{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124891228","url":"https://data.qipu.org/usa/san-francisco/reports/c124891228/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124891228/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124891228","source_id":"C124891228","title":"San Francisco new main library : bond program report","year":1988,"n_pages":76,"creator":null,"source_url":"https://archive.org/details/C124891228","issuer":"City and County of San Francisco, Dept. of Public Works","issuer_type":"government","gov_level":"city_county","prepared_by":null,"doc_kind":"study","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"meta","doc_kind_by":"model","jurisdiction_by":"meta","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":13,"statements_total":48,"statements_by_kind":{"finding":14,"proposal":33,"cites_decision":0,"background":1},"same_for_every_statement":{"source_id":"C124891228","source_url":"https://archive.org/details/C124891228","source_label":"IGS library: San Francisco new main library : bond program report","report_year":1988,"issuer":"City and County of San Francisco, Dept. of Public Works","issuer_type":"government","doc_kind":"study","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A study by the Department of Public Works on the bond-funded plan for a new San Francisco Main Library, covering its size, cost and design.","figures":[{"label":"Area","value":"442,500 total gross square feet","claim_ids":["c:e13dad24c39dcf8ca7f57f088aeac824"]},{"label":"Cost","value":"$120,468,000 total project cost","page_url":"https://archive.org/details/C124891228/page/n10","quote":"$120,468,000 total project cost (begin construction 1992)"},{"label":"Operating cost","value":"approximately $7.5 million","claim_ids":["c:476ec4bb388562cfc01f07b7993b496c"]}],"main_points":["c:103d591a40f52201c11297e9a7e1c99a","c:6f315b83795704b167e5e98b6463e17c","c:e69a358585c2a2374da81b048127b781"],"board_decisions_after":["qipu:sf/decision/journalofjuldecproceed87sanfrich:664/2","qipu:sf/decision/journalofjuldecproceed87sanfrich:628/3","qipu:sf/decision/journalofjuldecproceed87sanfrich:629/4","qipu:sf/decision/journalofjuldecproceed87sanfrich:629/1","qipu:sf/decision/journalofjanjunproceed87sanfrich|197","qipu:sf/decision/journalofjanjunproceed87sanfrich:370/5","qipu:sf/decision/journalofseptoctproceed86sanfrich:136/2","qipu:sf/decision/journalmayaugofproceed91sanfrich:181/5"],"board_decisions_before":["qipu:sf/decision/journalmayaugofproceed83sanfrich:175/4","qipu:sf/decision/journalmayaugofproceed83sanfrich:355/3"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:3dadafd843f60088856838ae218e00f8","page_id":"C124891228:11","page_url":"https://archive.org/details/C124891228/page/n10","statement_kind":"proposal","subject_label":"Main Library construction start","summary":"The report schedules the start of construction of the Main Library for 1992.","property":"other","value_text":"begin construction 1992","value_num":1992.0,"date_printed":"1992","t_from":"1992","quote":"A full service Main Library to be located in the San Francisco Civic Center, 442,500 total gross square feet, and $120,468,000 total project cost (begin construction 1992).","place_label":"San Francisco Civic Center","anchor":"s-3dadafd843f6","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Department of Public Works","stance":"own_position","speaker_evidence":"EXECUTIVE SUMMARY Project Summary This report describes"},{"claim_id":"c:58cd85c284aadfd17f46ccb2b696ad1f","page_id":"C124891228:11","page_url":"https://archive.org/details/C124891228/page/n10","statement_kind":"proposal","subject_label":"Main Library project cost","summary":"The report projects a total project cost of $120,468,000 (≈ $280.9 million in 2026 dollars) for the Main Library.","property":"cost_usd","value_text":"$120,468,000","value_num":120468000.0,"unit":"USD","date_printed":"1993","t_from":"1993","quote":"A full service Main Library to be located in the San Francisco Civic Center, 442,500 total gross square feet, and $120,468,000 total project cost (begin construction 1992).","place_label":"San Francisco Civic Center","anchor":"s-58cd85c284aa","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Department of Public Works","stance":"own_position","speaker_evidence":"EXECUTIVE SUMMARY Project Summary This report describes"},{"claim_id":"c:e13dad24c39dcf8ca7f57f088aeac824","page_id":"C124891228:11","page_url":"https://archive.org/details/C124891228/page/n10","statement_kind":"proposal","subject_label":"Main Library floor area","summary":"The report proposes a full service Main Library of 442,500 total gross square feet.","property":"floor_area_sqft","value_text":"442,500 total gross square feet","value_num":442500.0,"unit":"sqft","t_from":"1988","quote":"A full service Main Library to be located in the San Francisco Civic Center, 442,500 total gross square feet, and $120,468,000 total project cost (begin construction 1992).","place_label":"San Francisco Civic Center","anchor":"s-e13dad24c39d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Department of Public Works","stance":"own_position","speaker_evidence":"EXECUTIVE SUMMARY Project Summary This report describes"},{"claim_id":"c:103d591a40f52201c11297e9a7e1c99a","page_id":"C124891228:13","page_url":"https://archive.org/details/C124891228/page/n12","statement_kind":"finding","subject_label":"Main Library building","summary":"The report says the present Main Library building is too small, unsafe and antiquated.","property":"finding","value_text":"too small, unsafe and antiquated","t_from":"1988","quote":"The present building is too small, unsafe and antiquated.","place_label":"Main Library","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-main-library","resolved_by":"place links file","anchor":"s-103d591a40f5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"STATEMENT OF PROJECT PURPOSE: The present building is too small"},{"claim_id":"c:23d401a9751a98cba8d54739e6b24b09","page_id":"C124891228:13","page_url":"https://archive.org/details/C124891228/page/n12","statement_kind":"finding","subject_label":"Branch system dependence","summary":"The report says the fifteen branches built since 1950 depend on the Main Library.","property":"finding","value_text":"Fifteen new branches","value_num":15.0,"unit":"other","date_printed":"since 1950","t_from":"1950","quote":"Fifteen new branches were constructed since 1950, and like the system’s other branches, they are totally dependent on the Main Library facility for books, information and public services.","anchor":"s-23d401a9751a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Background Information: Fifteen new branches were constructed since 1950"},{"claim_id":"c:b8ae89b14c687cda481459c1ea5160f9","page_id":"C124891228:13","page_url":"https://archive.org/details/C124891228/page/n12","statement_kind":"finding","subject_label":"Main Library collection","summary":"The report says the collection has more than doubled beyond the building's capacity.","property":"finding","value_text":"more than one million volumes","value_num":1000000.0,"unit":"other","t_from":"1988","quote":"The collection has more than doubled, increasing from the building’s capacity of 500,000 volumes, to more than one million volumes.","place_label":"Main Library","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-main-library","resolved_by":"place links file","anchor":"s-b8ae89b14c68","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In the four decades since then the demands on the facility have grown"},{"claim_id":"c:c05c07cf776a7ad86ed4a4209cefff65","page_id":"C124891228:13","page_url":"https://archive.org/details/C124891228/page/n12","statement_kind":"finding","subject_label":"Main Library closure","summary":"The report says the Fire Department required closing the Main Library to move excess books out.","property":"event","value_text":"closed to move excess books","date_printed":"Last year","t_from":"1988","quote":"Last year the San Francisco Fire Department required the closing of the Main Library in order to move \"excess\" books out of the building.","place_label":"Main Library","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-main-library","resolved_by":"place links file","anchor":"s-c05c07cf776a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Last year the San Francisco Fire Department required the closing"},{"claim_id":"c:c45a01edfeb514a488f8e02104740804","page_id":"C124891228:13","page_url":"https://archive.org/details/C124891228/page/n12","statement_kind":"finding","subject_label":"Main Library capacity","summary":"The report says the building was declared at capacity as long ago as 1944.","property":"finding","value_text":"at capacity","date_printed":"1944","t_from":"1944","quote":"but as long ago as 1944 the building was declared \"at capacity\".","place_label":"Main Library","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-main-library","resolved_by":"place links file","anchor":"s-c45a01edfeb5","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"as long ago as 1944 the building was declared \"at capacity\""},{"claim_id":"c:f930bb6fcf4b369ef75cb442a41365cd","page_id":"C124891228:13","page_url":"https://archive.org/details/C124891228/page/n12","statement_kind":"finding","subject_label":"Main Library seating","summary":"The report says seating has decreased by about 50 percent to make room for the collection.","property":"finding","value_text":"decreased by approximately 50%","value_num":50.0,"unit":"percent","t_from":"1988","quote":"Although patronage has increased significantly, seating has decreased by approximately 50% to make more room available for the collection.","place_label":"Main Library","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-main-library","resolved_by":"place links file","anchor":"s-f930bb6fcf4b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"As the Bay Area's population has grown, demands for services have boomed"},{"claim_id":"c:687cc8f33844a42117a322792dae5bc4","page_id":"C124891228:15","page_url":"https://archive.org/details/C124891228/page/n14","statement_kind":"finding","subject_label":"Remodel closure period","summary":"The report says remodelling would require closing the Main Library for up to two and a half years.","property":"finding","value_text":"up to two and a half years","value_num":2.5,"unit":"other","t_from":"1988","quote":"It would not allow for any future expansion, and would require closing the Main Library for up to two and a half years.","place_label":"Main Library","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-main-library","resolved_by":"place links file","anchor":"s-687cc8f33844","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"STATEMENT OF PROJECT PURPOSE"},{"claim_id":"c:6f315b83795704b167e5e98b6463e17c","page_id":"C124891228:15","page_url":"https://archive.org/details/C124891228/page/n14","statement_kind":"finding","subject_label":"Remodel feasibility","summary":"The report says all four studies of the Main Library concluded remodelling and expansion is not feasible.","property":"finding","value_text":"not feasible to remodel and expand","t_from":"1988","quote":"All four studies of the Main Library facility have reached the same conclusion; it is not feasible to remodel and expand the existing building.","place_label":"Main Library","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-main-library","resolved_by":"place links file","anchor":"s-6f315b837957","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"All four studies of the Main Library facility have reached the same conclusion"},{"claim_id":"c:e30598e3fb6b359642cc2e4ec20a9be0","page_id":"C124891228:15","page_url":"https://archive.org/details/C124891228/page/n14","statement_kind":"finding","subject_label":"1986 remodel study","summary":"The 1986 study by Becker and Hayes and Omni Group found remodelling would yield a building not quite as good at almost the same cost.","property":"finding","value_text":"not quite as good and costs almost as much","date_printed":"1986","t_from":"1986","quote":"The most recent study, conducted by Becker and Hayes, Inc; Omni Group, Inc. in 1986, indicated that a remodel ing/expansion would result in a building which is not quite as good and costs almost as much as a new facility.","place_label":"Main Library","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-main-library","resolved_by":"place links file","anchor":"s-e30598e3fb6b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The most recent study, conducted by Becker and Hayes, Inc; Omni Group, Inc. in 1986"},{"claim_id":"c:e69a358585c2a2374da81b048127b781","page_id":"C124891228:15","page_url":"https://archive.org/details/C124891228/page/n14","statement_kind":"proposal","subject_label":"New Main Library","summary":"The report says building the new Main Library is essential to the library's strategic goal.","property":"proposes","value_text":"new Main Library","t_from":"1988","quote":"Building the new Main Library is essential to achieving this goal.","anchor":"s-e69a358585c2","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"MISSION AND STRATEGIC GOALS"},{"claim_id":"c:52658c5bc9bfafef11e816d802505e3f","page_id":"C124891228:17","page_url":"https://archive.org/details/C124891228/page/n16","statement_kind":"proposal","subject_label":"Online catalog","summary":"The project would implement an online public access catalog for the Library's holdings.","property":"proposes","value_text":"Online Public Access System (OPAC)","t_from":"1988","quote":"Implementing the Online Public Access System (OPAC) which will provide a complete computer catalog of the Library’s holdings","anchor":"s-52658c5bc9bf","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"STRATEGIES AND GOALS WHICH WILL BE MET BY THE NEW MAIN LIBRARY ADDITION"},{"claim_id":"c:6de60676b1949dfbbe51fd5a6a057203","page_id":"C124891228:17","page_url":"https://archive.org/details/C124891228/page/n16","statement_kind":"proposal","subject_label":"Children's Services space","summary":"The project would expand Children's Services space to five times its current size.","property":"proposes","value_text":"five times its current size","value_num":5.0,"unit":"other","t_from":"1988","quote":"Expanding the space for Children’s Services to five times its current size","place_label":"Main Library","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-main-library","resolved_by":"place links file","anchor":"s-6de60676b194","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The program for the new Main Library will allow for the expansion"},{"claim_id":"c:70e675040fe6b4602bfe3960d6d52d62","page_id":"C124891228:17","page_url":"https://archive.org/details/C124891228/page/n16","statement_kind":"proposal","subject_label":"Municipal reference center","summary":"The project would establish a municipal reference center for policy makers and the public.","property":"proposes","value_text":"municipal reference center","t_from":"1988","quote":"Establishing a municipal reference center to serve policy makers and the public, Establishing a bookstore, Establishing gallery space","place_label":"Main Library","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-main-library","resolved_by":"place links file","anchor":"s-70e675040fe6","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The program for the new Main Library will allow for the expansion"},{"claim_id":"c:b42270fe6c353a649afab84995d5ef4f","page_id":"C124891228:17","page_url":"https://archive.org/details/C124891228/page/n16","statement_kind":"proposal","subject_label":"Accessibility","summary":"The project would establish an entirely handicapped accessible building.","property":"proposes","value_text":"entirely handicapped accessible building","t_from":"1988","quote":"Establishing an entirely handicapped accessible building, Greatly expanding services for the Deaf and Hearing Impaired","place_label":"Main Library","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-main-library","resolved_by":"place links file","anchor":"s-b42270fe6c35","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The program for the new Main Library will allow for the expansion"},{"claim_id":"c:634cabb964f821e87e453641471bcb2e","page_id":"C124891228:19","page_url":"https://archive.org/details/C124891228/page/n18","statement_kind":"finding","subject_label":"Existing office building","summary":"The report says the building has been identified for demolition when the site is redeveloped.","property":"other","value_text":"identified for demolition","t_from":"1988","quote":"has been identified for demolition when the site is redeveloped.","place_label":"Marshall Square","anchor":"s-634cabb964f8","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"SITE section; building has been identified for demolition"},{"claim_id":"c:792d271b69ba4cab326e5383ab06ca2d","page_id":"C124891228:19","page_url":"https://archive.org/details/C124891228/page/n18","statement_kind":"finding","subject_label":"Existing office building","summary":"The report says a one-story City office building built in 1940 occupies the eastern part of the block.","property":"built_year","value_text":"1940","value_num":1940.0,"date_printed":"1940","t_from":"1940","quote":"An existing one-story building, built in 1940, occupies the eastern portion of the block and is used by the City as office space.","place_label":"Marshall Square","anchor":"s-792d271b69ba","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Marshall Square site is currently used for on grade parking"},{"claim_id":"c:ed9416ba72acb2cdd93039e87c0af5de","page_id":"C124891228:19","page_url":"https://archive.org/details/C124891228/page/n18","statement_kind":"finding","subject_label":"Marshall Square site area","summary":"The report says the Marshall Square site contains about 2.0 acres.","property":"acreage","value_text":"approximately 2.0 acres","value_num":2.0,"unit":"acres","t_from":"1988","quote":"In its existing configuration, the Marshall Square site contains approximately 2.0 acres of land.","place_label":"Marshall Square","anchor":"s-ed9416ba72ac","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In its existing configuration, the Marshall Square site contains approximately 2.0 acres"},{"claim_id":"c:451ba3be3fdeec6dff0f472926dcb75a","page_id":"C124891228:23","page_url":"https://archive.org/details/C124891228/page/n22","statement_kind":"background","subject_label":"1986 space requirements study","summary":"A 1986 Functional and Space Requirements Report outlined and defined space requirements for the new Main Library.","property":"other","date_printed":"1986","t_from":"1986","quote":"The 1986 \"Functional and Space Requirements Report\" ([name withheld] and Hayes, Inc.; Omni Group Inc.) outlined and defined space requirements for the new Main Library.","anchor":"s-451ba3be3fde","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The 1986 \"Functional and Space Requirements Report\""},{"claim_id":"c:4ff882740fe2221ab2cb5dd14ba4c571","page_id":"C124891228:23","page_url":"https://archive.org/details/C124891228/page/n22","statement_kind":"proposal","subject_label":"Space program revisions","summary":"The report says Library staff recommended numerous modifications to the 1986 space program.","property":"recommendation","value_text":"numerous modifications","t_from":"1988","quote":"Numerous modifications have been recommended and the following program summary reflects those revisions for current and projected space and functional needs for the Main Library.","anchor":"s-4ff882740fe2","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Numerous modifications have been recommended and the following program summary"},{"claim_id":"c:620cc785405f46244f9e2e6fe359a06b","page_id":"C124891228:23","page_url":"https://archive.org/details/C124891228/page/n22","statement_kind":"proposal","subject_label":"New Main Library facility capacity","summary":"The program estimates facility capacity for the new Main Library at 355,200 net square feet.","property":"floor_area_sqft","value_text":"355,200 net square feet (NSF)","value_num":355200.0,"unit":"sqft","t_from":"1988","quote":"Facility capacity associated with these needs is estimated to be 355,200 net square feet (NSF).","anchor":"s-620cc785405f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Facility capacity associated with these needs is estimated to be 355,200"},{"claim_id":"c:7b719ca36efe84db41d77d8d6c93c3df","page_id":"C124891228:23","page_url":"https://archive.org/details/C124891228/page/n22","statement_kind":"proposal","subject_label":"New Main Library total built space","summary":"The report estimates a total built space requirement of 442,500 gross square feet for the new Main Library.","property":"floor_area_sqft","value_text":"442,500 gross square feet (GSF)","value_num":442500.0,"unit":"sqft","t_from":"1988","quote":"a total built space requirement for the new Main Library is estimated at 442,500 gross square feet (GSF).","anchor":"s-7b719ca36efe","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"a total built space requirement for the new Main Library is estimated at 442,500"},{"claim_id":"c:13d92642b180c7c3f1bd442c8959d624","page_id":"C124891228:27","page_url":"https://archive.org/details/C124891228/page/n26","statement_kind":"proposal","subject_label":"New Main Library building siting","summary":"The new building is assumed to be generally symmetrical with the existing library about City Hall's east/west axis.","property":"other","value_text":"generally symmetrical","t_from":"1988","quote":"The new building, therefore, is assumed to be generally symmetrical with the existing library relative to the formal east/west axis of City Hall.","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-13d92642b180","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Department of Public Works","stance":"own_position","speaker_evidence":"FACILITY DESIGN, DESIGN STUDY ASSUMPTIONS"},{"claim_id":"c:2aa257194cc0736dff91a707511d0ec9","page_id":"C124891228:27","page_url":"https://archive.org/details/C124891228/page/n26","statement_kind":"proposal","subject_label":"Conceptual design of new Main Library","summary":"The conceptual design provides for a five-story building complying with functional and aesthetic requirements.","property":"stories","value_text":"five story building","value_num":5.0,"unit":"stories","t_from":"1988","quote":"The conceptual design presented in this report provides for a five story building complying with these functional and aesthetic requirements.","anchor":"s-2aa257194cc0","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Department of Public Works","stance":"own_position","speaker_evidence":"CONCEPTUAL DESIGN, The conceptual design presented in this report provides"},{"claim_id":"c:027b9bebcde1a835868dc9c1d4695a0f","page_id":"C124891228:29","page_url":"https://archive.org/details/C124891228/page/n28","statement_kind":"proposal","subject_label":"Service ramp relocation","summary":"The conceptual design includes relocating the existing service ramp to Brooks Hall, serving both buildings.","property":"proposes","value_text":"relocation of the existing service ramp to Brooks Hall","t_from":"1988","quote":"The conceptual design for the new Main Library includes the relocation of the existing service ramp to Brooks Hall.","place_label":"Brooks Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/brooks-hall","resolved_by":"place links file","anchor":"s-027b9bebcde1","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The conceptual design for the new Main Library includes the relocation"},{"claim_id":"c:1ff8bc32cd8d1d600d1df4a20b844435","page_id":"C124891228:29","page_url":"https://archive.org/details/C124891228/page/n28","statement_kind":"proposal","subject_label":"New Main Library entrances","summary":"The report proposes public entrances from Larkin and Fulton Streets and a staff entrance from Grove Street.","property":"proposes","value_text":"public entrances from Larkin and Fulton Streets; staff entrance from Grove Street","t_from":"1988","quote":"Public entrances to the building are proposed from Larkin and Fulton Streets with a separate staff entrance from Grove Street.","place_label":"Larkin Street; Fulton Street; Grove Street","place_precision":"street","anchor":"s-1ff8bc32cd8d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Public entrances to the building are proposed from Larkin and Fulton"},{"claim_id":"c:29073ab099658502a97d470b866d74b6","page_id":"C124891228:29","page_url":"https://archive.org/details/C124891228/page/n28","statement_kind":"proposal","subject_label":"Levels two through four use","summary":"The report assigns Levels Two through Four to the circulating collection and reference, stack, reading and staff areas.","property":"use","value_text":"circulating collection and reference, stack, reading and staff areas","t_from":"1988","quote":"Space on Levels Two through Four has been assigned to the circulating collection and other reference, stack, reading and staff areas.","anchor":"s-29073ab09965","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Space on Levels Two through Four has been assigned"},{"claim_id":"c:2e69335fbc13cd392a6470b0a4ff1438","page_id":"C124891228:29","page_url":"https://archive.org/details/C124891228/page/n28","statement_kind":"finding","subject_label":"Pioneer Monument site area","summary":"The monument and its direct site area occupy about 4,000 square feet.","property":"other","value_text":"about 4,000 square feet","value_num":4000.0,"unit":"sqft","t_from":"1988","quote":"The monument and its direct site area occupies about 4,000 square feet.","place_label":"Pioneer Monument","anchor":"s-2e69335fbc13","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The monument and its direct site area occupies about 4,000 square feet."},{"claim_id":"c:fff809ab90a90e890581b2f70b78e02a","page_id":"C124891228:29","page_url":"https://archive.org/details/C124891228/page/n28","statement_kind":"proposal","subject_label":"Pioneer Monument","summary":"The conceptual design retains the Pioneer Monument at its present location on the southeast corner of the site.","property":"proposes","value_text":"retained at present location","t_from":"1988","quote":"The conceptual design for the new Main Library retains the Pioneer Monument at its present location on the southeast corner of the site.","place_label":"Pioneer Monument","anchor":"s-fff809ab90a9","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The conceptual design for the new Main Library retains the Pioneer Monument"},{"claim_id":"c:6e007db945b940e1019c6ebf6a0f2629","page_id":"C124891228:31","page_url":"https://archive.org/details/C124891228/page/n30","statement_kind":"proposal","subject_label":"Relocation of the monument","summary":"The facility design proposes relocating the monument to another Civic Center site to be determined by the City.","property":"proposes","value_text":"relocate monument","t_from":"1988","quote":"FACILITY DESIGN for relocating the monument to another Civic Center site to be determined by the City.","place_label":"Civic Center","anchor":"s-6e007db945b9","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Department of Public Works","stance":"own_position","speaker_evidence":"FACILITY DESIGN for relocating the monument"},{"claim_id":"c:a25e930cfbb10ab90c4b0f65e91ab2cc","page_id":"C124891228:31","page_url":"https://archive.org/details/C124891228/page/n30","statement_kind":"proposal","subject_label":"Exterior walls and stairways","summary":"The design proposes granite exterior walls and stairways to match the Main Library Building and other Civic Center buildings.","property":"proposes","value_text":"granite","t_from":"1988","quote":"Exterior walls and stairways will be granite to match the existing Main Library Building and other buildings within the Civic Center area.","place_label":"Main Library Building; Civic Center","anchor":"s-a25e930cfbb1","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Department of Public Works","stance":"own_position","speaker_evidence":"Exterior walls and stairways will be granite"},{"claim_id":"c:ab0b83cd264736845fafbd27c8030084","page_id":"C124891228:31","page_url":"https://archive.org/details/C124891228/page/n30","statement_kind":"proposal","subject_label":"Landscaping conditional on Fulton Mall","summary":"If the Fulton Mall project is approved, the proposed northerly landscaping would conform with the mall design.","property":"alternative","value_text":"conditional on Fulton Mall approval","t_from":"1988","quote":"If the Fulton Mall project is approved, the landscaping proposed along the northerly side of the site will conform with the proposed design for the mall area.","place_label":"Fulton Mall","anchor":"s-ab0b83cd2647","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Department of Public Works","stance":"own_position","speaker_evidence":"CONCEPTUAL SITE DESIGN If the Fulton Mall project is approved"},{"claim_id":"c:e4c6d70b78516c627f56b3b0f48cd902","page_id":"C124891228:31","page_url":"https://archive.org/details/C124891228/page/n30","statement_kind":"proposal","subject_label":"Landscaping along Larkin and Fulton Streets","summary":"The design proposes landscaping around the building to match existing landscape along Larkin and Fulton Streets.","property":"proposes","value_text":"landscaping","t_from":"1988","quote":"Open space areas around the building will be appropriately landscaped in a manner and style to match existing landscape along Larkin and Fulton Streets.","place_label":"Larkin Street; Fulton Street","place_precision":"intersection","place_id":"qipu:sf/place/street/larkin-st","resolved_by":"place links file","anchor":"s-e4c6d70b7851","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Department of Public Works","stance":"own_position","speaker_evidence":"Open space areas around the building will be appropriately landscaped"},{"claim_id":"c:1e61f0149d1f156cf66ee5a9755f40d3","page_id":"C124891228:59","page_url":"https://archive.org/details/C124891228/page/n58","statement_kind":"proposal","subject_label":"Interior monumental spaces","summary":"The cost estimate provides that entrances, lobbies and major circulation spaces would receive high quality finishes.","property":"proposes","value_text":"high quality architectural finishes","t_from":"1988","quote":"The cost estimate provides that this group of special spaces will receive a high quality of architectural finishes such as marble floor and wall treatments","anchor":"s-1e61f0149d1f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Department of Public Works","stance":"own_position","speaker_evidence":"The cost estimate provides that this group of special spaces"},{"claim_id":"c:a1a035215cfba18945d98d39f076013e","page_id":"C124891228:59","page_url":"https://archive.org/details/C124891228/page/n58","statement_kind":"proposal","subject_label":"Structural framing","summary":"The conceptual design assumes a structural steel framing system for the new library building.","property":"proposes","value_text":"structural steel framing","t_from":"1988","quote":"The conceptual design for the building assumes a structural steel framing system.","anchor":"s-a1a035215cfb","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Department of Public Works","stance":"own_position","speaker_evidence":"The conceptual design for the building assumes a structural steel framing system."},{"claim_id":"c:abf25996e01cd3ca750d485f7dee70d5","page_id":"C124891228:59","page_url":"https://archive.org/details/C124891228/page/n58","statement_kind":"proposal","subject_label":"Roof configuration","summary":"The conceptual design proposes a mix of flat roofs and sloped mansard roofs, matching other Civic Center buildings.","property":"proposes","value_text":"flat and mansard roofs","t_from":"1988","quote":"The conceptual design proposes the roof configuration to be a combination of flat roofs and sloped mansard roofs, a design style established for other Civic Center buildings.","place_label":"Civic Center","anchor":"s-abf25996e01c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Department of Public Works","stance":"own_position","speaker_evidence":"The conceptual design proposes the roof configuration"},{"claim_id":"c:c6be1ca24f22187c748b461b8b2f3b3a","page_id":"C124891228:59","page_url":"https://archive.org/details/C124891228/page/n58","statement_kind":"proposal","subject_label":"Fire protection","summary":"The new building would be fully equipped with an automatic fire sprinkler system.","property":"proposes","value_text":"automatic fire sprinkler system","t_from":"1988","quote":"The new building will be fully equipped with an automatic fire sprinkler system.","anchor":"s-c6be1ca24f22","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Department of Public Works","stance":"own_position","speaker_evidence":"The new building will be fully equipped with an automatic fire sprinkler system."},{"claim_id":"c:dc83da1166774a7614458a53fb05acd6","page_id":"C124891228:59","page_url":"https://archive.org/details/C124891228/page/n58","statement_kind":"proposal","subject_label":"Exterior wall surfaces","summary":"The report proposes granite veneer for all exterior wall surfaces of the new library building.","property":"proposes","value_text":"granite veneer","t_from":"1988","quote":"Granite veneer is proposed for all exterior wall surfaces of the building.","anchor":"s-dc83da116677","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Department of Public Works","stance":"own_position","speaker_evidence":"Granite veneer is proposed for all exterior wall surfaces"},{"claim_id":"c:e6fa4932386b723afb7df7c9a1e39a7b","page_id":"C124891228:59","page_url":"https://archive.org/details/C124891228/page/n58","statement_kind":"proposal","subject_label":"Halon system","summary":"The report proposes a halon gas system for select areas such as rare book and document rooms.","property":"proposes","value_text":"halon system","t_from":"1988","quote":"A halon system (gas operated) is proposed for select areas such as the rare book and document rooms where materials are determined to be irreplaceable.","anchor":"s-e6fa4932386b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Department of Public Works","stance":"own_position","speaker_evidence":"A halon system (gas operated) is proposed for select areas"},{"claim_id":"c:3a8454f2fe170f6cfd1ac35f6297f8d6","page_id":"C124891228:61","page_url":"https://archive.org/details/C124891228/page/n60","statement_kind":"proposal","subject_label":"Interior finishes for patron and staff areas","summary":"The study proposes carpet tile floors, gypsum board partitions and acoustically treated ceilings for these areas.","property":"proposes","value_text":"carpet tile floors, gypsum board partitions, acoustically treated ceilings","t_from":"1988","quote":"Finishes proposed for these areas may include carpet tile floors, gypsum board partitions and acoustically treated ceilings.","anchor":"s-3a8454f2fe17","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Department of Public Works","stance":"own_position","speaker_evidence":"BUILDING SYSTEMS AND FINISHES. The second type of space"},{"claim_id":"c:dace5c511c9509644f0ece8f9eca69ab","page_id":"C124891228:65","page_url":"https://archive.org/details/C124891228/page/n64","statement_kind":"proposal","subject_label":"Pioneer Monument alternate","summary":"The budget plan includes a Pioneer Monument alternate costed at $7,000 thousand (≈ $19.9 million in 2026 dollars).","property":"alternative","value_text":"$ 7,000 (x1000)","value_num":7000000.0,"unit":"USD","t_from":"1988","quote":"PIONEER MONUMENT ALTERNATE $ 7,000 BUDGET EXCLUDES Moveable furniture, fixtures and equipment","place_label":"Pioneer Monument","anchor":"s-dace5c511c95","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"BUDGET COST PLAN SAN FRANCISCO MAIN PUBLIC LIBRARY"},{"claim_id":"c:f17acd7c43050d012b0bb31c72dd0dd6","page_id":"C124891228:65","page_url":"https://archive.org/details/C124891228/page/n64","statement_kind":"proposal","subject_label":"Recommended construction budget for the new Main Library","summary":"The budget plan recommends a construction budget of $120,468 thousand (≈ $289.3 million in 2026 dollars), beginning construction in 1992.","property":"cost_usd","value_text":"$ 120,468 (x1000)","value_num":120468000.0,"unit":"USD","date_printed":"1992","t_from":"1992","quote":"RECOMMENDED BUDGET FOR CONSTRUCTION (Begin Construction 1992) $ 120,468","place_label":"San Francisco Main Public Library","anchor":"s-f17acd7c4305","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"RECOMMENDED BUDGET FOR CONSTRUCTION (Begin Construction 1992)"},{"claim_id":"c:3fcbe10c90b37c781d844c35a355c34f","page_id":"C124891228:69","page_url":"https://archive.org/details/C124891228/page/n68","statement_kind":"proposal","subject_label":"Additional energy cost of the new Main Library","summary":"The study anticipates an additional $800,000 (≈ $2.3 million in 2026 dollars) per year for lighting, power, air conditioning and heat.","property":"cost_usd","value_text":"$800,000 (1988 dollars) per annum","value_num":800000.0,"unit":"USD","date_printed":"1988","t_from":"1988","quote":"An $800,000 (1988 dollars) per annum cost for lighting, power, air conditioning and heat is anticipated beyond that currently expended in the existing facility.","anchor":"s-3fcbe10c90b3","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Public Library (report issuer, Dept. of Public Works)","stance":"own_position","speaker_evidence":"Modern mechanical and electrical systems (not present in the existing facility) are important features"},{"claim_id":"c:476ec4bb388562cfc01f07b7993b496c","page_id":"C124891228:69","page_url":"https://archive.org/details/C124891228/page/n68","statement_kind":"proposal","subject_label":"Projected annual operating expenses of the new Main Library","summary":"The San Francisco Public Library predicts annual operating expenses of about $7.5 million (≈ $21.4 million in 2026 dollars) in today's dollars.","property":"cost_usd","value_text":"approximately $7.5 million","value_num":7500000.0,"unit":"USD","t_from":"1988","quote":"In summary, it is predicted that annual operating expenses expressed in today’s dollars will be approximately $7.5 million.","anchor":"s-476ec4bb3885","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In summary, it is predicted that annual operating expenses"},{"claim_id":"c:4bb97c0b0857245a6a03c8b6c347c6d9","page_id":"C124891228:69","page_url":"https://archive.org/details/C124891228/page/n68","statement_kind":"finding","subject_label":"Current operating cost of the existing library","summary":"The current operating cost of the library is approximately $6,607,000 (≈ $18.8 million in 2026 dollars) per year.","property":"cost_usd","value_text":"approximately $6,607,000 per year","value_num":6607000.0,"unit":"USD","t_from":"1988","quote":"The current operating cost is approximately $6,607,000 per year, and includes staffing costs as well as expenditure for energy, cleaning, etc..","anchor":"s-4bb97c0b0857","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The current operating cost is approximately $6,607,000 per year"},{"claim_id":"c:6f2519df2d63b51362e6a7a2765c0e57","page_id":"C124891228:69","page_url":"https://archive.org/details/C124891228/page/n68","statement_kind":"proposal","subject_label":"Staffing level of the new Main Library","summary":"The study projects that the number of staffing points could be reduced from 21 to 15.","property":"other","value_text":"21 to 15 staffing points","value_num":15.0,"t_from":"1988","quote":"current plans suggest that the number of staffing points could be reduced from 21 to 15 (almost one third).","anchor":"s-6f2519df2d63","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"current plans suggest that the number of staffing points could be reduced"}]}