Findings-ad1d33c23134
“The feasibility of relocating the terminal itself to a new location was considered, but limitations in land and the large existing investment in airport facilities make this proposal unfeasible.”
Scan 5Records › City reports › San Francisco International Airport (1968)
San Francisco International Airport : definitive plan ; prepared for the Public Utilities Commission, City and County of San Francisco
A plan for the San Francisco International Airport terminal, parking structures and surrounding roads, prepared for the Public Utilities Commission.The Board passed a resolution in April 1974 urging the Airports Commission to seek federal aid for the expansion. Scan on the Internet Archive ↗
Printed words Quoted from the page as read from the scan.
Findings-ad1d33c23134
“The feasibility of relocating the terminal itself to a new location was considered, but limitations in land and the large existing investment in airport facilities make this proposal unfeasible.”
Scan 5Backgrounds-e2dfcede4da2
“This plan provided for a design to accommodate 16 to 18 million passengers annually witha total of 81 aircraft loading positions.”
Scan 5Report recommendations-f350fd7968b5
“It provides a high degree of flexibility of aircraft positions and is realizable within the necessary cost limits.”
Scan 5Report recommendations-074871444dc6
“This plan provides for incorporating the existing central and south terminals within a single unified design.”
Scan 6Report recommendations-6a9dbfa866dd
“This arrangement can produce a total number of 88 to Sdlaircraft loading positions depending on the size of aircraft served.”
Scan 6Report recommendations-920305b7c1cc
“The terminal is designed to be incremental so that as additional terminal area is needed it can be added around the perimeter roadway in the quantity required.”
Scan 6Report recommendations-300732694829
“This lake would be over four hundred feet at its widest point and would extend up as a canal between the divided ten-lane entrance road.”
Scan 7Report recommendations-3289e75a946c
“Eventually it may be impossible to carry all passengers to the terminal by highway-operated vehicles.”
Scan 7Report recommendations-52312f8c3587
“The perimeter terminal roadway ramps will be greatly expanded to a total of five moving lanes plus two unloading lanes providing three times the present curb drop-off space.”
Scan 7Report recommendationPrinted words, misread in placess-ed346a9838b1
“The basic vehicular access to the terminal! will remain the Bayshore Freeway.”
Scan 7Report recommendations-1afaefd3cce9
“One-third of all aircraft will park directly at the face of the terminal at holding areas sized to fit the aircraft at each location.”
Scan 11Report recommendations-6ba2cd0d6eb9
“The rotunda structures are circular, 200 feet in diameter, and are virtually unobstructed for free passenger movement.”
Scan 11Report recommendations-85ee8f196b30
“Three lanes are provided for through traffic and 4,400 feet of curb frontage are provided for drop-off of passengers.”
Scan 11Report recommendations-12a274910c6c
“The preliminary design criteria for such a system would be 200 passengers per minute capacity leaving each station at thirty second intervals.”
Scan 13Report recommendations-247412e3bb37
“The estimated total time for this transfer would be about three and one-half minutes.”
Scan 13Report recommendations-aa7b82175fdc
“Sufficient structural capacity will be provided at the center of the parking structure to carry the future passenger circulation and lease areas which may be required.”
Scan 15Findings-dbc86fe17ee8
“Present indications show that an increasing number of passenger services, such as ticketing and even food service, may be desired at the parking structure location.”
Scan 15Report recommendationPrinted words, misread in placess-bf54fff5a8da
“When the proposed new control tower is constructed, the center terminal will have the present control tower and support facilities removed.”
Scan 19Report recommendations-e99b7b7a7c2b
“The south terminal will be widened to provide the frontal gate passenger boarding lounges and additional lease space.”
Scan 19Report recommendations-5d1a34bf3a3e
“Located mid-way between the ultimate five levels of the parking structure, level three would contain the first staffed baggage check islands.”
Scan 25Report recommendations-7f4d447658f0
“Level four is a typical parking level with the addition of vertical circulation, by stair or escalator, up to the six pedestrian bridges crossing to the terminal.”
Scan 25Report recommendations-b1b7e446d31c
“Parking level three is a typical parking level and is entered by a one-half level ramp up from the entrance road.”
Scan 25Report recommendations-caf1c7cc5d04
“Level five, not part of this construction phase, will be designed with the first four levels of expansion and will be added as needed and revenues permit.”
Scan 27Report recommendations-f7669da9f897
“Space is shown for a 100-foot-long passenger-mover at each line.”
Scan 27Report recommendations-82a7519e45cf
“Construction techniques should stress lightweight systems with disconnecting fasteners for possible future relocation or modification.”
Scan 37Report recommendations-2e2829979113
“This would provide space for possibly a major airport hotel facility on one side and office space for airport-related companies on the other.”
Scan 39Report recommendations-31f6373a8aa2
“Shown here is the fully developed center parking structure with the fifth level added and the sixth level passenger service facilities in place.”
Scan 39Report recommendations-ce58f9b0ba5e
“Shown are two tiered parking structures extending toward the freeway from the ends of the terminal structure, providing five additional parking levels on either side of the main entrance roadway.”
Scan 39Identifier ia:C124900593