A Technical assessment of the waste disposal concept in "Progress report no. 1--conceptual design study, San Francisco resource conversion center."

A technical assessment by the City and County of San Francisco of the waste disposal concept for a proposed resource conversion center, including landfill options, costs and timing.The Board's Energy and Environment Committee report on the waste disposal agreement was received and adopted as amended in December 1986. Scan on the Internet Archive ↗

Period
1977 to 1990Scan 21 ↗
Owed
$20 to $30 per ton (1984)Scan 68 ↗
Findings
  • A mass-burning waterwall would place less total load on a landfill but contribute significantly more ash.Scan 48 ↗
  • The study states its capital cost estimates have an accuracy of no better than plus or minus 25 percent.Scan 68 ↗
Report recommendations
  • The study recommends that either the split system or massburning waterwall handle waste routinely by early 1985.Scan 62 ↗
Board decisions
  • Silver requests a hearing on health and environmental impacts of the proposed San Francisco Resource Conversion Center waste plan; referred to committee.Record · Journal page ↗
  • 1979 · This reportCity and County of San Francisco
  • Board sent to committee a resolution urging the air district to refuse Sanitary Fill Company a permit for a resource conversion center.Record · Journal page ↗
  • A request for hearings on recycling alternatives to the proposed Resource Conversion Center was referred to the Health and Environment Committee.Record · Journal page ↗
  • The Chief Administrative Officer may accept and spend Sanitary Fill Company funds for solid waste disposal planning.Record · Journal page ↗
  • Ordinance authorizing a waste disposal agreement with B&J Drop Box and Sanitary Fill Company, naming Solano County landfill as sole refuse site, passed for second reading.Record · Journal page ↗
  • Energy and Environment Committee's report on the waste disposal agreement was received and adopted as amended.Record · Journal page ↗
2 more Board decisions after the report
  • Chief Administrative Officer may accept $712,000 (≈ $2.3 million in 2026 dollars) from Sanitary Fill Company for solid waste recycling and disposal projects.Record · Journal page ↗
  • Board referred the Agreement in Facilitation of Waste Disposal to Energy and Environment Committee for report back.Record · Journal page ↗
20 quotes from the scan

Printed words Quoted from the page as read from the scan.

Findings-02091a1315aa

“The U.S. Census Bureau is projecting only a 9 percent growth in population during the same 13 years.”

Scan 21

Findings-8cc9a4ce076d

“In San Francisco, this limited growth in the per capita waste generation rate will likely be offset by the anticipated slight decline in population.”

Scan 21

Backgrounds-f15ea7886302

“Current estimates (Franklin Associates, 1979) suggest a nationwide average increase in solid waste generation of 30 percent in the 13-year span between 1977 and 1990.”

Scan 21

Findings-2da9e57351c8

“This canyon has an estimated capacity in excess of 8 million cubic yards and is projected to meet San Mateo County needs through 1985.”

Scan 29

Findings-54d801a6cb39

“The addition of San Francisco's waste beginning in 1984 (estimated to be 555,000 tons per year, or about 1.1 million cubic yards per year) would reduce the site life by one year.”

Scan 29

Findings-a21bdd99c7ae

“The landfill at Mountain View is nearing capacity. The current contract between San Francisco and Mountain View expires in 1983.”

Scan 29

Report recommendations-6351c1e1b251

“Resource Systems, on the other hand, projects that only about 60 percent of the material received at the plant will be converted into fuel.”

Scan 46

Findings-44691e7aaa71

“A massburning waterwall would place less total load on a landfill (26 vs. 41 percent), but would contribute significantly more ash (19 vs. 7 percent).”

Scan 48

Findings-8c8ad4900518

“Of these, the most important are land and air pollution. Neither water nor noise pollution should present unusual or unmanageable problems.”

Scan 48

Report recommendations-2f3fc567bcf7

“In addition to Ox Mountain, several other sites exist which are capable of receiving City solid waste beyond 1983. These include the Vasco Road, Altamont Hills, Richmond and Mountain View Extension sites.”

Scan 55

Backgrounds-4c2634e2fe61

“These differences are important because of existing State disposal regulations, which classify furnace ash as a hazardous waste.”

Scan 55

Report recommendations-4b13bc9e859b

“A new landfill could be operating 2: years after serious efforts to locate, acquire and activate a site begin.”

Scan 62

Findings-60d19fb6b0bf

“The absence of turbo-generators in this system design places the procurement of steam generating equipment on the critical path (14 month lead-time assumed).”

Scan 62

Report recommendations-a73082fe7b6f

“Either the split system or massburning waterwall should be handling waste routinely by early 1985.”

Scan 62

Report recommendations-7740b2515eb6

“Given inflationary pressures, 1984 landfill costs (including transportation and disposal fees) are expected to range between $20 and $30 per ton.”

Scan 68

Findings-b46d0c4171b1

“The capital cost estimates have an accuracy of no better than +25 percent, but are suitable for preliminary decision making.”

Scan 68

Findings-0bc8322b4e16

“Although the Sanitary Fill Company design is probably workable, there is no operating experience with similar plant designs.”

Scan 82

Report recommendations-c07c765dee77

“The competitiveness of the alternatives should be reconfirmed at the completion of preliminary and final designs.”

Scan 82

Findings-cd7242ca8ae8

“Assuming that standard engineering accuracy applies to these cost elements, the precision of the estimates is no more than 25 percent of their forecast value.”

Scan 82

Findings-ef9da85926b3

“Several large corporations have teams in place to design, build, and shakedown a facility, and are prepared and able to assume these risks.”