{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124891468","url":"https://data.qipu.org/usa/san-francisco/reports/c124891468/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124891468/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124891468","source_id":"C124891468","title":"Staff report, Port of San Francisco, May 13, 1987 : summary of findings and recommendation for further study : commercial fishing facilities at Fisherman's Wharf","year":1987,"n_pages":84,"creator":"Rossi, Randall S","source_url":"https://archive.org/details/C124891468","issuer":"Port of San Francisco","issuer_type":"government","gov_level":"city_county","prepared_by":"Randall S. Rossi","doc_kind":"staff_report","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"model","doc_kind_by":"model","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":15,"statements_total":38,"statements_by_kind":{"finding":21,"proposal":11,"cites_decision":3,"background":3},"same_for_every_statement":{"source_id":"C124891468","source_url":"https://archive.org/details/C124891468","source_label":"IGS library: Staff report, Port of San Francisco, May 13, 1987 : summary of findings and recommendation for further study : commercia","report_year":1987,"issuer":"Port of San Francisco","issuer_type":"government","doc_kind":"staff_report","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A staff report by the Port of San Francisco on commercial fishing facilities at Fisherman's Wharf, with findings and a recommendation for further study.","figures":[{"label":"Phase I cost","value":"$27 and $35 million","claim_ids":["c:337c14c3c83f0bd70496b8746b4ec947"]},{"label":"Phase II cost","value":"$18 and $39 million","claim_ids":["c:bae707c62b89255b1af26cb7364b0b0d"]},{"label":"Pier removal cost","value":"$258,990 per acre","page_url":"https://archive.org/details/C124891468/page/n18","quote":"The approximate average cost per acre of pier removal is $258,990."}],"main_points":["c:31d3680db78e005ed3ab493fc27c5400","c:b16ddf084d7ab4a5d5f6dd7b873dade9","c:40899e1d239060e69e666958032259a4"],"board_decisions_after":["qipu:sf/decision/journalofjanaprproceed90sanfrich|130","qipu:sf/decision/journaljanaprofproceed89sanfrich:284/5","qipu:sf/decision/journaljanaprofproceed89sanfrich:339/4","qipu:sf/decision/journalofjanaprproceed90sanfrich:35/4","qipu:sf/decision/journalofmayaugproceed90sanfrich:365/1","qipu:sf/decision/journalofproceed92septdecsanfrich:250/7","qipu:sf/decision/journalofproceed92septdecsanfrich|218","qipu:sf/decision/journalofmayaugproceed92sanfrich:42/9"],"board_decisions_before":["qipu:sf/decision/journaljanaprofproceed82sanfrich|g417"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:0444bd460f7328385d6230ca6c839c12","page_id":"C124891468:3","page_url":"https://archive.org/details/C124891468/page/n2","statement_kind":"proposal","subject_label":"Pier 45 developer rent prepayments","summary":"Developers proposed lump sum rent prepayments to help finance the fishing facilities.","property":"proposes","value_text":"in excess of five million dollars","unit":"USD","date_printed":"January 1987","t_from":"1987","quote":"In accordance with the Request for Proposals the developers proposed lump sum rent prepayments in excess of five million dollars to be used to help finance the fishing facilities","place_label":"Pier 45","place_precision":"site","place_id":"qipu:sf/place/landmark/pier-45","resolved_by":"place links file","anchor":"s-0444bd460f73","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Port of San Francisco staff report","stance":"own_position","speaker_evidence":"A. BACKGROUND ... In accordance with the Request for Proposals"},{"claim_id":"c:1a0cce7ad770a4cbfa6f12c53383db58","page_id":"C124891468:3","page_url":"https://archive.org/details/C124891468/page/n2","statement_kind":"finding","subject_label":"Protective breakwater","summary":"The breakwater was completed in October 1986.","property":"built","value_text":"completed","date_printed":"October 1986","t_from":"1986","quote":"This agreement resolved funding and siting issues and was a catalyst to planning the full fisheries development. The breakwater was completed in October 1986.","place_label":"Fisherman's Wharf","place_precision":"site","place_id":"qipu:sf/place/landmark/fishermans-wharf","resolved_by":"place links file","anchor":"s-1a0cce7ad770","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Port of San Francisco staff report","stance":"own_position","speaker_evidence":"The breakwater was completed in October 1986."},{"claim_id":"c:49e31f3cc5c048311809e1ff4a96f47c","page_id":"C124891468:3","page_url":"https://archive.org/details/C124891468/page/n2","statement_kind":"cites_decision","subject_label":"Protective breakwater plan at Fisherman's Wharf","summary":"The US Army Corps of Engineers and the Port Commission gave final approval to a free standing protective breakwater plan.","property":"approved","value_text":"final approval","t_from":"1987","quote":"Prior to the Port's amendment to the Action Plan, the US Army Corps of Engineers and Port Commission gave final approval to a plan for a free standing protective breakwater.","place_label":"Fisherman's Wharf","place_precision":"site","place_id":"qipu:sf/place/landmark/fishermans-wharf","resolved_by":"place links file","anchor":"s-49e31f3cc5c0","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Port of San Francisco staff report","stance":"own_position","speaker_evidence":"Prior to the Port's amendment to the Action Plan"},{"claim_id":"c:ae6a026ecd90e737038a8aad7114b872","page_id":"C124891468:3","page_url":"https://archive.org/details/C124891468/page/n2","statement_kind":"finding","subject_label":"Pier 45 hotel proposals","summary":"Four proposals were received in January 1987 for a hotel on Pier 45.","property":"other","value_text":"four proposals","value_num":4.0,"date_printed":"January 1987","t_from":"1987","quote":"Four proposals were received in January of 1987.","place_label":"Pier 45","place_precision":"site","place_id":"qipu:sf/place/landmark/pier-45","resolved_by":"place links file","anchor":"s-ae6a026ecd90","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Port of San Francisco staff report","stance":"own_position","speaker_evidence":"Four proposals were received in January of 1987."},{"claim_id":"c:e8b408a71528b48d283fadde7a751114","page_id":"C124891468:3","page_url":"https://archive.org/details/C124891468/page/n2","statement_kind":"proposal","subject_label":"Action Plan key provisions","summary":"The Action Plan provides for fish handling facilities on a new Hyde Street Pier.","property":"proposes","value_text":"development of fish handling facilities on a new Hyde Street Pier","t_from":"1987","quote":"Key provisions are: o development of fish handling facilities on a new Hyde Street Pier","place_label":"Hyde Street Pier","place_precision":"building","anchor":"s-e8b408a71528","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Port of San Francisco staff report","stance":"own_position","speaker_evidence":"Key provisions are: o development of fish handling facilities"},{"claim_id":"c:f31e922564f3251a099f47472c16f779","page_id":"C124891468:3","page_url":"https://archive.org/details/C124891468/page/n2","statement_kind":"cites_decision","subject_label":"Fisherman's Wharf Action Plan amendment","summary":"The Port Commission amended the Action Plan in 1985 to include a hotel/mixed use development for Pier 45.","property":"adopted","value_text":"1985","date_printed":"1985","t_from":"1985","quote":"In 1985 the Port Commission amended the Action Plan to include this recommendation.","place_label":"Pier 45","place_precision":"site","place_id":"qipu:sf/place/landmark/pier-45","resolved_by":"place links file","anchor":"s-f31e922564f3","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Port of San Francisco staff report","stance":"own_position","speaker_evidence":"In 1985 the Port Commission amended the Action Plan"},{"claim_id":"c:6523c7016a789ededaec38c16fd7b6e5","page_id":"C124891468:5","page_url":"https://archive.org/details/C124891468/page/n4","statement_kind":"finding","subject_label":"Conceptual design schedule","summary":"The design work now stands in an extended Phase II rather than being reduced to two alternatives as planned.","property":"other","value_text":"extended Phase II","t_from":"1987","quote":"As will be described below, issues identified during the initial phase of the project prevented the reduction of alternatives to two as originally anticipated. The design work now stands in an extended Phase II.","place_label":"Hyde Street","place_precision":"street","place_id":"qipu:sf/place/street/hyde-st","resolved_by":"place links file","anchor":"s-6523c7016a78","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"As will be described below, issues identified during the initial phase"},{"claim_id":"c:90034746966601e9540a4702111f6671","page_id":"C124891468:5","page_url":"https://archive.org/details/C124891468/page/n4","statement_kind":"finding","subject_label":"Advisory committee","summary":"An advisory committee of industry, neighborhood, recreational and merchant representatives was formed in fall 1986.","property":"other","value_text":"advisory committee formed","date_printed":"Fall 1986","t_from":"1986","quote":"During the Fall of 1986, an advisory committee, composed of industry, neighborhood, recreational, and Wharf merchant representatives was formed","place_label":"Fisherman's Wharf","place_precision":"site","place_id":"qipu:sf/place/landmark/fishermans-wharf","resolved_by":"place links file","anchor":"s-900347469666","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"During the Fall of 1986, an advisory committee, composed of industry"},{"claim_id":"c:d6e72194ec87bed33499e73b871e3728","page_id":"C124891468:5","page_url":"https://archive.org/details/C124891468/page/n4","statement_kind":"cites_decision","subject_label":"Wharf fishing industry facilities needs report","summary":"The Commission adopted the fisheries consultant's report on Wharf fishing industry facilities needs in July 1986.","property":"adopted","value_text":"July 1986","date_printed":"July 1986","t_from":"1986","quote":"underwent three complete reviews prior to adoption by the Commission in July 1986.","place_label":"Fisherman's Wharf","place_precision":"site","place_id":"qipu:sf/place/landmark/fishermans-wharf","resolved_by":"place links file","anchor":"s-d6e72194ec87","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"underwent three complete reviews prior to adoption by the Commission in July 1986."},{"claim_id":"c:59f1a8119e86a2442756780097cf7d09","page_id":"C124891468:9","page_url":"https://archive.org/details/C124891468/page/n8","statement_kind":"proposal","subject_label":"Hyde Street conceptual design alternatives","summary":"The report describes a series of alternatives for berthing and fish handling at Hyde Street.","property":"alternative","value_text":"alternatives A through G","t_from":"1987","quote":"A series of alternatives were developed in response to accommodating the infrastructure program for both berthing and fish handling at Hyde Street.","place_label":"Hyde Street","place_precision":"street","place_id":"qipu:sf/place/street/hyde-st","resolved_by":"place links file","anchor":"s-59f1a8119e86","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Port of San Francisco staff report","stance":"own_position","speaker_evidence":"B.- CONCEPTUAL DESIGN ALTERNATIVES A series of alternatives were developed"},{"claim_id":"c:24d7316449ff2fe8f5116b3c3fe0a57d","page_id":"C124891468:13","page_url":"https://archive.org/details/C124891468/page/n12","statement_kind":"finding","subject_label":"Fish Alley Scheme B","summary":"Complete reconstruction of Fish Alley (Scheme B) did not appear to result in a more acceptable design.","property":"other","value_text":"Scheme B rejected as less acceptable","date_printed":"Phase I","t_from":"1987","quote":"Complete reconstruction of Fish Alley (Scheme B) did not appear to result in a more acceptable design either in terms of disruption to existing businesses, cost, or vehicle and vessel access.","place_label":"Fish Alley","anchor":"s-24d7316449ff","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"PHYSICAL ANALYSIS PHASE I"},{"claim_id":"c:337c14c3c83f0bd70496b8746b4ec947","page_id":"C124891468:13","page_url":"https://archive.org/details/C124891468/page/n12","statement_kind":"finding","subject_label":"Phase I cost estimates","summary":"Phase I development cost estimates ranged between 27 and 35 million dollars.","property":"cost_usd","value_text":"$27 and $35 million","unit":"USD","date_printed":"Phase I","t_from":"1987","quote":"The development cost estimates during Phase I ranged between $27 and $35 million.","place_label":"Hyde Street","place_precision":"street","place_id":"qipu:sf/place/street/hyde-st","resolved_by":"place links file","anchor":"s-337c14c3c83f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"PHYSICAL ANALYSIS PHASE I"},{"claim_id":"c:40899e1d239060e69e666958032259a4","page_id":"C124891468:13","page_url":"https://archive.org/details/C124891468/page/n12","statement_kind":"proposal","subject_label":"Phase II design recommendations","summary":"The analysis recommends that Phase II reserve an area for GGNRA to berth and interpret its vessels.","property":"recommendation","value_text":"reserve area for GGNRA","date_printed":"Phase II","t_from":"1987","quote":"the Phase II alternatives should reserve an area for GGNRA to berth and interpret their collection of vessels","place_label":"Hyde Street","place_precision":"street","place_id":"qipu:sf/place/street/hyde-st","resolved_by":"place links file","anchor":"s-40899e1d2390","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The analysis of Phase I alternatives also resulted in the recommendations"},{"claim_id":"c:b753302beaeb2ec3c01d2bf35debe551","page_id":"C124891468:13","page_url":"https://archive.org/details/C124891468/page/n12","statement_kind":"finding","subject_label":"Hyde Street traffic circulation","summary":"The most acceptable traffic circulation has major access at Leavenworth Street and secondary access at Hyde Street.","property":"recommendation","value_text":"major access at Leavenworth St., secondary at Hyde St.","t_from":"1987","quote":"the most acceptable traffic circulation solution is major access and egress at Leavenworth St. with secondary access and egress at Hyde St.","place_label":"Leavenworth St.","place_precision":"street","place_id":"qipu:sf/place/street/leavenworth-st","resolved_by":"place links file","anchor":"s-b753302beaeb","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"General findings during this phase were"},{"claim_id":"c:b805b0d5417888fb185a6687be58e02d","page_id":"C124891468:13","page_url":"https://archive.org/details/C124891468/page/n12","statement_kind":"finding","subject_label":"Fish Alley seawall","summary":"The seawall along Fish Alley has a potential life of 18 years.","property":"other","value_text":"18 years","value_num":18.0,"unit":"years","t_from":"1987","quote":"the seawall along Fish Alley has a potential life of 18 years; the most acceptable traffic circulation solution is major access and egress at Leavenworth St.","place_label":"Fish Alley","anchor":"s-b805b0d54178","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"General findings during this phase were"},{"claim_id":"c:6a1d098013586a2f6f9f1be4d02e35c4","page_id":"C124891468:15","page_url":"https://archive.org/details/C124891468/page/n14","statement_kind":"finding","subject_label":"Scheme E operations","summary":"The report says Scheme E incorporates the most desirable operational features.","property":"finding","value_text":"most desirable features","t_from":"1987","quote":"From an operational standpoint, Scheme E incorporates the most desirable features. However, the issue of building height versus the needs of the industry remains unresolved.","anchor":"s-6a1d09801358","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"From an operational standpoint, Scheme E incorporates the most desirable features."},{"claim_id":"c:8f45282f30a7772f331551b4db0d5723","page_id":"C124891468:15","page_url":"https://archive.org/details/C124891468/page/n14","statement_kind":"finding","subject_label":"Scheme G","summary":"The report says Scheme G limits opportunities for future expansion of the industry and may not satisfy GGNRA operational requirements.","property":"finding","value_text":"limits future expansion","t_from":"1987","quote":"Gear storage and on-site long term parking within a 25 foot height limit (Scheme G) limits opportunities for future expansion of the industry","anchor":"s-8f45282f30a7","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Gear storage and on-site long term parking within a 25 foot height limit (Scheme G) limits opportunities"},{"claim_id":"c:b27c1d2ca16f571433a8ef9ee92dea92","page_id":"C124891468:15","page_url":"https://archive.org/details/C124891468/page/n14","statement_kind":"finding","subject_label":"Scheme F","summary":"The report finds Scheme F, a minimum area of new pier construction, jeopardizes vehicular operations sufficiently to make it unacceptable.","property":"rejected","value_text":"unacceptable","t_from":"1987","quote":"Scheme F, depicting a minimum area of new pier construction jeopardizes vehicular operations sufficiently to make it unacceptable.","anchor":"s-b27c1d2ca16f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Scheme F, depicting a minimum area of new pier construction jeopardizes vehicular operations"},{"claim_id":"c:bae707c62b89255b1af26cb7364b0b0d","page_id":"C124891468:15","page_url":"https://archive.org/details/C124891468/page/n14","statement_kind":"finding","subject_label":"Development costs of Phase II alternatives","summary":"The report estimates Phase II alternative development costs range between $18 (≈ $53.39 in 2026 dollars) and $39 million (≈ $115.7 million in 2026 dollars).","property":"cost_usd","value_text":"$18 and $39 million","value_num":18000000.0,"unit":"USD","t_from":"1987","quote":"Appendix B contains a summary of estimated costs for each of the Phase II alternatives. They range between $18 and $39 million.","anchor":"s-bae707c62b89","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Appendix B contains a summary of estimated costs for each of the Phase II alternatives."},{"claim_id":"c:31d3680db78e005ed3ab493fc27c5400","page_id":"C124891468:19","page_url":"https://archive.org/details/C124891468/page/n18","statement_kind":"proposal","subject_label":"Hyde Street Pier financing","summary":"The report recommends the second course, placing some commercial fishing infrastructure on Pier 45.","property":"recommendation","value_text":"second course recommended","t_from":"1987","quote":"The second course is recommended. This will entail studying three alternative schemes for placing commercial fishing infrastructure on Pier 45.","place_label":"Pier 45","place_precision":"site","place_id":"qipu:sf/place/landmark/pier-45","resolved_by":"place links file","anchor":"s-31d3680db78e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Port of San Francisco staff report","stance":"own_position","speaker_evidence":"G. RECOMMENDATION ... The second course is recommended."},{"claim_id":"c:3e240500a5f28a22ce2fb84b5d6a3f43","page_id":"C124891468:19","page_url":"https://archive.org/details/C124891468/page/n18","statement_kind":"finding","subject_label":"Fill credits for pier removal","summary":"The report states the approximate average cost per acre of pier removal is $258,990 (≈ $768,170 in 2026 dollars).","property":"cost_usd","value_text":"$258,990 per acre","value_num":258990.0,"unit":"USD","t_from":"1987","quote":"The approximate average cost per acre of pier removal is $258,990.","anchor":"s-3e240500a5f2","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Port of San Francisco staff report","stance":"own_position","speaker_evidence":"The approximate average cost per acre of pier removal is $258,990."},{"claim_id":"c:11b145842fde5483542978cd6034f1f4","page_id":"C124891468:21","page_url":"https://archive.org/details/C124891468/page/n20","statement_kind":"proposal","subject_label":"Pier 45 alternatives reporting","summary":"The results of the analysis are to be reported to the Port Commission by June 15, 1987.","property":"other","value_text":"report by June 15, 1987","date_printed":"June 15, 1987","t_from":"1987","quote":"The results of this analysis, including physical and financial feasiblity will be reported to the Port Commission by June 15, 1987.","place_label":"Pier 45","place_precision":"site","place_id":"qipu:sf/place/landmark/pier-45","resolved_by":"place links file","anchor":"s-11b145842fde","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The results of this analysis, including physical and financial feasiblity"},{"claim_id":"c:b16ddf084d7ab4a5d5f6dd7b873dade9","page_id":"C124891468:21","page_url":"https://archive.org/details/C124891468/page/n20","statement_kind":"proposal","subject_label":"Pier 45 alternatives","summary":"The staff recommends that the Port Commission authorize the conceptual design team to study three alternatives for commercial fishing facilities within the Pier 45 development.","property":"recommendation","value_text":"study three alternatives","t_from":"1987","quote":"It is the staff's recommendation that the Port Commission authorize the conceptual design team to study three alternatives for including commercial fishing industry facilities within the Pier 45 development.","place_label":"Pier 45","place_precision":"site","place_id":"qipu:sf/place/landmark/pier-45","resolved_by":"place links file","anchor":"s-b16ddf084d7a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"It is the staff's recommendation that the Port Commission authorize"},{"claim_id":"c:0bd8bec7ba9c74489b708750bf6ce6ba","page_id":"C124891468:41","page_url":"https://archive.org/details/C124891468/page/n40","statement_kind":"proposal","subject_label":"Hyde Street Pier Scheme D-40 total floor area","summary":"Scheme D-40 totals 92,082 sq ft of floor area across the pier and landside buildings.","property":"floor_area_sqft","value_text":"92,082 sf","value_num":92082.0,"unit":"sqft","date_printed":"29 April 1987","t_from":"1987","quote":"Subtotal 33,197 sf TOTAL 92,082 sf Parking Ramp 6,275 sf Demolition 6,500 __—sf (Current leaseholds)","place_label":"Hyde Street Pier","place_precision":"street","anchor":"s-0bd8bec7ba9c","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"Port of San Francisco staff (report's own figures)","stance":"own_position","speaker_evidence":"Subtotal 33,197 sf TOTAL 92,082 sf Parking Ramp"},{"claim_id":"c:816d6874e9fd228d72bb232f891dad26","page_id":"C124891468:41","page_url":"https://archive.org/details/C124891468/page/n40","statement_kind":"proposal","subject_label":"Hyde Street Pier Scheme D-40 pier building","summary":"Scheme D-40 shows a 40-foot-high pier building with 6 tenants and about 58,885 sq ft of subtotal floor area.","property":"height_ft","value_text":"40 ft","value_num":40.0,"unit":"ft","date_printed":"29 April 1987","t_from":"1987","quote":"Scheme D-40 Moderate 1.Pier Building: (40° Ht./6 tenants) Deck +0 21,959 23;ino Sf F.H.- 95% eff.","place_label":"Hyde Street Pier","place_precision":"street","anchor":"s-816d6874e9fd","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"Port of San Francisco staff (report's own figures)","stance":"own_position","speaker_evidence":"Scheme D-40 Moderate 1.Pier Building: (40° Ht./6 tenants)"},{"claim_id":"c:661366a8362c25cdd9094697ee383c04","page_id":"C124891468:55","page_url":"https://archive.org/details/C124891468/page/n54","statement_kind":"proposal","subject_label":"Break-even rents for alternative plans","summary":"The consultant presents break-even monthly rents for alternative plans at the Hyde Street Pier.","property":"other","date_printed":"April 1, 1987","t_from":"1987","quote":"Break-even Monthly Rents for Alternative Plans A Berths/Ft. !) $ 3.00 $ Lockers -- Vessel Services/Berth@) 48.00","place_label":"Hyde Street Pier","place_precision":"other","anchor":"s-661366a8362c","shown":false,"hidden":"table","part":"table","speaker":"another_body","speaker_role":"Williams-Kuebelbeck & Associates, Inc. consultant memo","stance":"quotes_to_report","speaker_evidence":"SUBJECT: Break-even [name] for Alternative Plans"},{"claim_id":"c:be777016183240fb8c8c015c253de263","page_id":"C124891468:59","page_url":"https://archive.org/details/C124891468/page/n58","statement_kind":"background","subject_label":"Fish handler rents in other California ports","summary":"The memo compares fish handler rents and port lease terms across selected California port cities.","property":"other","t_from":"1987","quote":"Fish Handler Rents (Monthly Rent Port Lessor Per Square foot) San Port of San $.30 per month","anchor":"s-be7770161832","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"Port of San Francisco staff report table of selected port rents","stance":"own_position","speaker_evidence":"Fish Handler Rents (Monthly Rent Port Lessor Per Square foot)"},{"claim_id":"c:341546cc8be56f6797fc6e42bac8ac90","page_id":"C124891468:63","page_url":"https://archive.org/details/C124891468/page/n62","statement_kind":"proposal","subject_label":"Alternative plans F-25, D-25 and D-40","summary":"The consultant compares the costs of alternative plans F-25, D-25 and D-40, including retaining Fish Alley.","property":"alternative","value_text":"F-25, D-25, D-40","date_printed":"May 5, 1987","t_from":"1987","quote":"COST COMPARISONS FOR ALTERNATIVE PLANS Scheme MiNi aes Retain Fish Alle F - 25 D- 25 D - 40","place_label":"Fisherman's Wharf","place_precision":"site","place_id":"qipu:sf/place/landmark/fishermans-wharf","resolved_by":"place links file","anchor":"s-341546cc8be5","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"consultant memo table (Williams, Kuebelbeck & Associates)","stance":"own_position","speaker_evidence":"SUBJECT: COST COMPARISONS FOR ALTERNATIVE PLANS"},{"claim_id":"c:af4624732f5408155674fc8853d90986","page_id":"C124891468:63","page_url":"https://archive.org/details/C124891468/page/n62","statement_kind":"finding","subject_label":"Pier construction cost, first scheme column","summary":"Pier construction cost in the first scheme column is estimated at $8,554,032 (≈ $25.4 million in 2026 dollars).","property":"cost_usd","value_text":"$8,554,032","value_num":8554032.0,"unit":"USD","date_printed":"May 5, 1987","t_from":"1987","quote":"Pier Construction $ 8,554,032 $10,620,000 $10,620,000 (per square foot) (97.52) (98.69)","anchor":"s-af4624732f54","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"consultant memo table (Williams, Kuebelbeck & Associates)","stance":"own_position","speaker_evidence":"Pier Construction $ 8,554,032 $10,620,000"},{"claim_id":"c:d944d61c0c7e19a2ffa17d6a0bd4cd49","page_id":"C124891468:63","page_url":"https://archive.org/details/C124891468/page/n62","statement_kind":"finding","subject_label":"Total development cost, first scheme column","summary":"Total development cost in the first scheme column is estimated at $18,023,695 (≈ $53.5 million in 2026 dollars).","property":"cost_usd","value_text":"$18,023,695","value_num":18023695.0,"unit":"USD","date_printed":"May 5, 1987","t_from":"1987","quote":"Financing & Development Costs 2,147,108 2,349,292 25495 coe Total Development Cost $18,023,695","anchor":"s-d944d61c0c7e","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"consultant memo table (Williams, Kuebelbeck & Associates)","stance":"own_position","speaker_evidence":"Financing & Development Costs 2,147,108"},{"claim_id":"c:1fd5b39507cb2d2181daaa81729b9f2c","page_id":"C124891468:67","page_url":"https://archive.org/details/C124891468/page/n66","statement_kind":"finding","subject_label":"F-25 pier, site and infrastructure developer cost","summary":"The memo puts the F-25 pier, site and infrastructure developer cost at 100 percent Port at $9,142 thousand (≈ $27.1 million in 2026 dollars).","property":"cost_usd","value_text":"$9,142 thousand (1987 dollars)","value_num":9142000.0,"unit":"USD","date_printed":"1987","t_from":"1987","quote":"F-25 Pier, Site and Infrastructure Developer Cost (100% Port) $9,142","place_label":"F-25 Pier","anchor":"s-1fd5b39507cb","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"COMPARATIVE FINANCIAL SUMMARY Thousands of 1987 Dollars"},{"claim_id":"c:557b3454a25b52fabec82f3053382f63","page_id":"C124891468:67","page_url":"https://archive.org/details/C124891468/page/n66","statement_kind":"finding","subject_label":"Annual port cash flow","summary":"The memo reports annual port cash flow at market rates and at breakeven rates.","property":"other","value_text":"46 at market rates; 304 at breakeven rates (thousands)","date_printed":"1987","t_from":"1987","quote":"Annual Port Cash Flow at Market Rates 46 at Breakeven Rates","anchor":"s-557b3454a25b","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Annual Port Cash Flow at Market Rates"},{"claim_id":"c:789ca1856f9a75002f88efbdc1525756","page_id":"C124891468:67","page_url":"https://archive.org/details/C124891468/page/n66","statement_kind":"finding","subject_label":"Initial port investment","summary":"The memo reports initial port investment of 14,843 thousand at market rates and 9,142 thousand at breakeven rates.","property":"cost_usd","value_text":"14,843 at market rates; 9,142 at breakeven rates (thousands)","value_num":14843000.0,"unit":"USD","date_printed":"1987","t_from":"1987","quote":"Initial Port Investment at Market Rates 14,843 at Breakeven Rates 9,142","anchor":"s-789ca1856f9a","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Initial Port Investment at Market Rates 14,843"},{"claim_id":"c:72bde854f46764cdb7ab9a77d1b6e654","page_id":"C124891468:69","page_url":"https://archive.org/details/C124891468/page/n68","statement_kind":"finding","subject_label":"Port of SF commercial fishing berths","summary":"Memo reports Port of SF berth charges of $1.00 (≈ $2.97 in 2026 dollars)-$2.00 (≈ $5.93 in 2026 dollars) per foot monthly.","property":"rent_usd","value_text":"$1.00-$2.00","unit":"USD","date_printed":"May 6, 1987","t_from":"1987","quote":"Berths/Ft. $1.00-$2.00 $2.00-$4.50 $3.00 Gear Storage/SF .20-.30 .05-.80","place_label":"Port of San Francisco","anchor":"s-72bde854f467","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"Williams-Kuebelbeck & Associates memorandum table (consultant to the Port)","stance":"own_position","speaker_evidence":"TYPICAL MONTHLY CHARGES FOR COMMERCIAL FISHING FACILITIES"},{"claim_id":"c:c7b832057d69a7e42900387d3875f97e","page_id":"C124891468:69","page_url":"https://archive.org/details/C124891468/page/n68","statement_kind":"finding","subject_label":"Long-term parking at Port of SF","summary":"Memo reports Port of SF long-term parking at $0 (≈ $0.00 in 2026 dollars)-$30 (≈ $88.98 in 2026 dollars) per space, versus $100 (≈ $297 in 2026 dollars)-$180 (≈ $534 in 2026 dollars) at other California ports.","property":"rent_usd","value_text":"0-30.00 (Port of SF); 100.00-180.00 (other CA ports)","unit":"USD","date_printed":"May 6, 1987","t_from":"1987","quote":"Long Term Parking/Space 0-30.00 -- 100.00-180.00 Diesel Wharfage/Gallon . 00335 .01-.05 2025","place_label":"Port of San Francisco","anchor":"s-c7b832057d69","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"Williams-Kuebelbeck & Associates memorandum table (consultant to the Port)","stance":"own_position","speaker_evidence":"MONTHLY CHARGES Port of SF Other CA Ports Breakeven"},{"claim_id":"c:7428a05b13c0589ca1fad2b7083e5163","page_id":"C124891468:73","page_url":"https://archive.org/details/C124891468/page/n72","statement_kind":"background","subject_label":"Small Craft Harbor Development Loan","summary":"The state loan funds berths and vessel services with 30-year terms at 4.7%.","property":"other","value_text":"30 years, 4.7%","t_from":"1987","quote":"Small Craft Harbor Development Loan Authority: Sec. 70, Harbors and Navigation Code Source: California Department of Boating and Waterways Terms: 30 years, 4.7%","anchor":"s-7428a05b13c0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Port of San Francisco staff report (funding source table entry)","stance":"own_position","speaker_evidence":"A. BERTHS AND VESSEL SERVICES Small Craft Harbor Development Loan"},{"claim_id":"c:db36c569c787037777270ec9ed02ac6f","page_id":"C124891468:73","page_url":"https://archive.org/details/C124891468/page/n72","statement_kind":"finding","subject_label":"Small Craft Harbor Development Loan","summary":"The memo assesses the chance of approval for the Small Craft Harbor loan as fair because of exclusive commercial use.","property":"other","value_text":"Fair","t_from":"1987","quote":"Chance of Approval: Fair (exclusive commercial use is a problem). Contact: [name withheld] (916) 322-1800.","anchor":"s-db36c569c787","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Port of San Francisco staff report (funding source table entry)","stance":"own_position","speaker_evidence":"Chance of Approval: Fair (exclusive commercial use is a problem)."},{"claim_id":"c:0b27a4a6c54ab125eb9617a7bf6d7868","page_id":"C124891468:79","page_url":"https://archive.org/details/C124891468/page/n78","statement_kind":"background","subject_label":"San Francisco Small Business Loan Program","summary":"The city small business loan program offers loans up to 10 years at 7% with a $50,000 (≈ $148,301 in 2026 dollars) limit.","property":"other","value_text":"Up to 10 years at 7%; $50,000 limit","t_from":"1987","quote":"San Francisco Swall Business Loan Prograp Source: Mayor's Office of Housing and Economic Development Terms: Up to 10 years at 7%","place_label":"San Francisco","anchor":"s-0b27a4a6c54a","shown":false,"hidden":"table","part":"table","speaker":"another_body","speaker_role":"Mayor's Office of Housing and Economic Development","stance":"quotes_to_report","speaker_evidence":"Source: Mayor's Office of Housing and [name]"}]}