{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124902704","url":"https://data.qipu.org/usa/san-francisco/reports/c124902704/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124902704/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124902704","source_id":"C124902704","title":"Mission Bay status report","year":1990,"n_pages":10,"creator":"San Francisco (Calif.). Department of City Planning","source_url":"https://archive.org/details/C124902704","issuer":"City and County of San Francisco, Department of City Planning","issuer_type":"government","gov_level":"city_county","prepared_by":null,"doc_kind":"staff_report","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"meta","doc_kind_by":"model","jurisdiction_by":"meta","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":7,"statements_total":29,"statements_by_kind":{"finding":0,"proposal":28,"cites_decision":0,"background":1},"same_for_every_statement":{"source_id":"C124902704","source_url":"https://archive.org/details/C124902704","source_label":"IGS library: Mission Bay status report","report_year":1990,"issuer":"City and County of San Francisco, Department of City Planning","issuer_type":"government","doc_kind":"staff_report","t_from":"1990","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A staff plan by the City Planning Department setting out proposals and conditions for the Mission Bay development, covering land, housing, parks, fees and remediation.","figures":[{"label":"Area","value":"314.8 acres","claim_ids":["c:4cc51d6e5a3d2a900429b815c61361ef"]},{"label":"Residents","value":"about 16,000 residents","claim_ids":["c:66bb43b60d5c2d55d6129c752b953f45"]},{"label":"Jobs","value":"about 23,000 private sector jobs","claim_ids":["c:af2daf3674f89eebc536021ed082987e"]},{"label":"Homes","value":"8,000 homes, 3,000 affordable","claim_ids":["c:289dce80a482515c9ab763c9f9e788a7"]}],"main_points":["c:2e8c430da9d78941da59c276c53b7bc6","c:44808abc00b9a6cafc5bbb5d745e6275","c:894c3603ce2adec2460f7f56366acc95"],"board_decisions_after":[],"board_decisions_before":[],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:1fbf0c7bd887e046a887740a465174e8","page_id":"C124902704:1","page_url":"https://archive.org/details/C124902704/page/n0","statement_kind":"proposal","subject_label":"Proposition M ballot measure for Mission Bay office exemption","summary":"The report anticipates a November ballot measure under Proposition M to exempt Mission Bay offices from the annual office limitation.","property":"proposes","value_text":"ballot measure exemption from annual office limitation","date_printed":"November 1990","quote":"In November, we anticipate a baliot measure pursuant to Proposition M to consider an exemption from the proposition's annual office limitation provisions","place_label":"Mission Bay","place_precision":"area","anchor":"s-1fbf0c7bd887","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Memo from Mission Bay Project Director, Re: Mission Bay Status Report"},{"claim_id":"c:2ecedaddf7199ef524f40c8341906700","page_id":"C124902704:1","page_url":"https://archive.org/details/C124902704/page/n0","statement_kind":"background","subject_label":"Public hearing process for Mission Bay","summary":"The proposal will be considered at public hearings by the City Planning Commission, Port Commission and Board of Supervisors.","property":"other","value_text":"public hearings","quote":"The proposal will be considered at public hearings by the City Planning Commission, Port Commission and Board of Supervisors.","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-2ecedaddf719","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"To: Citizens and Public Officials, From: Mission Bay Project Director"},{"claim_id":"c:fafc2d4ab0ec3fa86d2daa65d4d865ea","page_id":"C124902704:1","page_url":"https://archive.org/details/C124902704/page/n0","statement_kind":"proposal","subject_label":"Draft development agreement and master plan amendments","summary":"The report expects a draft development agreement, specific plan, zoning amendments and a proposed final EIR for Planning Commission hearings in May.","property":"proposes","value_text":"draft development agreement and related documents","date_printed":"May 1990","quote":"We expect a draft development agreement, specific plan and other master plan amendments, zoning amendments and other documents","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-fafc2d4ab0ec","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We expect a draft development agreement"},{"claim_id":"c:0e3c44d678b09d1fa3b5c634f4bfc371","page_id":"C124902704:3","page_url":"https://archive.org/details/C124902704/page/n2","statement_kind":"proposal","subject_label":"Parks dedication by SFPR","summary":"SFPR would dedicate over 30 acres of its land and 22 acres under the Port licensing agreement for parks.","property":"proposes","value_text":"30+ acres of its land and 22 acres","value_num":30.0,"unit":"acres","quote":"SFPR provides lands for parks, dedicating 30+ acres of its land and 22 acres obtained under Port licensing agreement.","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-0e3c44d678b0","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"MISSION BAY SUMMARY LAND USE PROGRAM AND FINANCIAL RESPONSIBILITIES"},{"claim_id":"c:2e8c430da9d78941da59c276c53b7bc6","page_id":"C124902704:3","page_url":"https://archive.org/details/C124902704/page/n2","statement_kind":"proposal","subject_label":"Affordable housing and transit access","summary":"All Mission Bay homes would be within 2 1/2 blocks of transit routes and major parks.","property":"proposes","value_text":"within 2 1/2 blocks of transit routes and major parks","quote":"All homes would be within 2 1/2 blocks of transit routes and major parks.","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-2e8c430da9d7","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"All homes would be within 2 1/2 blocks of transit routes"},{"claim_id":"c:4a3675878186856b2299cb621ec35f59","page_id":"C124902704:3","page_url":"https://archive.org/details/C124902704/page/n2","statement_kind":"proposal","subject_label":"SFPR payment of school impact fee","summary":"SFPR would pay the School District's school impact fee for its development.","property":"proposes","value_text":"school impact fee paid by SFPR","quote":"SFPR pays School District's school impact fee for its development (City pays fee for its affordable housing).","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-4a3675878186","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Community and Cultural Facilities - SFPR provides land"},{"claim_id":"c:528133e7a4b6210e1bab33f3fc24f64a","page_id":"C124902704:3","page_url":"https://archive.org/details/C124902704/page/n2","statement_kind":"proposal","subject_label":"Port land transfer to SFPR","summary":"The Port would transfer 14.8 acres to SFPR for housing, retail and community service uses.","property":"proposes","value_text":"14.8 acres to SFPR","value_num":14.8,"unit":"acres","quote":"Port transfers 14.8 acres to SFPR for housing, retail and community service uses, and receives 26-acre Western Pacific Yard","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-528133e7a4b6","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Other Land Transfers Port transfers 14.8 acres to SFPR"},{"claim_id":"c:66bb43b60d5c2d55d6129c752b953f45","page_id":"C124902704:3","page_url":"https://archive.org/details/C124902704/page/n2","statement_kind":"proposal","subject_label":"Mission Bay development population","summary":"The development would accommodate about 16,000 residents.","property":"population","value_text":"about 16,000 residents","value_num":16000.0,"unit":"persons","quote":"The development would accommodate about 23,000 private sector jobs, and about 16,000 residents.","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-66bb43b60d5c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The development would accommodate about 23,000 private sector jobs"},{"claim_id":"c:8b695fd6dd30ed376e26504118ca02d2","page_id":"C124902704:3","page_url":"https://archive.org/details/C124902704/page/n2","statement_kind":"proposal","subject_label":"Public art set-aside","summary":"SFPR would set aside 1% of office and hotel construction costs for public art.","property":"proposes","value_text":"1% of office and hotel construction costs","value_num":1.0,"unit":"percent","quote":"SFPR sets aside 1% of office and hotel construction costs for public art.","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-8b695fd6dd30","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Public Art - SFPR sets aside 1% of office and hotel construction costs"},{"claim_id":"c:af2daf3674f89eebc536021ed082987e","page_id":"C124902704:3","page_url":"https://archive.org/details/C124902704/page/n2","statement_kind":"proposal","subject_label":"Mission Bay development program scale","summary":"The development would accommodate about 23,000 private sector jobs.","property":"jobs","value_text":"about 23,000 private sector jobs","value_num":23000.0,"unit":"jobs","quote":"The development would accommodate about 23,000 private sector jobs, and about 16,000 residents.","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-af2daf3674f8","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The development would accommodate about 23,000 private sector jobs"},{"claim_id":"c:ccdef9046074cb1f36f8bd48e5d51074","page_id":"C124902704:3","page_url":"https://archive.org/details/C124902704/page/n2","statement_kind":"proposal","subject_label":"Transit Impact Development Fee on office space","summary":"SFPR would pay the City's Transit Impact Development Fee of $5 (≈ $12.89 in 2026 dollars) per square foot of office space.","property":"proposes","value_text":"$5 per sq. ft. of office space","value_num":5.0,"unit":"USD","quote":"SFPR pays City's Transit Impact Development Fee (TIDF) of $5 per sq. ft. of office space and dedicates Metro ROWs","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-ccdef9046074","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Transportation- SFPR pays City's Transit Impact Development Fee"},{"claim_id":"c:0bbb04be59a20a4f31bd2dd6c016deff","page_id":"C124902704:4","page_url":"https://archive.org/details/C124902704/page/n3","statement_kind":"proposal","subject_label":"Fiscal surplus during buildout","summary":"The City would have a small immediate fiscal surplus that grows to about $14 million (≈ $36.1 million in 2026 dollars) at buildout.","property":"other","value_text":"maximum of about $14 million","value_num":14000000.0,"unit":"USD","date_printed":"at buildout","quote":"The City would have a small fiscal surplus immediately from Mission Bay which would grow to a maximum of about $14 million at buildout.","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-0bbb04be59a2","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The City would have a small fiscal surplus immediately"},{"claim_id":"c:2345d2167c7cc63b30c4dda691b99fee","page_id":"C124902704:4","page_url":"https://archive.org/details/C124902704/page/n3","statement_kind":"proposal","subject_label":"Future fee increases limits","summary":"Child care and transit fees could be increased once every 5 years for the first 15 years.","property":"proposes","value_text":"once every 5 years for first 15 years","value_num":5.0,"unit":"other","quote":"Child care and transit (TIDF) fees could be increased once every 5 years for first 15 years","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-2345d2167c7c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Future Fees - Child care and transit (TIDF) fees could be increased"},{"claim_id":"c:44808abc00b9a6cafc5bbb5d745e6275","page_id":"C124902704:4","page_url":"https://archive.org/details/C124902704/page/n3","statement_kind":"proposal","subject_label":"Open space phasing","summary":"Open space would be developed with housing at one acre for every 150 dwellings.","property":"proposes","value_text":"one acre for every 150 dwellings","value_num":150.0,"unit":"units","quote":"Open space would be developed concurrently with housing (one acre for every 150 dwellings), and housing with office development","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-44808abc00b9","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Phasing - Open space would be developed concurrently with housing"},{"claim_id":"c:5a4af7ed7c223a6f1e867f0808e98953","page_id":"C124902704:4","page_url":"https://archive.org/details/C124902704/page/n3","statement_kind":"proposal","subject_label":"Cost sharing for hazardous materials remediation","summary":"The City and SFPR would share remediation costs 50/50 on about 15 acres if regulators require it.","property":"proposes","value_text":"about 15 acres shared 50/50","value_num":15.0,"unit":"acres","quote":"For about 15 acres of the 315-acre site the City and SFPR share costs 50/50, if remediation is required by regulatory agencies.","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-5a4af7ed7c22","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Hazardous Materials/Sewage - SFPR assumes hazardous materials testing"},{"claim_id":"c:894c3603ce2adec2460f7f56366acc95","page_id":"C124902704:4","page_url":"https://archive.org/details/C124902704/page/n3","statement_kind":"proposal","subject_label":"Letter of credit for remediation","summary":"SFPR would provide a $30 million (≈ $77.3 million in 2026 dollars) letter of credit before investigation of the project area begins.","property":"proposes","value_text":"$30M Letter of Credit","value_num":30000000.0,"unit":"USD","quote":"SFPR provides a $30M Letter of Credit prior to commencing investigation of the project area, to ensure its responsibility","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-894c3603ce2a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"SFPR provides a $30M Letter of Credit prior to commencing investigation"},{"claim_id":"c:922ae51ff6c2fc6d6f4a468e3e3291c1","page_id":"C124902704:4","page_url":"https://archive.org/details/C124902704/page/n3","statement_kind":"proposal","subject_label":"Fiscal surplus at project buildout","summary":"City fiscal surpluses at buildout are estimated at about $215 million (≈ $554.3 million in 2026 dollars), excluding housing program costs.","property":"other","value_text":"about $215 million","value_num":215000000.0,"unit":"USD","date_printed":"at project buildout","quote":"By project buildout, City fiscal surpluses would be about $215 million, not including any costs incurred for the housing program","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-922ae51ff6c2","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Fiscal Implications - The City would have a small fiscal surplus"},{"claim_id":"c:dc2331a7b4afef9942600330ddef92d4","page_id":"C124902704:4","page_url":"https://archive.org/details/C124902704/page/n3","statement_kind":"proposal","subject_label":"Economic development fund from SFPR","summary":"SFPR would fund an economic development program by paying $2 (≈ $5.16 in 2026 dollars) per square foot of office space.","property":"proposes","value_text":"$2 per sq. ft. of office space","value_num":2.0,"unit":"USD","quote":"SFPR funds a comprehensive program by paying $2 per sq. ft. of office space.","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-dc2331a7b4af","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Economic Development/Affirmative Action/Job Training - SFPR funds"},{"claim_id":"c:012ceb94a892943f36dcb618572bc9e5","page_id":"C124902704:5","page_url":"https://archive.org/details/C124902704/page/n4","statement_kind":"proposal","subject_label":"Mission Bay land ownership","summary":"The Proposed Plan would give the City 190.6 acres, about 60.5 percent of the site.","property":"owned_by_city","value_text":"190.6 acres","value_num":190.6,"unit":"acres","quote":"Proposed ownership would be as follows: 190.6 60.5% City 1.6 0.5% USD 122.6 38.9% SFPR","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-012ceb94a892","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Table 2 - Proposed Land Distribution"},{"claim_id":"c:4cc51d6e5a3d2a900429b815c61361ef","page_id":"C124902704:5","page_url":"https://archive.org/details/C124902704/page/n4","statement_kind":"proposal","subject_label":"Mission Bay total site acreage","summary":"The proposed land distribution totals 314.8 acres.","property":"acreage","value_text":"314.8 acres","value_num":314.8,"unit":"acres","quote":"Other Public Facilities 11.3 11.3 3.6% 7th & Townsend Site 11.3 City Parks & Open Space 68.8 64.1 20.4 %","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-4cc51d6e5a3d","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Table 2 - Proposed Land Distribution"},{"claim_id":"c:42e23104834eb7ba1d9b6001a13971f6","page_id":"C124902704:6","page_url":"https://archive.org/details/C124902704/page/n5","statement_kind":"proposal","subject_label":"Port land licence","summary":"The Port would receive about 60 million dollars for licensing 22 acres of land for SFPR to build parks.","property":"proposes","value_text":"about $60 million","value_num":60000000.0,"unit":"USD","quote":"The Port would receive about $60 ($2M/yr. for 30 years, escalated) for licensing 22 acres of land for SFPR to construct parks.","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-42e23104834e","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Table 3 notes: 11. The Port would receive about $60"},{"claim_id":"c:725768c16355d673d91168cf711d466b","page_id":"C124902704:6","page_url":"https://archive.org/details/C124902704/page/n5","statement_kind":"proposal","subject_label":"School impact fee","summary":"The report says SFPR would pay a 9.3 million dollar school impact fee to the Unified School District.","property":"proposes","value_text":"$9.3M school impact fee","value_num":9300000.0,"unit":"USD","quote":"SFPR would pay a $9.3M school impact fee to the Unified Schoo! District for its development","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-725768c16355","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Table 3 notes: 7. SFPR would pay a $9.3M school impact fee"},{"claim_id":"c:7337b5947b017079a3e0be6b8b9282aa","page_id":"C124902704:6","page_url":"https://archive.org/details/C124902704/page/n5","statement_kind":"proposal","subject_label":"Port land exchange","summary":"The Port would exchange 15 acres within Mission Bay for SFPR's 26-acre Western Pacific Yard at Pier 80.","property":"proposes","value_text":"15 acres exchanged","value_num":15.0,"unit":"acres","quote":"The Port would exchange 15 acres of land within Mission Bay for SFPR's 26-acre Western Pacific Yard at Pier 80.","place_label":"Pier 80","place_precision":"site","place_id":"qipu:sf/place/landmark/pier-80","resolved_by":"place links file","anchor":"s-7337b5947b01","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Table 3 notes: 12. The Port would exchange 15 acres"},{"claim_id":"c:eaff4e8d8b7743e137fb3229c8ca72d9","page_id":"C124902704:6","page_url":"https://archive.org/details/C124902704/page/n5","statement_kind":"proposal","subject_label":"SFPR railroad relocation","summary":"The report says SFPR will relocate railroad tracks as necessary to keep freight service through Mission Bay.","property":"proposes","value_text":"relocate railroad tracks","quote":"SFPR will relocate railroad tracks as necessary to maintain freight service through Mission Bay.","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-eaff4e8d8b77","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Table 3 notes: 5. SFPR will relocate railroad tracks"},{"claim_id":"c:289dce80a482515c9ab763c9f9e788a7","page_id":"C124902704:7","page_url":"https://archive.org/details/C124902704/page/n6","statement_kind":"proposal","subject_label":"Proposed Plan 1990 housing","summary":"The Proposed Plan (1990) lists 8,000 residential homes, 3,000 of them affordable.","property":"units","value_text":"8,000 homes","value_num":8000.0,"unit":"units","date_printed":"1990","quote":"Proposed Plan (1990) $2 Billion 20-30 5,000 3,000 8,000 80 4.8 million 900,000 735,000 6.43 million","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-289dce80a482","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Proposed Plan (1990) $2 Billion 20-30 5,000"},{"claim_id":"c:25a9433310a7bc17c675609fac113533","page_id":"C124902704:8","page_url":"https://archive.org/details/C124902704/page/n7","statement_kind":"proposal","subject_label":"SFPR office linkage fee","summary":"The report says SFPR would pay 2 dollars per square foot of office space, about 10 million dollars, to fund the program.","property":"proposes","value_text":"about $10 million","value_num":10000000.0,"unit":"USD","quote":"SFPR would pay $2 per sq. ft. of office space, about $10 million, to fund program","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-25a9433310a7","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Proposed Plan 1990 table column describing the proposal"},{"claim_id":"c:8d236a84e70d03e81f4e130bb1aec398","page_id":"C124902704:8","page_url":"https://archive.org/details/C124902704/page/n7","statement_kind":"proposal","subject_label":"I-280 corridor funding","summary":"The report proposes that SFPR fund 85 million dollars, with 31 million from State and federal grants.","property":"proposes","value_text":"$85 million","value_num":85000000.0,"unit":"USD","quote":"SFPR to fund $85 million, with remaining $31 million to be funded through State and federal grants primarily for I-280 Corridor","place_label":"I-280 Corridor","anchor":"s-8d236a84e70d","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Proposed Plan 1990 column, Infrastructure and Open Space Improvements row"},{"claim_id":"c:8e13e1862f0872ea1e82119de0694adc","page_id":"C124902704:8","page_url":"https://archive.org/details/C124902704/page/n7","statement_kind":"proposal","subject_label":"Cultural center and theater","summary":"The report proposes that SFPR construct a 4.5 million dollar cultural center and theater.","property":"proposes","value_text":"$4.5 million cultural center/theater","value_num":4500000.0,"unit":"USD","quote":"SFPR to construct $4.5 million cultural center/theater, and City & SFPR to jointly fund a study to program its use","place_label":"Mission Bay","place_precision":"area","place_id":"qipu:sf/place/hood/mission-bay","resolved_by":"place links file","anchor":"s-8e13e1862f08","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Proposed Plan 1990 column, Community Facilities row"},{"claim_id":"c:c5bb7c69b63572150d8f98e1a51aea7a","page_id":"C124902704:8","page_url":"https://archive.org/details/C124902704/page/n7","statement_kind":"proposal","subject_label":"Piers 48-50 backlands","summary":"The report says the Port would retain 6 acres to keep the Piers 48-50 breakbulk marine terminal viable.","property":"acreage","value_text":"6 acres retained","value_num":6.0,"unit":"acres","quote":"6 acres retained by Port to ensure long-term viability of breakbalk marine terminal at Piers 48-50","place_label":"Piers 48-50","anchor":"s-c5bb7c69b635","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Proposed Plan 1990 column, Lease of Port Lands for Open Space row"}]}