{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124895686","url":"https://data.qipu.org/usa/san-francisco/reports/c124895686/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124895686/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124895686","source_id":"C124895686","title":"Muni J Line connection project, San Francisco, California : draft environmental impact statement","year":1982,"n_pages":204,"creator":null,"source_url":"https://archive.org/details/C124895686","issuer":"U.S. Department of Transportation, Urban Mass Transportation Administration","issuer_type":"government","gov_level":"federal","prepared_by":null,"doc_kind":"eir","jurisdiction":"United States","jurisdiction_id":"us","city":null,"issuer_by":"model","doc_kind_by":"meta","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":14,"statements_total":41,"statements_by_kind":{"finding":15,"proposal":25,"cites_decision":0,"background":1},"same_for_every_statement":{"source_id":"C124895686","source_url":"https://archive.org/details/C124895686","source_label":"IGS library: Muni J Line connection project, San Francisco, California : draft environmental impact statement","report_year":1982,"issuer":"U.S. Department of Transportation, Urban Mass Transportation Administration","issuer_type":"government","doc_kind":"eir","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-claims-20p-haiku55-cli-2026-10-23","city":"sf","prompt_version":"igs-sf-claims-cli-v1"},"summary":{"what":"A draft environmental impact statement by the U.S. Department of Transportation on routes for connecting the J-Church Muni line to Metro Center.","figures":[{"label":"Cost","value":"$17,400,000 construction capital","claim_ids":["c:7e22748a1003b742db11a1b3827697e0"]},{"label":"Length","value":"3.3 miles","page_url":"https://archive.org/details/C124895686/page/n7","quote":"would be 3.3 miles in length"},{"label":"Daily riders","value":"1,500-1,800 additional riders","claim_ids":["c:42fef2b25ee048a59e0bc409a82c6a9d"]}],"main_points":["c:63f97e858f2b8b2ee716542b26539f15","c:156ae2d1ae7c9a0f2fe58e985fdaeb74","c:611990c008bf33f6045f115e9b8d31a1"],"board_decisions_after":[],"board_decisions_before":[],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:5d612e2b3e9dcc88bb5a7fb8bab42ce5","page_id":"C124895686:5","page_url":"https://archive.org/details/C124895686/page/n4","statement_kind":"proposal","subject_label":"Muni J Line Connection alternatives","summary":"The draft EIS evaluates three build alternatives for the J Line connection, plus a no-build alternative.","property":"alternative","value_text":"three build alternatives","value_num":3.0,"t_from":"1982","quote":"The three build alternatives are the San Jose Alignment, the Monterey Boulevard Alignment and the Mission Street Alignment.","place_label":"San Jose and Ocean Avenues to 30th and Church Streets","place_precision":"segment","anchor":"s-5d612e2b3e9d","shown":false,"hidden":"cover_or_contents","part":"cover_or_contents","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"ABSTRACT: This report documents environmental impacts of three alternative alignments"},{"claim_id":"c:8dee0cbaeda333f9c884377e5a1a0ff2","page_id":"C124895686:5","page_url":"https://archive.org/details/C124895686/page/n4","statement_kind":"proposal","subject_label":"Muni J Line Connection draft EIS public hearing","summary":"The draft EIS states that a public hearing will be held on December 16, 1982.","property":"event","value_text":"December 16, 1982","date_printed":"December 16, 1982","t_from":"1982","quote":"A public hearing will be held on December 16, 1982.","place_label":"San Francisco","place_precision":"city","anchor":"s-8dee0cbaeda3","shown":false,"hidden":"cover_or_contents","part":"cover_or_contents","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"A public hearing will be held on December 16, 1982."},{"claim_id":"c:63f97e858f2b8b2ee716542b26539f15","page_id":"C124895686:7","page_url":"https://archive.org/details/C124895686/page/n6","statement_kind":"proposal","subject_label":"Muni J Line Connection","summary":"Muni proposes to connect the J-Church line terminal at 30th and Church Streets with the Muni Metro Center at Ocean and San Jose Avenues.","property":"proposes","value_text":"connection to Muni Metro Center","t_from":"1982","quote":"Muni proposes to connect the present terminal of the J-Church streetcar line at 30th and Church Streets with the Muni Metro Center at Ocean and San Jose Avenues.","place_label":"30th and Church Streets","place_precision":"intersection","place_id":"qipu:sf/place/street/30th-st","resolved_by":"place links file","anchor":"s-63f97e858f2b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"SUMMARY B. PROJECT DESCRIPTION Muni proposes to connect"},{"claim_id":"c:9c9448ccffe39dd84a7b335f603a5ff2","page_id":"C124895686:7","page_url":"https://archive.org/details/C124895686/page/n6","statement_kind":"proposal","subject_label":"Muni J Line Connection purpose","summary":"Muni states the project would link the Mission District with the southern portion of the City.","property":"other","value_text":"Mission District to southern City","t_from":"1982","quote":"Revenue service would provide a connection linking the Mission District with the southern portion of the City.","place_label":"San Francisco","place_precision":"city","anchor":"s-9c9448ccffe3","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"San Francisco Municipal Railway (Muni)","stance":"own_position","speaker_evidence":"The San Francisco Municipal Railway (Muni) has determined that the J Line Connection project is needed"},{"claim_id":"c:eb5b76cc9dedab208bb042c0ccc5ea93","page_id":"C124895686:7","page_url":"https://archive.org/details/C124895686/page/n6","statement_kind":"proposal","subject_label":"Muni J and M lines interlining","summary":"Muni proposes to interline the J and M lines to form a loop route.","property":"proposes","value_text":"loop route","t_from":"1982","quote":"Muni also proposes operationally to interline the J and M lines to form a loop route.","place_label":"San Francisco","place_precision":"city","anchor":"s-eb5b76cc9ded","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Muni also proposes operationally to interline the J and M lines"},{"claim_id":"c:e327d4f94812f1cbfdbe8401a5dbec32","page_id":"C124895686:34","page_url":"https://archive.org/details/C124895686/page/n33","statement_kind":"finding","subject_label":"Monterey Blvd. alignment historic landmark","summary":"The Monterey Blvd. alignment passes by a city landmark at 236 Monterey Blvd. (Sunnyside Conservatory).","property":"other","value_text":"city landmark","t_from":"1982","quote":"Passes by a city landmark at 236 Monterey Blvd.","place_label":"236 Monterey Blvd.","place_precision":"address","place_id":"qipu:sf/place/address/eas-407187","resolved_by":"place links file","anchor":"s-e327d4f94812","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"TABLE 1. COMPARISON OF ALTERNATIVES (Continued)"},{"claim_id":"c:25fb711c1e9595ae1ccdf555b72d67ff","page_id":"C124895686:35","page_url":"https://archive.org/details/C124895686/page/n34","statement_kind":"finding","subject_label":"J Line alignments transit benefit","summary":"The document finds any proposed route would marginally reduce dependence on the private automobile.","property":"other","value_text":"marginal reduction in auto dependence","t_from":"1982","quote":"Any of the proposed routes would marginally help to reduce dependence on the private automobile","place_label":"San Francisco","place_precision":"city","anchor":"s-25fb711c1e95","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Any of the proposed routes would marginally help to reduce dependence on the private automobile"},{"claim_id":"c:29f68e7a1e74146712b5683cc3736ad6","page_id":"C124895686:35","page_url":"https://archive.org/details/C124895686/page/n34","statement_kind":"finding","subject_label":"J Line alignments consistency with plans","summary":"The document finds all alignments under consideration conform generally to the Transportation Element of the San Francisco Comprehensive Plan.","property":"other","value_text":"conforms generally","t_from":"1982","quote":"All alignments under consideration conform generally to the policies of the Transportation Element of the San Francisco Comprehensive Plan","place_label":"San Francisco","place_precision":"city","anchor":"s-29f68e7a1e74","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"All alignments under consideration conform generally to the policies of the Transportation Element"},{"claim_id":"c:611990c008bf33f6045f115e9b8d31a1","page_id":"C124895686:35","page_url":"https://archive.org/details/C124895686/page/n34","statement_kind":"finding","subject_label":"J Line alignments historic resources","summary":"The document finds none of the alignments would affect designated landmarks, known archaeological sites, or National Register-eligible properties.","property":"other","value_text":"no effect on historic resources","t_from":"1982","quote":"None of the alignments would affect any designated landmark or known archaeological site or properties on or eligible for the National Register at Historic Places.","place_label":"San Francisco","place_precision":"city","anchor":"s-611990c008bf","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"None of the alignments would affect any designated landmark or known archaeological site"},{"claim_id":"c:ab01a4090f1674979bbacc07699f088d","page_id":"C124895686:35","page_url":"https://archive.org/details/C124895686/page/n34","statement_kind":"finding","subject_label":"J Line alignments consistency with Muni plan","summary":"The document finds the alignments conform generally to the Muni 5-year (1980-1985) Plan.","property":"other","value_text":"conforms generally","date_printed":"1980-1985","t_from":"1980","quote":"the Muni 5-year (1980-1985) Plan","place_label":"San Francisco","place_precision":"city","anchor":"s-ab01a4090f16","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"All alignments under consideration conform generally to the policies of the Transportation Element"},{"claim_id":"c:f2d78b35a4bc4f11e7836b485d72f679","page_id":"C124895686:35","page_url":"https://archive.org/details/C124895686/page/n34","statement_kind":"finding","subject_label":"J Line alignments displacement","summary":"The document finds none of the proposed alignments would displace or relocate businesses or residential structures.","property":"other","value_text":"no displacement","t_from":"1982","quote":"None of the proposals would displace or relocate businesses or residential structures.","place_label":"San Francisco","place_precision":"city","anchor":"s-f2d78b35a4bc","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"None of the proposals would displace or relocate businesses or residential structures."},{"claim_id":"c:f3ee122b7a9d4a347d8225f815afd7ce","page_id":"C124895686:35","page_url":"https://archive.org/details/C124895686/page/n34","statement_kind":"finding","subject_label":"J Line alignments environmental impacts","summary":"The document finds air quality, vegetation, noise and vibration impacts would be similar and practically unmeasurable for each alignment.","property":"other","value_text":"similar and practically unmeasurable","t_from":"1982","quote":"impacts on air quality and vegetation and impacts from noise and vibration would be similar and practically unmeasurable for each proposed alignment","place_label":"San Francisco","place_precision":"city","anchor":"s-f3ee122b7a9d","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Impacts on air quality and vegetation and impacts from noise and vibration would be similar"},{"claim_id":"c:426b2d0738a8d8ba5abb2c3463e2d584","page_id":"C124895686:50","page_url":"https://archive.org/details/C124895686/page/n49","statement_kind":"finding","subject_label":"Street lighting power delivery","summary":"The report states that street lamps powered by Hetch Hetchy are delivered through the PG&E distribution system.","property":"other","value_text":"delivered via PG&E distribution","t_from":"1982","quote":"However, the power is delivered through the PG&E distribution system.","place_label":"San Francisco citywide electricity service","place_precision":"city","anchor":"s-426b2d0738a8","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Street lamps along the alignments are powered by Hetch Hetchy"},{"claim_id":"c:6ac4aff78c14cedd7020ddf280699879","page_id":"C124895686:50","page_url":"https://archive.org/details/C124895686/page/n49","statement_kind":"finding","subject_label":"Mountain View Landfill contract","summary":"The report states the disposal company's contract for the Mountain View Landfill expires in October 1983.","property":"other","value_text":"expires October 1983","t_from":"1982","quote":"The disposal company has a contract for the landfill site which expires in October 1983","place_label":"Mountain View Landfill, San Francisco solid waste","place_precision":"city","anchor":"s-6ac4aff78c14","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The disposal company has a contract for the landfill site which expires in October 1983"},{"claim_id":"c:08af52c23e5ed3c49c1c56d4093eb499","page_id":"C124895686:65","page_url":"https://archive.org/details/C124895686/page/n64","statement_kind":"proposal","subject_label":"Muni 5-Year Plan, 26 line reroute","summary":"The report notes [name withheld] 5-Year Plan would move the 26 line from Valencia to Guerrero, if adopted; the plan is not yet adopted.","property":"proposes","value_text":"proposed move of 26 line to Guerrero","t_from":"1982","quote":"If the 5-year Plan to move the 26 line from Valencia to Guerrero in the Inner Mission is adopted","place_label":"Valencia Street to Guerrero Street, Inner Mission, San Francisco","place_precision":"intersection","place_id":"qipu:sf/place/street/valencia-st","resolved_by":"place links file","anchor":"s-08af52c23e5e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Muni 5-year Plan section, issuer's own narrative on route changes"},{"claim_id":"c:3faef4c81f1cc03d212e3ccd0834e948","page_id":"C124895686:65","page_url":"https://archive.org/details/C124895686/page/n64","statement_kind":"finding","subject_label":"24-Divisadero route change","summary":"The report states that January 1982 route changes connected the 24-Divisadero line south and east on Cortland Avenue.","property":"other","value_text":"route change January 1982","date_printed":"January 1982","t_from":"1982","quote":"the connection of the 24-Divisadero south and east on Cortland Avenue","place_label":"Cortland Avenue, Bernal Heights, San Francisco","place_precision":"street","place_id":"qipu:sf/place/street/cortland-ave","resolved_by":"place links file","anchor":"s-3faef4c81f1c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The January 1982 route changes relating to the J Line Connection Corridor include"},{"claim_id":"c:5191ac6ddfe055e43f6b2f3709db37fd","page_id":"C124895686:65","page_url":"https://archive.org/details/C124895686/page/n64","statement_kind":"finding","subject_label":"J Line Connection corridor transit patronage","summary":"The study reports patronage of 21,000 Muni boardings and 8,000 BART boardings, a total of 29,000, paralleling the J line.","property":"population","value_text":"29,000 boardings","value_num":29000.0,"unit":"persons","t_from":"1982","quote":"total 21,000 boardings for Muni and 8,000 boardings for BART, for a grand total of 29,000 boardings.","place_label":"J Line Connection corridor, San Francisco","place_precision":"area","anchor":"s-5191ac6ddfe0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"HI. Affected Environment/Environmental Setting, boardings total narrative"},{"claim_id":"c:7837dd9e2a9cd7972b4048e1e9124e27","page_id":"C124895686:65","page_url":"https://archive.org/details/C124895686/page/n64","statement_kind":"finding","subject_label":"26X bus route","summary":"The report states the 26X bus route has been discontinued because the M line and BART drew away its patronage.","property":"other","value_text":"discontinued","t_from":"1982","quote":"The M line and BART have attracted so much patronage away from the 26X that it has been discontinued.","place_label":"26X route, San Francisco","place_precision":"street","anchor":"s-7837dd9e2a9c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"c. Muni 5-year Plan, issuer's narrative on the 26X"},{"claim_id":"c:1d612e2b16e500855aadc8326a0cadb2","page_id":"C124895686:94","page_url":"https://archive.org/details/C124895686/page/n93","statement_kind":"proposal","subject_label":"J Line Connection, Monterey Boulevard Alignment","summary":"The study says six-minute headways on the full J line would require six additional vehicles plus a spare under the Monterey Boulevard alignment.","property":"other","value_text":"six additional vehicles plus a spare","value_num":6.0,"t_from":"1982","quote":"If six-minute headways were maintained the entire length of the J line, an additional six vehicles would be needed (plus a spare).","place_label":"Monterey Boulevard alignment, San Francisco","place_precision":"segment","anchor":"s-1d612e2b16e5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"IV. Environ. Consequences/Impacts & Mitigation Measures"},{"claim_id":"c:7e22748a1003b742db11a1b3827697e0","page_id":"C124895686:94","page_url":"https://archive.org/details/C124895686/page/n93","statement_kind":"proposal","subject_label":"J Line Connection, Monterey Boulevard Alignment","summary":"The study estimates total construction capital costs for the Monterey Boulevard alignment at $17,400,000 (≈ $60.8 million in 2026 dollars).","property":"cost_usd","value_text":"$17,400,000","value_num":17400000.0,"unit":"USD","t_from":"1982","quote":"Total costs are thus estimated to be $17,400,000.","place_label":"Monterey Boulevard alignment, San Francisco","place_precision":"segment","anchor":"s-7e22748a1003","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Monterey Boulevard Alignment. Construction capital cost estimates"},{"claim_id":"c:9d52312d87920b6bb20440ac415ac9f9","page_id":"C124895686:94","page_url":"https://archive.org/details/C124895686/page/n93","statement_kind":"proposal","subject_label":"J Line Connection, Mission Street Alignment","summary":"The study estimates total construction capital cost for the Mission Street alignment at $14,300,000 (≈ $49.9 million in 2026 dollars).","property":"cost_usd","value_text":"$14,300,000","value_num":14300000.0,"unit":"USD","t_from":"1982","quote":"the total construction capital cost is estimated to be $14,300,000.","place_label":"Mission Street alignment, San Francisco","place_precision":"segment","anchor":"s-9d52312d8792","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Mission Street Alignment. This route appears to be fairly straightforward"},{"claim_id":"c:de2a4aacca3a028bd4630f8a2586c669","page_id":"C124895686:94","page_url":"https://archive.org/details/C124895686/page/n93","statement_kind":"proposal","subject_label":"J Line Connection, San Jose Avenue Alignment","summary":"The study estimates total construction capital costs for the San Jose Avenue alignment at $10,900,000 (≈ $38.1 million in 2026 dollars).","property":"cost_usd","value_text":"$10,900,000","value_num":10900000.0,"unit":"USD","t_from":"1982","quote":"Total construction capital costs are estimated to be $10,900,000.","place_label":"San Jose Avenue alignment, San Francisco","place_precision":"segment","anchor":"s-de2a4aacca3a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"San Jose Avenue Alignment. Estimated construction capital costs include a contingency"},{"claim_id":"c:10bcefb04f531cd2da790b0d9a63f94f","page_id":"C124895686:109","page_url":"https://archive.org/details/C124895686/page/n108","statement_kind":"proposal","subject_label":"J Line Connection, outside-lane subalternative","summary":"The study says outbound trains' right-turn movement would be prohibited during the Monterey Boulevard westbound off-ramp phase under the outside-lane subalternative.","property":"proposes","value_text":"right-turn movement prohibited during off-ramp phase","t_from":"1982","quote":"this movement would be prohibited during the Monterey Boulevard off-ramp (westbound) phase","place_label":"Circular Avenue/Monterey Boulevard/I-280 ramp intersection, San Francisco","place_precision":"intersection","place_id":"qipu:sf/place/street/circular-ave","resolved_by":"place links file","anchor":"s-10bcefb04f53","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"IV. Environ. Consequences/Impacts & Mitigation Measures"},{"claim_id":"c:e97420d2c30e37a3bb32806277e17fc7","page_id":"C124895686:109","page_url":"https://archive.org/details/C124895686/page/n108","statement_kind":"proposal","subject_label":"J Line Connection, Circular Avenue inbound station","summary":"The study proposes that the inbound station at Circular Avenue and Diamond Street would sit on the San Jose Avenue on-ramp.","property":"proposes","value_text":"inbound station on San Jose Avenue on-ramp","t_from":"1982","quote":"The inbound station at Circular Avenue and Diamond Street would be on the San Jose Avenue on-ramp","place_label":"Circular Avenue and Diamond Street, San Francisco","place_precision":"intersection","place_id":"qipu:sf/place/street/circular-ave","resolved_by":"place links file","anchor":"s-e97420d2c30e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The inbound station at Circular Avenue and Diamond Street would be on the San Jose Avenue on-ramp"},{"claim_id":"c:f910dde83cf13490ffbc43de657c1e05","page_id":"C124895686:109","page_url":"https://archive.org/details/C124895686/page/n108","statement_kind":"proposal","subject_label":"J Line Connection, San Jose Avenue ramps","summary":"The study projects that losing a lane at both ramps would change the level of service from A to B.","property":"other","value_text":"level of service A to B","t_from":"1982","quote":"At both ramps the loss of a lane would change the level of service from A to B.","place_label":"Circular Avenue/Monterey Boulevard, San Francisco","place_precision":"intersection","place_id":"qipu:sf/place/street/circular-ave","resolved_by":"place links file","anchor":"s-f910dde83cf1","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"At both ramps the loss of a lane would change the level of service from A to B."},{"claim_id":"c:0632f289b9a9ea3e17e24892f3e8c691","page_id":"C124895686:110","page_url":"https://archive.org/details/C124895686/page/n109","statement_kind":"proposal","subject_label":"J Line Connection, median lane subalternative at I-280 ramp","summary":"The median lane subalternative would require a special fourth signal phase at the Circular Avenue intersection, replacing the Circular Avenue green phase.","property":"proposes","value_text":"special fourth signal phase","t_from":"1982","quote":"Outbound LRVs would require a special fourth signal phase, which would be substituted for the Circular Avenue green phase.","place_label":"Circular Avenue/Monterey Boulevard/I-280 ramp intersection","place_precision":"intersection","place_id":"qipu:sf/place/street/circular-ave","resolved_by":"place links file","anchor":"s-0632f289b9a9","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"IV. Environ. Consequences/Impacts & Mitigation Measures"},{"claim_id":"c:2fefa79124ae0126077771afd04ea1ad","page_id":"C124895686:110","page_url":"https://archive.org/details/C124895686/page/n109","statement_kind":"proposal","subject_label":"J Line Connection, Gennessee Street alternative","summary":"The draft proposes removing parking on one side of Gennessee Street for two-way LRV operation, with a loss of 32 spaces.","property":"proposes","value_text":"32 parking spaces","value_num":32.0,"unit":"parking spaces","t_from":"1982","quote":"Two-way LRV operation on Gennessee Street would require removing parking from one side of the street between Monterey Boulevard and Staples Avenue","place_label":"Gennessee Street between Monterey Boulevard and Staples Avenue","place_precision":"street_segment","place_id":"qipu:sf/place/street/gennessee-st","resolved_by":"place links file","anchor":"s-2fefa79124ae","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"IV. Environ. Consequences/Impacts & Mitigation Measures"},{"claim_id":"c:7090b6865b3099d12b827a5bab6e27f7","page_id":"C124895686:110","page_url":"https://archive.org/details/C124895686/page/n109","statement_kind":"proposal","subject_label":"J Line Connection, Monterey Boulevard car stops","summary":"Muni prefers to install 150-foot loading islands at car stops on four-lane streets to accommodate two-car trains.","property":"proposes","value_text":"150-foot-long loading islands","value_num":150.0,"unit":"ft","t_from":"1982","quote":"On four-lane streets, Muni prefers to install 150-foot-long loading islands to accommodate two-car trains.","place_label":"Monterey Boulevard","place_precision":"street","place_id":"qipu:sf/place/street/monterey-blvd","resolved_by":"place links file","anchor":"s-7090b6865b30","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"IV. Environ. Consequences/Impacts & Mitigation Measures"},{"claim_id":"c:156ae2d1ae7c9a0f2fe58e985fdaeb74","page_id":"C124895686:124","page_url":"https://archive.org/details/C124895686/page/n123","statement_kind":"proposal","subject_label":"J Line Connection, operational time savings","summary":"The draft estimates the J Line would save 915 minutes per weekday in travel time under the Monterey Boulevard alignment.","property":"proposes","value_text":"915 minutes per weekday","value_num":915.0,"unit":"minutes per weekday","t_from":"1982","quote":"For the J line the savings under this alignment would be an estimated 915 minutes per weekday","place_label":"city","place_precision":"city","anchor":"s-156ae2d1ae7c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"IV. Environ. Consequences/Impacts & Mitigation Measures; Operational Impacts."},{"claim_id":"c:42fef2b25ee048a59e0bc409a82c6a9d","page_id":"C124895686:124","page_url":"https://archive.org/details/C124895686/page/n123","statement_kind":"proposal","subject_label":"J Line Connection via Monterey Boulevard Alignment, patronage","summary":"The draft estimates 1,500-1,800 additional daily Muni riders if the J Line terminates at Metro Center.","property":"proposes","value_text":"1,500-1,800 additional daily riders","value_num":1500.0,"unit":"persons","t_from":"1982","quote":"The estimated change in overall Muni patronage due to the J Line Connection via the Monterey Boulevard Alignment is 1,500-!,800 additional daily riders if the J line Connection terminates at the Metro Center","place_label":"city","place_precision":"city","anchor":"s-42fef2b25ee0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"IV. Environ. Consequences/Impacts & Mitigation Measures; Patronage."},{"claim_id":"c:a9712d7ef7246b5b2cafde97f77c8724","page_id":"C124895686:124","page_url":"https://archive.org/details/C124895686/page/n123","statement_kind":"proposal","subject_label":"J Line Connection, Mission Street alignment and 26 route","summary":"The Mission Street alignment would not serve the San Jose Avenue section now served by the 26 route, requiring a revision to [name withheld] 5-year Plan.","property":"proposes","value_text":"revision to Muni 5-year Plan","t_from":"1982","quote":"would not serve the section of San Jose Avenue between Baden Street and Ocean Avenue currently served by the 26 route and would thus require a revision in [name withheld] 5-year Plan","place_label":"San Jose Avenue between Baden Street and Ocean Avenue","place_precision":"street_segment","place_id":"qipu:sf/place/street/san-jose-ave","resolved_by":"place links file","anchor":"s-a9712d7ef724","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"d. Mission Street Alignment; Route Impacts."},{"claim_id":"c:14be12328194fb74aea25ebef0c4287e","page_id":"C124895686:139","page_url":"https://archive.org/details/C124895686/page/n138","statement_kind":"proposal","subject_label":"J Line Connection, San Jose Avenue alignment noise","summary":"If the San Jose Avenue alignment is selected, the draft projects an overall noise reduction of about three dBA.","property":"proposes","value_text":"approximately three dBA","value_num":3.0,"unit":"dBA","t_from":"1982","quote":"there would be a reduction in the overall level of noise of approximately three dBA, which is just noticeable","place_label":"San Jose Avenue between Bosworth Street and Ocean Avenue","place_precision":"street_segment","place_id":"qipu:sf/place/street/san-jose-ave","resolved_by":"place links file","anchor":"s-14be12328194","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Thus, there would be a reduction in the overall level of noise of approximately three dBA"},{"claim_id":"c:93110f86b465b545064cf9b5b7f15c71","page_id":"C124895686:139","page_url":"https://archive.org/details/C124895686/page/n138","statement_kind":"finding","subject_label":"J Line Connection, noise impacts","summary":"The draft concludes that added LRVs would not significantly increase average noise levels at any location.","property":"finding","value_text":"no significant increase in average noise","t_from":"1982","quote":"the number of LRVs added during any hour would not sigificantly increase the average noise level at any location","place_label":"city","place_precision":"city","anchor":"s-93110f86b465","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the number of LRVs added during any hour would not sigificantly increase the average noise level"},{"claim_id":"c:e68ddfd86793c800c3d61f209990685d","page_id":"C124895686:139","page_url":"https://archive.org/details/C124895686/page/n138","statement_kind":"finding","subject_label":"Muni 26 route, San Jose Avenue","summary":"The draft reports that five 26 motor coaches currently travel the San Jose Avenue segment between 5:00 and 6:00 a.m.","property":"finding","value_text":"five 26-motor coaches","value_num":5.0,"unit":"vehicles","t_from":"1982","quote":"Between the critical hours of 5:00 to 6:00 a.m. five 26-motor coaches currently travel this segment of San Jose Avenue","place_label":"San Jose Avenue between Bosworth Street and Ocean Avenue","place_precision":"street_segment","place_id":"qipu:sf/place/street/san-jose-ave","resolved_by":"place links file","anchor":"s-e68ddfd86793","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Between the critical hours of 5:00 to 6:00 a.m. five 26-motor coaches currently travel"},{"claim_id":"c:2721b7369ba2a5bfead77ced970ee5c9","page_id":"C124895686:143","page_url":"https://archive.org/details/C124895686/page/n142","statement_kind":"proposal","subject_label":"J Line Connection, Muni operational measures","summary":"The draft says Muni would consider these operational energy measures if the project is built.","property":"proposes","value_text":"to be considered by Muni","t_from":"1982","quote":"these operational measures will be considered by Muni to achieve an acceptable balance between transit service goals and energy conservation","place_label":"city","place_precision":"city","anchor":"s-2721b7369ba2","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"IV. Environ. Consequences/Impacts & Mitigation Measures; these operational measures will be considered by Muni"},{"claim_id":"c:78c3cad934208286822a2591eaf33fbf","page_id":"C124895686:143","page_url":"https://archive.org/details/C124895686/page/n142","statement_kind":"proposal","subject_label":"J Line Connection, energy mitigation measures","summary":"The draft proposes reducing J Line energy use by stopping at 30th Street and turning every other car back during off-peak hours.","property":"proposes","value_text":"stop at 30th Street; turn back every other car off-peak","t_from":"1982","quote":"stopping the J Line at 30th Street and turning every other car back towards downtown during off-peak hours","place_label":"city","place_precision":"city","anchor":"s-78c3cad93420","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Mitigation. The energy costs of operating of the J Line may be reduced by"},{"claim_id":"c:ad670db428a03cc5c77c03dfc7624e14","page_id":"C124895686:143","page_url":"https://archive.org/details/C124895686/page/n142","statement_kind":"finding","subject_label":"J Line Connection, energy efficiency comparison","summary":"The draft concludes LRV travel is more energy efficient than passenger car travel when average car occupancy exceeds 22 people.","property":"finding","value_text":"greater than 22 people","value_num":22.0,"unit":"persons","t_from":"1982","quote":"the LRV is more energy efficient then passenger car travel when average occupancy per car is greater than 22 people","place_label":"city","place_precision":"city","anchor":"s-ad670db428a0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"it is found that the LRV is more energy efficient then passenger car travel"},{"claim_id":"c:ccd4db05a377e6db417aaa480bc87804","page_id":"C124895686:149","page_url":"https://archive.org/details/C124895686/page/n148","statement_kind":"proposal","subject_label":"J Line Connection, storm drain relocation","summary":"Catch basins and inlets would need relocation along portions of the three alignments.","property":"proposes","value_text":"catch basin and inlet relocation","t_from":"1982","quote":"Catch basins and inlets would require relocation along various portions of the three alignments.","place_label":"three alignments","place_precision":"none","anchor":"s-ccd4db05a377","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"IV. Environ. Consequences/Impacts & Mitigation Measures; Sewer/Storm Water Drainage"},{"claim_id":"c:d56ddd1fd298774480e9d3eef63884b8","page_id":"C124895686:149","page_url":"https://archive.org/details/C124895686/page/n148","statement_kind":"proposal","subject_label":"J Line Connection, water main impacts","summary":"All water lines along the selected alignment would potentially be impacted, with relocation costs borne by Muni.","property":"proposes","value_text":"all water lines potentially impacted","t_from":"1982","quote":"all water lines traversing the selected alignnent would potentially be impacted","place_label":"selected alignment","place_precision":"none","anchor":"s-d56ddd1fd298","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"IV. Environ. Consequences/Impacts & Mitigation Measures; Water lines traversing the selected alignment"},{"claim_id":"c:fde5e6d0ba25e1c6f86e4509f66d2061","page_id":"C124895686:149","page_url":"https://archive.org/details/C124895686/page/n148","statement_kind":"proposal","subject_label":"J Line Connection, construction dust mitigation","summary":"The draft lists dust-control measures, such as watering exposed surfaces, to be taken during construction.","property":"proposes","value_text":"watering exposed surfaces; restricting traffic on unpaved surfaces","t_from":"1982","quote":"examples of mitigation measures that will be taken to minimize dust pollution due to construction are","place_label":"city","place_precision":"city","anchor":"s-fde5e6d0ba25","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"4, Air Quality; Mitigation If the project were built"},{"claim_id":"c:969a213cd16527d1002561870235d1ed","page_id":"C124895686:150","page_url":"https://archive.org/details/C124895686/page/n149","statement_kind":"background","subject_label":"Construction noise limit (Ordinance 274-72)","summary":"The document states that the Noise Ordinance limits powered construction equipment noise to 80 dBA at 100 feet.","property":"other","value_text":"80 dBA at 100 feet","value_num":80.0,"unit":"dBA","t_from":"1982","quote":"The Noise Ordinance requires that all powered construction equipment (except impact tools and equipment) not emit more than 80 dBA when measured at a distance of 100 feet","instrument_kind":"ordinance","instrument_printed":"274-72","place_label":"J Line Connection, San Francisco","place_precision":"area","anchor":"s-969a213cd165","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The Noise Ordinance requires that all powered construction equipment"}]}