655/page/n7","statement_kind":"proposal","subject_label":"Financing programs for infrastructure","summary":"The report recommends three financing programs, starting with general obligation bonds for health and safety work.","property":"recommendation","value_text":"three financing programs","value_num":3.0,"t_from":"1985","quote":"We therefore recommend three financing programs: General obligation bonds for resolving health and safety matters in departments without access to user fees","place_label":"City and County of San Francisco","anchor":"s-9ab47077b206","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We therefore recommend three financing programs"},{"claim_id":"c:d5c4ed13cd8943fcd40c65b1207fc817","page_id":"C124887655:8","page_url":"https://archive.org/details/C124887655/page/n7","statement_kind":"proposal","subject_label":"Priorities for infrastructure projects","summary":"The report suggests project priorities be based on health and safety, threat to structural integrity, and size and lead times.","property":"recommendation","t_from":"1985","quote":"We suggest that project priorities should be based upon health and safety considerations; the degree of threat to the structural integrity of the asset","anchor":"s-d5c4ed13cd89","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We suggest that project priorities should be based upon"},{"claim_id":"c:4978818ab1eb1a1b5942045d55dcc8f5","page_id":"C124887655:9","page_url":"https://archive.org/details/C124887655/page/n8","statement_kind":"proposal","subject_label":"Health and safety repairs financing","summary":"The study recommends general obligation bonds to finance health and safety repairs estimated at $327 million (≈ $1.0 billion in 2026 dollars).","property":"proposes","value_text":"$327 million","value_num":327000000.0,"unit":"USD","t_from":"1985","quote":"We recommend the use of general obligation bonds to finance these repairs.","anchor":"s-4978818ab1eb","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We recommend the use of general obligation bonds"},{"claim_id":"c:58afd3fea5a511759a31abbf7b5ae823","page_id":"C124887655:9","page_url":"https://archive.org/details/C124887655/page/n8","statement_kind":"proposal","subject_label":"Sales tax revenue bonds fallback","summary":"If the Proposition 13 amendment fails, the study recommends sales tax revenue bonds backed by a 0.5-cent sales tax increase.","property":"proposes","value_text":"0.5-cent increase, 6.5 to 7.0 cents","value_num":0.5,"unit":"cents","t_from":"1985","quote":"we recommend the use of sales tax revenue bonds backed by a.5-cent increase in the sales tax (from 6.5 cents to 7.0 cents).","anchor":"s-58afd3fea5a5","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"we recommend the use of sales tax revenue bonds backed by"},{"claim_id":"c:86e0a68077712569d2b9cb3bac37652a","page_id":"C124887655:9","page_url":"https://archive.org/details/C124887655/page/n8","statement_kind":"proposal","subject_label":"Property tax increase for single family homeowners","summary":"The study estimates the average property tax bill increase for a single family homeowner would be $52 (≈ $163 in 2026 dollars) in the first year.","property":"other","value_text":"$52 in the first year","value_num":52.0,"unit":"USD","date_printed":"first year","t_from":"1985","quote":"The resultant increase in the average property tax bill for each single family homeowner would be $52 in the first year, $24 in the sixth year, and $7 in the eleventh year.","anchor":"s-86e0a6807771","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The resultant increase in the average property tax bill"},{"claim_id":"c:8b59d085de3ba73f7f3406a999d1cff0","page_id":"C124887655:9","page_url":"https://archive.org/details/C124887655/page/n8","statement_kind":"background","subject_label":"Illinois infrastructure financing","summary":"The State of Illinois recently used sales tax revenue bond financing for $1.3 billion (≈ $4.1 billion in 2026 dollars) of infrastructure work.","property":"other","value_text":"$1.3 billion","value_num":1300000000.0,"unit":"USD","date_printed":"recently","t_from":"1985","quote":"The State of Illinois recently used this type of financing for $1.3 billion worth of infrastructure work.","anchor":"s-8b59d085de3b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The State of Illinois recently used this type of financing"},{"claim_id":"c:b0785e05e2969f9bd5601dc25ce16b26","page_id":"C124887655:9","page_url":"https://archive.org/details/C124887655/page/n8","statement_kind":"proposal","subject_label":"General obligation bond issue structure","summary":"The study proposes general obligation bonds with 20-year terms sold in three issues five years apart.","property":"proposes","value_text":"20-year terms","value_num":20.0,"t_from":"1985","quote":"Under our proposal, general obligation bonds (with 20-year terms) would be sold in three issues, five years apart.","anchor":"s-b0785e05e296","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Under our proposal, general obligation bonds"},{"claim_id":"c:dd2aff1b8702af23c55f31d302ba1f9a","page_id":"C124887655:9","page_url":"https://archive.org/details/C124887655/page/n8","statement_kind":"proposal","subject_label":"Asbestos abatement and fire safety work","summary":"The study recommends that asbestos abatement and fire safety improvements be done over the next five years.","property":"recommendation","value_text":"five years","value_num":5.0,"t_from":"1985","quote":"For example, we recommend that asbestos abatement and the fire safety improvements be done over the next five years; that seismic modifications be scheduled over 10 years","anchor":"s-dd2aff1b8702","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"For example, we recommend that asbestos abatement"},{"claim_id":"c:f270fdd1042f3fb49093c632db65a5db","page_id":"C124887655:9","page_url":"https://archive.org/details/C124887655/page/n8","statement_kind":"proposal","subject_label":"Infrastructure Maintenance Program","summary":"The study developed an overall Infrastructure Maintenance Program to remedy existing infrastructure impairment.","property":"proposes","value_text":"Infrastructure Maintenance Program","t_from":"1985","quote":"We have developed an overall Infrastructure Maintenance Program for remedying the existing infrastructure impairment.","anchor":"s-f270fdd1042f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We have developed an overall Infrastructure Maintenance Program"},{"claim_id":"c:fc963e29fff9167b7261a61739b76cf2","page_id":"C124887655:9","page_url":"https://archive.org/details/C124887655/page/n8","statement_kind":"cites_decision","subject_label":"Proposition 13","summary":"Proposition 13 passed in 1978 and restricted property tax increases used to pay debt service.","property":"adopted","value_text":"Proposition 13 passed 1978","value_num":1978.0,"date_printed":"1978","t_from":"1978","quote":"The passage of Proposition 13 in 1978 effectively curtailed the use of these bonds in California by restricting increases in property tax to provide for debt service.","decided_by":"California voters","instrument_kind":"proposition","instrument_printed":"13","instrument_date_printed":"1978","anchor":"s-fc963e29fff9","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The passage of Proposition 13 in 1978 effectively curtailed"},{"claim_id":"c:5900057d79ecca2d11e51661a6617470","page_id":"C124887655:10","page_url":"https://archive.org/details/C124887655/page/n9","statement_kind":"finding","subject_label":"Remaining impairments in departments without user fees","summary":"The study estimates the cost of remaining impairments in departments without user fees at $418 million (≈ $1.3 billion in 2026 dollars).","property":"cost_usd","value_text":"$418 million","value_num":418000000.0,"unit":"USD","t_from":"1985","quote":"The cost of the remaining impairments in departments without access to use fees is estimated at $418 million.","anchor":"s-5900057d79ec","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The cost of the remaining impairments in departments without access to use fees is estimated"},{"claim_id":"c:8cd312ec80abace0b98598b785dd4f18","page_id":"C124887655:10","page_url":"https://archive.org/details/C124887655/page/n9","statement_kind":"proposal","subject_label":"Financing mix for remaining repairs","summary":"The study recommends financing these repairs 50:50 through business tax and sales tax increases, assuming Proposition 13 amendment passes.","property":"proposes","value_text":"50:50 basis","value_num":50.0,"unit":"percent","date_printed":"June 1986","t_from":"1986","quote":"We recommend that these repairs be financed on a 50:50 basis by increases in the business taxes and sales tax.","anchor":"s-8cd312ec80ab","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We recommend that these repairs be financed on a 50:50 basis"},{"claim_id":"c:8cd74634e10aa53fc99b10741835cc05","page_id":"C124887655:10","page_url":"https://archive.org/details/C124887655/page/n9","statement_kind":"finding","subject_label":"Repairs in departments with user fees","summary":"The study estimates the cost of remedying impairments in user fee departments at $417 million (≈ $1.3 billion in 2026 dollars).","property":"cost_usd","value_text":"$417 million","value_num":417000000.0,"unit":"USD","t_from":"1985","quote":"The cost of remedying impairments in these departments and bureaus is estimated at $417 million.","anchor":"s-8cd74634e10a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The cost of remedying impairments in these departments and bureaus is estimated at $417 million."},{"claim_id":"c:ae66c05557b9e63fc3015d85a2d25d1d","page_id":"C124887655:10","page_url":"https://archive.org/details/C124887655/page/n9","statement_kind":"proposal","subject_label":"Payroll tax increase","summary":"The study recommends increasing the payroll tax from 1.5% to 1.7%.","property":"proposes","value_text":"1.5% to 1.7%","value_num":1.7,"unit":"percent","t_from":"1985","quote":"we recommend an increase in the payroll tax from 1.5% to 1.7% and an increase in the average gross receipts tax of $0.27 per thousand","anchor":"s-ae66c05557b9","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Specifically, we recommend an increase in the payroll tax from 1.5% to 1.7%"},{"claim_id":"c:f50e83a3ca239b21afd1cbd4cf3d9546","page_id":"C124887655:10","page_url":"https://archive.org/details/C124887655/page/n9","statement_kind":"proposal","subject_label":"Port pier repairs","summary":"The study recommends financing pier repairs with Port fees at $20 million (≈ $62.6 million in 2026 dollars) per year.","property":"proposes","value_text":"$20 million per year","value_num":20000000.0,"unit":"USD","date_printed":"per year","t_from":"1985","quote":"Finance repairs to piers with Port rental and maritime fees at the rate of $20 million per year.","place_label":"Port piers","anchor":"s-f50e83a3ca23","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Finance repairs to piers with Port rental and maritime fees at the rate of $20 million per year."},{"claim_id":"c:fd6b11a4d29d1fcf28b6638ad2241d2c","page_id":"C124887655:10","page_url":"https://archive.org/details/C124887655/page/n9","statement_kind":"proposal","subject_label":"Water pipe repairs","summary":"The study recommends financing water pipe repairs with water revenue bonds at $7.8 million (≈ $24.4 million in 2026 dollars) per year.","property":"proposes","value_text":"$7.8 million per year","value_num":7800000.0,"unit":"USD","date_printed":"per year","t_from":"1985","quote":"Finance repairs to water pipes with water revenue bonds at the rate of $7.8 million per year.","anchor":"s-fd6b11a4d29d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Finance repairs to water pipes with water revenue bonds at the rate of $7.8 million per year."},{"claim_id":"c:375aa64c63900c38f82f4880120d6077","page_id":"C124887655:11","page_url":"https://archive.org/details/C124887655/page/n10","statement_kind":"proposal","subject_label":"Maintenance spending until engineering valuation","summary":"The study recommends continuing the existing expenditure level until a 1987 engineering valuation, then increasing it.","property":"recommendation","value_text":"until 1987 valuation","value_num":1987.0,"date_printed":"1987","t_from":"1987","quote":"We recommend continuing our existing level of expenditure until then and increasing it upon receipt of the valuation.","anchor":"s-375aa64c6390","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We recommend continuing our existing level of expenditure"},{"claim_id":"c:64e849464992398a67bbcca33f4a4805","page_id":"C124887655:11","page_url":"https://archive.org/details/C124887655/page/n10","statement_kind":"finding","subject_label":"City Hall dome granite balustrade repair","summary":"Emergency repairs to skylights, ceilings and balustrade after a granite piece fell at City Hall cost $500,000 (≈ $1.6 million in 2026 dollars).","property":"cost_usd","value_text":"$500,000","value_num":500000.0,"unit":"USD","t_from":"1985","quote":"the total cost for repairing the skylights, ceilings and ballustre on an emergency basis was $500,000.","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-64e849464992","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the total cost for repairing the skylights, ceilings and ballustre on an emergency basis was $500,000"},{"claim_id":"c:6b71260077ce96e0eab3d7f5a8423d52","page_id":"C124887655:11","page_url":"https://archive.org/details/C124887655/page/n10","statement_kind":"finding","subject_label":"City infrastructure asset value","summary":"The study states the city has $15.4 billion (≈ $48.2 billion in 2026 dollars) worth of infrastructure assets, many old and costly to maintain.","property":"other","value_text":"$15.4 billion","value_num":15400000000.0,"unit":"USD","t_from":"1985","quote":"The problem is that we have $15.4 billion worth of assets, many of which are old and becoming increasingly costly to maintain.","anchor":"s-6b71260077ce","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The problem is that we have $15.4 billion worth of assets"},{"claim_id":"c:742463ea097ece0dfd447dc17c9db73c","page_id":"C124887655:11","page_url":"https://archive.org/details/C124887655/page/n10","statement_kind":"finding","subject_label":"Recent infrastructure maintenance spending","summary":"The city spent an average of $155 million (≈ $801.0 million in 2026 dollars) per year on infrastructure repairs from 1978-79 through 1983-84.","property":"cost_usd","value_text":"$155 million per year","value_num":155000000.0,"unit":"USD","date_printed":"1978-79 through 1983-84","t_from":"1978","quote":"the city spent an average of $155 million per year—$930 million in 1985 dollars—on infrastructure repairs","anchor":"s-742463ea097e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the city spent an average of $155 million per year"},{"claim_id":"c:84e2391d8b292fe1638fc5d416043a71","page_id":"C124887655:11","page_url":"https://archive.org/details/C124887655/page/n10","statement_kind":"finding","subject_label":"Annual maintenance needed to keep up with deterioration","summary":"The study estimates the city needs to reinvest about $205 million (≈ $641.9 million in 2026 dollars) annually in maintenance to keep up with normal deterioration.","property":"cost_usd","value_text":"about $205 million in 1985 dollars","value_num":205000000.0,"unit":"USD","t_from":"1985","quote":"we estimate that the city needs to reinvest about $205 million in 1985 dollars annually in maintenance in order to keep up with normal deterioration.","anchor":"s-84e2391d8b29","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"we estimate that the city needs to reinvest about $205 million"},{"claim_id":"c:92f5865c833cba6e31fcddc3946d7dd5","page_id":"C124887655:11","page_url":"https://archive.org/details/C124887655/page/n10","statement_kind":"finding","subject_label":"Laguna Honda Hospital laundry machinery","summary":"Deferred maintenance on Laguna Honda Hospital laundry machinery led to total replacement costing $1 million (≈ $3.1 million in 2026 dollars).","property":"other","value_text":"$1 million","value_num":1000000.0,"unit":"USD","t_from":"1985","quote":"Maintenance was deferred and total replacement of the machinery cost $1 million.","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-92f5865c833c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Maintenance was deferred and total replacement of the machinery cost $1 million"},{"claim_id":"c:feb9cd2442eeac6d8fee80b160dd8168","page_id":"C124887655:13","page_url":"https://archive.org/details/C124887655/page/n12","statement_kind":"proposal","subject_label":"Infrastructure maintenance program total","summary":"The exhibit schedules infrastructure maintenance repairs with a total of $1,162 (≈ $3,639 in 2026 dollars) as printed.","property":"cost_usd","value_text":"$1,162","value_num":1162.0,"unit":"USD","t_from":"1985","quote":"Total $107.9 $107.9 $104.2 $102.9 $102.9 $77.9 $77.9 $77.9 $77.9 $77.9 $44.7 $44.7 $44.7 $44.7 $44.7 $7.8 $7.8 $7.8 $1,162","anchor":"s-feb9cd2442ee","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"EXHIBIT II INFRASTRUCTURE MAINTENANCE PROGRAM Total Impair-"},{"claim_id":"c:037233125a53a76dd6847f9166558706","page_id":"C124887655:14","page_url":"https://archive.org/details/C124887655/page/n13","statement_kind":"proposal","subject_label":"Laguna Honda Hospital seismic corrections","summary":"The report proposes major seismic corrections at Laguna Honda Hospital as a high priority project.","property":"proposes","t_from":"1985","quote":"Make major seismic corrections at Laguna Honda Hospital","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-037233125a53","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"EXHIBIT II EXAMPLES OF HIGH PRIORITY PROJECTS"},{"claim_id":"c:0d5e64ef9cd396587bf233f81239c073","page_id":"C124887655:14","page_url":"https://archive.org/details/C124887655/page/n13","statement_kind":"proposal","subject_label":"Sewer deterioration on Guerrero Street","summary":"The report proposes removing advanced deterioration in sewers such as those on Guerrero Street from 18th to 28th Streets.","property":"proposes","t_from":"1985","quote":"Remove advanced deterioration in sewers such as those on Guerrero Street from 18th to 28th Streets","place_label":"Guerrero Street from 18th to 28th Streets","place_precision":"street_segment","place_id":"qipu:sf/place/street/guerrero-st","resolved_by":"place links file","anchor":"s-0d5e64ef9cd3","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"EXHIBIT II EXAMPLES OF HIGH PRIORITY PROJECTS"},{"claim_id":"c:32d5c6a7dbae98528378234505b400aa","page_id":"C124887655:14","page_url":"https://archive.org/details/C124887655/page/n13","statement_kind":"proposal","subject_label":"Street deterioration on Townsend","summary":"The report proposes removing advanced deterioration in streets such as Townsend.","property":"proposes","t_from":"1985","quote":"Remove advanced deterioration in streets such as Townsend","place_label":"Townsend","place_precision":"street","anchor":"s-32d5c6a7dbae","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"EXHIBIT II EXAMPLES OF HIGH PRIORITY PROJECTS"},{"claim_id":"c:7289693de1523c2daa9b1b6e73d0cd10","page_id":"C124887655:14","page_url":"https://archive.org/details/C124887655/page/n13","statement_kind":"proposal","subject_label":"Water pipe deterioration on Battery Street","summary":"The report proposes removing advanced deterioration in the 8-inch water mains on Battery from Bush to Pacific.","property":"proposes","t_from":"1985","quote":"Remove advanced deterioration in water pipes such as the 8-inch mains on Battery from Bush to Pacific","place_label":"Battery Street from Bush to Pacific","anchor":"s-7289693de152","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"EXHIBIT II EXAMPLES OF HIGH PRIORITY PROJECTS"},{"claim_id":"c:9411663876565bb66ee2a45f2b30e823","page_id":"C124887655:14","page_url":"https://archive.org/details/C124887655/page/n13","statement_kind":"proposal","subject_label":"Repairs to Port piers","summary":"The report proposes repairing Pier Nos. 30, 32, 70 and 80.","property":"proposes","t_from":"1985","quote":"Repair Pier Nos. 30, 32, 70 and 80","place_label":"Pier Nos. 30, 32, 70 and 80","anchor":"s-941166387656","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"EXHIBIT II EXAMPLES OF HIGH PRIORITY PROJECTS"},{"claim_id":"c:d896b698333b693f94dca051597340bd","page_id":"C124887655:14","page_url":"https://archive.org/details/C124887655/page/n13","statement_kind":"proposal","subject_label":"San Bruno Jail deterioration","summary":"The report proposes removing advanced deterioration in buildings such as the San Bruno Jail.","property":"proposes","t_from":"1985","quote":"Remove advanced deterioration in buildings such as the San Bruno Jail","place_label":"San Bruno Jail","anchor":"s-d896b698333b","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"EXHIBIT II EXAMPLES OF HIGH PRIORITY PROJECTS"},{"claim_id":"c:477e120b6710c64133043424ddb5d677","page_id":"C124887655:16","page_url":"https://archive.org/details/C124887655/page/n15","statement_kind":"background","subject_label":"Submission of the report","summary":"The Capital Improvement Advisory Committee submitted this report to the Mayor and Board of Supervisors on November 25, 1985.","property":"other","date_printed":"November 25, 1985","t_from":"1985","quote":"The Capital Improvement Advisory Committee submitted this report to the Mayor and the Board of Supervisors of the City and County of San Francisco on November 25, 1985.","anchor":"s-477e120b6710","shown":false,"hidden":"cover_or_contents","part":"cover_or_contents","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Capital Improvement Advisory Committee submitted this report"}]}