{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124902290","url":"https://data.qipu.org/usa/san-francisco/reports/c124902290/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124902290/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124902290","source_id":"C124902290","title":"Into the 21st century : building a new facility to continue Laguna Honda Hospital's mission","year":1992,"n_pages":168,"creator":null,"source_url":"https://archive.org/details/C124902290","issuer":"City and County of San Francisco, Department of Public Health","issuer_type":"government","gov_level":"city_county","prepared_by":"Kaplan McLaughlin Diaz with Gordon H. Chong & Associates","doc_kind":"study","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"model","doc_kind_by":"model","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":12,"statements_total":49,"statements_by_kind":{"finding":17,"proposal":30,"cites_decision":0,"background":2},"same_for_every_statement":{"source_id":"C124902290","source_url":"https://archive.org/details/C124902290","source_label":"IGS library: Into the 21st century : building a new facility to continue Laguna Honda Hospital's mission","report_year":1992,"issuer":"City and County of San Francisco, Department of Public Health","issuer_type":"government","doc_kind":"study","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A study by the Department of Public Health weighing three options for replacing the Laguna Honda Hospital and recommending one of them.","next":"The Board affirmed the Planning Commission's certification of the final environmental impact report in August 2002.","next_decision":"qipu:sf/decision/meetingjuneaugminutes97sanfrich:352/2","figures":[{"label":"Area","value":"64 acres","claim_ids":["c:cddf9865f2016f4b8d8250a196b9b317"]},{"label":"Cost","value":"$548.4 million escalated dollars","page_url":"https://archive.org/details/C124902290/page/n8","quote":"This Report proposes a $548.4 million Bond Program to finance a replacement facility"},{"label":"New beds","value":"1207 new patient beds","claim_ids":["c:dffd7eabcd359d74e523fea802bee65f"]},{"label":"Period","value":"July 1997 to July 2003","claim_ids":["c:3789a768ce90cc5d158c651b1753f54b"]}],"main_points":["c:d4c46b2017d0117ac54446339ca26da0","c:f382180b26b566e627c2cab3a9b94c9a","c:cb54e03b8e339a968915b92dd03c7e2b"],"board_decisions_after":["qipu:sf/decision/meetingjuneaugminutes97sanfrich:352/2","qipu:sf/decision/journalofjulydecproceed93sanfrich:68/3","qipu:sf/decision/journalaprjuneofproceed94sanfrich|g737","qipu:sf/decision/journalaprjuneofproceed94sanfrich|g1266","qipu:sf/decision/hand:laguna-honda-bonds-1999","qipu:sf/decision/meetingjuneaugminutes97sanfrich:352/1","qipu:sf/decision/meetingjuneaugminutes97sanfrich:353/1"],"board_decisions_before":[],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:773ba22e36c25efabcb776e75194e1dd","page_id":"C124902290:15","page_url":"https://archive.org/details/C124902290/page/n14","statement_kind":"finding","subject_label":"Laguna Honda role in city health care","summary":"The report says Laguna Honda provides by far the bulk of long-term care services in San Francisco.","property":"other","t_from":"1992","quote":"It provides by far the bulk of long-term care services on which generations have depended.","anchor":"s-773ba22e36c2","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Core Support for City Network Needed"},{"claim_id":"c:7a9ba3c3723a0ff298b875c08ee67b0c","page_id":"C124902290:15","page_url":"https://archive.org/details/C124902290/page/n14","statement_kind":"finding","subject_label":"Laguna Honda regulatory waivers","summary":"The report finds Laguna Honda operates under special waivers from State and Federal regulatory agencies.","property":"other","value_text":"special waivers","t_from":"1992","quote":"Because of their physical deficiencies, the facilities at Laguna Honda are operating under special waivers from State and Federal regulatory agencies.","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-7a9ba3c3723a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"PHYSICAL DEFICIENCIES POSE RISK OF CLOSURE"},{"claim_id":"c:cddf9865f2016f4b8d8250a196b9b317","page_id":"C124902290:15","page_url":"https://archive.org/details/C124902290/page/n14","statement_kind":"finding","subject_label":"Laguna Honda site size","summary":"The report describes the Laguna Honda site as 64 acres.","property":"acreage","value_text":"64-acre","value_num":64.0,"unit":"acres","t_from":"1992","quote":"Laguna Honda Hospital is located on a beautiful, hilly 64-acre site at the approximate center of San Francisco.","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-cddf9865f201","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Laguna Honda Hospital is located on a beautiful, hilly 64-acre site"},{"claim_id":"c:eb8d175ce4c6f95c320bb433cd67fc0a","page_id":"C124902290:15","page_url":"https://archive.org/details/C124902290/page/n14","statement_kind":"finding","subject_label":"Open ward structure","summary":"The report finds the hospital's 30-bed open ward structure is no longer permitted.","property":"other","value_text":"30-bed open ward","value_num":30.0,"t_from":"1992","quote":"The hospital’s 30-bed open ward structure is no longer permitted for reasons of infection control, patient management, and patient dignity and privacy.","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-eb8d175ce4c6","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Obsolete Hospital Design"},{"claim_id":"c:f0449e01d8c30b0f58098e4f64675966","page_id":"C124902290:15","page_url":"https://archive.org/details/C124902290/page/n14","statement_kind":"finding","subject_label":"Age of principal patient care buildings","summary":"The report finds the principal patient care buildings are between 65 and 80 years old.","property":"other","value_text":"65 to 80 years old","t_from":"1992","quote":"The principal patient care buildings at Laguna Honda are between 65 and 80 years old.","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-f0449e01d8c3","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Aged Facilities"},{"claim_id":"c:3789a768ce90cc5d158c651b1753f54b","page_id":"C124902290:23","page_url":"https://archive.org/details/C124902290/page/n22","statement_kind":"proposal","subject_label":"Construction schedule","summary":"The report estimates construction would begin in July 1997 and be complete by July 2003.","property":"other","value_text":"July 1997 to July 2003","date_printed":"July 1997","t_from":"1997","quote":"construction is estimated to begin in July 1997, and to be complete by July 2003.","anchor":"s-3789a768ce90","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"RECOMMENDED PROJECT: TWO-PHASE REPLACEMENT"},{"claim_id":"c:7f369ced357a8c35486a55a074ce1065","page_id":"C124902290:23","page_url":"https://archive.org/details/C124902290/page/n22","statement_kind":"proposal","subject_label":"Phase One floor area","summary":"The report proposes about 442,000 square feet of new construction in Phase One.","property":"floor_area_sqft","value_text":"about 442,000 square feet","value_num":442000.0,"unit":"sqft","t_from":"1992","quote":"The total area of new construction is about 442,000 square feet.","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-7f369ced357a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Phase One The first phase of new construction"},{"claim_id":"c:7f4c403abf0e94d38da6b5804e11ffc9","page_id":"C124902290:23","page_url":"https://archive.org/details/C124902290/page/n22","statement_kind":"proposal","subject_label":"Residential care facility on Clarendon Hall site","summary":"The report proposes a new 50-unit residential care facility on the former site of Clarendon Hall.","property":"proposes","value_text":"50-unit two-bed per room","value_num":50.0,"unit":"units","t_from":"1992","quote":"A new 50-unit two-bed per room Residential Care Facility is constructed on the former site of Clarendon Hall.","place_label":"Clarendon Hall","anchor":"s-7f4c403abf0e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Phase Two The second phase adds approximately"},{"claim_id":"c:866b69bd9b46103dc148bd0405059772","page_id":"C124902290:23","page_url":"https://archive.org/details/C124902290/page/n22","statement_kind":"proposal","subject_label":"Recommended project total cost","summary":"The report estimates the total cost of the recommended project at $548.4 million (≈ $1.3 billion in 2026 dollars) in escalated dollars.","property":"cost_usd","value_text":"$548.4 million escalated dollars","value_num":548400000.0,"unit":"USD","t_from":"1992","quote":"the total cost of the Project over an eleven-year period is estimated at $548.4 million escalated dollars.","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-866b69bd9b46","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Based on this schedule, the total cost of the Project"},{"claim_id":"c:dffd7eabcd359d74e523fea802bee65f","page_id":"C124902290:23","page_url":"https://archive.org/details/C124902290/page/n22","statement_kind":"proposal","subject_label":"Recommended project beds","summary":"The report proposes 1207 new patient beds, 60 more than present.","property":"other","value_text":"1207 new patient beds","value_num":1207.0,"t_from":"1992","quote":"1207 new patient beds -- 60 more than present","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-dffd7eabcd35","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Altogether, the recommended Project provides a total"},{"claim_id":"c:eecaa32ecfc1d3985d7218cd6fe32260","page_id":"C124902290:23","page_url":"https://archive.org/details/C124902290/page/n22","statement_kind":"proposal","subject_label":"Recommended project floor area","summary":"The report proposes about 900,000 new square feet for patient care and support services.","property":"floor_area_sqft","value_text":"about 900,000 new Square feet","value_num":900000.0,"unit":"sqft","t_from":"1992","quote":"the recommended Project provides a total of about 900,000 new Square feet for patient care and support services","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-eecaa32ecfc1","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Altogether, the recommended Project provides a total of about 900,000"},{"claim_id":"c:f11a70e0bd8f215d547f55f4a343dd5b","page_id":"C124902290:23","page_url":"https://archive.org/details/C124902290/page/n22","statement_kind":"proposal","subject_label":"Phase Two addition","summary":"The report proposes that Phase Two add approximately 424,000 square feet to the new hospital.","property":"floor_area_sqft","value_text":"approximately 424,000 square feet","value_num":424000.0,"unit":"sqft","t_from":"1992","quote":"The second phase adds approximately 424,000 square feet to the new hospital, and provides 557 more patient beds.","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-f11a70e0bd8f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The second phase adds approximately 424,000 square feet"},{"claim_id":"c:199a890e2ba634d3b2747b67c25be75f","page_id":"C124902290:55","page_url":"https://archive.org/details/C124902290/page/n54","statement_kind":"proposal","subject_label":"Laguna Honda new facility","summary":"The report says the completed project would improve functionality and operational efficiency.","property":"proposes","t_from":"1992","quote":"The completed project would improve functionality and operational e:niciency.","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-199a890e2ba6","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"2. Functionality and Operational Efficiency Construction would aim to minimize"},{"claim_id":"c:26f3c14e0a7a6e65e6e05fb3b427b134","page_id":"C124902290:55","page_url":"https://archive.org/details/C124902290/page/n54","statement_kind":"finding","subject_label":"Alternate locations for Laguna Honda","summary":"The planning team found that no other site could duplicate the major advantages of Laguna Honda's current location.","property":"other","t_from":"1992","quote":"These investigations found that no other site (or sites) could duplicate the major advantages of Laguna Honda's current location.","place_label":"Clarendon Valley","anchor":"s-26f3c14e0a7a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"ALTERNATIVE SOLUTIONS The planning team considered a full spectrum"},{"claim_id":"c:91fcc16a1934256b7342a35dfb5b4490","page_id":"C124902290:55","page_url":"https://archive.org/details/C124902290/page/n54","statement_kind":"finding","subject_label":"Clarendon Valley site","summary":"The City already owns the land at Clarendon Valley.","property":"owned_by_city","value_text":"City owns land","t_from":"1992","quote":"The City already owns the land and the Hospital is an established feature in its environment.","place_label":"Clarendon Valley","anchor":"s-91fcc16a1934","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The advantages of Clarendon Valley begin with its familiarity."},{"claim_id":"c:c82e451fd514dca8947aa0be0234573b","page_id":"C124902290:55","page_url":"https://archive.org/details/C124902290/page/n54","statement_kind":"finding","subject_label":"Transit access at Laguna Honda","summary":"Seven lines converge at Laguna Honda, including Muni Metro, adjacent to the site.","property":"other","value_text":"7 lines","value_num":7.0,"t_from":"1992","quote":"Plentiful public transportation -- 7 lines converge at Laguna Honda, including Muni Metro -- adjacent to the site","place_label":"Laguna Honda","place_precision":"site","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-c82e451fd514","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Plentiful public transportation -- 7 lines converge at Laguna Honda"},{"claim_id":"c:5c191c3e65f758083910db61fd316061","page_id":"C124902290:63","page_url":"https://archive.org/details/C124902290/page/n62","statement_kind":"finding","subject_label":"Alternate A and B cost","summary":"Alternate A costs $211.4 million (≈ $507.7 million in 2026 dollars) more than Alternate C in escalated dollars.","property":"cost_usd","value_text":"$211.4 million more than Alternate C","value_num":211400000.0,"unit":"USD","t_from":"1992","quote":"Alternate A costs $211.4 million more than Alternate C, Alternate B costs $25.6 million more.","anchor":"s-5c191c3e65f7","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Estimated Project Cost—Escalated Dollars"},{"claim_id":"c:696dd2cb5ed16c7c46e224bfbf3e0634","page_id":"C124902290:63","page_url":"https://archive.org/details/C124902290/page/n62","statement_kind":"proposal","subject_label":"Alternate C","summary":"Alternate C nestles new construction into the hillside inside Clarendon Valley.","property":"alternative","value_text":"Alternate C","t_from":"1992","quote":"Because it nestles new construction into the hillside inside Clarendon Valley, the large new Structure barely alters the perception of the institution","place_label":"Clarendon Valley","anchor":"s-696dd2cb5ed1","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Neighborhood Acceptance"},{"claim_id":"c:7562b27a883b7c417061b99b35795aca","page_id":"C124902290:63","page_url":"https://archive.org/details/C124902290/page/n62","statement_kind":"finding","subject_label":"Alternate B service road","summary":"Alternate B requires a major new service road from Clarendon Avenue.","property":"alternative","value_text":"major new service road","t_from":"1992","quote":"Alternate B requires a major new service road from Clarendon Avenue that entails significant reworking and disruption of the site.","place_label":"Clarendon Avenue","place_precision":"street","place_id":"qipu:sf/place/street/clarendon-ave","resolved_by":"place links file","anchor":"s-7562b27a883b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"New Roadways Required"},{"claim_id":"c:7dd533612d296734b6e47005c74a46e6","page_id":"C124902290:63","page_url":"https://archive.org/details/C124902290/page/n62","statement_kind":"finding","subject_label":"Alternate A","summary":"Alternate A results in a very compromised functional arrangement given the existing structure.","property":"finding","t_from":"1992","quote":"Alternate A, which maintains the form of the existing hospital, results in a very compromised functional arrangement.","anchor":"s-7dd533612d29","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Alternate A, which maintains the form of the existing hospital"},{"claim_id":"c:c0ab129037a69afcdc1011d9bbd921cb","page_id":"C124902290:63","page_url":"https://archive.org/details/C124902290/page/n62","statement_kind":"finding","subject_label":"Alternate B cost","summary":"Alternate B costs $25.6 million (≈ $61.5 million in 2026 dollars) more than Alternate C in escalated dollars.","property":"cost_usd","value_text":"$25.6 million more than Alternate C","value_num":25600000.0,"unit":"USD","t_from":"1992","quote":"Alternate A costs $211.4 million more than Alternate C, Alternate B costs $25.6 million more.","anchor":"s-c0ab129037a6","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Alternate C remains the least costly in terms of escalated dollars."},{"claim_id":"c:f382180b26b566e627c2cab3a9b94c9a","page_id":"C124902290:63","page_url":"https://archive.org/details/C124902290/page/n62","statement_kind":"finding","subject_label":"Alternate C neighborhood acceptance","summary":"The report states Alternate C is the only concept that won neighborhood acceptance.","property":"finding","t_from":"1992","quote":"Alternate C is the only concept that won neighborhood acceptance.","place_label":"Clarendon Valley","anchor":"s-f382180b26b5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Neighborhood Acceptance"},{"claim_id":"c:cb54e03b8e339a968915b92dd03c7e2b","page_id":"C124902290:65","page_url":"https://archive.org/details/C124902290/page/n64","statement_kind":"finding","subject_label":"Alternate C construction time","summary":"Alternate C requires the shortest construction time and causes no loss of beds during construction.","property":"finding","t_from":"1992","quote":"By requiring the shortest construction time, it yields the most timely completion date.","anchor":"s-cb54e03b8e33","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"ALTERNATE C BEST MEETS CRITERIA"},{"claim_id":"c:d4c46b2017d0117ac54446339ca26da0","page_id":"C124902290:65","page_url":"https://archive.org/details/C124902290/page/n64","statement_kind":"proposal","subject_label":"Alternate C","summary":"The planning team unanimously endorses Alternate C as the recommended Project for this Report.","property":"recommendation","value_text":"Alternate C","t_from":"1992","quote":"the planning team unanimously endorses Alternate C as the recommended Project for this Report.","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-d4c46b2017d0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the planning team","stance":"own_position","speaker_evidence":"the planning team unanimously endorses Alternate C"},{"claim_id":"c:6ce5f4171804d4f844fa437faaf1bed2","page_id":"C124902290:85","page_url":"https://archive.org/details/C124902290/page/n84","statement_kind":"proposal","subject_label":"General Fund impact of recommended project","summary":"The report says the recommended project as a replacement program makes no additional General Fund demands for capital expansion.","property":"other","value_text":"no additional demands on General Fund","t_from":"1992","quote":"As a replacement program, the recommended Project does not make additional demands on the City's General Fund that are associated with capital expansion programs.","anchor":"s-6ce5f4171804","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Impact on General Fund: As a replacement program, the recommended Project does not make"},{"claim_id":"c:7d9f7c83a24697187dfd0b29e3401b2f","page_id":"C124902290:85","page_url":"https://archive.org/details/C124902290/page/n84","statement_kind":"proposal","subject_label":"City operating subsidy forecast for hospital operations","summary":"The pro-forma analysis projects the city operating subsidy falling from 14.44 percent to 7.00 percent of operating expenses.","property":"other","value_text":"7.00 percent","value_num":7.0,"unit":"percent","date_printed":"June 30, 2004","t_from":"2004","quote":"projects a decrease in the operating subsidy from 14.44 percent of total operating expenses for the fiscal year ended June 30, 1991 to 7.00 percent by the fiscal year ending June 30, 2004.","anchor":"s-7d9f7c83a246","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The pro-forma operating analysis projects a decrease in the operating subsidy"},{"claim_id":"c:a07c63c3476fe2fe3acf0f6ad72d6c13","page_id":"C124902290:85","page_url":"https://archive.org/details/C124902290/page/n84","statement_kind":"proposal","subject_label":"Construction cost by major component","summary":"The recommended project would devote 82.4% of total project cost to new hospital and housing construction.","property":"other","value_text":"82.4%","value_num":82.4,"unit":"percent","t_from":"1992","quote":"Figure 11 CONSTRUCTION COST BY MAJOR COMPONENTS Percent of Project Components Total Project Cost New Hospital and Housing Construction 82.4%","anchor":"s-a07c63c3476f","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Figure 11 CONSTRUCTION COST BY MAJOR COMPONENTS Percent of Project Components"},{"claim_id":"c:b32b04be391bb17a320061d5276c869c","page_id":"C124902290:85","page_url":"https://archive.org/details/C124902290/page/n84","statement_kind":"proposal","subject_label":"Per bed construction cost of recommended project","summary":"The report states the per bed construction cost for the recommended project in 1992 dollars.","property":"cost_usd","value_text":"$225,000","value_num":225000.0,"unit":"USD","date_printed":"1992","t_from":"1992","quote":"The Per Bed construction cost in 1992 dollars is $225,000.","anchor":"s-b32b04be391b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Per Bed construction cost in 1992 dollars is $225,000."},{"claim_id":"c:6499703a4ff07a3e4ea142c8ded5fe2b","page_id":"C124902290:103","page_url":"https://archive.org/details/C124902290/page/n102","statement_kind":"finding","subject_label":"Alternate A disruption during construction","summary":"The report finds Alternate A is the most disruptive of the three major options studied.","property":"other","value_text":"most disruptive of three options","t_from":"1992","quote":"Alternate A is the most disruptive of the three major options studied.","anchor":"s-6499703a4ff0","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Comments on Alternate A; Disruption During Construction: Alternate A is the most disruptive"},{"claim_id":"c:964930a143aa4bea6fe263ce84f8e24f","page_id":"C124902290:103","page_url":"https://archive.org/details/C124902290/page/n102","statement_kind":"proposal","subject_label":"Alternate A project cost","summary":"The report estimates the Alternate A project cost at $759.8 million (≈ $1.8 billion in 2026 dollars), the most expensive of the three options.","property":"cost_usd","value_text":"$759.8 million","value_num":759800000.0,"unit":"USD","t_from":"1992","quote":"At $759.8 million estimated project cost, Alternate A is the most expensive of the three options studied.","anchor":"s-964930a143aa","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Costs: At $759.8 million estimated project cost"},{"claim_id":"c:e963682827f8751df597bdefc2b14ed9","page_id":"C124902290:103","page_url":"https://archive.org/details/C124902290/page/n102","statement_kind":"proposal","subject_label":"Alternate A","summary":"The report describes Alternate A as creating a large new 5-story building at the east side of the site.","property":"stories","value_text":"5-story (four above-grade stories)","value_num":5.0,"unit":"stories","t_from":"1992","quote":"The Alternate A scheme (see Figure 13) creates a large new 5-story building (four above-grade stories) at the east side of the site.","place_label":"east side of the Laguna Honda Hospital site","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-e963682827f8","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Site Use: The Alternate A scheme (see Figure 13) creates"},{"claim_id":"c:2897545bffb336aef611ba662c09da96","page_id":"C124902290:105","page_url":"https://archive.org/details/C124902290/page/n104","statement_kind":"proposal","subject_label":"Alternate B main block","summary":"The report proposes that the main block of Alternate B would be eight stories tall relative to the adjacent grade.","property":"stories","value_text":"eight stories","value_num":8.0,"unit":"stories","t_from":"1992","quote":"The main block of the new construction for Alternate B would be eight stories tall relative to the adjacent grade","place_label":"northeast end of the existing hospital","anchor":"s-2897545bffb3","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"3. ALTERNATE B: MULTI-PHASE REPLACEMENT Description"},{"claim_id":"c:6e4b7ac574eea043d65fcf7605ab0d94","page_id":"C124902290:105","page_url":"https://archive.org/details/C124902290/page/n104","statement_kind":"proposal","subject_label":"Clarendon facility","summary":"The report proposes demolishing the existing Clarendon facility and replacing it with a 50-unit residential care facility.","property":"demolished","value_text":"50-unit residential care facility","value_num":50.0,"unit":"units","t_from":"1992","quote":"Like Alternate A, the existing Clarendon facility is also demolished and replaced by a 50-unit residential care facility.","place_label":"Clarendon facility","anchor":"s-6e4b7ac574ee","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Like Alternate A, the existing Clarendon facility is also demolished"},{"claim_id":"c:c3a66e88bd796f008f5756173c98c2a5","page_id":"C124902290:105","page_url":"https://archive.org/details/C124902290/page/n104","statement_kind":"proposal","subject_label":"Alternate B new construction area","summary":"The report proposes about 837,000 gross square feet of new construction under Alternate B.","property":"floor_area_sqft","value_text":"837,000 gross square feet","value_num":837000.0,"unit":"sqft","t_from":"1992","quote":"The total area of new construction would be about 837,000 gross square feet, plus a 32,000 square foot residential care facility.","anchor":"s-c3a66e88bd79","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The total area of new construction would be about 837,000 gross square feet"},{"claim_id":"c:ca66e27f3838bdc3a14cd00cf3b7cf36","page_id":"C124902290:105","page_url":"https://archive.org/details/C124902290/page/n104","statement_kind":"proposal","subject_label":"Alternate B capacity","summary":"The report proposes that Alternate B would ultimately accommodate 1207 beds.","property":"other","value_text":"1207 beds","value_num":1207.0,"t_from":"1992","quote":"It would ultimately accommodate 1207 beds. The total area of new construction would be about 837,000 gross square feet","anchor":"s-ca66e27f3838","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"It would ultimately accommodate 1207 beds. The total area of new construction"},{"claim_id":"c:1fb2dfff05ef285f4fced6377602b542","page_id":"C124902290:107","page_url":"https://archive.org/details/C124902290/page/n106","statement_kind":"proposal","subject_label":"Alternate B schedule","summary":"The report estimates the Alternate B project will take 7 1/2 years from beginning to end of construction.","property":"other","value_text":"7 1/2 years","value_num":7.5,"unit":"years","t_from":"1992","quote":"the entire project is estimated to take 7 1/2 years to complete from beginning to end of construction.","anchor":"s-1fb2dfff05ef","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Schedule There are four sequential phases within the Alternate B scheme"},{"claim_id":"c:6312512ed5eb7668df36d4a4ecb92aa5","page_id":"C124902290:107","page_url":"https://archive.org/details/C124902290/page/n106","statement_kind":"proposal","subject_label":"Alternate C completion","summary":"The report projects Alternate C would be completed 1 1/2 years sooner, in July 2003.","property":"other","value_text":"July 2003","date_printed":"July 2003","t_from":"2003","quote":"Alternate C, however, would be completed 1 1/2 years sooner, in July 2003.","anchor":"s-6312512ed5eb","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Alternate C, however, would be completed 1 1/2 years sooner"},{"claim_id":"c:bf56d282934e76e5119604eabdd0bf14","page_id":"C124902290:107","page_url":"https://archive.org/details/C124902290/page/n106","statement_kind":"proposal","subject_label":"Alternate B project cost","summary":"The report estimates Alternate B will cost approximately $574.0 million (≈ $1.4 billion in 2026 dollars).","property":"cost_usd","value_text":"$574.0 million","value_num":574000000.0,"unit":"USD","t_from":"1992","quote":"Based on the preliminary project schedule noted above, Alternate B is estimated to cost approximately $574.0 million.","anchor":"s-bf56d282934e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Costs Based on the preliminary project schedule noted above, Alternate B is estimated"},{"claim_id":"c:c7e0f99a74a884d406cabe94220ff748","page_id":"C124902290:107","page_url":"https://archive.org/details/C124902290/page/n106","statement_kind":"proposal","subject_label":"Alternate B completion","summary":"The report projects Alternate B would be complete about January 2005, four years earlier than Alternate A.","property":"other","value_text":"January 2005","date_printed":"January 2005","t_from":"2005","quote":"all the phases of the project would therefore be complete at about January 2005, 4 years earlier than the Alternate A scheme which would not be done until January 2009.","anchor":"s-c7e0f99a74a8","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Under the Alternate B approach, all the phases of the project would therefore be complete"},{"claim_id":"c:6afa3208c90bdda9f4b0ed97f0491183","page_id":"C124902290:135","page_url":"https://archive.org/details/C124902290/page/n134","statement_kind":"proposal","subject_label":"Phase 2 beds","summary":"557 beds would be built in Phase 2, beginning July 1, 2000, at $358.94 (≈ $702 in 2026 dollars) per square foot.","property":"proposes","value_text":"557 beds","value_num":557.0,"unit":"persons","date_printed":"July 1, 2000","t_from":"2000","quote":"557 beds would be built in Phase 2, beginning July 1, 2000, at $358.94 per square foot (escalated construction cost).","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-6afa3208c90b","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"Department of Public Health (report issuer)","stance":"own_position","speaker_evidence":"Appendix E. Typical Skilled Nursing Facility Patient Room"},{"claim_id":"c:6b5cd5ccef92b1e0b7026737e14e69a6","page_id":"C124902290:135","page_url":"https://archive.org/details/C124902290/page/n134","statement_kind":"proposal","subject_label":"Laguna Honda Hospital 2-bed rooms","summary":"The study evaluated 2-bed patient rooms as an alternative to 4-bed rooms, at a total cost premium of $34,034,000 (≈ $81.7 million in 2026 dollars).","property":"alternative","value_text":"$34,034,000","value_num":34034000.0,"unit":"USD","t_from":"1992","quote":"Total cost premium for having 2-bed rooms instead of 4-bed rooms is $34,034,000","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-6b5cd5ccef92","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"Department of Public Health (report issuer)","stance":"own_position","speaker_evidence":"Total cost premium for having 2-bed rooms instead of 4-bed rooms is $34,034,000"},{"claim_id":"c:71b32c0799c6e37df0e2df51cac1d35d","page_id":"C124902290:135","page_url":"https://archive.org/details/C124902290/page/n134","statement_kind":"background","subject_label":"HCFA patient room limit","summary":"Four patients per room is the maximum allowed by the Federal Health Care Financing Administration if an institution is to receive Medi-Cal and Medicare reimbursement.","property":"other","value_text":"4 patients per room","value_num":4.0,"unit":"persons","t_from":"1992","quote":"Four patients per room is the maximum number allowed by the Federal Health Care Financing Administration (HCFA) if an institution is to receive Medi-Cal and Medicare reimbursement.","anchor":"s-71b32c0799c6","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"Department of Public Health (report issuer)","stance":"own_position","speaker_evidence":"Four patients per room is the maximum number allowed by the Federal Health Care Financing Administration (HCFA)"},{"claim_id":"c:9a46dd25e55e7b680858e56f6b62ac3b","page_id":"C124902290:135","page_url":"https://archive.org/details/C124902290/page/n134","statement_kind":"background","subject_label":"Laguna Honda Hospital patient rooms","summary":"The space program is based on typical nursing units of seven 4-bed patient rooms and two single patient rooms per unit.","property":"other","value_text":"seven 4-bed rooms and two single rooms per unit","t_from":"1992","quote":"The Laguna Honda Hospital space program is currently based on typical nursing units of seven 4-bed patient rooms and two single patient rooms per unit.","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-9a46dd25e55e","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"Department of Public Health (report issuer)","stance":"own_position","speaker_evidence":"The Laguna Honda Hospital space program is currently based on typical nursing units"},{"claim_id":"c:bc2883232f4cc7ddedc5a250e5540fa9","page_id":"C124902290:135","page_url":"https://archive.org/details/C124902290/page/n134","statement_kind":"proposal","subject_label":"Phase 1 beds","summary":"650 beds would be built in Phase 1, beginning July 1, 1997, at $291.99 (≈ $613 in 2026 dollars) per square foot.","property":"proposes","value_text":"650 beds","value_num":650.0,"unit":"persons","date_printed":"July 1, 1997","t_from":"1997","quote":"650 beds would be built in Phase 1, beginning July 1, 1997, at $291.99 per square foot (escalated construction cost).","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-bc2883232f4c","shown":true,"part":"appendix","speaker":"issuer","speaker_role":"Department of Public Health (report issuer)","stance":"own_position","speaker_evidence":"650 beds would be built in Phase 1, beginning July 1, 1997"},{"claim_id":"c:e1a335e8cfe4528626654c1b5def55b3","page_id":"C124902290:141","page_url":"https://archive.org/details/C124902290/page/n140","statement_kind":"proposal","subject_label":"Laguna Honda bed program","summary":"The bed distribution covers a 1,207-bed program with 228 rooms, 912 beds in 2-bed rooms.","property":"proposes","value_text":"1,207 beds","value_num":1207.0,"unit":"persons","t_from":"1992","quote":"Appendix F. Distribution of Beds by Type for 1207-Bed Program","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-e1a335e8cfe4","shown":false,"part":"appendix","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Appendix F. Distribution of Beds by Type for 1207-Bed Program"},{"claim_id":"c:032f3f571d8b8429e7f2a30fd7f44f08","page_id":"C124902290:153","page_url":"https://archive.org/details/C124902290/page/n152","statement_kind":"proposal","subject_label":"Medi-Cal rate assumption","summary":"The study assumed an annual Medi-Cal rate increase of 7.0 percent in its pro-forma analysis.","property":"other","value_text":"7.0 percent","value_num":7.0,"unit":"percent","t_from":"1992","quote":"it was deemed realistic, and yet still conservative, to assume an annual MediCal rate increase of 7.0 percent","anchor":"s-032f3f571d8b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"it was deemed realistic, and yet still conservative, to assume"},{"claim_id":"c:a1d5015def40041f708bc671dc71dec7","page_id":"C124902290:153","page_url":"https://archive.org/details/C124902290/page/n152","statement_kind":"finding","subject_label":"Employee benefits","summary":"Employee benefits were computed at 27.34 percent of salaries and wages.","property":"other","value_text":"27.34 percent","value_num":27.34,"unit":"percent","t_from":"1992","quote":"Employee benefits were computed at 27.34 percent of salaries and wages.","anchor":"s-a1d5015def40","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Employee benefits were computed at 27.34 percent of salaries and wages."},{"claim_id":"c:b6d3013223e90c6038a3765e53f3e4f1","page_id":"C124902290:153","page_url":"https://archive.org/details/C124902290/page/n152","statement_kind":"proposal","subject_label":"Medicare reimbursement assumption","summary":"Medicare reimbursement rates were assumed to increase at an annual inflation rate of 3.5 percent.","property":"other","value_text":"3.5 percent","value_num":3.5,"unit":"percent","t_from":"1992","quote":"Medicare reimbursement rates were assumed to increase at an annual inflation rate of 3.5 percent.","anchor":"s-b6d3013223e9","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Medicare reimbursement rates were assumed to increase at an annual inflation rate of 3.5 percent."},{"claim_id":"c:e35c7903f8bae01e36dda8065e63f4b5","page_id":"C124902290:153","page_url":"https://archive.org/details/C124902290/page/n152","statement_kind":"finding","subject_label":"Medi-Cal reimbursement","summary":"Approximately 88.4 percent of total patient days at LHH are anticipated to be skilled nursing days subject to Medi-Cal reimbursement.","property":"other","value_text":"88.4 percent","value_num":88.4,"unit":"percent","t_from":"1992","quote":"approximately 88.4 percent of the total patient days at LHH are anticipated to be skilled nursing patient days that are subject to MediCal reimbursement.","place_label":"Laguna Honda Hospital","place_precision":"building","place_id":"qipu:sf/place/institution/laguna-honda-hospital-5d7f7a","resolved_by":"place links file","anchor":"s-e35c7903f8ba","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"approximately 88.4 percent of the total patient days at LHH are anticipated"}]}