{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124892967","url":"https://data.qipu.org/usa/san-francisco/reports/c124892967/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124892967/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"c124892967","source_id":"c124892967","title":"Transportation conditions and trends : background information for the transportation strategy and programs report","year":1976,"n_pages":86,"creator":null,"source_url":"https://archive.org/details/c124892967","issuer":"City and County of San Francisco, Department of City Planning","issuer_type":"government","gov_level":"city_county","prepared_by":null,"doc_kind":"study","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"model","doc_kind_by":"model","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":14,"statements_total":49,"statements_by_kind":{"finding":29,"proposal":12,"cites_decision":4,"background":4},"same_for_every_statement":{"source_id":"c124892967","source_url":"https://archive.org/details/c124892967","source_label":"IGS library: Transportation conditions and trends : background information for the transportation strategy and programs report","report_year":1976,"issuer":"City and County of San Francisco, Department of City Planning","issuer_type":"government","doc_kind":"study","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A 1976 background study by the City Planning Department of San Francisco's transit, parking, bicycle and street conditions, meant to inform the transportation strategy and programs report.","next":"In May 1984, the Board of Supervisors approved stop signs at Mission Street and Steuart Street, and at six Judah Street intersections.","next_decision":"qipu:sf/decision/journalofjanjuneproceed79sanfrich:645/1","figures":[{"label":"Off-street parking","value":"64,820 spaces downtown","claim_ids":["c:27319036257c2c561fe9afc2795ebbd8"]},{"label":"Neighborhood parking","value":"824 lot spaces; 1,013 garage spaces","claim_ids":["c:aa2829ac074829c5ba0ea4d08219a437"]},{"label":"Taxis licensed","value":"849 taxis across eight companies","claim_ids":["c:682f7cf4806c386174dbb6c5522a57c7"]},{"label":"Bicycle routes","value":"68 miles of streets","claim_ids":["c:6be3827eaa0be886ec834e58855c80c5"]}],"main_points":["c:547ae57c44c8c501e8d9b56d8f96c3fc","c:ac01d1f148cc501353faf8a12a9deb39","c:dfbc8e88d3db5fdeec2ed4daaa3c1456"],"board_decisions_after":["qipu:sf/decision/journalofjanjuneproceed79sanfrich:645/1","qipu:sf/decision/journaljulydecofproceed75sanfrich:93/2"],"board_decisions_before":["qipu:sf/decision/journalofproceed68sanfrich|g4430"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:1200434231bcb423d6e1499d431483db","page_id":"c124892967:17","page_url":"https://archive.org/details/c124892967/page/n16","statement_kind":"finding","subject_label":"N line raised right-of-way on Judah Street","summary":"The Department of Public Works completed a raised right-of-way for the N line on Judah Street.","property":"built","value_text":"raised right-of-way completed","t_from":"1976","quote":"Recently completed by the Department of Public Works is a raised right-of- way for the \"N\" line, on Judah Street between 9th and 19th Avenues.","place_label":"Judah Street between 9th and 19th Avenues","place_precision":"street_segment","place_id":"qipu:sf/place/street/judah-st","resolved_by":"place links file","anchor":"s-1200434231bc","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Recently completed by the Department of Public Works is a raised right-of-way"},{"claim_id":"c:547ae57c44c8c501e8d9b56d8f96c3fc","page_id":"c124892967:17","page_url":"https://archive.org/details/c124892967/page/n16","statement_kind":"finding","subject_label":"Muni diesel buses","summary":"Muni has experienced significant breakdown problems with its GM diesel buses bought at the same time.","property":"finding","value_text":"significant breakdown problems","t_from":"1976","quote":"Muni has been experiencing significant vehicle breakdown problems with its GM diesel buses, all of which were purchased at the same time","anchor":"s-547ae57c44c8","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Muni has been experiencing significant vehicle breakdown problems with its GM diesel buses"},{"claim_id":"c:754fe813c5f66e36a9889996acb08f26","page_id":"c124892967:17","page_url":"https://archive.org/details/c124892967/page/n16","statement_kind":"finding","subject_label":"Muni streetcar lines","summary":"Muni is in the process of rerailing its streetcar lines, some not replaced since 1918.","property":"other","value_text":"rerailing in process","date_printed":"1918","t_from":"1918","quote":"Muni, as part of its Transit Improvement Program, is in the process of rerailing its streetcar lines, some of which have not been replaced since 1918.","anchor":"s-754fe813c5f6","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"To maximize the benefit of the new Muni-Metro system, Muni, as part of its Transit Improvement Program"},{"claim_id":"c:889258544164a08a985f205721b67283","page_id":"c124892967:17","page_url":"https://archive.org/details/c124892967/page/n16","statement_kind":"finding","subject_label":"Judah Street and Church Street design","summary":"An interdepartmental staff committee has worked over a year on design details for Judah and Church Streets.","property":"other","value_text":"design work ongoing","t_from":"1976","quote":"An interdepartmental staff committee (DPW, Muni, Planning) has been working for over a year with all interested citizen groups on design details","place_label":"Judah Street from 19th Avenue to La Playa; Church Street","place_precision":"street_segment","anchor":"s-889258544164","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"An interdepartmental staff committee (DPW, Muni, Planning) has been working"},{"claim_id":"c:ac01d1f148cc501353faf8a12a9deb39","page_id":"c124892967:17","page_url":"https://archive.org/details/c124892967/page/n16","statement_kind":"proposal","subject_label":"Transit Preferential streets","summary":"The POM Study would study an additional 25 miles of Transit Preferential streets and recommend implementation concepts.","property":"proposes","value_text":"25 miles","value_num":25.0,"unit":"miles","t_from":"1976","quote":"an additional 25 miles of Transit Preferential streets are to be studied and implementation concents recommended","anchor":"s-ac01d1f148cc","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"As part of the Municipal Railway's Planning, Operations, and Marketing (POM) Study"},{"claim_id":"c:b468269abb49e44ee8bc550312e083f7","page_id":"c124892967:17","page_url":"https://archive.org/details/c124892967/page/n16","statement_kind":"finding","subject_label":"Street development program","summary":"The City's street development program has diminished in recent years.","property":"finding","value_text":"diminished","t_from":"1976","quote":"San Francisco's street development program, the development or upgrading of various City streets, has diminished in recent years due to changing transportation needs and other funding priorities.","anchor":"s-b468269abb49","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"San Francisco's street development program has diminished in recent years"},{"claim_id":"c:e05e6783e4af060de1f08ede332265f8","page_id":"c124892967:17","page_url":"https://archive.org/details/c124892967/page/n16","statement_kind":"proposal","subject_label":"Five-Year Plan","summary":"The Five-Year Plan will include a Transit Preferential Treatment element.","property":"proposes","value_text":"Transit Preferential Treatment element","t_from":"1976","quote":"The Five-Year Plan will aiso include a Transit Preferential Treatment element.","anchor":"s-e05e6783e4af","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Five-Year Plan will aiso include a Transit Preferential Treatment element."},{"claim_id":"c:f400429263f95cf3830696d01bd403c3","page_id":"c124892967:17","page_url":"https://archive.org/details/c124892967/page/n16","statement_kind":"finding","subject_label":"Geary Boulevard underpass","summary":"The Geary Boulevard underpass at Masonic Avenue was a major recent street development project.","property":"built","value_text":"underpass","t_from":"1976","quote":"One major recent street development project was the Geary Boulevard underpass at Masonic Avenue, which allows diversion of some traffic","place_label":"Geary Boulevard at Masonic Avenue","place_precision":"intersection","place_id":"qipu:sf/place/street/geary-blvd","resolved_by":"place links file","anchor":"s-f400429263f9","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"One major recent street development project was the Geary Boulevard underpass"},{"claim_id":"c:286476107bc22d0b1e5dfb262be56c64","page_id":"c124892967:23","page_url":"https://archive.org/details/c124892967/page/n22","statement_kind":"proposal","subject_label":"Recreational areas to open or improve","summary":"The document says three major recreational areas will be opened or improved within three to ten years.","property":"other","value_text":"three major recreational areas","value_num":3.0,"date_printed":"within the next three to ten years","t_from":"1976","quote":"Three major recreational areas will be opened or improved within the next three to ten years","anchor":"s-286476107bc2","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Three major recreational areas will be opened or improved"},{"claim_id":"c:b90150776ec7d808a5bd20c5fc43b4ac","page_id":"c124892967:23","page_url":"https://archive.org/details/c124892967/page/n22","statement_kind":"proposal","subject_label":"South Bayshore multi-purpose roadway","summary":"The Metropolitan Transportation Commission has included the South Bayshore roadway in its Regional Transportation Plan.","property":"proposes","value_text":"surface parkway of limited capacity","t_from":"1976","quote":"MTC has included the provision of such a roadway in its Regional Transportation Plan.","place_label":"South Bayshore area","anchor":"s-b90150776ec7","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"MTC has included the provision of such a roadway in its Regional Transportation Plan"},{"claim_id":"c:6be3827eaa0be886ec834e58855c80c5","page_id":"c124892967:25","page_url":"https://archive.org/details/c124892967/page/n24","statement_kind":"finding","subject_label":"Bicycle routes in the Master Plan","summary":"The Transportation element of the Master Plan designates 68 miles of streets as bicycle routes.","property":"other","value_text":"68 miles of streets designated as bicycle routes","value_num":68.0,"unit":"miles","t_from":"1976","quote":"designates 68 miles of streets as bicycle routes, and another 42 miles as","anchor":"s-6be3827eaa0b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Transportation element of the City's Master Plan designates 68 miles"},{"claim_id":"c:74465189b115746fd8257aa6edc8a818","page_id":"c124892967:25","page_url":"https://archive.org/details/c124892967/page/n24","statement_kind":"finding","subject_label":"Bicycle program funding","summary":"No Mayor's Office money was allocated to the bicycle program in fiscal year 1975-76.","property":"other","value_text":"no money allocated","unit":"USD","date_printed":"fiscal year 1975-76","t_from":"1975","quote":"The bicycle program has been funded by gas taxes; in fiscal year 1975-76 no money has been allocated by the Mayor's Office for this purpose.","anchor":"s-74465189b115","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The bicycle program has been funded by gas taxes; in fiscal year 1975-76 no money"},{"claim_id":"c:da6861e1480a69e4ed3df985aa66038b","page_id":"c124892967:25","page_url":"https://archive.org/details/c124892967/page/n24","statement_kind":"proposal","subject_label":"Gaps in bicycle path network","summary":"The document says significant gaps in the bicycle path network should be closed during the next three to five years.","property":"proposes","value_text":"close significant gaps in bicycle path network","date_printed":"next three to five years","t_from":"1976","quote":"significant gaps in the bicycle path network should be closed during the next three to five years.","anchor":"s-da6861e1480a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"significant gaps in the bicycle path network should be closed during the next three to five years"},{"claim_id":"c:168db8270ecfe9c1751cb41b33bd8618","page_id":"c124892967:29","page_url":"https://archive.org/details/c124892967/page/n28","statement_kind":"finding","subject_label":"Traffic signal program funding","summary":"No city monies were allocated to the traffic signal operation and channelization program for FY 1975-76.","property":"other","value_text":"no city monies allocated","unit":"USD","date_printed":"FY 1975-76","t_from":"1975","quote":"For FY 1975-76, no city monies were allocated to this program.","anchor":"s-168db8270ecf","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Traffic Signal Operation and Channelization Program ... For FY 1975-76, no city monies"},{"claim_id":"c:682f7cf4806c386174dbb6c5522a57c7","page_id":"c124892967:29","page_url":"https://archive.org/details/c124892967/page/n28","statement_kind":"finding","subject_label":"Taxi licences","summary":"The document reports 849 taxis licensed in San Francisco across eight companies.","property":"other","value_text":"849 taxis licensed","value_num":849.0,"t_from":"1976","quote":"There are currently 849 taxis licensed to operate in San Francisco, distributed over eight companies.","place_label":"San Francisco","anchor":"s-682f7cf4806c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Taxi Service There are currently 849 taxis licensed"},{"claim_id":"c:ae813e7c90b77b43a40a4f2b1518a066","page_id":"c124892967:29","page_url":"https://archive.org/details/c124892967/page/n28","statement_kind":"finding","subject_label":"Jitney service","summary":"The document reports 30-40 independently operated jitneys in San Francisco.","property":"other","value_text":"30-40 jitneys","value_num":30.0,"t_from":"1976","quote":"There are currently 30-40 jitneys operated independently in San Francisco.","place_label":"San Francisco","anchor":"s-ae813e7c90b7","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Jitneys are 12 passenger vans running on flexible schedules"},{"claim_id":"c:2b5fab89425e06a2362a17251d14eff8","page_id":"c124892967:31","page_url":"https://archive.org/details/c124892967/page/n30","statement_kind":"finding","subject_label":"BART and Muni fare agreements","summary":"Fare and transfer agreements have been concluded between BART and Muni.","property":"other","value_text":"fare and transfer agreements concluded","t_from":"1976","quote":"Fare and transfer agreements have been concluded between BART and Muni","anchor":"s-2b5fab89425e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Fare and transfer agreements have been concluded between BART and Muni"},{"claim_id":"c:ad44b63f8f914fac09f6fdd424faa5f2","page_id":"c124892967:31","page_url":"https://archive.org/details/c124892967/page/n30","statement_kind":"finding","subject_label":"Transit rider security","summary":"Recent teenage gang attacks on Muni buses illustrate the severity of transit security problems.","property":"other","value_text":"recent attacks by teenage gangs on Muni buses","date_printed":"recent","t_from":"1976","quote":"Recent attacks by teenage gangs on Muni buses illustrate the severity of the problem.","anchor":"s-ad44b63f8f91","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Recent attacks by teenage gangs on Muni buses illustrate the severity of the problem."},{"claim_id":"c:b9a6cdb1dcf7d3773443b7bd2c4fc9b3","page_id":"c124892967:31","page_url":"https://archive.org/details/c124892967/page/n30","statement_kind":"cites_decision","subject_label":"Transportation Policy Group criteria","summary":"The Transportation Policy Group adopted a set of policy criteria for evaluating proposed capital budget projects.","property":"adopted","value_text":"set of policy criteria","t_from":"1976","quote":"has adopted a set of policy criteria for evaluating each proposed project in the capital budget and the FAU","anchor":"s-b9a6cdb1dcf7","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Transportation Policy Group ... has adopted a set of policy criteria"},{"claim_id":"c:35e6fde6e0769d957bf00e6859e7f3ed","page_id":"c124892967:33","page_url":"https://archive.org/details/c124892967/page/n32","statement_kind":"proposal","subject_label":"Protected Residential Areas program","summary":"The PRA program seeks to divert through traffic from residential streets onto non-residential major thoroughfares.","property":"proposes","t_from":"1976","quote":"the PRA program seeks to divert through traffic from residential streets and onto non-residential major thoroughfares wherever possible.","anchor":"s-35e6fde6e076","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Based in part upon findings of the Street Livability Study; the PRA program seeks to divert"},{"claim_id":"c:6a264098ef387bf303c3bae364ebb33a","page_id":"c124892967:33","page_url":"https://archive.org/details/c124892967/page/n32","statement_kind":"cites_decision","subject_label":"Mission Plan","summary":"The City Planning Commission adopted the Mission Plan, which includes recommendations on separating truck traffic.","property":"adopted","value_text":"adopted","t_from":"1976","quote":"The Mission Plan, developed with the community and recently adopted by the City Planning Commission, includes recommendations as to the separation of truck traffic","place_label":"Mission District","place_precision":"area","place_id":"qipu:sf/place/hood/mission","resolved_by":"place links file","anchor":"s-6a264098ef38","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Mission Plan, developed with the community and recently adopted by the City Planning Commission"},{"claim_id":"c:7f2ee262ec0cdad0131c7efb807b28d6","page_id":"c124892967:33","page_url":"https://archive.org/details/c124892967/page/n32","statement_kind":"finding","subject_label":"Protected Residential Areas program","summary":"Planning and Public Works are implementing the PRA program; one area in the Inner Mission has been completed.","property":"event","value_text":"one area completed","t_from":"1976","quote":"The Departments of City Planning and Public Works are working together to implement this program; one area has been completed in the Inner Mission.","place_label":"Inner Mission","place_precision":"area","place_id":"qipu:sf/place/hood/mission","resolved_by":"place links file","anchor":"s-7f2ee262ec0c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Departments of City Planning and Public Works are working together to implement this program"},{"claim_id":"c:aa2829ac074829c5ba0ea4d08219a437","page_id":"c124892967:35","page_url":"https://archive.org/details/c124892967/page/n34","statement_kind":"finding","subject_label":"San Francisco Parking Authority neighborhood lots and garages","summary":"The Parking Authority operates 21 neighborhood lots with 824 spaces and two garages with 1,013 spaces.","property":"other","value_text":"21 lots, 824 spaces; two garages, 1,013 spaces","value_num":824.0,"t_from":"1976","quote":"The San Francisco Parking Authority currently operates 21 neighborhood parking lots comprising 824 spaces and two garages with 1,013 spaces","place_label":"neighborhood shopping districts","anchor":"s-aa2829ac0748","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"NEIGHBORHOOD COMMERCIAL PARKING The San Francisco Parking Authority currently operates"},{"claim_id":"c:515ef6b14fc6b63742b8f16676d25abd","page_id":"c124892967:37","page_url":"https://archive.org/details/c124892967/page/n36","statement_kind":"background","subject_label":"Cable car invention","summary":"The cable car was invented in 1873 to provide a braking system on steep grades such as Fillmore and Clay Streets.","property":"other","value_text":"1873","value_num":1873.0,"date_printed":"1873","t_from":"1873","quote":"The City's tcpography brought about the invention of the cable car in 1873 in order to provide a braking system that could allow transit use on some of the steepest grades","place_label":"Fillmore and Clay Streets","place_precision":"intersection","place_id":"qipu:sf/place/street/fillmore-st","resolved_by":"place links file","anchor":"s-515ef6b14fc6","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"SPECIAL VEHICLES San Francisco has special problems with its topography"},{"claim_id":"c:af5f9ddacd55ff7766b9aad6d71bf28a","page_id":"c124892967:37","page_url":"https://archive.org/details/c124892967/page/n36","statement_kind":"background","subject_label":"Boeing-Vertol light rail vehicle contract","summary":"San Francisco and Boston contracted with Boeing-Vertol to manufacture the new light rail vehicle.","property":"other","value_text":"contract with Boeing-Vertol","t_from":"1976","quote":"they contracted with the aerospace firm of Boeing-Vertol to manufacture the new vehicle. That vehicle subsequently became the standard light rail vehicle (LRV) for the U.S.","anchor":"s-af5f9ddacd55","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"they contracted with the aerospace firm of Boeing-Vertol to manufacture the new vehicle"},{"claim_id":"c:20d9ab050e1fb40cb5195367bf58a418","page_id":"c124892967:39","page_url":"https://archive.org/details/c124892967/page/n38","statement_kind":"finding","subject_label":"Powell Street traffic closure","summary":"Powell Street between Market and Ellis Streets is now closed to all traffic except cable cars and service vehicles.","property":"other","value_text":"closed to all traffic except cable cars and service vehicles","t_from":"1976","quote":"Powell Street, between Market and Ellis Streets, is now closed to all traffic except cable cars and service vehicles.","place_label":"Powell Street between Market and Ellis Streets","place_precision":"street_segment","place_id":"qipu:sf/place/street/powell-st","resolved_by":"place links file","anchor":"s-20d9ab050e1f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Powell Street, between Market and Ellis Streets, is now closed"},{"claim_id":"c:e6f44c2b9d075def5a7b185c0abdefaa","page_id":"c124892967:39","page_url":"https://archive.org/details/c124892967/page/n38","statement_kind":"cites_decision","subject_label":"Market Street reconstruction bond","summary":"Voters approved a $31 million (≈ $300.1 million in 2026 dollars) bond issue to reconstruct and beautify Market Street from the Ferry Building to the Central Freeway.","property":"approved","value_text":"$31 million bond issue","value_num":31000000.0,"unit":"USD","date_printed":"June 1968","t_from":"1968","quote":"approved a $31 million bond issue to implement the reconstruction and beautification of Market Street from the Ferry Building to the Central Freeway.","place_label":"Market Street from the Ferry Building to the Central Freeway","place_precision":"building","anchor":"s-e6f44c2b9d07","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"In June 1968 the voters of San Francisco approved a $31 million bond issue"},{"claim_id":"c:eaae5f19ed001845d6ea90092b5ba7dc","page_id":"c124892967:39","page_url":"https://archive.org/details/c124892967/page/n38","statement_kind":"finding","subject_label":"Transbay Terminal pedestrian volume","summary":"Over 20,000 people exit the Transbay Terminal each morning toward downtown destinations.","property":"population","value_text":"over 20,000 people each morning","value_num":20000.0,"unit":"persons","t_from":"1976","quote":"Over 20,000 people exit the Transbay Terminal each morning toward downtown destinations.","place_label":"Transbay Terminal","place_precision":"intersection","anchor":"s-eaae5f19ed00","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Over 20,000 people exit the Transbay Terminal each morning"},{"claim_id":"c:ec014295b8951a773825344d7f8c8ef0","page_id":"c124892967:39","page_url":"https://archive.org/details/c124892967/page/n38","statement_kind":"proposal","subject_label":"Downtown pedestrian and traffic separation","summary":"The Urban Design Plan does not recommend continuing the separation of traffic and pedestrians for the rest of downtown.","property":"recommendation","t_from":"1976","quote":"the Urban Design Plan does not recommend continuance of this practice for the rest of downtown.","place_label":"downtown","anchor":"s-ec014295b895","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the Urban Design Plan does not recommend continuance of this practice"},{"claim_id":"c:8995b3e7f93355990481bef001063bbe","page_id":"c124892967:43","page_url":"https://archive.org/details/c124892967/page/n42","statement_kind":"finding","subject_label":"Golden Gate Transit local Marin routes","summary":"GGT operates ten local Marin County routes, five of which travel to San Francisco in off-peak hours.","property":"other","value_text":"ten local routes, five to San Francisco off-peak","value_num":10.0,"t_from":"1976","quote":"Serving Marin, southern Sonoma, and San Francisco counties, GGT operates ten local","anchor":"s-8995b3e7f933","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Serving Marin, southern Sonoma, and San Francisco counties, GGT operates ten local"},{"claim_id":"c:075849b702b55398a01cc8cb52a40436","page_id":"c124892967:47","page_url":"https://archive.org/details/c124892967/page/n46","statement_kind":"cites_decision","subject_label":"Embarcadero Freeway study","summary":"The Board of Supervisors adopted Resolution No. 828-73, requesting a short-term study of Embarcadero Freeway alternatives.","property":"adopted","value_text":"Resolution No. 828-73","date_printed":"December 10, 1973","t_from":"1973","quote":"Resolution No. 828-73 adopted December 10, 1973, requested the Department of City Planning to undertake a short-term study","decided_by":"Board of Supervisors","instrument_kind":"resolution","instrument_printed":"828-73","instrument_date_printed":"December 10, 1973","place_label":"Embarcadero Freeway","place_precision":"area","place_id":"qipu:sf/place/freeway/embarcadero-freeway","resolved_by":"place links file","anchor":"s-075849b702b5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Resolution No. 828-73 adopted December 10, 1973, requested the Department of City Planning","links":[{"show_target_kind":"decision","show_target_id":"qipu:sf/decision/journalofproceed68sanfrich|g4430","show_url":"https://data.qipu.org/usa/san-francisco/record/?id=qipu%3Asf%2Fdecision%2Fjournalofproceed68sanfrich%7Cg4430"}]},{"claim_id":"c:5418134698a85816bdb5f985de9fbe97","page_id":"c124892967:47","page_url":"https://archive.org/details/c124892967/page/n46","statement_kind":"background","subject_label":"Embarcadero Freeway demolition","summary":"A series of Board of Supervisors resolutions since 1965 have called for demolition of the Embarcadero Freeway.","property":"other","value_text":"demolition called for since 1965","value_num":1965.0,"date_printed":"since 1965","t_from":"1965","quote":"A series of Board of Supervisors resolutions since 1965 have called for the demolition of the Embarcadero Freeway.","place_label":"Embarcadero Freeway","place_precision":"area","place_id":"qipu:sf/place/freeway/embarcadero-freeway","resolved_by":"place links file","anchor":"s-5418134698a8","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"A series of Board of Supervisors resolutions since 1965 have called for the demolition"},{"claim_id":"c:9bb578386603d1e8d42b0876fd0453e0","page_id":"c124892967:47","page_url":"https://archive.org/details/c124892967/page/n46","statement_kind":"proposal","subject_label":"Embarcadero Area transportation study","summary":"The November 1974 study recommends improvements in the Embarcadero area combined with demolition of the freeway.","property":"recommendation","value_text":"improvements combined with freeway demolition","date_printed":"November 1974","t_from":"1974","quote":"resulted in recommendations for improvements in the area combined with demolition of the freeway","place_label":"Embarcadero Area","place_precision":"area","anchor":"s-9bb578386603","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The study, entitled A Transportation System for the Embarcadero Area resulted in recommendations"},{"claim_id":"c:d7c45ea4422b42136f10d6bff10de4b3","page_id":"c124892967:47","page_url":"https://archive.org/details/c124892967/page/n46","statement_kind":"finding","subject_label":"Justin Herman Plaza","summary":"The study reports that the use and value of Justin Herman Plaza are impaired by its location under the freeway.","property":"other","value_text":"use and value impaired by freeway","t_from":"1976","quote":"But the use and value of the Plaza are impaired by the fact that it must stand in the shadow of the freeway","place_label":"Justin Herman Plaza and Park","anchor":"s-d7c45ea4422b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"But the use and value of the Plaza are impaired by the fact"},{"claim_id":"c:24a79365563097b7caccc3f026b6167d","page_id":"c124892967:49","page_url":"https://archive.org/details/c124892967/page/n48","statement_kind":"finding","subject_label":"Exclusive bus lanes","summary":"Exclusive bus lanes currently exist at the Bay Bridge Toll Plaza and on I-280 southbound.","property":"other","value_text":"exclusive bus lanes exist","t_from":"1976","quote":"Currently, exclusive bus lanes exist at the Bay Bridge Toll Plaza; on 1-280 southbound, between 6th Street off-ramp and U.S. Route 101","place_label":"Bay Bridge Toll Plaza","anchor":"s-24a793655630","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Currently, exclusive bus lanes exist at the Bay Bridge Toll Plaza"},{"claim_id":"c:5a734f730ae7bca432838183f3e4e539","page_id":"c124892967:49","page_url":"https://archive.org/details/c124892967/page/n48","statement_kind":"finding","subject_label":"Caltrans vanpool fleet","summary":"The California Department of Transportation operates a fleet of vans assigned to employees who carpool to work.","property":"other","value_text":"fleet of vans for employees","t_from":"1976","quote":"The California Department of Transportation, including District Four offices in San. Francisco, currently operates a fleet of vans which are assigned to employees","anchor":"s-5a734f730ae7","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Multiple-Occupancy Vehicles. The California Department of Transportation, including District Four offices"},{"claim_id":"c:b247e50574e8011986f734a5f4aad34d","page_id":"c124892967:49","page_url":"https://archive.org/details/c124892967/page/n48","statement_kind":"finding","subject_label":"AC Transit transbay ridership","summary":"AC Transit transbay ridership decreased 28.5 percent between February 1974 and February 1975.","property":"other","value_text":"decreased 28.5 percent","value_num":28.5,"unit":"percent","date_printed":"February 1974 to February 1975","t_from":"1974","quote":"Between February 1974 and February 1975, AC transbay ridership decreased 28.5 percent, resulting in a reduction in runs of 13 percent.","anchor":"s-b247e50574e8","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Between February 1974 and February 1975, AC transbay ridership decreased 28.5 percent"},{"claim_id":"c:c1ed97315c15a1cce20aa0cec1117169","page_id":"c124892967:49","page_url":"https://archive.org/details/c124892967/page/n48","statement_kind":"finding","subject_label":"BART transbay patronage","summary":"BART total system patronage as of May 1976 is estimated at 123,000 trips per day.","property":"other","value_text":"123,000 trips per day","value_num":123000.0,"unit":"persons","date_printed":"May 1976","t_from":"1976","quote":"BART total system patronage as of May 1976 is estimated at 123,000 trips per day; Transbay runs account for 50,000","anchor":"s-c1ed97315c15","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"BART total system patronage as of May 1976 is estimated at 123,000 trips per day"},{"claim_id":"c:ebfcfdbbaccee2a891d7f560fd0eba51","page_id":"c124892967:49","page_url":"https://archive.org/details/c124892967/page/n48","statement_kind":"finding","subject_label":"Vanpool program on Golden Gate Bridge","summary":"The GGBHTD has recently instituted a vanpool program allowing registered vans to cross the bridge free during commute hours.","property":"other","value_text":"vanpool program, free crossing in commute hours","t_from":"1976","quote":"The GGBHTD has recently instituted a vanpool program on the Golden Gate Bridge, whereby registered vans","place_label":"Golden Gate Bridge","anchor":"s-ebfcfdbbacce","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The GGBHTD has recently instituted a vanpool program on the Golden Gate Bridge"},{"claim_id":"c:0909ed12f5d75929ed2ddcba74d68405","page_id":"c124892967:61","page_url":"https://archive.org/details/c124892967/page/n60","statement_kind":"finding","subject_label":"Employer outreach on staggered work hours","summary":"Seminars on staggered work hours have been attended by over 185 San Francisco firms.","property":"event","value_text":"over 185 firms","value_num":185.0,"t_from":"1976","quote":"The sessions have been attended by over 185 different firms located within San Francisco.","place_label":"San Francisco","anchor":"s-0909ed12f5d7","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"Greater San Francisco Chamber of Commerce","stance":"quotes_to_report","speaker_evidence":"The sessions have been attended by over 185 different firms"},{"claim_id":"c:27319036257c2c561fe9afc2795ebbd8","page_id":"c124892967:61","page_url":"https://archive.org/details/c124892967/page/n60","statement_kind":"finding","subject_label":"Downtown parking supply","summary":"The report finds about 8,097 on-street and 64,820 off-street parking spaces in the downtown area.","property":"other","value_text":"8,097 on-street; 64,820 off-street","value_num":64820.0,"t_from":"1976","quote":"There are currently approximately 8,097 on-street spaces, and 64,820 off-street parking spaces available in the downtown area","place_label":"downtown area","anchor":"s-27319036257c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"There are currently approximately 8,097 on-street spaces"},{"claim_id":"c:827837fdcd5e64d3e83c4a13c334b997","page_id":"c124892967:61","page_url":"https://archive.org/details/c124892967/page/n60","statement_kind":"finding","subject_label":"City Parking Authority garages and lots","summary":"The City's Parking Authority owns eleven downtown garages and lots with 6,398 spaces.","property":"owned_by_city","value_text":"eleven garages and lots, 6,398 spaces","value_num":6398.0,"t_from":"1976","quote":"The City's Parking Authority owns eleven parking garages and lots in the downtown area.","place_label":"downtown area","anchor":"s-827837fdcd5e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The City's Parking Authority owns eleven parking garages and lots"},{"claim_id":"c:8da295bbcd4dab23ffd8715cf04052e4","page_id":"c124892967:61","page_url":"https://archive.org/details/c124892967/page/n60","statement_kind":"background","subject_label":"Staggered work hours concept","summary":"Staggered work hours alter the traditional 8:00 a.m. to 5:00 p.m. work pattern to spread peak demand.","property":"other","t_from":"1976","quote":"Staggered Work Hours, an idea introduced recently, is a concept whereby the traditional 8:00 a.m. to 5:00 p.m. work pattern is altered","anchor":"s-8da295bbcd4d","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Staggered Work Hours, an idea introduced recently, is a concept"},{"claim_id":"c:94093ce1f09798cbc8206997484f9659","page_id":"c124892967:61","page_url":"https://archive.org/details/c124892967/page/n60","statement_kind":"finding","subject_label":"Growth in downtown off-street parking since 1965","summary":"Off-street parking spaces downtown increased from 49,610 in 1965 to about 64,820.","property":"other","value_text":"increase of about 15,210 spaces over 10 years","value_num":15210.0,"date_printed":"1965","t_from":"1965","quote":"Compared with a total of 49,610 off-street spaces in 1965, this is an increase of I e210 Spaces over a 10 year period","place_label":"downtown area","anchor":"s-94093ce1f097","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Compared with a total of 49,610 off-street spaces in 1965"},{"claim_id":"c:ba0ece23bd7947a66f681ea7b1c2ba1f","page_id":"c124892967:61","page_url":"https://archive.org/details/c124892967/page/n60","statement_kind":"finding","subject_label":"Long-term parkers","summary":"Most recent data show 53 percent of parkers stayed more than 4 hours.","property":"other","value_text":"53 percent long-term parkers","value_num":53.0,"unit":"percent","t_from":"1976","quote":"The most recent data available shows 53 percent of all parkers parked for more than 4 hours (long-term).","anchor":"s-ba0ece23bd79","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The most recent data available shows 53 percent of all parkers"},{"claim_id":"c:dfbc8e88d3db5fdeec2ed4daaa3c1456","page_id":"c124892967:61","page_url":"https://archive.org/details/c124892967/page/n60","statement_kind":"proposal","subject_label":"Planned downtown off-street parking additions","summary":"About 3,000 new off-street spaces would be added in five years if proposed projects are built.","property":"proposes","value_text":"approximately 3,000 new off-street spaces","value_num":3000.0,"date_printed":"next five years","t_from":"1976","quote":"Approximately 3,000 new off-street parking spaces will be added in the next five years if proposed projects previously approved or in the review process are built.","place_label":"downtown area","anchor":"s-dfbc8e88d3db","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Approximately 3,000 new off-street parking spaces will be added"},{"claim_id":"c:3a709fb9874603585864f752f54deee3","page_id":"c124892967:77","page_url":"https://archive.org/details/c124892967/page/n76","statement_kind":"proposal","subject_label":"Transit equipment program: 80 rail cars","summary":"The transit equipment program includes purchase of 80 articulated rail transit cars.","property":"proposes","value_text":"80 articulated rail transit cars","value_num":28000000.0,"unit":"USD","t_from":"1976","quote":"Purchase of 80 articulated rail transit cars 28,000,000","anchor":"s-3a709fb98746","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"TRANSIT EQUIPMENT PROGRAM Project Item Amount"},{"claim_id":"c:f5aaaef8449eb56b931377734b53f7b6","page_id":"c124892967:77","page_url":"https://archive.org/details/c124892967/page/n76","statement_kind":"proposal","subject_label":"Transit equipment program: 400 buses","summary":"The transit equipment program includes purchase of 400 radio-equipped transit buses.","property":"proposes","value_text":"400 buses","value_num":15698524.0,"unit":"USD","t_from":"1976","quote":"Purchase of 400 48 passenger radio-equipped transit buses $ 15,698,524","anchor":"s-f5aaaef8449e","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"TRANSIT EQUIPMENT PROGRAM Project Item Amount"},{"claim_id":"c:fe48fd474c83131614e82c19aad74039","page_id":"c124892967:77","page_url":"https://archive.org/details/c124892967/page/n76","statement_kind":"proposal","subject_label":"Transit equipment program: 210 trolley coaches","summary":"The transit equipment program includes purchase of 210 electric trolley coaches.","property":"proposes","value_text":"210 electric trolley coaches","value_num":16634976.0,"unit":"USD","t_from":"1976","quote":"Purchase of 210 electric trolley coaches 16,634,976","anchor":"s-fe48fd474c83","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Purchase of 210 electric trolley coaches 16,634,976"}]}