{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124896626","url":"https://data.qipu.org/usa/san-francisco/reports/c124896626/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124896626/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"c124896626","source_id":"c124896626","title":"Growth management alternatives for downtown San Francisco : downtown EIR consultant's report","year":1983,"n_pages":550,"creator":null,"source_url":"https://archive.org/details/c124896626","issuer":"City and County of San Francisco, Department of City Planning","issuer_type":"government","gov_level":"city_county","prepared_by":"Environmental Science Associates, Inc.","doc_kind":"eir","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"model","doc_kind_by":"meta","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":14,"statements_total":31,"statements_by_kind":{"finding":12,"proposal":10,"cites_decision":2,"background":7},"same_for_every_statement":{"source_id":"c124896626","source_url":"https://archive.org/details/c124896626","source_label":"IGS library: Growth management alternatives for downtown San Francisco : downtown EIR consultant's report","report_year":1983,"issuer":"City and County of San Francisco, Department of City Planning","issuer_type":"government","doc_kind":"eir","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"An environmental impact report by the Department of City Planning consultant, examining growth management alternatives for downtown San Francisco, including rezoning and office development limits.","figures":[{"label":"Period","value":"1981 to 2000","claim_ids":["c:e567634b267f550caa0c21096e2da34d"]},{"label":"Office inventory","value":"over 50 million square feet","page_url":"https://archive.org/details/c124896626/page/n90","quote":"San Francisco, with a current office inventory of over 50 million square feet"}],"main_points":["c:ab1b96009a2368a7cd9f9b6ff0ead459","c:c971b2281aa53576ef86fbbc840741cd","c:0bbbd73f849b719f492346fa3c181b95"],"board_decisions_after":["qipu:sf/decision/journalofjulydecproceed80sanfrich:29/1","qipu:sf/decision/journaljanjuneofproceed80sanfrich:605/1","qipu:sf/decision/journaljanjuneofproceed80sanfrich:608/1","qipu:sf/decision/journaljanjuneofproceed80sanfrich:609/1","qipu:sf/decision/journaljanjuneofproceed80sanfrich:689/8"],"board_decisions_before":["qipu:sf/decision/journaljulydecofproceed76sanfrich:403/2"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:49e8fcb637b0001a2ff8eccd45722d39","page_id":"c124896626:24","page_url":"https://archive.org/details/c124896626/page/n23","statement_kind":"cites_decision","subject_label":"Downtown buildings of architectural or historic significance","summary":"The City Planning Commission identified Downtown buildings of special architectural or historic significance by Resolution No. 8275.","property":"historic_rating","value_text":"architecturally or historically important buildings","date_printed":"May 29, 1980","t_from":"1980","quote":"This discussion should also cover potential effects of each alternative on both designated landmarks and buildinss determined by the City Planning Commission to be architecturally or historically important (Resolution No. 8275, May 29, 1980).","decided_by":"City Planning Commission","instrument_kind":"resolution","instrument_printed":"8275","instrument_date_printed":"May 29, 1980","place_label":"Downtown","anchor":"s-49e8fcb637b0","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"Department of City Planning staff","stance":"own_position","speaker_evidence":"Appendix A; discussion should cover landmarks and buildings (Resolution No. 8275)"},{"claim_id":"c:884289c77a7d13ceff63f1ead16c66f4","page_id":"c124896626:24","page_url":"https://archive.org/details/c124896626/page/n23","statement_kind":"finding","subject_label":"Rezoning and Planning Code text changes under alternatives","summary":"The report says several alternative proposals would require both rezoning and changes to the City Planning Code text.","property":"rezoned","value_text":"rezoning and text changes required","t_from":"1983","quote":"Several of the alternative proposals would require both rezoning and chances to the City Planning Code text.","anchor":"s-884289c77a7d","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"Department of City Planning staff","stance":"own_position","speaker_evidence":"Appendix A; several alternatives would require rezoning and text changes"},{"claim_id":"c:c1846e1e3d6a120b19b24e8ed99b6622","page_id":"c124896626:24","page_url":"https://archive.org/details/c124896626/page/n23","statement_kind":"finding","subject_label":"School system effects of downtown development","summary":"The report concludes that additional development would not have a significant effect on the school system because the district leases many school sites for non-school use.","property":"finding","value_text":"not significant effect on school system","t_from":"1983","quote":"Because the school system in San Francisco presently is leasing many of its school sites for non-school use, it can be determined that additional development, particularly in the Downtown area,","place_label":"San Francisco","anchor":"s-c1846e1e3d6a","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"Department of City Planning staff","stance":"own_position","speaker_evidence":"Appendix A; the school system is leasing many of its school sites"},{"claim_id":"c:d8d37e4575b019fa0feaa29d1b57f071","page_id":"c124896626:24","page_url":"https://archive.org/details/c124896626/page/n23","statement_kind":"finding","subject_label":"Alternative proposals and EIR scope","summary":"The report states the alternative proposals would not have significant effects on several topic areas, so EIR coverage is not needed there.","property":"finding","value_text":"not significant","t_from":"1983","quote":"The alternative proposals would not have significant effects and EIR coverage is not needed on the following areas: geology, biological sciences","anchor":"s-d8d37e4575b0","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"Department of City Planning staff","stance":"own_position","speaker_evidence":"Appendix A; alternative proposals would not have significant effects"},{"claim_id":"c:0bbbd73f849b719f492346fa3c181b95","page_id":"c124896626:26","page_url":"https://archive.org/details/c124896626/page/n25","statement_kind":"finding","subject_label":"Electricity demand under alternatives","summary":"The report says some alternative proposals could cause substantial increases in demand on the PG&E system and need further study.","property":"finding","value_text":"substantial increases in demand on PG&E system","t_from":"1983","quote":"Some alternative proposals could caues substantiél increases in demand on the PG&E system.","anchor":"s-0bbbd73f849b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Appendix A; Some alternative proposals could cause substantial increases in demand"},{"claim_id":"c:6eac3c818a3b3bf7feb4123dc5e74f37","page_id":"c124896626:26","page_url":"https://archive.org/details/c124896626/page/n25","statement_kind":"finding","subject_label":"Air quality from alternative buildings","summary":"The report says buildings permitted under some alternatives could cumulatively cause air quality standards to be violated, needing further investigation.","property":"finding","value_text":"possible cumulative air quality violations","t_from":"1983","quote":"building that could be permitted under some of the alternative scenarios covld cumulatively cause air quality standards to be violated.","place_label":"Downtown","anchor":"s-6eac3c818a3b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Appendix A; building that could be permitted under some of the alternative scenarios"},{"claim_id":"c:dba256a32817e04d1cd3edeee169c93a","page_id":"c124896626:26","page_url":"https://archive.org/details/c124896626/page/n25","statement_kind":"finding","subject_label":"Plant and animal life in Downtown","summary":"The report finds that because Downtown is already fully built, the alternatives would have no impact on plant or animal life.","property":"finding","value_text":"no impact on plant or animal life","t_from":"1983","quote":"Because Downtown San Francisco is already fully built, there would be no at impact on plant or animal life fram any of the alternatives.","place_label":"Downtown San Francisco","anchor":"s-dba256a32817","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Appendix A; Because Downtown San Francisco is already fully built"},{"claim_id":"c:ab1b96009a2368a7cd9f9b6ff0ead459","page_id":"c124896626:116","page_url":"https://archive.org/details/c124896626/page/n115","statement_kind":"proposal","subject_label":"Rezoning areas adjacent to downtown for new housing","summary":"The document proposes rezoning certain areas adjacent to downtown to encourage development of new housing.","property":"proposes","t_from":"1983","quote":"Rezone certain areas adjacent to downtown to encourage development of new housing. These areas, shown on Map 5 on the following page, are as follows:","place_label":"Central-South-of-Market; Rincon Hill; South Park","place_precision":"area","place_id":"qipu:sf/place/hood/south-of-market","resolved_by":"place links file","anchor":"s-ab1b96009a23","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Rezone certain areas adjacent to downtown to encourage development of new housing."},{"claim_id":"c:ada286bb014bfd0aa1a0f65c2d2f9172","page_id":"c124896626:116","page_url":"https://archive.org/details/c124896626/page/n115","statement_kind":"proposal","subject_label":"South Park rezoning","summary":"The document recommends rezoning South Park to R-C-3 for medium density housing.","property":"rezoned","value_text":"R-C-3","t_from":"1983","quote":"The entire area should be encouraged to revert to residential use by rezoning it R-C-3 for medium density housing.","place_label":"South Park","place_precision":"park","place_id":"qipu:sf/place/park/south-park","resolved_by":"place links file","anchor":"s-ada286bb014b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The entire area should be encouraged to revert to residential use by rezoning it R-C-3 for medium density housing."},{"claim_id":"c:dc82e861398c484ed6cbd5ba150af843","page_id":"c124896626:116","page_url":"https://archive.org/details/c124896626/page/n115","statement_kind":"proposal","subject_label":"Rincon Hill rezoning","summary":"The document says R-C-4 zoning, allowing about 210 units per acre, would be appropriate for Rincon Hill.","property":"proposes","value_text":"approximately 210 units per acre","value_num":210.0,"unit":"units","t_from":"1983","quote":"R-C-4 zoning, allowing a density of approximetely 210 units per acre, would be appropriate.","place_label":"Rincon Hill","anchor":"s-dc82e861398c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"R-C-4 zoning, allowing a density of approximetely 210 units per acre, would be appropriate."},{"claim_id":"c:15cf3ebb5627f6f5feda19e10bd6bdd8","page_id":"c124896626:156","page_url":"https://archive.org/details/c124896626/page/n155","statement_kind":"background","subject_label":"National Register of Historic Places","summary":"The National Register affords no protection against private development, so its legal usefulness downtown is limited.","property":"other","t_from":"1983","quote":"it affords no protection against private development, and therefore has limited legal usefulness in preserving buildings in downtown San Francisco.","anchor":"s-15cf3ebb5627","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Appendix E NATIONAL REGISTER OF HISTORIC PLACES"},{"claim_id":"c:1a8f0202baba51a226ebfb09dfff7544","page_id":"c124896626:156","page_url":"https://archive.org/details/c124896626/page/n155","statement_kind":"finding","subject_label":"National Register buildings in C-3 District","summary":"The document reports nine individual C-3 District buildings are on the National Register of Historic Places.","property":"other","value_text":"nine buildings","value_num":9.0,"t_from":"1983","quote":"Presently, there are nine individual C-3 District buildings on the National Register of Historie Places (see Table E.1).","place_label":"C-3 District","anchor":"s-1a8f0202baba","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Presently, there are nine individual C-3 District buildings on the National Register"},{"claim_id":"c:2bff0edadc2d7392f0dd7276ae7cee66","page_id":"c124896626:156","page_url":"https://archive.org/details/c124896626/page/n155","statement_kind":"cites_decision","subject_label":"Official listing of architecturally and historically significant buildings","summary":"The San Francisco City Planning Commission approved Resolution No. 8600 listing structures warranting special concern for preservation.","property":"approved","value_text":"Resolution No. 8600","date_printed":"May 29, 1980","t_from":"1980","quote":"On May 29, 1980, the San Francisco City Planning Commission approved Resolution No. 8600, \"An Official Listing of Structures Warranting Special Concern for Preservation in Part or in Whole (as) Designated by the Commission.\"","decided_by":"San Francisco City Planning Commission","instrument_kind":"resolution","instrument_printed":"8600","instrument_date_printed":"May 29, 1980","anchor":"s-2bff0edadc2d","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"On May 29, 1980, the San Francisco City Planning Commission approved Resolution No. 8600"},{"claim_id":"c:881e0d863cafc8af80c1b08b7cfe2819","page_id":"c124896626:156","page_url":"https://archive.org/details/c124896626/page/n155","statement_kind":"background","subject_label":"City Landmarks designation","summary":"The San Francisco Planning Code provides for designation of City Landmarks, which may bar demolition or alteration for up to one year.","property":"other","t_from":"1983","quote":"the designation of a structure as a City Landmark may involve a prohibition against demolition or alteration for up to one year after an application is made for a demolition permit.","anchor":"s-881e0d863caf","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"CITY LANDMARKS The San Francisco Planning Code provides for the designation"},{"claim_id":"c:131e7f58036a39c8baa82703c297b9c4","page_id":"c124896626:160","page_url":"https://archive.org/details/c124896626/page/n159","statement_kind":"finding","subject_label":"Recognized architectural resources table","summary":"The table data are current as of December 31, 1982, and buildings demolished before that date are not shown.","property":"other","value_text":"December 31, 1982","date_printed":"December 31, 1982","t_from":"1982","quote":"Data shown are current as of December 31, 1982. Buildings demolished before this date are not shown.","place_label":"C-3 District","anchor":"s-131e7f58036a","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Appendix E Notes: Data shown are current as of December 31, 1982."},{"claim_id":"c:25c31aba0c707e518d1c9293b915c019","page_id":"c124896626:213","page_url":"https://archive.org/details/c124896626/page/n212","statement_kind":"finding","subject_label":"Downtown EIR survey sample size","summary":"The later survey includes fewer employee responses than the initial survey.","property":"other","value_text":"1,015 compared to 2,352","value_num":1015.0,"unit":"persons","t_from":"1983","quote":"it includes fewer employee responses (1,015 compared to 2,352, or only 30 percent of the sample employees).","anchor":"s-25c31aba0c70","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Appendix F sample (35 compared to 23, or 60 percent of the sample establishments)"},{"claim_id":"c:99090a02baca8b095f1813e7403ad3ae","page_id":"c124896626:213","page_url":"https://archive.org/details/c124896626/page/n212","statement_kind":"background","subject_label":"C-3 District establishments sampling list","summary":"The Downtown EIR Land Use Inventory served as an alternative source for listing C-3 District establishments by estimated employees.","property":"other","t_from":"1983","quote":"The Downtown EIR Land Use Inventory provided an alternative to a list of C-3 District establishments by estimated number of employees.","place_label":"C-3 District","anchor":"s-99090a02baca","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Appendix F The Downtown EIR Land Use Inventory provided an alternative to a list"},{"claim_id":"c:7d7098eaadf2f7ee859dd3aa00af2fcf","page_id":"c124896626:228","page_url":"https://archive.org/details/c124896626/page/n227","statement_kind":"finding","subject_label":"Downtown EIR survey accuracy","summary":"The report states the survey estimates are accurate to about 2 percent at the 95 percent confidence level.","property":"finding","value_text":"+ 2 percent","value_num":2.0,"unit":"percent","t_from":"1983","quote":"the second variable, the number of C-3 District workers in households with C-3 District workers, are + 2 percent, at the 95 percent level of confidence.","anchor":"s-7d7098eaadf2","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"Environmental Science Associates (consultant writing the report's appendix)","stance":"own_position","speaker_evidence":"Appendix F the second variable, the number of C-3 District workers"},{"claim_id":"c:83839305b93773a5da83e47e36f9abe3","page_id":"c124896626:228","page_url":"https://archive.org/details/c124896626/page/n227","statement_kind":"background","subject_label":"Comparison with other surveys","summary":"The report says past surveys were less comprehensive than the Downtown EIR Surveys and were made for different purposes.","property":"finding","t_from":"1983","quote":"none of the past surveys were as comprehensive as the Downtown EIR Surveys; they were undertaken for different purposes.","anchor":"s-83839305b937","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"Environmental Science Associates (consultant writing the report's appendix)","stance":"own_position","speaker_evidence":"none of the past surveys were as comprehensive as the Downtown EIR Surveys"},{"claim_id":"c:f1f9649afc0dcf1b8b1ee045aa7ad0d7","page_id":"c124896626:228","page_url":"https://archive.org/details/c124896626/page/n227","statement_kind":"finding","subject_label":"1974 SPUR survey of hotel workers","summary":"The SPUR survey of hotel workers consisted of 818 employees in 14 downtown hotels.","property":"other","value_text":"818 employees in 14 downtown hotels","value_num":818.0,"unit":"persons","date_printed":"1974","t_from":"1974","quote":"The sample of hotel employees for the survey of hotel workers consisted of 818 employees in I4 downtown hotels.","place_label":"downtown hotels","anchor":"s-f1f9649afc0d","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"Environmental Science Associates (consultant writing the report's appendix)","stance":"quotes_to_report","speaker_evidence":"Two surveys were conducted in 1974 for the SPUR study"},{"claim_id":"c:1ff0a86a4608808d9c0463364d20f4d7","page_id":"c124896626:279","page_url":"https://archive.org/details/c124896626/page/n278","statement_kind":"proposal","subject_label":"Alternatives 1 and 2 office conversion","summary":"The report says Alternatives 1 and 2 differ in office conversion only because of different demolition estimates.","property":"alternative","value_text":"Alternatives 1 and 2","date_printed":"1990-2000","t_from":"1990","quote":"The only difference in the amount of office space supplied through conversion in these two Alternatives results from different estimates of demolition.","anchor":"s-1ff0a86a4608","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"consultant (Environmental Science Associates) writing the report's appendix","stance":"own_position","speaker_evidence":"Appendix G ... The only difference in the amount of office space"},{"claim_id":"c:5849b4c9f55eee36deed965e09721f17","page_id":"c124896626:279","page_url":"https://archive.org/details/c124896626/page/n278","statement_kind":"proposal","subject_label":"Office conversion forecast by Alternative","summary":"The report says the amount of office conversion between 1990 and 2000 varies by Alternative.","property":"alternative","value_text":"varies by Alternative","date_printed":"1990-2000","t_from":"1990","quote":"Between 1990 and 2000, the amount of conversion varies by Alternative.","anchor":"s-5849b4c9f55e","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"consultant (Environmental Science Associates) writing the report's appendix","stance":"own_position","speaker_evidence":"Appendix G ... Between 1990 and 2000, the amount of conversion varies by Alternative."},{"claim_id":"c:e567634b267f550caa0c21096e2da34d","page_id":"c124896626:331","page_url":"https://archive.org/details/c124896626/page/n330","statement_kind":"proposal","subject_label":"C-3 District employment forecast by business activity","summary":"The report presents a C-3 District employment forecast for each business activity for 1981 to 2000.","property":"finding","value_text":"1981 to 2000","date_printed":"1981 to 2000","t_from":"1981","quote":"Table H.4 shows C-3 District employment growth for each business activity for 1981 to 2000.","place_label":"C-3 District","anchor":"s-e567634b267f","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Appendix H The forecasts for each business activity"},{"claim_id":"c:15abc5a78b0afa06438c876c22353342","page_id":"c124896626:346","page_url":"https://archive.org/details/c124896626/page/n345","statement_kind":"background","subject_label":"Effect of Alternatives on C-3 District employment","summary":"The Alternatives affect C-3 District employment indirectly, through their effect on development potential.","property":"other","t_from":"1983","quote":"The Alternatives affect employment in the C-3 District indirectly, by means of their effect on development potential in the area.","place_label":"C-3 District","anchor":"s-15abc5a78b0a","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"Environmental Science Associates consultant's report author writing Appendix H","stance":"own_position","speaker_evidence":"Appendix H C-3 District Employment Forecasts for Alternatives"},{"claim_id":"c:c971b2281aa53576ef86fbbc840741cd","page_id":"c124896626:346","page_url":"https://archive.org/details/c124896626/page/n345","statement_kind":"proposal","subject_label":"Growth management Alternatives","summary":"The report describes five Alternatives that offer different space supply potentials for C-3 District development.","property":"alternative","value_text":"five Alternatives","value_num":5.0,"t_from":"1983","quote":"The five Alternatives offer different space supply potentials in terms of the amount, location, type, and cost of newly constructed or converted space.","place_label":"C-3 District","anchor":"s-c971b2281aa5","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"Environmental Science Associates consultant's report author writing Appendix H","stance":"own_position","speaker_evidence":"Appendix H C-3 District Employment Forecasts for Alternatives"},{"claim_id":"c:8a07642371da84004c0583b7d7d1fde9","page_id":"c124896626:386","page_url":"https://archive.org/details/c124896626/page/n385","statement_kind":"background","subject_label":"Employment growth and housing market relationship","summary":"The appendix describes the theoretical basis for considering employment growth effects on San Francisco's housing market.","property":"other","t_from":"1983","quote":"Appendix | describes the theoretical basis for considering the impli- cations of employment growth on the housing market in San Francisco and describes the assumptions","place_label":"San Francisco","anchor":"s-8a07642371da","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"Environmental Science Associates, consultant preparing the report's appendix","stance":"own_position","speaker_evidence":"APPENDIX |: THEORETICAL DISCUSSION OF HOUSING MARKET EFFECTS"},{"claim_id":"c:e83537406de2dc5602ee838fde143be5","page_id":"c124896626:392","page_url":"https://archive.org/details/c124896626/page/n391","statement_kind":"background","subject_label":"Employment growth and housing market relationship","summary":"The relationship between C-3 District employment growth and San Francisco's housing market can be described in several ways.","property":"other","t_from":"1983","quote":"the relationship between employment growth in the C-3 District and San Francisco's housina market can be described in the following ways:","place_label":"C-3 District","anchor":"s-e83537406de2","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Appendix | Basically, the relationship between employment growth in the C-3 District"},{"claim_id":"c:55ae3e4d66a69258af0de65db2e01613","page_id":"c124896626:415","page_url":"https://archive.org/details/c124896626/page/n414","statement_kind":"proposal","subject_label":"Low growth scenario share of C-3 job growth held by residents","summary":"The low scenario implies that resident workers would fill a relatively small share of new C-3 District jobs.","property":"other","value_text":"12.2 percent - 21.4 percent","unit":"percent","t_from":"1983","quote":"They indicate that the increase in City residents working in the C-3 District would represent a relatively small share of the growth of C-3 District jobs (12.2 percent - 21.4 percent).","place_label":"C-3 District","anchor":"s-55ae3e4d66a6","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"Environmental Science Associates consultant writing the appendix","stance":"own_position","speaker_evidence":"Appendix | The second page of the table provides ratios"},{"claim_id":"c:8687a4e160627b5ab2fd14890f4ec910","page_id":"c124896626:415","page_url":"https://archive.org/details/c124896626/page/n414","statement_kind":"finding","subject_label":"High growth scenario and C-3 employment share","summary":"The report judged the high scenario's share of employed residents working in the C-3 District in 2000 too high.","property":"other","value_text":"51.3-54.8 percent","unit":"percent","date_printed":"2000","t_from":"2000","quote":"the resulting percentage of employed residents who would be working in the C-3 District in 2000 was judged to be too high (51.3-54.8 percent).","place_label":"C-3 District","anchor":"s-8687a4e16062","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"Environmental Science Associates consultant writing the appendix","stance":"own_position","speaker_evidence":"Appendix | The second page of the table provides ratios"},{"claim_id":"c:1aa14abb2a907f27fe363fcd9a2aca71","page_id":"c124896626:511","page_url":"https://archive.org/details/c124896626/page/n510","statement_kind":"proposal","subject_label":"Telephone utility users tax forecast in C-3 District","summary":"The forecast excludes parking space added or removed from the C-3 District from the telephone tax rate.","property":"other","value_text":"parking space excluded","date_printed":"1984-2000","t_from":"1984","quote":"The tax rate was not applied to the parking space added or removed from the C-3 District. It was assumed that utility users taxes from telephone service at parking garages or lots would be negligible.","place_label":"C-3 District","anchor":"s-1aa14abb2a90","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Appendix L TABLE L.25: METHODOLOGY FOR FORECASTING UTILITY USERS"},{"claim_id":"c:cb52ea03c9284717b05df0814b077fbf","page_id":"c124896626:511","page_url":"https://archive.org/details/c124896626/page/n510","statement_kind":"proposal","subject_label":"Taxable cultural space in Yerba Buena Center","summary":"The forecast applies the tax rate to only part of the cultural and institutional space added during 1984-1990.","property":"floor_area_sqft","value_text":"235,000 sq. ft. of 565,000 sq. ft.","value_num":235000.0,"unit":"sqft","date_printed":"1984-1990","t_from":"1984","quote":"The tax rate was applied to only 235,000 sq. ft. of the 565,000 sq. ft. of space added in the cultural/institutional/educational/other category during 1984-1990.","place_label":"Yerba Buena Center redevelopment project area","anchor":"s-cb52ea03c928","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Appendix L TABLE L.25: METHODOLOGY FOR FORECASTING UTILITY USERS"}]}