{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124904191","url":"https://data.qipu.org/usa/san-francisco/reports/c124904191/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124904191/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124904191","source_id":"C124904191","title":"A feasibility review of the waste disposal concept in \"Progress report no. 1, conceptual design study, San Francisco resource conversion center.\"","year":1979,"n_pages":36,"creator":"CSI Resource Systems, Inc","source_url":"https://archive.org/details/C124904191","issuer":"City and County of San Francisco","issuer_type":"government","gov_level":"city_county","prepared_by":"CSI Resource Systems, Inc.","doc_kind":"study","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"model","doc_kind_by":"model","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":16,"statements_total":56,"statements_by_kind":{"finding":25,"proposal":26,"cites_decision":0,"background":5},"same_for_every_statement":{"source_id":"C124904191","source_url":"https://archive.org/details/C124904191","source_label":"IGS library: A feasibility review of the waste disposal concept in \"Progress report no. 1, conceptual design study, San Francisco res","report_year":1979,"issuer":"City and County of San Francisco","issuer_type":"government","doc_kind":"study","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A feasibility review by the City of a proposed Sanitary Fill Company resource recovery facility that would turn solid waste into fuel and metals.","next":"The Board gave a first reading to an ordinance naming the Solano County landfill as the sole refuse site in February 1984, and the ordinance then passed for second reading.","next_decision":"qipu:sf/decision/journalofjanjuneproceed79sanfrich:177/2","figures":[{"label":"Facility","value":"1900 ton per day","claim_ids":["c:fb858ddb4a92443c73415b232e19bd5f"]},{"label":"Landfill cost","value":"$22 to $30 per ton","claim_ids":["c:9dd03b7f31612436eef8c73e4356d577"]},{"label":"Net cost","value":"$27 per ton","claim_ids":["c:872c7f71f90c5634f6941389942c3dc0"]},{"label":"Contract expiry","value":"1983","claim_ids":["c:85814f9c2f2f7fdd50d97609c9695bb2"]}],"main_points":["c:7ec94791b1427ea09d56459f8066c8ae","c:460978e8090c06eecf45ddaf4defe7d1","c:b789450665b0fa573c173452a4d90bdc"],"board_decisions_after":["qipu:sf/decision/journalofjanjuneproceed79sanfrich:177/2","qipu:sf/decision/journaljanjuneofproceed74sanfrich:549/2","qipu:sf/decision/journaljanjuneofproceed75sanfrich:689/2","qipu:sf/decision/journaljulydecofproceed75sanfrich:486/2","qipu:sf/decision/journaljulydecofproceed75sanfrich:639/2","qipu:sf/decision/journalofjanjuneproceed77sanfrich:400/3","qipu:sf/decision/journalofjanjuneproceed77sanfrich:796/1","qipu:sf/decision/journalofjanjuneproceed79sanfrich:765/2"],"board_decisions_before":["qipu:sf/decision/journaljulydecofproceed74sanfrich:129/1"],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:2024bff340915ac0a0668dac2f4c1e57","page_id":"C124904191:7","page_url":"https://archive.org/details/C124904191/page/n6","statement_kind":"proposal","subject_label":"Replacement disposal system options","summary":"The report says the new system could include a resource recovery plant and landfill, or simply new landfills.","property":"alternative","value_text":"resource recovery plant and landfill, or new landfills","t_from":"1979","quote":"The new system could include a resource recovery plant and a landfill for disposal of residues and ash, or could simply include one or more new landfills for the disposal of unprocessed solid waste.","anchor":"s-2024bff34091","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"INTRODUCTION The City and County of San Francisco is facing"},{"claim_id":"c:85814f9c2f2f7fdd50d97609c9695bb2","page_id":"C124904191:7","page_url":"https://archive.org/details/C124904191/page/n6","statement_kind":"finding","subject_label":"City solid waste disposal contract","summary":"The City's contract for disposing of its solid waste in Mountain View expires in 1983.","property":"other","value_text":"1983","date_printed":"1983","t_from":"1983","quote":"The City's contract for disposing of its solid waste in Mountain View expires in 1983.","anchor":"s-85814f9c2f2f","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The City's contract for disposing of its solid waste in Mountain View expires in 1983."},{"claim_id":"c:97566af060456b9546e2819430246ef2","page_id":"C124904191:7","page_url":"https://archive.org/details/C124904191/page/n6","statement_kind":"background","subject_label":"CSI review of Sanitary Fill report","summary":"The City's Chief Administrative Officer retained CSI Resource Systems to review the Sanitary Fill Company report.","property":"other","value_text":"CSI Resource Systems review","date_printed":"February 1979","t_from":"1979","quote":"In February 1979, Roger Boas, the City's Chief Administrative Officer, retained CSI Resource Systems, Inc. (Resource Systems) to review the Sanitary Fill Company report.","anchor":"s-97566af06045","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In February 1979, [name], the City's Chief Administrative Officer, retained"},{"claim_id":"c:98ee9017c2e1a9e1eda3bb579d546f65","page_id":"C124904191:7","page_url":"https://archive.org/details/C124904191/page/n6","statement_kind":"finding","subject_label":"Sanitary Fill report submission","summary":"Sanitary Fill Company, a joint-venture of Sunset Scavengers and Golden Gate Disposal Company, submitted the progress report to the City.","property":"sponsor","value_text":"Sanitary Fill Company","date_printed":"September 1978","t_from":"1978","quote":"The report was submitted to the City by Sanitary Fill Company, a joint-venture of Sunset Scavengers","anchor":"s-98ee9017c2e1","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In September 1978, the City received \"Progress Report No. 1\""},{"claim_id":"c:cf15835356ea13419d51aa81c1fbae6a","page_id":"C124904191:7","page_url":"https://archive.org/details/C124904191/page/n6","statement_kind":"proposal","subject_label":"Energy recovery from combustible fraction","summary":"The proposed facility would use recovered combustible waste as fuel in a steam power plant to generate electricity.","property":"proposes","value_text":"steam power plant generating electricity","t_from":"1979","quote":"The proposed facility would separate metals and other heavy materiais from the waste, and use the recovered combustible fraction as fuel in a steam power plant to generate electricity.","anchor":"s-cf15835356ea","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Sanitary Fill Company proposed a 1900 ton per day resource re- covery facility"},{"claim_id":"c:fb858ddb4a92443c73415b232e19bd5f","page_id":"C124904191:7","page_url":"https://archive.org/details/C124904191/page/n6","statement_kind":"proposal","subject_label":"Resource recovery facility at Brisbane transfer station","summary":"Sanitary Fill Company proposed a 1900 ton per day resource recovery facility.","property":"proposes","value_text":"1900 ton per day","value_num":1900.0,"unit":"tons_per_day","t_from":"1979","quote":"Sanitary Fill Company proposed a 1900 ton per day resource re- covery facility for processing the solid waste currently being handled at the transfer station in Brisbane.","place_label":"transfer station in Brisbane","anchor":"s-fb858ddb4a92","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"Sanitary Fill Company proposed a 1900 ton per day resource"},{"claim_id":"c:1c6f026670a1adb513d80dd9c0d4a2fc","page_id":"C124904191:9","page_url":"https://archive.org/details/C124904191/page/n8","statement_kind":"background","subject_label":"Public and business purposes of resource recovery","summary":"The report says a resource recovery project serves public waste disposal purposes and a business purpose of producing and selling products.","property":"other","t_from":"1979","quote":"Thus, a resource recovery project serves the public purposes of waste disposal and energy and materials conservation","anchor":"s-1c6f026670a1","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"CSI Resource Systems, Inc. (independent consultant)","stance":"own_position","speaker_evidence":"[name] A resource recovery facility has two functions"},{"claim_id":"c:d243d49cd4814be20d1a3903e93b9367","page_id":"C124904191:9","page_url":"https://archive.org/details/C124904191/page/n8","statement_kind":"background","subject_label":"Resource recovery project ingredients","summary":"The report states that a successful resource recovery project has seven key ingredients.","property":"other","value_text":"seven key ingredients","value_num":7.0,"t_from":"1979","quote":"A successful resource recovery project has seven key ingredients:","anchor":"s-d243d49cd481","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"CSI Resource Systems, Inc. (independent consultant)","stance":"own_position","speaker_evidence":"A successful resource recovery project has seven key ingredients:"},{"claim_id":"c:e33db2bc0b1cf6d31bc635208b9f5ed1","page_id":"C124904191:11","page_url":"https://archive.org/details/C124904191/page/n10","statement_kind":"proposal","subject_label":"Sanitary Fill Company 1900 TPD facility","summary":"The report describes the 1900 TPD facility proposed by Sanitary Fill Company, with front-end processing to produce fuel and metals.","property":"proposes","value_text":"1900 TPD","value_num":1900.0,"t_from":"1979","quote":"The 1900 TPD (tons per day) facility proposed by Sanitary Fill Company will include front-end processing","anchor":"s-e33db2bc0b1c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The 1900 TPD (tons per day) facility proposed by Sanitary Fill Company will include"},{"claim_id":"c:96781bbc752c55938609e7054cc47379","page_id":"C124904191:12","page_url":"https://archive.org/details/C124904191/page/n11","statement_kind":"proposal","subject_label":"Split System alternative","summary":"The report considers a Split System alternative with fuel preparation at a Brisbane plant and remote boilers.","property":"alternative","value_text":"Split System","t_from":"1979","quote":"Fuel preparation at a Brisbane plant, with rail transport of the fuel to remote boilers which produce steam for sale to industry.","place_label":"Brisbane","anchor":"s-96781bbc752c","shown":false,"hidden":"unclear","part":"main_text","speaker":"unclear","speaker_role":"Resource Systems, Inc. (consultant writing the feasibility review)","stance":"own_position","speaker_evidence":"For the purpose of comparison, Resource Systems chose four alternatives"},{"claim_id":"c:6751ac1133438960cdda3229bd3e9fda","page_id":"C124904191:15","page_url":"https://archive.org/details/C124904191/page/n14","statement_kind":"proposal","subject_label":"Sanitary Fill Company system design","summary":"The report recommends that the Sanitary Fill Company system design can and should be simplified.","property":"recommendation","value_text":"simplified","t_from":"1979","quote":"The Sant tary Fill Company system destgn can and should be stmplifted.","anchor":"s-6751ac113343","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Resource Systems (CSI Resource Systems, Inc.), the report's author","stance":"own_position","speaker_evidence":"CONCLUSIONS AND RECOMMENDATIONS; Results of Resource Systems' evaluation"},{"claim_id":"c:7ec94791b1427ea09d56459f8066c8ae","page_id":"C124904191:15","page_url":"https://archive.org/details/C124904191/page/n14","statement_kind":"finding","subject_label":"Sanitary Fill Company proposed project","summary":"The study concludes the Sanitary Fill Company project is technically feasible.","property":"finding","value_text":"technically feasible","t_from":"1979","quote":"The Sanitary Fill Company design is likely to produce a fuel suitable for firing in the proposed boilers.","anchor":"s-7ec94791b142","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Resource Systems (CSI Resource Systems, Inc.), the report's author","stance":"own_position","speaker_evidence":"CONCLUSION: Santtary Fill Company's proposed project ts technically feastble"},{"claim_id":"c:9dd03b7f31612436eef8c73e4356d577","page_id":"C124904191:15","page_url":"https://archive.org/details/C124904191/page/n14","statement_kind":"proposal","subject_label":"Land disposal cost for City solid waste","summary":"The study estimates land disposal of the City's solid waste will cost $22 (≈ $71.34 in 2026 dollars) to $30 (≈ $97.29 in 2026 dollars) per ton by 1984.","property":"cost_usd","value_text":"$22 to $30 per ton","value_num":22.0,"unit":"USD","date_printed":"by 1984","t_from":"1984","quote":"Resource Systems estimates that by 1984 the total cost for land disposal of the City's solid waste will be anywhere from $22 to $30 per ton.","anchor":"s-9dd03b7f3161","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"Resource Systems (CSI Resource Systems, Inc.), the report's author","stance":"own_position","speaker_evidence":"Resource Systems estimates that by 1984 the total cost"},{"claim_id":"c:2d25e856cb717c001de12f252a74da39","page_id":"C124904191:16","page_url":"https://archive.org/details/C124904191/page/n15","statement_kind":"proposal","subject_label":"Turbine generator","summary":"The report recommends eliminating the redundant turbine generator and updating system costs.","property":"recommendation","t_from":"1979","quote":"turbine generator should be eliminated, system costs should be updated","anchor":"s-2d25e856cb71","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Resource Systems, Inc. (consultant writing the report's conclusions)","stance":"own_position","speaker_evidence":"RECOMMENDATIONS: It makes economic sense for the City"},{"claim_id":"c:460978e8090c06eecf45ddaf4defe7d1","page_id":"C124904191:16","page_url":"https://archive.org/details/C124904191/page/n15","statement_kind":"finding","subject_label":"Economic feasibility of proposed resource recovery project","summary":"The study finds the proposed project appears economically feasible even after adjusting Sanitary Fill Company's estimates upwards.","property":"finding","t_from":"1979","quote":"The proposed project appears to be economically feasible even after adjusting upwards Sanitary Fill Company's estimates","anchor":"s-460978e8090c","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Resource Systems, Inc. (consultant writing the report's conclusions)","stance":"own_position","speaker_evidence":"The proposed project appears to be economically feasible even after adjusting upwards"},{"claim_id":"c:5439161a3d6af9e423f4ff5db6bfd14b","page_id":"C124904191:16","page_url":"https://archive.org/details/C124904191/page/n15","statement_kind":"finding","subject_label":"Operational timing of resource recovery facility","summary":"Resource Systems' analyses indicate a resource recovery plant could not be fully operational in San Francisco until mid to late 1984.","property":"finding","value_text":"mid to late 1984","date_printed":"mid to late 1984","t_from":"1984","quote":"could not be fully operational in San Francisco until mid to late 1984","place_label":"San Francisco","anchor":"s-5439161a3d6a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Resource Systems, Inc. (consultant writing the report's conclusions)","stance":"own_position","speaker_evidence":"Resource Systems' analyses indicate that, under the best of circumstances"},{"claim_id":"c:9bc8eff5f9a37be3ffab1993bf735146","page_id":"C124904191:16","page_url":"https://archive.org/details/C124904191/page/n15","statement_kind":"proposal","subject_label":"Hazardous waste classification of boiler ash","summary":"The report recommends that the City take steps to resolve the hazardous waste classification of boiler ash.","property":"recommendation","t_from":"1979","quote":"should take steps to resolve the tssue of hazardous waste classtfteatton of botler ash","anchor":"s-9bc8eff5f9a3","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Resource Systems, Inc. (consultant writing the report's conclusions)","stance":"own_position","speaker_evidence":"Furthermore, the Ctty should take steps to resolve the tssue of hazardous waste"},{"claim_id":"c:b789450665b0fa573c173452a4d90bdc","page_id":"C124904191:16","page_url":"https://archive.org/details/C124904191/page/n15","statement_kind":"proposal","subject_label":"Resource recovery concept","summary":"The report recommends that the City proceed with implementation of the proposed resource recovery concept.","property":"recommendation","t_from":"1979","quote":"It makes economic sense for the City to proceed with the tmplementatton of the pro- posed resource recovery concept","anchor":"s-b789450665b0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Resource Systems, Inc. (consultant writing the report's conclusions)","stance":"own_position","speaker_evidence":"RECOMMENDATIONS: It makes economic sense for the City to proceed"},{"claim_id":"c:ea2fb68b74121fd8f7826a4db8efb94a","page_id":"C124904191:16","page_url":"https://archive.org/details/C124904191/page/n15","statement_kind":"finding","subject_label":"Incinerator ash disposal regulation","summary":"The report says the California hazardous waste landfill requirement for ash could add $6 (≈ $27.85 in 2026 dollars) per ton to disposal cost.","property":"cost_usd","value_text":"$6 per ton","value_num":6.0,"unit":"USD","t_from":"1979","quote":"could add $6 per ton to the net disposal cost at a resource recovery facility","anchor":"s-ea2fb68b7412","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"Resource Systems, Inc. (consultant writing the report's conclusions)","stance":"own_position","speaker_evidence":"If not changed, the regulation could add $6 per ton to the net disposal cost"},{"claim_id":"c:8ec57a587f87e98e81a6cf9fb1c37c96","page_id":"C124904191:17","page_url":"https://archive.org/details/C124904191/page/n16","statement_kind":"proposal","subject_label":"Landfill space acquisition","summary":"The report recommends that the City initiate a program to acquire landfill space.","property":"recommendation","t_from":"1979","quote":"The City should inttiate a program to acqutre landfill space for","anchor":"s-8ec57a587f87","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"CSI Resource Systems, Inc. (consultant whose text appears on this page)","stance":"own_position","speaker_evidence":"RECOMMENDATION: The City should inttiate a program to acqutre landfill space"},{"claim_id":"c:a68e9432d5769eff49e55f2305e7c0e2","page_id":"C124904191:17","page_url":"https://archive.org/details/C124904191/page/n16","statement_kind":"proposal","subject_label":"Front-end or back-end processing","summary":"The report recommends the City require front-end or back-end processing to reduce ash for disposal.","property":"recommendation","t_from":"1979","quote":"The City should requtre etther: (1) front-end processing of soltd waste to remove materials","anchor":"s-a68e9432d576","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"CSI Resource Systems, Inc. (consultant whose text appears on this page)","stance":"own_position","speaker_evidence":"CONCLUSION: The potenttal classtftcatton of botler ash ... RECOMMENDATION: The City should requtre etther"},{"claim_id":"c:c42bc1a87807223e491ffb463f17a039","page_id":"C124904191:17","page_url":"https://archive.org/details/C124904191/page/n16","statement_kind":"finding","subject_label":"Massburning waterwall systems","summary":"The report finds massburners produce more than twice as much ash as the Sanitary Fill Company design.","property":"finding","t_from":"1979","quote":"This is because massburners produce more than twice as much ash as a system of the Sanitary Fill Company design","anchor":"s-c42bc1a87807","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"CSI Resource Systems, Inc. (consultant whose text appears on this page)","stance":"own_position","speaker_evidence":"Resource Systems' economic analyses indicate that massburning waterwall systems"},{"claim_id":"c:026971207f92f0a4ee581388bfc089e5","page_id":"C124904191:18","page_url":"https://archive.org/details/C124904191/page/n17","statement_kind":"proposal","subject_label":"Environmental review expedition","summary":"The report recommends the City take steps to help expedite the environmental review process.","property":"recommendation","t_from":"1979","quote":"The [name withheld] should take steps to help expedite the environmental review process","anchor":"s-026971207f92","shown":false,"hidden":"attachment","part":"attachment","speaker":"another_body","speaker_role":"CSI Resource Systems, Inc. (consultant)","stance":"own_position","speaker_evidence":"RECOMMENDATION: [name] should take steps to help expedite the environmental review process"},{"claim_id":"c:4055cc1b44bb352c019876f5f09b08a6","page_id":"C124904191:18","page_url":"https://archive.org/details/C124904191/page/n17","statement_kind":"finding","subject_label":"Air quality offsets","summary":"The report notes state and regional California air agencies have not adopted the federal offset exemption policy.","property":"finding","t_from":"1979","quote":"State and regional air quality agencies in California have not adopted the Federal policy","anchor":"s-4055cc1b44bb","shown":false,"hidden":"attachment","part":"attachment","speaker":"another_body","speaker_role":"CSI Resource Systems, Inc. (consultant)","stance":"own_position","speaker_evidence":"State and regional air quality agencies in California have not adopted the Federal policy"},{"claim_id":"c:8e01953c8f60d9321612c9e629d319cc","page_id":"C124904191:18","page_url":"https://archive.org/details/C124904191/page/n17","statement_kind":"finding","subject_label":"Capital cost escalation of facility","summary":"The report estimates a $100 million (≈ $464.1 million in 2026 dollars) facility's capital cost may escalate as much as $12 million (≈ $55.7 million in 2026 dollars) per year.","property":"cost_usd","value_text":"$12 million per year","value_num":12000000.0,"unit":"USD","t_from":"1979","quote":"The capital cost of a $100 million facility may escalate as much as $12 million per year","anchor":"s-8e01953c8f60","shown":false,"hidden":"attachment","part":"attachment","speaker":"another_body","speaker_role":"CSI Resource Systems, Inc. (consultant)","stance":"own_position","speaker_evidence":"*The capital cost of a $100 million facility may escalate as much as $12 million per year"},{"claim_id":"c:ad759a8214da96cfdeb77d929328b56c","page_id":"C124904191:18","page_url":"https://archive.org/details/C124904191/page/n17","statement_kind":"finding","subject_label":"Sanitary Fill Company facility environmental performance","summary":"The report states the proposed facility could be environmentally superior to land disposal of solid waste.","property":"finding","t_from":"1979","quote":"The proposed Sanitary Fill Company facility could be, on balance, environmentally superior to land disposal of solid waste","anchor":"s-ad759a8214da","shown":false,"hidden":"attachment","part":"attachment","speaker":"another_body","speaker_role":"CSI Resource Systems, Inc. (consultant)","stance":"own_position","speaker_evidence":"The proposed Sanitary Fill Company facility could be, on balance, environmentally superior"},{"claim_id":"c:f5067a38d13447fb654c40fb886424d2","page_id":"C124904191:18","page_url":"https://archive.org/details/C124904191/page/n17","statement_kind":"finding","subject_label":"Environmental review and permits","summary":"The report finds environmental review and permitting are time-consuming and have major impacts on project costs.","property":"finding","t_from":"1979","quote":"Therefore, they have major impacts on project costs","anchor":"s-f5067a38d134","shown":false,"hidden":"attachment","part":"attachment","speaker":"another_body","speaker_role":"CSI Resource Systems, Inc. (consultant)","stance":"own_position","speaker_evidence":"The environmental review and permitting processes are time-consuming. Therefore, they have major impacts"},{"claim_id":"c:1206a5eac1d1e6d7b2f3d434b7ce6c15","page_id":"C124904191:20","page_url":"https://archive.org/details/C124904191/page/n19","statement_kind":"proposal","subject_label":"Sanitary Fill Company facility plan","summary":"The City has been asked to approve Sanitary Fill Company's plan to design, construct and operate the facility.","property":"proposes","t_from":"1979","quote":"The City has been asked to approve Sanitary Fill Company's plan to design, construct, operate","anchor":"s-1206a5eac1d1","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"CONCLUSION: System procurement and project financing require clarification"},{"claim_id":"c:1487949ed4d01b7ad812d4bd52fdf217","page_id":"C124904191:20","page_url":"https://archive.org/details/C124904191/page/n19","statement_kind":"finding","subject_label":"Technical and economic feasibility","summary":"The report says the project appears technically and economically feasible but recovery system performance is uncertain.","property":"finding","t_from":"1979","quote":"Although the proposed resource recovery project appears to be technically and economically feastble","anchor":"s-1487949ed4d0","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"CONCLUSION: Although the proposed resource recovery project appears to be technically"},{"claim_id":"c:817947cf3053681786c6251a5e85b2e2","page_id":"C124904191:20","page_url":"https://archive.org/details/C124904191/page/n19","statement_kind":"proposal","subject_label":"Revenue bond financing agreements","summary":"The report says financing will likely require Rate Board or Board of Supervisors agreements designating the facility as sole disposal site.","property":"proposes","t_from":"1979","quote":"The anticipated revenue bond project financing will likely require that the Rate Board and/or the Board of Supervisors enter into agreements","anchor":"s-817947cf3053","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The anticipated revenue bond project financing will likely require"},{"claim_id":"c:8c338fdfd0aaa4a34dd0d1bd420ee221","page_id":"C124904191:20","page_url":"https://archive.org/details/C124904191/page/n19","statement_kind":"finding","subject_label":"Project financing plan","summary":"The report states a project financing plan cannot be prepared because legal procedures have not been developed.","property":"finding","t_from":"1979","quote":"Consequently, a project financing plan cannot be prepared","anchor":"s-8c338fdfd0aa","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Consequently, a project financing plan cannot be prepared"},{"claim_id":"c:b7c154b5abfe041c96e295116bd9e437","page_id":"C124904191:20","page_url":"https://archive.org/details/C124904191/page/n19","statement_kind":"proposal","subject_label":"Preliminary financing plan","summary":"The report recommends developing a preliminary project financing plan.","property":"recommendation","t_from":"1979","quote":"A preliminary project financing plan should be developed","anchor":"s-b7c154b5abfe","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"RECOMMENDATIONS: Formal legal options on procurement requirements"},{"claim_id":"c:cbfd6c9eb32a42dd635f3355b9fc132e","page_id":"C124904191:20","page_url":"https://archive.org/details/C124904191/page/n19","statement_kind":"background","subject_label":"Massburning waterwall technology","summary":"The report describes massburning waterwall units that burn unprocessed solid waste and produce steam.","property":"other","t_from":"1979","quote":"massburning waterwall units which burn unprocessed solid waste and produce steam","anchor":"s-cbfd6c9eb32a","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Experience with even the most proven resource recovery technologies"},{"claim_id":"c:15b58c0bd411c18133de5c928bbacc64","page_id":"C124904191:21","page_url":"https://archive.org/details/C124904191/page/n20","statement_kind":"finding","subject_label":"Sanitary Fill Company design","summary":"The study finds the Sanitary Fill Company design is probably workable but has no operating experience with similar plants.","property":"finding","t_from":"1979","quote":"Although the Sanitary Fill Company design is probably workable, there is no operating experience with -simi- _lar.plant designs...","anchor":"s-15b58c0bd411","shown":false,"hidden":"unclear","part":"main_text","speaker":"unclear","speaker_role":"CSI Resource Systems, Inc. (consultant writing the report's text)","stance":"own_position","speaker_evidence":"Although the Sanitary Fill Company design is probably workable, there is no operating experience"},{"claim_id":"c:46fd5f1f5cd6edb2a3eaa21913d287d8","page_id":"C124904191:21","page_url":"https://archive.org/details/C124904191/page/n20","statement_kind":"finding","subject_label":"Project risk responsibility","summary":"The City and Sanitary Fill Company have not yet resolved responsibility for managing the major project risks.","property":"other","t_from":"1979","quote":"The City and Sanitary Fill Company have not yet resolved responsibility for managing each of the major project risks, or for assuming the consequences of their occurrence.","anchor":"s-46fd5f1f5cd6","shown":false,"hidden":"unclear","part":"main_text","speaker":"unclear","speaker_role":"CSI Resource Systems, Inc. (consultant writing the report's text)","stance":"own_position","speaker_evidence":"The City and Sanitary Fill Company have not yet resolved responsibility for managing each of the major project risks"},{"claim_id":"c:136f3489495261e6d4fbcaebc7a83ca8","page_id":"C124904191:22","page_url":"https://archive.org/details/C124904191/page/n21","statement_kind":"finding","subject_label":"Financing of resource recovery project","summary":"The report says a San Francisco resource recovery project would likely be financed through revenue bonds.","property":"finding","value_text":"revenue bonds","t_from":"1979","quote":"It is likely in San Francisco that a resource re- covery project would be financed through some form of revenue bonds.","place_label":"San Francisco","anchor":"s-136f34894952","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"CONCLUSION: Regardless of the approach used to pro- cure and finance"},{"claim_id":"c:264a4007508dcbed87b5f3dc769bc697","page_id":"C124904191:22","page_url":"https://archive.org/details/C124904191/page/n21","statement_kind":"proposal","subject_label":"Risk protection options","summary":"The report recommends the City consider a full-service arrangement or a cooperative agreement to protect against technical and economic risks.","property":"recommendation","t_from":"1979","quote":"The City should consider protection agatnst teehntcal and economic risks outstde of tts control through etther: (1) a full-service arrangement with Santtary Ftll Company","anchor":"s-264a4007508d","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"RECOMMENDATION: The City should consider protection"},{"claim_id":"c:3da42623ccb19cb8f0ec41f2cebcd515","page_id":"C124904191:22","page_url":"https://archive.org/details/C124904191/page/n21","statement_kind":"finding","subject_label":"City financial liability","summary":"The report concludes the City will be the ultimate guarantor of the financing and responsible for debt payback if other participants default.","property":"finding","t_from":"1979","quote":"the City wtll be the ulttmate guarantor of the financing and responstble for pay-back of debt tf other partict- pants default--","anchor":"s-3da42623ccb1","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"CONCLUSION: Regardless of the approach used to pro- cure"},{"claim_id":"c:543aea3f85dd6d9e3999c764bdae4134","page_id":"C124904191:23","page_url":"https://archive.org/details/C124904191/page/n22","statement_kind":"finding","subject_label":"Feasibility of proposed project","summary":"The study concludes the proposed resource recovery project is, in concept, a feasible undertaking with costs competitive with landfilling.","property":"finding","value_text":"feasible in concept","t_from":"1979","quote":"the proposed resource recovery project is, in concept, a feasible undertaking; that resultant net disposal costs can be competitive with landfilling","anchor":"s-543aea3f85dd","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"Resource Systems, Inc. (consultant)","stance":"own_position","speaker_evidence":"In summary, Resource Systems' analyses lead toward conclusions that"},{"claim_id":"c:56fed6f5867419e0bcd48ba8c8b9254e","page_id":"C124904191:23","page_url":"https://archive.org/details/C124904191/page/n22","statement_kind":"proposal","subject_label":"Overall project recommendation","summary":"The report recommends that the City proceed to implement the resource recovery concept proposed by Sanitary Fill Company.","property":"recommendation","t_from":"1979","quote":"It is Resource Systems' overall recommendation that, subject to protecting the purposes of the environmental review process, the City proceed to implement the resource recovery concept","anchor":"s-56fed6f58674","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"Resource Systems, Inc. (consultant)","stance":"own_position","speaker_evidence":"It is Resource Systems' overall recommendation that, subject to protecting"},{"claim_id":"c:683985cd575b99aecfd3482797f33922","page_id":"C124904191:23","page_url":"https://archive.org/details/C124904191/page/n22","statement_kind":"proposal","subject_label":"Steps before negotiations","summary":"The report recommends the City determine risks, set performance requirements and define its review role before negotiating.","property":"recommendation","t_from":"1979","quote":"Before entering into negotiations for a resource recovery project, the Ctty should: (1) deter- mine risks tt ts willing to asswne or share","anchor":"s-683985cd575b","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"Resource Systems, Inc. (consultant)","stance":"own_position","speaker_evidence":"RECOMMENDATION: Before entering into negotiations for a resource recovery project, the Ctty should"},{"claim_id":"c:1d43b01ea4b64f22e083aff9fb50b311","page_id":"C124904191:25","page_url":"https://archive.org/details/C124904191/page/n24","statement_kind":"proposal","subject_label":"Alternative waste disposal systems","summary":"The report analyzes alternatives including a modified Sanitary Fill concept, a Split System and a Massburning Waterwall System.","property":"alternative","t_from":"1979","quote":"the Split System where waste is processed at the transfer station and shipped to remote boilers, and the Massburning Waterwall Sys- tem where unprocessed waste is burned to produce steam.","anchor":"s-1d43b01ea4b6","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"SUMMARY OF TECHNICAL FINDINGS; Resource Systems developed performance estimates"},{"claim_id":"c:8f76ede3a93192c0965c38a2b1164537","page_id":"C124904191:25","page_url":"https://archive.org/details/C124904191/page/n24","statement_kind":"finding","subject_label":"Fuel recovery rate estimate","summary":"Resource Systems estimates that 60 percent of incoming waste will be recovered as fuel.","property":"other","value_text":"60 percent","value_num":60.0,"unit":"percent","t_from":"1979","quote":"Resource Systems estimates that 60 percent of the incoming waste will be recovered as fuel.","anchor":"s-8f76ede3a931","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"Resource Systems, Inc.","stance":"quotes_to_report","speaker_evidence":"Resource Systems estimates that 60 percent of the incoming waste"},{"claim_id":"c:bb4679c0bb21fbcee5721105acea2c7c","page_id":"C124904191:25","page_url":"https://archive.org/details/C124904191/page/n24","statement_kind":"proposal","subject_label":"Fuel recovery rate predicted by Sanitary Fill Company","summary":"The Sanitary Fill Company's proposal predicts an 82 percent fuel recovery rate.","property":"other","value_text":"82 percent","value_num":82.0,"unit":"percent","t_from":"1979","quote":"The Sanitary Fill Company's proposal predicts an 82 percent recovery rate.","anchor":"s-bb4679c0bb21","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"Sanitary Fill Company","stance":"quotes_to_report","speaker_evidence":"The Sanitary Fill Company's proposal predicts an 82 percent recovery rate."},{"claim_id":"c:dfbe587b6d2f31126ad870cc24b3543e","page_id":"C124904191:25","page_url":"https://archive.org/details/C124904191/page/n24","statement_kind":"finding","subject_label":"Unprocessible waste","summary":"Unprocessibles are about 2 percent of incoming waste, over 9000 tons per year for the Sanitary Fill system.","property":"other","value_text":"about 2 percent, over 9000 tons per year","value_num":2.0,"unit":"percent","t_from":"1979","quote":"Unprocessibles usually amount to about 2 percent of the incoming waste, or over 9000 tons per year for the system proposed by Sanitary Fill Company.","anchor":"s-dfbe587b6d2f","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"Resource Systems, Inc.","stance":"own_position","speaker_evidence":"Unprocessibles usually amount to about 2 percent of the incoming waste"},{"claim_id":"c:c230c3ab83ea6a90963ad4f9463dabd4","page_id":"C124904191:28","page_url":"https://archive.org/details/C124904191/page/n27","statement_kind":"finding","subject_label":"Landfill disposal costs for hazardous residue","summary":"Disposal costs for hazardous wastes are much higher than for landfilling solid waste.","property":"finding","value_text":"much higher","t_from":"1979","quote":"Because hazardous wastes require special handling, disposal costs are much higher than for the landfilling of solid waste.","anchor":"s-c230c3ab83ea","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"ENVIRONMENTAL EVALUATIONS; CSI RESOURCE SYSTEMS, INC. report text"},{"claim_id":"c:c93ba1a76ee12aac716faa93bfc0c03b","page_id":"C124904191:28","page_url":"https://archive.org/details/C124904191/page/n27","statement_kind":"background","subject_label":"California water quality rules for incinerator ash","summary":"Current California water quality regulations require incinerator ash to be handled as a hazardous material.","property":"other","value_text":"hazardous material","t_from":"1979","quote":"Current California water quality regulations require that incinerator ash be handled as if it were a hazardous material.","place_label":"California","anchor":"s-c93ba1a76ee1","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Residue and Ash Disposal; Current California water quality regulations require"},{"claim_id":"c:d6b4d460270bdf505f8a7c79c12cb217","page_id":"C124904191:28","page_url":"https://archive.org/details/C124904191/page/n27","statement_kind":"finding","subject_label":"Sanitary Fill Company system air emissions","summary":"Resource Systems' analyses indicate that sulfur and nitrogen oxide emissions could exceed the current limit.","property":"other","value_text":"250 pounds per day","value_num":250.0,"unit":"other","t_from":"1979","quote":"Particulate emissions could also exceed the 250 pounds per day limit.","anchor":"s-d6b4d460270b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Air Pollution; Resource Systems' analyses indicate"},{"claim_id":"c:01a47b0aa814bf943200b9601f53b6d8","page_id":"C124904191:29","page_url":"https://archive.org/details/C124904191/page/n28","statement_kind":"proposal","subject_label":"Sanitary Fill Company system commercial start","summary":"Resource Systems estimates the earliest commercial operating date is late 1984.","property":"event","value_text":"late 1984","value_num":1984.0,"date_printed":"late 1984","t_from":"1984","quote":"As shown in Figure 4, Resource Systems estimates that the earliest commercial operating date is late 1984.","anchor":"s-01a47b0aa814","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"As shown in Figure 4, Resource Systems estimates that the earliest commercial operating date is late 1984."},{"claim_id":"c:76a6a59491c12e5ac79675465b8804f5","page_id":"C124904191:29","page_url":"https://archive.org/details/C124904191/page/n28","statement_kind":"proposal","subject_label":"Sanitary Fill Company system commercial start","summary":"The Sanitary Fill Company predicts full commercial operation of its system in 1983.","property":"event","value_text":"1983","value_num":1983.0,"date_printed":"1983","t_from":"1983","quote":"The Sanitary Fill Company predicts that they could begin full commercial operation of their system in 1983.","anchor":"s-76a6a59491c1","shown":false,"hidden":"another_body","part":"main_text","speaker":"another_body","speaker_role":"Sanitary Fill Company","stance":"quotes_to_report","speaker_evidence":"The Sanitary Fill Company predicts that they could begin full commercial operation"},{"claim_id":"c:face7b2d5833b71dc93a6bfc4718ac74","page_id":"C124904191:29","page_url":"https://archive.org/details/C124904191/page/n28","statement_kind":"finding","subject_label":"New city-owned sanitary landfill sites","summary":"A preliminary investigation identified four locations where new city-owned sanitary landfills could be developed.","property":"finding","value_text":"four locations","value_num":4.0,"unit":"other","t_from":"1979","quote":"A preliminary investigation identified four locations where new city-owned sanitary landfills could be developed.","anchor":"s-face7b2d5833","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"A preliminary investigation identified four locations where new city-owned sanitary landfills could be developed."},{"claim_id":"c:1f9a87e26b01f546418e2367061ca77a","page_id":"C124904191:30","page_url":"https://archive.org/details/C124904191/page/n29","statement_kind":"finding","subject_label":"Environmental review schedule","summary":"Resource Systems believes a minimum of nine months will be needed after construction for mechanical modifications.","property":"finding","value_text":"nine months","value_num":9.0,"unit":"other","t_from":"1979","quote":"Resource Systems believes that a minimum of nine months will be needed after the system is built to accomodate the inevitable mechanical modifica-","anchor":"s-1f9a87e26b01","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"consultant, CSI Resource Systems, Inc.","stance":"own_position","speaker_evidence":"Resource Systems believes that a minimum of nine months"},{"claim_id":"c:6c46cfa27c0ef3c39e9bf7579d8293b5","page_id":"C124904191:30","page_url":"https://archive.org/details/C124904191/page/n29","statement_kind":"proposal","subject_label":"Mass-burning waterwall net disposal cost","summary":"The massburning waterwall is estimated at $18 (≈ $58.37 in 2026 dollars) per ton.","property":"cost_usd","value_text":"$18 per ton","value_num":18.0,"unit":"USD","date_printed":"1984","t_from":"1984","quote":"The split system is expected to cost $29 per ton, and the massburning waterwall $18 per ton.","anchor":"s-6c46cfa27c0e","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"consultant, CSI Resource Systems, Inc.","stance":"own_position","speaker_evidence":"ECONOMIC REVIEW. The split system is expected to cost $29 per ton"},{"claim_id":"c:872c7f71f90c5634f6941389942c3dc0","page_id":"C124904191:30","page_url":"https://archive.org/details/C124904191/page/n29","statement_kind":"proposal","subject_label":"Sanitary Fill Company concept net disposal cost","summary":"The Sanitary Fill Company concept is expected to dispose of City waste at a net cost of $27 (≈ $87.56 in 2026 dollars) per ton in 1984.","property":"cost_usd","value_text":"$27 per ton","value_num":27.0,"unit":"USD","date_printed":"1984","t_from":"1984","quote":"The Sanitary Fill Company concept is expected to dispose of City waste for a net cost of $27 per ton in 1984.","anchor":"s-872c7f71f90c","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"consultant, CSI Resource Systems, Inc.","stance":"own_position","speaker_evidence":"The Sanitary Fill Company concept is expected to dispose of City waste"},{"claim_id":"c:b1e87aa95dc40d96b45094753884043a","page_id":"C124904191:30","page_url":"https://archive.org/details/C124904191/page/n29","statement_kind":"proposal","subject_label":"Split system net disposal cost","summary":"The split system is expected to cost $29 (≈ $94.04 in 2026 dollars) per ton.","property":"cost_usd","value_text":"$29 per ton","value_num":29.0,"unit":"USD","date_printed":"1984","t_from":"1984","quote":"The split system is expected to cost $29 per ton, and the massburning waterwall $18 per ton.","anchor":"s-b1e87aa95dc4","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"consultant, CSI Resource Systems, Inc.","stance":"own_position","speaker_evidence":"The split system is expected to cost $29 per ton"},{"claim_id":"c:e77aa880af02c250f87cccebcd4e53e0","page_id":"C124904191:30","page_url":"https://archive.org/details/C124904191/page/n29","statement_kind":"finding","subject_label":"Competitiveness with 1984 landfill costs","summary":"The Sanitary Fill Company concept is competitive with the expected 1984 landfill cost of $22 (≈ $71.34 in 2026 dollars) to $30 (≈ $97.29 in 2026 dollars) per ton.","property":"other","value_text":"$22 to $30 per ton","value_num":22.0,"unit":"USD","date_printed":"1984","t_from":"1984","quote":"Regardless of the final disposition of furnace ash, the Sanitary Fill Company concept is competitive with the expected 1984 sanitary landfill cost of $22 to $30 per ton.","anchor":"s-e77aa880af02","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"consultant, CSI Resource Systems, Inc.","stance":"own_position","speaker_evidence":"Regardless of the final disposition of furnace ash, the Sanitary Fill Company concept is competitive"}]}