{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124902971","url":"https://data.qipu.org/usa/san-francisco/reports/c124902971/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124902971/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124902971","source_id":"C124902971","title":"Report to the San Francisco Board of Supervisors : management audit of the city's permit processing system","year":1989,"n_pages":288,"creator":"San Francisco (Calif.). Board of Supervisors. Budget Analyst","source_url":"https://archive.org/details/C124902971","issuer":"City and County of San Francisco, Board of Supervisors. Budget Analyst","issuer_type":"government","gov_level":"city_county","prepared_by":null,"doc_kind":"audit_financial","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"meta","doc_kind_by":"meta","jurisdiction_by":"meta","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":17,"statements_total":47,"statements_by_kind":{"finding":28,"proposal":11,"cites_decision":0,"background":8},"same_for_every_statement":{"source_id":"C124902971","source_url":"https://archive.org/details/C124902971","source_label":"IGS library: Report to the San Francisco Board of Supervisors : management audit of the city's permit processing system","report_year":1989,"issuer":"City and County of San Francisco, Board of Supervisors. Budget Analyst","issuer_type":"government","doc_kind":"audit_financial","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A management audit by the Board of Supervisors' Budget Analyst of how San Francisco processes building and development permits, covering staffing, backlogs and counter procedures.","next":"In September 1991 the Board directed the Budget Analyst to study permit processing, including a possible one-stop permit shop.","next_decision":"qipu:sf/decision/journalofseptoctproceed86sanfrich:149/3","figures":[{"label":"Savings","value":"$27,550 annually","claim_ids":["c:68a42bbcc80feb31567c9810c7920d92"]},{"label":"Automation plan","value":"$1 million","claim_ids":["c:836fccad60207e09a3517e8d61efd213"]},{"label":"Applications on hold","value":"1,219 applications on hold","claim_ids":["c:4bbd5c432a5b27a33a154d5542144042"]},{"label":"Applications backlogged","value":"1,476 applications backlogged","claim_ids":["c:80c654973127cacd97b46fcfa572c6e4"]}],"main_points":["c:4b360ddc3e8239f6ba0ad8dbdfa5a965","c:5263c2033e7f02b438b15c821c4262c5","c:68a42bbcc80feb31567c9810c7920d92"],"board_decisions_after":["qipu:sf/decision/journalofseptoctproceed86sanfrich:121/1","qipu:sf/decision/journalofseptoctproceed86sanfrich:149/3"],"board_decisions_before":[],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:fcad7ac454ca2e5ce5c8f3fcaa45058b","page_id":"C124902971:3","page_url":"https://archive.org/details/C124902971/page/n2","statement_kind":"background","subject_label":"Permit processing management audit","summary":"The management audit reviewed permit processing operations of several City departments, including Public Works, City Planning, Public Health and the Fire Department.","property":"other","t_from":"1989","quote":"This management audit was conducted in accordance with Charter Section 2.401, which authorizes the Board of Supervisors to make inquiries concerning departmental operations.","anchor":"s-fcad7ac454ca","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Budget Analyst transmittal letter","stance":"own_position","speaker_evidence":"Transmitted herewith is the Budget Analyst's management audit"},{"claim_id":"c:83c5fb505f5b03c639cba86cb6c9a894","page_id":"C124902971:57","page_url":"https://archive.org/details/C124902971/page/n56","statement_kind":"background","subject_label":"Tier 3 permit applications","summary":"Tier 3 projects require approval by the City Planning Commission after a public hearing.","property":"other","t_from":"1989","quote":"Tier 3 projects require approval by the City Planning Commission. A public hearing must be held for all Tier 3 projects","anchor":"s-83c5fb505f5b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Tier 3 covers applications that propose to build up to the limits"},{"claim_id":"c:9d20dfc6e1481875c2c06e119a5a3017","page_id":"C124902971:57","page_url":"https://archive.org/details/C124902971/page/n56","statement_kind":"background","subject_label":"Site Permit procedure","summary":"The Site Permit procedure was until very recently available only to large projects estimated to cost at least $2.5 million (≈ $6.8 million in 2026 dollars).","property":"cost_usd","value_text":"at least $2.5 million","value_num":2500000.0,"unit":"USD","t_from":"1989","quote":"this procedure, which until very recently was available only to large projects estimated to cost at least $2.5 million","anchor":"s-9d20dfc6e148","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"this procedure, which until very recently was available only to large projects"},{"claim_id":"c:9669afc2714b5cf5326ddd89b1e92d8c","page_id":"C124902971:75","page_url":"https://archive.org/details/C124902971/page/n74","statement_kind":"proposal","subject_label":"Director of Planning's permit backlog program","summary":"The Director of Planning proposed paid overtime and temporary staff to eliminate the permit processing backlog within four months.","property":"proposes","date_printed":"August 31, 1989","t_from":"1989","quote":"The Director of Planning, in a letter dated August 31, 1989, to the Mayor, the Board of Supervisors, and the City Planning Commission, has outlined a program","anchor":"s-9669afc2714b","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"Director of Planning","stance":"quotes_to_report","speaker_evidence":"The Director of Planning, in a letter dated August 31, 1989"},{"claim_id":"c:a89980145e15cb47a57cbdcf10ca42d6","page_id":"C124902971:75","page_url":"https://archive.org/details/C124902971/page/n74","statement_kind":"finding","subject_label":"Violation abatement backlog staffing","summary":"The Budget Analyst calculated that about 4.05 FTE positions are required to eliminate the violation abatement backlog within one year.","property":"other","value_text":"4.05 FTE positions","value_num":4.05,"t_from":"1989","quote":"we have calculated that approximately 4.05 FTE positions are required to eliminate the violation abatement backlog within a one year period.","anchor":"s-a89980145e15","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"we have calculated that approximately 4.05 FTE positions are required"},{"claim_id":"c:c28379d6783e508e0fa8c2ce45bf45d6","page_id":"C124902971:75","page_url":"https://archive.org/details/C124902971/page/n74","statement_kind":"proposal","subject_label":"Director of Planning's resource request","summary":"The Budget Analyst recommends that the Director of Planning's resource request be approved.","property":"proposes","t_from":"1989","quote":"The Budget Analyst is in agreement with the work program and resource request of the Director of Planning and recommends that the resource request be approved.","anchor":"s-c28379d6783e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The Budget Analyst is in agreement with the work program"},{"claim_id":"c:e85e82e449dc066840dc59808b147c3f","page_id":"C124902971:75","page_url":"https://archive.org/details/C124902971/page/n74","statement_kind":"finding","subject_label":"Violation abatement case backlog","summary":"The audit reports more than 4,000 open violation abatement cases, many of which may no longer exist.","property":"other","value_text":"greater than 4,000","value_num":4000.0,"t_from":"1989","quote":"A sample of the quality of the greater than 4,000 currently open violation abatement cases would be required to determine a more accurate caseload work factor.","anchor":"s-e85e82e449dc","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"A sample of the quality of the greater than 4,000"},{"claim_id":"c:4b360ddc3e8239f6ba0ad8dbdfa5a965","page_id":"C124902971:92","page_url":"https://archive.org/details/C124902971/page/n91","statement_kind":"finding","subject_label":"Growth in permit applications on hold","summary":"Permit applications on hold increased by 132 percent between August 1986 and August 1989.","property":"other","value_text":"132 percent increase","value_num":132.0,"unit":"percent","date_printed":"August 8, 1986 to August 4, 1989","t_from":"1986","quote":"the number of permit applications on hold increased from 525 to 1,219, or by 132 percent","anchor":"s-4b360ddc3e82","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Between August 8, 1986, and August 4, 1989, the number of permit applications on hold increased"},{"claim_id":"c:4bbd5c432a5b27a33a154d5542144042","page_id":"C124902971:92","page_url":"https://archive.org/details/C124902971/page/n91","statement_kind":"finding","subject_label":"Building permit applications on hold","summary":"Table 8 shows approximately 1,219 building permit applications were on hold as of August 4, 1989.","property":"other","value_text":"1,219 applications on hold","value_num":1219.0,"unit":"units","date_printed":"August 4, 1989","t_from":"1989","quote":"Table 8 shows that as of August 4, 1989, there were approximately 1,219 building permit applications on hold and approximately 1,476 applications not yet initially reviewed.","anchor":"s-4bbd5c432a5b","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Table 8 shows that as of August 4, 1989, there were approximately 1,219"},{"claim_id":"c:5263c2033e7f02b438b15c821c4262c5","page_id":"C124902971:92","page_url":"https://archive.org/details/C124902971/page/n91","statement_kind":"finding","subject_label":"Growth in permit applications backlogged","summary":"Permit applications backlogged increased by 323 percent between August 1986 and August 1989.","property":"other","value_text":"323 percent increase","value_num":323.0,"unit":"percent","date_printed":"August 8, 1986 to August 4, 1989","t_from":"1986","quote":"the number of permit applications backlogged increased from 349 to 1,476, or by 323 percent.","anchor":"s-5263c2033e7f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the number of permit applications backlogged increased from 349 to 1,476"},{"claim_id":"c:80c654973127cacd97b46fcfa572c6e4","page_id":"C124902971:92","page_url":"https://archive.org/details/C124902971/page/n91","statement_kind":"finding","subject_label":"Building permit applications backlogged","summary":"Approximately 1,476 building permit applications had not yet been initially reviewed as of August 4, 1989.","property":"other","value_text":"1,476 applications backlogged","value_num":1476.0,"unit":"units","date_printed":"August 4, 1989","t_from":"1989","quote":"Table 8 shows that as of August 4, 1989, there were approximately 1,219 building permit applications on hold and approximately 1,476 applications not yet initially reviewed.","anchor":"s-80c654973127","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Table 8 shows that as of August 4, 1989, there were approximately 1,219"},{"claim_id":"c:c5f186e2572a79417d06028f45e18329","page_id":"C124902971:92","page_url":"https://archive.org/details/C124902971/page/n91","statement_kind":"finding","subject_label":"Share of permits on hold and backlogged","summary":"By 1989 the share of permit applications on hold reached 19.3 percent and the share backlogged reached 23.4 percent.","property":"other","value_text":"19.3 percent on hold; 23.4 percent backlogged","value_num":19.3,"unit":"percent","date_printed":"1989","t_from":"1989","quote":"By 1989, the amount on hold had increased to 19.3 percent and the amount backlogged had increased to 23.4 percent of all permits processed.","anchor":"s-c5f186e2572a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"By 1989, the amount on hold had increased to 19.3 percent"},{"claim_id":"c:1efa9a80f3a0a44a1144b955d3e9c83d","page_id":"C124902971:100","page_url":"https://archive.org/details/C124902971/page/n99","statement_kind":"finding","subject_label":"City Master Plan","summary":"The Budget Analyst's December 1988 audit concluded the Master Plan should be more comprehensive and systematically reviewed and updated.","property":"finding","value_text":"Master Plan outdated and needs update","date_printed":"December 1988","t_from":"1988","quote":"The Master Plan should be systematically reviewed and updated.","anchor":"s-1efa9a80f3a0","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"Budget Analyst's December 1988 management audit report of the Department of City","stance":"quotes_to_report","speaker_evidence":"The Budget Analyst's December, 1988, management audit report of the Department of City Planning includes the following conclusion"},{"claim_id":"c:46a6dc453c8fe759219f912d9580d6df","page_id":"C124902971:100","page_url":"https://archive.org/details/C124902971/page/n99","statement_kind":"finding","subject_label":"Planning Department information base","summary":"The Budget Analyst found the Planning Department lacks an adequate information base.","property":"finding","value_text":"inadequate information base","t_from":"1989","quote":"a basic deficiency of the Department is its lack of an adequate information base.","anchor":"s-46a6dc453c8f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"As covered in the Budget Analyst's previous audit report"},{"claim_id":"c:5985d2139ef7d7ea13fa2120c19022f1","page_id":"C124902971:100","page_url":"https://archive.org/details/C124902971/page/n99","statement_kind":"finding","subject_label":"Planning Department role","summary":"The Budget Analyst found the Planning Department's mission had been truncated in practice to zoning decisions, reactive planning and support for special projects.","property":"finding","value_text":"mission truncated to zoning and reactive planning","t_from":"1989","quote":"the mission of the City's Department of City Planning has, with few exceptions, been truncated in actual practice to that of providing zoning decisions, reactive planning, and providing support for special projects.","anchor":"s-5985d2139ef7","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Within at least the last two years, the mission of the City's Department"},{"claim_id":"c:81df72a3185a3890e133d97db26c1850","page_id":"C124902971:100","page_url":"https://archive.org/details/C124902971/page/n99","statement_kind":"finding","subject_label":"Reactive development initiatives","summary":"The audit cites the Battleship Missouri homeporting, a Pier 39 aquarium and a China Basin baseball stadium as reactive initiatives.","property":"finding","value_text":"three reactive development initiatives","value_num":3.0,"t_from":"1989","quote":"the development of an aquarium at Pier 39, and the building of a baseball stadium in China Basin.","place_label":"Pier 39; China Basin","place_precision":"site","place_id":"qipu:sf/place/landmark/pier-39","resolved_by":"place links file","anchor":"s-81df72a3185a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"three development initiatives of recent significance have been the homeporting"},{"claim_id":"c:03bf54407765821fde127c2c080b8b6b","page_id":"C124902971:111","page_url":"https://archive.org/details/C124902971/page/n110","statement_kind":"proposal","subject_label":"Planning Department staffing","summary":"The audit recommends permanent staff of a manager, 4.31 FTE planner positions, a secretary and a senior telephone operator.","property":"recommendation","value_text":"4.31 FTE planner positions","value_num":4.31,"t_from":"1989","quote":"The staff resources we have recommended in Section 1.1 of this audit report include permanent staff of a manager, 4.31 FTE planner positions","anchor":"s-03bf54407765","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The staff resources we have recommended in Section 1.1 of this audit report"},{"claim_id":"c:dafe3e6e51a0931df8c576737e691b9b","page_id":"C124902971:111","page_url":"https://archive.org/details/C124902971/page/n110","statement_kind":"finding","subject_label":"Conditional use at 85 St. Elmo Way","summary":"The opinion became the control standard for the continuing conditional use at 85 St. Elmo Way held by the [name withheld].","property":"finding","value_text":"continuing conditional use","t_from":"1989","quote":"continuing conditional use at 85 St. Elmo Way by the Gurdjieffs","place_label":"85 St. Elmo Way","privacy_flag":"may_name_private_person_after_1950","privacy_class":"private_person","public_after_year":2064,"anchor":"s-dafe3e6e51a0","shown":false,"hidden":"letter","part":"letter","speaker":"another_body","speaker_role":"MHHA attorney, a neighborhood association's counsel","stance":"quotes_to_report","speaker_evidence":"September 15, 1988 - MHHA attorney letter to Passmore"},{"claim_id":"c:f02a0dd7ade52b99b92ecb99fdb8cd8c","page_id":"C124902971:111","page_url":"https://archive.org/details/C124902971/page/n110","statement_kind":"finding","subject_label":"Appeal of 85 St. Elmo Way conditional use","summary":"[name withheld] issued his opinion letter on November 1, 1988, and the MHHA decided not to appeal it.","property":"finding","value_text":"opinion issued; no appeal","date_printed":"November 1, 1988","t_from":"1988","quote":"On November 1, 1988, Mr. [name withheld] finally issued his opinion letter which was earlier cited.","place_label":"85 St. Elmo Way","anchor":"s-f02a0dd7ade5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"On November 1, 1988, Mr. [name withheld] finally issued his opinion letter"},{"claim_id":"c:fe589892779bf293d21de14d5d0e92fe","page_id":"C124902971:111","page_url":"https://archive.org/details/C124902971/page/n110","statement_kind":"finding","subject_label":"Planning Department information services","summary":"The Director of Planning recognizes a serious problem in the Department's information services and records maintenance function.","property":"finding","value_text":"serious problem in information services","t_from":"1989","quote":"The Director of Planning recognizes that the Department has a serious problem in its information services/records maintenance function","anchor":"s-fe589892779b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The Director of Planning recognizes that the Department has a serious problem"},{"claim_id":"c:3a7063b7bc601ccd75792c2e373c5c51","page_id":"C124902971:119","page_url":"https://archive.org/details/C124902971/page/n118","statement_kind":"finding","subject_label":"Permit intake duplication","summary":"The Central Permit Bureau and Counter Services Division duplicate essential clerical tasks in the permit application process.","property":"finding","value_text":"duplicated clerical tasks","t_from":"1989","quote":"the clerical and professional staff of the two divisions duplicate essential clerical tasks related to assisting applicants at the counter","anchor":"s-3a7063b7bc60","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"our investigations revealed that the clerical and professional staff"},{"claim_id":"c:68a42bbcc80feb31567c9810c7920d92","page_id":"C124902971:119","page_url":"https://archive.org/details/C124902971/page/n118","statement_kind":"proposal","subject_label":"Reassigning clerical duties at permit counter","summary":"Reassigning clerical staff duties and revising procedures would avoid costs of about $27,550 (≈ $74,860 in 2026 dollars) annually.","property":"cost_usd","value_text":"$27,550 annually","value_num":27550.0,"unit":"USD","t_from":"1989","quote":"THE BUREAU WOULD AVOID COSTS OF APPROXIMATELY $27,550 ANNUALLY","anchor":"s-68a42bbcc80f","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"THE BUREAU WOULD AVOID COSTS OF APPROXIMATELY $27,550 ANNUALLY"},{"claim_id":"c:f5d466e080eb9e85ccd1f53c33291f63","page_id":"C124902971:119","page_url":"https://archive.org/details/C124902971/page/n118","statement_kind":"finding","subject_label":"Inspectors assisting applicants at counter","summary":"CSD inspectors assigned to the counter help applicants fill out permit applications, a clerical task.","property":"finding","value_text":"inspectors doing clerical work","t_from":"1989","quote":"CSD inspectors assigned to the counter assist the applicants in filling out the permit applications","place_label":"Bureau of Building Inspection counter","anchor":"s-f5d466e080eb","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We found: CSD inspectors assigned to the counter assist the applicants"},{"claim_id":"c:025ba742290dad5cba6632a25a0aaef7","page_id":"C124902971:128","page_url":"https://archive.org/details/C124902971/page/n127","statement_kind":"background","subject_label":"Section 65940 of the State Government Code","summary":"Section 65940 requires each agency to compile lists specifying information required from permit applicants.","property":"other","t_from":"1989","quote":"Section 65940 of the State Government Code specifies that each agency shall compile one or more lists which specify in detail the information that will be required from any applicant","anchor":"s-025ba742290d","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Section 65940 of the State Government Code specifies that each agency"},{"claim_id":"c:344ec8a84b490497d04e21f984dd5994","page_id":"C124902971:128","page_url":"https://archive.org/details/C124902971/page/n127","statement_kind":"background","subject_label":"Section 65943 completeness determination","summary":"Section 65943 requires notice within 30 calendar days on whether a development application is complete.","property":"other","value_text":"30 calendar days","value_num":30.0,"unit":"days","t_from":"1989","quote":"Section 65943 specifies that applicants for development projects be notified not later than 30 calendar days after an agency has received a development application","anchor":"s-344ec8a84b49","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Section 65943 specifies that applicants for development projects be notified"},{"claim_id":"c:5d354146f752d38215ed12360a6b6cf4","page_id":"C124902971:128","page_url":"https://archive.org/details/C124902971/page/n127","statement_kind":"finding","subject_label":"Permit application list","summary":"The current list does not include the hazardous waste site certification requirement.","property":"finding","value_text":"certification requirement omitted","t_from":"1989","quote":"the current list does not include the certification requirement related to the State Department of Health Service's list of hazardous waste","anchor":"s-5d354146f752","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"the current list does not include the certification requirement"},{"claim_id":"c:701372161ad831c54cb072cb145aa50a","page_id":"C124902971:128","page_url":"https://archive.org/details/C124902971/page/n127","statement_kind":"finding","subject_label":"Permit applicant brochures","summary":"The report finds the brochures assisting permit applicants are four years old and need updating.","property":"finding","value_text":"four years old","value_num":4.0,"t_from":"1989","quote":"Brochures that assist the applicant in assembling the necessary information for a permit application are four years old and need to be updated.","anchor":"s-701372161ad8","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Brochures that assist the applicant in assembling the necessary information"},{"claim_id":"c:72d343c15b84d1ff6c29db178a501bbe","page_id":"C124902971:128","page_url":"https://archive.org/details/C124902971/page/n127","statement_kind":"finding","subject_label":"Waiver of time restriction at CSD counter","summary":"The report finds CSD clerks strongly discourage applicants from declining to sign a waiver of the completeness time limit.","property":"finding","value_text":"strongly discouraged from not signing the waiver","t_from":"1989","quote":"BBI reports that customers are “strongly discouraged\" from not signing the waiver.","place_label":"CSD counter","anchor":"s-72d343c15b84","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"BBI reports that customers are strongly discouraged"},{"claim_id":"c:d0c39e14f48a161122f5a9f336bdab1a","page_id":"C124902971:128","page_url":"https://archive.org/details/C124902971/page/n127","statement_kind":"finding","subject_label":"Summary list of information for permit applicants","summary":"The report finds the summary list of information is not easily visible and available to the public.","property":"finding","value_text":"not easily visible and available to the public","t_from":"1989","quote":"BBI has compiled a summary list of information, but that list is not easily visible and available to the public.","anchor":"s-d0c39e14f48a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"BBI has compiled a summary list of information, but that list is not easily visible"},{"claim_id":"c:969158332a118475d4f388241d3cbc7b","page_id":"C124902971:137","page_url":"https://archive.org/details/C124902971/page/n136","statement_kind":"finding","subject_label":"Combined planning and building departments elsewhere","summary":"The Office of Planning and Research reports numerous counties, including Orange and San Mateo, have combined planning and building departments.","property":"finding","value_text":"combined planning and building departments","t_from":"1989","quote":"numerous counties, including Orange and San Mateo Counties, have combined planning and building departments.","anchor":"s-969158332a11","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Discussions with the State Office of Planning and Research (OPR) reveals that numerous counties"},{"claim_id":"c:ff8c648c8b320d9f124a1cdc3b1bd63e","page_id":"C124902971:137","page_url":"https://archive.org/details/C124902971/page/n136","statement_kind":"proposal","subject_label":"Combined planning and building department","summary":"The report suggests BBI staff would be a strong asset in a transition to a single department.","property":"recommendation","value_text":"single combined department","t_from":"1989","quote":"We think that these staff members would be a strong asset in a transition to a single department.","anchor":"s-ff8c648c8b32","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We think that these staff members would be a strong asset"},{"claim_id":"c:554c2cdde68ddbdbe087999eba8c8975","page_id":"C124902971:142","page_url":"https://archive.org/details/C124902971/page/n141","statement_kind":"proposal","subject_label":"Legibility of permit applications","summary":"The report suggests requiring applicants to type or print permit applications.","property":"recommendation","value_text":"type or print applications","t_from":"1989","quote":"Illegibility can be corrected by requiring applicants to type or print when completing the permit application.","anchor":"s-554c2cdde68d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Improving the Current Procedure; Illegibility can be corrected by requiring applicants"},{"claim_id":"c:680c006095f43bef907ce57025878531","page_id":"C124902971:142","page_url":"https://archive.org/details/C124902971/page/n141","statement_kind":"finding","subject_label":"Assessor review of permit applications","summary":"The report finds the Assessor's review of permit applications after microfilming is generally effective.","property":"finding","value_text":"generally effective","t_from":"1989","quote":"We believe that the current process by which the Assessor reviews permit applications once they have been microfilmed by the outside vendor is generally effective.","anchor":"s-680c006095f4","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We believe that the current process by which the Assessor"},{"claim_id":"c:f6e1b5b16abcb3c9e9a38a7d61a0c48c","page_id":"C124902971:142","page_url":"https://archive.org/details/C124902971/page/n141","statement_kind":"proposal","subject_label":"Control procedure for microfilmed applications","summary":"The report recommends BBI develop a simple control procedure for tracking applications sent for microfilming.","property":"recommendation","value_text":"control procedure for microfilming","t_from":"1989","quote":"BBI should develop a simple control procedure for keeping track of the applications that are sent out for microfilming.","anchor":"s-f6e1b5b16abc","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Improving the Current Procedure; BBI should develop a simple control procedure"},{"claim_id":"c:83931c1d8507b1c279e70d08ed937a27","page_id":"C124902971:148","page_url":"https://archive.org/details/C124902971/page/n147","statement_kind":"background","subject_label":"Electrical Inspection Division staffing","summary":"The Electrical Inspection Division has one chief, two senior inspectors, 17 inspectors and two clerks.","property":"other","value_text":"one chief electrical inspector, two senior electrical inspectors, 17 electrical inspectors, and two clerks","t_from":"1989","quote":"This Division has a staff of one chief electrical inspector, two senior electrical inspectors, 17 electrical inspectors, and two clerks.","anchor":"s-83931c1d8507","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Electrical Inspection is responsible for inspecting all electrical construction"},{"claim_id":"c:f8e348762615c48492d5efeab7d5fa06","page_id":"C124902971:148","page_url":"https://archive.org/details/C124902971/page/n147","statement_kind":"background","subject_label":"Electrical districts","summary":"The City is divided into 16 electrical districts for electrical inspection.","property":"other","value_text":"16 electrical districts","value_num":16.0,"t_from":"1989","quote":"The City is divided into 16 electrical districts.","anchor":"s-f8e348762615","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The City is divided into 16 electrical districts."},{"claim_id":"c:1c0fd0e7b603a22efbd5dfc8b544775f","page_id":"C124902971:157","page_url":"https://archive.org/details/C124902971/page/n156","statement_kind":"proposal","subject_label":"Expanded code of ethics for the Bureau","summary":"The recommendations would result in clear and expanded guidelines on the Bureau's expectations for its employees.","property":"recommendation","t_from":"1989","quote":"The implementation of these recommendations would result in a process and a document that provides clear and expanded guidelines on the Bureau’s expectations for its employees.","anchor":"s-1c0fd0e7b603","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"BENEFITS /COSTS The implementation of these recommendations would result"},{"claim_id":"c:d17e06fc32b5dc01f5d5119c2e859983","page_id":"C124902971:169","page_url":"https://archive.org/details/C124902971/page/n168","statement_kind":"proposal","subject_label":"Advance plan checking by Plumbing Inspection Division","summary":"The report recommends that the Plumbing Inspection Division review plans for code compliance on all projects except single family dwellings.","property":"recommendation","t_from":"1989","quote":"We therefore recommend that the Plumbing Inspection Division review plans for code compliance on all projects except construction involving only single family dwellings.","anchor":"s-d17e06fc32b5","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"We therefore recommend that the Plumbing Inspection Division review plans"},{"claim_id":"c:d57d607bc7e8e27df822537e1aae57eb","page_id":"C124902971:169","page_url":"https://archive.org/details/C124902971/page/n168","statement_kind":"finding","subject_label":"Two Senior Plumbing Inspector positions","summary":"The FY 1988-89 budget authorized two new Senior Plumbing Inspectors, but the positions have not been filled.","property":"other","value_text":"two positions","value_num":2.0,"date_printed":"September 1, 1988","t_from":"1988","quote":"The FY 1988-89 budget contained authorization for two new Senior Plumbing Inspectors and authorized their hiring, effective September 1, 1988.","anchor":"s-d57d607bc7e8","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The FY 1988-89 budget contained authorization for two new Senior Plumbing Inspectors"},{"claim_id":"c:4ea40d9bf4efcb588d0e4f40e99c98a8","page_id":"C124902971:186","page_url":"https://archive.org/details/C124902971/page/n185","statement_kind":"proposal","subject_label":"Routine inspections per inspector per day","summary":"The report proposes increasing inspections per inspector per day to eight.","property":"proposes","value_text":"eight per inspector per day","value_num":8.0,"t_from":"1989","quote":"Increase the total number of inspections per inspector per day from 5.5 per inspector per day to eight per inspector per day.","anchor":"s-4ea40d9bf4ef","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"this_page main text: recommendations list with bullet markers"},{"claim_id":"c:e6388ed30a504d63e0dd298294393417","page_id":"C124902971:186","page_url":"https://archive.org/details/C124902971/page/n185","statement_kind":"finding","subject_label":"HID housing inspection staff","summary":"HID has a staff of 20 full-time housing inspectors, one of whom is devoted to the Hotel Conversion Ordinance.","property":"other","value_text":"20 full-time housing inspectors","value_num":20.0,"t_from":"1989","quote":"Presently, HID has a staff of 20 full-time housing inspectors, of which one is devoted full-time to administering the requirements of the Hotel Conversion Ordinance","anchor":"s-e6388ed30a50","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Presently, HID has a staff of 20 full-time housing inspectors"},{"claim_id":"c:fe586fba83ebb6433c793d3d027f6a9f","page_id":"C124902971:186","page_url":"https://archive.org/details/C124902971/page/n185","statement_kind":"finding","subject_label":"HID routine inspection objective","summary":"The Budget Analyst finds HID will not reach the mandated 20,000 routine inspections per year with current staffing.","property":"finding","value_text":"20,000 routine inspections per year","value_num":20000.0,"t_from":"1989","quote":"HID will not, with current staffing levels, accomplish the mandated objective of 20,000 routine inspections per year.","anchor":"s-fe586fba83eb","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Our review of the BBI proposal indicates that HID will not"},{"claim_id":"c:18065e11aced4ef0bf2d790746ffb2d3","page_id":"C124902971:192","page_url":"https://archive.org/details/C124902971/page/n191","statement_kind":"finding","subject_label":"3-R report response time","summary":"The Budget Analyst found 3-R reports were sent back within two days only 65.5 percent of the time, October 1988 to April 1989.","property":"finding","value_text":"65.5 percent","value_num":65.5,"unit":"percent","date_printed":"October 1988 to April 1989","t_from":"1988","quote":"3-R reports are produced and sent back to the applicants within two days only 65.5 percent of the time, substantially below the 77.8 percent","anchor":"s-18065e11aced","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the Budget Analyst","stance":"own_position","speaker_evidence":"Our review of the 3-R Section included a review of a sample"},{"claim_id":"c:49054747f13c2cfd98e82e29962b6341","page_id":"C124902971:192","page_url":"https://archive.org/details/C124902971/page/n191","statement_kind":"background","subject_label":"3-R report response time objective","summary":"BBI has set a management objective of responding to 3-R report requests within two days, 95 percent of the time.","property":"other","value_text":"two days, 95 percent of the time","value_num":95.0,"unit":"percent","t_from":"1989","quote":"BBI has set a management objective of responding to a request for a 3-R report within two days, 95 percent of the time.","anchor":"s-49054747f13c","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"another body","stance":"quotes_to_report","speaker_evidence":"BBI has set a management objective of responding"},{"claim_id":"c:8fa85e642e83e5308c0027dfe9fa5830","page_id":"C124902971:206","page_url":"https://archive.org/details/C124902971/page/n205","statement_kind":"finding","subject_label":"Investigative Enforcement Division staffing","summary":"The report says 4 IED positions are filled, including two supervisory positions.","property":"other","value_text":"4 positions filled","value_num":4.0,"t_from":"1989","quote":"Currently 4 positions within IED are filled, including two supervisory positions.","anchor":"s-8fa85e642e83","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Currently 4 positions within IED are filled, including two supervisory positions."},{"claim_id":"c:e800635de9c964040dab1a098228873c","page_id":"C124902971:206","page_url":"https://archive.org/details/C124902971/page/n205","statement_kind":"finding","subject_label":"Investigative Enforcement Division staffing","summary":"The report says the IED needs nine positions rather than the 10 BBI projected.","property":"other","value_text":"9 positions","value_num":9.0,"t_from":"1989","quote":"While preliminary, the workload data available indicates that the IED will require a total of nine positions rather than the 10 projected by BBI.","anchor":"s-e800635de9c9","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"While preliminary, the workload data available indicates that the IED will require a total of nine positions"},{"claim_id":"c:836fccad60207e09a3517e8d61efd213","page_id":"C124902971:241","page_url":"https://archive.org/details/C124902971/page/n240","statement_kind":"proposal","subject_label":"BBI three-year automation plan","summary":"The draft plan proposes a networked PC system for the Bureau at about $1 million (≈ $2.7 million in 2026 dollars).","property":"proposes","value_text":"$1 million","value_num":1000000.0,"unit":"USD","t_from":"1989","quote":"At an estimated total cost of $1 million, the automation plan proposes to establish a network of personal computers throughout the Bureau","place_label":"Bureau of Building Inspection","anchor":"s-836fccad6020","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"BBI has recognized the need to automate their operation"}]}