{"note":"Statements read from one scanned government report in the IGS library collection on the Internet Archive. Each statement has a verbatim quote found on its page (quote, page_url). The summary and subject_label of each statement were written by a model (Claude Haiku 5.5) and can be wrong: read the page before quoting. At most 20 selected pages of a report were read. Keys are the column names of the tables igs_reports and igs_claims; a column that is null for a statement is left out, and columns with one value for every statement of this report are given once under same_for_every_statement. \"[name withheld]\" stands where the release withholds a name; the site's page guard withholds a few more in reports after 1951, so a cell here can differ from the table; for a few reports prepared_by and creator are left out. A statement's links to the Board record are under links (show_target_kind: decision, instrument or ballot measure; show_target_id; show_url); they replace the table's decision_id and instrument_id, which are left out. place_id, place_label and place_precision come from a corrected place match where there is one. part, speaker, speaker_role, stance and speaker_evidence say who is speaking: a model (Claude Haiku 5.5) read each page and its context and can be wrong. part: main_text, attachment, appendix, letter, comment, response, table or cover_or_contents; speaker: issuer, another_body, letter_writer or unclear; speaker_role: a role or organisation, never a personal name; stance: own_position, quotes_to_dispute, quotes_to_report, restates_to_reject or unclear. The report page shows a statement only when speaker is issuer, part is main_text or appendix, and stance is own_position or quotes_to_report; hidden gives the part, the speaker or the stance of the others. ","release":"v0.9.2","licence":"CC0-1.0","slug":"c124904960","url":"https://data.qipu.org/usa/san-francisco/reports/c124904960/","statement_url":"https://data.qipu.org/usa/san-francisco/reports/c124904960/#{anchor}","tables":{"igs_reports":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_reports.parquet","igs_claims":"https://tiles.qipu.org/data/releases/v0.9.2/parquet/igs_claims.parquet"},"report":{"report_id":"C124904960","source_id":"C124904960","title":"Final report Balboa and Francisco Reservoirs needs assessment","year":1990,"n_pages":373,"creator":null,"source_url":"https://archive.org/details/C124904960","issuer":"City and County of San Francisco, Public Utilities Commission (San Francisco Water Department)","issuer_type":"government","gov_level":"city_county","prepared_by":"LeedsHill-Herkenhoff, Inc. / AGS, Inc.","doc_kind":"study","jurisdiction":"San Francisco","jurisdiction_id":"sf","city":"sf","issuer_by":"model","doc_kind_by":"model","jurisdiction_by":"model","run_id":"igs-labels-rules+haiku55-cli-2026-10-23"},"pages_with_statements":7,"statements_total":28,"statements_by_kind":{"finding":15,"proposal":12,"cites_decision":0,"background":1},"same_for_every_statement":{"source_id":"C124904960","source_url":"https://archive.org/details/C124904960","source_label":"IGS library: Final report Balboa and Francisco Reservoirs needs assessment","report_year":1990,"issuer":"City and County of San Francisco, Public Utilities Commission (San Francisco Water Department)","issuer_type":"government","doc_kind":"study","t_from":"1990","t_precision":"year","status":"extracted","claim_kind":"observation","extraction_table":"igs_claims","run_id":"igs-sf-pages-v2-haiku55-batch-2026-10-23","city":"sf","prompt_version":"igs-page-v2-2026-10-23"},"summary":{"what":"A study by the City's Public Utilities Commission assessing the need for and upgrades to the Balboa and Francisco Reservoirs and the water supply they serve.","figures":[{"label":"Cost","value":"about $4.3 million (1990 dollars)","claim_ids":["c:6e2a961a132d20758f4551e377a57fdf"]},{"label":"Storage","value":"5.8 million gallons raised Francisco","claim_ids":["c:177d2353d7af3852d1b58ae8b479a8a9"]},{"label":"Balboa capacity","value":"150 million gallons at 312 feet","claim_ids":["c:9a015af274fa4ed6760580afa5bf9e95"]},{"label":"Reserve storage","value":"3.3 days of reserve storage","claim_ids":["c:c41c7116f745b8d04da69943f12ca4b1"]}],"main_points":["c:e8856b7647d9e92460496891e0c4ea15","c:177d2353d7af3852d1b58ae8b479a8a9","c:b9834619e4577e8c226b39881a6909f6"],"board_decisions_after":[],"board_decisions_before":[],"made_by":"A model (Claude Haiku 5.5) wrote the lead and picked the figures, main points and later Board decisions from the statements, from a second reading of the report's summary and cost pages, and from Board decisions dated 3 years before to 10 years after the report; every number it wrote was checked against them, and a figure must be about the report's own area or project."},"statements":[{"claim_id":"c:05bfce001cf3e22fc16d2c4cfd214681","page_id":"C124904960:35","page_url":"https://archive.org/details/C124904960/page/n34","statement_kind":"finding","subject_label":"Balboa Reservoir basins use","summary":"The two Balboa Reservoir basins have never been used for water storage.","property":"other","value_text":"never used for water storage","quote":"The two asphalt-concrete lined basins have never been used for water stora,c.","place_label":"Balboa Reservoir","place_precision":"site","place_id":"qipu:sf/place/reservoir/balboa-reservoir","resolved_by":"place links file","anchor":"s-05bfce001cf3","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"CHAPTER 2 NEED FOR BALBOA AND FRANCISCO RESERVOIRS"},{"claim_id":"c:1751b687cd7b182baef61c73e34de4f9","page_id":"C124904960:35","page_url":"https://archive.org/details/C124904960/page/n34","statement_kind":"background","subject_label":"City pressure zones","summary":"The City is subdivided into eleven principal pressure zones fed by gravity from reservoirs.","property":"other","value_text":"eleven principal pressure zones","value_num":11.0,"quote":"The City of San Francisco is subdivided into eleven principal pressure zones, each fed by gravity from reservoirs with capacities ranging from 1.1 to 176.7 million gallons.","place_label":"City of San Francisco","anchor":"s-1751b687cd7b","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"OVERVIEW OF FACILITIES The City of San Francisco is subdivided"},{"claim_id":"c:26cbfadd0ba30d22d6aad817267c987d","page_id":"C124904960:35","page_url":"https://archive.org/details/C124904960/page/n34","statement_kind":"finding","subject_label":"Balboa Reservoir north basin","summary":"The north basin is presently used as a parking lot for the College.","property":"use","value_text":"parking lot for the College","date_printed":"present","quote":"The north basin is presently used as a parking lot for the College.","place_label":"Balboa Reservoir north basin","place_precision":"site","place_id":"qipu:sf/place/reservoir/balboa-reservoir-north-basin","resolved_by":"place links file","anchor":"s-26cbfadd0ba3","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Balboa Reservoir The two Balboa Reservoir basins are located"},{"claim_id":"c:9a015af274fa4ed6760580afa5bf9e95","page_id":"C124904960:35","page_url":"https://archive.org/details/C124904960/page/n34","statement_kind":"proposal","subject_label":"Balboa Reservoir capacity when filled","summary":"When filled, the two Balboa Reservoir basins would hold 150 million gallons at an overflow elevation of 312 feet.","property":"other","value_text":"150 million gallons at 312 feet overflow","value_num":150000000.0,"unit":"gallons","quote":"When filled, the total capacity of the two reservoir basins would be 150 million gallons at an overflow elevation of 312 feet.","place_label":"Balboa Reservoir","place_precision":"site","place_id":"qipu:sf/place/reservoir/balboa-reservoir","resolved_by":"place links file","anchor":"s-9a015af274fa","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"When filled, the total capacity of the two reservoir basins"},{"claim_id":"c:b9834619e4577e8c226b39881a6909f6","page_id":"C124904960:35","page_url":"https://archive.org/details/C124904960/page/n34","statement_kind":"proposal","subject_label":"Relining or repair of Balboa Reservoir","summary":"It may be necessary to repair small cracks in the lining or reline the entire reservoir to fill and use the basins.","property":"proposes","value_text":"repair cracks or reline reservoir","quote":"In order to fill and use the basins it may be necessary to repair small cracks in the lining or reline the entire reservoir.","place_label":"Balboa Reservoir","place_precision":"site","place_id":"qipu:sf/place/reservoir/balboa-reservoir","resolved_by":"place links file","anchor":"s-b9834619e457","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In order to fill and use the basins it may be necessary"},{"claim_id":"c:f7cca78893008cb11c35afd5facffe0e","page_id":"C124904960:35","page_url":"https://archive.org/details/C124904960/page/n34","statement_kind":"finding","subject_label":"Existing gravity storage","summary":"Table 2-1 shows over 412 million gallons of gravity-flow potable water storage within the City.","property":"other","value_text":"over 412 million gallons","value_num":412000000.0,"unit":"gallons","quote":"Table 2-1 shows over 412 million gallons (MG) of gravity- flow, potable water storage within the City.","place_label":"City of San Francisco","anchor":"s-f7cca7889300","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Table 2-1 shows over 412 million gallons (MG)"},{"claim_id":"c:8d75a054973785d21cbf2f8936d01cbd","page_id":"C124904960:101","page_url":"https://archive.org/details/C124904960/page/n100","statement_kind":"finding","subject_label":"Maximum day demand factor","summary":"A 150 percent ratio of maximum day to average day demand was agreed upon by City staff and is used for all pressure zones.","property":"other","value_text":"150 percent of average day","value_num":150.0,"unit":"percent","quote":"For this study, a 150 percent ratio of maximum day to average day demand was agreed upon by City staff and is used for all pressure zones.","place_label":"City of San Francisco","anchor":"s-8d75a0549737","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"For this study, a 150 percent ratio of maximum day to average day demand was agreed upon"},{"claim_id":"c:9906af587a6aa8c3e54fd810c193d971","page_id":"C124904960:101","page_url":"https://archive.org/details/C124904960/page/n100","statement_kind":"finding","subject_label":"EBMUD maximum day factor","summary":"EBMUD uses a maximum day factor of 170 percent of average day for areas west of the Berkeley/Oakland hills.","property":"other","value_text":"170 percent of average day","value_num":170.0,"unit":"percent","quote":"East Bay Municipal Utility District (EBMUD) uses a maximum day factor of 170 percent of average day for areas west of the Berkeley/Oakland hills.","place_label":"Berkeley/Oakland hills","anchor":"s-9906af587a6a","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"East Bay Municipal Utility District (EBMUD) uses a maximum day factor of 170 percent"},{"claim_id":"c:b64ea0391494cb3b9dfc66d5cf002491","page_id":"C124904960:101","page_url":"https://archive.org/details/C124904960/page/n100","statement_kind":"finding","subject_label":"Peak hour demand factor","summary":"A 225 percent ratio of peak hour demand to average day demand was agreed upon and is used for all pressure zones.","property":"other","value_text":"225 percent of average day","value_num":225.0,"unit":"percent","quote":"A 225 percent ratio of peak hour demand to average day demand was agreed upon and is used for all pressure zones.","place_label":"City of San Francisco","anchor":"s-b64ea0391494","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"A 225 percent ratio of peak hour demand to average day demand was agreed upon"},{"claim_id":"c:bf4a75c149f8e7e2bc302619c163cffb","page_id":"C124904960:101","page_url":"https://archive.org/details/C124904960/page/n100","statement_kind":"finding","subject_label":"Balboa Reservoir location","summary":"Balboa Reservoir is located adjacent to the Crosstown pipeline and at an elevation intermediate to Sunset and College Hill reservoirs.","property":"other","value_text":"adjacent to Crosstown pipeline","quote":"Balboa Reservoir is located adjacent to the Crosstown pipeline connecting Sunset and College Hil] Reservoirs, and is at an elevation intermediate to these reservoirs.","place_label":"Crosstown pipeline","anchor":"s-bf4a75c149f8","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Balboa Reservoir is located adjacent to the Crosstown pipeline"},{"claim_id":"c:e7a6754b9d19f7d7dffb298abf3cc5ad","page_id":"C124904960:101","page_url":"https://archive.org/details/C124904960/page/n100","statement_kind":"finding","subject_label":"Share of City water demand","summary":"University Mound, Sunset, and College Hill pressure zones account for 80 percent of total City water demand.","property":"other","value_text":"80 percent of total City demand","value_num":80.0,"unit":"percent","quote":"Taken together, University Mound, Sunset, and College Hill pressure zones account for 80 percent of total City water demand.","place_label":"City of San Francisco","anchor":"s-e7a6754b9d19","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Taken together, University Mound, Sunset, and College Hill pressure zones account for 80 percent"},{"claim_id":"c:0a2635637bf316ed8a15875c7b823b85","page_id":"C124904960:121","page_url":"https://archive.org/details/C124904960/page/n120","statement_kind":"finding","subject_label":"Embankment slope deformation","summary":"The ESA study predicts permanent seismically-induced deformation of 1 to 2 inches in the embankment slopes.","property":"other","value_text":"1 to 2 inches","quote":"The ESA study predicts a permanent seismically-induced deformation on the order of 1 to 2 inches in the embankment slopes during the maximum credible earthquake.","anchor":"s-0a2635637bf3","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The ESA study predicts a permanent seismically-induced deformation"},{"claim_id":"c:2128015778e939f915092cdff5387357","page_id":"C124904960:121","page_url":"https://archive.org/details/C124904960/page/n120","statement_kind":"proposal","subject_label":"Embankment seismic response analysis","summary":"The report suggests a two-dimensional dynamic analysis could model the embankment seismic response more realistically.","property":"other","value_text":"two-dimensional dynamic response analysis","quote":"However, a two-dimensional dynamic response analysis of the embankment could model the seismic response of the embankment more realistically","anchor":"s-2128015778e9","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"However, a two-dimensional dynamic response analysis of the embankment could model"},{"claim_id":"c:6c0e906ce4b3b95c99feae1b153dcff2","page_id":"C124904960:121","page_url":"https://archive.org/details/C124904960/page/n120","statement_kind":"finding","subject_label":"Southern embankment foundation soils","summary":"The ESA study found that a dense soil zone has liquefaction potential during the maximum credible earthquake.","property":"finding","value_text":"liquefaction potential","quote":"The ESA study indicates that a dense zone of foundation soils (with SPT blow counts ranging from 32 to 50) in the southeast corner of the southern embankment has liquefaction potential during the maximum credible earthquake.","anchor":"s-6c0e906ce4b3","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The ESA study indicates that a dense zone of foundation soils"},{"claim_id":"c:d3b6d3d8ae70fe940c927e0742925340","page_id":"C124904960:121","page_url":"https://archive.org/details/C124904960/page/n120","statement_kind":"finding","subject_label":"Borings B-4 to B-9 soils","summary":"The MKE study concludes that a medium dense sand zone in Borings B-4 to B-9 is liquefiable under a maximum credible earthquake.","property":"finding","value_text":"liquefiable","quote":"The MKE study concludes that a zone of medium dense sand to silty sand materials, encountered in Borings B-4, B-5, B-6, B-7, B-8, and B-9 is liquefiable under a maximum credible earthquake","anchor":"s-d3b6d3d8ae70","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"quotes_to_report","speaker_evidence":"The MKE study concludes that a zone of medium dense sand"},{"claim_id":"c:6e2a961a132d20758f4551e377a57fdf","page_id":"C124904960:141","page_url":"https://archive.org/details/C124904960/page/n140","statement_kind":"proposal","subject_label":"Francisco Reservoir upgrade","summary":"The report estimates the Francisco Reservoir upgrade will cost about $4.3 million (≈ $11.1 million in 2026 dollars) in 1990 dollars.","property":"cost_usd","value_text":"about $4.3 million","value_num":4300000.0,"unit":"USD","date_printed":"1990 dollars","quote":"The estimated cost to upgrade the Francisco Reservoir will be about $4.3 million dollars.","place_label":"Francisco Reservoir","anchor":"s-6e2a961a132d","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"The estimated cost to upgrade the Francisco Reservoir will be about $4.3 million dollars."},{"claim_id":"c:1b004567bb31008dcf3698b38082da91","page_id":"C124904960:209","page_url":"https://archive.org/details/C124904960/page/n208","statement_kind":"proposal","subject_label":"Balboa Reservoir gravity supply to College Hill","summary":"The report says Balboa Reservoir could supply College Hill directly by gravity if the College Hill system fails.","property":"proposes","value_text":"direct, gravity-fed supply","quote":"Balboa Reservoir could provide a direct, gravity-fed supply in the event of a failure of the College Hill supply system.","place_label":"Balboa Reservoir","place_precision":"site","place_id":"qipu:sf/place/reservoir/balboa-reservoir","resolved_by":"place links file","anchor":"s-1b004567bb31","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Balboa Reservoir could provide a direct, gravity-fed supply"},{"claim_id":"c:4a89aff77dd33e5c5488d714e1c95ceb","page_id":"C124904960:209","page_url":"https://archive.org/details/C124904960/page/n208","statement_kind":"proposal","subject_label":"Francisco Reservoir integration into University Mound system","summary":"The report says integrating Francisco Reservoir would reduce University Mound demand by 2.2 mgd.","property":"proposes","value_text":"reduce demand by 2.2 mgd","value_num":2.2,"unit":"mgd","quote":"Integration of Francisco Reservoir into the University Mound System would reduce the demand on University Mound by 2.2 mgd.","place_label":"University Mound Reservoir","place_precision":"site","place_id":"qipu:sf/place/landmark/university-mound-reservoir","resolved_by":"place links file","anchor":"s-4a89aff77dd3","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Integration of Francisco Reservoir into the University Mound System would reduce"},{"claim_id":"c:76f6804c0c23ed612c58d91a93566362","page_id":"C124904960:209","page_url":"https://archive.org/details/C124904960/page/n208","statement_kind":"proposal","subject_label":"Sunset-Francisco zone connection","summary":"The report says enlarging the Sunset-Francisco connection would give University Mound a secondary supply route.","property":"proposes","value_text":"secondary supply route","quote":"Enlargement of the connection between the Sunset and Francisco zones would provide a secondary supply route to University Mound, without use of the Crosstown pipeline.","place_label":"University Mound Reservoir","place_precision":"site","place_id":"qipu:sf/place/landmark/university-mound-reservoir","resolved_by":"place links file","anchor":"s-76f6804c0c23","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Enlargement of the connection between the Sunset and Francisco zones"},{"claim_id":"c:9466d051bde80dda27e8a8667480f1c2","page_id":"C124904960:209","page_url":"https://archive.org/details/C124904960/page/n208","statement_kind":"proposal","subject_label":"Crosstown pipe line capacity under ultimate demand","summary":"The report estimates that under ultimate demand the Crosstown pipe line would need to carry 53.0 mgd.","property":"other","value_text":"53.0 mgd","value_num":53.0,"unit":"mgd","quote":"Under ultimate demand conditions, the average day capacity that would be required from this line would be 53.0 mgd.","place_label":"Crosstown pipe line","anchor":"s-9466d051bde8","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Under ultimate demand conditions, the average day capacity"},{"claim_id":"c:e8856b7647d9e92460496891e0c4ea15","page_id":"C124904960:209","page_url":"https://archive.org/details/C124904960/page/n208","statement_kind":"finding","subject_label":"Crosstown pipe line maximum day capacity","summary":"The report concludes the Crosstown pipe line cannot handle maximum day demands.","property":"finding","value_text":"does not have the capacity to handle maximum day demands","quote":"Thus the pipeline does not have the capacity to handle maximum day demands.","place_label":"Crosstown pipe line","anchor":"s-e8856b7647d9","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Thus the pipeline does not have the capacity"},{"claim_id":"c:177d2353d7af3852d1b58ae8b479a8a9","page_id":"C124904960:229","page_url":"https://archive.org/details/C124904960/page/n228","statement_kind":"proposal","subject_label":"Francisco Reservoir raised storage","summary":"The report proposes raising Francisco Reservoir to 145 feet, which would provide about 5.8 million gallons of storage.","property":"proposes","value_text":"about 5.8 million gallons","value_num":5800000.0,"unit":"gallons","quote":"Raising Francisco Reservoir to an overflow elevation of 145 feet would provide about 5.8 million gallons of storage, using the footprint of the existing reservoir.","place_label":"Francisco Reservoir","anchor":"s-177d2353d7af","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Emergency Storage Benefits section of the report body"},{"claim_id":"c:43f4d2acf081f84fc3de76472b3192d6","page_id":"C124904960:229","page_url":"https://archive.org/details/C124904960/page/n228","statement_kind":"proposal","subject_label":"Marina District added storage from raised Francisco Reservoir","summary":"The report estimates raising Francisco Reservoir would add 2.1 days of storage for the Marina District.","property":"proposes","value_text":"additional 2.1 days of storage","value_num":2.1,"unit":"days","quote":"This would provide an additional 2.1 days of storage for the Marina District.","place_label":"Marina District","place_precision":"area","place_id":"qipu:sf/place/hood/marina","resolved_by":"place links file","anchor":"s-43f4d2acf081","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"This would provide an additional 2.1 days of storage"},{"claim_id":"c:c41c7116f745b8d04da69943f12ca4b1","page_id":"C124904960:229","page_url":"https://archive.org/details/C124904960/page/n228","statement_kind":"finding","subject_label":"Marina District reserve storage","summary":"The report says the Marina District is currently supplied by University Mound Reservoir, which provides 3.3 days of reserve storage.","property":"other","value_text":"3.3 days of reserve storage","value_num":3.3,"unit":"days","quote":"At present, the Marina District is supplied by the University Mound Reservoir, which provides 3.3 days of reserve storage","place_label":"Marina District","place_precision":"area","place_id":"qipu:sf/place/hood/marina","resolved_by":"place links file","anchor":"s-c41c7116f745","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"At present, the Marina District is supplied by the University Mound Reservoir"},{"claim_id":"c:c96a55b5b257e2bf16b71235b2c52c5a","page_id":"C124904960:229","page_url":"https://archive.org/details/C124904960/page/n228","statement_kind":"proposal","subject_label":"Francisco Reservoir raised to 145 feet","summary":"The report proposes raising the existing Francisco Reservoir to about 145 feet for pressure benefits.","property":"proposes","value_text":"about 145 feet","value_num":145.0,"unit":"ft","quote":"To derive pressure benefits, and to achieve compatibility with the present water system hydraulics, the existing reservoir would be raised to about 145 feet.","place_label":"Francisco Reservoir","anchor":"s-c96a55b5b257","shown":true,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Structural and Geotechnical Feasibility"},{"claim_id":"c:ec42f7ddbc0bc5cef32429cfa03b3788","page_id":"C124904960:229","page_url":"https://archive.org/details/C124904960/page/n228","statement_kind":"proposal","subject_label":"Francisco pressure zone fire flow pipe","summary":"The report says installing 5700 feet of new pipe is required to raise low pressures in the Francisco zone during fire fighting.","property":"proposes","value_text":"5700 feet of new pipe","value_num":5700.0,"unit":"ft","quote":"installation of 5700 feet of new pipe is required.","place_label":"Francisco pressure zone","anchor":"s-ec42f7ddbc0b","shown":false,"part":"main_text","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"In order to adequately raise low pressures in the Francisco pressure zone"},{"claim_id":"c:1cdab5c137d96fbcdbbb4d79f0aa1ac5","page_id":"C124904960:330","page_url":"https://archive.org/details/C124904960/page/n329","statement_kind":"finding","subject_label":"Sunset pressure zone water demand model","summary":"The model reports average day demand for the entire system as 110.5 MGD.","property":"other","value_text":"110.5 MGD","value_num":110.5,"unit":"MGD","quote":"Sunset Max Day Demand Max Day = Ave Day x 1.5 Ave Day = 110.5 MGD for Entire System","place_label":"Sunset pressure zone","anchor":"s-1cdab5c137d9","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"Sunset Max Day Demand Max Day = Ave Day x 1.5 Ave Day = 110.5 MGD"},{"claim_id":"c:d8ab46965f614f9ef4bd795e4d221b1c","page_id":"C124904960:330","page_url":"https://archive.org/details/C124904960/page/n329","statement_kind":"finding","subject_label":"Sunset pressure zone hydraulic model network","summary":"The model network has 311 pipes, 222 junctions, 86 loops and 4 fixed grade nodes.","property":"other","value_text":"311 pipes, 222 junctions, 86 loops, 4 FGNs","value_num":311.0,"quote":"THIS SYSTEM HAS 311 PIPES WITH 222 JUNCTIONS , 86 LOOPS AND 4 FGNS","place_label":"Sunset pressure zone","anchor":"s-d8ab46965f61","shown":false,"hidden":"table","part":"table","speaker":"issuer","speaker_role":"the issuer","stance":"own_position","speaker_evidence":"THIS SYSTEM HAS 311 PIPES WITH 222 JUNCTIONS , 86 LOOPS AND 4 FGNS"}]}