{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124897569","url":"https://data.qipu.org/usa/san-francisco/reports/c124897569/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124897569/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"c124897569","source_id":"c124897569","title":"Civic Center proposal","year":1987,"n_pages":96,"creator":"San Francisco (Calif.). Mayor (1978-1988 : Feinstein)","source_url":"https://archive.org/details/c124897569","issuer":"City and County of San Francisco, Mayor (1978-1988 : Feinstein)","issuer_type":"government","gov_level":"city_county","prepared_by":null,"doc_kind":"plan","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"meta","doc_kind_by":"model","jurisdiction_by":"meta","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":19,"statements_total":76,"statements_by_kind":{"finding":32,"proposal":41,"cites_decision":2,"background":1},"same_for_every_statement":{"source_id":"c124897569","source_url":"https://archive.org/details/c124897569","source_label":"IGS library: Civic Center proposal","report_year":1987,"issuer":"City and County of San Francisco, Mayor (1978-1988 : Feinstein)","issuer_type":"government","doc_kind":"plan","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A plan by the Mayor of San Francisco proposing a consolidated courthouse, a new main library, a new Asian Art Museum and improvements to Civic Center plaza and mall.","next":"The Board passed a resolution in December 1987 accepting the Mayor's Civic Center Report in principle and urging the Chief Administrative Officer to act.","next_decision":"qipu:sf/decision/journalofproceed82septdecsanfrich:452/5","figures":[{"label":"Cost","value":"262.0 - $325.0 million","claim_ids":["c:ddc8dc761c385dd6cc839e9affbd81f1"]},{"label":"Office space gap","value":"approximately 440,000 net square feet","page_url":"https://archive.org/details/c124897569/page/n69","quote":"there is an unfulfilled office space requirement of approximately 440,000 net square feet"},{"label":"Leased space cost","value":"more than $3 million each year","claim_ids":["c:92c211b1dd441a0ed6ff9ba5146a671f"]},{"label":"Main Library cost","value":"$70 million in 1987 dollars","claim_ids":["c:40dc8efb25cb5890860b9116abbdccfd"]}],"main_points":["c:3aa96ecdd0696db59b27230c091da686","c:702acdc82c5e1d34b4ae047d42b9c225","c:ddc8dc761c385dd6cc839e9affbd81f1"],"board_decisions_after":["qipu:sf/decision/journalofproceed82septdecsanfrich:452/5","qipu:sf/decision/journalofproceed82septdecsanfrich:454/3","qipu:sf/decision/journalofseptoctproceed86sanfrich|219","qipu:sf/decision/journalofjanjunproceed87sanfrich:153/3","qipu:sf/decision/journalofjanjunproceed87sanfrich:306/2","qipu:sf/decision/journalofjanjunproceed87sanfrich:306/3","qipu:sf/decision/journalofjanjunproceed87sanfrich|131","qipu:sf/decision/journalmayaugofproceed91sanfrich|333"],"board_decisions_before":["qipu:sf/decision/journalofjulydecproceed80sanfrich:713/2"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:3aa96ecdd0696db59b27230c091da686","page_id":"c124897569:3","page_url":"https://archive.org/details/c124897569/page/n2","statement_kind":"proposal","subject_label":"Civic Center proposals","summary":"The Mayor proposes a central consolidated courthouse, a new main library, a new Asian Art Museum and Civic Center plaza and mall improvements.","property":"proposes","date_printed":"1987","t_from":"1987","quote":"These proposals would provide a central consolidated courthouse, a new main library, a new Asian Art Museum, funded privately, as well as Civic Center plaza and mall improvements.","place_label":"Civic Center","anchor":"s-3aa96ecdd069","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Office of the Mayor; I urge each of you; These proposals would provide"},{"claim_id":"c:702acdc82c5e1d34b4ae047d42b9c225","page_id":"c124897569:3","page_url":"https://archive.org/details/c124897569/page/n2","statement_kind":"proposal","subject_label":"General Fund responsibility","summary":"The Mayor's proposals assume the General Fund will not be the source of support.","property":"other","t_from":"1987","quote":"Our fiscal situation requires, and these proposals assume, that the General Fund not be the source of support.","anchor":"s-702acdc82c5e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Our fiscal situation requires, and these proposals assume"},{"claim_id":"c:13ee996a8646884b6f7e6e20742f51f6","page_id":"c124897569:7","page_url":"https://archive.org/details/c124897569/page/n6","statement_kind":"finding","subject_label":"Renovation cost","summary":"Renovating and expanding the existing Main Library would cost no less than 75 to 80 percent of new construction.","property":"cost_usd","value_text":"75 to 80 percent of new construction cost","unit":"percent","t_from":"1987","quote":"Renovating and expanding the existing Main Library structure would cost no less than 75 to 80 percent of the cost of new construction","place_label":"Main Library Building","anchor":"s-13ee996a8646","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Our classic old Main Library Building at Hyde and McAllister Streets"},{"claim_id":"c:40dc8efb25cb5890860b9116abbdccfd","page_id":"c124897569:7","page_url":"https://archive.org/details/c124897569/page/n6","statement_kind":"proposal","subject_label":"New Main Library cost","summary":"The estimated cost of a new Main Library is 70 million dollars in 1987 dollars.","property":"cost_usd","value_text":"$70 million in 1987 dollars","value_num":70000000.0,"unit":"USD","date_printed":"1987","t_from":"1987","quote":"Cost of a new Main Library is estimated at $70 million in 1987 dollars.","place_label":"Main Library Building","anchor":"s-40dc8efb25cb","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Cost and Financing: Cost of a new Main Library is estimated at $70 million"},{"claim_id":"c:43c16ad6320567b3e24754c04c3a8fb9","page_id":"c124897569:7","page_url":"https://archive.org/details/c124897569/page/n6","statement_kind":"finding","subject_label":"Main Library use","summary":"The Main Library serves about 3,000 persons daily.","property":"population","value_text":"about 3,000 persons daily","value_num":3000.0,"unit":"persons","t_from":"1987","quote":"A shutdown would be impractical, since the Main Library serves about 3,000 persons daily.","place_label":"Main Library Building","anchor":"s-43c16ad63205","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"A shutdown would be impractical, since the Main Library serves about 3,000 persons daily."},{"claim_id":"c:64c8b53d6557d2aa47dc69cea92dd9a4","page_id":"c124897569:7","page_url":"https://archive.org/details/c124897569/page/n6","statement_kind":"finding","subject_label":"Main Library space needs","summary":"The Library needs 346,000 square feet by 2005, more than the existing building can hold.","property":"floor_area_sqft","value_text":"346,000 square feet","value_num":346000.0,"unit":"sqft","date_printed":"2005","t_from":"2005","quote":"Between now and the year 2005, the Library needs 346,000 square feet.","place_label":"Main Library Building","anchor":"s-64c8b53d6557","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Between now and the year 2005, the Library needs 346,000 square feet."},{"claim_id":"c:90e88524879c4e203af7e8525073d23f","page_id":"c124897569:15","page_url":"https://archive.org/details/c124897569/page/n14","statement_kind":"proposal","subject_label":"Courthouse project lead","summary":"The Mayor proposes the San Francisco Redevelopment Agency undertake the courthouse project.","property":"lead_agency","value_text":"San Francisco Redevelopment Agency","t_from":"1987","quote":"I propose this project be undertaken by the San Francisco Redevelopment Agency, using its unique resources and financing powers.","anchor":"s-90e88524879c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the Mayor","stance":"own_position","speaker_evidence":"I propose this project be undertaken by the San Francisco Redevelopment Agency"},{"claim_id":"c:ac563bdbc3208bcfbc9cb48938d80e19","page_id":"c124897569:15","page_url":"https://archive.org/details/c124897569/page/n14","statement_kind":"proposal","subject_label":"Courthouse cost","summary":"At 175 dollars per square foot the minimal courthouse would cost over 90 million dollars.","property":"cost_usd","value_text":"in excess of $90 million","value_num":90000000.0,"unit":"USD","t_from":"1987","quote":"A cost of $175 per square foot for the minimal courthouse space requirements yields a price tag in excess of $90 million, with $10 million per year necessary to finance the project.","anchor":"s-ac563bdbc320","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the Mayor","stance":"own_position","speaker_evidence":"Cost and Financing: I propose this project; A cost of $175 per square foot"},{"claim_id":"c:d5c76e1fd744ed5502b5317be5cebc0a","page_id":"c124897569:15","page_url":"https://archive.org/details/c124897569/page/n14","statement_kind":"proposal","subject_label":"Superior Court filing fee","summary":"Raising the Superior Court construction filing fee from 20 to 50 dollars would yield 890,000 to 1,200,000 dollars more.","property":"other","value_text":"$890,000 to $1,200,000 additional","value_num":890000.0,"unit":"USD","t_from":"1987","quote":"Increasing the Superior Court construction filing fee from $20 to $50, for example, would yield $890,000 to $1,200,000 additional","anchor":"s-d5c76e1fd744","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the Mayor","stance":"own_position","speaker_evidence":"Courthouse Construction Fee: Courts would increase their filing fees"},{"claim_id":"c:dca635336bbed8f176dcbbb1b2ff5cf8","page_id":"c124897569:15","page_url":"https://archive.org/details/c124897569/page/n14","statement_kind":"background","subject_label":"Court filing fees","summary":"The courts are empowered to raise construction funds by increasing filing fee surcharges.","property":"other","t_from":"1987","quote":"The courts are empowered to raise construction funds by increasing filing fee surcharges and imposing a surcharge on traffic fines.","anchor":"s-dca635336bbe","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the Mayor","stance":"own_position","speaker_evidence":"Several revenue sources have been identified to make the plan a reality."},{"claim_id":"c:68e909de9557c76090b4f7c2d96ec94a","page_id":"c124897569:17","page_url":"https://archive.org/details/c124897569/page/n16","statement_kind":"finding","subject_label":"Mayor's lack of recommendation on new office building","summary":"The Mayor states he is unable to make a recommendation on a new City office building because of General Fund cost concerns.","property":"recommendation","value_text":"no recommendation at this time","t_from":"1987","quote":"Several proposals have been made, but I am unable to make a recommendation at this time because of concerns about additional costs to the General Fund.","anchor":"s-68e909de9557","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Several proposals have been made, but I am unable to make a recommendation"},{"claim_id":"c:92c211b1dd441a0ed6ff9ba5146a671f","page_id":"c124897569:17","page_url":"https://archive.org/details/c124897569/page/n16","statement_kind":"finding","subject_label":"City spending on leased space in Civic Center area","summary":"The document states the City spends more than $3 million (≈ $8.9 million in 2026 dollars) each year leasing space in the Civic Center area.","property":"cost_usd","value_text":"more than $3 million each year","value_num":3000000.0,"unit":"USD","t_from":"1987","quote":"We spend more than $3 million each year to lease space for city operations in the Civic Center area.","place_label":"Civic Center area","anchor":"s-92c211b1dd44","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We spend more than $3 million each year to lease space"},{"claim_id":"c:965e57c08cf42b27e5df366428392937","page_id":"c124897569:17","page_url":"https://archive.org/details/c124897569/page/n16","statement_kind":"proposal","subject_label":"Traffic citation surcharge as courthouse funding source","summary":"The document proposes a surcharge on traffic citations as a courthouse funding source.","property":"proposes","value_text":"$2,800,000 - $3,400,000 per year","value_num":2800000.0,"unit":"USD","t_from":"1987","quote":"Surcharge on Traffic Citations: State code authorizes the imposition of a 10 percent surcharge on moving violations","anchor":"s-965e57c08cf4","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Surcharge on Traffic Citations: State code authorizes the imposition"},{"claim_id":"c:da189d830ebe87b30befda36970e048f","page_id":"c124897569:17","page_url":"https://archive.org/details/c124897569/page/n16","statement_kind":"finding","subject_label":"Space need for consolidating leased City departments","summary":"The document states the City needs about 400,000 square feet to consolidate departments now in leased space.","property":"other","value_text":"about 400,000 square feet","value_num":400000.0,"unit":"sqft","t_from":"1987","quote":"The City needs about 400,000 square feet to effectively and efficiently consolidate those departments now in leased space.","place_label":"Civic Center area","anchor":"s-da189d830ebe","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The City needs about 400,000 square feet"},{"claim_id":"c:e4619a9174563040f99674c20b72592d","page_id":"c124897569:17","page_url":"https://archive.org/details/c124897569/page/n16","statement_kind":"proposal","subject_label":"Estimated annual yield from interim leases of reserved parcels","summary":"The document estimates the reserved parcels could yield about $770,000 (≈ $2.3 million in 2026 dollars) a year.","property":"rent_usd","value_text":"$770,000 a year","value_num":770000.0,"unit":"USD","t_from":"1987","quote":"This could yield an estimated $770,000 a year.","place_label":"Grove Street and McAllister Street","place_precision":"intersection","place_id":"qipu:sf/place/street/grove-st","resolved_by":"place links file","anchor":"s-e4619a917456","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"This could yield an estimated $770,000 a year."},{"claim_id":"c:fa7a8810e755f77bc6f1b033343ed692","page_id":"c124897569:17","page_url":"https://archive.org/details/c124897569/page/n16","statement_kind":"proposal","subject_label":"Reserving City parcels on Grove and McAllister Streets","summary":"The document proposes reserving City-owned parcels on Grove and McAllister Streets for future City uses.","property":"proposes","value_text":"reserve for future City uses","t_from":"1987","quote":"City-owned properties on Grove Street and McAllister Street adjacent to City Hall and the steam plant site next to the Main Library should be reserved","place_label":"Grove Street and McAllister Street","place_precision":"intersection","place_id":"qipu:sf/place/street/grove-st","resolved_by":"place links file","anchor":"s-fa7a8810e755","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"City-owned properties on Grove Street and McAllister Street"},{"claim_id":"c:0a16efda93c1e1cf793ab6d271b014b4","page_id":"c124897569:19","page_url":"https://archive.org/details/c124897569/page/n18","statement_kind":"proposal","subject_label":"Fulton Street pedestrian mall","summary":"The document proposes converting Fulton Street between Hyde and Larkin into a pedestrian mall.","property":"proposes","value_text":"pedestrian mall","t_from":"1987","quote":"Convert the portion of Fulton Street between Hyde and Larkin into a genuine pedestrian mall, symbolically linking the new Asian Art Museum","place_label":"Fulton Street between Hyde and Larkin","place_precision":"street_segment","place_id":"qipu:sf/place/street/fulton-st","resolved_by":"place links file","anchor":"s-0a16efda93c1","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"This proposal embodies a number of subordinate elements"},{"claim_id":"c:70b6b3c084dfc572e417a786ce138774","page_id":"c124897569:19","page_url":"https://archive.org/details/c124897569/page/n18","statement_kind":"proposal","subject_label":"City history museum","summary":"The document suggests a City history museum could be housed in the new Main Library or in space vacated by the Museum of Modern Art.","property":"proposes","value_text":"City history museum","t_from":"1987","quote":"We should consider establishing a City museum, which could be housed either in the new Main Library or in space when the Museum of Modern Art leaves","place_label":"Main Library","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-main-library","resolved_by":"place links file","anchor":"s-70b6b3c084df","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"This proposal embodies a number of subordinate elements"},{"claim_id":"c:8003907fbabc13eba1f6b81cb948b2dc","page_id":"c124897569:19","page_url":"https://archive.org/details/c124897569/page/n18","statement_kind":"proposal","subject_label":"Restoring Civic Center Plaza to original design","summary":"The document proposes restoring Civic Center Plaza to its original design, removing the pool and building facing fountains.","property":"proposes","value_text":"removing the existing pool, building the facing fountains","t_from":"1987","quote":"Restoring Civic Center Plaza to its original design -- removing the existing pool, building the facing fountains and integrating the entire plaza","place_label":"Civic Center Plaza","place_precision":"park","place_id":"qipu:sf/place/institution/civic-center-plaza-d21230","resolved_by":"place links file","anchor":"s-8003907fbabc","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"This proposal embodies a number of subordinate elements"},{"claim_id":"c:aece02cec4c0f8134b850aa6c17332df","page_id":"c124897569:19","page_url":"https://archive.org/details/c124897569/page/n18","statement_kind":"proposal","subject_label":"Cost of restoring Civic Center Plaza","summary":"The document estimates the Civic Center Plaza restoration at $1.8 million (≈ $5.3 million in 2026 dollars).","property":"cost_usd","value_text":"$1.8 million","value_num":1800000.0,"unit":"USD","t_from":"1987","quote":"Estimated cost: $1.8 million. Funding could be added to the Library bond or to a capital improvements appropriation.","place_label":"Civic Center Plaza","place_precision":"park","place_id":"qipu:sf/place/institution/civic-center-plaza-d21230","resolved_by":"place links file","anchor":"s-aece02cec4c0","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"This proposal embodies a number of subordinate elements"},{"claim_id":"c:cd3364e55da52fdf5b3f1d06e0535464","page_id":"c124897569:19","page_url":"https://archive.org/details/c124897569/page/n18","statement_kind":"proposal","subject_label":"Expansion of Civic Center Garage under Fulton Mall","summary":"The document proposes a feasibility study for expanding the Civic Center Garage under Fulton Mall.","property":"proposes","value_text":"expand Civic Center Garage","t_from":"1987","quote":"Expand the Civic Center Garage under Fulton Mall and connecting it to the new and old library buildings.","place_label":"Civic Center Garage","anchor":"s-cd3364e55da5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"This proposal embodies a number of subordinate elements"},{"claim_id":"c:18a21d63d66fe8be90e43ce6ab81ef4b","page_id":"c124897569:28","page_url":"https://archive.org/details/c124897569/page/n27","statement_kind":"proposal","subject_label":"Relocating the Museum of Modern Art","summary":"The document proposes relocating the Museum of Modern Art to a new facility.","property":"proposes","value_text":"relocate Museum of Modern Art","t_from":"1987","quote":"Relocate the Museum of Modern Art to a new facility which would provide a separate identity for the Museum","place_label":"War Memorial Complex","anchor":"s-18a21d63d66f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Relocate the Museum of Modern Art to a new facility which would provide a separate identity"},{"claim_id":"c:53e031afefceb8a9ac67c7e91d32cf23","page_id":"c124897569:28","page_url":"https://archive.org/details/c124897569/page/n27","statement_kind":"proposal","subject_label":"New performing arts building","summary":"The document proposes constructing a new performing arts building on the undeveloped Davies Hall site.","property":"proposes","value_text":"new performing arts building","t_from":"1987","quote":"Construct a new performing arts building on undeveloped Davies Hall site.","place_label":"Davies Hall site","anchor":"s-53e031afefce","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Construct a new performing arts building on undeveloped Davies Hall site."},{"claim_id":"c:6a43663d8cdcf37bebe8a2dbf11832f5","page_id":"c124897569:28","page_url":"https://archive.org/details/c124897569/page/n27","statement_kind":"proposal","subject_label":"Steam Plant site reserve","summary":"The document proposes setting aside the Steam Plant site as a reserve for future Civic Center expansion.","property":"proposes","value_text":"reserve area for future Civic Center expansion","t_from":"1987","quote":"Set aside Steam Plant site as reserve area for future Civic Center expansion when facility is no longer needed for steam generation.","place_label":"Steam Plant Site","anchor":"s-6a43663d8cdc","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Set aside Steam Plant site as reserve area for future Civic Center expansion"},{"claim_id":"c:a225c408f9556aedf77964614d841251","page_id":"c124897569:28","page_url":"https://archive.org/details/c124897569/page/n27","statement_kind":"proposal","subject_label":"Alternative Marshall Square Main Library site","summary":"The document proposes constructing a new Main Library Building on Marshall Square.","property":"alternative","value_text":"new Main Library on Marshall Square","t_from":"1987","quote":"Construct a New Main Library Building on Marshall Square, and modify vehicular and pedestrian access to Brooks Hall.","place_label":"Marshall Square","anchor":"s-a225c408f955","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Construct a New Main Library Building on Marshall Square, and modify vehicular"},{"claim_id":"c:85e15003d851e707d2915d542a3b2219","page_id":"c124897569:30","page_url":"https://archive.org/details/c124897569/page/n29","statement_kind":"proposal","subject_label":"Hall of Justice new consolidated court and jail building","summary":"The document estimates the Hall of Justice consolidated court and jail project at 86.0 to 105.0 million dollars.","property":"cost_usd","value_text":"86.0 - 105.0 (millions)","value_num":86000000.0,"unit":"USD","t_from":"1987","quote":"Hall of Justice, New Consolidated 86.0 - 105.0 25556 Court Building and Jail Facility","place_label":"Hall of Justice","place_precision":"site","place_id":"qipu:sf/place/landmark/hall-of-justice","resolved_by":"place links file","anchor":"s-85e15003d851","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Estimated Cost Magnitude Proposed Project (in millions)"},{"claim_id":"c:ddc8dc761c385dd6cc839e9affbd81f1","page_id":"c124897569:30","page_url":"https://archive.org/details/c124897569/page/n29","statement_kind":"proposal","subject_label":"Total approximate cost of Civic Center proposals","summary":"The document estimates the total approximate cost of the proposed projects at 262 to 325 million dollars.","property":"cost_usd","value_text":"262.0 - $325.0 (millions)","value_num":262000000.0,"unit":"USD","t_from":"1987","quote":"TOTAL APPROXIMATE COST 262.0 - $325.0 *NOTE: See following section for explanation of numbers.","place_label":"Civic Center","anchor":"s-ddc8dc761c38","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"TOTAL APPROXIMATE COST 262.0 - $325.0"},{"claim_id":"c:4792557c790cb0e68d070f1ab881783a","page_id":"c124897569:34","page_url":"https://archive.org/details/c124897569/page/n33","statement_kind":"proposal","subject_label":"Civic Center cost estimates and financing","summary":"The report says future analysis should estimate costs and financing options for the development program.","property":"other","t_from":"1987","quote":"future analysis should be undertaken to provide cost estimates for this development program and to determine financing options.","place_label":"Civic Center","anchor":"s-4792557c790c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"This report has raised a number of issues which affect the future development of the Civic Center."},{"claim_id":"c:d5ef3397ded4ae33079024c9ca2770e8","page_id":"c124897569:34","page_url":"https://archive.org/details/c124897569/page/n33","statement_kind":"proposal","subject_label":"Civic Center completion course","summary":"The report sets a recommended course for the City to complete the Civic Center.","property":"recommendation","t_from":"1987","quote":"The report has set a recommended course along which the City should proceed to ensure that the Civic Center is completed","place_label":"Civic Center","anchor":"s-d5ef3397ded4","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The report has set a recommended course along which the City should proceed"},{"claim_id":"c:61903fb96f7a099846eba3422181235e","page_id":"c124897569:42","page_url":"https://archive.org/details/c124897569/page/n41","statement_kind":"cites_decision","subject_label":"Civic Center site plan committee","summary":"The Board of Supervisors by resolution requested the Mayor to appoint a technical coordinating committee.","property":"other","value_text":"resolution requesting committee","t_from":"1987","quote":"the Board of Supervisors by resolution requested the Mayor to appoint a technical coordinating committee for the purpose of preparing a detailed site plan for the Civic Center.","place_label":"Civic Center","anchor":"s-61903fb96f7a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"As a result of this plan, the Board of Supervisors by resolution requested the Mayor"},{"claim_id":"c:71c8b03e30deb68baff3b4636ebda409","page_id":"c124897569:42","page_url":"https://archive.org/details/c124897569/page/n41","statement_kind":"finding","subject_label":"Civic Center theater","summary":"The theater was constructed in 1925 with an unfinished facade.","property":"event","value_text":"1925","value_num":1925.0,"date_printed":"1925","t_from":"1925","quote":"In the years following the construction of the theater in 1925, elaborate studies were prepared","place_label":"Civic Center","anchor":"s-71c8b03e30de","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In the years following the construction of the theater in 1925, elaborate studies were prepared"},{"claim_id":"c:b7bdbd4fda3155c09fbb492cc635120d","page_id":"c124897569:42","page_url":"https://archive.org/details/c124897569/page/n41","statement_kind":"finding","subject_label":"Civic Center theater sale","summary":"The theater was sold around 1930 and work on its facade faded.","property":"event","value_text":"sold","date_printed":"Around 1930","t_from":"1930","quote":"Around 1930, the theater was sold and the concern for an appropriate solution began to fade into oblivion","place_label":"Civic Center","anchor":"s-b7bdbd4fda31","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Around 1930, the theater was sold and the concern for an appropriate solution began to fade"},{"claim_id":"c:e0219ada9b034c744dbb127cebf1e05d","page_id":"c124897569:42","page_url":"https://archive.org/details/c124897569/page/n41","statement_kind":"proposal","subject_label":"1953 Civic Center introductory plan","summary":"The 1953 plan recommended contemporary building forms to provide additional office space.","property":"proposes","value_text":"contemporary building forms","date_printed":"June 1953","t_from":"1953","quote":"recommended contemporary building forms to provide the needed additional office space","place_label":"Civic Center","anchor":"s-e0219ada9b03","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The plan, which barely recognized the architectural heritage of the monumental buildings"},{"claim_id":"c:fd461cdd67d8902992e9d66dd3cee622","page_id":"c124897569:42","page_url":"https://archive.org/details/c124897569/page/n41","statement_kind":"proposal","subject_label":"Marshall Square office building","summary":"The Bureau of Architecture report recommended a new office building on the block bounded by Hyde, Grove, Larkin, and Fulton Streets.","property":"proposes","value_text":"new office building","t_from":"1987","quote":"The report recommended the construction of a new office building on the block bounded by Hyde, Grove, Larkin, and Fulton Streets (Marshall Square)","place_label":"Marshall Square","anchor":"s-fd461cdd67d8","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The report recommended the construction of a new office building on the block bounded by Hyde"},{"claim_id":"c:285fcc55f8a5bf0447e089b13681083c","page_id":"c124897569:49","page_url":"https://archive.org/details/c124897569/page/n48","statement_kind":"finding","subject_label":"Civic Center private land ownership","summary":"Private owners hold 13.9 gross acres of Civic Center land.","property":"acreage","value_text":"13.9","value_num":13.9,"unit":"acres","t_from":"1987","quote":"Gross Land Area (Acres) City 30.5 State 8.6 Federal 4.8 Private 13.9","place_label":"Civic Center","anchor":"s-285fcc55f8a5","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Table 1] OWNERSHIP OF CIVIC CENTER LANDS"},{"claim_id":"c:8cf5a046efd9232e5f798590330ca209","page_id":"c124897569:49","page_url":"https://archive.org/details/c124897569/page/n48","statement_kind":"finding","subject_label":"Civic Center land ownership","summary":"The City owns 30.5 gross acres of Civic Center land.","property":"acreage","value_text":"30.5","value_num":30.5,"unit":"acres","t_from":"1987","quote":"Gross Land Area (Acres) City 30.5 State 8.6 Federal 4.8 Private 13.9","place_label":"Civic Center","anchor":"s-8cf5a046efd9","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Table 1] OWNERSHIP OF CIVIC CENTER LANDS"},{"claim_id":"c:a707948d37c8ade69fb6ef855a24fceb","page_id":"c124897569:49","page_url":"https://archive.org/details/c124897569/page/n48","statement_kind":"proposal","subject_label":"Civic Center core block height limit","summary":"The plan sets an 80-foot height limit for the key core blocks.","property":"height_ft","value_text":"80-foot","value_num":80.0,"unit":"ft","t_from":"1987","quote":"an 80-foot building height limit for the key core blocks has been set","place_label":"key core blocks of Civic Center","anchor":"s-a707948d37c8","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"To ensure that the prominence of City Hall is maintained along the principal axis"},{"claim_id":"c:b88e57a359af658bb87548972e87028a","page_id":"c124897569:49","page_url":"https://archive.org/details/c124897569/page/n48","statement_kind":"proposal","subject_label":"Blocks north and south of City Hall height limit","summary":"The plan sets a 70-foot height limit for the two one-half blocks north and south of City Hall.","property":"height_ft","value_text":"70-foot","value_num":70.0,"unit":"ft","t_from":"1987","quote":"The exception to this limit is the 70-foot height limit which has been established for the two one-half blocks located north and south of City Hall.","place_label":"two one-half blocks north and south of City Hall","place_precision":"building","anchor":"s-b88e57a359af","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The exception to this limit is the 70-foot height limit"},{"claim_id":"c:26030ae4cfc84ffd211237bd47be67cb","page_id":"c124897569:54","page_url":"https://archive.org/details/c124897569/page/n53","statement_kind":"finding","subject_label":"Civic Center office space deficiency","summary":"There is a space deficiency of approximately 440,000 net square feet.","property":"floor_area_sqft","value_text":"approximately 440,000 net square feet","value_num":440000.0,"unit":"sqft","t_from":"1987","quote":"there is a space deficiency of approximately 440,000 net Square feet.","place_label":"Civic Center","anchor":"s-26030ae4cfc8","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Subtracting this area from the total estimated future space requirements"},{"claim_id":"c:301d5f6cd02cc9a18b2a7a3fe6d0fa75","page_id":"c124897569:54","page_url":"https://archive.org/details/c124897569/page/n53","statement_kind":"finding","subject_label":"Civic Center office space requirement","summary":"Estimated future Civic Center office space requirements total 800,948 net square feet.","property":"floor_area_sqft","value_text":"800,948 net square feet","value_num":800948.0,"unit":"sqft","t_from":"1987","quote":"the total estimated future space requirements for Civic Center related administrative office activities is 800,948 net square feet","place_label":"Civic Center","anchor":"s-301d5f6cd02c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the total estimated future space requirements for Civic Center related administrative office activities"},{"claim_id":"c:7a3892705170a31934e75ec1e3319644","page_id":"c124897569:54","page_url":"https://archive.org/details/c124897569/page/n53","statement_kind":"finding","subject_label":"City Hall and Public Health Building usable area","summary":"City Hall and the Public Health Building have 360,698 square feet of net usable area.","property":"floor_area_sqft","value_text":"360,698 square feet","value_num":360698.0,"unit":"sqft","t_from":"1987","quote":"These two buildings have a net usable area of 360,698 square feet.","place_label":"City Hall and 101 Grove Street","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-7a3892705170","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"These two buildings have a net usable area of 360,698 square feet."},{"claim_id":"c:a071805d098205e41462a4b72557a565","page_id":"c124897569:54","page_url":"https://archive.org/details/c124897569/page/n53","statement_kind":"proposal","subject_label":"Public Health Department consolidation","summary":"The Department of Public Health plans to centralize administrative, accounting and personnel functions in the Public Health Building at 101 Grove Street.","property":"proposes","value_text":"centralize functions","t_from":"1987","quote":"The future plan of the Department of Public Health is to centralize all administrative, accounting and personnel functions in the Public Health Building at 101 Grove Street","place_label":"101 Grove Street","place_precision":"address","place_id":"qipu:sf/place/address/eas-451099","resolved_by":"place links file","anchor":"s-a071805d0982","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The future plan of the Department of Public Health is to centralize"},{"claim_id":"c:cf36fe5c83304dae0c22f31d0a6b4e3d","page_id":"c124897569:54","page_url":"https://archive.org/details/c124897569/page/n53","statement_kind":"finding","subject_label":"Court space in City Hall","summary":"City Hall contains 89,693 net square feet for court related activities.","property":"floor_area_sqft","value_text":"89,693 net square feet","value_num":89693.0,"unit":"sqft","t_from":"1987","quote":"The City Hall currently contains 89,693 net square feet of area for court related activities.","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-cf36fe5c8330","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The City Hall currently contains 89,693 net square feet of area"},{"claim_id":"c:e5a95b6b96a81855f1a099d6ebd6e441","page_id":"c124897569:54","page_url":"https://archive.org/details/c124897569/page/n53","statement_kind":"finding","subject_label":"City-owned Civic Center office space","summary":"The City owns 414,541 net square feet of Civic Center related office space at nine locations.","property":"floor_area_sqft","value_text":"414,541 net square feet","value_num":414541.0,"unit":"sqft","t_from":"1987","quote":"the City currently owns 414,541 net square feet of Civic Center related office space at the nine identified locations","place_label":"Civic Center","anchor":"s-e5a95b6b96a8","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Although the City currently owns 414,541 net square feet of Civic Center related office space"},{"claim_id":"c:1331c0b74b9ff61fde7f4acea24bfd07","page_id":"c124897569:59","page_url":"https://archive.org/details/c124897569/page/n58","statement_kind":"finding","subject_label":"City-owned cars in City Hall area","summary":"In 1980 there were 130 City-owned cars assigned to departments in the City Hall area.","property":"other","value_text":"130 City-owned cars","value_num":130.0,"date_printed":"1980","t_from":"1980","quote":"At that time, there were 130 City-owned cars assigned to departments in the City Hall area.","place_label":"City Hall area","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-1331c0b74b9f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Off-Street Parking Facility. The parking of City automobiles"},{"claim_id":"c:6e711bf43e6b8e78cd5535dfeacc194f","page_id":"c124897569:59","page_url":"https://archive.org/details/c124897569/page/n58","statement_kind":"finding","subject_label":"War Memorial Complex office space","summary":"The plan finds that office space for the Opera and the Symphony exceeds acceptable occupancy levels.","property":"finding","value_text":"exceeds acceptable occupancy levels","t_from":"1987","quote":"Office space for the Opera and the Symphony exceeds acceptable occupancy levels.","place_label":"War Memorial Complex","anchor":"s-6e711bf43e6b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"War Memorial/Performing Arts Center Complex. Space is at a premium within the complex."},{"claim_id":"c:9943032197fb8d747c4bb5ab616c499d","page_id":"c124897569:59","page_url":"https://archive.org/details/c124897569/page/n58","statement_kind":"proposal","subject_label":"Veterans' Building extension","summary":"The plan proposes extending the Veterans' Building and the Memorial Court to match the Opera House addition.","property":"proposes","value_text":"extend Veterans' Building","t_from":"1987","quote":"the Veterans' Building should be extended to conform with the Opera House addition and the Memorial Court should also be extended","place_label":"Veterans' Building","place_precision":"building","place_id":"qipu:sf/place/landmark/veterans-building","resolved_by":"place links file","anchor":"s-9943032197fb","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"To correct this design relationship between these two important buildings"},{"claim_id":"c:b55a98f7d8a531672486f098564ea619","page_id":"c124897569:59","page_url":"https://archive.org/details/c124897569/page/n58","statement_kind":"proposal","subject_label":"Fulton Street area","summary":"The plan proposes converting the Fulton Street area into a pedestrian area connecting Civic Center Plaza and United Nations Plaza.","property":"proposes","value_text":"pedestrian area","t_from":"1987","quote":"The Fulton Street area could then be converted into a pedestrian area to connect the Civic Center Plaza with the United Nations Plaza.","place_label":"Fulton Street","place_precision":"street","place_id":"qipu:sf/place/street/fulton-st","resolved_by":"place links file","anchor":"s-b55a98f7d8a5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Fulton Street area could then be converted into a pedestrian area"},{"claim_id":"c:6806563cb7052ef95242b58c5a8a1a8d","page_id":"c124897569:65","page_url":"https://archive.org/details/c124897569/page/n64","statement_kind":"proposal","subject_label":"Marshall Square potential floor area","summary":"The plan estimates the potential gross buildable floor area of Marshall Square at 384,300 square feet.","property":"floor_area_sqft","value_text":"384,300 square feet","value_num":384300.0,"unit":"sqft","t_from":"1987","quote":"the potential gross buildable floor area of the site is 384,300 square feet.","place_label":"Marshall Square","anchor":"s-6806563cb705","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"On the assumption that the monument will remain at its present location"},{"claim_id":"c:9fd51998259e03008b34c3cada77210b","page_id":"c124897569:65","page_url":"https://archive.org/details/c124897569/page/n64","statement_kind":"proposal","subject_label":"Marshall Square building access ramp","summary":"The report says a new Marshall Square building should include a reconfigured access ramp to Brooks Hall.","property":"proposes","value_text":"reconfigured access ramp","t_from":"1987","quote":"A new building proposal on Marshall Square should therefore incorporate into the first floor and basement plan a means to accommodate a reconfigured access ramp","place_label":"Marshall Square","anchor":"s-9fd51998259e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"A new building proposal on Marshall Square should therefore incorporate"},{"claim_id":"c:b7179b8b91388997ae0e9e3336da511c","page_id":"c124897569:65","page_url":"https://archive.org/details/c124897569/page/n64","statement_kind":"finding","subject_label":"Marshall Square land area","summary":"The land area actually available for development on Marshall Square is 54,900 net square feet.","property":"other","value_text":"54,900 net square feet","value_num":54900.0,"unit":"sqft","t_from":"1987","quote":"the land area actually available for development is 54,900 net square feet.","place_label":"Marshall Square","anchor":"s-b7179b8b9138","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the land area actually available for development is 54,900 net square feet."},{"claim_id":"c:dee521eb3e86725c57ad4db1127f2c81","page_id":"c124897569:65","page_url":"https://archive.org/details/c124897569/page/n64","statement_kind":"finding","subject_label":"McAllister Block ownership","summary":"The McAllister Block contains three City-owned parcels and two privately-owned lots.","property":"other","value_text":"three City-owned parcels and two privately-owned lots","t_from":"1987","quote":"The block contains three City-owned parcels and two privately-owned lots.","place_label":"McAllister Block","place_precision":"area","anchor":"s-dee521eb3e86","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"McAllister Block The McAllister Block is located north of City Hall"},{"claim_id":"c:1316f8815d70c260672bc368ff0b396a","page_id":"c124897569:66","page_url":"https://archive.org/details/c124897569/page/n65","statement_kind":"proposal","subject_label":"Grove Block potential development","summary":"The plan estimates maximum potential development of the Grove Block at 127,590 gross square feet within the 70-foot height limit.","property":"floor_area_sqft","value_text":"127,590 gross square feet","value_num":127590.0,"unit":"sqft","t_from":"1987","quote":"is 127,590 gross square feet within the height limit of 70 feet.","place_label":"Grove Block","anchor":"s-1316f8815d70","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Grove Block, excluding the Public Health Buildings"},{"claim_id":"c:64a4ee0caab3bd6a981f64e08684b704","page_id":"c124897569:66","page_url":"https://archive.org/details/c124897569/page/n65","statement_kind":"proposal","subject_label":"McAllister Block potential development","summary":"The plan estimates maximum potential development of the McAllister Block at 231,000 gross square feet within the 70-foot height limit.","property":"floor_area_sqft","value_text":"231,000 gross square feet","value_num":231000.0,"unit":"sqft","t_from":"1987","quote":"The maximum potential development of this block with six floors of occupancy and one full basement level is 231,000 gross square feet within the 70-foot height limitation.","place_label":"McAllister Block","anchor":"s-64a4ee0caab3","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The McAllister Block ... maximum potential development of this block with six floors"},{"claim_id":"c:66e69f8927cf64b23f85def5733037ec","page_id":"c124897569:66","page_url":"https://archive.org/details/c124897569/page/n65","statement_kind":"finding","subject_label":"Grove Block ownership","summary":"The Grove Block contains four City-owned parcels and two privately-owned lots.","property":"other","value_text":"four City-owned parcels and two privately-owned lots","t_from":"1987","quote":"The block contains four City-owned parcels and two privately-owned lots.","place_label":"Grove Block","anchor":"s-66e69f8927cf","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Grove Block The Grove Block is located south of City Hall."},{"claim_id":"c:3253243b4e56ca48c87b4dd0c4ee1fb2","page_id":"c124897569:67","page_url":"https://archive.org/details/c124897569/page/n66","statement_kind":"finding","subject_label":"Steam plant future","summary":"The report notes that no final decision has been made regarding the future status of the steam plant.","property":"finding","value_text":"no final decision","t_from":"1987","quote":"but no final decision has been made regarding the future status of the plant.","place_label":"Steam Plant Site","place_precision":"other","anchor":"s-3253243b4e56","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The City has considered closing the plant"},{"claim_id":"c:a3a566a4edd970e0cbca7cb000bc4cdd","page_id":"c124897569:67","page_url":"https://archive.org/details/c124897569/page/n66","statement_kind":"finding","subject_label":"Steam plant service","summary":"The steam plant supplies steam heat to seven City buildings within the Civic Center.","property":"other","value_text":"seven City buildings","value_num":7.0,"t_from":"1987","quote":"The plant supplies steam heat to seven City buildings within the Civic Center.","place_label":"Steam Plant Site","place_precision":"other","anchor":"s-a3a566a4edd9","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The plant supplies steam heat to seven City buildings"},{"claim_id":"c:c7808ddd22cb5b04a83053c5dd93ce26","page_id":"c124897569:67","page_url":"https://archive.org/details/c124897569/page/n66","statement_kind":"proposal","subject_label":"Larkin Block acquisition","summary":"The plan suggests future acquisition of the three privately-owned Larkin Block parcels to complete the Civic Center design concept.","property":"proposes","value_text":"future acquisition of three parcels","value_num":3.0,"t_from":"1987","quote":"The block contains three privately-owned parcels which are suggested for future acquisition to complete the Civic Center design concept around the Plaza.","place_label":"Larkin Block","anchor":"s-c7808ddd22cb","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The block contains three privately-owned parcels which are suggested"},{"claim_id":"c:072b0abefeaf79121c6039191c7e367a","page_id":"c124897569:68","page_url":"https://archive.org/details/c124897569/page/n67","statement_kind":"cites_decision","subject_label":"Seismic upgrade of 1680 Mission Street","summary":"The Board of Supervisors has appropriated funds to seismically upgrade the 1680 Mission Street building.","property":"approved","value_text":"appropriated funds for seismic upgrade","t_from":"1987","quote":"The Board of Supervisors has appropriated funds to seismically upgrade the building.","place_label":"1680 Mission Street","place_precision":"address","place_id":"qipu:sf/place/address/eas-483937","resolved_by":"place links file","anchor":"s-072b0abefeaf","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In addition to the development opportunities suggested in this report"},{"claim_id":"c:23402865c3f2dfd55b33e30ae10e7473","page_id":"c124897569:68","page_url":"https://archive.org/details/c124897569/page/n67","statement_kind":"finding","subject_label":"One South Van Ness Avenue office building","summary":"One South Van Ness Avenue contains 435,000 net square feet of usable area.","property":"floor_area_sqft","value_text":"435,000 net square feet usable","value_num":435000.0,"unit":"sqft","t_from":"1987","quote":"The building contains 435,000 net square feet of usable area.","place_label":"One South Van Ness Avenue","place_precision":"address","anchor":"s-23402865c3f2","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The building contains 435,000 net square feet of usable area."},{"claim_id":"c:24e09938cdc35959aa77a421d0bd3cac","page_id":"c124897569:68","page_url":"https://archive.org/details/c124897569/page/n67","statement_kind":"proposal","subject_label":"Acquisition of One South Van Ness Avenue","summary":"The Real Estate Department has put together a proposal to acquire One South Van Ness Avenue, an office building owned by the Bank of America.","property":"proposes","value_text":"acquisition of office building","t_from":"1987","quote":"The Real Estate Department has put together a proposal for the acquisition of One South Van Ness Avenue, an office building currently owned by the Bank of America.","place_label":"One South Van Ness Avenue","place_precision":"address","anchor":"s-24e09938cdc3","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Real Estate Department has put together a proposal"},{"claim_id":"c:264f7ea17bc1aa71b61a98e08ea84a12","page_id":"c124897569:68","page_url":"https://archive.org/details/c124897569/page/n67","statement_kind":"finding","subject_label":"1680 Mission Street office building","summary":"The 1680 Mission Street building contains 34,200 square feet of net usable area.","property":"floor_area_sqft","value_text":"34,200 square feet net usable","value_num":34200.0,"unit":"sqft","t_from":"1987","quote":"The building contains 34,200 square feet of net usable area.","place_label":"1680 Mission Street","place_precision":"address","place_id":"qipu:sf/place/address/eas-483937","resolved_by":"place links file","anchor":"s-264f7ea17bc1","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The building contains 34,200 square feet of net usable area."},{"claim_id":"c:545baa97a1560bce66138929da5fba8b","page_id":"c124897569:68","page_url":"https://archive.org/details/c124897569/page/n67","statement_kind":"proposal","subject_label":"Civic Center parking lot site development potential","summary":"The maximum potential development of the site with six floors and one basement is estimated at 116,200 gross square feet.","property":"floor_area_sqft","value_text":"116,200 gross square feet","value_num":116200.0,"unit":"sqft","t_from":"1987","quote":"The maximum potential development of this site with six floors of occupancy and one full basement level is 116,200 gross square feet.","place_label":"Civic Center parking lot site","anchor":"s-545baa97a156","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The maximum potential development of this site"},{"claim_id":"c:a064cc0fdc8d90ced9d095a7c222e87a","page_id":"c124897569:68","page_url":"https://archive.org/details/c124897569/page/n67","statement_kind":"proposal","subject_label":"Traffic Bureau relocation","summary":"Only the Traffic Bureau of the Department of Public Works is proposed to be relocated to 1680 Mission Street.","property":"proposes","value_text":"relocate Traffic Bureau","t_from":"1987","quote":"At this time, only the Traffic Bureau of the Department of Public Works is proposed to be relocated to this site.","place_label":"1680 Mission Street","place_precision":"address","place_id":"qipu:sf/place/address/eas-483937","resolved_by":"place links file","anchor":"s-a064cc0fdc8d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"At this time, only the Traffic Bureau of the Department of Public Works"},{"claim_id":"c:14cfed501f4eb996b10995778313d566","page_id":"c124897569:73","page_url":"https://archive.org/details/c124897569/page/n72","statement_kind":"proposal","subject_label":"Relocation of Civil Divisions to a new building","summary":"The report recommends relocating the Civil Divisions from City Hall to a new building adjacent to the Hall of Justice.","property":"recommendation","value_text":"relocate Civil Divisions to new building","t_from":"1987","quote":"Relocate the Civil Divisions of the Superior Court and Municipal Court from City Hall to a New Building Adjacent to the Hall of Justice","place_label":"Hall of Justice","place_precision":"site","place_id":"qipu:sf/place/landmark/hall-of-justice","resolved_by":"place links file","anchor":"s-14cfed501f4e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"RECOMMENDATION: Relocate the Civil Divisions"},{"claim_id":"c:657b40c4573b13dadc55d857be7f0e4d","page_id":"c124897569:73","page_url":"https://archive.org/details/c124897569/page/n72","statement_kind":"finding","subject_label":"East Block height limit","summary":"The block east of the Hall of Justice is under a height limit of 30 feet.","property":"height_ft","value_text":"30 feet","value_num":30.0,"unit":"ft","t_from":"1987","quote":"The block is under a height limit of 30 feet.","place_label":"East Block","anchor":"s-657b40c4573b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The block is under a height limit of 30 feet."},{"claim_id":"c:9b6792eb624585a12d81e92bd1625ec6","page_id":"c124897569:73","page_url":"https://archive.org/details/c124897569/page/n72","statement_kind":"finding","subject_label":"Court space need","summary":"The two Civil Divisions have an estimated need for 281,434 gross square feet of space by 2005.","property":"floor_area_sqft","value_text":"281,434 gross square feet by 2005","value_num":281434.0,"unit":"sqft","date_printed":"2005","t_from":"2005","quote":"The two Civil Divisions have an estimated need for 281,434 gross square feet of space by the year 2005, as determined by the court consultant.","anchor":"s-9b6792eb6245","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"as determined by the court consultant"},{"claim_id":"c:af57b970e311ace308de019144f89b98","page_id":"c124897569:73","page_url":"https://archive.org/details/c124897569/page/n72","statement_kind":"proposal","subject_label":"East Block development potential","summary":"The development potential of the East Block is estimated at about 371,000 gross square feet.","property":"floor_area_sqft","value_text":"about 371,000 gross square feet","value_num":371000.0,"unit":"sqft","t_from":"1987","quote":"The development potential of the East Block is about 371,000 gross square feet, assuming seven floors of occupancy and [name withheld]","place_label":"East Block","anchor":"s-af57b970e311","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The development potential of the East Block"},{"claim_id":"c:e1215b959b86dcd3b7a10d3f7bd94953","page_id":"c124897569:73","page_url":"https://archive.org/details/c124897569/page/n72","statement_kind":"finding","subject_label":"Civil Divisions space in City Hall","summary":"The Civil Divisions of the Superior and Municipal Courts occupy about 90,000 net square feet in City Hall.","property":"floor_area_sqft","value_text":"about 90,000 net square feet","value_num":90000.0,"unit":"sqft","t_from":"1987","quote":"currently occupy about 90,000 net square feet of space on the third and fourth floors of City Hall.","place_label":"City Hall","place_precision":"building","place_id":"qipu:sf/place/landmark/sf-city-hall","resolved_by":"place links file","anchor":"s-e1215b959b86","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Civil Divisions ... currently occupy about 90,000 net square feet"},{"claim_id":"c:15cd3094172f34cf89b43643a6bea89b","page_id":"c124897569:78","page_url":"https://archive.org/details/c124897569/page/n77","statement_kind":"finding","subject_label":"Marshall Square site","summary":"The Marshall Square site is the largest site within the Civic Center available for future development.","property":"finding","value_text":"largest available site in Civic Center","t_from":"1987","quote":"The Marshall Square site is the largest site within the Civic Center which is available for future development.","place_label":"Marshall Square","anchor":"s-15cd3094172f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Marshall Square site is the largest site within the Civic Center"},{"claim_id":"c:73a7675f8ec5bfdb882bd962a88cc479","page_id":"c124897569:78","page_url":"https://archive.org/details/c124897569/page/n77","statement_kind":"proposal","subject_label":"Asian Art Museum re-use of Main Library","summary":"The Asian Art Museum would provide an appropriate re-use option for the existing Main Library Building.","property":"proposes","value_text":"Asian Art Museum in Main Library Building","t_from":"1987","quote":"The Asian Art Museum would provide an appropriate re-use option for the existing Main Library Building","place_label":"Main Library Building","anchor":"s-73a7675f8ec5","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Asian Art Museum would provide an appropriate re-use option for the existing Main Library Building"},{"claim_id":"c:f489863e8579329ee3c018f647d3ca02","page_id":"c124897569:78","page_url":"https://archive.org/details/c124897569/page/n77","statement_kind":"finding","subject_label":"Museum re-use option space","summary":"The architectural consultant estimated the existing building could provide 136,000 gross square feet for museum purposes.","property":"floor_area_sqft","value_text":"136,000 gross square feet","value_num":136000.0,"unit":"sqft","t_from":"1987","quote":"estimated that 136,000 gross square feet of floor area could be provided for museum purposes within the existing building.","place_label":"Main Library Building","anchor":"s-f489863e8579","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The architectural consultant's analysis of the museum re-use option estimated that 136,000"},{"claim_id":"c:8e4f2256be8eaff1015c8ff01c29553b","page_id":"c124897569:84","page_url":"https://archive.org/details/c124897569/page/n83","statement_kind":"finding","subject_label":"Superior Court space need","summary":"The space need for the Superior Court alone is about 151,000 net square feet.","property":"floor_area_sqft","value_text":"about 151,000 net square feet","value_num":151000.0,"unit":"sqft","t_from":"1987","quote":"For the Superior Court separately, the space need is about 151,000 net square feet.","place_label":"Veterans' Building","place_precision":"building","place_id":"qipu:sf/place/landmark/veterans-building","resolved_by":"place links file","anchor":"s-8e4f2256be8e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Using the space projections from the courthouse consultant's report"},{"claim_id":"c:92028c000ee24e71640122f9bad1dd88","page_id":"c124897569:84","page_url":"https://archive.org/details/c124897569/page/n83","statement_kind":"finding","subject_label":"Veterans' Building net usable area","summary":"The Veterans' Building has a net usable area of approximately 129,800 square feet, excluding the Herbst Theater and Green Room.","property":"floor_area_sqft","value_text":"approximately 129,800 square feet","value_num":129800.0,"unit":"sqft","t_from":"1987","quote":"there is a net usable area of approximately 129,800 square feet, excluding the Herbst Theater and Green Room.","place_label":"Veterans' Building","place_precision":"building","place_id":"qipu:sf/place/landmark/veterans-building","resolved_by":"place links file","anchor":"s-92028c000ee2","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Based on a preliminary review of the building's floor plans"},{"claim_id":"c:db3725f4cb1a581387750494e958692b","page_id":"c124897569:84","page_url":"https://archive.org/details/c124897569/page/n83","statement_kind":"proposal","subject_label":"Veterans' Building addition","summary":"A building extension in the style of the Opera House addition would add about 36,600 net square feet for a future user.","property":"floor_area_sqft","value_text":"about 36,600 net square feet","value_num":36600.0,"unit":"sqft","t_from":"1987","quote":"If an extension were provided for the building in a manner and style of the Opera House addition, about 36,600 net square feet would be available for a future user.","place_label":"Veterans' Building","place_precision":"building","place_id":"qipu:sf/place/landmark/veterans-building","resolved_by":"place links file","anchor":"s-db3725f4cb1a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"If an extension were provided for the building in a manner and style"},{"claim_id":"c:dcf5176dd7daa118de2993b190b59e6d","page_id":"c124897569:84","page_url":"https://archive.org/details/c124897569/page/n83","statement_kind":"finding","subject_label":"Herbst Theater floor area","summary":"The Herbst Theater occupies a net usable area of about 27,500 square feet, including the Green Room.","property":"floor_area_sqft","value_text":"about 27,500 square feet","value_num":27500.0,"unit":"sqft","t_from":"1987","quote":"The Herbst Theater, a viable performing arts facility, occupies a net usable area of about 27,500 square feet, including the Green Room.","place_label":"Herbst Theater","anchor":"s-dcf5176dd7da","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Herbst Theater, a viable performing arts facility, occupies a net usable area"}]}