{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124902041","url":"https://data.qipu.org/usa/san-francisco/reports/c124902041/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124902041/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124902041","source_id":"C124902041","title":"Options for change : land use choices for the waterfront plan : a document for public review and comment","year":1993,"n_pages":154,"source_url":"https://archive.org/details/C124902041","issuer":"Port of San Francisco","issuer_type":"government","gov_level":"city_county","doc_kind":"study","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"model","doc_kind_by":"model","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":17,"statements_total":46,"statements_by_kind":{"finding":20,"proposal":19,"cites_decision":0,"background":7},"same_for_every_statement":{"source_id":"C124902041","source_url":"https://archive.org/details/C124902041","source_label":"IGS library: Options for change : land use choices for the waterfront plan : a document for public review and comment","report_year":1993,"issuer":"Port of San Francisco","issuer_type":"government","doc_kind":"study","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A study by the Port of San Francisco setting out land use options for the waterfront plan, for public review and comment.","next":"The Board adopted a resolution urging the Port Commission to keep the fishing industry on the waterfront in October 2000.","next_decision":"qipu:sf/decision/meetingminutesb2000sanf_1:202/4","figures":[{"label":"Cost per berth","value":"about $50 million per berth","claim_ids":["c:2dd6b507d2d8eae608a3f01a750a3bb8"]},{"label":"Pier 45 repair","value":"$13.4 million","claim_ids":["c:ff4e07e49bda00776378546502d8d40a"]},{"label":"Port land reserved","value":"70%","claim_ids":["c:92d3f48da1d0396aff2f9f06ee5667f5"]},{"label":"Piers reserved","value":"21 piers","claim_ids":["c:e8dc69e145c45c3b46e89b96d6cbfae3"]}],"main_points":["c:ed731b9bef6dd3484c9388ad4543ac86","c:0b6f112c1804dcedb262505a8e4e0b70","c:031a8c5d4d609055467263bc480af2ca"],"board_decisions_after":["qipu:sf/decision/meetingminutesb2000sanf_1:202/4","qipu:sf/decision/journalofjanaprproceed90sanfrich:35/4","qipu:sf/decision/journalmayaugofproceed91sanfrich:28/1","qipu:sf/decision/journalmayaugofproceed91sanfrich:181/4"],"board_decisions_before":["qipu:sf/decision/journalofproceed85julydecsanfrich:174/4"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:335e32a6eb231227f42be876c6b9f8e2","page_id":"C124902041:3","page_url":"https://archive.org/details/C124902041/page/n2","statement_kind":"background","subject_label":"Waterfront Plan preparation","summary":"The Waterfront Plan is being prepared under the guidance of the Waterfront Plan Advisory Board.","property":"other","t_from":"1993","quote":"The Waterfront Plan is being prepared under the guidance of the Waterfront Plan Advisory Board, which will report its recommendations to the San Francisco Port Commission.","place_label":"Port jurisdiction, Fisherman’s Wharf to India Basin","anchor":"s-335e32a6eb23","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Executive Summary. The Port of San Francisco is engaged in a public planning process"},{"claim_id":"c:92d3f48da1d0396aff2f9f06ee5667f5","page_id":"C124902041:3","page_url":"https://archive.org/details/C124902041/page/n2","statement_kind":"finding","subject_label":"Port land reserved for water-dependent activities","summary":"Approximately 70% of Port land was reserved for water-dependent activities in Phase I.","property":"other","value_text":"70%","value_num":70.0,"unit":"percent","t_from":"1993","quote":"Approximately 70% of Port land was reserved for this pur- pose.","place_label":"Port land","anchor":"s-92d3f48da1d0","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Executive Summary. Approximately 70% of Port land was reserved"},{"claim_id":"c:cdee6b4b1b51660878f26b1e458265ce","page_id":"C124902041:3","page_url":"https://archive.org/details/C124902041/page/n2","statement_kind":"proposal","subject_label":"Draft Waterfront Plan","summary":"Phase III is planned to integrate water-dependent and non-water-dependent uses into a draft Waterfront Plan.","property":"proposes","t_from":"1993","quote":"After receiving comments on the Options for Change, Phase III of the planning process will integrate the water-dependent and non- water-dependent uses","anchor":"s-cdee6b4b1b51","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"After receiving comments on the Options for Change, Phase III"},{"claim_id":"c:e0e3151a49b1c90528f039ae0b5e04d6","page_id":"C124902041:3","page_url":"https://archive.org/details/C124902041/page/n2","statement_kind":"finding","subject_label":"Port buildings and finger piers","summary":"The document observes that Port buildings and finger piers are underutilized and deteriorating.","property":"other","value_text":"underutilized and deteriorating","t_from":"1993","quote":"A closer inspection reveals that Port buildings and finger piers are underutilized and deteriorating.","place_label":"Port buildings and finger piers","anchor":"s-e0e3151a49b1","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"A closer inspection reveals that Port buildings"},{"claim_id":"c:ed731b9bef6dd3484c9388ad4543ac86","page_id":"C124902041:3","page_url":"https://archive.org/details/C124902041/page/n2","statement_kind":"proposal","subject_label":"Options for Change document","summary":"The report proposes land use options focused on primarily non-water-dependent uses for underused Port sites.","property":"proposes","t_from":"1993","quote":"Options for Change has been published to focus on primarily non-water-dependent land use options for various underused Port sites","place_label":"Underused Port sites","anchor":"s-ed731b9bef6d","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Options for Change has been published to focus"},{"claim_id":"c:1356d7303902579560de9604c7cfe1c5","page_id":"C124902041:18","page_url":"https://archive.org/details/C124902041/page/n17","statement_kind":"background","subject_label":"Advisory Board membership","summary":"Advisory Board members were appointed by the Mayor, Board of Supervisors and Port Commission.","property":"other","t_from":"1993","quote":"The Advisory Board members, appointed by the Mayor, Board of Supervisors and Port Commission, include representatives from maritime industries","anchor":"s-1356d7303902","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Advisory Board members, appointed by the Mayor"},{"claim_id":"c:2f5c0635c8b31a80ddb10b38333f0a39","page_id":"C124902041:18","page_url":"https://archive.org/details/C124902041/page/n17","statement_kind":"finding","subject_label":"Piers not required for water-dependent activities","summary":"The Advisory Board determined that seven piers would not be required for water-dependent activities.","property":"other","value_text":"seven piers","value_num":7.0,"t_from":"1993","quote":"Alternatively, the Advisory Board determined that seven piers would not be required for water-dependent activities.","anchor":"s-2f5c0635c8b3","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the Advisory Board determined that seven piers would not be required"},{"claim_id":"c:8242e16a9eb0d12c1cc4fca6650eaf21","page_id":"C124902041:18","page_url":"https://archive.org/details/C124902041/page/n17","statement_kind":"proposal","subject_label":"Piers tentatively reserved pending Phase II","summary":"The Advisory Board tentatively reserved 11 additional piers pending completion of Phase II.","property":"proposes","value_text":"11 additional piers","value_num":11.0,"t_from":"1993","quote":"with 11 additional piers tentatively reserved for that purpose pending the completion of Phase II of the planning process.","anchor":"s-8242e16a9eb0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"with 11 additional piers tentatively reserved for that purpose"},{"claim_id":"c:b23e0f16c55e95b95080c26b0ecf7b37","page_id":"C124902041:18","page_url":"https://archive.org/details/C124902041/page/n17","statement_kind":"finding","subject_label":"[name withheld] condemned","summary":"Two piers have been condemned, Piers 24 and 34.","property":"other","value_text":"two piers condemned","value_num":2.0,"t_from":"1993","quote":"Of those, two piers have been condemned (Piers 24, 34), and the remainder will require substantial and costly improvements","place_label":"Piers 24, 34","anchor":"s-b23e0f16c55e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Of those, two piers have been condemned"},{"claim_id":"c:e8dc69e145c45c3b46e89b96d6cbfae3","page_id":"C124902041:18","page_url":"https://archive.org/details/C124902041/page/n17","statement_kind":"proposal","subject_label":"Piers reserved for water-dependent activities","summary":"The Advisory Board's preliminary recommendation was that 21 piers be permanently reserved for long-term water-dependent activities.","property":"proposes","value_text":"21 piers","value_num":21.0,"t_from":"1993","quote":"At the end of Phase I, the Advisory Board’s preliminary recommendation was that 21 piers should be permanently reserved for long-term, water-dependent activities","anchor":"s-e8dc69e145c4","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the Advisory Board's preliminary recommendation was that 21 piers"},{"claim_id":"c:031a8c5d4d609055467263bc480af2ca","page_id":"C124902041:24","page_url":"https://archive.org/details/C124902041/page/n23","statement_kind":"proposal","subject_label":"Review of waterfront policies and regulations","summary":"The Advisory Board reached a consensus to reconsider existing waterfront policies and regulations and urge amendments if necessary.","property":"proposes","value_text":"reconsider policies and regulations","t_from":"1993","quote":"A consensus has emerged on the Advisory Board to reconsider existing policies and regulations governing waterfront development and urge amendments, if necessary","place_label":"San Francisco waterfront","anchor":"s-031a8c5d4d60","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Regulatory Context. A consensus has emerged on the Advisory Board"},{"claim_id":"c:16ce56731271bfd2a5680678fd6cdaaa","page_id":"C124902041:24","page_url":"https://archive.org/details/C124902041/page/n23","statement_kind":"proposal","subject_label":"Land use options in the report","summary":"The report says Options for Change includes land use options permitted under existing regulations and options requiring new interpretations.","property":"proposes","value_text":"land use options","t_from":"1993","quote":"Options for Change therefore includes land use options that would be permitted under existing regulations, as well as those that would require new interpretations","anchor":"s-16ce56731271","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Options for Change therefore includes land use options"},{"claim_id":"c:83a7e4b4fa2e6ea06094f8f00a701036","page_id":"C124902041:24","page_url":"https://archive.org/details/C124902041/page/n23","statement_kind":"background","subject_label":"Waterfront planning history","summary":"Twelve years have passed since the last comprehensive planning effort for the San Francisco waterfront.","property":"other","value_text":"twelve years","value_num":12.0,"unit":"years","t_from":"1993","quote":"Twelve years have passed since the last comprehensive planning effort was completed for the San Francisco waterfront.","place_label":"San Francisco waterfront","anchor":"s-83a7e4b4fa2e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Twelve years have passed since the last comprehensive planning effort"},{"claim_id":"c:c012b42085bfa3a79ebc8d8cea5d1dd9","page_id":"C124902041:24","page_url":"https://archive.org/details/C124902041/page/n23","statement_kind":"background","subject_label":"State Lands Commission jurisdiction","summary":"The California State Lands Commission has jurisdiction over the lands granted in trust to the Port of San Francisco.","property":"other","value_text":"jurisdiction over trust lands","t_from":"1993","quote":"The California State Lands Commission has jurisdiction over the lands granted in trust to the Port of San Francisco.","place_label":"Port of San Francisco","anchor":"s-c012b42085bf","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"State and Local Agencies With Jurisdiction Over The Port"},{"claim_id":"c:0b6f112c1804dcedb262505a8e4e0b70","page_id":"C124902041:34","page_url":"https://archive.org/details/C124902041/page/n33","statement_kind":"proposal","subject_label":"Flexible waterfront plan","summary":"The report states the objective of a flexible waterfront plan is to let the Port manage its property more effectively than in the past.","property":"proposes","value_text":"flexible waterfront plan","t_from":"1993","quote":"The objective of a flexible waterfront plan is to allow the Port to more effectively manage its property than in the past, within a framework of streamlined","anchor":"s-0b6f112c1804","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The objective of a flexible waterfront plan is to allow the Port"},{"claim_id":"c:c3f03369da6a92b5168fe4a202cb93ec","page_id":"C124902041:34","page_url":"https://archive.org/details/C124902041/page/n33","statement_kind":"proposal","subject_label":"Opportunity Sites approach","summary":"The report says Options for Change primarily focuses on land uses for individual Opportunity Sites.","property":"proposes","value_text":"site-specific land use options","t_from":"1993","quote":"Options for Change primarily focuses on land uses for individual Opportunity Sites, a site-specific approach which is necessary","anchor":"s-c3f03369da6a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Options for Change primarily focuses on land uses for individual Opportunity Sites"},{"claim_id":"c:b12cfd3db533aef742f26f34fe17a01c","page_id":"C124902041:35","page_url":"https://archive.org/details/C124902041/page/n34","statement_kind":"proposal","subject_label":"Excursion boat, cruise and hotel options","summary":"The report notes that excursion boat terminals, cruise terminals and hotels are listed as options for more sites than could ultimately use them.","property":"alternative","value_text":"excursion boat terminals, cruise terminal, hotels","t_from":"1993","quote":"Certain uses, for example excursion boat terminals, cruise terminal or hotels, are included as land use options for a greater number of sites than could ultimately be used","anchor":"s-b12cfd3db533","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Certain uses, for example excursion boat terminals, cruise terminal or hotels"},{"claim_id":"c:adc387ee61c78b12da0c6415f9c51ffe","page_id":"C124902041:46","page_url":"https://archive.org/details/C124902041/page/n45","statement_kind":"proposal","subject_label":"Maritime support uses","summary":"The report says maritime support uses would enhance Port competitiveness but involve considerable costs for new facilities.","property":"proposes","value_text":"enhance competitiveness, considerable costs","t_from":"1993","quote":"Would enhance Port’s competitiveness with other Ports, although would involve considerable costs of building new facilities for these uses","anchor":"s-adc387ee61c7","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Port of San Francisco","stance":"own_position","speaker_evidence":"Economic Issues: Would enhance Port's competitiveness with other Ports"},{"claim_id":"c:c9b7969ab94a658e7fa74e7bbabb3dd2","page_id":"C124902041:46","page_url":"https://archive.org/details/C124902041/page/n45","statement_kind":"finding","subject_label":"Breakwater construction for historic ships","summary":"The report finds breakwater construction is very expensive relative to the economic return from historic ship uses.","property":"finding","value_text":"very expensive relative to economic return","t_from":"1993","quote":"Breakwater construction, which could alleviate this problem, is very expensive in relation to economic return from this use.","anchor":"s-c9b7969ab94a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Port of San Francisco","stance":"own_position","speaker_evidence":"Land Use Issues: Breakwater construction, which could alleviate this problem, is very expensive"},{"claim_id":"c:10a8a5632928a819399135c9e71b5649","page_id":"C124902041:56","page_url":"https://archive.org/details/C124902041/page/n55","statement_kind":"finding","subject_label":"Pier 45 earthquake damage","summary":"The 1989 [name withheld] Earthquake caused considerable damage to Pier 45.","property":"event","value_text":"considerable damage","date_printed":"1989","t_from":"1989","quote":"the 1989 [name withheld] Earthquake occurred, causing considerable damage to Pier 45.","place_label":"Pier 45","place_precision":"site","place_id":"qipu:sf/place/landmark/pier-45","resolved_by":"place links file","anchor":"s-10a8a5632928","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Port was preparing to begin construction of the harbor facilities when the 1989 Loma Prieta Earthquake occurred"},{"claim_id":"c:2e455fa4e8ce52ca29961cab031eea6d","page_id":"C124902041:56","page_url":"https://archive.org/details/C124902041/page/n55","statement_kind":"finding","subject_label":"Fisherman's Wharf plan revision","summary":"The CAC has developed a draft Fisherman's Wharf Plan that has not yet been presented to the Port Commission or Planning Commission.","property":"other","value_text":"not yet presented","t_from":"1993","quote":"The CAC has developed a draft Fisherman’s Wharf Plan that has not yet been presented to the Port Commission or Planning Commission.","place_label":"Fisherman's Wharf","place_precision":"site","place_id":"qipu:sf/place/landmark/fishermans-wharf","resolved_by":"place links file","anchor":"s-2e455fa4e8ce","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The CAC has developed a \"Draft Fisherman's Wharf Plan\" that has not yet been presented to the Port Commission"},{"claim_id":"c:b8c5eaea7a1b7b0b86c6027d9ccd3c19","page_id":"C124902041:56","page_url":"https://archive.org/details/C124902041/page/n55","statement_kind":"finding","subject_label":"Fish Alley infrastructure","summary":"The Port is not able to bear all related costs and has no immediate plans for infrastructure improvements in Fish Alley fish handling areas.","property":"other","value_text":"no immediate plans","t_from":"1993","quote":"the Port is not able to bear all related costs and has no immediate plans for infrastructure improvements in Fish Alley fish handling areas.","place_label":"Fish Alley","anchor":"s-b8c5eaea7a1b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the Port is not able to bear all related costs and has no immediate plans for infrastructure improvements"},{"claim_id":"c:c486ef9c64d8bef51fb507118d771eab","page_id":"C124902041:56","page_url":"https://archive.org/details/C124902041/page/n55","statement_kind":"proposal","subject_label":"Seafood Center Project","summary":"The 1988 Seafood Center Project proposed new fish handling facilities at Pier 45 and a new Hyde Street Harbor for $26 million (≈ $74.1 million in 2026 dollars).","property":"cost_usd","value_text":"$26 million","value_num":26000000.0,"unit":"USD","date_printed":"1988","t_from":"1988","quote":"a $26 million project proposed in 1988 to provide new fish handling facilities at Pier 45 and a new Hyde Street Harbor","place_label":"Pier 45","place_precision":"site","place_id":"qipu:sf/place/landmark/pier-45","resolved_by":"place links file","anchor":"s-c486ef9c64d8","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"On Port property, one proposed project with widespread community and fishing industry support is the pre-earthquake Seafood Center Project"},{"claim_id":"c:ff4e07e49bda00776378546502d8d40a","page_id":"C124902041:56","page_url":"https://archive.org/details/C124902041/page/n55","statement_kind":"finding","subject_label":"Pier 45 earthquake damage repair","summary":"The Port Commission shifted its priority to the $13.4 million (≈ $31.2 million in 2026 dollars) Pier 45 Earthquake Damage Repair Project, which is now underway.","property":"cost_usd","value_text":"$13.4 million","value_num":13400000.0,"unit":"USD","t_from":"1993","quote":"the Port Commission shifted its priority from the harbor to the $13.4 million Pier 45 Earthquake Damage Repair Project which is now underway","place_label":"Pier 45","place_precision":"site","place_id":"qipu:sf/place/landmark/pier-45","resolved_by":"place links file","anchor":"s-ff4e07e49bda","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the Port Commission shifted its priority from the harbor to the $13.4 million Pier 45 Earthquake Damage Repair Project"},{"claim_id":"c:35eff7d384f09823ffff98cfdd4d2e9f","page_id":"C124902041:67","page_url":"https://archive.org/details/C124902041/page/n66","statement_kind":"finding","subject_label":"Pier 43½ leases","summary":"Pier 43½ is under long-term leases through 2036 for the Franciscan Restaurant and about 250 parking spaces.","property":"leased","value_text":"through 2036","value_num":2036.0,"date_printed":"2036","t_from":"1993","quote":"currently is under long term leases, through 2036, for the Franciscan Restaurant and approximately 250 parking spaces.","place_label":"Pier 43½","anchor":"s-35eff7d384f0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Pier 43 currently is under long term leases, through 2036"},{"claim_id":"c:c7b21d64471b263f4b868da46d755980","page_id":"C124902041:67","page_url":"https://archive.org/details/C124902041/page/n66","statement_kind":"proposal","subject_label":"Pier 43½ east side","summary":"The CAC's draft plan recommends reserving the east side of the Pier for public access, with no berthing except for an historic sailing ship.","property":"proposes","value_text":"reserve east side for public access","t_from":"1993","quote":"The CAC’s Draft Fisherman’s Wharf Plan also recommends reserving the east side of the Pier for public access, with no berthing along the water’s edge","place_label":"Pier 43½","anchor":"s-c7b21d64471b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The CAC’s Draft Fisherman’s Wharf Plan also recommends reserving the east side"},{"claim_id":"c:e9444b058270b33a572c43ee91e684fa","page_id":"C124902041:67","page_url":"https://archive.org/details/C124902041/page/n66","statement_kind":"finding","subject_label":"Ferry berths","summary":"There are currently seven ferry boat berths in the Pier 43½ area.","property":"other","value_text":"seven ferry boat berths","value_num":7.0,"unit":"berths","t_from":"1993","quote":"Currently there are seven ferry boat berths in the area, but other Bay Area ferry services have expressed a need for universally accessible landing facility","place_label":"Pier 43½","anchor":"s-e9444b058270","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Currently there are seven ferry boat berths in the area"},{"claim_id":"c:411a7ae40e7af2a6e5f343ab57cf0805","page_id":"C124902041:76","page_url":"https://archive.org/details/C124902041/page/n75","statement_kind":"background","subject_label":"Northern Waterfront Special Use District #1","summary":"NWSUD #1 permits only maritime uses as permitted uses; all non-maritime uses are conditional uses.","property":"use","value_text":"only maritime uses permitted","t_from":"1993","quote":"NWSUD #1 Northern Waterfront Special Use District #1, under which only maritime uses are permitted uses; all non-maritime uses are conditional uses.","anchor":"s-411a7ae40e7a","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"KEY: MP = The City's Master Plan; NWSUD #1 Northern Waterfront Special Use District #1"},{"claim_id":"c:05d075e0494b10d56c15a98df1d57c95","page_id":"C124902041:78","page_url":"https://archive.org/details/C124902041/page/n77","statement_kind":"finding","subject_label":"Pier 35 cruise terminal","summary":"The existing cruise terminal at Pier 35 does not operate efficiently, but its location near Fisherman's Wharf is an advantage.","property":"other","value_text":"does not operate efficiently","t_from":"1993","quote":"Although existing terminal at Pier 35 does not operate efficiently, close proximity to Fisherman’s Wharf offers an advantage for cruise ship customers.","place_label":"Pier 35","anchor":"s-05d075e0494b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Options for change : land use choices for the waterfront plan"},{"claim_id":"c:2543db87a15ebb2419319efbab3e62d6","page_id":"C124902041:81","page_url":"https://archive.org/details/C124902041/page/n80","statement_kind":"proposal","subject_label":"Piers 15-17 long-term use","summary":"The document says long-term use of Piers 15-17 should be considered in any seawall lot 321 redevelopment proposal.","property":"recommendation","t_from":"1993","quote":"Nevertheless the long-term use of Piers 15-17 should be considered as part of any redevelopment proposals for seawall lot 321","place_label":"Piers 15-17; seawall lot 321","anchor":"s-2543db87a15e","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Port of San Francisco","stance":"own_position","speaker_evidence":"Nevertheless the long-term use of Piers 15-17 should be considered"},{"claim_id":"c:6916dcaaa34fd72f86177cba80c9dea7","page_id":"C124902041:81","page_url":"https://archive.org/details/C124902041/page/n80","statement_kind":"finding","subject_label":"Housing on seawall lots 321, 323 and 324","summary":"The document finds housing on these seawall lots could lead to conflicts with adjacent maritime operations.","property":"other","t_from":"1993","quote":"Housing on seawall lot 321, or 323 and 324, could lead to conflicts between new residents and maritime operations on adjacent piers","place_label":"Seawall lots 321, 323, 324","anchor":"s-6916dcaaa34f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Port of San Francisco","stance":"own_position","speaker_evidence":"Site G -- Land Use Options, Issues and Comments"},{"claim_id":"c:604017cae181d8238836d5c81477b1a2","page_id":"C124902041:89","page_url":"https://archive.org/details/C124902041/page/n88","statement_kind":"finding","subject_label":"Ferry Building","summary":"The document notes the Ferry Building is exempt from some BCDC land use restrictions because of its historic landmark status.","property":"other","t_from":"1993","quote":"* Ferry Building is exempt from some BCDC land use restrictions due to its historic landmark status, which offers greater flexibility in its reuse.","place_label":"Ferry Building","place_precision":"building","place_id":"qipu:sf/place/landmark/ferry-building","resolved_by":"place links file","anchor":"s-604017cae181","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"* Ferry Building is exempt from some BCDC land use restrictions"},{"claim_id":"c:d24155ad7535948737ca3c0189b95b43","page_id":"C124902041:99","page_url":"https://archive.org/details/C124902041/page/n98","statement_kind":"background","subject_label":"Mission Bay Specific Plan buffer zones","summary":"The document states the Mission Bay Specific Plan provided buffer zones between residential areas and waterfront maritime activities.","property":"other","t_from":"1993","quote":"The Mission Bay Specific Plan strived to meet this challenge by providing buffer zones between the planned residential communities and maritime activities on the waterfront","place_label":"Mission Bay; China Basin Street","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-d24155ad7535","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Mission Bay Specific Plan strived to meet this challenge by providing buffer zones"},{"claim_id":"c:eb4c84aad1c6fad27ac40328bad53cf4","page_id":"C124902041:99","page_url":"https://archive.org/details/C124902041/page/n98","statement_kind":"finding","subject_label":"Port seawall lot housing returns","summary":"The document states the Port accepted low industrial rates of return on seawall lots developed for affordable housing, contributing to neighbourhood change.","property":"other","t_from":"1993","quote":"The Port’s willingness to accept historic, and low, industrial rates of return on seawall lots developed for affordable housing in this area contributed to the transformation of the neighborhood.","place_label":"South Beach","place_precision":"area","place_id":"qipu:sf/place/hood/financial-district-south-beach","resolved_by":"place links file","anchor":"s-eb4c84aad1c6","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Port's willingness to accept historic, and low, industrial rates of return"},{"claim_id":"c:5b2453a612aa34ade7477a604d859d29","page_id":"C124902041:110","page_url":"https://archive.org/details/C124902041/page/n109","statement_kind":"proposal","subject_label":"Pier 34 reuse","summary":"The document says Pier 34 was proposed for reuse as a much smaller pier for a potential ferry or water taxi dock.","property":"proposes","value_text":"ferry or water taxi dock","t_from":"1993","quote":"As part of the Scandinavia Center, this site was proposed for reuse as a much smaller pier for a potential Ferry or Water Taxi Dock","place_label":"Pier 34; Scandinavia Center","anchor":"s-5b2453a612aa","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"As part of the Scandinavia Center, this site was proposed"},{"claim_id":"c:f9af98c67a44095d7d1f16b803795a38","page_id":"C124902041:110","page_url":"https://archive.org/details/C124902041/page/n109","statement_kind":"finding","subject_label":"Pier 34","summary":"The document states existing regulations do not encourage fill removal by granting credit for use elsewhere on the waterfront.","property":"other","t_from":"1993","quote":"Existing regulations do not encourage fill removal -by granting credit for use elsewhere on the waterfront.","place_label":"Pier 34","anchor":"s-f9af98c67a44","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Existing regulations do not encourage fill removal"},{"claim_id":"c:2dd6b507d2d8eae608a3f01a750a3bb8","page_id":"C124902041:118","page_url":"https://archive.org/details/C124902041/page/n117","statement_kind":"finding","subject_label":"Cost of new container terminal berth","summary":"The report states that developing new terminal facilities costs about $50 million (≈ $116.6 million in 2026 dollars) per berth.","property":"cost_usd","value_text":"about $50 million per berth","value_num":50000000.0,"unit":"USD","t_from":"1993","quote":"Given the cost of developing new terminal facilities (about $50 million per berth) and the Port’s current financial situation","anchor":"s-2dd6b507d2d8","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Given the cost of developing new terminal facilities"},{"claim_id":"c:4d973028a4a4bc82c890ca89af8ffc4a","page_id":"C124902041:118","page_url":"https://archive.org/details/C124902041/page/n117","statement_kind":"proposal","subject_label":"Southern Waterfront port property use","summary":"The report says the primary use of Port property in the Southern Waterfront should be continued and expanded industrial maritime business.","property":"use","t_from":"1993","quote":"the primary use of Port property in this subarea should be for the continued operation and expansion of industrial maritime businesses","place_label":"Southern Waterfront Subarea","anchor":"s-4d973028a4a4","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the primary use of Port property in this subarea should be"},{"claim_id":"c:8c3ff509122504bcd66b9db658887efd","page_id":"C124902041:118","page_url":"https://archive.org/details/C124902041/page/n117","statement_kind":"proposal","subject_label":"Pier 70 historic buildings reuse","summary":"The report proposes that non-maritime tenants be allowed to use the Pier 70 historic buildings not needed for maritime operations.","property":"proposes","t_from":"1993","quote":"flexibility should be afforded to allow non-maritime tenants to use the buildings.","place_label":"Pier 70 backlands","place_precision":"area","anchor":"s-8c3ff5091225","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"flexibility should be afforded to allow non-maritime tenants"},{"claim_id":"c:dce20f820d947cfbb78c3683af175f3e","page_id":"C124902041:118","page_url":"https://archive.org/details/C124902041/page/n117","statement_kind":"finding","subject_label":"Port container terminals","summary":"The report observes that both Port container terminals are operating well below capacity.","property":"other","value_text":"well below capacity","t_from":"1993","quote":"Currently, both of the Port’s container terminals are operating well below capacity.","place_label":"Port of San Francisco","anchor":"s-dce20f820d94","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Currently, both of the Port's container terminals are operating well below capacity."},{"claim_id":"c:f4b240d9e5e0690bbbd26f366b528e5f","page_id":"C124902041:118","page_url":"https://archive.org/details/C124902041/page/n117","statement_kind":"finding","subject_label":"Pier 70 backlands historic structures","summary":"The report finds that three Pier 70 backlands buildings are currently uninhabitable after the 1989 earthquake.","property":"finding","value_text":"three of the buildings currently are uninhabitable","value_num":3.0,"date_printed":"1989","t_from":"1989","quote":"Most suffered damage during the 1989 [name withheld] earthquake and three of the buildings currently are uninhabitable.","place_label":"Pier 70 backlands","place_precision":"area","anchor":"s-f4b240d9e5e0","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Most suffered damage during the 1989 earthquake and three of the buildings"},{"claim_id":"c:13edfe5f469a752bc95c1ec96e6f3a85","page_id":"C124902041:130","page_url":"https://archive.org/details/C124902041/page/n129","statement_kind":"background","subject_label":"Waterfront jurisdictions","summary":"The report notes that the Port, City Planning Commission, BCDC, Board of Supervisors and State Lands operate under separate legal mandates.","property":"other","t_from":"1993","quote":"The Port, City Planning Commission, BCDC, the Board of Supervisors and State Lands all operate under separate legal mandates","anchor":"s-13edfe5f469a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"There are complex jurisdictional issues that would have to be addressed."},{"claim_id":"c:6674ab040b486027a5617d5233ef4faf","page_id":"C124902041:130","page_url":"https://archive.org/details/C124902041/page/n129","statement_kind":"proposal","subject_label":"Entitlement process reform","summary":"The report suggests joint powers agreements or a public benefit corporation to bridge jurisdictional issues.","property":"proposes","t_from":"1993","quote":"Possible vehicles for bridging these issues include Joint Powers Agreements and/or creation of a Public Benefit Corporation where each entity is represented","anchor":"s-6674ab040b48","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Possible vehicles for bridging these issues include Joint Powers Agreements"},{"claim_id":"c:d0fbd8141c48a553e3e9fae93649e873","page_id":"C124902041:130","page_url":"https://archive.org/details/C124902041/page/n129","statement_kind":"finding","subject_label":"Entitlement process inefficiency","summary":"The report finds that the main inefficiency is the lack of early comprehensive review of project concepts by all decision-making agencies.","property":"finding","t_from":"1993","quote":"Chief among these is the lack of comprehensive review of the project concept by all of the decision-making agencies early in the process.","anchor":"s-d0fbd8141c48","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Chief among these is the lack of comprehensive review of the project concept"},{"claim_id":"c:e6e500a3c488ec9f2637a7442e3cb213","page_id":"C124902041:130","page_url":"https://archive.org/details/C124902041/page/n129","statement_kind":"proposal","subject_label":"Waterfront plan approval and voter review","summary":"The report notes a suggestion that the final waterfront plan be submitted to the voters.","property":"proposes","t_from":"1993","quote":"It has also been suggested that the final plan be submitted to the voters, to ensure the necessary mandate to proceed with improvements consistent with the plan.","anchor":"s-e6e500a3c488","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"It has also been suggested that the final plan be submitted to the voters"},{"claim_id":"c:0539751e3e44c00d9fbf9f38e56113d1","page_id":"C124902041:141","page_url":"https://archive.org/details/C124902041/page/n140","statement_kind":"proposal","subject_label":"Waterfront Plan policy on water-dependent uses","summary":"Draft Policy 3.1 says preference should be given to water-dependent activities and public access.","property":"recommendation","t_from":"1993","quote":"Preference should be given to water-dependent activities, public access and environmental restoration activities, with highest priority given to uses","anchor":"s-0539751e3e44","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"Waterfront Plan Advisory Board (Appendix B policy text)","stance":"own_position","speaker_evidence":"Appendix B 123 POLICY 3.1: Preference should be given to water-dependent activities"}]}