A Technical assessment of the waste disposal concept in "Progress report no. 1--conceptual design study, San Francisco resource conversion center."
A technical assessment by the City and County of San Francisco of the waste disposal concept for a proposed resource conversion center, including landfill options, costs and timing.The Board's Energy and Environment Committee report on the waste disposal agreement was received and adopted as amended in December 1986. Scan on the Internet Archive ↗
Printed words Quoted from the page as read from the scan.
Findings-02091a1315aa
“The U.S. Census Bureau is projecting only a 9 percent growth in population during the same 13 years.”
Scan 21Findings-8cc9a4ce076d
“In San Francisco, this limited growth in the per capita waste generation rate will likely be offset by the anticipated slight decline in population.”
Scan 21Backgrounds-f15ea7886302
“Current estimates (Franklin Associates, 1979) suggest a nationwide average increase in solid waste generation of 30 percent in the 13-year span between 1977 and 1990.”
Scan 21Findings-2da9e57351c8
“This canyon has an estimated capacity in excess of 8 million cubic yards and is projected to meet San Mateo County needs through 1985.”
Scan 29Findings-54d801a6cb39
“The addition of San Francisco's waste beginning in 1984 (estimated to be 555,000 tons per year, or about 1.1 million cubic yards per year) would reduce the site life by one year.”
Scan 29Findings-a21bdd99c7ae
“The landfill at Mountain View is nearing capacity. The current contract between San Francisco and Mountain View expires in 1983.”
Scan 29Report recommendations-6351c1e1b251
“Resource Systems, on the other hand, projects that only about 60 percent of the material received at the plant will be converted into fuel.”
Scan 46Findings-44691e7aaa71
“A massburning waterwall would place less total load on a landfill (26 vs. 41 percent), but would contribute significantly more ash (19 vs. 7 percent).”
Scan 48Findings-8c8ad4900518
“Of these, the most important are land and air pollution. Neither water nor noise pollution should present unusual or unmanageable problems.”
Scan 48Report recommendations-2f3fc567bcf7
“In addition to Ox Mountain, several other sites exist which are capable of receiving City solid waste beyond 1983. These include the Vasco Road, Altamont Hills, Richmond and Mountain View Extension sites.”
Scan 55Backgrounds-4c2634e2fe61
“These differences are important because of existing State disposal regulations, which classify furnace ash as a hazardous waste.”
Scan 55Report recommendations-4b13bc9e859b
“A new landfill could be operating 2: years after serious efforts to locate, acquire and activate a site begin.”
Scan 62Findings-60d19fb6b0bf
“The absence of turbo-generators in this system design places the procurement of steam generating equipment on the critical path (14 month lead-time assumed).”
Scan 62Report recommendations-a73082fe7b6f
“Either the split system or massburning waterwall should be handling waste routinely by early 1985.”
Scan 62Report recommendations-7740b2515eb6
“Given inflationary pressures, 1984 landfill costs (including transportation and disposal fees) are expected to range between $20 and $30 per ton.”
Scan 68Findings-b46d0c4171b1
“The capital cost estimates have an accuracy of no better than +25 percent, but are suitable for preliminary decision making.”
Scan 68Findings-0bc8322b4e16
“Although the Sanitary Fill Company design is probably workable, there is no operating experience with similar plant designs.”
Scan 82Report recommendations-c07c765dee77
“The competitiveness of the alternatives should be reconfirmed at the completion of preliminary and final designs.”
Scan 82Findings-cd7242ca8ae8
“Assuming that standard engineering accuracy applies to these cost elements, the precision of the estimates is no more than 25 percent of their forecast value.”
Scan 82Findings-ef9da85926b3
“Several large corporations have teams in place to design, build, and shakedown a facility, and are prepared and able to assume these risks.”