{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124889006","url":"https://data.qipu.org/usa/san-francisco/reports/c124889006/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124889006/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124889006","source_id":"C124889006","title":"Statewide multidisciplinary molecular biology acquired immune deficiency syndrome (AIDS) research center : project planning guide","year":1987,"n_pages":42,"creator":null,"source_url":"https://archive.org/details/C124889006","issuer":"City and County of San Francisco, Department of Public Health","issuer_type":"government","gov_level":"city_county","prepared_by":null,"doc_kind":"study","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"model","doc_kind_by":"model","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":8,"statements_total":26,"statements_by_kind":{"finding":10,"proposal":13,"cites_decision":1,"background":2},"same_for_every_statement":{"source_id":"C124889006","source_url":"https://archive.org/details/C124889006","source_label":"IGS library: Statewide multidisciplinary molecular biology acquired immune deficiency syndrome (AIDS) research center : project plann","report_year":1987,"issuer":"City and County of San Francisco, Department of Public Health","issuer_type":"government","doc_kind":"study","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A planning guide by the City and County of San Francisco's Department of Public Health for a statewide AIDS research center to be built at San Francisco General Hospital.","figures":[{"label":"Cost","value":"$12 million","claim_ids":["c:8e08615b5b12d71eb39e144c431ea374"]},{"label":"Space","value":"approximately 16,688 assignable square feet","claim_ids":["c:66532c0d9739964651a7205d9b27177b"]},{"label":"Lab modules","value":"9 modules @ 660 asf","claim_ids":["c:d1c1450fa7c0a22ce2a35ed28be6aba2"]}],"main_points":["c:55f4004f41788f75cb825f231d931ac0","c:114a1f54e399f84201112264040eb4d5","c:740cc78c34272c38912efb36f040afab"],"board_decisions_after":["qipu:sf/decision/journalofjanjunproceed87sanfrich:253/1","qipu:sf/decision/journaljanaprofproceed82sanfrich|g1336","qipu:sf/decision/journalofjanaprproceed83sanfrich:51/3","qipu:sf/decision/journalmayaugofproceed83sanfrich:289/3","qipu:sf/decision/journalmayseptofproceed84sanfrich:203/2","qipu:sf/decision/journalofproceedjanjune85sanfrich:9/1","qipu:sf/decision/journalofproceedjanjune85sanfrich:264/3","qipu:sf/decision/journalofjanjunproceed87sanfrich:52/1"],"board_decisions_before":[],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:6a1c258876ae7a01bd31fe4b39c9523a","page_id":"C124889006:5","page_url":"https://archive.org/details/C124889006/page/n4","statement_kind":"proposal","subject_label":"AIDS Research Laboratory Pathology Building Expansion","summary":"The budget data sheet proposes an AIDS Research Laboratory Pathology Building Expansion at San Francisco General Hospital Medical Center.","property":"proposes","value_text":"AIDS Research Laboratory Pathology Building Expansion","date_printed":"May 28, 1987","t_from":"1987","quote":"Project Title: AIDS Research Laboratory Pathology Building Expansion Cost Index ENR:4680","place_label":"San Francisco General Hospital Medical Center","anchor":"s-6a1c258876ae","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"CAPITAL IMPROVEMENT BUDGET CITY AND COUNTY OF SAN FRANCISCO BUDGET DATA SHEET Project Title"},{"claim_id":"c:8dcf223fb93dbce2da8bacb2fd4466d8","page_id":"C124889006:5","page_url":"https://archive.org/details/C124889006/page/n4","statement_kind":"proposal","subject_label":"Total project cost of the AIDS research laboratory expansion","summary":"The budget data sheet shows a total project cost of $18,520,000 (≈ $56.9 million in 2026 dollars).","property":"cost_usd","value_text":"$18,520,000","value_num":18520000.0,"unit":"USD","date_printed":"1986/1987 to 1988/1989","t_from":"1986","quote":"FUNDING SCHEDULE Totals 1986/1987 1987/1988 1988/1989 520 ,G00 P 520 , 080 1,800,080 W 1,880 ,OGS 12,580,080 C 18 , 588 , 080 2,008,000 E 2 , OBS , OOO $14,888 , G82 $1,580 , 280 $18,520,000 $2,080,080 (Total Project)","place_label":"San Francisco General Hospital Medical Center","anchor":"s-8dcf223fb93d","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"FUNDING SCHEDULE Totals 1986/1987 1987/1988 1988/1989"},{"claim_id":"c:bfdcde178813077f3c8f5e241b78e158","page_id":"C124889006:5","page_url":"https://archive.org/details/C124889006/page/n4","statement_kind":"finding","subject_label":"Project status","summary":"The budget data sheet states the project is in preliminary planning.","property":"other","value_text":"Preliminary Planning","date_printed":"May 28, 1987","t_from":"1987","quote":"STATUS OF PROJECT: Preliminary Planning Prepared By: Adamson Associates","anchor":"s-bfdcde178813","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"Adamson Associates","stance":"own_position","speaker_evidence":"STATUS OF PROJECT: [name]: Adamson Associates"},{"claim_id":"c:39473b8fcecdf2a99b867769b418f496","page_id":"C124889006:7","page_url":"https://archive.org/details/C124889006/page/n6","statement_kind":"proposal","subject_label":"Pathology Building Expansion construction cost","summary":"The capital budget data sheet estimates the building cost at $9,238,000 (≈ $27.4 million in 2026 dollars).","property":"cost_usd","value_text":"$9,238,000","value_num":9238000.0,"unit":"USD","date_printed":"May 28, 1987","t_from":"1987","quote":"BUILDING COST $9,238,000 Additional Bldg. Costs 258 , 000 TOTAL CONSTRUCTION COST","place_label":"San Francisco General Hospital Medical Center","anchor":"s-39473b8fcecd","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"CAPITAL IMPROVEMENT BUDGET ANALYTICAL DATA SHEET; BUILDING COST $9,238,000"},{"claim_id":"c:8051ca63015cf3183e0652cd6298d0cf","page_id":"C124889006:7","page_url":"https://archive.org/details/C124889006/page/n6","statement_kind":"finding","subject_label":"Pathology Building Expansion architect","summary":"The data sheet names Adamson Associates as the architect on the Pathology Building Expansion.","property":"architect","value_text":"Adamson Associates","date_printed":"May 28, 1987","t_from":"1987","quote":"Adamson Associates CITY AND COUNTY OF SAN FRANCISCO May 28, 1987","place_label":"San Francisco General Hospital Medical Center","anchor":"s-8051ca63015c","shown":false,"hidden":"table","part":"table","speaker":"another_body","speaker_role":"Adamson Associates","stance":"quotes_to_report","speaker_evidence":"Prepared by: [name] 28, 1987"},{"claim_id":"c:292c3667cf4565e1c97e4274613adb27","page_id":"C124889006:15","page_url":"https://archive.org/details/C124889006/page/n14","statement_kind":"proposal","subject_label":"Pathology Building completion","summary":"Completing the Pathology Building would circumvent the need for a new building and provide laboratory space for AIDS research.","property":"proposes","value_text":"approximately 16,600 ASF","value_num":16600.0,"unit":"sqft","t_from":"1987","quote":"Completion of this structure would circumvent the need for a new building, providing approximately 16,600 ASF of laboratory space devoted to investigation of the AIDS disease.","place_label":"San Francisco General Hospital, Pathology Building","place_precision":"building","place_id":"qipu:sf/place/institution/san-francisco-general-hospital-77e8b1","resolved_by":"place links file","anchor":"s-292c3667cf45","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"ARRIVING AT A SOLUTION; Completion of this structure would circumvent"},{"claim_id":"c:3bbd8e5c93b12308d258cd7267d46aae","page_id":"C124889006:15","page_url":"https://archive.org/details/C124889006/page/n14","statement_kind":"background","subject_label":"Proposal submission","summary":"The City and County Department of Public Health submitted a proposal in September 1986 to the State Department of Health Services, Office of AIDS.","property":"other","value_text":"September 1986","date_printed":"September 1986","t_from":"1986","quote":"submitted a proposal in September 1986 to the California State Department of Health Services, Office of AIDS, outlining a plan","anchor":"s-3bbd8e5c93b1","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"City and County of San Francisco Department of Public Health","stance":"own_position","speaker_evidence":"THE PROPOSED PROJECT; the City and County of San Francisco Department of Public Health, submitted a proposal"},{"claim_id":"c:55f4004f41788f75cb825f231d931ac0","page_id":"C124889006:15","page_url":"https://archive.org/details/C124889006/page/n14","statement_kind":"proposal","subject_label":"Statewide AIDS Research Center","summary":"The proposed Statewide AIDS Research Center would be developed on the SFGH campus to research an AIDS vaccine and a method of killing AIDS virions.","property":"proposes","value_text":"Statewide AIDS Research Center","t_from":"1987","quote":"The primary objective of the proposed research facility will be to bring together an elite group of basic scientists from various disciplines","place_label":"San Francisco General Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/san-francisco-general-hospital-77e8b1","resolved_by":"place links file","anchor":"s-55f4004f4178","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The primary objective of the proposed research facility"},{"claim_id":"c:96032a50875c9c3aebdf352d87be7aee","page_id":"C124889006:15","page_url":"https://archive.org/details/C124889006/page/n14","statement_kind":"finding","subject_label":"AIDS-related funds at SFGH","summary":"Allocated funds of over $5 million (≈ $14.8 million in 2026 dollars) are targeted for AIDS-related activities at SFGH.","property":"other","value_text":"over $5 million","value_num":5000000.0,"unit":"USD","t_from":"1987","quote":"as attested to by allocated funds of over $5 million targeted for AIDS-related activities.","place_label":"San Francisco General Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/san-francisco-general-hospital-77e8b1","resolved_by":"place links file","anchor":"s-96032a50875c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"ARRIVING AT A SOLUTION; as attested to by allocated funds"},{"claim_id":"c:be3cf13bb257e54d1c2c3fe07d80f71b","page_id":"C124889006:15","page_url":"https://archive.org/details/C124889006/page/n14","statement_kind":"finding","subject_label":"SFGH research budget","summary":"SFGH has a research budget of over $15 million (≈ $44.5 million in 2026 dollars) per year, largely obtained in national competition.","property":"other","value_text":"over $15 million per year","value_num":15000000.0,"unit":"USD","t_from":"1987","quote":"With a research budget of over $15 million per year -obtained largely in national competition- it ranks as one of the leading City/County hospitals in the nation in biomedical research.","place_label":"San Francisco General Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/san-francisco-general-hospital-77e8b1","resolved_by":"place links file","anchor":"s-be3cf13bb257","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"ARRIVING AT A SOLUTION; With a research budget of over $15 million"},{"claim_id":"c:df2728faa20e9b5bd548fe4ea43da23e","page_id":"C124889006:15","page_url":"https://archive.org/details/C124889006/page/n14","statement_kind":"cites_decision","subject_label":"State funding for the project","summary":"The California State legislature approved the proposal and appropriated $1.5 million (≈ $4.4 million in 2026 dollars) in FY 86-87 to develop the project.","property":"approved","value_text":"$1.5 million in FY 86-87","value_num":1500000.0,"unit":"USD","date_printed":"FY 86-87","t_from":"1987","quote":"After consideration, the California State legislature approved the proposal and appropriated $1.5 million in FY 86-87 to develop the project.","anchor":"s-df2728faa20e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"THE PROPOSED PROJECT; the California State legislature approved the proposal"},{"claim_id":"c:66532c0d9739964651a7205d9b27177b","page_id":"C124889006:17","page_url":"https://archive.org/details/C124889006/page/n16","statement_kind":"proposal","subject_label":"Research space allocation","summary":"The proposed space allocation is approximately 16,688 assignable square feet including common space, laboratories and a vivarium.","property":"floor_area_sqft","value_text":"approximately 16,688 assignable square feet","value_num":16688.0,"unit":"sqft","t_from":"1987","quote":"The proposed space allocation of approximately 16,688 assignable square feet will include common space, investigators' laboratories, office space","anchor":"s-66532c0d9739","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The proposed space allocation of approximately 16,688 assignable square feet will include"},{"claim_id":"c:d1c1450fa7c0a22ce2a35ed28be6aba2","page_id":"C124889006:19","page_url":"https://archive.org/details/C124889006/page/n18","statement_kind":"proposal","subject_label":"Laboratory space program","summary":"The space program proposes 9 laboratory modules of 660 asf each.","property":"proposes","value_text":"9 modules @ 660 asf","unit":"sqft","t_from":"1987","quote":"Laboratories 9 Modules @ 660 asf Office 9 @ 120 asf Common Equipment Rooms","anchor":"s-d1c1450fa7c0","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"STATEWIDE AIDS RESEARCH CENTER SPACE PROGRAM SUMMARY"},{"claim_id":"c:297b4cefe7d2f2a4ecbfcc4c76681075","page_id":"C124889006:23","page_url":"https://archive.org/details/C124889006/page/n22","statement_kind":"finding","subject_label":"Pathology Building (Building 3)","summary":"The Pathology Building was built 28 years ago to house the Pathology service, an auditorium, and the vivarium.","property":"built_year","value_text":"built 28 years ago","t_from":"1987","quote":"The Pathology Building (Building 3) at San Francisco General Hospital was built 28 years ago to house the Pathology service, an auditorium, and the vivarium","place_label":"Pathology Building (Building 3), San Francisco General Hospital","anchor":"s-297b4cefe7d2","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"DESCRIPTION The Pathology Building (Building 3) at San Francisco General Hospital"},{"claim_id":"c:7187869fe8730c2859173ddb7595ca68","page_id":"C124889006:23","page_url":"https://archive.org/details/C124889006/page/n22","statement_kind":"finding","subject_label":"Building 3 floors","summary":"Only three floors of Building 3 were originally constructed.","property":"stories","value_text":"three floors","value_num":3.0,"unit":"stories","t_from":"1987","quote":"Only three floors of Building 3 were originally constructed, although the building was designed to accomodate an additional two floors.","place_label":"Building 3, San Francisco General Hospital","anchor":"s-7187869fe873","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Only three floors of Building 3 were originally constructed"},{"claim_id":"c:743de3f9e35dcf282db1aecc538f6e18","page_id":"C124889006:23","page_url":"https://archive.org/details/C124889006/page/n22","statement_kind":"finding","subject_label":"AIDS laboratory space need","summary":"The programming consultants identified a need for 16,680 ASF for the AIDS laboratory requirements.","property":"floor_area_sqft","value_text":"16,680 ASF","value_num":16680.0,"unit":"sqft","t_from":"1987","quote":"they identified the need for 16,680 ASF for the AIDS laboratory requirements","place_label":"Building 3, San Francisco General Hospital","anchor":"s-743de3f9e35d","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"As the programming consultants developed the project scope, they identified the need"},{"claim_id":"c:78ec81a0c8cc6ad0f00adbee19398841","page_id":"C124889006:23","page_url":"https://archive.org/details/C124889006/page/n22","statement_kind":"proposal","subject_label":"Elevators for the new facility","summary":"The current elevator will be extended and a second elevator will be added to serve the new facility.","property":"proposes","value_text":"extend current elevator and add a second elevator","t_from":"1987","quote":"The current elevator will be extended, and a second elevator will be added to serve the new facility.","place_label":"Building 3, San Francisco General Hospital","anchor":"s-78ec81a0c8cc","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Construction Requirements: The current elevator will be extended"},{"claim_id":"c:7aaf2a9122712059a38f60a9ce3594b9","page_id":"C124889006:23","page_url":"https://archive.org/details/C124889006/page/n22","statement_kind":"finding","subject_label":"Alternate construction site","summary":"Only one alternate site with potential for new construction was identified, a parking lot adjoining Building 3.","property":"alternative","value_text":"parking lot adjoining the current Building 3","t_from":"1987","quote":"only one alternate site with potential for new construction was identified, which was a parking lot adjoining the current Building 3.","place_label":"parking lot adjoining Building 3, San Francisco General Hospital campus","anchor":"s-7aaf2a912271","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In review of existing building opportunities at the SFGH campus, only one alternate site"},{"claim_id":"c:b1a79e62b12a2beedc1286e7798ebda9","page_id":"C124889006:23","page_url":"https://archive.org/details/C124889006/page/n22","statement_kind":"background","subject_label":"Parking replacement requirement","summary":"City Planning Codes require mitigating the removal of parking, including building replacement parking in the basement.","property":"other","value_text":"replacement parking required","t_from":"1987","quote":"The requirement by City Planning Codes to mitigate removal of parking availability, i.e., the need to construct replacement parking in the basement","place_label":"Building 3 parking lot","anchor":"s-b1a79e62b12a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Several factors weighed against the alternative site for construction, including: The requirement by City Planning Codes"},{"claim_id":"c:2155700d2998b911fc0b6b65e2098696","page_id":"C124889006:25","page_url":"https://archive.org/details/C124889006/page/n24","statement_kind":"proposal","subject_label":"Statewide AIDS Research Program","summary":"The program would draw basic scientists from various disciplines to develop an AIDS vaccine.","property":"other","t_from":"1987","quote":"Develop a vaccine for AIDS by identifying proteins of the virus that are antigenic and that induce the production of antibodies that are neutralizing in vitro and protective in vivo","anchor":"s-2155700d2998","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"SUMMARY OF PROJECT BENEFITS. The purpose of the Statewide AIDS Research Program"},{"claim_id":"c:8848e6ba579b7b9deb5ddf0815663704","page_id":"C124889006:25","page_url":"https://archive.org/details/C124889006/page/n24","statement_kind":"finding","subject_label":"New construction cost for intensive laboratory space","summary":"The study finds new construction of this laboratory space costs more than adding two floors to the existing structure.","property":"other","t_from":"1987","quote":"The cost of new construction for this intensive laboratory space is Greater than the cost of adding two floors to the existing structure.","place_label":"San Francisco General Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/san-francisco-general-hospital-77e8b1","resolved_by":"place links file","anchor":"s-8848e6ba579b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The cost of new construction for this intensive laboratory space is Greater than"},{"claim_id":"c:8e08615b5b12d71eb39e144c431ea374","page_id":"C124889006:25","page_url":"https://archive.org/details/C124889006/page/n24","statement_kind":"proposal","subject_label":"Statewide AIDS Research Program funding","summary":"The project would be funded from State funds for planning, design and construction totaling $12 million (≈ $36.9 million in 2026 dollars).","property":"cost_usd","value_text":"$12 million","value_num":12000000.0,"unit":"USD","date_printed":"fiscal years 1986-87 and 1987-88","t_from":"1986","quote":"This project will be funded from State funds for planning, design and construction, totaling $12 million, in fiscal years 1986-87 and 1987-88, according to the schedule shown below.","anchor":"s-8e08615b5b12","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"PROJECT FUNDING STATEMENT This project will be funded from State funds"},{"claim_id":"c:0cb8f6abbd2e51ddd8db23d0811c9e83","page_id":"C124889006:29","page_url":"https://archive.org/details/C124889006/page/n28","statement_kind":"proposal","subject_label":"CEQA review of the project","summary":"The classification states an Initial Study is to be prepared to determine whether the project may have a significant effect.","property":"other","t_from":"1987","quote":"This project is not Exempt from CEOA or Categorically Exempt; an Inital Study is to be prepared to detemine if the project may have a significant effect on the environment.","anchor":"s-0cb8f6abbd2e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"This project is not Exempt from CEOA or Categorically Exempt; an Inital Study is to be prepared"},{"claim_id":"c:114a1f54e399f84201112264040eb4d5","page_id":"C124889006:29","page_url":"https://archive.org/details/C124889006/page/n28","statement_kind":"proposal","subject_label":"Building 3 addition at San Francisco General Hospital","summary":"The project proposes to design and construct a two-level addition to the existing three story Building 3.","property":"proposes","value_text":"two-level addition","value_num":2.0,"unit":"stories","t_from":"1987","quote":"The proposed project will design and construct a two-level addition to the existing three story Building 3 on the San Francisco General Hospital grounds.","place_label":"Building 3, San Francisco General Hospital","anchor":"s-114a1f54e399","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"PROJECT DESCRIPTION: The proposed project will design and construct a two-level addition"},{"claim_id":"c:740cc78c34272c38912efb36f040afab","page_id":"C124889006:29","page_url":"https://archive.org/details/C124889006/page/n28","statement_kind":"finding","subject_label":"CEQA environmental classification","summary":"The environmental classification states that the project will have a significant effect on the environment.","property":"finding","value_text":"significant effect on the environment","t_from":"1987","quote":"Tt 1s known that the project will have a significant effect on the environment.","anchor":"s-740cc78c3427","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"IV. ENVIRONMENTAL IMPACT REPORT (EIR) Tt 1s known that the project will have a significant effect"},{"claim_id":"c:80b9e8cfda93bef1bc83ce82d984e36b","page_id":"C124889006:29","page_url":"https://archive.org/details/C124889006/page/n28","statement_kind":"proposal","subject_label":"Building 3 addition floor area","summary":"The addition would require about 16,600 assignable square feet for laboratories and support space.","property":"floor_area_sqft","value_text":"Approximately 16,600 assignable square feet","value_num":16600.0,"unit":"sqft","t_from":"1987","quote":"Approximately 16,600 assignable square feet will be required for laboratories, biohazard containment facility, equipment rooms, vivarium, offices and support services.","place_label":"Building 3, San Francisco General Hospital","anchor":"s-80b9e8cfda93","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"PROJECT DESCRIPTION: Approximately 16,600 assignable square feet will be required"}]}