{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124899910","url":"https://data.qipu.org/usa/san-francisco/reports/c124899910/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124899910/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124899910","source_id":"C124899910","title":"5 year plan, 1977-1982 : issue paper 1 : MUNI metro, issues and strategies","year":1977,"n_pages":70,"source_url":"https://archive.org/details/C124899910","issuer":"City and County of San Francisco, Municipal Railway","issuer_type":"government","gov_level":"city_county","doc_kind":"plan","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"model","doc_kind_by":"model","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":15,"statements_total":45,"statements_by_kind":{"finding":14,"proposal":26,"cites_decision":1,"background":4},"same_for_every_statement":{"source_id":"C124899910","source_url":"https://archive.org/details/C124899910","source_label":"IGS library: 5 year plan, 1977-1982 : issue paper 1 : MUNI metro, issues and strategies","report_year":1977,"issuer":"City and County of San Francisco, Municipal Railway","issuer_type":"government","doc_kind":"plan","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A plan by the City and County of San Francisco's Municipal Railway on Muni Metro issues and strategies, covering rail sequencing, extensions and service startup.","figures":[{"label":"Cost","value":"$10 million","claim_ids":["c:fbb022ed1d2346432ca1c9405ce7abf8"]},{"label":"LRV fleet","value":"approximately 25 LRVs","claim_ids":["c:dfa34d15b13c74ebe402cfdd824d1d5e"]},{"label":"Capacity increase","value":"over 50%","claim_ids":["c:fccb1b6c1548da22b4c82fa23fdd5ef8"]}],"main_points":["c:78e1e4e2fae07d3db56f723e875061c1","c:5db9dadc7c8209d989480e80fd495f31","c:909f1c01540cd7cea1cafe00a72bade4"],"board_decisions_after":["qipu:sf/decision/journaljanjuneofproceed75sanfrich|g215","qipu:sf/decision/journajulydeclofproceed72sanfrich|g588","qipu:sf/decision/journaljulydecofproceed74sanfrich:279/2","qipu:sf/decision/journaljulydecofproceed74sanfrich:303/4","qipu:sf/decision/journaljulydecofproceed74sanfrich:580/4","qipu:sf/decision/journaljulydecofproceed74sanfrich|g1912","qipu:sf/decision/journaljanjuneofproceed75sanfrich|g133","qipu:sf/decision/journaljulydecofproceed75sanfrich:111/2"],"board_decisions_before":["qipu:sf/decision/journalofjulydecproceed70sanfrich|g593"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:67532417e373e74b7d68bef5aa257103","page_id":"C124899910:8","page_url":"https://archive.org/details/C124899910/page/n7","statement_kind":"finding","subject_label":"LRV coupling accident risk","summary":"The report says the case for increased coupling accident risk has likely been overstated, at least for some hazards.","property":"finding","t_from":"1977","quote":"It is likely that the case has been averstated, at least for cases (a) and (b).","anchor":"s-67532417e373","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway Planning Division","stance":"own_position","speaker_evidence":"Operations and Scheduling; the issuer's own text on safety concerns"},{"claim_id":"c:991d966dfd5d959a39a8956f1f811e0b","page_id":"C124899910:8","page_url":"https://archive.org/details/C124899910/page/n7","statement_kind":"finding","subject_label":"Passenger value of time","summary":"Studies show that time spent waiting is up to twice as expensive to passengers as time spent travelling.","property":"finding","t_from":"1977","quote":"Extensive studies of the value of time to transportation users have shown that time spent waiting is up to twice as","anchor":"s-991d966dfd5d","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway Planning Division","stance":"own_position","speaker_evidence":"Extensive studies of the value of time to transportation users have shown"},{"claim_id":"c:27b184e64a5b217d5bf09dbd78e674d8","page_id":"C124899910:9","page_url":"https://archive.org/details/C124899910/page/n8","statement_kind":"proposal","subject_label":"En-route coupling","summary":"The report recommends that en-route coupling be avoided if its benefits are slight or illusory.","property":"recommendation","t_from":"1977","quote":"these benefits need to be carefully evaluated and en-route coupling should be avoided if such benefits are slight or Illusory.","anchor":"s-27b184e64a5b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway Planning Division","stance":"own_position","speaker_evidence":"It seems reasonable however to conclude that"},{"claim_id":"c:30b5161fac997360ee0c637542ad48dc","page_id":"C124899910:9","page_url":"https://archive.org/details/C124899910/page/n8","statement_kind":"finding","subject_label":"Subway headway simulation","summary":"A computer simulation indicates trains could operate between Van Ness and Embarcadero at 90-second headways without interference.","property":"finding","value_text":"90-seconds","value_num":90.0,"unit":"seconds","t_from":"1977","quote":"It was found that if congestion at the Embarcadero Station is not considered, trains could operate between Van Ness and Embarcadero at headways of as short as 90-seconds","place_label":"Van Ness and Embarcadero","place_precision":"intersection","place_id":"qipu:sf/place/street/van-ness-ave","resolved_by":"place links file","anchor":"s-30b5161fac99","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway Planning Division","stance":"own_position","speaker_evidence":"A computer simulation program (RAPTRAN) was adapted and run"},{"claim_id":"c:031aa27e5fda1357d5cc6657103f42ff","page_id":"C124899910:13","page_url":"https://archive.org/details/C124899910/page/n12","statement_kind":"proposal","subject_label":"Church Street rerailing","summary":"The plan says Church Street between Market and Seventeenth Streets will not be rerailed until most streetcar services are in subway operation.","property":"proposes","t_from":"1977","quote":"Because of the intensity of use by four streetcar routes, Church Street between Market and Seventeenth Streets will not be rerailed until at least most of our streetcar services","place_label":"Church Street between Market and Seventeenth Streets","place_precision":"street_segment","place_id":"qipu:sf/place/street/church-st","resolved_by":"place links file","anchor":"s-031aa27e5fda","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway Planning Division","stance":"own_position","speaker_evidence":"Because of the intensity of use by four streetcar routes"},{"claim_id":"c:78e1e4e2fae07d3db56f723e875061c1","page_id":"C124899910:13","page_url":"https://archive.org/details/C124899910/page/n12","statement_kind":"proposal","subject_label":"Sequence N-K-L-M-J","summary":"The paper proposes an N-K-L-M-J sequence to serve the three most important rail lines first.","property":"proposes","value_text":"N-K-L-M-J","t_from":"1977","quote":"This sequence addresses itself more to service requirements. It would allow our three most important rail lines, the N-JUDAH, K-INGLESIDE and L-TARAVAL","anchor":"s-78e1e4e2fae0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway Planning Division","stance":"own_position","speaker_evidence":"This sequence addresses itself more to service requirements. It would allow our three most important"},{"claim_id":"c:b6bce22a4579d64d90ecf468b4fd1229","page_id":"C124899910:13","page_url":"https://archive.org/details/C124899910/page/n12","statement_kind":"finding","subject_label":"N-JUDAH line","summary":"The N-JUDAH is the heaviest single line of the five streetcar services.","property":"finding","value_text":"heaviest single line","t_from":"1977","quote":"The N-JUDAH is the heaviest single line of the five streetcar services, so the most heavily loaded line can be served first","anchor":"s-b6bce22a4579","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway Planning Division","stance":"own_position","speaker_evidence":"The N-JUDAH is the heaviest single line of the five streetcar services"},{"claim_id":"c:d8c100b8b7d20807746766e51eb63ca6","page_id":"C124899910:13","page_url":"https://archive.org/details/C124899910/page/n12","statement_kind":"proposal","subject_label":"Light rail sequencing options","summary":"The paper sets out two options for sequencing light rail service, starting with the N-JUDAH line.","property":"proposes","t_from":"1977","quote":"Given this decision to inaugurate service on the N-JUDAH, two options exist for sequencing inauguration of service on MUNI's other four light rail lines","anchor":"s-d8c100b8b7d2","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway Planning Division","stance":"own_position","speaker_evidence":"Given this decision to inaugurate service on the N-JUDAH, two options exist"},{"claim_id":"c:0cbc69c025075c61b2426fa5b62f6d0b","page_id":"C124899910:15","page_url":"https://archive.org/details/C124899910/page/n14","statement_kind":"finding","subject_label":"Embarcadero reconstruction engineering contract","summary":"A Request for Proposal for a first stage engineering contract has been undergoing UMTA review.","property":"other","value_text":"under UMTA review","date_printed":"since February 1976","t_from":"1976","quote":"has been undergoing UMTA review since February 1976","place_label":"Embarcadero Station","place_precision":"building","anchor":"s-0cbc69c02507","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway Planning Division","stance":"own_position","speaker_evidence":"A Request for Proposal ... has been undergoing UMTA review since February 1976"},{"claim_id":"c:15e21ab1f1a0065ccbc7682ad1a93de2","page_id":"C124899910:15","page_url":"https://archive.org/details/C124899910/page/n14","statement_kind":"finding","subject_label":"BART Spear Street ventilation shafts","summary":"A limited reconstruction through BART's Spear Street ventilation shafts was authorized and has been completed.","property":"other","value_text":"authorized and completed","t_from":"1977","quote":"a limited amount of reconstruction through BART's Spear Street ventilation shafts was authorized and has already been completed","place_label":"Embarcadero Station","place_precision":"building","anchor":"s-15e21ab1f1a0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway Planning Division","stance":"own_position","speaker_evidence":"a limited amount of reconstruction through BART's Spear Street ventilation shafts was authorized and has already been completed"},{"claim_id":"c:3422f493990d1a785e633646ebb77d7b","page_id":"C124899910:15","page_url":"https://archive.org/details/C124899910/page/n14","statement_kind":"finding","subject_label":"M-OCEAN VIEW extension","summary":"The extension of the M-OCEAN VIEW from Broad and Plymouth to the Metro Center is a committed project with construction pending.","property":"other","value_text":"committed project, construction pending","t_from":"1977","quote":"This is however now a committed project and construction is pending.","place_label":"Broad and Plymouth; Metro Center","anchor":"s-3422f493990d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway Planning Division","stance":"own_position","speaker_evidence":"Mention should also be made of the extension of the M-OCEAN VIEW"},{"claim_id":"c:5db9dadc7c8209d989480e80fd495f31","page_id":"C124899910:15","page_url":"https://archive.org/details/C124899910/page/n14","statement_kind":"proposal","subject_label":"J-CHURCH extension to Balboa Park Station/Metro Center","summary":"The plan proposes extending the J-CHURCH line from the 30th Street terminal to a connection with the existing system at Balboa Park Station/Metro Center.","property":"proposes","value_text":"extension of J-CHURCH line","t_from":"1977","quote":"extension of the J-CHURCH line from the present 30th Street terminal via 30th Street and San Jose Avenue to a connection with the existing system at the Balboa Park Station/Metro Center site","place_label":"30th Street; San Jose Avenue; Balboa Park Station/Metro Center","place_precision":"intersection","place_id":"qipu:sf/place/street/30th-st","resolved_by":"place links file","anchor":"s-5db9dadc7c82","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway Planning Division","stance":"own_position","speaker_evidence":"a further short-term expansion of the MUNI METRO system has been proposed"},{"claim_id":"c:fbb022ed1d2346432ca1c9405ce7abf8","page_id":"C124899910:15","page_url":"https://archive.org/details/C124899910/page/n14","statement_kind":"proposal","subject_label":"Embarcadero turnaround reconstruction funding request","summary":"A request for funding of $10 million (≈ $55.6 million in 2026 dollars) was included as a line item in the System Improvement Program.","property":"proposes","value_text":"$10 million","value_num":10000000.0,"unit":"USD","t_from":"1977","quote":"a request for funding was included as a $10 million line item in the System Improvement Program (SIP)","place_label":"Embarcadero Station","place_precision":"building","anchor":"s-fbb022ed1d23","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway Planning Division","stance":"own_position","speaker_evidence":"a request for funding was included as a $10 million line item in the System Improvement Program (SIP)"},{"claim_id":"c:479e449ea62c22d8dcfd3f6f85d8eda3","page_id":"C124899910:22","page_url":"https://archive.org/details/C124899910/page/n21","statement_kind":"finding","subject_label":"Embarcadero loop feasibility","summary":"The February 1975 preliminary engineering study included this proposal and found it feasible.","property":"finding","value_text":"found feasible","date_printed":"February 1975","t_from":"1975","quote":"This proposal was also included in the February 1975 preliminary engineering study, and was found feasible.","place_label":"Embarcadero","place_precision":"street","place_id":"qipu:sf/place/street/the-embarcadero","resolved_by":"place links file","anchor":"s-479e449ea62c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"This proposal was also included in the February 1975 preliminary engineering study"},{"claim_id":"c:e4913e4ecfbefa5cf51784e7f0b1ce26","page_id":"C124899910:22","page_url":"https://archive.org/details/C124899910/page/n21","statement_kind":"proposal","subject_label":"Concept E loop extension with southward provision","summary":"The Concept E design is a minimum cost alignment based on single-level subway construction.","property":"proposes","value_text":"minimum cost alignment, single-level subway","t_from":"1977","quote":"The design as sketched is a minimum cost alignment, based on single-level subway construction.","place_label":"Embarcadero","place_precision":"street","place_id":"qipu:sf/place/street/the-embarcadero","resolved_by":"place links file","anchor":"s-e4913e4ecfbe","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The design as sketched is a minimum cost alignment, based on single-level subway construction."},{"claim_id":"c:ea45083252de033ae369e24f0e96bcf9","page_id":"C124899910:22","page_url":"https://archive.org/details/C124899910/page/n21","statement_kind":"background","subject_label":"Geary corridor line","summary":"A Geary corridor line has been rejected as city policy.","property":"other","value_text":"rejected as city policy","t_from":"1977","quote":"since any such line has been rejected as city policy, it is the former two opportunities which should be stressed","place_label":"Geary Corridor","anchor":"s-ea45083252de","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"since any such line has been rejected as city policy, it is the former two opportunities which should be stressed"},{"claim_id":"c:0287c44129f291b6e7715103c4a7d9db","page_id":"C124899910:24","page_url":"https://archive.org/details/C124899910/page/n23","statement_kind":"cites_decision","subject_label":"Embarcadero rail service consistency with Planning Commission objectives","summary":"The Embarcadero rail service is consistent with objectives adopted by the City Planning Commission.","property":"adopted","value_text":"objectives adopted","t_from":"1977","quote":"with objectives adopted by the City Planning Commission","place_label":"Northeastern Waterfront","anchor":"s-0287c44129f2","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Embarcadero rail service proposal has been provided for in plans"},{"claim_id":"c:0b10c8621e54e26f7483c264b0a82ab4","page_id":"C124899910:24","page_url":"https://archive.org/details/C124899910/page/n23","statement_kind":"background","subject_label":"Embarcadero rail service history","summary":"An Embarcadero rail service using upgraded Belt Line Railroad facilities was first proposed in 1974.","property":"other","value_text":"first proposed in 1974","date_printed":"1974","t_from":"1974","quote":"An Embarcadero rail service, using upgraded Belt Line Railroad facilities, was first proposed in 1974","place_label":"Embarcadero","place_precision":"street","place_id":"qipu:sf/place/street/the-embarcadero","resolved_by":"place links file","anchor":"s-0b10c8621e54","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"was first proposed in 1974 by G.P. Cauthen, in a report titled"},{"claim_id":"c:19b1519d0c2f2b2f9ebc030b57fad92c","page_id":"C124899910:24","page_url":"https://archive.org/details/C124899910/page/n23","statement_kind":"proposal","subject_label":"Mid-day LRV storage facility near SP Depot","summary":"The authors propose a modest storage facility for mid-day storage of light rail vehicles near the SP Depot.","property":"proposes","value_text":"modest storage facility","t_from":"1977","quote":"Such a facility could essentially eliminate the labor and operating costs associated with mid-day pull-ins and pull-outs.","place_label":"SP Depot","anchor":"s-19b1519d0c2f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Such a facility could essentially eliminate the labor and operating costs"},{"claim_id":"c:1a86099c24c98963773e3b608822f795","page_id":"C124899910:24","page_url":"https://archive.org/details/C124899910/page/n23","statement_kind":"proposal","subject_label":"Operating cost offsets from bus reductions","summary":"Operating cost offsets could be achieved by reducing present surface bus operations such as the 40-COMMUTER and 80-GATEWAY EXPRESS.","property":"proposes","value_text":"reduce 40-COMMUTER and 80-GATEWAY EXPRESS bus operations","t_from":"1977","quote":"Operating cost offsets could be achieved by reductions in present surface bus operations such as the 40-COMMUTER and 80-GATEWAY EXPRESS.","anchor":"s-1a86099c24c9","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Operating cost offsets could be achieved by reductions in present surface bus"},{"claim_id":"c:1c5b86d3fd624c45c01726b56695a132","page_id":"C124899910:24","page_url":"https://archive.org/details/C124899910/page/n23","statement_kind":"background","subject_label":"Peninsula Transit Alternatives Project","summary":"The Peninsula Transit Alternatives Project called for a major upgrading of Westbay Corridor service.","property":"other","value_text":"major upgrading of Westbay Corridor service","t_from":"1977","quote":"The Peninsula Transit Alternatives Project called for a major upgrading of Westbay Corridor service to include improved access","place_label":"Westbay Corridor","anchor":"s-1c5b86d3fd62","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The Peninsula Transit Alternatives Project called for a major upgrading"},{"claim_id":"c:59ebe83ade672f1d605f0469ddf5b90f","page_id":"C124899910:24","page_url":"https://archive.org/details/C124899910/page/n23","statement_kind":"proposal","subject_label":"J-M through-routing layovers at SP Depot","summary":"Extending the J-M trips to the SP Depot would allow terminal layovers to be taken there.","property":"proposes","value_text":"J-M trips extended to SP Depot","t_from":"1977","quote":"Extending the J-M trips to the SP Depot, however, would very conveniently allow terminal layovers to be taken there.","place_label":"SP Depot","anchor":"s-59ebe83ade67","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Extending the J-M trips to the SP Depot, however, would very conveniently"},{"claim_id":"c:7eadf81bca2120b97840cfb1cf3b8d65","page_id":"C124899910:24","page_url":"https://archive.org/details/C124899910/page/n23","statement_kind":"proposal","subject_label":"Concept G physical connection to Balboa Park","summary":"The Concept G proposal would connect the Embarcadero rail line to the MUNI maintenance and storage base at Balboa Park via the subway.","property":"proposes","value_text":"physical connection via subway","t_from":"1977","quote":"The Concept G proposal would provide a physical connection, via the subway, between the Embarcadero rail line and the MUNI's principal rail vehicle maintenance and storage base at Balboa Park.","place_label":"Balboa Park","place_precision":"park","place_id":"qipu:sf/place/park/balboa-park","resolved_by":"place links file","anchor":"s-7eadf81bca21","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Concept G proposal would provide a physical connection, via the subway"},{"claim_id":"c:045a7fae71d43e923cd78146fb9d978f","page_id":"C124899910:26","page_url":"https://archive.org/details/C124899910/page/n25","statement_kind":"proposal","subject_label":"N-Judah MUNI METRO start-up","summary":"The report proposes that efforts continue toward initiating MUNI METRO service over the N-line on roughly present headways.","property":"proposes","value_text":"N-line MUNI METRO service","t_from":"1977","quote":"Efforts should continue to be geared toward initiation of MUNI METRO service over the N-line, using a schedule based approximately on present headways","place_label":"N-Judah line","anchor":"s-045a7fae71d4","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway (issuer's planning text)","stance":"own_position","speaker_evidence":"RECOMMENDATIONS ... Efforts should continue to be geared toward initiation"},{"claim_id":"c:0dcc07437506e9249f7e540d52001019","page_id":"C124899910:26","page_url":"https://archive.org/details/C124899910/page/n25","statement_kind":"proposal","subject_label":"N-Judah stand-by schedule","summary":"The report proposes a stand-by schedule on 24-minute peak headways for excess demand, needing about 5 more LRVs.","property":"other","value_text":"24 minute peak headways","value_num":24.0,"t_from":"1977","quote":"A stand-by schedule to respond to excess demand for service should also be prepared, based on 24 minute peak headways.","place_label":"N-Judah line","anchor":"s-0dcc07437506","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway (issuer's planning text)","stance":"own_position","speaker_evidence":"A stand-by schedule to respond to excess demand for service should also be prepared"},{"claim_id":"c:909f1c01540cd7cea1cafe00a72bade4","page_id":"C124899910:26","page_url":"https://archive.org/details/C124899910/page/n25","statement_kind":"proposal","subject_label":"Embarcadero Station reconstruction","summary":"The report proposes expediting engineering design and reconstruction of Embarcadero Station facilities.","property":"proposes","value_text":"expedite engineering design and reconstruction","t_from":"1977","quote":"Work on engineering design and subsequent reconstruction of facilities at Embarcadero should be expedited so as to get underway at the earliest possible time.","place_label":"Embarcadero Station","place_precision":"building","anchor":"s-909f1c01540c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway (issuer's planning text)","stance":"own_position","speaker_evidence":"Embarcadero Station. Work on engineering design and subsequent reconstruction"},{"claim_id":"c:dfa34d15b13c74ebe402cfdd824d1d5e","page_id":"C124899910:26","page_url":"https://archive.org/details/C124899910/page/n25","statement_kind":"proposal","subject_label":"N-Judah LRV fleet requirement","summary":"The report estimates the N-line schedule would require about 25 light rail vehicles.","property":"other","value_text":"approximately 25 LRVs","value_num":25.0,"t_from":"1977","quote":"would require approximately 25 LRVs, based in part on the draft schedule worked out two years ago.","place_label":"N-Judah line","anchor":"s-dfa34d15b13c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway (issuer's planning text)","stance":"own_position","speaker_evidence":"would require approximately 25 LRVs, based in part on the draft schedule"},{"claim_id":"c:e7fb43a72c4086269c5e628c210954b8","page_id":"C124899910:26","page_url":"https://archive.org/details/C124899910/page/n25","statement_kind":"proposal","subject_label":"N-Judah station staffing","summary":"The report says N-Judah service would require staffing at five downtown stations but not Church or Castro.","property":"other","value_text":"Embarcadero, Montgomery, Powell, Civic Center and Van Ness stations","t_from":"1977","quote":"N-JUDAH service will require staffing of the Embarcadero, Montgomery, Powell, Civic Center and Van Ness Stations, but not Church or Castro.","place_label":"Embarcadero, Montgomery, Powell, Civic Center, Van Ness stations","place_precision":"area","anchor":"s-e7fb43a72c40","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway (issuer's planning text)","stance":"own_position","speaker_evidence":"N-JUDAH service will require staffing of the Embarcadero"},{"claim_id":"c:fccb1b6c1548da22b4c82fa23fdd5ef8","page_id":"C124899910:26","page_url":"https://archive.org/details/C124899910/page/n25","statement_kind":"proposal","subject_label":"N-Judah car-for-car substitution capacity","summary":"The report says the proposed N-line schedule would increase capacity by over 50 percent.","property":"other","value_text":"over 50%","value_num":50.0,"unit":"percent","t_from":"1977","quote":"Such a schedule would provide a capacity increase of over 50%, and would require approximately 25 LRVs","place_label":"N-Judah line","anchor":"s-fccb1b6c1548","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway (issuer's planning text)","stance":"own_position","speaker_evidence":"Such a schedule would provide a capacity increase of over 50%"},{"claim_id":"c:16e3cf1efeb449f7cf1151a92b76b18b","page_id":"C124899910:29","page_url":"https://archive.org/details/C124899910/page/n28","statement_kind":"proposal","subject_label":"Phase II start-up timing","summary":"The report recommends that Phase II service not start until after West Portal Station is complete.","property":"proposes","value_text":"after West Portal Station is complete","t_from":"1977","quote":"until after West Portal Station is complete, although under present schedules this should not pose any probelms.","place_label":"West Portal Station","anchor":"s-16e3cf1efeb4","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway Planning Division","stance":"own_position","speaker_evidence":"It is also recommended that Phase II service not be initiated"},{"claim_id":"c:8f449742eb38c682ca969461a914dbcb","page_id":"C124899910:29","page_url":"https://archive.org/details/C124899910/page/n28","statement_kind":"proposal","subject_label":"K and L MUNI METRO service staffing","summary":"The report says K and L MUNI METRO service would require staffing the Church and Castro Stations.","property":"proposes","value_text":"staffing Church and Castro Stations","t_from":"1977","quote":"Inauguration of K and L MUNI METRO service will require staffing the Church and Castro Stations.","place_label":"Church Station, Castro Station","anchor":"s-8f449742eb38","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway Planning Division","stance":"own_position","speaker_evidence":"Inauguration of K and L MUNI METRO service will require"},{"claim_id":"c:b57be49075e349bf4403b7954b8d57ed","page_id":"C124899910:29","page_url":"https://archive.org/details/C124899910/page/n28","statement_kind":"proposal","subject_label":"Duboce Avenue track replacement","summary":"The report says track on Duboce Avenue should be replaced with weekend and evening work and bus substitution.","property":"proposes","value_text":"replace two blocks of track","value_num":2.0,"t_from":"1977","quote":"replace the two blocks of track on Duboce Avenue between Church Street and the Sunset Tunnel.","place_label":"Duboce Avenue between Church Street and Sunset Tunnel","place_precision":"street_segment","place_id":"qipu:sf/place/street/duboce-ave","resolved_by":"place links file","anchor":"s-b57be49075e3","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway Planning Division","stance":"own_position","speaker_evidence":"It is likely that we will be in at least Phase II operations"},{"claim_id":"c:cc67f2a524cb3f76d3047cd23b383412","page_id":"C124899910:29","page_url":"https://archive.org/details/C124899910/page/n28","statement_kind":"proposal","subject_label":"M-Ocean View temporary shuttle","summary":"The report proposes operating the M line as a temporary shuttle to West Portal.","property":"proposes","value_text":"temporary shuttle to West Portal","t_from":"1977","quote":"the M should be operated as a temporary shuttle to West Portal.","place_label":"West Portal","anchor":"s-cc67f2a524cb","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway Planning Division","stance":"own_position","speaker_evidence":"the M should be operated as a temporary shuttle to West Portal"},{"claim_id":"c:ab42f3e26885408e7fa99e7511bb1b3c","page_id":"C124899910:34","page_url":"https://archive.org/details/C124899910/page/n33","statement_kind":"background","subject_label":"Line M Ocean View route","summary":"The schedule page describes the Line M Ocean View route from Junipero Serra Boulevard to Plymouth Avenue.","property":"other","value_text":"route description","t_from":"1977","quote":"From Junipero Serra Boulevard and St. Francis Circie, via West Portal Ave., 19th Avenue Extension, Worcester, Randolph, Orizaba and Broad Streets to Plymouth Avenue.","place_label":"Junipero Serra Boulevard, West Portal Ave., Plymouth Avenue","anchor":"s-ab42f3e26885","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"Municipal Railway (route schedule listing)","stance":"quotes_to_report","speaker_evidence":"APPENDIX A: MUNICIPAL RAILWAY SCHEDULES 1930 AND AS PROPOSED"},{"claim_id":"c:5cd1b895191aec559b70c7457218e7a1","page_id":"C124899910:39","page_url":"https://archive.org/details/C124899910/page/n38","statement_kind":"finding","subject_label":"LRV coupler impact absorption","summary":"A consultant letter says LRV couplers can absorb impacts of up to two mph without damage to the car or passengers.","property":"finding","value_text":"up to two mph without damage","value_num":2.0,"date_printed":"1974","t_from":"1974","quote":"With these LRV features, coupling impacts of up to two moh (relative motion) can be absorbed without damage to the car or any discomfort to the vassengers","anchor":"s-5cd1b895191a","shown":false,"hidden":"letter","part":"letter","speaker":"letter_writer","speaker_role":"a letter writer","stance":"own_position","speaker_evidence":"LOUIS T. KLAUDER AND ASSOCIATES CONSULTING ENGINEERS"},{"claim_id":"c:36227508650849fe8d6c1516c7ff12a4","page_id":"C124899910:40","page_url":"https://archive.org/details/C124899910/page/n39","statement_kind":"proposal","subject_label":"Subway car coupling procedure","summary":"The letter describes the procedure for coupling cars at the subway, with a safety stop and low-speed coupling.","property":"proposes","t_from":"1977","quote":"This procedure will be to make a safety stop a short distance from the car in front, start up and maintain the low coupling speed necessary","anchor":"s-362275086508","shown":false,"hidden":"letter","part":"letter","speaker":"letter_writer","speaker_role":"a letter writer","stance":"own_position","speaker_evidence":"[name]. 3"},{"claim_id":"c:46569a471c046e25f2eef5c7cdd461d5","page_id":"C124899910:40","page_url":"https://archive.org/details/C124899910/page/n39","statement_kind":"finding","subject_label":"Duboce Portal coupling location","summary":"The letter states that the Duboce Portal coupling location is on a descending grade, which eases coupling.","property":"other","value_text":"descending grade","t_from":"1977","quote":"The Duboce Portal area has a further advantage in that the coupling location is on a descending grade.","place_label":"Duboce Portal area","anchor":"s-46569a471c04","shown":false,"hidden":"letter","part":"letter","speaker":"letter_writer","speaker_role":"a letter writer","stance":"own_position","speaker_evidence":"LOUIS T. KLAUDER AND ASSOCIATES TO LRV Program Manager"},{"claim_id":"c:a19b6cd1c01fc79b8f80eb9e6e31dab5","page_id":"C124899910:40","page_url":"https://archive.org/details/C124899910/page/n39","statement_kind":"finding","subject_label":"German coupler","summary":"The letter states that the German coupler is designed to couple cars in revenue service with passengers on board.","property":"other","t_from":"1977","quote":"This German coupler is specifically designed to couple cars in revenue service with passengers on board","anchor":"s-a19b6cd1c01f","shown":false,"hidden":"letter","part":"letter","speaker":"letter_writer","speaker_role":"a letter writer","stance":"own_position","speaker_evidence":"[name]. 3"},{"claim_id":"c:f3fa7059b0b275bfa862af6d000e643e","page_id":"C124899910:40","page_url":"https://archive.org/details/C124899910/page/n39","statement_kind":"finding","subject_label":"Coupling cars with passengers aboard","summary":"The letter states that coupling cars while carrying passengers has been and is an accepted operating procedure.","property":"other","t_from":"1977","quote":"Coupling cars while carrying passengers has been and is an accepted operating procedure.","anchor":"s-f3fa7059b0b2","shown":false,"hidden":"letter","part":"letter","speaker":"letter_writer","speaker_role":"a letter writer","stance":"own_position","speaker_evidence":"Coupling cars while carrying passengers has been and is an accepted operating procedure"},{"claim_id":"c:6c9fbfb7a2d1d1b3ec764c9bd927f9bc","page_id":"C124899910:44","page_url":"https://archive.org/details/C124899910/page/n43","statement_kind":"proposal","subject_label":"Embarcadero Station cross-over clearance","summary":"The operations sheet assumes that clearing the cross-over interlocking for the next train move takes 10 seconds.","property":"other","value_text":"10 seconds","value_num":10.0,"t_from":"1977","quote":"Time required to clear cross-over interlocking for next train move: 10 seconds.","place_label":"Embarcadero Station","place_precision":"building","anchor":"s-6c9fbfb7a2d1","shown":false,"hidden":"attachment","part":"attachment","speaker":"issuer","speaker_role":"Municipal Railway Planning Division","stance":"own_position","speaker_evidence":"Time required to clear cross-over interlocking for next train move"},{"claim_id":"c:7e316e7301f4a58839f643e1d15ee7fc","page_id":"C124899910:53","page_url":"https://archive.org/details/C124899910/page/n52","statement_kind":"proposal","subject_label":"Loop alignment at Embarcadero","summary":"The memo says a loop alignment is hard to reject until LRV experience is gained.","property":"alternative","value_text":"loop alignment","date_printed":"December 17, 1974","t_from":"1974","quote":"This makes a loop alignment, which is functionally simplest under any mode of operation, difficult to reject until we have at least gained some experience with the LRVs.","place_label":"Embarcadero Station","place_precision":"building","anchor":"s-7e316e7301f4","shown":false,"hidden":"attachment","part":"attachment","speaker":"letter_writer","speaker_role":"a letter writer","stance":"own_position","speaker_evidence":"Memorandum (PS) December 17, 1974 Re: [name]"},{"claim_id":"c:e956202d726d4e3991e93b86fdaeaa1e","page_id":"C124899910:53","page_url":"https://archive.org/details/C124899910/page/n52","statement_kind":"finding","subject_label":"Embarcadero Station car storage","summary":"The memo judges the three-track stub arrangement probably best for storage.","property":"other","date_printed":"December 17, 1974","t_from":"1974","quote":"Of the alignments described above, .the three- track stub arrangement is probably best for storage","place_label":"Embarcadero Station","place_precision":"building","anchor":"s-e956202d726d","shown":false,"hidden":"attachment","part":"attachment","speaker":"letter_writer","speaker_role":"a letter writer","stance":"own_position","speaker_evidence":"Memorandum (PS) December 17, 1974 Re: [name]"},{"claim_id":"c:892fc7a74a2bbd87fe7d29f6f02cb005","page_id":"C124899910:54","page_url":"https://archive.org/details/C124899910/page/n53","statement_kind":"finding","subject_label":"Cut-and-cover construction on Lower Market","summary":"The memo says cut-and-cover construction on Lower Market is likely to meet intense opposition.","property":"other","value_text":"intense opposition","date_printed":"December 17, 1974","t_from":"1974","quote":"Any cut-and-cover construction on Lower Merket street, no matter how limited, is likely to encounter intense opposition at this time.","place_label":"Lower Market Street","place_precision":"street","place_id":"qipu:sf/place/street/market-st","resolved_by":"place links file","anchor":"s-892fc7a74a2b","shown":false,"hidden":"attachment","part":"attachment","speaker":"letter_writer","speaker_role":"Municipal Railway planning staff memorandum author (PS), an internal memorandum","stance":"own_position","speaker_evidence":"Memorandum (PS) December 17, 1974 Re: [name]"},{"claim_id":"c:128c74ae81aa4b7464e2ddb593e8c116","page_id":"C124899910:58","page_url":"https://archive.org/details/C124899910/page/n57","statement_kind":"proposal","subject_label":"Two-car trains on LRV routes","summary":"The memo says two-car trains throughout LRV routes would be more practical than on-line coupling.","property":"alternative","value_text":"two-car trains throughout most or all LRV routes","t_from":"1977","quote":"operation of two- car trains throughout most or all LRV routes would be a much more practical alternative than on-line coupling-uncoupling","anchor":"s-128c74ae81aa","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway planning staff (report author)","stance":"own_position","speaker_evidence":"10. Two-Car Trains Throughout ... would be a much more practical alternative"},{"claim_id":"c:e3260c2d4257f38258229c8ba24012d2","page_id":"C124899910:58","page_url":"https://archive.org/details/C124899910/page/n57","statement_kind":"proposal","subject_label":"Downtown LRV terminal loop","summary":"The memo recommends building a loop as soon as possible at the downtown LRV terminal.","property":"recommendation","value_text":"build a loop at the downtown LRV terminal","t_from":"1977","quote":"For the longer run, the best, and probably only practical, operating solution is to build a loop as soon as possible at the downtown LRV terminal.","place_label":"downtown LRV terminal","anchor":"s-e3260c2d4257","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Municipal Railway planning staff (report author)","stance":"own_position","speaker_evidence":"11. Conclusion For the longer run, the best, and probably only practical"}]}