{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124889945","url":"https://data.qipu.org/usa/san-francisco/reports/c124889945/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124889945/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124889945","source_id":"C124889945","title":"San Francisco water & power : a history of the Municipal Water Department and Hetch Hetchy System","year":1985,"n_pages":58,"source_url":"https://archive.org/details/C124889945","issuer":"San Francisco Public Utilities Commission","issuer_type":"government","gov_level":"city_county","doc_kind":"study","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"model","doc_kind_by":"model","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":16,"statements_total":63,"statements_by_kind":{"finding":40,"proposal":3,"cites_decision":11,"background":9},"same_for_every_statement":{"source_id":"C124889945","source_url":"https://archive.org/details/C124889945","source_label":"IGS library: San Francisco water & power : a history of the Municipal Water Department and Hetch Hetchy System","report_year":1985,"issuer":"San Francisco Public Utilities Commission","issuer_type":"government","doc_kind":"study","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A history by the San Francisco Public Utilities Commission of the city's water department and the Hetch Hetchy system, from early supply to its later expansion.","next":"In August 1987 the Board adopted a resolution opposing the Interior Secretary's proposal to dismantle the Hetch Hetchy Water System.","next_decision":"qipu:sf/decision/journalmayaugofproceed82sanfrich:541/3","figures":[{"label":"Cost","value":"$45 million bond issue","claim_ids":["c:9122d72db328ebb2a6c75e593541bc37"]},{"label":"Dam height","value":"226.6 feet","claim_ids":["c:9515bad920945e939456d9129c15186a"]},{"label":"Pipeline","value":"1,191 miles of pipeline","claim_ids":["c:af19bd91a1fd7b2a9ba19143c0fb9a57"]},{"label":"Initial cost","value":"just over $100 million","claim_ids":["c:72f5a80806d230fa51c073d5af46d797"]}],"main_points":["c:eef84744d9d16de6b536fe47f73841d8","c:69ba1418cff85157558dd3cd5723d1b9","c:72f5a80806d230fa51c073d5af46d797"],"board_decisions_after":["qipu:sf/decision/journalmayaugofproceed82sanfrich:541/3","qipu:sf/decision/journalmayaugofproceed82sanfrich:277/4","qipu:sf/decision/journalofjuldecproceed87sanfrich:623/2"],"board_decisions_before":[],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:0c109e84bbe2c95ae01bfcb668fcf9f4","page_id":"C124889945:2","page_url":"https://archive.org/details/C124889945/page/n1","statement_kind":"finding","subject_label":"Calaveras Dam","summary":"Calaveras Dam failed and reconstruction was monitored by the City Engineer.","property":"event","value_text":"fails","t_from":"1985","quote":"Calaveras Dam fails — reconstruction monitored by City Engineer Early Intake Powerhouse starts operation","place_label":"Calaveras Dam","anchor":"s-0c109e84bbe2","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Calaveras Dam fails — reconstruction monitored by City Engineer"},{"claim_id":"c:6be787f702e80fadd31c84edcfbe5510","page_id":"C124889945:2","page_url":"https://archive.org/details/C124889945/page/n1","statement_kind":"finding","subject_label":"Eleanor Dam","summary":"Eleanor Dam was completed to a height of 70 feet.","property":"height_ft","value_text":"70 feet","value_num":70.0,"unit":"ft","t_from":"1985","quote":"Eleanor Dam completed to height of 70 feet Power Administrator orders surplus Early Intake power to PG&E","place_label":"Eleanor Dam","anchor":"s-6be787f702e8","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Eleanor Dam completed to height of 70 feet"},{"claim_id":"c:9515bad920945e939456d9129c15186a","page_id":"C124889945:2","page_url":"https://archive.org/details/C124889945/page/n1","statement_kind":"finding","subject_label":"O'Shaughnessy Dam","summary":"O'Shaughnessy Dam was dedicated at 226.6 feet high with capacity of 206,000 acre feet.","property":"height_ft","value_text":"226.6 feet","value_num":226.6,"unit":"ft","t_from":"1985","quote":"O'Shaughnessy Dam dedicated — height 226.6 feet, capacity 206,000 acre feet","place_label":"O'Shaughnessy Dam","place_precision":"site","place_id":"qipu:sf/place/landmark/hetch-hetchy","resolved_by":"place links file","anchor":"s-9515bad92094","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"O'Shaughnessy Dam dedicated — height 226.6 feet"},{"claim_id":"c:eef84744d9d16de6b536fe47f73841d8","page_id":"C124889945:2","page_url":"https://archive.org/details/C124889945/page/n1","statement_kind":"proposal","subject_label":"[name withheld] development","summary":"A Board of Army Engineers report recommends San Francisco develop Hetch Hetchy.","property":"recommendation","value_text":"$20 million cheaper","t_from":"1985","quote":"Board of Army Engineers report recommends San Francisco develop Hetch Hetchy $20 million cheaper Interior Secretary Fisher refuses further permits","place_label":"Hetch Hetchy","place_precision":"site","place_id":"qipu:sf/place/landmark/hetch-hetchy","resolved_by":"place links file","anchor":"s-eef84744d9d1","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Board of Army Engineers report recommends San Francisco develop Hetch Hetchy"},{"claim_id":"c:314fbe79d10979072f958a8f6f253384","page_id":"C124889945:3","page_url":"https://archive.org/details/C124889945/page/n2","statement_kind":"cites_decision","subject_label":"Board of Supervisors bond issue","summary":"Mayor Selby vetoed the Board of Supervisors' $6 million (≈ $18.8 million in 2026 dollars) bond issue as inappropriate.","property":"rejected","value_text":"$6 million","value_num":6000000.0,"unit":"USD","t_from":"1985","quote":"San Francisco Mayor Selby vetos Board of Supervisors $6 million bond issue as “inappropriate”","place_label":"San Francisco","anchor":"s-314fbe79d109","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"CHRONOLOGY; San Francisco Mayor [name] vetos Board of Supervisors $6 million bond issue"},{"claim_id":"c:655467ff10b52794d51830d79061b571","page_id":"C124889945:3","page_url":"https://archive.org/details/C124889945/page/n2","statement_kind":"cites_decision","subject_label":"[name withheld] development","summary":"The Board of Supervisors adopted resolution #6949 formally abandoning the Hetch Hetchy development.","property":"adopted","value_text":"resolution #6949","value_num":6949.0,"t_from":"1985","quote":"Board of Supervisors adopts resolution #6949 formally abandoning the Hetch Hetchy development","decided_by":"Board of Supervisors","instrument_kind":"resolution","instrument_printed":"6949","place_label":"Hetch Hetchy","place_precision":"site","place_id":"qipu:sf/place/landmark/hetch-hetchy","resolved_by":"place links file","anchor":"s-655467ff10b5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"CHRONOLOGY; Board of Supervisors adopts resolution #6949 formally abandoning"},{"claim_id":"c:693436a3fd1deef4a35be7b37f5fb919","page_id":"C124889945:3","page_url":"https://archive.org/details/C124889945/page/n2","statement_kind":"proposal","subject_label":"Calaveras site","summary":"City Engineer T.R. Scowden recommends San Francisco buy the Calaveras site.","property":"recommendation","value_text":"buy Calaveras site","t_from":"1985","quote":"City Engineer T.R. Scowden recommends San Francisco buy Calaveras site [name withheld] raises Pilarcitos Dam to 95 feet","place_label":"Calaveras","anchor":"s-693436a3fd1d","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"CHRONOLOGY; City Engineer [name] recommends San Francisco buy Calaveras site"},{"claim_id":"c:9122d72db328ebb2a6c75e593541bc37","page_id":"C124889945:3","page_url":"https://archive.org/details/C124889945/page/n2","statement_kind":"cites_decision","subject_label":"[name withheld] bond issue","summary":"San Francisco voters approved a $45 million (≈ $140.9 million in 2026 dollars) bond issue to build the Hetch Hetchy system.","property":"approved","value_text":"$45 million","value_num":45000000.0,"unit":"USD","t_from":"1985","quote":"San Francisco votes 20-1 for $45 million bond issue to build Hetch Hetchy system","place_label":"San Francisco","anchor":"s-9122d72db328","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"CHRONOLOGY; San Francisco votes 20-1 for $45 million bond issue"},{"claim_id":"c:81777e5177145f4df25dea9cbb6d63c7","page_id":"C124889945:8","page_url":"https://archive.org/details/C124889945/page/n7","statement_kind":"background","subject_label":"Hetch Hetchy System origin","summary":"The Hetch Hetchy System had its birth in the Raker Act of 1913.","property":"event","value_text":"Raker Act of 1913","date_printed":"1913","t_from":"1913","quote":"The Hetch Hetchy System had its birth in the Raker Act of 1913 which granted water resource rights-of-way on the Tuolumne River in Yosemite National Park to San Francisco.","place_label":"Tuolumne River, Yosemite National Park","anchor":"s-81777e517714","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"This 1985 update ... published by direction of the San Francisco Public Utilities Commission"},{"claim_id":"c:c16e26d6fc954fe265974f046be46d14","page_id":"C124889945:8","page_url":"https://archive.org/details/C124889945/page/n7","statement_kind":"finding","subject_label":"Purchase of Spring Valley Water Company","summary":"Mayor Rolph purchased the Spring Valley water works for San Francisco in 1930.","property":"acquired","value_text":"$39,962,606.51","value_num":39962606.51,"unit":"USD","date_printed":"March 3, 1930","t_from":"1930","quote":"Mayor “Sunny Jim” Rolph purchased the fully developed, mature water works for San Francisco ata cost of $39,962,606.51 on March 3, 1930.","place_label":"San Francisco","anchor":"s-c16e26d6fc95","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Preface ... Mayor Rolph purchased the fully developed, mature water works"},{"claim_id":"c:d60ab552c6b50d1fedfcf97b01e8d105","page_id":"C124889945:8","page_url":"https://archive.org/details/C124889945/page/n7","statement_kind":"finding","subject_label":"Sierra Nevada water delivery","summary":"Sierra Nevada water was being delivered into the Water Department distribution system by 1934.","property":"event","value_text":"by 1934","date_printed":"1934","t_from":"1934","quote":"A very busy 20 years of construction on the Hetch Hetchy dams and aqueducts resulted in Sierra Nevada water being delivered into the Water Department local distribution system by 1934.","place_label":"San Francisco","anchor":"s-d60ab552c6b5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Preface ... A very busy 20 years of construction on the Hetch Hetchy dams"},{"claim_id":"c:08f66db30728bfd50320af5f45be07ca","page_id":"C124889945:11","page_url":"https://archive.org/details/C124889945/page/n10","statement_kind":"finding","subject_label":"Mountain Lake Water Company","summary":"Within two years, 1850 to 1852, San Francisco was entirely destroyed by fire six times.","property":"event","value_text":"six times","value_num":6.0,"date_printed":"1850-1852","t_from":"1850","quote":"Within the two years, 1850-1852, San Francisco was entirely destroyed by fire six times, with staggering losses of property, and was as often rebuilt.","place_label":"San Francisco","anchor":"s-08f66db30728","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In the Beginning; this is the report's own narrative history"},{"claim_id":"c:16f317ad67b1c15604b11642bd69a13b","page_id":"C124889945:11","page_url":"https://archive.org/details/C124889945/page/n10","statement_kind":"cites_decision","subject_label":"San Francisco City Water Works franchise","summary":"The San Francisco City Water Works was franchised by San Francisco Order No. 46.","property":"approved","value_text":"Order No. 46","value_num":46.0,"date_printed":"1856","t_from":"1856","quote":"In 1856, the San Francisco City Water Works, popularly known as the Bensley Company, was franchised by San Francisco Order No. 46.","decided_by":"San Francisco","instrument_kind":"other","instrument_printed":"46","instrument_date_printed":"1856","place_label":"San Francisco","anchor":"s-16f317ad67b1","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In 1856, the San Francisco City Water Works, popularly known as the Bensley Company"},{"claim_id":"c:52152cc8dda7ffd8871ad0aa42642d25","page_id":"C124889945:11","page_url":"https://archive.org/details/C124889945/page/n10","statement_kind":"finding","subject_label":"Sausalito Water and Steam Tug Company","summary":"The Sausalito Water and Steam Tug Company barged water across the bay from Marin springs in 1851.","property":"event","value_text":"barging water from Marin","date_printed":"1851","t_from":"1851","quote":"In 1851, the Sausalito Water and Steam Tug Company was barging the precious fluid across the bay by tank steamer from springs on the Marin shore","place_label":"Marin shore","anchor":"s-52152cc8dda7","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In 1851, the Sausalito Water and Steam Tug Company was barging"},{"claim_id":"c:5346b3cd478a64dbace93674de60200d","page_id":"C124889945:11","page_url":"https://archive.org/details/C124889945/page/n10","statement_kind":"finding","subject_label":"San Francisco population","summary":"By 1859 San Francisco had nearly 100,000 inhabitants.","property":"population","value_text":"nearly 100,000","value_num":100000.0,"unit":"persons","date_printed":"1859","t_from":"1859","quote":"By 1859, the City was solidly built of brick and stone with nearly 100,000 inhabitants having all the accomplishments of wealth and culture.","place_label":"San Francisco","anchor":"s-5346b3cd478a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"By 1859, the City was solidly built of brick and stone"},{"claim_id":"c:a8061da851bc71b07b906f28a0420d3a","page_id":"C124889945:11","page_url":"https://archive.org/details/C124889945/page/n10","statement_kind":"finding","subject_label":"Pueblo of Yerba Buena","summary":"The U.S.S. Portsmouth took the Pueblo of Yerba Buena on July 9, 1846.","property":"event","value_text":"taken by U.S.S. Portsmouth","date_printed":"July 9, 1846","t_from":"1846","quote":"The Pueblo of Yerba Buena, a town government organized by 450 residents, was taken by the U.S.S. Portsmouth, commanded by Captain R.B. Montgomery, on July 9, 1846.","place_label":"Yerba Buena","anchor":"s-a8061da851bc","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Pueblo of Yerba Buena, a town government organized by 450 residents"},{"claim_id":"c:d4f23fdbac0933cb8cd8e330193c067c","page_id":"C124889945:11","page_url":"https://archive.org/details/C124889945/page/n10","statement_kind":"finding","subject_label":"Lobos Creek water supply","summary":"Alexei Waldemar von Schmidt dammed the mouth of Lobos Creek and brought two million gallons of water a day to the City.","property":"event","value_text":"two million gallons a day","value_num":2000000.0,"unit":"other","date_printed":"1857","t_from":"1857","quote":"The next year, Alexei Waldemar von Schmidt, chief engineer of the Bensley Company, dammed the mouth of Lobos Creek and brought two million gallons of water a day","place_label":"Lobos Creek","anchor":"s-d4f23fdbac09","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The next year, Alexei Waldemar von Schmidt, chief engineer"},{"claim_id":"c:f7d0638c0ad2004a50b8e74dbcfd50a0","page_id":"C124889945:11","page_url":"https://archive.org/details/C124889945/page/n10","statement_kind":"background","subject_label":"Spanish and Mexican rule","summary":"Spain's royal rule over Yerba Buena and California ended in 1821.","property":"event","value_text":"1821","value_num":1821.0,"date_printed":"1821","t_from":"1821","quote":"When Spain’s royal rule over Yerba Buena and California was ended in 1821, Mexico opened Mission lands to settlement","place_label":"Yerba Buena","anchor":"s-f7d0638c0ad2","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"When Spain's royal rule over Yerba Buena and California was ended in 1821"},{"claim_id":"c:3100dff3b18e347a356d7c236368026d","page_id":"C124889945:12","page_url":"https://archive.org/details/C124889945/page/n11","statement_kind":"background","subject_label":"San Francisco water rate fixing","summary":"Water rate fixing was an annual squabble within the Board of Supervisors until 1910.","property":"other","value_text":"annual squabble within the Board of Supervisors","date_printed":"until 1910","t_from":"1910","quote":"Fixing the water rates was then an annual squabble within the Board of Supervisors until 1910 when the Constitution was again changed","anchor":"s-3100dff3b18e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Fixing the water rates was then an annual squabble"},{"claim_id":"c:6b1d25aaa39537be0ca2499b1efdaedf","page_id":"C124889945:12","page_url":"https://archive.org/details/C124889945/page/n11","statement_kind":"finding","subject_label":"Pilarcitos peninsula water supply","summary":"The first peninsula water arrived in the City via the Pilarcitos tunnel and redwood flume.","property":"event","value_text":"first peninsula water arrived","date_printed":"July 4, 1862","t_from":"1862","quote":"on July 4, 1862 the first peninsula water arrived in the City via the tunnel and 32 miles of redwood flume.","place_label":"Pilarcitos","anchor":"s-6b1d25aaa395","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"on July 4, 1862 the first peninsula water arrived in the City"},{"claim_id":"c:d6b9e634e25f6be644d40794bea4dddb","page_id":"C124889945:12","page_url":"https://archive.org/details/C124889945/page/n11","statement_kind":"background","subject_label":"Spring Valley Water Works","summary":"George H. Ensign obtained a water charter from the California Legislature and organized the Spring Valley Water Works.","property":"event","value_text":"1858","date_printed":"1858","t_from":"1858","quote":"George H. Ensign obtained a water charter from the California Legislature in 1858 and organized the Spring Valley Water Works.","anchor":"s-d6b9e634e25f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"George H. Ensign obtained a water charter from the California Legislature in 1858"},{"claim_id":"c:8a1c7c544f9292cbc923ec82c802fc29","page_id":"C124889945:15","page_url":"https://archive.org/details/C124889945/page/n14","statement_kind":"finding","subject_label":"San Andres Reservoir","summary":"San Andres Reservoir entered water operations for San Francisco.","property":"event","value_text":"entered water operations","date_printed":"November 1870","t_from":"1870","quote":"San Andrés Reservoir entered water operations for San Francisco in November 1870.","place_label":"San Andres Reservoir","anchor":"s-8a1c7c544f92","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"San Andrés Reservoir entered water operations for San Francisco in November 1870"},{"claim_id":"c:9e0ab722c932cf3896930aa96c8f7016","page_id":"C124889945:18","page_url":"https://archive.org/details/C124889945/page/n17","statement_kind":"finding","subject_label":"Crystal Springs Dam","summary":"The American Society of Civil Engineers designated Crystal Springs Dam as a California Historic Civil Engineering landmark.","property":"historic_rating","value_text":"California Historic Civil Engineering landmark","date_printed":"1976","t_from":"1976","quote":"The American Society of Civil Engineers designated Crystal Springs Dam as a California Historic Civil En- gineering landmark in 1976.","place_label":"Crystal Springs Dam","anchor":"s-9e0ab722c932","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The American Society of Civil Engineers designated Crystal Springs Dam"},{"claim_id":"c:e1404ccbf98b2799c8338993cc070cd4","page_id":"C124889945:18","page_url":"https://archive.org/details/C124889945/page/n17","statement_kind":"finding","subject_label":"Crystal Springs Dam","summary":"The dam impounds 22.6 billion gallons of water across a 35 square mile catchment area.","property":"other","value_text":"22.6 billion gallons (69,300 acre feet)","t_from":"1985","quote":"With a 35 square mile catchment area, the dam im- pounds 22.6 billion gallons of water (69,300 acre feet)","place_label":"Crystal Springs Dam","anchor":"s-e1404ccbf98b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"With a 35 square mile catchment area, the dam impounds"},{"claim_id":"c:41e105cf8a1d4b2a33e55d7727361a0d","page_id":"C124889945:21","page_url":"https://archive.org/details/C124889945/page/n20","statement_kind":"finding","subject_label":"Turner Dam","summary":"Turner Dam is a compacted earth-fill structure 195 feet high.","property":"height_ft","value_text":"195 feet high","value_num":195.0,"unit":"ft","t_from":"1985","quote":"Turner Dam is a compacted earth-fill structure 195 feet high, 2,160 feet long and 1,075 feet wide at the base.","place_label":"Turner Dam","anchor":"s-41e105cf8a1d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Turner Dam is a compacted earth-fill structure"},{"claim_id":"c:7f9abce7287bd2deb76569627eb3d476","page_id":"C124889945:21","page_url":"https://archive.org/details/C124889945/page/n20","statement_kind":"finding","subject_label":"San Francisco municipal reservoirs","summary":"The twelve municipal reservoirs can hold some 414 million gallons at capacity, about a five-day supply.","property":"other","value_text":"414 million gallons (1,271 acre feet)","t_from":"1985","quote":"San Francisco’s twelve municipal reservoirs can hold, at capacity, some 414 million gallons (1,271 acre feet), about a five-day supply for the City.","place_label":"San Francisco","anchor":"s-7f9abce7287b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"San Francisco's twelve municipal reservoirs can hold"},{"claim_id":"c:af19bd91a1fd7b2a9ba19143c0fb9a57","page_id":"C124889945:21","page_url":"https://archive.org/details/C124889945/page/n20","statement_kind":"finding","subject_label":"San Francisco water distribution system","summary":"The city distribution network has 1,191 miles of pipeline.","property":"other","value_text":"1,191 miles of pipeline","value_num":1191.0,"t_from":"1985","quote":"an amazing network of 1,191 miles of pipeline, of various diameter, all tucked out of view under the City streets.","place_label":"San Francisco","anchor":"s-af19bd91a1fd","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"an amazing network of 1,191 miles of pipeline"},{"claim_id":"c:4a4dbbafc87456ba2df7cf29d43cdf7b","page_id":"C124889945:23","page_url":"https://archive.org/details/C124889945/page/n22","statement_kind":"finding","subject_label":"Tuolumne watershed","summary":"The Tuolumne watershed drains 652 square miles of rugged granite mountains sloping west from the Sierra Nevada crest.","property":"other","value_text":"652 square miles","value_num":652.0,"t_from":"1985","quote":"The Tuolumne, with its source in a perpetual glacier on 13,000 feet high Mount Lyell, drains 652 square miles of watershed in rugged granite mountains","place_label":"Tuolumne River watershed","anchor":"s-4a4dbbafc874","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Tuolumne, with its source in a perpetual glacier"},{"claim_id":"c:69ba1418cff85157558dd3cd5723d1b9","page_id":"C124889945:23","page_url":"https://archive.org/details/C124889945/page/n22","statement_kind":"finding","subject_label":"Tuolumne River system superiority","summary":"Grunsky's investigation established the superiority of the Tuolumne River system, later called Hetch Hetchy.","property":"finding","value_text":"Tuolumne River system","date_printed":"1900-1901","t_from":"1900","quote":"Grunsky’s investigation established the superiority of the Tuolumne River system — later called Hetch Hetchy — for the following basic reasons","place_label":"Tuolumne River; Hetch Hetchy","anchor":"s-69ba1418cff8","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Grunsky's investigation established the superiority of the Tuolumne"},{"claim_id":"c:9fec8e6d22784fe7737a613ffa80e06c","page_id":"C124889945:23","page_url":"https://archive.org/details/C124889945/page/n22","statement_kind":"background","subject_label":"Harris offer of Tuolumne rights","summary":"George M. Harris offered to sell his rights to the entire length of the Tuolumne for $200,000 (≈ $7.5 million in 2026 dollars).","property":"other","value_text":"$200,000","value_num":200000.0,"unit":"USD","date_printed":"1888","t_from":"1888","quote":"offering to sell his rights to the entire length of the Tuolumne for $200,000.","place_label":"Tuolumne River","privacy_flag":"may_name_private_person_after_1950","privacy_class":"private_person","public_after_year":2060,"anchor":"s-9fec8e6d2278","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"George M. Harris pointed out the possibility of Hetch Hetchy"},{"claim_id":"c:dc7c84c6cb328d5118f16c6e69251cbd","page_id":"C124889945:23","page_url":"https://archive.org/details/C124889945/page/n22","statement_kind":"finding","subject_label":"Water source study","summary":"Mayor Phelan directed City Engineer Carl E. Grunsky to study 14 possible water sources during 1900 and 1901.","property":"other","value_text":"14 possible water sources","value_num":14.0,"date_printed":"1900-1901","t_from":"1900","quote":"Mayor James Phelan directed City Engineer Carl E. Grunsky to study 14 possible water sources during 1900 and 1901","anchor":"s-dc7c84c6cb32","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Mayor James Phelan directed City Engineer Carl E. Grunsky to study 14"},{"claim_id":"c:050a74baaac28c53878c37fa6294d656","page_id":"C124889945:24","page_url":"https://archive.org/details/C124889945/page/n23","statement_kind":"background","subject_label":"Yosemite National Park creation","summary":"Congress created Yosemite National Park on October 1, 1890, without Yosemite Valley and Mariposa Grove.","property":"other","value_text":"October 1, 1890","date_printed":"October 1, 1890","t_from":"1890","quote":"The Park was created by Congress on October 1, 1890, but at the time it did not include Yosemite Valley and Mariposa Grove.","place_label":"Yosemite National Park","anchor":"s-050a74baaac2","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Park was created by Congress on October 1, 1890"},{"claim_id":"c:6f2776604fcd7f19c8414eccb62a0036","page_id":"C124889945:24","page_url":"https://archive.org/details/C124889945/page/n23","statement_kind":"cites_decision","subject_label":"Hetch Hetchy permission","summary":"Interior Secretary Garfield granted limited permission for reservoirs, dams, aqueducts and rights-of-way.","property":"approved","value_text":"limited permission","date_printed":"May 11, 1908","t_from":"1908","quote":"On May 11, 1908, after holding hearings in San Francisco, Interior Secretary Garfield granted limited permission for reservoirs, dams, aqueducts and rights-of-way","place_label":"Lake Eleanor; Hetch Hetchy","anchor":"s-6f2776604fcd","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"On May 11, 1908, after holding hearings in San Francisco, Interior Secretary Garfield granted limited permission"},{"claim_id":"c:8a64eb2783b7da7b27f04c0af1930e3d","page_id":"C124889945:24","page_url":"https://archive.org/details/C124889945/page/n23","statement_kind":"finding","subject_label":"Graft investigations","summary":"Abe Ruef, political boss, was sentenced to 14 years in the state penitentiary but served five years.","property":"other","value_text":"14 years","value_num":14.0,"date_printed":"1907-1908","t_from":"1907","quote":"San Francisco’s political boss, Abe Ruef, crony and benefactor to Mayor Schmitz, was sentenced to 14 years in the state penitentiary","place_label":"San Francisco","anchor":"s-8a64eb2783b7","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"San Francisco's political boss, Abe Ruef, crony and benefactor to Mayor Schmitz"},{"claim_id":"c:9e3256076036cb7fd13bc4508be06819","page_id":"C124889945:24","page_url":"https://archive.org/details/C124889945/page/n23","statement_kind":"proposal","subject_label":"Bay Cities Water Company purchase","summary":"The Board of Supervisors Committee on Water Supply selected the Bay Cities Water Company proposal to buy its system.","property":"proposes","value_text":"$10.5 million","value_num":10500000.0,"unit":"USD","date_printed":"1906","t_from":"1906","quote":"the Board of Supervisors Committee on Water Supply selected the Bay Cities Water Company proposal that the City buy its system for $10.5 million.","anchor":"s-9e3256076036","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the Board of Supervisors Committee on Water Supply selected the Bay Cities Water Company proposal"},{"claim_id":"c:b2756768d9c13a981c716d6549962e8d","page_id":"C124889945:24","page_url":"https://archive.org/details/C124889945/page/n23","statement_kind":"cites_decision","subject_label":"Hetch Hetchy abandonment","summary":"The Board of Supervisors adopted resolution #6949, formally abandoning Hetch Hetchy.","property":"adopted","value_text":"resolution #6949","value_num":6949.0,"date_printed":"February 1906","t_from":"1906","quote":"The Board, controlled by Mayor Eugene E. Schmitz, who succeeded Mayor Phelan in 1902, promptly adopted resolution #6949 in February, formally abandoning Hetch Hetchy.","decided_by":"Board of Supervisors","instrument_kind":"resolution","instrument_printed":"6949","instrument_date_printed":"February 1906","place_label":"Hetch Hetchy","place_precision":"site","place_id":"qipu:sf/place/landmark/hetch-hetchy","resolved_by":"place links file","anchor":"s-b2756768d9c1","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Board, controlled by Mayor Eugene E. Schmitz, who succeeded Mayor Phelan in 1902"},{"claim_id":"c:eaefff147b330190dc3738eb6648bb12","page_id":"C124889945:24","page_url":"https://archive.org/details/C124889945/page/n23","statement_kind":"cites_decision","subject_label":"Congress rights-of-way through national parks","summary":"Congress authorized the Secretary of Interior to use rights-of-way through Yosemite, Sequoia and General Grant National Parks for water works.","property":"approved","value_text":"Act of February 15, 1901","date_printed":"February 15, 1901","t_from":"1901","quote":"By the Act of February 15, 1901, Congress authorized the Secretary of Interior to use the rights-of-way through the Yosemite, Sequoia and General Grant National Parks","decided_by":"Congress","instrument_kind":"other","instrument_printed":"February 15, 1901","instrument_date_printed":"February 15, 1901","place_label":"Yosemite National Park","anchor":"s-eaefff147b33","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"By the Act of February 15, 1901, Congress authorized the Secretary of Interior"},{"claim_id":"c:fd22cd7614d527844fa35e5f5ec27503","page_id":"C124889945:24","page_url":"https://archive.org/details/C124889945/page/n23","statement_kind":"cites_decision","subject_label":"San Francisco first application for Hetch Hetchy","summary":"Interior Secretary E.A. Hitchcock denied San Francisco's first application to develop Hetch Hetchy.","property":"rejected","value_text":"denied","date_printed":"June 20, 1903","t_from":"1903","quote":"San Francisco’s first application to develop Hetch Hetchy was denied by Interior Secretary E.A. Hitchcock on June 20, 1903","place_label":"Hetch Hetchy","place_precision":"site","place_id":"qipu:sf/place/landmark/hetch-hetchy","resolved_by":"place links file","anchor":"s-fd22cd7614d5","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"San Francisco's first application to develop Hetch Hetchy was denied by Interior Secretary E.A. Hitchcock"},{"claim_id":"c:6cf1990708a8ee6ee4040365766863e4","page_id":"C124889945:33","page_url":"https://archive.org/details/C124889945/page/n32","statement_kind":"background","subject_label":"Raker Act power condition","summary":"The Raker Act required the City to develop electric power for municipal and commercial use.","property":"other","t_from":"1985","quote":"Develop electric power for municipal and commercial use.","anchor":"s-6cf1990708a8","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"the Act imposes many conditions and obligations upon the City, stipulating"},{"claim_id":"c:6ff23ead1fb67e45b444ac3df9230474","page_id":"C124889945:33","page_url":"https://archive.org/details/C124889945/page/n32","statement_kind":"background","subject_label":"Raker Act rental condition","summary":"The Raker Act required San Francisco to pay an annual rental rising to $30,000 (≈ $93,942 in 2026 dollars) after 20 years.","property":"other","value_text":"$15,000 rising to $30,000","value_num":15000.0,"unit":"USD","t_from":"1985","quote":"Pay an annual rental starting at $15,000 and rising to $30,000 after 20 years.","anchor":"s-6ff23ead1fb6","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"the Act imposes many conditions and obligations upon the City, stipulating"},{"claim_id":"c:308b89cdbb4192b116351c68bb97836a","page_id":"C124889945:38","page_url":"https://archive.org/details/C124889945/page/n37","statement_kind":"finding","subject_label":"O'Shaughnessy Dam dedication","summary":"At its dedication the O'Shaughnessy Dam was acclaimed the largest single structure of the West Coast.","property":"other","value_text":"largest single structure of the West Coast","date_printed":"July 7, 1923","t_from":"1923","quote":"At its dedication on July 7, 1923, it was acclaimed the largest single structure of the West Coast.","place_label":"O'Shaughnessy Dam","place_precision":"site","place_id":"qipu:sf/place/landmark/hetch-hetchy","resolved_by":"place links file","anchor":"s-308b89cdbb41","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"At its dedication on July 7, 1923, it was acclaimed"},{"claim_id":"c:711bbed9c1d055949e8a25f0b77cdb32","page_id":"C124889945:38","page_url":"https://archive.org/details/C124889945/page/n37","statement_kind":"finding","subject_label":"O'Shaughnessy Dam raising","summary":"The O'Shaughnessy Dam was raised 85.5 feet in elevation.","property":"height_ft","value_text":"85.5 feet","value_num":85.5,"unit":"ft","date_printed":"1938","t_from":"1938","quote":"The dam was raised 85.5 feet in elevation fifteen years later, in 1938","place_label":"O'Shaughnessy Dam","place_precision":"site","place_id":"qipu:sf/place/landmark/hetch-hetchy","resolved_by":"place links file","anchor":"s-711bbed9c1d0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The dam was raised 85.5 feet in elevation fifteen years later"},{"claim_id":"c:72f5a80806d230fa51c073d5af46d797","page_id":"C124889945:38","page_url":"https://archive.org/details/C124889945/page/n37","statement_kind":"finding","subject_label":"Hetch Hetchy initial cost","summary":"The total initial cost of Hetch Hetchy development was just over $100 million (≈ $2.5 billion in 2026 dollars), met solely by the City.","property":"cost_usd","value_text":"just over $100 million","value_num":100000000.0,"unit":"USD","date_printed":"up to 1934","t_from":"1934","quote":"The cost was met solely by the City — without State or Federal assistance.","place_label":"Hetch Hetchy","place_precision":"site","place_id":"qipu:sf/place/landmark/hetch-hetchy","resolved_by":"place links file","anchor":"s-72f5a80806d2","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The cost was met solely by the City"},{"claim_id":"c:8eb5fceeda72115f4d7a0f57e76d8cad","page_id":"C124889945:38","page_url":"https://archive.org/details/C124889945/page/n37","statement_kind":"finding","subject_label":"Early Intake Powerhouse output","summary":"Early Intake Powerhouse produced $550,000 (≈ $12.3 million in 2026 dollars) of power for Hetch Hetchy construction in its first 16 years.","property":"other","value_text":"$550,000","value_num":550000.0,"unit":"USD","date_printed":"May 1918","t_from":"1918","quote":"Electrical generation began in May 1918, and in 16 years the powerhouse produced $550,000 worth of power for Hetch Hetchy construction","place_label":"Early Intake Powerhouse","anchor":"s-8eb5fceeda72","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Electrical generation began in May 1918, and in 16 years"},{"claim_id":"c:eddd0084a26c0746d1ea54f1d3c88c6e","page_id":"C124889945:38","page_url":"https://archive.org/details/C124889945/page/n37","statement_kind":"finding","subject_label":"Lake Eleanor reservoir","summary":"The dam at Lake Eleanor created a reservoir holding 28,000 acre feet.","property":"other","value_text":"28,000 acre feet","value_num":28000.0,"unit":"acres","t_from":"1985","quote":"The dam turned it into a reservoir holding 28,000 acre feet.","place_label":"Lake Eleanor","anchor":"s-eddd0084a26c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The dam turned it into a reservoir holding 28,000 acre feet."},{"claim_id":"c:25607d6b0ba1ad9f0387fc3dcf0a0edf","page_id":"C124889945:42","page_url":"https://archive.org/details/C124889945/page/n41","statement_kind":"cites_decision","subject_label":"Coast Range Tunnel budget","summary":"The budget for the Coast Range Tunnel was adopted in 1927 after waiting for Board of Supervisors approval.","property":"adopted","date_printed":"1927","t_from":"1927","quote":"When the budget was finally adopted in 1927, tunnel drilling started without delay.","place_label":"Coast Range Tunnel","anchor":"s-25607d6b0ba1","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Hetch Hetchy's master plan scheduled construction"},{"claim_id":"c:43067a70997463a0be5d6c4a72861298","page_id":"C124889945:42","page_url":"https://archive.org/details/C124889945/page/n41","statement_kind":"finding","subject_label":"Pipeline #2","summary":"Pipeline #2 cost $12.3 million (≈ $155.2 million in 2026 dollars) and raised aqueduct capacity to 140 million gallons per day.","property":"cost_usd","value_text":"$12.3 million","value_num":12300000.0,"unit":"USD","date_printed":"1953","t_from":"1953","quote":"The line cost $12.3 million and increased the aqueduct capacity by 80 million gallons to 140 million gallons per day.","place_label":"Pipeline #2","anchor":"s-43067a709974","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Pipeline #2 entered service in 1953."},{"claim_id":"c:5b307742aa513513bdefbd0b1fedf906","page_id":"C124889945:42","page_url":"https://archive.org/details/C124889945/page/n41","statement_kind":"finding","subject_label":"Pipeline #3","summary":"Pipeline #3 was completed at a cost of $19.5 million (≈ $188.8 million in 2026 dollars).","property":"cost_usd","value_text":"$19.5 million","value_num":19500000.0,"unit":"USD","date_printed":"1968","t_from":"1968","quote":"Completed in 1968 at a cost of $19.5 million, it increased the aqueduct capacity by 160 million gallons per day","place_label":"Pipeline #3","anchor":"s-5b307742aa51","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Pipeline #3 is the largest of the three"},{"claim_id":"c:da4112160cd522edd5155192b92df484","page_id":"C124889945:43","page_url":"https://archive.org/details/C124889945/page/n42","statement_kind":"cites_decision","subject_label":"City Charter of 1932","summary":"The new City Charter of 1932 went into effect and formed the Public Utilities Commission.","property":"adopted","date_printed":"1932","t_from":"1932","quote":"The new City Charter of 1932 went into effect, forming the Public Utilities Commission","anchor":"s-da4112160cd5","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The new City Charter of 1932 went into effect, forming the Public Utilities Commission"},{"claim_id":"c:faa3426c577c72a2be3dcb3b0ad602f5","page_id":"C124889945:43","page_url":"https://archive.org/details/C124889945/page/n42","statement_kind":"finding","subject_label":"Mitchell Shaft methane explosion","summary":"The methane explosion at Mitchell Shaft killed twelve men.","property":"other","value_text":"twelve lives","value_num":12.0,"unit":"persons","date_printed":"July 17, 1931","t_from":"1931","quote":"In the resultant explosion twelve lives were lost.","place_label":"Mitchell Shaft","anchor":"s-faa3426c577c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In the resultant explosion twelve lives were lost."},{"claim_id":"c:0111266d945fcdd58ac3cd8db7ee4dc5","page_id":"C124889945:47","page_url":"https://archive.org/details/C124889945/page/n46","statement_kind":"background","subject_label":"1949 cooperative agreement","summary":"The 1949 agreement required the federal government to pay $9 million (≈ $127.4 million in 2026 dollars) toward Cherry Valley Reservoir.","property":"cost_usd","value_text":"$9 million","value_num":9000000.0,"unit":"USD","date_printed":"1949","t_from":"1949","quote":"to pay $9 million toward construction of the $13 million Cherry Valley Reservoir","place_label":"Cherry Valley","anchor":"s-0111266d945f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The City's 1949 cooperative agreement describes federal payments toward Cherry Valley Reservoir"},{"claim_id":"c:0c184118195ca125dacf4482bfb35a9f","page_id":"C124889945:47","page_url":"https://archive.org/details/C124889945/page/n46","statement_kind":"finding","subject_label":"Bay Crossing Pipeline #2","summary":"Pipeline #2 was completed in 1936 at a cost of $4 million (≈ $97.0 million in 2026 dollars).","property":"cost_usd","value_text":"$4 million","value_num":4000000.0,"unit":"USD","date_printed":"1936","t_from":"1936","quote":"Completed in 1936, the cost was $4 million.","anchor":"s-0c184118195c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Pipeline #2 is the same length and uses the same right-of-way"},{"claim_id":"c:6ed78fcf82ab3e432f3300dc8cb5da37","page_id":"C124889945:47","page_url":"https://archive.org/details/C124889945/page/n46","statement_kind":"finding","subject_label":"Cherry Dam","summary":"Cherry Dam is 330 feet high above bedrock.","property":"height_ft","value_text":"330 feet","value_num":330.0,"unit":"ft","date_printed":"1956","t_from":"1956","quote":"330 feet high above bedrock, 2,600 feet long, and 1,320 feet thick at the base.","place_label":"Cherry Valley","anchor":"s-6ed78fcf82ab","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the huge Cherry Dam was complete"},{"claim_id":"c:9b6bcc26db2ec4f655beecdc171f95de","page_id":"C124889945:47","page_url":"https://archive.org/details/C124889945/page/n46","statement_kind":"finding","subject_label":"O’Shaughnessy Dam raising","summary":"Transbay Construction Company made the low bid for the O’Shaughnessy Dam raising.","property":"cost_usd","value_text":"$3,219,965","value_num":3219965.0,"unit":"USD","date_printed":"1935","t_from":"1935","quote":"Transbay Construction Company made the low bid of $3,219,965 and construction started in January 1935.","place_label":"O’Shaughnessy Dam","place_precision":"site","place_id":"qipu:sf/place/landmark/hetch-hetchy","resolved_by":"place links file","anchor":"s-9b6bcc26db2e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Transbay Construction Company made the low bid"},{"claim_id":"c:e04a8e4fab79cbb243197e6947f17f0a","page_id":"C124889945:47","page_url":"https://archive.org/details/C124889945/page/n46","statement_kind":"cites_decision","subject_label":"Hetch Hetchy bond issue","summary":"San Francisco approved a $3.5 million (≈ $90.7 million in 2026 dollars) bond issue for the O’Shaughnessy Dam project.","property":"approved","value_text":"$3.5 million bond issue","value_num":3500000.0,"unit":"USD","date_printed":"November 1933","t_from":"1933","quote":"San Francisco had approved a $3.5 million bond issue for this project in November 1933.","place_label":"O’Shaughnessy Dam","place_precision":"site","place_id":"qipu:sf/place/landmark/hetch-hetchy","resolved_by":"place links file","anchor":"s-e04a8e4fab79","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"San Francisco had approved a $3.5 million bond issue"},{"claim_id":"c:fd398592db7cb87e8a929124250b9342","page_id":"C124889945:47","page_url":"https://archive.org/details/C124889945/page/n46","statement_kind":"finding","subject_label":"Crystal Springs Bypass Tunnel","summary":"The Crystal Springs Bypass Tunnel was completed at a cost of $8.6 million (≈ $83.3 million in 2026 dollars).","property":"cost_usd","value_text":"$8.6 million","value_num":8600000.0,"unit":"USD","date_printed":"1968","t_from":"1968","quote":"was completed in 1968 at a cost of $8.6 million.","anchor":"s-fd398592db7c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Crystal Springs Bypass Tunnel was completed in 1968"},{"claim_id":"c:1664f7961df1dbbb2c97eb1de022756f","page_id":"C124889945:48","page_url":"https://archive.org/details/C124889945/page/n47","statement_kind":"finding","subject_label":"Moccasin-Newark transmission line","summary":"The Moccasin-Newark line operates at 115 kV for its 98.5-mile length.","property":"other","value_text":"98.5-mile length","value_num":98.5,"t_from":"1985","quote":"The Moccasin-Newark line operates at 115 kV for its 98.5-mile length.","place_label":"Moccasin-Newark line","anchor":"s-1664f7961df1","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Moccasin-Newark line operates at 115 kV"},{"claim_id":"c:37290e8df01ad0bcdf7d561b4907e2ab","page_id":"C124889945:48","page_url":"https://archive.org/details/C124889945/page/n47","statement_kind":"finding","subject_label":"Canyon Power Tunnel","summary":"The Canyon Power Tunnel was completed in 1965 at a cost of $11 million (≈ $117.7 million in 2026 dollars).","property":"cost_usd","value_text":"$11 million","value_num":11000000.0,"unit":"USD","date_printed":"1965","t_from":"1965","quote":"It was completed in 1965 at a cost of $11 million.","place_label":"Canyon Power Tunnel","anchor":"s-37290e8df01a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Canyon Power Tunnel ... It was completed in 1965"},{"claim_id":"c:8647d2500f66962a2aa06eabe53a8a06","page_id":"C124889945:48","page_url":"https://archive.org/details/C124889945/page/n47","statement_kind":"finding","subject_label":"Hetch Hetchy power sales","summary":"In 1984 power sales produced over $70 million (≈ $227.0 million in 2026 dollars) in gross revenues.","property":"other","value_text":"over $70 million gross revenues","value_num":70000000.0,"unit":"USD","date_printed":"1984","t_from":"1984","quote":"In 1984, these sales produced over $70 million in gross revenues and $42 million for the General Fund and San Francisco taxpayer relief.","anchor":"s-8647d2500f66","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In 1984, these sales produced over $70 million in gross revenues"},{"claim_id":"c:9d50752f168b5efc78d3c47731382b88","page_id":"C124889945:48","page_url":"https://archive.org/details/C124889945/page/n47","statement_kind":"finding","subject_label":"Holm Powerhouse","summary":"The Holm Powerhouse came on line in 1960.","property":"other","value_text":"came on line","date_printed":"1960","t_from":"1960","quote":"Holm Powerhouse came on line in 1960, and is the largest of the three Hetch Hetchy powerhouses.","place_label":"Dion R. Holm Powerhouse","anchor":"s-9d50752f168b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Holm Powerhouse came on line in 1960"},{"claim_id":"c:a48c9489c37b31e88c93d67b34ed1225","page_id":"C124889945:48","page_url":"https://archive.org/details/C124889945/page/n47","statement_kind":"finding","subject_label":"[name withheld] Powerhouse","summary":"The Holm powerhouse, tunnel, penstock and equipment represent a San Francisco investment of $25 million (≈ $78.3 million in 2026 dollars).","property":"cost_usd","value_text":"$25 million","value_num":25000000.0,"unit":"USD","t_from":"1985","quote":"represent a San Francisco investment of $25 million","place_label":"Dion R. Holm Powerhouse","anchor":"s-a48c9489c37b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Plant, tunnel, penstock and all equipment except transmission lines represent a San Francisco investment"},{"claim_id":"c:aaa0dff7eb6e0d4a42bd18c59928acc5","page_id":"C124889945:48","page_url":"https://archive.org/details/C124889945/page/n47","statement_kind":"finding","subject_label":"Hetch Hetchy power output","summary":"[name withheld] three power plants generate over two billion kWh of electricity a year.","property":"other","value_text":"over two billion kWh a year","t_from":"1985","quote":"[name withheld] three power plants generate over two billion kWh of electricity a year.","anchor":"s-aaa0dff7eb6e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Hetch Hetchy's three power plants generate over two billion kWh"},{"claim_id":"c:f06474805d9a85a47fdbac592a755a0c","page_id":"C124889945:48","page_url":"https://archive.org/details/C124889945/page/n47","statement_kind":"finding","subject_label":"New Don Pedro Reservoir","summary":"The New Don Pedro project total cost was $100 million (≈ $313.1 million in 2026 dollars).","property":"cost_usd","value_text":"$100 million","value_num":100000000.0,"unit":"USD","t_from":"1985","quote":"Total cost of the project was $100 million.","place_label":"Lake Don Pedro","anchor":"s-f06474805d9a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Total cost of the project was $100 million."}]}