{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124897684","url":"https://data.qipu.org/usa/san-francisco/reports/c124897684/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124897684/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"c124897684","source_id":"c124897684","title":"Stadium feasibility analysis : task force report to the mayor, October 1983","year":1983,"n_pages":136,"creator":"San Francisco (Calif.). Mayor's Stadium Task Force","source_url":"https://archive.org/details/c124897684","issuer":"City and County of San Francisco, Mayor's Stadium Task Force","issuer_type":"government","gov_level":"city_county","prepared_by":null,"doc_kind":"study","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"meta","doc_kind_by":"model","jurisdiction_by":"meta","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":11,"statements_total":38,"statements_by_kind":{"finding":16,"proposal":17,"cites_decision":1,"background":4},"same_for_every_statement":{"source_id":"c124897684","source_url":"https://archive.org/details/c124897684","source_label":"IGS library: Stadium feasibility analysis : task force report to the mayor, October 1983","report_year":1983,"issuer":"City and County of San Francisco, Mayor's Stadium Task Force","issuer_type":"government","doc_kind":"study","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A study by the Mayor's Stadium Task Force on whether and how to build a new downtown stadium, including financing options and candidate sites.","next":"In April 1986, the Board passed amendments to the Candlestick Park stadium lease with the San Francisco Forty Niners.","next_decision":"qipu:sf/decision/journalofmayaugproceed81sanfrich:121/1","figures":[{"label":"Cost","value":"$170 million lease revenue bond issue","claim_ids":["c:d77b707ab016fdffa873d39c3de09358"]},{"label":"Owed","value":"$1.4 million per year in tax revenue","claim_ids":["c:af85bdb9c24c22f8200709e09978495a"]},{"label":"Area","value":"8.8 acres footprint","claim_ids":["c:a17d2f015dd5104be0684403f67f86d0"]},{"label":"Seats","value":"70,000 for football, 64,000 for baseball","page_url":"https://archive.org/details/c124897684/page/n10","quote":"seat 70,000 people for football and 64,000 for baseball"}],"main_points":["c:7d5e1f50e6ae0b27b4fb20358b0356bd","c:99215d2511eee10c883b15bd7c9a0989","c:329306b5c41c8c6feef95088fc30d2a3"],"board_decisions_after":["qipu:sf/decision/journalofmayaugproceed81sanfrich:121/1","qipu:sf/decision/journalofproceed78julydecsanfrich:415/3","qipu:sf/decision/journaljulydecofproceed79sanfrich:367/7","qipu:sf/decision/journalofjulydecproceed80sanfrich|311","qipu:sf/decision/journalofjulydecproceed80sanfrich|322","qipu:sf/decision/journaljanaprofproceed82sanfrich:482/6","qipu:sf/decision/journalofproceed78julydecsanfrich:678/6"],"board_decisions_before":["qipu:sf/decision/journalofjulydecproceed77sanfrich|244"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:0d5894da135a193a0cc221803c6b5619","page_id":"c124897684:13","page_url":"https://archive.org/details/c124897684/page/n12","statement_kind":"finding","subject_label":"Luxury suites at Candlestick Park","summary":"The consultants conclude only 96 suites can be installed at Candlestick Park.","property":"units","value_text":"96 suites","value_num":96.0,"unit":"units","t_from":"1983","quote":"The consultants conclude that only 96 suites can be installed at Candlestick, and many of these could not be designed to appropriate standards.","place_label":"Candlestick Park","place_precision":"site","place_id":"qipu:sf/place/institution/candlestick-park-7d336c","resolved_by":"place links file","anchor":"s-0d5894da135a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The consultants conclude that only 96 suites"},{"claim_id":"c:85c6072ede5d7c44c955c54950fc6571","page_id":"c124897684:13","page_url":"https://archive.org/details/c124897684/page/n12","statement_kind":"background","subject_label":"Redevelopment tax allocation bonds","summary":"Financing through Redevelopment Agency tax allocation bonds would need substantial tax revenue from an established redevelopment area.","property":"other","value_text":"tax allocation bonds","t_from":"1983","quote":"Financing the stadium through the Redevelopment Agency tax allocation bonds would require a substantial tax revenue from an established redevelopment area in which the stadium would be located.","place_label":"established redevelopment area","anchor":"s-85c6072ede5d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Financing the stadium through the Redevelopment Agency tax allocation bonds would require"},{"claim_id":"c:8a23fa1f5a23016e266a1d031d5fadc7","page_id":"c124897684:13","page_url":"https://archive.org/details/c124897684/page/n12","statement_kind":"finding","subject_label":"Luxury suites in a new downtown stadium","summary":"The study estimates as many as 190 luxury suites can be built in a new stadium.","property":"units","value_text":"as many as 190 suites","value_num":190.0,"unit":"units","t_from":"1983","quote":"because as many as 190 of them can be built, the revenue potential from this source is much greater and more certain than for suites at Candlestick.","place_label":"downtown stadium","anchor":"s-8a23fa1f5a23","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"as many as 190 of them can be built, the revenue potential"},{"claim_id":"c:99215d2511eee10c883b15bd7c9a0989","page_id":"c124897684:13","page_url":"https://archive.org/details/c124897684/page/n12","statement_kind":"finding","subject_label":"Financing a downtown stadium","summary":"The study concludes a private sponsor with independent financing offers the City the best potential and least financial exposure.","property":"recommendation","value_text":"private sponsor financing","t_from":"1983","quote":"Conclusion: Of the five methods examined for financing a_new stadium, a private sponsor or sponsors with independent financing offers the City the best potential and least financial exposure.","place_label":"downtown stadium","anchor":"s-99215d2511ee","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Conclusion: Of the five methods examined for"},{"claim_id":"c:af2588d4b60f9f9a37679b6381c083c2","page_id":"c124897684:13","page_url":"https://archive.org/details/c124897684/page/n12","statement_kind":"finding","subject_label":"Sale-leaseback financing","summary":"The study has set aside sale-leaseback financing as a practical method for a new stadium while congressional actions are unclear.","property":"recommendation","value_text":"set aside","t_from":"1983","quote":"Until congressional actions are more clearly understood, it has been set aside as a practical method for financing a new stadium.","anchor":"s-af2588d4b60f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"it has been set aside as a practical method"},{"claim_id":"c:ec8bf5fe4a9ccfbbea9ac1508560c86f","page_id":"c124897684:13","page_url":"https://archive.org/details/c124897684/page/n12","statement_kind":"finding","subject_label":"Loge seats in a new stadium","summary":"The study says as many as 8,000 loge seats could be created in a new stadium, which Candlestick cannot achieve.","property":"units","value_text":"as many as 8,000 loge seats","value_num":8000.0,"unit":"units","t_from":"1983","quote":"as many as 8,000 loge seats could be created in a new stadium to produce even more revenue, a situation which cannot be achieved at Candlestick.","place_label":"downtown stadium","anchor":"s-ec8bf5fe4a9c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"as many as 8,000 loge seats could be created"},{"claim_id":"c:13688ba1bb4bd544fa01e3b3a644fe1c","page_id":"c124897684:31","page_url":"https://archive.org/details/c124897684/page/n30","statement_kind":"background","subject_label":"Candlestick access study","summary":"The Department of Public Works undertook a 1981 study titled Report on Candlestick Park Access to recommend a solution.","property":"other","value_text":"Report on Candlestick Park Access","date_printed":"1981","t_from":"1981","quote":"a special study titled \"Report on Candlestick Park Access\" was undertaken by the City's Department of Public Works in 1981 for the purpose of recommending a solution.","place_label":"Candlestick Park","place_precision":"site","place_id":"qipu:sf/place/institution/candlestick-park-7d336c","resolved_by":"place links file","anchor":"s-13688ba1bb4b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"a special study titled \"Report on Candlestick Park Access\" was undertaken by the City's Department of Public Works"},{"claim_id":"c:30980ef81966381d8bf51f08769b8369","page_id":"c124897684:31","page_url":"https://archive.org/details/c124897684/page/n30","statement_kind":"cites_decision","subject_label":"Candlestick access policy","summary":"The Board of Supervisors adopted Resolution No. 1012.81 supporting long range alternative plan No. 7.","property":"adopted","value_text":"Resolution No. 1012.81","date_printed":"12/14/81","t_from":"1983","quote":"As a result of this study the San Francisco Board of Supervisors adopted Resolution No. 1012.81 (dated 12/14/81) establishing a policy in support of long range alternative plan No. 7","decided_by":"San Francisco Board of Supervisors","instrument_kind":"resolution","instrument_printed":"1012.81","instrument_date_printed":"12/14/81","place_label":"Candlestick Park","place_precision":"site","place_id":"qipu:sf/place/institution/candlestick-park-7d336c","resolved_by":"place links file","anchor":"s-30980ef81966","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"As a result of this study the San Francisco Board of Supervisors adopted Resolution No. 1012.81"},{"claim_id":"c:44dbd97fb3562c041259afab9777e7e3","page_id":"c124897684:31","page_url":"https://archive.org/details/c124897684/page/n30","statement_kind":"proposal","subject_label":"Candlestick transportation improvements","summary":"The study estimates total transportation improvements at Candlestick at $44,082 thousand (≈ $149.1 million in 2026 dollars), based on mid-1983 construction costs.","property":"cost_usd","value_text":"$44,082 thousand","value_num":44082000.0,"unit":"USD","date_printed":"mid-1983","t_from":"1983","quote":"the estimated costs of these improvements based on mid-1983 construction costs.","place_label":"Candlestick Park","place_precision":"site","place_id":"qipu:sf/place/institution/candlestick-park-7d336c","resolved_by":"place links file","anchor":"s-44dbd97fb356","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Following is a list of all traffic-related improvements required at Candlestick"},{"claim_id":"c:57aba4c54c3263b3b8cb126773d50e3d","page_id":"c124897684:31","page_url":"https://archive.org/details/c124897684/page/n30","statement_kind":"finding","subject_label":"Candlestick usage","summary":"Candlestick usage is estimated to increase from 89 events per year to as many as 180.","property":"other","value_text":"89 to as many as 180 events per year","value_num":180.0,"t_from":"1983","quote":"Candlestick usage is estimated to increase from 89 events per year to as many as 180.","place_label":"Candlestick Park","place_precision":"site","place_id":"qipu:sf/place/institution/candlestick-park-7d336c","resolved_by":"place links file","anchor":"s-57aba4c54c32","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Candlestick usage is estimated to increase from 89 events per year to as many as 180."},{"claim_id":"c:3d636ee68d9c3288a2d01fe49ec7a27e","page_id":"c124897684:37","page_url":"https://archive.org/details/c124897684/page/n36","statement_kind":"finding","subject_label":"Community facilities district financing for Candlestick Park","summary":"The study finds community facilities district financing not a feasible method of financing Candlestick Park improvements.","property":"rejected","value_text":"not considered feasible","t_from":"1983","quote":"it is not considered a feasible method of financing Candlestick Park's improvements","place_label":"Candlestick Park","place_precision":"site","place_id":"qipu:sf/place/institution/candlestick-park-7d336c","resolved_by":"place links file","anchor":"s-3d636ee68d9c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"SECTION 3: FINANCING CANDLESTICK PARK IMPROVEMENTS"},{"claim_id":"c:60f27f5fc69e08bdb2f738a75449e712","page_id":"c124897684:37","page_url":"https://archive.org/details/c124897684/page/n36","statement_kind":"finding","subject_label":"Tax allocation bond financing for Candlestick Park","summary":"The study rules out tax allocation bond financing because no existing project has unallocated tax increments at the needed scale.","property":"rejected","value_text":"ruled out","t_from":"1983","quote":"Tax allocation bond financing would require incorporating Candlestick Park into an existing or new redevelopment project","place_label":"Candlestick Park","place_precision":"site","place_id":"qipu:sf/place/institution/candlestick-park-7d336c","resolved_by":"place links file","anchor":"s-60f27f5fc69e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Tax allocation bond financing would require incorporating Candlestick Park"},{"claim_id":"c:c70bb6a0879b9a5b697d32eea87b7d92","page_id":"c124897684:37","page_url":"https://archive.org/details/c124897684/page/n36","statement_kind":"finding","subject_label":"Sale-leaseback financing for Candlestick Park","summary":"The study finds the sale-leaseback method highly complex and not a reliable financing method for Candlestick Park improvements.","property":"rejected","value_text":"not considered reliable","t_from":"1983","quote":"the sale-leaseback method is regarded as highly complex and involves substantial questions regarding tax and securities laws","place_label":"Candlestick Park","place_precision":"site","place_id":"qipu:sf/place/institution/candlestick-park-7d336c","resolved_by":"place links file","anchor":"s-c70bb6a0879b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the sale-leaseback method is regarded as highly complex"},{"claim_id":"c:9814da0eea0b8400103c6e5b472f2b3a","page_id":"c124897684:49","page_url":"https://archive.org/details/c124897684/page/n48","statement_kind":"proposal","subject_label":"New multiuse stadium configuration","summary":"The consultants recommend a circular stadium with a ground level diameter of approximately 700 feet.","property":"proposes","value_text":"circular, approximately 700 ft diameter","value_num":700.0,"unit":"ft","t_from":"1983","quote":"The consultants recommend a circular configuration which would have a.ground level diameter of approximately 700 feet.","anchor":"s-9814da0eea0b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Mayor's Stadium Task Force, the report's own narrative","stance":"own_position","speaker_evidence":"The architectural and engineering consultants prepared, as part of this study"},{"claim_id":"c:a17d2f015dd5104be0684403f67f86d0","page_id":"c124897684:49","page_url":"https://archive.org/details/c124897684/page/n48","statement_kind":"proposal","subject_label":"New multiuse stadium footprint","summary":"The study states the stadium footprint would have a total area of 385,000 square feet (8.8 acres).","property":"acreage","value_text":"8.8 acres","value_num":8.8,"unit":"acres","t_from":"1983","quote":"This \"footprint\" would have a total area of 385,000 square feet (8.8 acres).","anchor":"s-a17d2f015dd5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Mayor's Stadium Task Force, the report's own narrative","stance":"own_position","speaker_evidence":"This \"footprint\" would have a total area of 385,000 square feet"},{"claim_id":"c:329306b5c41c8c6feef95088fc30d2a3","page_id":"c124897684:63","page_url":"https://archive.org/details/c124897684/page/n62","statement_kind":"proposal","subject_label":"Stadium site selection","summary":"The report states that Site 14 appears to be the best site based exclusively on technical considerations.","property":"recommendation","value_text":"Site 14","t_from":"1983","quote":"Based exclusively on technical considerations, Site 14 (bounded by the China Basin Building and 3rd, 4th and Townsend Streets) appears to be the best site.","place_label":"Site 14","anchor":"s-329306b5c41c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"SELECTING A BEST SITE. Based exclusively on technical considerations"},{"claim_id":"c:4aae75efca9fb874a0451de09b81a00d","page_id":"c124897684:63","page_url":"https://archive.org/details/c124897684/page/n62","statement_kind":"finding","subject_label":"Site 14 land area","summary":"The report states that Site 14 consists of about 14.5 acres and is principally privately owned.","property":"acreage","value_text":"14.5 acres","value_num":14.5,"unit":"acres","t_from":"1983","quote":"Site 14, consisting of about 14.5 acres, is principally privately owned.","place_label":"Site 14","anchor":"s-4aae75efca9f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Site 14, consisting of about 14.5 acres, is principally privately owned."},{"claim_id":"c:5761d6e4b22ba352ebef303f0c79dd4c","page_id":"c124897684:63","page_url":"https://archive.org/details/c124897684/page/n62","statement_kind":"finding","subject_label":"Port leases on Site 7","summary":"The report states that leases of Port building area produce about 138,000 dollars in annual income to the Port.","property":"other","value_text":"$138,000 annual income","value_num":138000.0,"unit":"USD","t_from":"1983","quote":"Approximately 83,000 square feet of the building area is also leased to three commercial tenants at rates of $.11 to $.14 per square foot per month producing $138,000 in annual income to the Port.","place_label":"Site 7","anchor":"s-5761d6e4b22b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Approximately 83,000 square feet of the building area is also leased"},{"claim_id":"c:5cc23f59be62eec869d47595a211b83b","page_id":"c124897684:63","page_url":"https://archive.org/details/c124897684/page/n62","statement_kind":"finding","subject_label":"Site 7 land area","summary":"The report states that Site 7 comprises about 20.9 acres and is entirely publicly owned.","property":"acreage","value_text":"20.9 acres","value_num":20.9,"unit":"acres","t_from":"1983","quote":"It comprises a total area of about 20.9 acres and is entirely publically owned.","place_label":"Site 7","anchor":"s-5cc23f59be62","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"It comprises a total area of about 20.9 acres and is entirely publically owned."},{"claim_id":"c:7d5e1f50e6ae0b27b4fb20358b0356bd","page_id":"c124897684:63","page_url":"https://archive.org/details/c124897684/page/n62","statement_kind":"finding","subject_label":"Stadium site selection","summary":"The report concludes that Site 7 may be the only feasible location for a new downtown stadium.","property":"recommendation","value_text":"Site 7","t_from":"1983","quote":"Because of both cost and availability, Site 7 may be the only feasible location for a new downtown stadium.","place_label":"Site 7","anchor":"s-7d5e1f50e6ae","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Because of both cost and availability, Site 7 may be the only feasible location"},{"claim_id":"c:0c3f9a2216d0940758415dc7ae260fc3","page_id":"c124897684:65","page_url":"https://archive.org/details/c124897684/page/n64","statement_kind":"proposal","subject_label":"Southern Pacific Mission Bay parking","summary":"Southern Pacific hopes to build over 3,700 parking spaces on its two blocks.","property":"proposes","value_text":"over 3,700 parking spaces","value_num":3700.0,"t_from":"1983","quote":"Southern Pacific hopes to construct 2.8 million square feet of office space and over 3,700 parking spaces on the two blocks owned by the Company.","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-0c3f9a2216d0","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Based on the recently announced Mission Bay plan, Southern Pacific hopes to construct"},{"claim_id":"c:345145d40eb7508758fbcf38f70b20fe","page_id":"c124897684:65","page_url":"https://archive.org/details/c124897684/page/n64","statement_kind":"finding","subject_label":"Southern Pacific response to stadium","summary":"The report states that Southern Pacific has rejected suggestions to include a new stadium on Site 14 in its Mission Bay plans.","property":"rejected","value_text":"Rejected suggestions for a stadium on Site 14","t_from":"1983","quote":"Southern Pacific to this date has rejected suggestions for redesigning Mission Bay plans to include a new stadium on Site 14.","place_label":"Site 14","anchor":"s-345145d40eb7","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Southern Pacific to this date has rejected suggestions for redesigning Mission Bay plans"},{"claim_id":"c:4ae80b72e0aecf6bb5836dc9ed37f5ee","page_id":"c124897684:65","page_url":"https://archive.org/details/c124897684/page/n64","statement_kind":"finding","subject_label":"China Basin Building plans","summary":"The owners of the China Basin Building have approved plans for a 180,000 square foot office building.","property":"approved","value_text":"180,000 square foot office building","value_num":180000.0,"unit":"sqft","t_from":"1983","quote":"The owners of the China Basin Building have approved plans for a 180,000!square foot office building and a 550-car underground: parking structure.","place_label":"China Basin Building","anchor":"s-4ae80b72e0ae","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The owners of the China Basin Building have approved plans for a 180,000 square foot office building"},{"claim_id":"c:6e3c7abe846a8f97b3a6ec096ad27970","page_id":"c124897684:65","page_url":"https://archive.org/details/c124897684/page/n64","statement_kind":"proposal","subject_label":"Southern Pacific Mission Bay project","summary":"Southern Pacific hopes to construct 2.8 million square feet of office space on its two blocks.","property":"proposes","value_text":"2.8 million square feet of office space","value_num":2800000.0,"unit":"sqft","t_from":"1983","quote":"Southern Pacific hopes to construct 2.8 million square feet of office space and over 3,700 parking spaces on the two blocks owned by the Company.","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-6e3c7abe846a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Southern Pacific hopes to construct 2.8 million square feet of office space"},{"claim_id":"c:f3e1e55e0f2f0db01d272266d3191924","page_id":"c124897684:81","page_url":"https://archive.org/details/c124897684/page/n80","statement_kind":"background","subject_label":"Stadium financial feasibility analysis","summary":"The study team processed nineteen computer runs testing assumptions on revenues and costs.","property":"other","value_text":"Nineteen runs","value_num":19.0,"t_from":"1983","quote":"Nineteen runs were processed analyzing the impact of various assumptions on revenues and costs.","anchor":"s-f3e1e55e0f2f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"To determine financial feasibility, a computer program was set up"},{"claim_id":"c:0ea0d95d0b060738323f1b0d89dbccd0","page_id":"c124897684:91","page_url":"https://archive.org/details/c124897684/page/n90","statement_kind":"proposal","subject_label":"Stadium financing rates","summary":"The study assumes a financing rate of 9.5% for lease revenue bonds and 13.25% for private sponsorship.","property":"other","value_text":"9.5% lease revenue; 13.25% private sponsorship","value_num":9.5,"unit":"percent","t_from":"1983","quote":"The financing rate for lease revenue bonds will be 9.5% and for private sponsorship, 13.25%.","anchor":"s-0ea0d95d0b06","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The financing rate for lease revenue bonds will be 9.5%"},{"claim_id":"c:0f5f37fd44628ff7bc00f6ecb8716f94","page_id":"c124897684:91","page_url":"https://archive.org/details/c124897684/page/n90","statement_kind":"proposal","subject_label":"Stadium exhibition space","summary":"The study projects that about 50,000 sq ft of exhibition space could be created and leased.","property":"floor_area_sqft","value_text":"approximately 50,000 square feet","value_num":50000.0,"unit":"sqft","date_printed":"first year of operation","t_from":"1983","quote":"Approximately 50,000 square feet of exhibition space can be created within the stadium which can be leased for half of the first year at a daily rate of $.12 per square foot.","anchor":"s-0f5f37fd4462","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Approximately 50,000 square feet of exhibition space can be created"},{"claim_id":"c:3489153a2425eaaebc1ee324dcc7f6ab","page_id":"c124897684:91","page_url":"https://archive.org/details/c124897684/page/n90","statement_kind":"proposal","subject_label":"Stadium private sponsorship bond issue","summary":"The study estimates a private sponsorship bond issue of $71 million (≈ $240.2 million in 2026 dollars) with sponsor equity of $40.0 million (≈ $135.3 million in 2026 dollars).","property":"cost_usd","value_text":"$71 million with $40.0 million sponsor equity","value_num":71000000.0,"unit":"USD","t_from":"1983","quote":"$170 million for the lease revenue method and $71 million for private sponsorship with a sponsor's equity of $40.0 million.","anchor":"s-3489153a2425","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The size of the bond issue which must be supported by the stadium"},{"claim_id":"c:b0bd7e4eaf9cce04921a76a8f6fba596","page_id":"c124897684:91","page_url":"https://archive.org/details/c124897684/page/n90","statement_kind":"finding","subject_label":"Candlestick admissions taxes","summary":"Admissions taxes at Candlestick are $.50 per ticket for tickets priced $9.00 (≈ $30.45 in 2026 dollars) or over.","property":"other","value_text":"$.50 per ticket for tickets priced $9.00 or over","value_num":0.5,"unit":"USD","t_from":"1983","quote":"This compares with admissions taxes at Candlestick which are $.50 per ticket for each ticket priced $9.00 or over.","place_label":"Candlestick","anchor":"s-b0bd7e4eaf9c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"This compares with admissions taxes at Candlestick"},{"claim_id":"c:c83a5357285da6bc542915977d61b51b","page_id":"c124897684:91","page_url":"https://archive.org/details/c124897684/page/n90","statement_kind":"proposal","subject_label":"Stadium guided tours","summary":"The study estimates guided tours could produce $250,000 (≈ $845,733 in 2026 dollars) in revenues annually.","property":"other","value_text":"$250,000 annually","value_num":250000.0,"unit":"USD","t_from":"1983","quote":"Guided tours can produce $250,000 in revenues annually.","anchor":"s-c83a5357285d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Guided tours can produce $250,000 in revenues annually."},{"claim_id":"c:d77b707ab016fdffa873d39c3de09358","page_id":"c124897684:91","page_url":"https://archive.org/details/c124897684/page/n90","statement_kind":"proposal","subject_label":"Stadium bond issue","summary":"The study estimates the lease revenue bond issue at $170 million (≈ $575.1 million in 2026 dollars).","property":"cost_usd","value_text":"$170 million","value_num":170000000.0,"unit":"USD","t_from":"1983","quote":"The size of the bond issue which must be supported by the stadium will be $170 million for the lease revenue method","anchor":"s-d77b707ab016","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The size of the bond issue which must be supported by the stadium will be $170 million"},{"claim_id":"c:db0fe2bc40384d8c68799bac47fa8930","page_id":"c124897684:91","page_url":"https://archive.org/details/c124897684/page/n90","statement_kind":"proposal","subject_label":"Stadium operating costs","summary":"The study projects stadium operating costs of about $6.2 million (≈ $21.0 million in 2026 dollars) in the first year.","property":"cost_usd","value_text":"approximately $6.2 million","value_num":6200000.0,"unit":"USD","date_printed":"first year of operation","t_from":"1983","quote":"Operating costs will be approximately $6.2 million during the first year of operation escalating at a 7% annual rate thereafter.","anchor":"s-db0fe2bc4038","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Operating costs will be approximately $6.2 million during the first year"},{"claim_id":"c:fe13b74c7cccf6ee5eef35906c67fabc","page_id":"c124897684:91","page_url":"https://archive.org/details/c124897684/page/n90","statement_kind":"proposal","subject_label":"Stadium admissions tax","summary":"The study proposes an admissions tax of 5.0% of ticket prices on all tickets to all events.","property":"other","value_text":"5.0% of ticket prices","value_num":5.0,"unit":"percent","t_from":"1983","quote":"An admissions tax equal to 5.0% of ticket prices will be imposed on all tickets to all events.","anchor":"s-fe13b74c7ccc","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"An admissions tax equal to 5.0% of ticket prices will be imposed"},{"claim_id":"c:af85bdb9c24c22f8200709e09978495a","page_id":"c124897684:103","page_url":"https://archive.org/details/c124897684/page/n102","statement_kind":"proposal","subject_label":"Tax revenue from Alternative 4 (best economic use)","summary":"The study's computations estimate combined property, sales, and payroll tax revenue from Alternative 4 at $1.4 million (≈ $4.7 million in 2026 dollars) per year.","property":"alternative","value_text":"$1.4 million per year","value_num":1400000.0,"unit":"USD","t_from":"1983","quote":"Computations done as part of this study indicate that the combined property, sales, and payroll tax revenues which would result from Alternative 4, the best economic use, would be $1.4 million per year.","anchor":"s-af85bdb9c24c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Computations done as part of this study indicate"},{"claim_id":"c:c56095cf14312e781ff52e11618dba00","page_id":"c124897684:103","page_url":"https://archive.org/details/c124897684/page/n102","statement_kind":"proposal","subject_label":"Tax revenue from Alternative 3 (housing emphasis)","summary":"The study estimates Alternative 3, which emphasizes housing, would generate about $3.5 million (≈ $11.8 million in 2026 dollars) per year in taxes.","property":"alternative","value_text":"about $3.5 million per year","value_num":3500000.0,"unit":"USD","t_from":"1983","quote":"Alternative 3 which emphasizes housing would generate about $3.5 million per year, $2.75 million of which would be property taxes from housing.","anchor":"s-c56095cf1431","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Alternative 3 which emphasizes housing would generate"},{"claim_id":"c:1985c10c50058868029f121ef9f63de8","page_id":"c124897684:109","page_url":"https://archive.org/details/c124897684/page/n108","statement_kind":"proposal","subject_label":"Lease revenue bond stadium timetable","summary":"The report sets out a timetable for building a new stadium under lease revenue bonds, with the stadium opening in June.","property":"proposes","value_text":"stadium open June","t_from":"1983","quote":"The timetable for construction of a new stadium under lease revenue bonds is as follows: ORDER TC PRCCEED (JUNS) DESIGN (14 MONTHS) BID (3 MONTHS) CONSTRUCTION (30 MONTHS) STADIUM OPEN (JUNE)","anchor":"s-1985c10c5005","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The timetable for construction of a new stadium under lease revenue bonds is as follows:"},{"claim_id":"c:65252412663ea68bc112d5440a1cc0fe","page_id":"c124897684:109","page_url":"https://archive.org/details/c124897684/page/n108","statement_kind":"background","subject_label":"Park land disposition","summary":"The City Charter requires voter approval for disposition of park lands, and Candlestick Park is regarded as park land.","property":"other","t_from":"1983","quote":"The City Charter requires voter approval on park lands proposed for disposition.","place_label":"Candlestick Park","place_precision":"site","place_id":"qipu:sf/place/institution/candlestick-park-7d336c","resolved_by":"place links file","anchor":"s-65252412663e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The City Charter requires voter approval on park lands proposed for disposition."},{"claim_id":"c:e15c62a6ba97670c1d339d35058ab45d","page_id":"c124897684:111","page_url":"https://archive.org/details/c124897684/page/n110","statement_kind":"proposal","subject_label":"Relocation program for Site 7","summary":"The report estimates the relocation program for Site 7 will take at least 14 months after an order to proceed.","property":"proposes","value_text":"at least 14 months","value_num":14.0,"unit":"months","t_from":"1983","quote":"The relocation program (for Site 7) is estimated to take at least 14 months to complete after an order to proceed.","place_label":"Site 7","anchor":"s-e15c62a6ba97","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"This timetable shows construction beginning immediately after the relocation program"}]}