{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124899442","url":"https://data.qipu.org/usa/san-francisco/reports/c124899442/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124899442/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124899442","source_id":"C124899442","title":"Report on proposed installation of rapid transit trains on Golden Gate Bridge","year":1962,"n_pages":34,"creator":"Ammann, Othmar H","source_url":"https://archive.org/details/C124899442","issuer":"Golden Gate Bridge, Highway and Transportation District","issuer_type":"government","gov_level":"regional","prepared_by":"Othmar H. Ammann, Frank M. Masters, Nathan M. Newmark (Engineering Board of Review)","doc_kind":"study","jurisdiction":"SF Bay Area","jurisdiction_id":"region:bay-area","city":null,"issuer_by":"model","doc_kind_by":"model","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":18,"statements_total":61,"statements_by_kind":{"finding":38,"proposal":18,"cites_decision":2,"background":3},"same_for_every_statement":{"source_id":"C124899442","source_url":"https://archive.org/details/C124899442","source_label":"IGS library: Report on proposed installation of rapid transit trains on Golden Gate Bridge","report_year":1962,"issuer":"Golden Gate Bridge, Highway and Transportation District","issuer_type":"government","doc_kind":"study","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-claims-20p-haiku55-cli-2026-10-23","city":"sf","prompt_version":"igs-sf-claims-cli-v1"},"summary":{"what":"A study by the Golden Gate Bridge, Highway and Transportation District on whether rapid transit trains could be added to the bridge, and what it would cost structurally.","figures":[{"label":"Dead load","value":"25,700 lbs. per ft. center span","claim_ids":["c:e78267a8aca3afd10d074a2b354eb141"]},{"label":"Center span dead load","value":"22,900 lbs. per ft.","claim_ids":["c:1b4a9565b10a0c1465a81a9a1037ce6e"]},{"label":"Sidewalk width","value":"10 ft. to 6 ft.","claim_ids":["c:6bdce691dd9b7585f7992b6798eee4a2"]}],"main_points":["c:1b09fdbb163758db1b6bea3433d59b67","c:b99698772249abb80e04dd141db7a65a","c:b1a3407e5faa7a5485a29a4291c23ecf"],"board_decisions_after":[],"board_decisions_before":["qipu:sf/decision/journalofproceed56sanfrich|g645"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:0abb942b6171a471137e54b97ca094eb","page_id":"C124899442:7","page_url":"https://archive.org/details/C124899442/page/n6","statement_kind":"cites_decision","subject_label":"Scope of engineering review of rapid transit on Golden Gate Bridge","summary":"The Board of Directors approved the engineering board's proposed scope of investigations, covering loads, stresses, and fatigue.","property":"approved","value_text":"approved","date_printed":"February 5, 1962","t_from":"1962","quote":"This scope, approved by the Board of Directors, provided, as a first phase, substantially for the following studies","decided_by":"Board of Directors of the Golden Gate Bridge and Highway District","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-0abb942b6171","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"INTRODUCTION AND SCOPE OF REVIEW; we submitted to the Board of Directors"},{"claim_id":"c:235ffcfd3e19f7eab68fe8081bbc333a","page_id":"C124899442:7","page_url":"https://archive.org/details/C124899442/page/n6","statement_kind":"finding","subject_label":"Addition of two rapid transit tracks on Golden Gate Bridge","summary":"Consulting engineer [name withheld] March 1961 report found adding two rapid transit tracks to the bridge feasible and practicable.","property":"finding","value_text":"feasible and practicable","date_printed":"March 1961","t_from":"1961","quote":"found the addition of two rapid transit tracks on the bridge feasible and practicable","place_label":"Golden Gate Bridge","place_precision":"street","privacy_flag":"may_name_private_person_after_1950","privacy_class":"private_person","public_after_year":2037,"anchor":"s-235ffcfd3e19","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"another body","stance":"quotes_to_report","speaker_evidence":"In a report of March 1961 to the [name]. [name]"},{"claim_id":"c:6f7e2c5dfd2865f1945275d1ec6402cb","page_id":"C124899442:7","page_url":"https://archive.org/details/C124899442/page/n6","statement_kind":"finding","subject_label":"Rapid transit trains on Golden Gate Bridge","summary":"Consulting engineer [name withheld] July 1961 review recommended that rapid transit trains not be permitted on the bridge.","property":"recommendation","value_text":"not be permitted","date_printed":"July 1961","t_from":"1961","quote":"recommended that rapid transit trains not be per- mitted to operate over the bridge","place_label":"Golden Gate Bridge","place_precision":"street","privacy_flag":"may_name_private_person_after_1950","privacy_class":"private_person","public_after_year":2037,"anchor":"s-6f7e2c5dfd28","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"another body","stance":"quotes_to_report","speaker_evidence":"Mr. [name], [name], reviewed [name] report and, in a report of July 1961, recommended"},{"claim_id":"c:c9ad02024bd130b7e03ed3ac4ce9933f","page_id":"C124899442:7","page_url":"https://archive.org/details/C124899442/page/n6","statement_kind":"cites_decision","subject_label":"Engineering Board of Review on rapid transit on Golden Gate Bridge","summary":"The Board of Directors appointed the authors as an Engineering Board of Review to review conflicting feasibility reports.","property":"adopted","value_text":"January 12, 1962","date_printed":"January 12, 1962","t_from":"1962","quote":"On January 12, 1962 the Board of Directors of the Golden Gate Bridge and Highway District appointed the undersigned as an Engineering Board of Review","decided_by":"Board of Directors of the Golden Gate Bridge and Highway District","instrument_date_printed":"January 12, 1962","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-c9ad02024bd1","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"On January 12, 1962 the Board of Directors of the Golden Gate Bridge and Highway District appointed the undersigned"},{"claim_id":"c:6a04763b747dee268725f0efb4ddaa9d","page_id":"C124899442:8","page_url":"https://archive.org/details/C124899442/page/n7","statement_kind":"proposal","subject_label":"Sidewalk width reduction on Golden Gate Bridge","summary":"The board assumed, as a permissible modification to offset added dead weight, reducing sidewalk width from 10 to 6 feet.","property":"proposes","value_text":"from 10 to 6 feet","value_num":6.0,"unit":"ft","date_printed":"April 1962","t_from":"1962","quote":"reduction of the width of the sidewalks from 10 to 6 feet","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-6a04763b747d","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"To offset this dead weight required by rapid transit installation, we have assumed as a permissible modification"},{"claim_id":"c:95cce9b12319ef9148a4cacdef1a4b7f","page_id":"C124899442:8","page_url":"https://archive.org/details/C124899442/page/n7","statement_kind":"proposal","subject_label":"Open steel grating deck replacement on Golden Gate Bridge","summary":"The board does not recommend replacing the solid deck slabs with open steel grating in any roadway lane or sidewalk.","property":"recommendation","value_text":"not recommended","date_printed":"April 1962","t_from":"1962","quote":"We do not recom- mend, however, the replacement of the present solid deck slabs by open steel grating in any of the roadway lanes or the sidewalks.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-95cce9b12319","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"We do not recom- mend, however, the replacement of the present solid deck slabs"},{"claim_id":"c:95e7bf053c313c3b6a2644231ab60014","page_id":"C124899442:8","page_url":"https://archive.org/details/C124899442/page/n7","statement_kind":"finding","subject_label":"Golden Gate Bridge structural reserve capacity","summary":"The engineering board finds the bridge as originally built had a certain reserve capacity to carry additional load.","property":"finding","value_text":"reserve capacity","date_printed":"April 1962","t_from":"1962","quote":"As originally designed and built the Golden Gate Bridge had a certain reserve capacity to carry additional load.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-95e7bf053c31","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"As originally designed and built the Golden Gate Bridge had a certain reserve capacity"},{"claim_id":"c:d564c3c32a5695c206e24ca489acfa61","page_id":"C124899442:8","page_url":"https://archive.org/details/C124899442/page/n7","statement_kind":"proposal","subject_label":"Light-weight rapid transit trains assumption","summary":"The board assumed light-weight rapid transit trains, as contemplated by BART, for the moving load on the tracks.","property":"proposes","value_text":"light-weight trains","date_printed":"April 1962","t_from":"1962","quote":"For the moving load on the tracks we have assumed light-weight rapid transit trains as contemplated by the San Francisco Bay Area Rapid Transit District.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-d564c3c32a56","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"For the moving load on the tracks we have assumed light-weight rapid transit trains"},{"claim_id":"c:57f91f094e52b73ead5d96a7766a386a","page_id":"C124899442:9","page_url":"https://archive.org/details/C124899442/page/n8","statement_kind":"finding","subject_label":"Major carrying members stresses under rapid transit","summary":"The board's calculations show that even under light-weight trains the permissible stresses would be appreciably exceeded in all major carrying members.","property":"finding","value_text":"appreciably exceeded","date_printed":"April 1962","t_from":"1962","quote":"the permissible stresses would be appreciably exceeded in all major carrying members","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-57f91f094e52","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The stress figures given in the text of this report disclose that"},{"claim_id":"c:b1a3407e5faa7a5485a29a4291c23ecf","page_id":"C124899442:9","page_url":"https://archive.org/details/C124899442/page/n8","statement_kind":"finding","subject_label":"Service life of Golden Gate Bridge with rapid transit","summary":"The board concludes that installing rapid transit would decrease the possible life of the bridge.","property":"finding","value_text":"decrease in possible life","date_printed":"April 1962","t_from":"1962","quote":"installation of rapid transit on the Golden Gate Bridge would lead to a decrease in the possible life of the bridge","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-b1a3407e5faa","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"From available information on fatigue effects resulting from repeated stresses"},{"claim_id":"c:dc27012241aaff20109116888a277192","page_id":"C124899442:9","page_url":"https://archive.org/details/C124899442/page/n8","statement_kind":"proposal","subject_label":"Main cable stress limit with rapid transit","summary":"The board judges that wire cable stresses could conservatively be permitted about 5% above original design limits if rapid transit is installed.","property":"proposes","value_text":"about 5% higher","unit":"percent","date_printed":"April 1962","t_from":"1962","quote":"the stresses in the wire cables can be conservatively permitted to go about 5% higher than the limiting value set up in the original design specifications","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-dc27012241aa","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"It is our judgment that, in case rapid transit is installed"},{"claim_id":"c:1b4a9565b10a0c1465a81a9a1037ce6e","page_id":"C124899442:11","page_url":"https://archive.org/details/C124899442/page/n10","statement_kind":"finding","subject_label":"Golden Gate Bridge center span dead load","summary":"The report states that additions after 1937 raised the center span dead load to its present value of 22,900 lbs. per foot.","property":"other","value_text":"22,900 lbs. per ft.","value_num":22900.0,"unit":"lbs per ft","date_printed":"July 1961","t_from":"1961","quote":"These additions increased the dead load of the center span to its present value of 22,900 lbs. per ft. of bridge.","place_label":"Golden Gate Bridge center span","place_precision":"street","anchor":"s-1b4a9565b10a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"These additions increased the dead load of the center span"},{"claim_id":"c:6bdce691dd9b7585f7992b6798eee4a2","page_id":"C124899442:11","page_url":"https://archive.org/details/C124899442/page/n10","statement_kind":"proposal","subject_label":"Golden Gate Bridge pedestrian walkways","summary":"The report proposes reducing the pedestrian walks from 10 feet to about 6 feet to offset added weight from rapid transit.","property":"proposes","value_text":"10 ft. to 6 ft.","value_num":6.0,"unit":"ft","t_from":"1962","quote":"by reducing the width of the pedestrian walks from the present 10 ft. to say 6 ft.","place_label":"Golden Gate Bridge pedestrian walks","place_precision":"street","anchor":"s-6bdce691dd9b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In considering the addition of rapid transit it is evident that partially"},{"claim_id":"c:b4efd82cd1b540048a056714db8937e8","page_id":"C124899442:11","page_url":"https://archive.org/details/C124899442/page/n10","statement_kind":"proposal","subject_label":"Golden Gate Bridge dead load reserve","summary":"The report recommends maintaining a reserve of at least 800 lbs. per foot for possible future dead loads before rapid transit is added.","property":"recommendation","value_text":"800 lbs. per ft. reserve","value_num":800.0,"unit":"lbs per ft","t_from":"1962","quote":"It would be advisable to maintain a reserve for such possible future additional dead loads to the extent of at least 800 lbs. per ft. of bridge before additions of rapid transit facilities are made.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-b4efd82cd1b5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"It would be advisable to maintain a reserve for such possible future"},{"claim_id":"c:b7089f5aa0e94ac6f4631e9ee62ce451","page_id":"C124899442:11","page_url":"https://archive.org/details/C124899442/page/n10","statement_kind":"proposal","subject_label":"Golden Gate Bridge center span dead load with reserve","summary":"The report estimates the center span dead load with the modest reserve would be 23,700 lbs. per foot.","property":"other","value_text":"23,700 lbs. per ft.","value_num":23700.0,"unit":"lbs per ft","t_from":"1962","quote":"The total dead load of the center span with this modest reserve would amount to 23,700 lbs. per ft. of bridge.","place_label":"Golden Gate Bridge center span","place_precision":"street","anchor":"s-b7089f5aa0e9","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The total dead load of the center span with this modest reserve"},{"claim_id":"c:c9918c640829f3b66bb743fcf62b32ab","page_id":"C124899442:11","page_url":"https://archive.org/details/C124899442/page/n10","statement_kind":"background","subject_label":"Golden Gate Bridge suspension spans original design dead load","summary":"The report states the suspension spans were originally designed for an assumed uniform dead load of 21,000 lbs. per foot of bridge.","property":"other","value_text":"21,000 lbs. per ft.","value_num":21000.0,"unit":"lbs per ft","t_from":"1962","quote":"the suspension spans were designed for an assumed uniform dead load of the structure suspended from the towers of 21,000 Ibs. per lin. ft. of bridge","place_label":"Golden Gate Bridge suspension spans","place_precision":"street","anchor":"s-c9918c640829","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"As originally built the suspension spans were designed for an assumed"},{"claim_id":"c:93c70b37ac51b4861120de77bd04dd16","page_id":"C124899442:12","page_url":"https://archive.org/details/C124899442/page/n11","statement_kind":"proposal","subject_label":"Golden Gate Bridge deck flooring","summary":"The report advises against substituting open gratings for the solid flooring in the sidewalks or roadway lanes.","property":"recommendation","value_text":"not advisable","t_from":"1962","quote":"It would not be advisable, however, to substitute open gratings for the present solid flooring in either the sidewalks or any of the roadway lanes.","place_label":"Golden Gate Bridge deck","place_precision":"street","anchor":"s-93c70b37ac51","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"It would not be advisable, however, to substitute open gratings"},{"claim_id":"c:aebd37a71391bc6050dbffd611f5401e","page_id":"C124899442:12","page_url":"https://archive.org/details/C124899442/page/n11","statement_kind":"proposal","subject_label":"Two rapid transit tracks on Golden Gate Bridge","summary":"The report estimates the new structural members supporting two rapid transit tracks would add 535 lbs. per foot to the dead load.","property":"other","value_text":"535 lbs. per ft.","value_num":535.0,"unit":"lbs per ft","t_from":"1962","quote":"For new structural members to support the tracks (stringers, bracing between stringers, etc.) 535 Ibs.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-aebd37a71391","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"If two rapid transit tracks are installed in the center"},{"claim_id":"c:e78267a8aca3afd10d074a2b354eb141","page_id":"C124899442:13","page_url":"https://archive.org/details/C124899442/page/n12","statement_kind":"proposal","subject_label":"Golden Gate Bridge center span total design dead load","summary":"The report states the total design dead load of the center span with rapid transit would be 25,700 lbs. per foot, 22.4% above the original design.","property":"other","value_text":"25,700 lbs. per ft. (22.4% above original)","value_num":25700.0,"unit":"lbs per ft","t_from":"1962","quote":"total design dead load in the center span to 25,700 lbs. per ft. of bridge, which is 4,700 lbs. per ft. or 22.4% higher than the original design dead load of 21,000 lbs. per ft. of bridge.","place_label":"Golden Gate Bridge center span","place_precision":"street","anchor":"s-e78267a8aca3","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Design Live Loads; total design dead load in the center span to 25,700 lbs. per ft."},{"claim_id":"c:1b4cde147f7ef412f35d9a915142b3aa","page_id":"C124899442:15","page_url":"https://archive.org/details/C124899442/page/n14","statement_kind":"finding","subject_label":"New York Transit Authority experimental light rail cars","summary":"The report states the New York Transit Authority is about to put experimental lighter cars weighing 1,810 lbs. per foot per track into operation.","property":"finding","value_text":"1,810 lbs. per ft. per track","value_num":1810.0,"unit":"lbs per ft","t_from":"1962","quote":"the New York Transit Authority is about to put into experimental operation a few cars weighing fully loaded 1,810 lbs. per ft. per track.","place_precision":"none","anchor":"s-1b4cde147f7e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"We understand that, after many years of experimenting"},{"claim_id":"c:2e7d7baeb062b9e56c6343b86f725267","page_id":"C124899442:15","page_url":"https://archive.org/details/C124899442/page/n14","statement_kind":"proposal","subject_label":"Golden Gate Bridge stiffening truss design live load","summary":"The report assumes a restricted-length live load of 6,000 lbs. per foot (highway plus rapid transit) for the stiffening trusses.","property":"other","value_text":"6,000 lbs. per ft.","value_num":6000.0,"unit":"lbs per ft","t_from":"1962","quote":"This restricted length live load of 3,200 + 2,800 = 6,000 Ibs. per ft. of bridge is placed in a position to cause maximum stress in the stiffening trusses.","place_label":"Golden Gate Bridge stiffening trusses","place_precision":"street","anchor":"s-2e7d7baeb062","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Design Live Loads for Stiffening Trusses. The maximum stresses in the stiffening trusses"},{"claim_id":"c:b165ea633ef2c4bcbb60cd34a7486b3f","page_id":"C124899442:15","page_url":"https://archive.org/details/C124899442/page/n14","statement_kind":"proposal","subject_label":"Rapid transit car safety on Golden Gate Bridge","summary":"The report says adequate protection against wind overturning and derailment is essential before rapid transit is installed.","property":"recommendation","value_text":"protective measures essential","t_from":"1962","quote":"In any case we consider it essential that adequate protective measures against such happenings, as well as against possible derailments, be taken.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-b165ea633ef2","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In any case we consider it essential that adequate protective measures"},{"claim_id":"c:f55a47662cb528001074a020cffcfcd7","page_id":"C124899442:15","page_url":"https://archive.org/details/C124899442/page/n14","statement_kind":"proposal","subject_label":"Golden Gate Bridge combined highway and rapid transit design live load","summary":"The report assumes a combined design live load of 4,600 lbs. per foot for highway and rapid transit, 15% above the original design load.","property":"other","value_text":"4,600 lbs. per ft.","value_num":4600.0,"unit":"lbs per ft","t_from":"1962","quote":"The above highway and rapid transit live loads assumed for this study give a combined live load of 2,900 + 1,700 = 4,600 Ibs. per ft.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-f55a47662cb5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Combined Design Live Load for Cables, Anchorages and Towers"},{"claim_id":"c:ba3770a3782f70276c4a3617de2d8c5d","page_id":"C124899442:16","page_url":"https://archive.org/details/C124899442/page/n15","statement_kind":"proposal","subject_label":"Rapid transit cars design axle load","summary":"The report assumes light-weight rapid transit cars of 88,260 lbs. loaded, or 22,065 lbs. per axle, for designing the deck structure.","property":"other","value_text":"22,065 lbs. per axle","value_num":22065.0,"unit":"lbs","t_from":"1962","quote":"or 22,065 Ibs. per axle, have been assumed, with impact and permissible unit stresses for the deck structure","place_label":"Golden Gate Bridge deck structure","place_precision":"street","anchor":"s-ba3770a3782f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"Design Live Loads for the Deck Structure and Suspenders"},{"claim_id":"c:e47f9b252586005eb79476d62d1028eb","page_id":"C124899442:16","page_url":"https://archive.org/details/C124899442/page/n15","statement_kind":"finding","subject_label":"Aerodynamic effect of rapid transit on Golden Gate Bridge","summary":"The report concludes that adding rapid transit has relatively little effect on the actual bridge's aerodynamic behavior.","property":"finding","value_text":"relatively little effect","t_from":"1962","quote":"even the addition of rapid transit on the bridge, have relatively little effect on the behavior of the actual structure.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-e47f9b252586","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"Refinements in the form of a structure, such as shape of railings"},{"claim_id":"c:a86fbee7d01322f41bbddb2f86ebfa55","page_id":"C124899442:17","page_url":"https://archive.org/details/C124899442/page/n16","statement_kind":"finding","subject_label":"Golden Gate Bridge wind motions after lower lateral system","summary":"The report states that winds up to about 60 mph have been observed on the bridge since the lower lateral system was added, with unobjectionable motions.","property":"other","value_text":"about 60 mi. per hr.","value_num":60.0,"unit":"mph","t_from":"1962","quote":"Wind velocities of up to about 60 mi. per hr., with resulting unobjection- able motions, have been observed on the Golden Gate Bridge since the lower lateral system was added","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-a86fbee7d013","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"Wind velocities of up to about 60 mi. per hr., with resulting unobjection- able motions, have been observed"},{"claim_id":"c:a97b1c62292d7a4338583797dfd819cb","page_id":"C124899442:17","page_url":"https://archive.org/details/C124899442/page/n16","statement_kind":"finding","subject_label":"Golden Gate Bridge aerodynamic effect of rapid transit","summary":"The report expects the adverse aerodynamic effect of rapid transit to be probably offset by narrower sidewalks and greater dead weight.","property":"finding","value_text":"offset","t_from":"1962","quote":"would probably be offset by the narrowing of the sidewalks and the increase in dead weight.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-a97b1c62292d","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"would probably be offset by the narrowing of the sidewalks and the increase in dead weight."},{"claim_id":"c:bd177884435c835c4250865fc5b05aeb","page_id":"C124899442:17","page_url":"https://archive.org/details/C124899442/page/n16","statement_kind":"finding","subject_label":"Golden Gate Bridge earthquake resistance","summary":"The report concurs that the bridge is adequately stable and resistant against earthquake forces with or without rapid transit.","property":"finding","value_text":"adequately stable","t_from":"1962","quote":"the Golden Gate Bridge is adequately stable and resistant against earthquake forces with or without rapid transit.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-bd177884435c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"We concur in Mr. Gronquist's conclusions that the Golden Gate Bridge is adequately stable"},{"claim_id":"c:1b09fdbb163758db1b6bea3433d59b67","page_id":"C124899442:19","page_url":"https://archive.org/details/C124899442/page/n18","statement_kind":"proposal","subject_label":"Golden Gate Bridge rapid transit installation","summary":"The report considers installation of rapid transit on the bridge inadvisable because the cables would be overstressed.","property":"recommendation","value_text":"inadvisable","t_from":"1962","quote":"Because of this overstressing of the existing cables we consider the installation of rapid transit inadvisable.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-1b09fdbb1637","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Because of this overstressing of the existing cables we consider the installation of rapid transit inadvisable."},{"claim_id":"c:8b170c91335578a87f9927e892aaf7be","page_id":"C124899442:19","page_url":"https://archive.org/details/C124899442/page/n18","statement_kind":"finding","subject_label":"Golden Gate Bridge main cables under highway loading","summary":"The report states the existing maximum axial cable stress under highway traffic is 86,000 psi, within the conservative limit.","property":"other","value_text":"86,000 lbs. per sq. in.","value_num":86000.0,"unit":"psi","t_from":"1962","quote":"is 86,000 Ibs. per sq. in., or still well within the above mentioned conservative limit for highway traffic.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-8b170c913355","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The maximum axial cable stress in the bridge as it exists today"},{"claim_id":"c:b99698772249abb80e04dd141db7a65a","page_id":"C124899442:19","page_url":"https://archive.org/details/C124899442/page/n18","statement_kind":"finding","subject_label":"Golden Gate Bridge main cables under rapid transit","summary":"The report calculates the axial cable stress under rapid transit operation at 97,750 psi, about 12,000 psi above its conservative limit.","property":"other","value_text":"97,750 lbs. per sq. in.","value_num":97750.0,"unit":"psi","t_from":"1962","quote":"The calculated axial cable stress under rapid transit operation is 97,750 Ibs. per sq. in.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-b99698772249","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The calculated axial cable stress under rapid transit operation is 97,750"},{"claim_id":"c:301c4e15016923810eb3ddae6aa6a7f4","page_id":"C124899442:20","page_url":"https://archive.org/details/C124899442/page/n19","statement_kind":"finding","subject_label":"Golden Gate Bridge anchorage chains","summary":"The report concludes that rapid transit installation would overstress the anchorage chains.","property":"finding","value_text":"overstress","t_from":"1962","quote":"We conclude that rapid transit installation would overstress the anchorage chains.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-301c4e150169","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"We conclude that rapid transit installation would overstress the anchorage chains."},{"claim_id":"c:5aa934e61afa2ba6d5573720dac835bd","page_id":"C124899442:20","page_url":"https://archive.org/details/C124899442/page/n19","statement_kind":"finding","subject_label":"Golden Gate Bridge anchorage chains under rapid transit","summary":"The report calculates the anchorage chain stress under rapid transit at 30,300 psi, exceeding the permissible limit by 3,300 psi.","property":"other","value_text":"30,300 lbs. per sq. in.","value_num":30300.0,"unit":"psi","t_from":"1962","quote":"Under rapid transit operation the calculated stress under the assumed loads will reach 30,300 Ibs. per sq. in.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-5aa934e61afa","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"Under rapid transit operation the calculated stress under the assumed loads will reach 30,300 Ibs."},{"claim_id":"c:296801cd664c41de4feb1040a51361f6","page_id":"C124899442:21","page_url":"https://archive.org/details/C124899442/page/n20","statement_kind":"finding","subject_label":"Golden Gate Bridge tower shafts under rapid transit","summary":"The report finds calculated tower stresses exceed permissible values over about 400 ft of the tower height, including 80 to 300 ft above the base.","property":"other","value_text":"about 400 ft.","value_num":400.0,"unit":"ft","t_from":"1962","quote":"the calculated stresses are found to exceed these values","place_label":"Golden Gate Bridge tower","place_precision":"street","anchor":"s-296801cd664c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"In portions of the tower of an aggregate height of about 400 ft."},{"claim_id":"c:83f605e7b9b28602ac5dd7559f6c9eda","page_id":"C124899442:21","page_url":"https://archive.org/details/C124899442/page/n20","statement_kind":"finding","subject_label":"Golden Gate Bridge tower shafts about 80 ft below tower top","summary":"The report finds calculated axial stress in the silicon steel tower shaft about 80 ft below the top exceeds the permissible value by 2,200 psi.","property":"other","value_text":"2,200 lbs. per sq. in. excess","value_num":2200.0,"unit":"psi","t_from":"1962","quote":"Excess over permissible stress: 2,200 Ibs. per sq. in.","place_label":"Golden Gate Bridge tower","place_precision":"street","anchor":"s-83f605e7b9b2","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"Excess over permissible stress: 2,200 Ibs. per sq. in."},{"claim_id":"c:995e014ba687c086056b46f313e7ffaa","page_id":"C124899442:21","page_url":"https://archive.org/details/C124899442/page/n20","statement_kind":"finding","subject_label":"Golden Gate Bridge tower shafts about 300 ft below tower top","summary":"The report finds calculated stress in the carbon steel tower shaft about 300 ft below the top exceeds the permissible value by 2,400 psi.","property":"other","value_text":"2,400 lbs. per sq. in. excess","value_num":2400.0,"unit":"psi","t_from":"1962","quote":"Excess over permissible stress: 2,400 Ibs. per sq. in.","place_label":"Golden Gate Bridge tower","place_precision":"street","anchor":"s-995e014ba687","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"Excess over permissible stress: 2,400 Ibs. per sq. in."},{"claim_id":"c:5b9320fc28509d4373ba8474a475daa8","page_id":"C124899442:23","page_url":"https://archive.org/details/C124899442/page/n22","statement_kind":"finding","subject_label":"Golden Gate Bridge suspenders under rapid transit","summary":"The report finds the single-part suspender rope stress under rapid transit somewhat exceeds its permissible limit, though it considers the suspenders adequate.","property":"finding","value_text":"187,500 lbs. vs 176,000 lbs. permissible","value_num":187500.0,"unit":"lbs","t_from":"1962","quote":"The permissible single-part stress, therefore, is somewhat exceeded.","place_label":"Golden Gate Bridge suspenders","place_precision":"street","anchor":"s-5b9320fc2850","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"The permissible single-part stress, therefore, is somewhat exceeded."},{"claim_id":"c:7377308910bd801614dcb4a2b455596a","page_id":"C124899442:23","page_url":"https://archive.org/details/C124899442/page/n22","statement_kind":"finding","subject_label":"Golden Gate Bridge stiffening truss chords under rapid transit","summary":"The report says the stress range in the stiffening truss chords under each train passage is large enough to be of concern unless the trusses are strengthened.","property":"finding","value_text":"large enough to be of concern","t_from":"1962","quote":"The range in stress from maximum to minimum value, which would occur in the chords of the stiffening truss under each passage of a train","place_label":"Golden Gate Bridge stiffening truss","place_precision":"street","anchor":"s-7377308910bd","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"The range in stress from maximum to minimum value, which would occur in the chords of the stiffening truss"},{"claim_id":"c:10a60dee414b57cede40ab9955595169","page_id":"C124899442:24","page_url":"https://archive.org/details/C124899442/page/n23","statement_kind":"proposal","subject_label":"Golden Gate Bridge stiffening truss adjustment","summary":"[name withheld] proposes jacking up the stiffening trusses and inserting shims to offset the deflection effects.","property":"proposes","value_text":"jack up stiffening trusses and insert shims","t_from":"1962","quote":"Mr. [name withheld] proposes to jack up the stiffening trusses and insert shims between the suspender sockets and their bearings.","place_label":"Golden Gate Bridge","place_precision":"street","privacy_flag":"may_name_private_person_after_1950","privacy_class":"private_person","public_after_year":2037,"anchor":"s-10a60dee414b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review, the issuer","stance":"quotes_to_report","speaker_evidence":"To offset these effects, at least in part, Mr. Gronquist proposes to jack up"},{"claim_id":"c:4c87b3718d635c050450f58f7737f37d","page_id":"C124899442:24","page_url":"https://archive.org/details/C124899442/page/n23","statement_kind":"finding","subject_label":"Golden Gate Bridge center span cable deflection","summary":"The report calculates that the center-span cable deflection under combined loads and 110°F would be 19.3 ft.","property":"other","value_text":"19.3 ft","value_num":19.3,"unit":"ft","t_from":"1962","quote":"Under a combination of these loads and a temperature of 110° F. the deflection at the center of the center span from the original dead load position would be 19.3 ft.","place_label":"Golden Gate Bridge center span","place_precision":"street","anchor":"s-4c87b3718d63","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review, the issuer","stance":"own_position","speaker_evidence":"We have calculated the deflections of the cables in the center span"},{"claim_id":"c:4fa45c63458041a664ddd56243ed1475","page_id":"C124899442:24","page_url":"https://archive.org/details/C124899442/page/n23","statement_kind":"finding","subject_label":"Golden Gate Bridge roadway profile","summary":"The added deflections would cause appreciable and objectionable changes in the roadway profile, with sharp kinks at the towers.","property":"finding","value_text":"sharp kinks at the towers","t_from":"1962","quote":"and objectionable changes in the roadway profile with sharp kinks at the towers","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-4fa45c634580","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review, the issuer","stance":"own_position","speaker_evidence":"would cause appreciable and objectionable changes in the roadway profile"},{"claim_id":"c:b727e35714a35d633bb1120abbaa690a","page_id":"C124899442:24","page_url":"https://archive.org/details/C124899442/page/n23","statement_kind":"finding","subject_label":"Golden Gate Bridge navigation under-clearance","summary":"The added deflection would encroach up to about 9 ft on the 220 ft under-clearance originally required by the War Department.","property":"other","value_text":"up to about 9 ft","value_num":9.0,"unit":"ft","t_from":"1962","quote":"This would cause an encroachment of up to about 9 ft. on the 220 ft. under-clearance originally required by the War Department.","place_label":"Golden Gate Bridge center span","place_precision":"street","anchor":"s-b727e35714a3","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review, the issuer","stance":"own_position","speaker_evidence":"This would cause an encroachment of up to about 9 ft."},{"claim_id":"c:bcaf8bccc85ba7a3efb43e106b6c2850","page_id":"C124899442:24","page_url":"https://archive.org/details/C124899442/page/n23","statement_kind":"background","subject_label":"Golden Gate Bridge center span cable deflection","summary":"[name withheld] had previously reported a center-span deflection of 18.2 ft.","property":"other","value_text":"18.2 ft","value_num":18.2,"unit":"ft","t_from":"1962","quote":"Mr. [name withheld] and Mr. [name withheld] reported 18.2 ft.","place_label":"Golden Gate Bridge center span","place_precision":"street","privacy_flag":"may_name_private_person_after_1950","privacy_class":"private_person","public_after_year":2037,"anchor":"s-bcaf8bccc85b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review, the issuer","stance":"quotes_to_report","speaker_evidence":"Mr. Gronquist and Mr. Paine reported 18.2 ft."},{"claim_id":"c:dd8e726106f839a15b4f426e22b7ec36","page_id":"C124899442:24","page_url":"https://archive.org/details/C124899442/page/n23","statement_kind":"finding","subject_label":"Golden Gate Bridge stiffening truss adjustment","summary":"The report says the jacking method would be feasible but very tedious, delicate and costly, with doubtful satisfactory adjustments.","property":"finding","value_text":"tedious, delicate and costly","t_from":"1962","quote":"This or any other method would undoubtedly be feasible, but would involve very tedious, delicate and costly operations.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-dd8e726106f8","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review, the issuer","stance":"own_position","speaker_evidence":"This or any other method would undoubtedly be feasible"},{"claim_id":"c:ddc15e7d0506c1bf61cf4c108f8e62bf","page_id":"C124899442:24","page_url":"https://archive.org/details/C124899442/page/n23","statement_kind":"background","subject_label":"Golden Gate Bridge navigation clearance ruling","summary":"The report states that a ruling from the Department of the Army would be needed for the encroachment, and rapid transit would be impossible without it.","property":"other","value_text":"Department of the Army ruling required","t_from":"1962","quote":"A ruling with respect to such encroachment would have to be obtained from the present Department of the Army.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-ddc15e7d0506","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review, the issuer","stance":"own_position","speaker_evidence":"A ruling ... would have to be obtained from the present Department of the Army."},{"claim_id":"c:05fb7799d6b117215cd9bcde4272dc38","page_id":"C124899442:25","page_url":"https://archive.org/details/C124899442/page/n24","statement_kind":"finding","subject_label":"Golden Gate Bridge highway deck expansion dams","summary":"Because of grade changes and greater motions, the highway deck expansion dams would very likely require complete redesign and replacement.","property":"other","value_text":"complete redesign and replacement","t_from":"1962","quote":"the expansion dams would very likely require complete redesign","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-05fb7799d6b1","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"Due to grade changes at the existing expansion dams, the expansion dams would very likely require complete redesign"},{"claim_id":"c:089c3a0dd0d433750c529b39b4efd349","page_id":"C124899442:25","page_url":"https://archive.org/details/C124899442/page/n24","statement_kind":"proposal","subject_label":"Golden Gate Bridge lateral system","summary":"The report suggests that dismantling the lateral system and replacing it with a lower deck structure might be more practicable and economical.","property":"proposes","value_text":"replace lateral system with lower deck structure","t_from":"1962","quote":"a complete dismantling of the present lateral system and its replacement by a properly designed lower deck structure would not only be more practicable, but also more economical.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-089c3a0dd0d4","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"it might be found that a complete dismantling of the present lateral system would not only be more practicable"},{"claim_id":"c:63c280bf2969293929dc9c148c4cc6b1","page_id":"C124899442:25","page_url":"https://archive.org/details/C124899442/page/n24","statement_kind":"finding","subject_label":"Golden Gate Bridge transverse struts","summary":"The solid web plate reinforcement would create a narrow deep tube that would not permit adequate inspection and maintenance.","property":"finding","value_text":"inadequate inspection and maintenance","t_from":"1962","quote":"This would create a very narrow, deep tube and, although a few small handholes are provided, would not permit adequate inspection and maintenance.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-63c280bf2969","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"This would create a very narrow, deep tube and would not permit adequate inspection and maintenance"},{"claim_id":"c:7454256e9ab948625680696ef4501792","page_id":"C124899442:25","page_url":"https://archive.org/details/C124899442/page/n24","statement_kind":"finding","subject_label":"Golden Gate Bridge superstructure stresses","summary":"Detailed design studies would likely show further dead-weight increases that would increase already excessive calculated stresses in major members under rapid transit.","property":"finding","value_text":"already excessive calculated stresses","t_from":"1962","quote":"All these detailed design studies would likely divulge further necessary increases in the dead weight of the superstructure and, in turn, increase the already excessive calculated stresses in the major carrying members under rapid transit operation.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-7454256e9ab9","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"All these detailed design studies would likely divulge further necessary increases in the dead weight"},{"claim_id":"c:974995742b40c06303032c7cf7cff650","page_id":"C124899442:25","page_url":"https://archive.org/details/C124899442/page/n24","statement_kind":"proposal","subject_label":"Golden Gate Bridge transverse struts","summary":"[name withheld] proposes reinforcing the transverse struts by replacing the latticing with solid web plates.","property":"proposes","value_text":"solid web plates replacing latticing","t_from":"1962","quote":"Mr. [name withheld] proposes to reinforce the central part of the transverse struts which are to carry the rapid transit track stringers by replacing the latticing by solid web plates.","place_label":"Golden Gate Bridge","place_precision":"street","privacy_flag":"may_name_private_person_after_1950","privacy_class":"private_person","public_after_year":2037,"anchor":"s-974995742b40","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"quotes_to_report","speaker_evidence":"Mr. [name withheld] proposes to reinforce the central part of the transverse struts"},{"claim_id":"c:bde7e36701ebc7ede8ec0e5e6e944843","page_id":"C124899442:25","page_url":"https://archive.org/details/C124899442/page/n24","statement_kind":"finding","subject_label":"Golden Gate Bridge highway deck expansion dams","summary":"Certain changes, including the expansion dam work, could not be done without serious interference with traffic.","property":"finding","value_text":"serious interference with traffic","t_from":"1962","quote":"Certain of these changes, such as the expansion dams of the highway deck, could not be accomplished without serious interference with the traffic.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-bde7e36701eb","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"Certain of these changes, such as the expansion dams of the highway deck, could not be accomplished without serious interference"},{"claim_id":"c:265a6fcb267e9e5793ab28c61f2dd96e","page_id":"C124899442:26","page_url":"https://archive.org/details/C124899442/page/n25","statement_kind":"finding","subject_label":"Golden Gate Bridge cables and eye-bar anchorages","summary":"The appendix concludes fatigue will not be a problem in the cables or eye-bar anchorages under contemplated rapid transit loading.","property":"finding","value_text":"no fatigue problem in cables or eye-bar anchorages","t_from":"1962","quote":"under the contemplated rapid transit loading, fatigue will not be a","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-265a6fcb267e","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"APPENDIX—COMMENTS ON POSSIBLE FATIGUE EFFECTS"},{"claim_id":"c:590999384316b8d5174f6b880d7eda91","page_id":"C124899442:26","page_url":"https://archive.org/details/C124899442/page/n25","statement_kind":"finding","subject_label":"Golden Gate Bridge fatigue safety","summary":"The appendix concludes the Golden Gate Bridge is adequately safe from fatigue failures under present highway loadings.","property":"finding","value_text":"adequately safe under present highway loadings","t_from":"1962","quote":"The conclusion is reached that the Golden Gate bridge is adequately safe from fatigue failures under present highway loadings.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-590999384316","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"APPENDIX—COMMENTS ON POSSIBLE FATIGUE EFFECTS"},{"claim_id":"c:db3ee910972e4fe7414b65ed0871dca0","page_id":"C124899442:26","page_url":"https://archive.org/details/C124899442/page/n25","statement_kind":"finding","subject_label":"Golden Gate Bridge stiffening truss connections","summary":"The appendix warns fatigue failures may develop after years in stiffening truss connections unless stress fluctuations are minimized.","property":"finding","value_text":"possible fatigue failures after years of service","t_from":"1962","quote":"there is a possibility that fatigue failures may develop after a period of years in the connections in the stiffening trusses unless the fluctuations in stress in the stiffening truss members are held to a minimum.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-db3ee910972e","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"APPENDIX—COMMENTS ON POSSIBLE FATIGUE EFFECTS"},{"claim_id":"c:09682796edf4b63a2f65e59d28f52ab4","page_id":"C124899442:28","page_url":"https://archive.org/details/C124899442/page/n27","statement_kind":"finding","subject_label":"Golden Gate Bridge cable wire fatigue test","summary":"Specimen No. 3, a wire from the Golden Gate bridge cable, survived 2,500,000 additional cycles without failure.","property":"finding","value_text":"2,500,000 cycles without failure","value_num":2500000.0,"t_from":"1962","quote":"for 2,500,000 cycles of additional loading without failure.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-09682796edf4","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Specimen No. 3, also a wire from the Golden Gate bridge"},{"claim_id":"c:24ca0d58976bb2a7f892b0d9311b93da","page_id":"C124899442:28","page_url":"https://archive.org/details/C124899442/page/n27","statement_kind":"finding","subject_label":"Golden Gate Bridge cable wire fatigue test","summary":"Specimen No. 2, a wire from the bridge cable, failed after 210,400 additional cycles of loading in the fatigue test.","property":"other","value_text":"210,400 cycles","value_num":210400.0,"t_from":"1962","quote":"until failure occurred at 210,400 cycles of additional loading.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-24ca0d58976b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Specimen No. 2, consisting of a section of wire from the bridge cable"},{"claim_id":"c:eb48ce8a5ad8fdf56d107969705685ef","page_id":"C124899442:28","page_url":"https://archive.org/details/C124899442/page/n27","statement_kind":"finding","subject_label":"Golden Gate Bridge eye-bars","summary":"The eye-bar stress fluctuation capability is estimated at about three to four times the maximum range in the bridge, so fatigue should not be a problem.","property":"finding","value_text":"three to four times the estimated maximum stress range","value_num":3.0,"t_from":"1962","quote":"This stress fluctuation capability is about three to four times as great as the estimated maximum range in stress for the eye-bars in the bridge; hence there should be no problem of fatigue in these members.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-eb48ce8a5ad8","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"hence there should be no problem of fatigue in these members"},{"claim_id":"c:44296eac618b79b3966058c6b55c51dd","page_id":"C124899442:29","page_url":"https://archive.org/details/C124899442/page/n28","statement_kind":"finding","subject_label":"Golden Gate Bridge stiffening truss stress fluctuations","summary":"Stress fluctuations above 40,000 psi would occur rarely, possibly only several times per year, by rough estimate.","property":"finding","value_text":"more than 40,000 psi, several times per year","value_num":40000.0,"unit":"psi","t_from":"1962","quote":"stress fluctuations of the order of more than 40,000 psi would occur rarely, possibly not even as often as several times per year.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-44296eac618b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"Report on proposed installation rapid transit trains; this page's narrative: stress fluctuations of the order of more than 40,000 psi would occur rarely"},{"claim_id":"c:8a13946ce542f4b9a487a8964a9837af","page_id":"C124899442:29","page_url":"https://archive.org/details/C124899442/page/n28","statement_kind":"finding","subject_label":"Golden Gate Bridge stiffening truss stress fluctuations","summary":"Rough estimates for rapid transit loading suggest 20,000 to 25,000 psi fluctuations might occur about ten times per day.","property":"finding","value_text":"20,000 to 25,000 psi about ten times per day","value_num":20000.0,"unit":"psi","t_from":"1962","quote":"fluctuations of the order of 20,000 to 25.000 psi might occur on the average as often as about ten times per day.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-8a13946ce542","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"POSSIBLE FATIGUE EFFECTS IN STIFFENING TRUSS CONNECTIONS; fluctuations of the order of 20,000 to 25.000 psi"},{"claim_id":"c:9187f9f0dac7f0034280784fc40a1680","page_id":"C124899442:29","page_url":"https://archive.org/details/C124899442/page/n28","statement_kind":"finding","subject_label":"Golden Gate Bridge stiffening truss connections fatigue","summary":"Stress fluctuations below about 15,000 psi would have no influence on the endurance of the connections.","property":"finding","value_text":"less than about 15,000 psi","value_num":15000.0,"unit":"psi","t_from":"1962","quote":"fluctuations corresponding to less than a range of about 15,000 psi for any cycle would have no influence on the endurance.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-9187f9f0dac7","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"For conditions of stress fluctuation in which large fluctuations are combined with small fluctuations"},{"claim_id":"c:b17a291297d417848899d2c979468052","page_id":"C124899442:29","page_url":"https://archive.org/details/C124899442/page/n28","statement_kind":"finding","subject_label":"Golden Gate Bridge stiffening truss connections fatigue","summary":"Fatigue resistance of the connections at 2,000,000 or more cycles corresponds to a stress fluctuation of about 20,000 psi.","property":"finding","value_text":"approximately 20,000 psi","value_num":20000.0,"unit":"psi","t_from":"1962","quote":"The fatigue resistance at 2,000,000 or more cycles of application of load corresponds to a stress fluctuation, in either complete reversal or in the range from zero-to-maximum tensile stress, of approximately 20,000 psi.","place_label":"Golden Gate Bridge","place_precision":"street","anchor":"s-b17a291297d4","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Engineering Board of Review","stance":"own_position","speaker_evidence":"From a study of the various data, the following conclusions are reached"}]}